Report-3 Proposals Approved by State Investment Promotion Board (SIPB) Sl. No. Name of the Company Proposal Proposed Investment (In Crores Rs.) Direct Employ -ment SIPB Approval date CM/ Cabinet approval date 1 M/S Netarhat Alumni Educational Trust (Vidya Vihar Educational Trust), Purnea. Proposal for Establishment of Engineering College in Purnea. 6.74 27.2.06 13.06.06 2 M/S Indian Tractors & Components Pvt. Ltd., New Delhi. (Canceling the earlier name M/S International Tractors Ltd., new name as M/S Indian Tractors & Components Pvt. Ltd. has been approved) Proposal for production of Tractors and Commercial Vehicle at Industrial Area, Fatuha. 150.00 27-2-06 29.09.08 29.09.07 27.01.09 3 M/s Gangotri Iron & Steel Co Ltd., Exhibition Road, Patna. Fax: 0612- 2685959 Phone: 2665456 E-mail: [email protected] Proposal for capacity expansion of the Unit and TMT and M.S. Twisted Bars production 33.8 29-3-06 22.10.06 4 M/s Century Ply Wood Ltd., Kolkata. Cement Manufacturing Company Ltd., Sajjan Bhajanka, Chairman, 281 Deepali Pitampura, New Delhi- 110034 Proposal for establishment of one Million Ton/Year Cement Grinding Plant at Kahalgaon. 119.00 300 17-4-06 08.09.06 5 M/s Raj Laxmi Udyog, C/O Jain Paper Agency , Rajan Complex, Naya Tola , Patna. Off-Set Paper Printing and Paper Conversion (Place has been changed form Hajipur Industrial Area to Industrial Area Fatuha in SIPB meeting on 19.05.08) 1.645 70 19-6-06 19.05.08 25.07.08 6 M/s Lord Buddha Shiksha Prathisthan, Saharsa. Medical College Hospital 100.00 24-7-06 7 M/s Bharat Sugar Mills, Singhwalia, Gopalganj. Expansion of Sugar Mill from 2500 TCD to 5000 TCD and 15 M.W Co- generation Plant 137.00 1-8-06 15.09.06 8 M/S Ramco Industries Ltd, Chennai (Canceling the earlier approval given by SIPB in its meeting held on 16.12.08 on the proposal for establishment of Asbestos Cement Sheet Plant, Water Storage Plant and Cement Grinding Plant ; approval for establishment of 1,20,000 MT/Annum Capacity of Asbestos Cement Sheet Plant and 2 Lakh MT/Annum Capacity of Cement Grinding Plant at Industrial Area, Bihiya, Bhojpur has been given by SIPB in its meeting held on 23.11.09) Proposal for establishment of 1,20,000 MT/Annum Capacity of Asbestos Cement Sheet Plant and 2 Lakh MT/Annum Capacity of Cement Grinding Plant at Industrial Area, Bihiya, Bhojpur. 60.20 200 23.11.09 16.12.08 9 M/S Shakti Sudha Industries, Boring Road,Patna. Establishment of Makhana Processing Unit & with Backward/ Forward linkage 70.00 14-8-06 10 M/S Riga Sugar Co. Expansion of Sugar Mill from 3500 37.98 739 14-8-06 07.11.06

Transcript of Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment...

Page 1: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

Proposals Approved by State Investment Promotion Board (SIPB)

Sl. No.

Name of the Company Proposal Proposed Investment (In Crores Rs.)

Direct Employ -ment

SIPB Approval

date

CM/ Cabinet

approval date 1 M/S Netarhat Alumni

Educational Trust (Vidya Vihar Educational Trust), Purnea.

Proposal for Establishment of Engineering College in Purnea.

6.74 27.2.06 13.06.06

2 M/S Indian Tractors & Components Pvt. Ltd., New Delhi. (Canceling the earlier name M/S International Tractors Ltd., new name as M/S Indian Tractors & Components Pvt. Ltd. has been approved)

Proposal for production of Tractors and Commercial Vehicle at Industrial Area, Fatuha.

150.00 27-2-06 29.09.08

29.09.07 27.01.09

3 M/s Gangotri Iron & Steel Co Ltd., Exhibition Road, Patna. Fax: 0612-2685959 Phone: 2665456 E-mail: [email protected]

Proposal for capacity expansion of the Unit and TMT and M.S. Twisted Bars production

33.8 29-3-06 22.10.06

4 M/s Century Ply Wood Ltd., Kolkata. Cement Manufacturing Company Ltd., Sajjan Bhajanka, Chairman, 281 Deepali Pitampura, New Delhi-110034

Proposal for establishment of one Million Ton/Year Cement Grinding Plant at Kahalgaon.

119.00 300 17-4-06 08.09.06

5 M/s Raj Laxmi Udyog, C/O Jain Paper Agency , Rajan Complex, Naya Tola , Patna.

Off-Set Paper Printing and Paper Conversion (Place has been changed form Hajipur Industrial Area to Industrial Area Fatuha in SIPB meeting on 19.05.08)

1.645 70 19-6-06 19.05.08

25.07.08

6 M/s Lord Buddha Shiksha Prathisthan, Saharsa.

Medical College Hospital 100.00 24-7-06

7 M/s Bharat Sugar Mills, Singhwalia, Gopalganj.

Expansion of Sugar Mill from 2500 TCD to 5000 TCD and 15 M.W Co-generation Plant

137.00 1-8-06 15.09.06

8 M/S Ramco Industries Ltd, Chennai (Canceling the earlier approval given by SIPB in its meeting held on 16.12.08 on the proposal for establishment of Asbestos Cement Sheet Plant, Water Storage Plant and Cement Grinding Plant ; approval for establishment of 1,20,000 MT/Annum Capacity of Asbestos Cement Sheet Plant and 2 Lakh MT/Annum Capacity of Cement Grinding Plant at Industrial Area, Bihiya, Bhojpur has been given by SIPB in its meeting held on 23.11.09)

Proposal for establishment of 1,20,000 MT/Annum Capacity of Asbestos Cement Sheet Plant and 2 Lakh MT/Annum Capacity of Cement Grinding Plant at Industrial Area, Bihiya, Bhojpur.

60.20

200

23.11.09 16.12.08

9 M/S Shakti Sudha Industries, Boring Road,Patna.

Establishment of Makhana Processing Unit & with Backward/ Forward linkage

70.00 14-8-06

10 M/S Riga Sugar Co. Expansion of Sugar Mill from 3500 37.98 739 14-8-06 07.11.06

Page 2: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

2 Ltd.,Netajee Subash Road, 2nd Floor, Kolkata. (Consent has been given on proposal of extension of period till 31.03.2011 for capacity expansion of existing Sugar Mill to 5000 TCD in SIPB meeting held on 25.02.11)

TCD to 5000 TCD, 7.7 Megawatt Co-generation Plant and 50 KLPD Distillery at Sitamadhi

25.02.11

11 M/S Harinagar Sugar Mills Ltd. West Champaran.

Capacity expansion of Sugar Mill from 8500 TCD to 10000 TCD

39.96 2112 14-8-06 07.09.06

12

M/S New Swadeshi Sugar Mills, Narkatiaganj (Proposal for capacity expansion of Distillery Plant in two phases form 30 KLPD to 60 KLPD and 60 KLPD to 100 KLPD has been approved in SIPB Meeting on 18.05.09)

Capacity expansion of Sugar Mill from 5000 TCD to 7500 TCD, capacity expansion of Distillery Plant from 30 KLPD to 60 KLPD and 60 KLPD to 100 KLPD(in two phases) and 5 M.W. Co-generation Plant.

107.40 728

21-8-06 18.05.09

30.11.06

13 M/s Patna Notre Dame Sister's Society, Patliputra, Patna.

Establishment of Media arts and Communication.

3.32 21-8-06

14 M/S Ambuja Cements Ltd. at P.O- Ambuja Nagar, Taluka- Kodinar, Dist.- Junagadh, Gujarat-362715

Establishment of Cement Grinding Plant of 1.5 Million Ton Capacity and 15 MW Co-generation Plant at Barh

380.00 150 21-8-06 19.02.07 22.05.07

11.09.07

15 M/s Balmukund Concast Ltd., Patna.

Capacity expansion of MS Rod and Steel Production from 28350 MTA to 52350 MTA in the Bihta (Mahadeopur,Fulari)Unit.

13.96 175 06-9-06 22.10.06

16 M/s Harinagar Sugar Mills Ltd., Harinagar, W. Champaran. (Proposal has been rectified from 45 KLPD Distillery Plant to Distillery Plant for production of 45 KLPD Ethanol/50 KLPD Total Spirit)

Establishment of Distillery Plant for production of 45 KLPD Ethanol/50 KLPD Total Spirit.

45.00 89 06-9-06 29.09.08

22.10.06

17 M/s Vishnu Sugar Mills Ltd., Gopalganj.

Capacity expansion of Sugar Mill from 5000 TCD to 7500 TCD.

41.00 26-9-06 02.12.06

18 M/s Protech Feed Pvt. Ltd.)., Hajipur. (Name has been changed from M/S Protech Bio-System to M/S Protech Biosciences Pvt. Ltd.) (Company’s proposal approved by SIPB on 02.01.08 for production of LVP in the name of M/S Protech Biosciences Pvt. Ltd has been amended and consent has been given for establishment of 48,000 MT per year capacity Cattle and Poultry Feed unit at E.P.I.P, Hajipur in the name of M/S Protech Feed Pvt. Ltd.)

Establishment of 48,000 MT per year capacity Cattle and Poultry Feed unit at E.P.I.P, Hajipur

14.70

60

26-9-06 02.01.08 27.08.10

06.01.07 19.03.11

19 M/s M.P. Chini Industries Ltd. , Majahaulia, West Champaran.

Capacity expansion of Sugar Mill from 3500TCD to 5000 TCD.

24.35 565 9.10.06

15.12.06

Page 3: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

3 (Consent has been given for proposal of extension of period till 31.12.2011 for 2nd phase capacity expansion of Sugar Mill from 4300 TCD to 5000 TCD in SIPB meeting held on 08.03.10)

08.03.10

20 M/S Hasanpur Sugar Mills, Hasanpur Road, Samastipur. (Approval has been given on time extension proposal for completing 2nd phase expansion work till December, 2013 of existing Sugar Mill at Hasanpur, Rosera, Samastipur in SIPB meeting held on 28.06.13.)

Expansion of Sugar Mill First phase - 1750 TCD to 3000 TCD.(Investment-Rs99.094 Crores) Second phase- 3000 TCD to 5000 TCD.(Investment-Rs 50.956 Crores)

150.050 532 23.10.06 28.06.13 (Consent with Condition)

05.01.07

21 M/S Poorvanchal Urja Pvt. Ltd., R.Z.-1/57, Tuglakabad Extension, New Delhi-110019

Establishment of 1 MW Renewable Energy Power Plant (Biomass Based Power Plant in Buxar Industrial Area)

4.00 22 23.10.06 (Consent in principle with condition)

22 M/s Riga Sugar Co. Ltd., Kolkata. E-mail: dhanukas @cal2.vsnl.net.in

2500 TCD to 5000 TCD Expandable (within three years) Sugar Mill and 15 Megawatts Co-generation Plant at Nayagaon, Darbhanga

161.46 400 06.09.06 06.11.06

09.01.07

23 M/S Vishnu Sugar Mills Ltd., Gopalganj.

Proposal for establishment of 45 KLPD Distillery Plant and 15 MW Co-generation Plant in factory situated at Gopalganj

94.06 400 13.11.06 26.12.06

24 M/S J.H.V Distilleries & Sugar Mills Limited, Marhowrah, Saran(Chapra)

Establishment of 6000 TCD Sugar Mill , 25 MW Co-generation Plant at Marhowrah, Dist.- Saran (Chapra)

172.54 450 04.12.06 06.02.07

25 M/S Winsome International Ltd., Unit:-Rameshwara Jute Mills, 301,Viashno Chambers(3rd.Floor) 6,Brabourne Road, Kolkata-1

Proposal for establishment of new Jute Mill of 100 MT/day at Purnea/Kishanganj in Bihar

61.00 3121 15.01.07 (Consent in principle)

26 M/S Patwari Steels Pvt. Ltd. , 6-M, Rajendra Nagar, Patna-16,

Proposal for expansion of production capacity of Steel Ingot, M.S. Bar and Rod and production of Cast Grinding Media Ball.

5.08 15.01.07 Proposal noted

27 M/S Madina Educational Welfare Trust, Swarnim, East Boring Canal Road, Patna.

Establishment of Engineering College at Darbhanga(Simri, P.O.-Birdipur, Dist.-Darbhanga)

12.50 57 01.02.07 (Consent in principle)

10.05.08

28 M/S Rakesh Eatables and General Products Pvt. Ltd., B-4, Industrial Area, Hajipur, Vaishali,-844101 (Canceling earlier name of the company M/S Rakesh Masala Pvt. Ltd, the new name as " M/S Rakesh Eatables and General Products Pvt. Ltd." has been approved in SIPB meeting on 14.08.08")

Setting up a Food Processing Unit at Hajipur Industrial Area/Export Zone

1.37 16 19.02.07 (Consent in principle) 14.08.08

29 M/S Jas Infrastructure and Power Ltd, Mahabir Tower,

Establishment of 2640 MW coal based Thermal Power Plant in two

11120.00

5000 12.03.07 (Consent in

11.03.08

Page 4: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

4 Main Road, Ranchi (Amending the earlier proposal approved on 11.07.08 and approval has been given on change of company’s name from M/S Jas Infrastructure Capital Pvt. Ltd. to Jas Infrastructure and Power Ltd for the same project on 26.05.11)

phases (each phase 2x660 MW) at Banka. (Proposal for 2640 MW Thermal Power Plant in place of 1215(9x135MW) MW Thermal Power Plant)

principle) 12.04.07 11.07.08 26.05.11

30 M/S Nandi Soaps Private Ltd., Raxaul

Establishment of soap manufacturing plant at Raxual

6.414 142 19.03.07 21.05.07

31 M/S Saran Renewable Energy Pvt. Ltd., Chapra

Generation of 240 K.W Electricity from Biomass based Gasification System at Garkha, Saran.

