Proposed Bike Lanes for Summer 2021 – Summer 2022 Resurfacing Program Virtual Public Engagement #2 July 25 – August 11, 2021

Transcript of Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Page 1: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Proposed Bike Lanes for Summer 2021 – Summer 2022 

Resurfacing ProgramVirtual Public Engagement #2 July 25 – August 11, 2021

Page 2: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Project Overview

• Six (6) new bike facilities are proposed to be installed as part of the Department of Public Works’ (DPW) annual citywide paving and resurfacing program for FY22 that runs from summer 2021 through summer 2022 • The corridors were identified based on 2015 Richmond Bicycle Master Plan and support the City’s Vision Zero Action Plan by using our Better Streets multimodal approach to improve safety for all • Each proposed project includes safety improvements, such as high‐visibility crosswalks for people who walk, accessible curb ramps for people who roll, and dedicated space for people to bike or scoot

2Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 3: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Project Timeline

Project Identification

Concept Design

Detailed Design Final Design

3Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Construction

May 202

1

April 202

1

March 202

1

June/July 20

21

July/Aug

ust 2

021

Augu

st 202

1

Beginn

ing 

Septem

ber 2

021

We are here!

Page 4: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Proposed Corridors

• Brookland Parkway, from Arthur Ashe Boulevard/Hermitage Road to Brook Road (0.8 miles)• Colorado Avenue, from Hampton Street to Dance Street (0.9 miles)• Grove Avenue, from Shadwell Road to Seneca Road (0.8 miles)• Marshall Street, from 29th Street to 21st Street (0.5 miles)• Walmsley Boulevard, from the west City line to Belmont Road (1 mile) • Warwick Road, from Hull Street to Richmond Highway (3 miles)

4Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 5: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Summary of Public Engagement #1

• The online survey ran from May 16 through May 30, 2021• Concept designs were shown, including cross‐section options for each section/corridor• Respondents rated the options for each section/corridor from “Strongly Approve” to “Strongly Oppose” • Over 1,100 responses recorded (THANK YOU!) • Over 1,200 individual comments received

5Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 6: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Summary of Public Engagement #1

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 6

10%

90%

Do you live in the City of Richmond? 

NOYES

29%

71%

Do you work in the City of Richmond?

NOYES

Page 7: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Summary of Public Engagement #1

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 7

No ‐ I don't bike.(10%)

Yes ‐ I bike and I'm interested, but I am 

concerned about safety.(45%)

Yes ‐ I'm a confident cyclist.

(45%)

Do you ride a bike and how would you describe yourself as a cyclist?

46%57%

94%

7%16%

0%10%20%30%40%50%60%70%80%90%100%

If you currently bike, what is the nature of your biking? 

Page 8: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Public Engagement #2

• Fill out the survey to provide general feedback on each of the proposed projects.Link: https://www.surveymonkey.com/r/YHSG3SR

• Review and comment on the detailed designs. A summary of each corridor is provided in the following slides. Link: https://richmond.konveio.com/bikelanes

• Public comment period open:Sunday, July 25 through Wednesday, August 11, 2021 

8Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 9: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Brookland Parkway – Project Overview

Limits: Arthur Ashe Boulevard/ Hermitage Road to Brook Road

Length: 0.8 miles 

Summary: convert existing parking‐adjacent buffered bike lanes to protected bike lanes 

9Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 10: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Brookland Parkway – May Survey Results

• Presented “Existing Conditions” + 2 Options 1. Curbside parking‐protected bike lanes 2. Median‐side buffered bike lanes with curbside parking

• Received over 1,000 responses and nearly 400 comments • Comments included: • Concerns about speeding and use of the existing buffered bike lane to illegally pass on the right 

• Support for protected bike lanes, like those on nearby Brook Rd • Request for regular sweeping of bike lanes and for physical barrier between parked cars and curbside bike lanes

10Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 11: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Brookland Parkway – May Survey Results

11Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

0

100

200

300

400

500

600

ExistingExisting Conditions

Page 12: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Brookland Parkway – May Survey Results

12Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

0

100

200

300

400

500

600

Option 1Option 1 – Parking‐Protected Curbside Bike Lanes

Page 13: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Brookland Parkway – May Survey Results

13Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

0

100

200

300

400

500

600

Option 2Option 2 – Median‐Side Buffered Bike Lanes

Page 14: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Brookland Parkway – Detailed Design

• Option 1 (Parking‐Protected Curbside Bike Lanes) chosen as preferred alternative, including: • Addition of flexposts within the buffer, similar to what is provided on the nearby Brook Rd lanes • Evaluation of intersections at Rennie Ave/Loxley Rd and Robin Hood Rd  

14Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 15: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Brookland Parkway – Detailed Design

15Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 16: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Brookland Parkway – Detailed Design

16Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 17: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Colorado Avenue – Project Overview

Limits: Hampton Street to Dance Street

Length: 0.9 miles

Summary: no existing bike facility, addition of separated bike lanes

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 17

Page 18: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Colorado Avenue – May Survey Results