1.45 14 19.03.07

32 M/S Prachin Bharat Tourism, , Kalptaru Apartment, Bangalore E-mail: [email protected]

Establishment of Integrated Tourist Park at Nepura, Silao, Nalanda

5.00 100 19.03.07 (Consent in principle on concept of proposal) 08.10.07 (Consent )

14.11.07

33 M/s Cement Manufacturing Co. Ltd., Kolkata.

Proposal for establishment of 2x250 MW Thermal Power Plant at Kahalgaon

1650.00 225 26.03.07

34 M/S Pinax Steel Industries Pvt. Ltd., VII/ 1&2 Industrial Estate, Patliputra, Patna-13

Manufacturing of M.S Ingot by setting of Induction Furnace at Devkuli , Bihta

8.67 69 07.05.07(Consent in principle)

10.05.08

35 M/S M J & Sons Distillery & Breweries Private Ltd., Jankivilla, Near Pushpanjali Plaza , Vasant Vihar Colony, Boring Rd., Patna-1

Setting up of Extra Neutral Alcohol Plant based on food grains at Amarpur, Banka.

36.70 375 07.05.07(Consent in principle)

09.10.07

36 M/S Birla Corporation Ltd., Birla Building,9/1,RN Mukharji Road, Kolkata,-700001

Setting up of 1 Million TPA Cement grinding Unit at Barh, Patna.

155.00 350 25.06.07(Consent in principle)

17.06.08

37 M/S Angpradesh Handloom Park Pvt. Ltd., Bhagalpur.

Establishment of Handloom Park under Cluster Business Plan at Bhagalpur.

27.5 5000 16.07.07 (Consent in principle)

38 M/S Saran Renewable Energy Pvt. Ltd., Chapra

Generation of 10 MW Electricity from Biomass based Gasification System at Garkha, Saran.

50.80 20 24.09.07 (Consent in principle)

39 M/S Vaishali Kisan Uday Sugar Mills Pvt. Ltd., Patna. (Consent has been given for establishment of 1400 TCD Gur Khandsari unit at Tarwa, Majhaulia, Chochahi Chapra Panchayat, Anchal-Paru, Muzaffarpur in SIPB meeting held on 11.08.10)

Proposal for establishment of 5000 TCD Sugar Mill, 72 KLPD Ethanol Plant and 26 MW Captive Power Plant at Vill.- Chochahi-Chapra, Anchal- Paru, Muzaffarpur. (Proposal for starting of 500 TCD Mini Sugar Mill at Jita Chapra Block-Pakri Basrat has been approved with condition on 17.08.09) (Proposal for establishment of 1400 TCD Gur Khandsari unit at Tarwa, Majhaulia, Chochahi Chapra Panchayat, Anchal-Paru, Muzaffarpur.)

155.18 22.5917

440 150

24.09.07 (Consent in principle) 17.08.09 11.08.10

13.05.08

40 M/S Sai Iron India Ltd., Didarganj, Patna

Establishment of second Rolling Mill in the Campus of existing Rolling Mill

42.39 367 24.09.07 (Consent in

15.02.08

Page 5: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

5 at Sabalpur, Didarganj, Patna. principle)

41 M/S Maurya Sugar Pvt. Ltd., 47/B Sahadeo Mahato Marg, Sri Krishna Puri, Patna- 800001

Setting up of 3500 TCD Sugar Mill, 120 KLPD Distillery Plant & 16 MW Co-generation Power Plant at Vill- Gurwalia Bishwash, Anchal- Chanpatia, Dist.- W. Champaran.

241.95 330 24.09.07 (Consent in principle)

23.09.08

42 M/S Steel Authority of India Ltd., Bokaro Steel Plant, Bokaro

Establishment of 1.55 Lakh Ton Steel Processing Unit at Kumarbagh, Bettiah.

160.63 293 24.09.07 (Consent in principle)

11.03.08

43 M/s Gangotri Iron & Steel Co Ltd., 307 Ashiana Tower, Exhibition Road, Patna. E-mail: [email protected]

Establishment of 15 MTx 2 Nos. Induction Furnace, Concast unit, Oxygen Plant , Wire Rod Plant & A Rerolling Mill of 300 TPD to manufacture Thermax TMT Bars Plant at Bihta, Patna

50.00 570 08.10.07 (Consent in principle)

31.01.08

44 M/S Steel Authority of India Ltd., Bokaro Steel Plant, Bokaro

Establishment of 1.07 Lakh TPA Steel Processing Unit at Sahdei, Vaishali

318.75 250 08.10.07 (Consent in principle)

21.02.08

45 M/S Prachin Bharat Tourism, Kalptaru Apartment, Bangalore

Establishment of Multi Media Museum at Nalanda

0.20 20 22.10.07 (Consent in

principle)

46

M/S Globe Sugar Refinery Ltd, Berger House, 5th Floor, 129, Park Street, Kolkata (Change of name of the company from M/S Kamlapur Sugar Refinery Limited to M/S Globe Sugar Refinery Ltd has been approved in SIPB meeting on 18.05.09)

Establishment of 8000 TCD Sugar Mill, 120 KLPD Ethanol Plant and 26 MW Co-generation Plant at Sariatpur-Chakia, East Champaran

248.80 106.10 132.90

450 60 30

29.10.07 (Consent in principle) 18.05.09

04.03.08

47 M/S Jagdamba Ispat (P) Ltd., Nasriganj, Danapur, Patna.

Capacity expansion of 5400 MT/Year MS Ingot at present established unit at Danapur

1.675 15 29.10.07 (Consent in principle)

48 M/S Babu Cold Storage, Pilkhan Road, Chura Patti, Kishanganj

Establishment of 5200 MT/Year capacity Cold Storage for Vegetable and Food Preservation at Chura Patti, Kishanganj

1.81 07 29.10.07 (Consent in principle)

49 M/S Laxmivinayak Ventures Pvt. Ltd., Malsalami, Patna City

Establishment of one Lakh Ton /Year Detergent Powder production Plant at Hajipur. (Place has been changed from Bihta to Hajipur)

20.00 20 29.10.07 (Consent in principle) 21.4.08

14.06.08

50 M/S P. M. R. Educational Trust, 2036, 15 th Main Road, Anna Nagar, West Chennai-600040

Setting up of Engineering College in Bihar

35.00 02.01.08

30.03.08

51 M/S Ganga Power & Natural Resources Ltd., 14 th Netaji Subhas Road, 2nd Floor, Kolkata-700001 (Name has been changed form M/S Neepaz Thermal Energy Ltd to Adhunik Power & Natural Resources Ltd.) (Company’s proposal approved by SIPB on 01.02.10 for establishment of 1320 MW Thermal Power Plant at Kahalgaon, Bhagalpur in the name of M/S Adhunik Power & Natural Resources Ltd has

Proposal for establishment of 2640 MW Coal based Thermal Power Plant in two phases at Pirpainti, Bhagalpur (Approval has been given for establishment of 1320 MW in place of 1000 MW in SIPB meeting held on 1.2.10) (Company’s proposal approved on 29.06.10 for establishment of 1320 MW Thermal Power Plant at Pirpainti Block, Bhagalpur has been amended and approval has been given for establishment of 2640 MW Coal based Thermal Power Plant in two phases at Pirpainti, Bhagalpur in

15079 1450 02.01.08 09.06.08 01.02.10 29.06.10 12.01.11

23.09.08

Page 6: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

6 been amended and consent has been given to establish that project at Pirpainti Block, Bhagalpur in the new name as M/S Ganga Power & Natural Resources Ltd in SIPB Meeting held on 29.06.10)

SIPB meeting held on 12.01.11)

52 M/S Subhas Projects and Marketing Ltd., 22 Camac Street, Block-A, 3rd Floor, Kolkata-700016

Setting up of 1200 MW Thermal Power Plant at Rampur, Dist.- Lakhisarai, Bihar

5000.00 400 02.01.08

53 M/S India Power Corporation Ltd., Vishwakarma, 86 C, Topsia Road(South), Kolkata-700046 (Company's proposal approved by SIPB on 02.01.08 for establishment of 1650 MW Coal Based Thermal Power Plant in Bihar has been amended and consent has been given for establishment of 1320 (2x660) MW Coal Based Thermal Power Plant at Indragachi, Sangrampur(Areraj), East Champaran in SIPB meeting held on 21.07.10)

Establishment of 1320 (2x660) MW Coal Based Thermal Power Plant at Indragachi, Sangrampur (Areraj), East Champaran

7280.00 650 02.01.08 21.07.10

05.04.11

54 M/S P & M Infrastructure Pvt. Ltd., 47/B, Sahdeo Mahto Marg, Sri Krishna Puri, Patna-1

Setting up of Bodh Gaya Resort at Bodh Gaya

18.41 250 02.01.08 (Consent in principle)

55 M/S Maurya Sugar Pvt. Ltd., Sri Krishna Puri, Patna-1

Setting up of 3500 TCD expendable up to 6000 TCD Sugar Complex at Kharkatwa, Dhonar Devli, Ramgarhwa,EastChamparan

171.96 330 02.01.08

11.03.08

56 M/S Nalanda Power Company Limited, R.P.G. Group, C.E.S.C House, Chaurangi Square, Kolkata- 700001 (Name has been changed form M/S C.E.S.C. Limited to M/S Nalanda Power Company Limited)

Setting up of 1800 MW Coal based Thermal Power Plant at Pirpainti or other suitable place.

7290.00 02.01.08 09.06.08

26.03.08 12.08.08

57 M/S Neutral Publishing House Ltd.(Prabhat Khabar), Old By Pass Road, Kankarbagh, Patna- 20

Proposal for establishment of Printing, Publishing of News Papers and Publishing of Periodical at Patna, Bhagalpur and Muzaffarpur

38.62 502 25.02.08 25.07.08

58 M/S Amrapali Foods Ltd., Ujjawal, 2nd Floor, Opposite Planetarium, Bailey Road, Patna

Proposal for establishment of Food Park at Muzaffarpur, Vaishali (Hajipur).

125.00 25.02.08

59 M/S Bihar Agro Projects Ltd, 19, R.N. Mukherjee Road, Kolkata-1

Proposal for establishment of Food Park at Bhagalpur

75.00 25.02.08

60 M/S Amit Oil Ltd., Allahabad Proposal for establishment of Solvent Extraction Plant at Kaimur

7.50 57 25.02.08 25.07.08

61 M/S I.L. & F.S, 4 B, 1st Floor, S.K. Puri, Patna

Proposal for establishment of 500 MW Power Plant in Muzaffarpur District

2223.40 500 25.02.08 (with condition)

62 M/S Amrapali Agro Foods Proposal for establishment of Fresh 2.253 228 25.02.08 04.06.09

Page 7: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

7 Pvt. Ltd., Ujjawal, 2nd Floor, Bailey Road, Patna

Fruits and Vegetable Unit at Muzaffarpur

(Consent in principle)

63 M/S Reliance Industries Ltd. Establishment of 5 MW Solar Power Plant at Patna

25.02.08 (Consent inprinciple)

64 M/S Medical World 4U Ltd., M.D- Dr. Ashok Kumar, 49 Truman Drive, High Beech, Saint Leonards-on-Sea, East Sussex, TN- 377 TH , U.K.

Company's proposal for establishment of Dental College and Para Medical College in the name of Lord Buddha International Institute of Medical Science

148.87 25.02.08

65 M/S Titagarh Biotech Pvt. Ltd., Kolkata

Establishment of Jatropha based Bio-diesel Plant at Banka

51.00 40 25.02.08

66 M/S Punrasar Jute Park Limited, 404, Vaishno Chamber, 6, Brabourne Road, Kolkta.

Establishment of Jute Hessian Cloth/Sacking Bags, Jute Yarn and Jute Twine industry at Moranga Industrial Area, Purnea (Canceling the above proposal, consent has been given for Jute Park at Moranga Industrial Estate in SIPB meeting on 19.05.08)

40.00 10000 17.03.08 (Consent in principle) 19.05.08

03.08.08

67 M/S M. D. International , Fatuha, Patna. (Approval was given on 17.3.08 in SIPB meeting for establishment of Mineral Powder production unit at Fatuah, Patna. Again on company’s request approval has been given for establishment of 40,800 MT per year capacity Wall Putty/Decorative Cement Paint production unit in the place of Mineral Powder in proprietorship at Industrial Area, Fatuha, Patna in the SIPB meeting held on 24.05.13.)

Proposal for establishment of 40,800 MT per year capacity Wall Putty/Decorative Cement Paint production unit in proprietorship at Industrial Area, Fatuha, Patna

2.4492 50 17.03.08 (Consent in principle)

24.05.13

68 M/S Tiger Warehousing Cold Chain Pvt. Ltd., 508, Dalamal House, Nariman Point, J.B. Road, Mumbai, Maharastra (Company's name has been changed form M/S Central Warehousing Cold Chain Pvt. Ltd to M/S Tiger Warehousing Cold Chain Pvt. Ltd on 09.02.09,)

Establishment of Warehousing, Container Freight and Cold Storage at Hajipur

49.75 105 09.02.09 17.03.08 (Consent in principle)

04.06.09

69 M/S Era Agritech(I) Pvt. Ltd., 153 Okhla Industrial Area, Phase-III, New Delhi.

Establishment of Agro Business Centre and Primary Processing Centre in Bihar

84.70 300 17.03.08 (Consent in principle)

70 M/S PTC Bermaco Green Energy Systems Ltd., D 73/1 TTC, Industrial Area , Navi Mumbai (Company’s name has been changed from M/S Bermaco Energy Systems Ltd to M/S PTC Bermaco Green Energy Systems Ltd on 29.06.09)

Establishment of 12 MW Biomass Power Plant at Sasaram- Rohtas.

56.7988 92 17.03.08 29.06.09 28.09.11

71 M/S Navran Advanced Nano Products Development

Proposal for Production Polymerised Toner for Business Network Laser

32.00 17.03.08

Page 8: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

8 International Pvt. Ltd., 109, M.I.G, Kankarbagh Colony, Patna.

Printer

72 M/S Amrapali Foods Limited, Ujjwal, II Floor, Opposite Planetarium, Bailey Road, Patna

Proposal for expansion and Modernisation of Fruits and Vegetable Processing Unit at Hajipur Industrial Area.