• Presented “Existing Conditions” + 3 Options 1. Two‐way cycletrack on 1 side with no on‐street parking 2. One‐way buffered bike lanes (both directions) with no on‐street parking 3. One‐way buffered bike lane on 1 side with parking on opposite side

• Received over 700 responses and nearly 200 comments • Comments included: • Concerns about existing travel speeds• Support for proposed facility to connect nearby schools and parks • Request for physical barrier between the bike lane and adjacent travel lane

18Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 19: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Colorado Avenue – May Survey Results

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 19

0

50

100

150

200

250

300

350

400

ExistingExisting Conditions

* Note: street width varies, most constrained 

section shown

Page 20: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Colorado Avenue – May Survey Results

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 20

0

50

100

150

200

250

300

350

400

Option 1Option 1 – Two‐Way Cycletrack on 1 Side

* Note: street width varies, most constrained 

section shown

Page 21: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Colorado Avenue – May Survey Results

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 21

0

50

100

150

200

250

300

350

400

Option 2Option 2 – One‐Way Buffered Bike Lanes on Each Side

* Note: street width varies, most constrained 

section shown

Page 22: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Colorado Avenue – May Survey Results

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 22

0

50

100

150

200

250

300

350

400

Option 3Option 3 – One‐Way Buffered Bike Lane on 1 Side with Parking 

* Note: street width varies, most constrained 

section shown

Page 23: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Colorado Avenue – Detailed Design

• Option 2 (One‐Way Buffered Bike Lanes on Each Side) chosen as preferred alternative, including: • Addition of flexposts within the buffer, similar to other “protected” bike lane facilities in the City • Retention of 2 existing accessible parking spaces on 1700 block 

• While Option 1 had high percentage of respondents strongly supporting, concerns over accommodating existing GRTC bus stops and turn conflicts at intersections with two‐way cycletrack make Option 2 more favorable

23Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 24: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Colorado Avenue – Detailed Design

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 24

From Hampton Street to Randolph Street From Randolph Street to Dance Street

Page 25: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Colorado Avenue – Detailed Design

25Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 26: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Grove Avenue – Project Overview

Limits: Shadwell Road to Seneca Road

Length: 0.8 miles

Summary: existing shared lane markings (sharrows), addition of separated bike lanes

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 26

Page 27: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Grove Avenue – May Survey Results

• Presented “Existing Conditions” + 3 Options 1. Buffered bike lanes in existing parking lane (parking removed) 2. Curbside parking‐protected bike lanes (1 travel lane in either direction 

removed, parking retained)3. Curbside buffered bike lanes with separate jog lane (1 travel lane in either 

direction and parking removed)

• Received nearly 650 responses and over 200 comments • Comments included: • Concerns over existing speeds and congestion impacts of removing travel lane• Support for facility for use by existing cyclists and joggers 

27Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 28: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Grove Avenue – May Survey Results

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 28

0

50

100

150

200

250

300

350

ExistingExisting Conditions

Page 29: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Grove Avenue – May Survey Results

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 29

0

50

100

150

200

250

300

350

Option 1Option 1 – Buffered Bike Lanes 

Page 30: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Grove Avenue – May Survey Results

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 30

0

50

100

150

200

250

300

350

Option 2Option 2 – Parking‐Protected Bike Lanes 

Page 31: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Grove Avenue – May Survey Results

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 31

0

50

100

150

200

250

300

350

Option 3Option 3 – Buffered Bike Lanes with Jog Lane 

Page 32: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Grove Avenue – Detailed Design

• Option 1 (Buffered Bike Lanes) chosen as preferred alternative• Feedback (strongly approve vs. approve) varied over the 3 options provided, but general support was expressed for the addition of bike facilities along the corridor • Due to short project segment, decision was made to retain 2 travel lanes in either direction at this time • While strong support for a separate “jog lane”, the width of proposed bike lane + buffer should provide enough room for joggers and cyclists 

32Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 33: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Grove Avenue – Detailed Design

33Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 34: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Grove Avenue – Detailed Design

34Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 35: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Marshall Street – Project Overview

Limits: 29th Street to 21st Street

Length: 0.5 miles

Summary: existing shared lane markings (sharrows) on some blocks, addition of treatments as designated “bike‐walk street”

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 35

Page 36: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Marshall Street – May Survey Results

• Presented “Existing Conditions” + 2 Options 1. Shared lane markings with addition of painted centerline 2. Yield street with advisory bike lanes 

• Received over 550 responses and nearly 200 comments • Comments included: • Concerns about existing travel speeds • Concern that addition of centerline would cause people driving to closely pass those cycling• Interest in the “advisory bike lane” concept but concern over the application on this street only leading to confusion 

36Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 37: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Marshall Street – May Survey Results

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 37

Existing Conditions

0

50

100

150

200

250

Existing

Page 38: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Marshall Street – May Survey Results