2.28 15 17.03.08 31.05.08

73 M/S Maurya-Patna, Bihar Hotels Ltd, South Gandhi Maidan, Patna

Proposal for establishment of New Maurya Hotel Tower and expansion of existing Hotel

35.74 180 17.03.08 (Consent with condition)

74 M/S Krishak Bharti Cooperative Ltd., A-10, Sector-1, Noida-201301, Dist. Gautambudh Nagar(U.P.)

Proposal for establishment of 1320 MW coal based Power Project at Bihta/ Lakhisarai/Banka/Dehri

6200.00 800 17.03.08 (Consent in principle)

75 M/S Apollo Hospitals Enterprise Limited, Ali Tower, 55, Greams Road, Chennai

Establishment of state-of- art hospital, accommodation, educational and training infrastructure under Health Care Infrastructure.

40.00 376 21.04.08 (Consent in principle)

25.07.08

76 M/S Maharshi DAV Educational Trust, Haryana

Establishment of College for Engineering & Diploma Course at Muzaffarpur

4.06 30 19.05.08 ) (with condition)

25.07.08

77 M/S R.N.Dwivedi Foundation, Patna

Establishment of Composite Educational Complex at Patliputra Industrial Estate

10.08 227 19.05.08 (Consent in principle with condition)

78 M/S Triton Energy Limited, "Indiabulls House" 448-451, Udyog Vihar, Phase-V, Gurgaon-122001

Establishment of 1320 MW coal based mega thermal power plant at vill Kochar, Tehsil-Barun, Dist.-Aurangabad. (Change of place from Navinagar, Aurangabad to vill- Kochar, Tehsil-Barun, Dist.-Aurangabad has been approved in SIPB meeting on 19.10.09)

6573.50 400 09.06.08 (Consent in principle) 19.10.09

29.12.09

79 M/S Essar Steel Limited, 11 K K Road, Mahalaxmi, Mumbai-400034

Proposal for establishment of call center at Bhagalpur and Patna

250.00 2000 09.06.08

80 M/S Jhunjhunwala Vanspati Ltd., Jhunjhunwala Bhawan, Nati Imli, Varanasi(U.P)

Establishment of 225000 MT/A Refined Edible Oil Plant at Dehri (Rohtas)

95.00 171 11.07.08 14.08.08

81 M/S Jay Shri Ram Annapurna Rice Mill Pvt. Ltd, Rohtas

Establishment of Rice Mill at Kailani, Rohtas

1.7325 10 11.07.08 14.08.08

82 M/S India Greenfuel Pvt. Ltd., 241, Okhla Industrial Estate, Phase- III, New Delhi- 110020

Establishment of 5000 TCD Sugar Mill, 175 KLPD Distillery Plant and 25 MW Bagasse based Co-generation Plant at Khajooriya, Areraj, East Champaran

240.00 325 11.07.08 (Consent in principle)

83 M/S Licchavi Foundation, Hajipur( Vaishali)

Establishment of B.Ed. Teacher's Training Institute at Hajipur, Vaishali.

1.61 19 11.07.08 (Consent with condition)

08.09.08

84 M/S ITC Limited, Indian Tobacco Division, P.O- Basdeopur Munger(Bihar)-811202

Establishment of Milk Processing Plant at Sitakund, Munger

100.90 140 14.08.08 31.07.14

85 M/S Ramadhar Singh Cold Establishment of Multi Purpose and 3.58 26 14.08.08 15.11.08

Page 9: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

9 Storage Pvt. Ltd., Bharhopur, Ganjpar, Ekma, Saran-841208

Multi Chambered Cold Storage at Ganjpar, Ekma, Saran.

86 M/S Essar Power (Jharkhand) Limited, Next to Tirath Mansion, Near Over Bridge, Main Road, Ranchi

Establishment of Thermal Power Plant of 3x600 MW capacity at Pirpainti, Bhagalpur.

8130.00 2200 29.09.08 (Consent with condition)

87 M/S Jain Agro Distilleries Pvt Ltd., 306, Akash Deep Building, 26-A, Barakhamba Road, New Delhi-110001

Establishment of 45 KLPD Distillery Plant at Bighaijaghish, Tehsil-Hathua(Mirganj, Gopalganj (Cancelling earlier approved place which was at Chitauli, Siwan and new place as Bighaijaghish, Tehsil-Hathua(Mirganj), Gopalganj has been approved on 09.2.09)

29.69 100 09.02.09 29.09.08

11.02.10

88 M/S Astonfield Renewable Resources Pvt. Ltd., 28, Naresh Mitra Sarani, Kolkata.

Establishment of 100 MW (10x10 MW) Biomass based Power Plant in 10 district clusters in Bihar

598.00 45 29.09.08

89 M/S All India Asian Educational Foundation, 3&4, Industrial Area, Jasola (Sarita Vihar), New Delhi-110025

Proposal for opening of Technical Institute at Patna.

51.00 19 29.09.08

90 M/S Birsa Institute of Technology, Ratu Road, Ranchi

Establishment of Engineering College in Bihar.

29.09.08

91 M/S Narayan Chikitsalay, Rohtas

Establishment of Medical College at Sasaram Road, Jamuar, Rohtas.

29.09.08 (Consent with condition)

92 M/S Malti Holy health & Welfare Society, Arrah, Pakri, Bhojpur.

Establishment of Medical College and Hospital at Arrah, Bhojpur.

29.09.08 (Consent with condition)

93 M/S Sona Auto Agriculture Pvt. Ltd., Abhishek Plaza, 2nd Floor, Exhibition Rd. Patna.

Proposal for manufacturing of Agriculture Implements unit at Fatuha Industrial Area.

12.70 59 29.09.08

94 M/S East West Power Generation Company Ltd., Maharastra

Proposal for establishment of 1000 MW coal based Thermal Power Plant at Kahalgaon/Aurangabad

5000.00 700 18.11.08 (Consent in-principle with condition)

95 M/S Sri Durga Agro Energy Ltd, Station Road, Buxar.

Proposal for establishment of Rice Mill, Solvent Extraction Plant and 15 MW Co-generation Plant at Bhagra Kudra, Kaimur.

141.00 265 18.11.08 (Consent in-principle with condition)

96 M/S Emergent Ventures India Pvt. Ltd, Gurgaon, Haryana (On request of M/S Emergent Ventures India Pvt. Ltd for its Gaya project, approval has been given to its new subsidiary company namely M/S Tathagata Bio Energy Pvt. Ltd for establishment of 12 MW Biomass based Power Plant at vill- Churi, Dist.-Gaya and for its Kaimur project also approval has been given to new SPV company namely M/S Mundeshwari Bio Energy

Proposal for establishment of 12 MW biomass based Power Plant in each district namely Nalanda, Nawada, Jehanabad, Arwal, Bhojpur, Patna and Banka.

358.00 90 18.11.08 (Consent in-principle with condition) 12.01.11

Page 10: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

10Pvt. Ltd for establishment of 12 MW Biomass based Power Plant at Kaimur, Bhabhua in SIPB meeting held on 12.01.11) (On request of M/S Emergent Ventures India Pvt. Ltd for its Rohtas project newly formed subsidiary company M/S Sanmati Bio Energy Pvt. Ltd for 12 MW Biomass based Power Plant at Songwa, Rohtas and for its Aurangabad project newly formed subsidiary company M/S Harit Bio Energy Pvt. Ltd for 12 MW Biomass based Power Plant at Barwa, Aurangabad have been approve on 26.05.11.)

26.05.11

97 M/S Shahi Foundation, Gannipur, Muzaffarpur

Proposal for establishment of Engineering College at Dighra, Mushari, Muzaffarpur.

6.99 38 18.11.08 (Consent with condition)

98 M/S ESVEEGEE STARCH AND CHEMICALS PVT. LTD., Ahmedabad.

Proposal for establishment of Maize Processing Unit at Imadpur Raghunathpur, Block- Bhagwanpur, Dist.- Vaishali

90.00 250 18.11.08 22.12.08

99 M/S Siddhashram Rice Mills Cluster Pvt. Ltd., Rambag, Buxar.

Proposal for establishment of Rice Mill and 2 MW Rice Husk based Power Plant at Chausa, Buxar

14.30 250 18.11.08 (Consent with condition)

04.06.09

100 M/S Manju Makhana Enterprises Pvt. Ltd, Madhubani. (Unit's proposal approved by SIPB on 18.11.08 for establishment of Makhana Storage Godown and Mechanised Packaging Facilities in the name of M/S Manju Udyog, has been amended and consent has been given for establishment of Makhana Processing and 200 MT Warehouse at Sapta, Rahika, Madhubani in the name of M/S Manju Makhana Enterprises Pvt. Ltd. in SIPB meeting held on 11.08.10)

Proposal for establishment of Makhana Processing and 200 MT Warehouse at Sapta, Rahika, Madhubani.

0.80 15 18.11.08 11.08.10

04.06.09

101 M/S Institute of Chartered Accountant of India, Frazer Road, Patna.

Proposal for establishment of a Branch of Chartered Accountant of India at Patna

18.11.08 (Consent with condition)

102 M/S Prachin Bharat Tourism, Bangalore.

Establishment of following proposals based on outsourcing:- (a) Management of Tourist

Information Centre using new technology.

(b) Development and management of Website of Bihar State Tourism Development Corporation(BSTDC) using 2.0

18.11.08 (Consent with condition)

Page 11: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

11Technology.

103 M/S Bihar Starch Ltd, Khagaria.

Proposal for establishment of Maize Processing Unit at Kothia, Kashimpur, Khagaria.

17.11 91 18.11.08 (Consent in-principle)

28.12.08

104 M/S Jaiprakash Associates Ltd., New Delhi.

Proposal for establishment of capacity of 1 Million Ton Flyash based Cement Grinding Plant at Motipur, Muzaffarpur

18.11.08 (Consent in-principle with condition)

105 M/S Archi Breweries Pvt Ltd, Birchand Patel Marg, R Block, Patna

Proposal for establishment of Beer Plant with capacity of 1 lakh HLPA at Parew, Bihta, Patna.

9.63 45 16.12.08

106 M/S PTC Bermaco Green Energy Systems Ltd, Navi Mumbai, Maharastra (Earlier, in the SIPB's 63rd meeting held on 16.12.08 consent was given for establishment of Biomass based Power Plant for 300 MW(12x25 number) at 25 different places and in the SIPB's 66th meeting on 29.06.09 consent was given for 12 MW Biomass based Power Plant at Rohtas. Again on company's request, consent has been given on 28.09.11 for establishment of 312 MW(26x12) Biomass based Power Plant at 26 different places, Bikramganj-Rohtas, Dinara-Rohtas, Durgawati-Kaimur, Kudra-Kaimur, Dumraon-Buxar, Jagdishpur-Bhojpur, Gaunaha-West Champaran, Bettiah-West Champaran, Motihari-East Champaran and Sasaram-Rohtas, Purnea, Samastipur, Bihta-Patna, Belaganj-Gaya, Aurangabad, Marhaura-Saran, Siwan, Katihar, Saharsa, Banka, Udakishanganj-Madhepura, Rafiganj-Aurangabad, Rahika-Madhubani, Forbesganj-Araria, Gopalganj and Supaul.)

Proposal for establishment of 300 MW Biomass Power Plant in 25 different places ( 12 MW in each place) - Bikramganj-Rohtas, Dinara-Rohtas, Durgawati-Kaimur, Kudra-Kaimur, Dumraon-Buxar, Jagdishpur-Bhojpur, Gaunaha-West Champaran, Bettiah-West Champaran, Motihari-East Champaran, Purnea, Samastipur, Bihta-Patna, Belaganj-Gaya, Aurangabad, Marhaura-Saran, Siwan, Katihar, Saharsa, Banka, Udakishanganj-Madhepura, Rafiganj-Aurangabad, Rahika-Madhubani, Forbesganj-Araria, Gopalganj and Supaul.)

1254.25 2300 16.12.08 (Consent with condition) 28.09.11

01.06.13 (For Gaunaha, West Champaran) 23.06.13 (For Jagdishpur, Bhojpur)

107 M/S Geneva Software Technologies Ltd, Bangalore

Proposal for working in the field of Disaster Information Management and Enterprise Solution at Patna.

16.12.08

108 M/S Meera Comtrade Pvt Ltd, Exhibition Road, Patna (Change of name of the company from M/S Meera Enterprises to M/S Meera Comtrade Pvt Ltd has been approved in SIPB meeting on 18.05.09)

Proposal for establishment of Cold Storage with proposed capacity of 40 MT, Agri Marketing Yard and Dry Warehouse with proposed capacity of 400 MT under Rural Agri Business Centre at Narkatiabazar, East Champaran.

3.861 100 16.12.08 18.05.09

11.07.09

109 M/S Bhartiya Agro Products Pvt Ltd, Bettiah

Proposal for establishment of Cold Storage with proposed capacity of 6150 MT, Dry Warehouse with proposed capacity of 5000 MT, Agri Input

9.319 280 16.12.08

Page 12: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

12Marketing and Agri Output Marketing Project at Bettiah

110 M/S Jai Kisan Food Products Pvt Ltd, Sasaram

Proposal for establishment of Modern Rice Mill with proposed capacity of 4 MT per hour, Warehousing with proposed capacity of 5000 MT and Packaging project with proposed capacity of 4 MT per hour at Chandwa, Rohtas.

5.3851 150 16.12.08 04.06.09

111 M/S Vindhyabasini Rice Mills Cluster Pvt Ltd, Nokha, Rohtas (Change of name of the company from M/S Sunil Kumar Singh to M/S Vindhyabasini Rice Mills Cluster Pvt Ltd has been approved in SIPB meeting on 18.05.09)

Proposal for establishment of Modern Rice Mill with proposed capacity of 7 MT per hour, Warehouse with proposed capacity of 10,000 MT and Packaging Project with proposed capacity of 4 MT per hour at Nokha, Rohtas.

10.38 200 16.12.08 18.05.09

11.07.09

112 M/S Shivjee Modern Rice Mill Pvt Ltd, Konar, Sasaram

Proposal for establishment of Modern Rice Mill with proposed capacity of 4 MT per hour, Warehouse with proposed capacity of 5000 MT and Packaging Project with proposed capacity of 4 MT per hour at Konar, Shiv Sagar, Rohtas.

4.715 150 16.12.08 04.06.09

113 M/S Indsolar Renewables Pvt. Ltd., Harihar Singh Road, Morabadi, Ranchi. (Canceling the company's earlier approved proposal to set up 5 MW Solar Thermal Power Project with earlier name(Indsolar India) and approval has been given for establishment of 2 MW Power Plant based on Solar Photo Voltaic Technology and 3 MW Solar Thermal Power Generation Plant with it's new name as Indsolar Renewables Pvt. Ltd. in SIPB meeting on 19.10.09)

Establishment of 2 MW Power Plant based on Solar Photo Voltaic Technology and 3 MW Solar Thermal Power Generation Plant at Aurangabad

26.74 20 09.02.09 (Consent in-principle) 19.10.09

114 M/S Nalanda Biscuit Company Ltd, Khagaul Road, Nayatola, Phulwarisharif, Patna

Proposal for capacity expansion of existing Biscuit manufacturing unit at Phulwarisharif from 10,750 MT per year to 16,750 MT per year.

3.38 269 09.02.09

115 Prachin Bharat Tourism, Bangalore

Establishment of Multimedia Museum at Bodh Gaya

0.2471 09.02.09

116 M/S All India Asian Educational Foundation, 3&4, Industrial Area, Jasola (Sarita Vihar), New Delhi-110025

Establishment of Institute of Medical Sciences, Dental Sciences and Nursing Sciences at Patna

150.00 09.02.09 (Consent with condition)

117 M/S SREI Infrastructure Finance Limited, 'Vishwakarma' 86 C, Topsia Road(South), Kolkata.

Establishment of 5 MW Grid Interactive Solar Power Plant at Jamalpur

116.00 30 09.02.09 (Consent with condition)

118 M/S Taj Trading Company, Chhatia, Bhatgama, Purnea East, Purnea

Establishment of Warehousing and Packaging Facility for Makhana at Purnea.

0.936 55 09.02.09

119 M/S Employees' State Insurance Corporation, Patna

Establishment of Medical College and Hospital at Patna

201.00 500 09.02.09

120 M/S Lakhisarai Bijlee Establishment of 1320(660x2) MW Coal 6810.00 600 09.02.09 10.05.11

Page 13: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

13Company Pvt. Ltd., New Delhi

based Thermal Power Project at Kajra, Lakhisarai

121 M/S Buxar Bijlee Company Pvt. Ltd., New Delhi

Establishment of 1320 MW Coal based Thermal Power Project at Chausa, Buxar

6795.00 600 09.02.09 10.05.11

122 M/S Shristi Infrastructure Development Corporation Ltd. Kolkata

Establishment of Five Star Hotel in Patna and International Tourist Resort at Bodh Gaya in PPP mode and Golf Course

18.05.09 (Consent with condition)

123 M/S Steel Authority of India Ltd., Bokaro Steel Plant, Bokaro

Establishment of Steel Processing Unit of TMT Bar with the capacity of one lakh Ton per year at Gaya

88.76 179 18.05.09 07.08.09

124 M/S Chaitanya Gurukul Trust, Gopalganj.

Establishment of Educational Institution as- Model School from class 1 to 12, Degree Engineering College and Research and Development at Chamanpura, Gopalganj

30.00 200 18.05.09 (Consent in-principle)

125 M/S Tirupati Balajee Nutrition Pvt. Ltd., Patna

Establishment of Flour Mill with the capacity of 45,000 MT per year at Khedalpura, Bihta, Patna.

5.56 103 18.05.09 07.08.09

126 M/S Royal Engineering and Cold Storage Pvt. Ltd., Siwan.

Establishment of Cold Storage with the Capacity of 5000 MT at Pakwaliya, Dhrundha, Siwan.

1.5 15 18.05.09 16.09.09

127 M/S Hindustan Petroleum Corporation Ltd, Mumbai.

Establishment of 3500 TCD Capacity of Sugar Mill, 60 KLPD Capacity of Ethanol Plant and 20 MW Co-generation Plant at Lauriya, West Champaran.

304.39 375 29.06.09 (Consent with condition)

128 M/S Hindustan Petroleum Corporation Ltd, Mumbai.

Establishment of 3500 TCD Capacity of Integrated Sugar Mill, 60 KLPD Capacity of Ethanol Plant and 20 MW Co-generation Plant at Sugauli, East Champaran.

309.15 375 29.06.09 (Consent with condition)

129 M/S Nibhi Industries Pvt. Ltd, Mylapore, Chennai

Establishment of 1,00,000 (One Lakh) MT Capacity Asbestos Fiber Cement Corrugated Sheet, Flat Sheet and Accessories and Light Weight Fly Ash Block Plant at Industrial Growth Centre, Giddha, Ara (Change of place from Dariapur, Chapra to Industrial Growth Centre, Giddha, Ara has been approved in SIPB meeting on 19.10.09)

31.00 125 29.06.09 (Consent with condition) 19.10.09

130 M/S Parijat Next Gen Energy Pvt. Ltd, Bangalore.

Establishment of 15 MW (2x7.5 MW) Biomass based Power Plant at Bihiya, Bhojpur.

73.00 30 29.06.09 (Consent with condition)

131 M/S Bajaj Buildcon Pvt. Ltd, Patna.

Establishment of Resort, Water Park and Educational Development at Patna.

285.00 29.06.09 (Consent with condition)

132 M/S Kanika Buildcon Pvt. Ltd, Patna

Establishment of Mall-cum- Multiplex, Health and Medical, Educational Development and Residential Complex at Patna.

365.00 29.06.09 (Consent with condition)

133 M/S Sukhjit Starch & Chemicals Limited, Phagwara, Punjab.

Establishment of two Warehouse with the capacity of 5000-5000 MT at Naugachia(Bhagalpur) and Gulzarbagh (Purnea).

12.62 50 29.06.09 (Consent with condition)

13.12.09

134 M/S Sahu Agro Business Pvt. Establishment of Cold Storage with 4.21 64 29.06.09 13.12.09

Page 14: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

14Ltd, Bhagalpur. capacity of 3000 MT, Warehouse

with capacity of 1100 MT and Pack House with the capacity of 200 MT under R.A.B.C at Naugachia, Bhagalpur.

135 M/S Radhe Shyam Cold Storage & Foods Pvt. Ltd, Gajipur, Uttar Pradesh.

Establishment of Fruit Pulp and Juice Plant with annual capacity of 17,500 MT at Industrial Area, Pandaul, Madhubani.

9.61 148 29.06.09

13.12.09

136 M/S Usha Martin Ltd, New Delhi.

Establishment of 1200-1320 MW Coal based Thermal Power Plant at Kahalgaon/ Pirpainti, Bhagalpur.

6000.00 500 29.06.09

137 M/S Amrapali Foundation, New Delhi. (Approval has been given for change of place from Motihari to Kumarbagh(Bettiah) in SIPB meeting held on 20.07.09)

Establishment of Engineering College at Foundation’s Campus- Begusarai, Jamalpur and Kumarbagh(Bettiah)and Management Institute at Motipur.

18.952 247 29.06.09 (Consent with condition)

138 M/S Advantage Educational Society, New Delhi.

Establishment of Advantage Media Academy at off Bailey Road, Patna.

7.00 30 29.06.09 (Consent with condition)

139 M/S Suman Agritech Pvt. Ltd, Indore

Establishment of Vegetable Refined Oil and Inter-esterification unit and Bakery fat at Kulaharia, Ara

120.00 250 20.07.09 29.12.09

140 M/S Amit metaliks Ltd, Durgapur, West Bengal.

Establishment of Five Star Hotel at Patna Town

168.18 309 20.07.09 (Consent with condition)

141 M/S Uttam Cycle Pvt. Ltd, Patna

Establishment of Cycle Manufacturing Industry at Gaya-Patna Road

50.00 75 20.07.09

142 M/S Ganapati Biscuits Pvt. Ltd, Patna City

Establishment of Biscuit Manufacturing Unit at Bankaghat, Patna City

14.85 300 20.07.09 13.12.09

143 M/S Sarvottam Infrastructure Pvt. Ltd, Kolkata.

Establishment of 540 MW coal based Thermal Power Plant at Kahalgaon

2250.00 610 17.08.09

144 M/S I L & FS Renewable Energy Ltd, Mumbai

Establishment of 12 MW biomass based Power Project at Banka.

50.17 92 17.08.09

145 M/S Tarouna Cold Storage Pvt Ltd, Purnea

Establishment of Cold Storage with the capacity of 11,400 MT under R.A.B.C. at Jalalgarh, Purnea.

7.29 60 17.08.09 13.12.09

146 M/S Ambo Agro Products Ltd, Kolkata

Establishment of 200 TPD Refined Edible Oil, 2.5 MW Captive Power Plant, 200 TPD Rice Mill and 150 TPD Flour Mill at Bhagalpur / Patna/ Begusarai

84.00 200 17.08.09

147 M/S Ashwini Jhunjhunwala, Tilkamanjhi, Bhagalpur.

Establishment of 100 MT Cold Room, 500 MT Pack House, Processing Hall, 1000 MT Agri Input Warehouse and 5600 MT Grain Storage Warehouse under R.A.B.C at Tilkamanjhi, Bhagalpur.

5.9091 31 17.08.09

148 M/S Hira Bharti Agro Pvt. Ltd, Bhagalpur. (Unit's proposal approved by SIPB on 17.08.09 for establishment of 3000 MT Cold Storage, 2800 MT Warehouse for grains and 600 MT Pack House and

Establishment of 3000 MT Cold Storage, 2800 MT Warehouse for grains and 600 MT Pack House and Cold Room under R.A.B.C. at Shivnarayanpur, Kahalgaon Bhagalpur.

4.77 38 17.08.09 08.06.10

Page 15: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

15Cold Room under R.A.B.C. at Shivnarayanpur, Kahalgaon, Bhaglapur in the name of M/S Amit Sinha, has been amended and consent has been given for establishment of that project in the name of M/S Hira Bharti Agro Pvt. Ltd in SIPB meeting held on 08.06.10.)

149 M/S Unique Foods, Muzaffarpur

Establishment of I. Q. F. Plant-2 MT per hour Frozen / Aseptic line 10 MT per hour, Canning Line 15 MT per day, Cold Room 500 MT and Modern Cold Chain at Muzaffarpur.

16.64 35 17.08.09 13.12.09

150 M/S Ruchi Soya Industries Ltd, Mumbai (Company’s revised proposal for establishment of Bran/ Seed De-oiled Cake -1,20,000 MTA, Vanaspati / Bakery Fats/ Interestified -90,000 MTA, Packaged Blended / Refined Oils-1,26,000 MTA , Expeller Oil- 18000 MTA, Textured Soya Protein- 15,000 MTA , Packaged Grains- 22,500 MTA, Co-generation Power – 4.5 MW has been approved in SIPB meeting on 15.02.10.) (Again on company’s request consent has been given for 4.5 MW Biomass based Captive generation Plant and 1.5 MW Solar PV Power Plant in place of 4.5 MW co-generation Plant in the SIPB meeting held on 28.09.11.)

Establishment of Bran/ Seed De-oiled Cake -1,20,000 MTA, Vanaspati / Bakery Fats/ Interestified -90,000 MTA, Packaged Blended / Refined Oils-1,26,000 MTA , Expeller Oil- 18000 MTA, Textured Soya Protein- 15,000 MTA , Packaged Grains- 22,500 MTA, 4.5 MW Biomass based Captive generation Plant and 1.5 MW Solar PV Power Plant at Durgawati, Kaimur, Dist.- Bhabhua.

215.00 530 17.08.09 15.02.10 28.09.11

19.04.11

151 M/S Bhagwan Agro Pvt Ltd, Rohtas

Establishment of 4 MT per hour Modern Rice Mill and 2000 MT Capacity Warehouse at Nokha,Rohtas.

3.46 90 17.08.09 13.12.09

152 M/S Shanti Modern Rice Mill, Sasaram

Establishment of 4 MT per hour Modern Rice Mill and 1000 MT capacity Warehouse at Kaua Dehri, Block-Shivsagar, Rohtas.

1.45 40 17.08.09 13.12.09

153 M/S Shree Hanumanjee Modern Rice Mill Pvt Ltd, Sasaram. (Company's proposal approved by SIPB on 17.08.09 for establishment of 4 MT per hour Modern Rice Mill and 4000 MT Capacity Warehouse at Vaijala, Sasaram in the name of M/S Hanumanjee Modern Rice Mill Pvt Ltd and 5 MT per hour capacity Rice Mill and 3000 MT capacity Warehouse at Baijala, Sasaram in the name of M/S Hanuman Food Products. As per company's request, amending the approvals given on both proposals, consent has been given for one company as M/S Shree Hanumanjee Modern Rice Mill Pvt. Ltd, Rohtas for establishment of 12 MT per hour Modern Rice Mill and 3000 MT Warehouse at Baijala, Mokar, Rohtas in SIPB meeting held on 21.07.10.)

Establishment of 12 MT per hour Modern Rice Mill and 3000 MT Warehouse at Baijala, Mokar, Rohtas

9.75 50 17.08.09 21.07.10

13.12.09 21.12.10

Page 16: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

16154 M/S Dumraon Textiles Ltd,

Dumraon Establishment of 10 MT per hour capacity Modern Rice Mill and 2 MW Captive Power Plant at Dumraon, Buxar.