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 38

Option 1 – Shared Lane Markings with Centerline

0

50

100

150

200

250

Option 1

Page 39: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Marshall Street – May Survey Results

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 39

Option 2 – Yield Street/Advisory Bike Lanes

0

50

100

150

200

250

Option 2

Page 40: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Marshall Street – Detailed Design

• Modified Option 1 (Shared Lane Markings) chosen as preferred alternative, including: • No centerline added, except for short segments (20‐ft) added at intersections to help calm traffic 

• Corner clearance markings to delineate existing on‐street parking • Marked crosswalks at every intersection, including side streets 

• While there was support for the “Advisory Bike Lane” concept, conflicts with existing bus service on a “Yield Street” make the concept infeasible at this time. Also a new type of facility should be Citywide application with robust education effort 

40Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 41: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Marshall Street – Detailed Design

41Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 42: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Marshall Street – Detailed Design

42Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 43: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Walmsley Boulevard – Project Overview

Limits: the west City line to Belmont Road

Length: 1 mile

Summary: no existing bike facility, addition of shoulder‐running bike lanes

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 43

Page 44: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Walmsley Boulevard – May Survey Results

• Presented “Existing Conditions” + 1 Option 1. Paved shoulder‐running bike lanes 

• Received over 500 responses and over 100 comments • Comments include: • Concerns about existing travel speeds and comfort of shoulder bike lanes for those who cycle 

• Request for maintenance of the shoulder, including sweeping of gravel that accumulates • Need for dedicated space for those who walk as current sidewalks end at Belmont Road 

44Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 45: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Walmsley Boulevard – May Survey Results

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 45

Existing Conditions

0

50

100

150

200

250

300

350

Existing

Page 46: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Walmsley Boulevard – May Survey Results

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 46

Option 1 – Shoulder‐Running Bike Lanes

0

50

100

150

200

250

300

350

Option 1

Page 47: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Walmsley Boulevard – Detailed Design

• Moving forward with Option 1 (Shoulder‐Running Bike Lanes)• While there is strong support for the addition of sidewalk, that is unfortunately outside the scope of this project. 

47Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 48: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Walmsley Boulevard – Detailed Design

48Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 49: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Walmsley Boulevard – Detailed Design

49Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 50: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Warwick Road – Project Overview

Limits: Hull Street to Richmond Highway

Length: 3 miles

Summary: no existing bike facility, addition of separated bike lanes

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 50

Page 51: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Warwick Road – May Survey Results

• Presented “Existing Conditions” + 3 Options 1. Curbside buffered bike lanes with wide buffers 2. Buffered bike lanes with standard buffer width and curbside shoulder3. Median‐side buffered bike lanes 

• Received nearly 550 responses and over 125 comments • Comments included: • Support for dedicated bike facility in the Southside and requests for additional protection within the buffer and connections to other nearby facilities

• Support for wide bike lane buffers due to existing travel speeds along corridor• Concerns that the shoulder concept would lead to driving in the bike lane 

51Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 52: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Warwick Road – May Survey Results

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 52

Existing Conditions

0

50

100

150

200

250

300

Existing

* Note: street width varies, section between Hopkins Rd & Belt Blvd shown

Page 53: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Warwick Road – May Survey Results

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 53

Option 1 – Curbside Bike Lanes with Wide Buffers

0

50

100

150

200

250

300

Option 1

* Note: street width varies, section between Hopkins Rd & Belt Blvd shown

Page 54: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Warwick Road – May Survey Results

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 54

Option 2 – Curbside Bike Lanes with Shoulder

0

50

100

150

200

250

300

Option 2

* Note: street width varies, section between Hopkins Rd & Belt Blvd shown

Page 55: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Warwick Road – May Survey Results

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 55

Option 3 – Median‐Side Buffered Bike Lanes

0

50

100

150

200

250

300

Option 3

* Note: street width varies, section between Hopkins Rd & Belt Blvd shown

Page 56: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Warwick Road – Detailed Design

• Option 1 (Curbside Bike Lanes with Wide Buffers) chosen as preferred alternative, including: • Addition of flexposts within the buffer • Two‐stage left‐turn turn boxes to connect to north‐south bike lanes on Broad Rock Road • Additional intersection treatments to align with removal of travel lane along corridor

56Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 57: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Warwick Road – Detailed Design

Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 57

From Hull Street to Belt Boulevard From Belt Boulevard to Richmond Highway

* Note: street width is 1‐ft narrower on either side of median (26’‐6”) between Hull Street and Hopkins Road, where buffer will be 6‐ft

Page 58: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Warwick Road – Detailed Design

58Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2

Page 59: Proposed Bike Lanes for Summer 2021 –Summer 2022 ...

Next Steps

• DPW will use the feedback provided in the survey and on the detailed design plans to finalize the design and plan for each proposed facility before implementation begins in September. • If you have other questions or if you need an alternate way to provide comment, please contact the project manager: 