19.68 175 17.08.09

155 M/S Sushila Cold Storage Pvt Ltd, Ara (Cancelling the earlier proposal approved on 17.8.09, present proposal as establishment of 7000 MT capacity Cold Storage (5000 MT capacity of Potato storage and 2000 MT capacity of Fruit and Vegetable storage), 2000 MT capacity Onion storage and Primary Processing and Packaging unit of Fruits and Vegetable under RABC at Giddha Industrial Area has been approved on 21.12.09)

Establishment of 7000 MT capacity Cold Storage (5000 MT capacity of Potato storage and 2000 MT capacity of Fruit and Vegetable storage), 2000 MT capacity Onion storage and Primary Processing and Packaging unit of Fruits and Vegetable under RABC at Giddha Industrial Area

7.05 85 17.08.09 21.12.09

11.03.10

156 M/S Om Shivam Modern Rice Mill Pvt Ltd, Sasaram.

Establishment of 11 MT per hour capacity Modern Rice Mill and 5000 MT capacity Warehouse at Konar, Shivsagar, Rohtas

5.79 55 17.08.09 13.12.09

157 M/S Fox Petroleum Ltd, New Delhi

Establishment of 30 MW Power Generation Plant based on dual fuel (gas & alternative fuel) technology in each 38 districts of Bihar.

7899.83 695 19.10.09 (Consent with condition)

158 M/S Gajanana Agronomy Pvt. Ltd, Bettiah.

Establishment of Multipurpose Cold Storage with the capacity of 6860 MTA at Chhawani, Mehdia Bari, West Champaran.

4.49 13 19.10.09 01.02.10

159 M/S Aasma Foods & Beverages Pvt. Ltd., Patna.

Establishment of Fruit & Vegetable Processing unit with the capacity of 2500 MTA at EPIP, Hajipur.

1.10 72 19.10.09 11.02.10

160 M/S Maa Jaemangla Dairy Clusters Ltd., Kolkata. (Earlier, in the SIPB meeting held on 19.10.09 consent was given in the name of M/S Prashant Jalan & Associates, Kolkata for establishment of 100 MT per day capacity of Skimmed Milk Powder, Poly Pack Milk, Ice-cream, Ghee and Curd production unit at Begusarai/ Kahalgaon, Bhagalpur. Again, in SIPB meeting held on 28.09.11 consent has been given in the name of newly formed company M/S Maa Jaemangla Dairy Clusters Ltd for establishment of 44,000 MT per year capacity Ghee, Skimmed Milk Powder, Concentrated Milk, Pasteurized Poly Pack Milk, Curd/Yoghurt production unit at Mohanpur, Begusarai.

Proposal for establishment of 44,000 MT per year capacity Ghee, Skimmed Milk Powder, Concentrated Milk, Pasteurized Poly Pack Milk, Curd/Yoghurt at Mohanpur, Begusarai.

38.61 47 19.10.09 28.09.11

25.09.12

161 M/S Shiv Shakti Modern Establishment of Flour Mill with the 6.144 78 19.10.09 11.02.10

Page 17: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

17Flour Mills Pvt. Ltd., Raxaul, East Champaran.

capacity of 120 MT per day at Raghunathpur, Ramgharwa, Raxaul, E.Champaran.

162 M/S Om Shri LaxminarayanWarehouse Shoppers Ltd, Patna.

Establishment of Modern Rice Mill with the capacity of 24 MT per hour at Nasriganj, Danapur, Patna.

13.62 101 19.10.09 11.02.10

163 M/S Thakur Nikunj Cold Storage Pvt. Ltd., Samastipur.

Establishment of Multipurpose Cold Storage with the capacity of 6000 MT at Mathurapur, Samastipur.

3.59 130 19.10.09 11.02.10

164 M/S Auro Sundram International Pvt. Ltd., Roorkee, Dist.- Haridwar(Uttarakhand) (Company’s earlier proposal approved by SIPB on 19.10.09 to set up 150 TPD capacity Maize Processing unit for production of Maize Starch and Liquid Glucose and 3 MW Captive Power Plant at Industrial Area, Forbesganj, Araria has been amended by SIPB on 19.04.10 for establishment of 200 MT per day capacity Maize Processing unit for production of Maize Starch and Liquid Glucose and 2.5 MW Captive power Plant at the same place.) (Earlier, in the SIPB's 83rd meeting held on 19.04.10 consent was given for establishment of 200 MT per day capacity Maize Processing unit for production of Maize Starch and Liquid Glucose and 2.5 MW Captive Power Plant.. Again on request of the company amending the above proposal consent has been given for establishment of 300 TPD capacity Maize Processing unit for production of Maize Starch and Liquid Glucose and 03 MW in place of 2.5 MW Captive Power Plant in SIPB meeting held on 28.09.11)

Establishment of 300 TDP capacity Maize Processing unit for production of Maize Starch and Liquid Glucose and 03 MW in place of 2.5 MW Captive Power Plant at Industrial Area, Forbesganj, Araria.

110.00 140 19.10.09 19.04.10 28.09.11

24.06.10

165 M/S Vikramshila Educational and Welfare Society, Patna.

Establishment of Management Institute in the name of Indian School of Management at Vill- Sarai, Khagaul, Patna.

15.13 44 19.10.09 01.02.10

166 M/S Yugal Green Urja Solutions Pvt. Ltd., New Delhi.

Establishment of 750 KW Biomass based Power Plant at Goriakothi, Siwan.

3.55 20 19.10.09

167 M/S Eco Cements Ltd., Varanasi.

Establishment of grinding unit of Portland Cement, Portland Pozzolana Cement and Portland Slag Cement with the capacity of 3000 TPD and 5 MVA Captive Power Plant at Karamnasa, Bhabhua.

100.00 150 19.10.09 23.08.12

168 M/S Simri Cold Storage Pvt Establishment of 6000 MT Capacity 4.5055 8 09.11.09 01.02.10

Page 18: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

18Ltd, Simri, Samastipur. Cold Storage, 3 MT per hour Sorting

/Grading Unit under R.A.B.C Scheme at Simri, Samastipur.

169 M/S Mohan Cold Storage Pvt Ltd, Samastipur

Establishment of 10,600 MT Capacity Cold Storage under R.A.B.C. Scheme at Tajpur, Samastipur.

7.44 09.11.09 11.02.10

170 M/S Lichchhwi Foods India Pvt Ltd, Hajipur (Vaishali).

Establishment of 7000 MT per year Capacity Multi Commodity Cold Storage, 2000 MT per year Capacity Deep Freezer and 2 MT per hour I.Q.F Line Freezer at Dighi Kala, Industrial Estate Hajipur

8.72 7 09.11.09 11.02.10

171 M/S Aqua Tech Industries, Keshrinagar, Patna

Establishment of 60 Lakh Liter per year Capacity Packaged Drinking Water Unit at Rajiv Nagar, Patna

1.66 18 09.11.09 (Consent with condition)

172 M/S Sityog Educational & Welfare Society, Patna

Establishment of Engineering and Management College at Aurangabad.

3.20 56 16.11.09

173 M/S Protech Cold Storage Pvt. Ltd, Muzaffarpur.

Establishment of 10,000 MT per year capacity Cold Storage at Paroo, Muzaffarpur.

4.82 26 16.11.09 11.02.10

174 M/S Kamla Agro Pvt. Ltd, Banka

Establishment of 6 MT per hour capacity Rice Mill, Husk Based Power Plant and 5000 MT capacity Warehouse at Amarpur, Banka.

11.47 100 16.11.09 11.02.10

175 M/S Ambo Exports Ltd, Kolkata (Company's proposal approved by SIPB on 16.11.09 for establishment of 100 MT per day capacity Rice Bran Oil Extraction Plant at Aurangabad Industrial Area has been amended and consent has been given with condition for establishment of 500 MT per day capacity Rice Bran Oil Extraction Plant at Kahalgaon Industrial Area, Bhagalpur on 03.05.10.)

Establishment of 500 MT per day capacity Rice Bran Oil Extraction Plant at Kahalgaon Industrial Area, Bhagalpur

25.00 114 16.11.09 03.05.10

176 M/S Bihar College of Education, Promoter- Nav Bharti Trust, Patna

Establishment of Training College in the name and style of Bihar College of Education at Giddha Industrial Area, Ara.

1.0704 17 16.11.09 (Consent with condition)

177 M/S Ashok Cattle and Poultry Feeds Pvt. Ltd, Darbhanga

Establishment of 9600 MT per year capacity Cattle and Poultry Feed Unit at New Industrial Estate Bela, Darbhanga.

0.8922 18 16.11.09 11.02.10

178 M/S D.K. Agro Products, Turki, Muzaffarpur.

Establishment of 60 Lakh Liter per year capacity Milk Processing Plant at Turki, Muzaffarpur.

2.15 80 16.11.09 (Consent with condition)

179 M/S Mirzanagar Gramodyog Sahyog Samiti Ltd, Hajipur.

Establishment of Honey Processing and Packaging Plant at Mahua, Hajipur.

1.166 14 23.11.09 25.05.10

180 M/S Ram Pukar Cold Storage Pvt. Ltd, Samastipur

Establishment of 6500 MT capacity Cold Storage at Mohiuddin Nagar, Samastipur

5.2288 23 23.11.09 11.02.10

181 M/S Hrideshwari Jee Modern Establishment of 2 MT Per hour 2.1283 15 23.11.09 11.02.10

Page 19: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

19Rice Mill, Rohtas capacity Modern Rice Mill at Saleya,

Akori Gola, Rohtas. 182 M/S Maurya Foods Pvt. Ltd,

East Champaran Establishment of 8134 MT Capacity Cold Storage under Rural Agri Business Centre at Mehsi, East Champaran.

5.93 37 23.11.09 11.02.14

183 M/S Shree Kalu Cold Storage Pvt. Ltd, Purnea.

Establishment of 11000 MT Capacity Cold Storage under Rural Agri Business Centre at Moranga Growth Centre, Purnea.

6.0430 51 23.11.09 23.04.10

184 M/S Vaidyanath Sugar Mills Pvt. Ltd, East Chamaran

Establishment of 3500 TCD Sugar Mill and 12 MW Electric Co-generation Plant at Chakia,East Champaran.

175.00 277 23.11.09 (Consent with condition)

185 M/S Xavier’s Girls School, Muzaffarpur

Establishment of 10+2 Level Xavier’s Girls School at Industrial Area, Bela, Muzaffarpur.

2.20 46 30.11.09

186 M/S Balajee Mini Steels & Rerolling Pvt. Ltd, Patna

Establishment of 63000 MTA capacity Re-rolling Mill at Bihta-Maner Road, Patna

17.66 78 30.11.09 01.02.10

187 M/S Sivaani Agribusiness Pvt. Ltd, Gaya

Establishment of 30 MT per day capacity Dal Mill at Dhanua, Dovi Road, Gaya.

3.00 20 30.11.09 01.02.13

188 M/S Sadafal Dev Agro Mills Pvt. Ltd, Dehri, Sasaram

Establishment of 96 MT per day capacity Rice Mill at Kauwa, Dehri, Sasaram.

3.9618 45 30.11.09 11.03.10

189 M/S Gaurav Foods and Cool Connections Pvt. Ltd, Patna

Establishment of 45000 MTA capacity Roller Flour Mill at Didarganj, Patna City

4.8781 103 30.11.09 01.02.10

190 M/S SVJ Enterprises Pvt. Ltd, Donar, Darbhanga.

Establishment of 1(one) MT per day capacity Honey Processing unit at Donar, Dist.-Darbhanga

1.236 22 30.11.09 21.12.10

191 M/S Jagran Institute of Management & Mass Communication, Patna.

Proposal for establishment of Jagaran Institute of Management & Mass Communication at Bihta, Patna of M/S Shri Puran Chandra Gupta Smarak Trust, Kanpur

30.11.09

192 M/S Astonfield Renewable Resources Ltd, New Delhi

Establishment of 300 MW Solar Power Plant(5-25 MW size) in first phase at Dist.-Gaya, Sasaram, etc and in second phase at Dist.-Muzaffarpur, Madhubani, West Champaran, Bhojpur and Patna, etc

4500.00 5000 30.11.09

193 M/S Ambo Exports Ltd, Kolkata

Establishment of 1(one) Lakh MT per year capacity Maize Primary Processing, Drying, Sorting and Packaging unit at Kahalgaon Industrial Area, Bhagalpur.

17.00 27 07.12.09

194 M/S Great Value Foods, New Delhi

Establishment of 60,000 MT per year capacity RTE(Ready to eat) Supplementary Nutrition Fortified Food unit in Bihar.

16.2903 179 07.12.09

195 M/S Om Shri Gramin Fodder Food Process Ltd, Patna (Company’s proposal approved on 07.12.09 for establishment of 1,53,600 MT per year capacity Modern Rice Mill at Phulwarisharif, Patna has been amended and approval has been given

Establishment of 1,53,600 MT per year capacity Modern Rice Mill at Danapur, Patna.

10.14 101 07.12.09 12.01.11 (Consent with condition)

Page 20: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

20for the same project at Danapur, Patna in SIPB meeting held on 12.01.11)

196 M/S Okpet Construction & Services Pvt. Ltd, Patna.

Establishment of 600 MT/Kilo Litre per year Fruit Pulp and Juice Processing unit at Simri, Darbhanga

1.1291 21 07.12.09

197 M/S Shree Shree Dwarikaji Foods Pvt. Ltd, Patna City.

Proposal for capacity expansion from 24000 MT per year to 60000 MT per year in the existing Flour Mill at Karmali Chak, Bypass Road, Patna City.

3.77 50 21.12.09 06.01.11

198 M/S Sano Foods Pvt. Ltd, Mumbai.

Proposal for establishment of 3434 MT capacity production unit of Vermicelli and Macroni at Danapur, Patna.

13.39 28 21.12.09

199 M/S Golden Dairy Products Pvt. Ltd, Patna.

Proposal for establishment of Ice-cream and Dairy Products unit at Industrial Area, Hajipur.

1.96 37 21.12.09

200 M/S Balmukund Cement & Roofings Ltd, Kolkata

Proposal for establishment of 1.5 Lakh MT capacity production unit of Asbestos Fiber Cement Sheet (Corrugated/Flat) and Accessories at Kanti, Muzaffarpur.

31.00 45 21.12.09

201 M/S Bhagwan Veer Hanuman Cold Storage Pvt. Ltd, Samastipur

Proposal for establishment of 5000 MT capacity Cold Storage, 2 MT per hour capacity Rice Mill and Warehouse under RABC at Industrial Area, Harpur Alloth, Samastipur.

4.17 4 21.12.09 11.07.11

202 M/S Hamara Industries, Boring Road, Patna

Proposal for establishment of 700 MT per year capacity Glucose-D Processing and Packaging unit from Dextrose Monohydrate (100% Maize product) at Industrial Area, Giddha.

2.55 50 21.12.09 27.02.11

203 M/S Bansal Biscuits Pvt. Ltd, Kolkata (Amending the proposal approved on 21.12.09 for establishment of 12,600 MT per year capacity Biscuits production unit at EPIP, Hajipur, approval has been given for manufacturing of 36,000 MT per year capacity Biscuit manufacturing unit at EPIP, Hajipur on 26.05.11)

Proposal for establishment of 36000 MT per year capacity Biscuit production unit at EPIP, Hajipur Industrial Area.

50.57 328 21.12.09 26.05.11

25.05.10

204 M/S Shyama Agro Foods & Exports Pvt. Ltd, Muzaffarpur. (Cancelling the earlier proposal approved on 04.01.10 for establishment of Ultra Modern Fruit and Vegetable Processing unit at Industrial Area, Bela, Muzaffarpur, approval has been given for establishment of 36,000 MT per year capacity Modern Flour Mill unit at Industrial Area, Bela, Muzaffarpur in SIPB meeting held on 11.06.12.)

Establishment of 36,000 MT per year capacity Modern Flour Mill unit at Industrial Area, Bela, Muzaffarpur.

5.5500 36 04.01.10 11.06.12

20.02.11

205 M/S Raghunandan Teachers Training College,

Establishment of B.Ed. Teachers Training College at Mathiyapur(Kali

1.00 30 04.01.10

Page 21: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

21Promoter-Baba Educational Trust, Danapur, Patna.

Asthan), Danapur, Patna.

206 M/S Glatt Solutions Pvt. Ltd, Kolkata. (Approval was given on 11.01.10 in SIPB meeting for establishment of 03 MW Grid connected Solar Photo Voltaic Power Project at Muzaffarpur/Purnea. Again on request of the company approval has been given for same project at Nawada in place of Muzaffarpur/Purnea in SIPB meeting on 26.05.11) (Approval has been given by SIPB on the proposal for calculating date of SIPB approval from the date of Power Purchase Agreement in SIPB meeting held on 24.05.13.)

Establishment of 3 MW Grid Connected Solar Photo Voltaic Power Project at Nawada

57.00 22 11.01.10 26.05.11 24.05.13

01.06.13

207 M/S Gokul Sericulture Production and Training Centre, Gokul, Pilkhi, Muzaffarpur

Establishment of Sericulture Production and Training Centre at Gokul, Pilkhi, Muzaffarpur in the name of M/S Gokul Sericulture Production and Training Centre by M/S Maha Lakshmi Kripa Social and Educational Welfare Society, Muzaffarpur

2.53 65 11.01.10

208 M/S Abacus Holdings Pvt. Ltd, Kolkata.

Establishment of 05-05 MW Grid Connected Solar Photo Voltaic Power Project at Muzaffarpur, Gaya, Bhagalpur and Purnea.

392.48 96 11.01.10

209 M/S Adhunik Metaliks Ltd, Kolkata (Company's proposal approved by SIPB on 01.02.10 for establishment of 2.2 MTA Integrated Steel Plant at Industrial Growth Centre, Bhagalpur has been amended and consent has been given for establishment of 2.2 MTPA Integrated Steel Plant at Kahalgaon, Pirpainti Block, Bhagalpur.)

Establishment of 2.2 MT PA capacity Integrated Steel Plant at Kahalgaon, Pirpainti Block, Bhagalpur.

5668.29 2187 01.02.10 03.05.10

210 M/S Bhojpur Rice Mill Pvt. Ltd, Bhojpur

Establishment of 9600 MT per year capacity Rice Mill at Baradparva, District.- Bhojpur

1.54 30 01.02.10 06.04.10

211 M/S Maa Durga Rice Mill, Madhubani.

Establishment of 2400 MT per year capacity Rice Mill at Industrial Area, Pandaul, Madhubani.

0.4731 7 01.02.10 08.06.10

212 M/S Raj Agrochem Products Pvt. Ltd, Muzaffarpur.

Establishment of 45000 MT per year capacity Poultry Feed and Cattle Feed Unit at Bochahan, Muzaffarpur.

5.39 41 01.02.10 16.04.10

213 M/S Maa Shitla Rice Mill Pvt. Ltd, Purnea.

Establishment of 14,400 MT per year capacity Rice Mill at Growth Centre, Moranga, Purnea.

1.206 26 01.02.10 06.01.11

214 M/S Bihar Hotels Ltd, Patna. (Company’s earlier proposal approved by SIPB on 01.02.10 for establishment of

Establishment of 2-Star Hotel at Dehri-on-Sone.

4.79 49 01.02.10 19.04.10 (Consent

Page 22: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

22Budget Hotel at Dehri-on-Sone has been amended and consent has been given with condition for establishment of 2-Star Hotel at Dehri-on-Sone on 19.04.10)

with condition)

215 M/S Prakash Udyog, Patna. Establishment of 1200 Kiloliter Fruit Drink, 12000 Kiloliter Packaged Drinking Water and 2400 Kiloliter Soda Water Production Plant at Industrial Area, Patliputra, Patna.

2.52 25 01.02.10

216 M/S UAL Industries Ltd, Kolkata. (Company's proposal approved by SIPB on 01.02.10 for establishment of 1,20,000 MT per year capacity Asbestos Cement and corrugated Sheets Plant at Bakhtiyarpur has been amended and consent has been given for establishment of 2,33,000 MT per year capacity Asbestos Cement Sheet, Corrugated Sheets Plant in two phases at Goraul, Vaishali in the name of UAL-Bihar in SIPB meeting held on 21.07.10)

Establishment of 2,33,000 MT per year capacity Asbestos Cement Sheet and Corrugated Sheets Plant in two phases at Goraul, Vaishali in the name of UAL-Bihar

54.67 210 01.02.10 21.07.10

217 M/S Oriental Group of Institutes, Bhopal

Establishment of Engineering College at Patna

59.84 300 01.02.10 (Consent with condition)

218 M/S Shobhnath Rice Mill Pvt. Ltd, Bhabhua.

Establishment of 2 MT per hour capacity Rice Mill and 1000 MT capacity Warehouse at Kulhariya, Kaimur, Dist.-Bhabhua.

1.15 16 01.02.10 28.03.10

219 M/S G. C. Foods Pvt. Ltd, Muzaffarpur.

Establishment of 960 MT per year capacity Puff and Fried Snacks Food unit at Industrial Estate, Bela, Muzaffarpur.

1.91 23 01.02.10

220 M/S Satbhani Agro Pvt. Ltd, Aurangabad.

Establishment of 10 MT per hour capacity Modern Rice Mill, 4 MT per hour capacity Sortex and Packaging unit, 7000 MT capacity Warehouse and 1.2 MW Husk based Power Plant at Aurangabad.

10.77 36 01.02.10

221 M/S Kaimur Kohinur Rice Mill Pvt. Ltd, Kaimur.

Establishment of 9600 MT per year capacity Rice Mill at Chand, Dist.- Kaimur.

1.53 14 01.02.10 23.04.10

222 M/S Shrawasthi Agrotech Pvt. Ltd, Lucknow.

Establishment of 4500 MT capacity Poultry Feed unit at Giddha Growth Centre, Ara(Bhojpur).

6.18 30 01.02.10 04.02.11

223 M/S Milsha Agro Exports Pvt. Ltd, Kolkata.

Establishment of 500 MT capacity Multi Purpose Cold Storage, 10 MT Pre-cooling Room, 5 MT Pulp Processing Unit in Phase-1 and 1 MT Individual Quick Freezer in Phase-2 at Hajipur Industrial Estate.

5.60 41 15.02.10

224 M/S Badrinarayanji Agromills Pvt. Ltd, Sasaram.

Establishment of 7 MT per hour capacity Modern Rice Mill, 3000 MT capacity Warehouse at Usrawan,

4.50 40 15.02.10 12.05.10

Page 23: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

23Cochas, Rohtas.

225 M/S Keshri Cold Storage Agro Products and Construction Pvt. Ltd, Rohtas.

Establishment of 7000 MT (5000 MT Potato and 2000 MT Onion) capacity Cold Storage, 2 MT per hour Potato sorting/grading line, 2 MT per hour capacity Modern Rice Mill and 4000 MT capacity Warehouse under R.A.B.C at Dhoudhad, Sasaram

7.17 11 15.02.10 23.04.10

226 M/S Gayatri Soya Food Products, Patna.

Proposal for establishment of Production unit of 960 Liter per day capacity Soya Milk and Paneer at Phulwarisharif, Patna

0.51 17 15.02.10 02.12.11

227 M/S Nilkanth Chawal Mills Pvt. Ltd, Kolkata. (Approval was given for Modernisation of the existing Rice Mill with the capacity of 10,692 MT per year at Conch, Gaya. Again on request of the company, approval has been given for capacity expansion from 54 MT per day to 90 MT per day in the existing Rice Mill at Conch, Gaya on 26.05.11)

Proposal for Modernisation of the existing unit of Rice Mill of 10,692 MT per year capacity at Ahiyapur, Konch, Gaya. Proposal for capacity expansion from 54 MT per day to 90 MT per day in the existing Rice Mill at Conch, Gaya.

3.3634 1.2047

19 19

15.02.10 26.05.11

25.05.10

228 M/S Comprehensive Consultancy Pvt. Ltd, Kolkata.

Establishment of 5 MT per hour capacity Rice Mill, 3 MT per hour capacity Sorting/ Packaging, Warehouse of 4500 MT and Husk Processing Gasifier unit at Banka, Bhagalpur.

6.10 14 22.02.10 23.07.10

229 M/S Sita Flour Mills Pvt. Ltd, Darbhanga

Proposal for capacity expansion of existing Flour Mill from 100 MT per hour to 200 MT per hour at Donar Industrial Area, Darbhanga.

1.45 7 22.02.10 04.02.11

230 M/S Shivsagar Rice Mill Pvt. Ltd, Nalanda

Establishment of 14400 MT per year capacity Rice Mill at Deep Nagar, Maniyama Road, Nalanda.

2.05 33 22.02.10 08.06.10

231 M/S Champaran Agricon Pvt. Ltd, East Champaran (Motihari)

Establishment of 64 MT per day capacity Rice Mill at Chandrahiya, Motihari.

2.29 45 22.02.10

232 M/S Auto Matrix Pvt. Ltd, Patna.

Proposal for capacity expansion and Modernization of existing unit of Service Centre and Auto Parts at Patliputra Industrial Estate.

2.76 22 08.03.10 (Consent with condition)

233 M/S Kumar Tech Bio Products Pvt. Ltd, Bangalore. (Company’s proposal for establishment of 30 MW Rice Husk based Power Plant at Bodh Gaya, Gaya which was approved in SIPB meeting on 8.03.10, has been amended and approval has been given for same project at Kizarsarai Road, Gaya in SIPB meeting held on 29.11.10)

Establishment of 30 MW Rice Husk based Power Plant at Kizarsarai Road, Gaya.

306.00 300 08.03.10 (Consent with condition) 29.11.10 (Consent with condition)

20.12.11

234 M/S Leela Anand Fertilizer & Chemicals Pvt. Ltd, Patna

Establishment of 60,000 MT per year capacity N.P.K. Fertilizer unit at Ahiyapur, Turki, Muzaffarpur.

7.90 67 08.03.10

235 M/S Gokul Steels Pvt. Ltd, Patna.

Establishment of Steel Re-rolling Mill for production of 28,800 MT per year

9.20 46 08.03.10

Page 24: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

24capacity Steel Bar and Rod at Khusrupur, Patna.

236 M/S Shree Vishnu Vishal Paper Mills Pvt. Ltd, Patna

Establishment of 33,000 MT per year capacity Craft Paper and Paper Board and 3 MW Captive Power Plant at Industrial Area Growth Centre, Giddha

32.11 182 08.03.10

03.08.13

237 M/S Amrapali Biotech India Pvt. Ltd, Gaziabad, U.P. (Company's proposal approved by SIPB on 08.03.10 for establishment of 2779 MT per year capacity Pickles and Corn Flakes unit at Industrial Area, Bela, Muzaffarpur has been amended and consent has been given for establishment of 8825 MT per year capacity Tomato Ketchup, Pickles, Jam and Jelly and Corn Flakes unit at Chabilapur, Rajgir in SIPB meeting held on 21.07.10)

Establishment of 8825 MT per year capacity Tomato Ketchup, Pickles, Jam and Jelly and Corn Flakes unit at Chabilapur, Rajgir

17.37 119 08.03.10 21.07.10

04.02.11

238 M/S Amrit Cement Pvt. Ltd, Kolkata.

Establishment of Cement Grinding unit of 6.60 Lakh MT per year capacity at Kahalgaon, Bhagalpur.

111.28 140 08.03.10

239 M/S Natraj Agro and Herbs Pvt. Ltd, Nawada

Establishment of 4 MT per hour capacity Modern Rice Mill and 1200 MT Warehouse at Konchgaon, Warsaliganj, Nawada.

1.48 20 08.03.10 (Consent with condition)

25.05.10

240 M/S Binod Cold Storage Pvt. Ltd, Begusarai

Establishment of 7000 MT capacity Cold Storage, Sorting/Grading of Potato and Agri Input Store under R.A.B.C. at Tilrath Devnath Industrial Area, Barauni, Begusarai.

5.48 20 08.03.10 (Consent with condition)

06.01.11

241 M/S Rozy Food Processing Pvt. Ltd, Begusarai

Proposal for capacity expansion of existing production unit of Spice Powder from 500 Kg per day to 1500 Kg per day at Tilrath Industrial Area, Barauni, Begusarai.

0.9423 15 08.03.10 (Consent with condition)

242 M/S Sri Moti Pvt. Ltd., Chapra

Proposal for establishment of 6500 MT capacity Cold Storage, 2 MT per hour Potato Grading Line, Weighing Line-1, 500 MT Agri Input Godown and 600 MT capacity Warehouse unit under R.A.B.C at Khalpura, Motinagar, Chapra.

5.61 20 23.03.10

243 M/S Uttri Bihar Milk Food Company Pvt. Ltd., Begusarai (Amending the earlier proposal approved in SIPB meeting on 23.03.10 for the production of 30,140 MT per year capacity Pasteurized Milk, Chhena, Curd, Paneer, Milk Cake and Khoa at Industrial Area, Begusarai, approval has been given for the production of 30,000 MT capacity Pasteurized Milk, Chhena, Curd, Paneer, Milk Cake and Khoa at Ajnul, Dalsingsarai, Samastipur on 26.05.11)

Proposal for production of 30,000 MT capacity Pasteurized Milk, Chhena, Curd, Paneer, Milk Cake and Khoa at Ajnul, Dalsingsarai, Samastipur.

1.0918 102 23.03.10 26.05.11

16.08.11

Page 25: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

25244 M/S Ambo Exports Ltd,

Kolkata Proposal for establishment of 35 MT per day capacity Biscuit production unit at Kahalgaon Industrial Area, Bhagalpur.

17.50 204 23.03.10

245 M/S Yashoda Enterprises Pvt. Ltd, Fatuha, Patna.

Proposal for establishment of 3000 Liters per hour capacity Packaged Drinking Water unit at Fatuha Industrial Area, Patna.

1.00 24 23.03.10 (Consent with condition)

246 M/S Maa Mundeshwari Agro Mills Pvt. Ltd., Aurangabad.

Proposal for establishment of 4 MT per hour capacity Modern Rice Mill and 1000 MT Warehouse at Growth Centre, Aurangabad.

2.59 30 23.03.10 02.01.12

247 M/S Hindustan Coca-Cola Beverages Pvt. Ltd., Haryana

Proposal for establishment of Coca Cola Green Field Project for the production of Aerated Drinks, Soft Drinks, other Non-alcoholic Beverage, Fruit Juice/ Fruit Based Drinks and Packaged Drinking Water at Industrial Area, Bihta, Patna.

100.00 100 23.03.10 (Consent with condition)

248 M/S Mega Rice Mill Pvt. Ltd, Jehanabad

Proposal for establishment of 3 MT per hour capacity Rice Mill at Algana, Jehanabad.

1.17 10 23.03.10 02.01.12

249 M/S Rainbow Products Pvt. Ltd, Patna. (Company’s proposal approved by SIPB on 19.04.10 for establishment of 28,800 MT per year capacity Rice Mill at Mahuli Road, Karmalichak, Patna City, Patna has been amended and consent has been given for establishment of 14,400 MT per year capacity Rice Mill at the same place.)

Proposal for establishment of 14,400 MT per year Capacity Rice Mill Unit at Mahuli Road, Karmalichak, Patna City.

3.11 23 19.04.10 27.08.10

04.02.11

250 M/S Gulshan Polyols Ltd, Delhi (Cancelling the earlier proposal approved on 19.04.10, approval has been given for establishment of Maize Processing unit for the production capacity of Sorbitol-10,000 MT per year, Dextrose Monohydrate - 20,000 MT per year and Lysine- 30,000 MT per year capacity from Maize and in addition to this project establishment of 63,200 Kiloliter per year capacity grain based Distillery for E.N.A. unit, 6.5 lac HLA capacity Brewery Plant and 13.5 lac Cases per month capacity I.M.F.L Bottling Plant unit at Industrial Growth Centre, Kahalgaon, Bhagalpur in SIPB meeting held on 09.04.12).

Proposal for establishment of Maize Processing unit for the production capacity of Sorbitol-10,000 MT per year, Dextrose Monohydrate - 20,000 MT per year and Lysine- 30,000 MT per year capacity from Maize and in addition to this project establishment of 63,200 Kiloliter per year capacity grain based Distillery for E.N.A. unit, 6.5 lac HLA capacity Brewery Plant and 13.5 lac Cases per month capacity I.M.F.L Bottling Plant unit at Industrial Growth Centre, Kahalgaon, Bhagalpur.

583.05

531

19.04.10 09.04.12

251 M/S Aditya Food Products, Ara(Bhojpur)

Proposal for establishment of 21,600 MT per year capacity Flour Mill in partnership at Giddha, Ara.

1.43 36 19.04.10

252 M/S Harinagar Sugar Mills Ltd, Harinagar.

Proposal for establishment of 14.5 MW new Power Project at Bagaha, Harinagar.

77.50 29 19.04.10 (Consent with condition)

10.04.11

Page 26: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

26253 M/S Terai Ispat Ltd, Siliguri. Proposal for establishment of two

Induction Furnace of 15 MT,(Steel Melting Shop 1,05,000 MT per year) 99684 MT per year capacity Re-rolling Mill and 12 MW Captive Power Plant at Banka

149.88 697 19.04.10 (Consent with condition)

254 M/S Durga Agronomy Pvt. Ltd, Darbhanga.

Proposal for establishment of 8 MT per hour capacity Rice Mill and 2000 MT capacity Warehouse at Donar Industrial Area, Darbhanga.

3.87 30 19.04.10

255 M/S Shree Shyam Kutir Udyog, Muzaffarpur.

Proposal for establishment of 480 MT per year capacity Spice Powder and Besan Udyog at Industrial Estate, Bela, Muzaffarpur in proprietorship.

0.3273 15 19.04.10

256 M/S Kunwar Apiary Pvt. Ltd, Gaya.

Proposal for establishment of 10 MT per day capacity Honey Processing unit at Janakpur, Buniyadganj.

1.41 20 19.04.10 06.01.11

257 M/S Shiv Shakti Agriproducts and Rice Industries Pvt. Ltd, East Champaran.

Proposal for establishment of 05 MT per hour capacity Modern Rice Mill at Gamaharia, Raxaul.

2.81 52 19.04.10 21.12.10

258 M/S Kumar Industries, Darbhanga

Proposal for establishment of 150 MT per year capacity Noodle Production unit at Industrial Area, Bela, Darbhanga in proprietorship.

0.1681 10 19.04.10

259 M/S Moti Babu Institute of Technology, New Delhi.

Proposal for establishment of Engineering College at Forbesganj, Araria.

14.66 65 19.04.10 (Consent with condition)

260 M/S Ambe Kamakhya Agronomy Pvt. Ltd, Begusarai

Proposal for establishment of 5000 MT per year capacity Cold Storage under Rural Agri Business Centre at Bakhri Bazar, Begusarai.

3.91 20 19.04.10 (Consent with condition)

06.01.11

261 M/S Britannia Industries Ltd, Bangalore(Karnataka)

Proposal for establishment of 50,000 MT per year capacity Bakery Product and production of Biscuit at E.P.I.P., Hajipur.

55.00 330 19.04.10 27.02.11

262 M/S Hyderabad Industries Ltd, Hyderabad.

Proposal for establishment of 2,50,000 MT per year capacity Asbestos Cement Sheeting Plant in two Phases at Kumarbagh Industrial Area, West Champaran.

80.00 600 19.04.10

263 M/S Sonamoti Agrotech Pvt. Ltd, Patna. (Earlier, in the SIPB meeting held on 03.05.10 consent was given for establishment of 28,800 MT per year capacity Rice Mill at Karmalichak, Patna City. Again on request of company, amending the above proposal consent has been given for establishment of 62592 MT per year capacity Modern Rice Mill in place of 28,800 MT per year capacity in SIPB meeting held on 28.09.11)

Proposal for establishment of 62592 MT per year capacity Modern Rice Mill in place of 28,800 MT per year capacity at, Karmalichak, Patna City. Patna.

22.4394 103 03.05.10 28.09.11

04.02.11 22.12.12

264 M/S Creation Agro Processing Industries, Bhagalpur.

Proposal for establishment of 1500 MT per year capacity Chura(Pressed Rice) Mill at Barari Industrial Area, Bhagalpur in proprietorship.

0.46 12 03.05.10

Page 27: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

27265 M/S Radhika Flour Mills Pvt.

Ltd, Patna. Proposal for establishment of 36,000 MT capacity Flour Mill for production of Maida, Atta, Suzi and Chokar at Sikandarpur, Bihta.

5.84 55 03.05.10 10.04.11

266 M/S Khilani Agro Foods Pvt. Ltd, Hajipur.

Proposal for establishment of 12.73 Crore pieces per year capacity Preform Pet Bottle's unit at E.P.I.P. Hajipur.

15.77 25 03.05.10

267 M/S Jaya Nutritions Pvt. Ltd, Deedarganj Patna City.

Proposal for establishment of 80 MT per day capacity Roller Flour Mill at Deedarganj, Patna City.

5.65 42 03.05.10 23.07.10

268 M/S Riya Chakraborty Food Processing Pvt. Ltd, Bhagalpur.

Proposal for establishment of 01 MT per hour capacity Fruit Processing Unit and Tomato Juice Plant at Industrial Area, Barari, Bhagalpur.

0.99 20 03.05.10 (Consent with condition)

269 M/S Arisson Power Ltd, Kolkata

Proposal for establishment of 1320 MW Coal Based Thermal Power Plant at Prabhawati Nagar, Banka.

7260.00 145 24.05.10 11.09.12

270 M/S Pashupati Roller Flour Mill Pvt. Ltd, East Champaran.

Proposal for establishment of 100 MT per day capacity Roller Flour Mill at Bela Industrial Area, Muzaffarpur.

5.60 30 24.05.10 02.12.11

271 M/S Shimla Horticulture Pvt. Ltd, Kolkata.

Proposal for establishment of 1000 MT per year capacity Multipurpose Cold Storage at EPIP, Hajipur.

15.66 400 24.05.10

272 M/S Aarna Foods Pvt. Ltd, Patna City.

Proposal for capacity expansion from 4500 MT to 9600 MT per year capacity in the existing Rice Mill at Deedarganj, Patna City.

2.95 7 24.05.10 04.02.11

273 M/S Sunasi Food and Beverages Pvt. Ltd, Patna.

Proposal for production of 60 Lac Liters per year capacity Fruit Juice at Industrial Area, Giddha, Ara.

2.00 70 24.05.10

274 M/S Green Valliey Industries Ltd, Shillong

Proposal for establishment of 1 Million Ton per year capacity Cement Grinding unit at Industrial Growth Centre, Kahalgaon, Bhagalpur.

120.00 200 24.05.10

275 M/S Sandeep Sijol Infrastructure Pvt. Ltd, Mumbai

Proposal for Generation of Electricity from 3 MW Solar Photo Voltaic Modules at Madhubani / Samastipur / Vaishali.

57.00 23 24.05.10

276 M/S A Infrastructure Ltd, Rajasthan (Company’s proposal for change of place from Industrial Area, Kumarbagh, Bettiah to Pandaul Industrial Area, Madhubani has been approved in SIPB meeting held on 07.09.10)

Proposal for establishment of 1,25,000 MT per year capacity A.C. Sheet and 1,00,000 MT per year capacity A.C. Pressure Pipe at Pandaul Industrial Area, Madhubani.

91.65 352 24.05.10 07.09.10

10.04.12

277 M/S Ruby Rahul Rice Mills Pvt. Ltd., Patna.

(Approval has been given on proposal for change of

capacity in SIPB meeting held on 17.07.14.)

Proposal for establishment of 6 MT per hour capacity Arwa Rice Mill and

1000 MT capacity Warehouse at Giddha Industrial Area, Ara.

6.4710 22 24.05.10

17.07.14

278 M/S Kisan Food Processing Udyog, Darbhanga.

Proposal for establishment of 2 MT per hour capacity Modern Rice Mill, 01 MT per hour capacity Rice Flakes and 0.5 MT per hour capacity Corn Flakes unit in proprietorship at New Industrial Area, Bela, Darbhanga.

0.9089 30 24.05.10 30.09.11

Page 28: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

28279 M/S Maa Tara Water

Products, Patna. Proposal for establishment of 120 Lac Liters per year capacity Packaged Drinking Water unit in partnership at Dashratha, Patna.

0.8522 24 24.05.10

280 M/S Aquadolphin Solutions Pvt. Ltd, Patna.

Proposal for establishment of 72 Lac Liters per year capacity Packaged Drinking Water unit at Babhanpura, Phulwarisharif, Patna.

1.0161 13 24.05.10

281 M/S Patliputra Educational and Welfare Foundation, Patna.

Proposal for establishment of Educational Institute of Engineering and Polytechnic College in two phases at Islampur, Nalanda.

30.00 150 24.05.10

282 M/S City Rolling Mills Pvt. Ltd, Patna. (Company’s proposal approved by SIPB on 24.05.10 for establishment of 3000 MT per year capacity Rolling Mill at Bihta, Patna has been amended and consent has been given for establishment of 30,000 MT per year capacity Rolling Mill at Bihta, Patna in SIPB meeting held on 29.06.10)

Proposal for establishment of 30,000 MT per year capacity Rolling Mill at Bihta, Patna.

7.72 44 24.05.10 29.06.10

283 M/S Ganga Dairy Ltd, Begusarai

Proposal for Capacity Expansion from 10 MT per day to 40 MT per day in the existing Milk Processing unit at Begusarai.

10.30 65 08.06.10 21.05.11

284 M/S Royal Manucon Pvt Ltd, Hajipur(Vaishali). (Earlier on 08.06.10 approval was given for establishment of 120 Lac Liters per year capacity Packaged Drinking Water unit at Industrial Area, Hajipur. Again on company's request, amending above, approval has been given for 120 Lac Liters per year capacity Packaged Drinking Water, 5 Lakh Cartoons per year Soda Water (24x600 ml. in one Cartoon) and 2,16,000 Pieces per year capacity Pet Jar production unit at Industrial Area, Hajipur in SIPB held on 26.03.12.)

Proposal for establishment of 120 Lac Liters per year capacity Packaged Drinking Water, 5 Lakh Cartoons per year Soda Water (24x600 ml. in one Cartoon) and 2,16,000 Pieces per year capacity Pet Jar production unit at Industrial Area, Hajipur

1.5480 51 08.06.10 26.03.12

285 M/S Diwakar Solar Projects Pvt. Ltd, Hyderabad.

Proposal for establishment of 15 MW Solar Photo Voltaic Power Plant at Kumarbagh Industrial Estate, Bettiah.

253.50 15 08.06.10

286 M/S Howrah Mills Company Ltd., Howrah

Proposal for establishment of 05 MW Rice Husk Based Power Plant at Barsoni, Purnea.

28.50 25 08.06.10

287 M/S Mohini Oil Mills, Nalanda.

Proposal for establishment of 15 Lac Liters per year capacity Mustard Oil Extraction Plant at Hilsa, Nalanda in Partnership.

0.48 14 08.06.10

288 M/S Maruti Nandan Food Products Pvt. Ltd, Ara

Proposal for establishment of 250 MT per day capacity Roller Flour Mill at Giddha Industrial Area, Ara.

12.38 60 08.06.10 26.07.10

289 M/S Global Powmin Ltd., Proposal for establishment of 14908.40 400 08.06.10

Page 29: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

29Kolkata (Amending the proposal approved on 08.06.10 for establishment of 2640 MW coal based Therma Power Plant at Sirdala(Nawada), approval has been given for establishment of 2640 MW coal based Thermal Power Plant at Sirdala(Nawada)- Fatehpur(Gaya) on 26.05.11.)

2640(4x660) MW Coal Based Thermal Power Plant at Sirdala (Nawada)-Fatehpur(Gaya).

26.05.11

290 M/S Vishwanath Agro Foods Pvt. Ltd, Muzaffarpur.

Proposal for establishment of 60 MT per day capacity Modern Maize Mill at Kudhani, Muzaffarpur

4.60 35 29.06.10 04.02.11

291 M/S Lavanya Finvest Pvt Ltd, Muzaffarpur.

Proposal for establishment of 36,000 MT per year capacity Pale-G and Pare Namkin Biscuit production unit at Industrial Area, Bela, Muzaffarpur.

22.70 434 29.06.10 27.02.11

292 M/S Kanishka Agro Foods Pvt Ltd, Begusarai.

Proposal for establishment of 40,000 MT per year capacity Cattle and Poultry Feed unit at Industrial Area, Barauni.

4.70 36 29.06.10

293 M/S Himalayan Vegefruit Ltd, Chandigarh.

Proposal for establishment of 2000 MT per year capacity Fruit Processing unit at Industrial Estate, Muzaffarpur.

18.00 150 29.06.10

294 M/S Akanksha Foods Pvt Ltd, Patna City, Patna. (Cancelling the earlier proposal approved on 29.06.10 for establishment of 21,600 MT per year capacity Flour and Bran production unit at E.P.I.P. , Hajipur, approval has been given for establishment of 21,600 MT per year capacity Flour and Bran production unit at Simli, Didarganj, Patna in SIPB meeting held on 13.08.12.) (Approval has been given for change of capacity of Flour and Bran production unit at Simli, Didarganj, Patna as 29,400 MT per year capacity in place of 21,600 MT per year capacity in SIPB meeting held on 13.03.13. )

Proposal for establishment of 29,400 MT per year capacity Flour and Bran production unit at Simli, Didarganj, Patna.

6.10

67

29.06.10 13.08.12 13.03.13

11.07.14

295 M/S J. K. Aqua Industries, Muzaffarpur.

Proposal for establishment of 120 Lac Liters per year capacity Packaged Drinking Water unit at Banaras Bank Chowk, Muzaffarpur in proprietorship.

0.98 10 29.06.10

296 M/S Peerage Buildtech Pvt. Ltd, New Delhi.

Proposal for establishment of 8400 MT per year capacity Noodle production unit at Industrial Area, Hajipur.

6.16 62 29.06.10

297 M/S Paras Agro Foods, Muzaffarpur.

Proposal for establishment of 54000 MT per year capacity Makhana Processing and Packaging unit at Bela Industrial Estate, Muzaffarpur in proprietorship.

0.2676 12 29.06.10 02.01.12

Page 30: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

30298 M/S Siddhi Refoils &

Industries Pvt. Ltd, Kolkata. (Earlier on 29.06.10 approval was given for establishment of 75,000 MT per year capacity Edible Oil Refinery Plant and 1 MW Captive Power Plant at Akbar Malahi, Lalganj, Vaishali. Again on company's request, amending partly approval has been given for 75,000 MT per year capacity Edible Oil Refinery Plant and 2 MW Captive Power Plant at Akbar Malahi, Lalganj, Vaishali in SIPB held on 23.02.12.) (Approval has been given on the proposal for change of capacity in the SIPB meeting held on 20.01.14.)

Proposal for establishment of 135000 MT per year capacity Edible Oil Refinery Plant and 2 MW Captive Power Plant at Akbar Malahi, Lalganj, Vaishali.

72.18 130 29.06.10 23.02.12 20.01.14

18.12.11

299 M/S Nawneet Raj Rice Mills Pvt. Ltd, Ara.

Proposal for establishment of 2.5 MT per hour capacity Rice Mill and 1000 MT Warehouse at Ariaon, Dumraon, Buxar.

1.54 20 29.06.10

300 M/S Oriental Crafts Manufacturing Company Pvt. Ltd , Guwahati, Assam.

Proposal for establishment of 40,000 MT per year capacity Maize based Cattle Feed and Poultry Feed production unit at Bela Industrial Area, Muzaffarpur.

4.45 36 21.07.10

301 M/S Ambo Exports Ltd, Kolkata

Proposal for establishment of 200 MT per day capacity Modern Rice Mill unit at Kahalgaon Industrial Area, Bhagalpur.

17.50 114 21.07.10

302 M/S Ambo Exports Ltd, Kolkata

Proposal for establishment of 18,000 MT per year capacity Maize Starch Production Unit at Kahalgaon Industrial Area, Bhagalpur.

16.12 114 21.07.10

303 M/S Anmol Feeds Pvt. Ltd, Muzaffarpur

Proposal for capacity expansion from 36000 MT per year capacity to 81000 MT per year capacity in the existing unit of Cattle and Poultry Feed at Bela Industrial Area, Muzaffarpur.

3.39 55 21.07.10 16.02.12

304 M/S Shree Saibaba Plasto Products Pvt. Ltd, Kolkata.

Proposal for establishment of 1914 MT per year capacity Plastic Molded unit at E.P.I.P. , Hajipur.

5.62 40 21.07.10

305 M/S Kumar Infratrade Enterprises Pvt. Ltd, Patna. (Approval has been given for 135 rooms Five Star Hotel in place of 84 rooms in SIPB meeting held on 25.02.11)

Proposal for establishment of 135 rooms Five Star Hotel at Exhibition Road, Patna.

48.34 50 21.07.10 25.02.11

17.09.11

306 M/S Keventer Food Park Infra Ltd., Kolkata. (Approval has been given on the proposal for change of place at Mauza-Mirnapur, Sanhaul, Bhagalpur in place of earlier approved proposal for establishment of Food Park at Kahalgaon Industrial Area, Bhagalpur in the SIPB meeting held on 05.03.14.)

Proposal for establishment of Food Park at Mauza-Mirnapur, Sanhaul, Bhagalpur.

75.3300 425 21.07.10 05.03.14

Page 31: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

31307 M/S Maa Sarswati Modern

Rice Mill Pvt. Ltd, Patna. Proposal for establishment of 6 MT per hour capacity Rice Mill and 1000 MT Warehouse at Bhagwatipur More, Bihta, Patna.

01.55 45 21.07.10 06.01.11

308 M/S AKS Fashion News Pvt. Ltd, Patna.

Proposal for establishment of 900 MT per year capacity Banana & Bamboo Fiber Yarns unit at Hajipur.

2.06 120 21.07.10

309 M/S Dharti Agro Food Products, Muzaffarpur.

Proposal for establishment of 24 MT per day capacity Flour Mill at Bela Industrial Area, Muzaffarpur in Partnership.

0.8748 32 21.07.10

310 M/S Mirach Power Ltd, Gurgaon, Haryana. (Amending the earlier proposal approved on 11.08.10, approval has been given on change of company’s name from M/S Mirach Power Pvt. Ltd. to M/S Mirach Power Ltd for the same project on 27.07.11)

Proposal for establishment of 1320 MW (2x660MW) coal based Thermal Power Plant at Lakhisarai.

7359.60 600 11.08.10 (Consent in-principle) 27.07.11

311 M/S Mars Mountain Securities and Trade Pvt. Ltd, Fatuha

Proposal for establishment of 75 lac liters per year capacity Packaged Drinking Water unit at Fatuha Industrial Area.

2.08 25 11.08.10

312 M/S S.S.K. Enterprises, Muzaffarpur.

Proposal for establishment of 2000 Liters per hour Packaged Drinking Water at Shyambabu Road, Andigola, Muzaffarpur in proprietorship.

0.9177 22 11.08.10

313 M/S Pawan Rice Industries, Gopalganj

Proposal for establishment of 6 MT per hour Modern Rice Mill and 1000 MT Warehouse at Madhomath, Kuchaikot, Gopalganj in partnership.

0.9892 21 11.08.10 04.02.11

314 M/S Vindhya Steel Pvt. Ltd, Patna

Proposal for establishment of 6000 MT per year capacity Clod Briquetted Iron production unit at Giddha Growth Centre, Ara.

5.00 100 11.08.10

315 M/S Netaji Subhas Institute of Technology, Patna.

Proposal for establishment of new syllabus for M.Tech., M.B.A. in Netaji Subhas Institute of Technology, Amhara, Bihta, Patna.

25.12 11.08.10

316 M/S Lakhan Aqua Enterprises Pvt. Ltd, Patna.

Proposal for establishment of 120 lac liters per year capacity Packaged Drinking Water unit at Khusrupur, Patna.

0.8546 15 11.08.10 04.02.11

317 M/S Aqua Honey Industries, Darbhanga.

Proposal for establishment of 72 lac liters per year capacity Packaged Drinking Water unit at Donar Industrial Area, Dharbhanga in partnership.

0.6896 24 11.08.10

318 M/S Bihar Ma Durga Agro Industries Pvt. Ltd, Patna.

Proposal for establishment of 8 MT per hour Modern Rice Mill unit at Pandaul Industrial Area, Madhubani.

5.00 30 11.08.10

319 M/S AES Patliputra Energy Pvt. Ltd, Gurgaon, Haryana. (Approved proposal of M/S AES India Pvt. Ltd on 11.08.10 for establishment of 1320 MW (2x660 MW) coal based Thermal Power Plant

Proposal for establishment of 1320 MW (2x660 MW) coal based Thermal Power Plant at Jagdishpur, Bhagalpur.

8120.00 300 11.08.10 (Consent in-principle) 25.02.11

Page 32: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

32at Jagdishpur, Bhagalpur has been approved in the name of M/S AES Patliputra Energy Pvt. Ltd in SIPB meeting held on 25.02.11)

320 M/S Champaran Agri Park Pvt. Ltd, Kolkata.

Proposal for establishment of Food Park at Bairia, Motihari.

132.14 1140 11.08.10

321 M/S Cruinne Edulac Consultancy Services Pvt. Ltd, Patna.

Proposal for establishment of Kautilya International Business School in Bihta Industrial Mega Park, Patna.

130.60 290 11.08.10 (Consent with condition)

322 M/S Sona Biscuits Ltd, Kolkata

Proposal for establishment of 15000 MT per year capacity Biscuit production unit at E.P.I.P., Hajipur.

26.51 219 13.08.10 05.09.12

323 M/S PI Systems Pvt. Ltd, Patna.

Proposal for establishment of Information Technology unit at Patliputra.

1.02 12 13.08.10

324 M/S S.K. Gupta Rice Mill, Banka.

Proposal for establishment of 3 MT pre hour Rice Mill, 500 MT Warehouse, Husk Based Gasifier D.G. Set at Rajbandh, Dhoraiya, Banka in partnership.

0.73 5 13.08.10

325 M/S Sai Sachidanand Agrotech Pvt. Ltd, Jamshedpur.

Proposal for establishment of 3 MT per hour Rice Mill at Khera, Darbhanga.

2.71 20 13.08.10

326 M/S Sushila Food Product, Gaya.

Proposal for establishment of 900 MT per year capacity Vermicelli, Chowmien, Gold Finger and Fryums industry at Bhagwanpur, Baiju Bigaha, Gaya in partnership.

1.04 15 13.08.10

327 M/S Aarcee Foods, Aurangabad.

Proposal for establishment of 300 MT per year capacity Spices Grinding, Spice Blending and Packaging unit at Industrial Area, Aurangabad in proprietorship.

0.7569 25 13.08.10

328 M/S Mcore Foods Pvt. Ltd, Purnea.

Proposal for establishment of 3000 MT per year capacity Rice Mill, 4000 MT per year capacity Colour Sorting, Grading and Packing and 950 MT per year capacity Grinding and packing unit at Growth Centre, Moranga, Purnea.

1.60 50 13.08.10

329 M/S Blue Heavens Agro Industries Ltd, Patna.

Proposal for establishment of 1,20,000,00 Liters per year capacity Packaged Drinking Water at Chhotki Chanda, Koilwar, Bhojpur.

1.0087 17 13.08.10

330 M/S Alok Harsh Rice Mill Pvt. Ltd, Danapur, Patna.

Proposal for establishment of 4 MT per hour Modern Rice Mill at Giddha Industrial Area, Koilwar, Ara.

2.0970 42 13.08.10

331 M/S Tirupati Sugars Ltd, West Champaran.

Proposal for modernisation and capacity expansion from 2500 TCD to 5000 TCD in the existing Sugar Mill at Bagaha, West Champaran.

144.90 451 13.08.10 (Consent in-principle)

24.03.11

332 M/S Narayani Packaging Pvt. Ltd, Patna City, Patna. (Amending the proposal approved on 13.08.10 for 2400 MT per year capacity corrugated Boxes production unit at E.P.I.P., Hajipur,

Proposal for establishment of 9000 MT per year capacity Corrugated Boxes production unit at E.P.I.P., Hajipur.

7.1483 40 13.08.10 23.02.12

Page 33: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

33approval has been given for 9000 MT per year capacity instead of 2400 MT per year capacity Corrugated Boxes production unit at E.P.I.P., Hajipur in SIPB meeting held on 23.02.12.).

333 M/S Prince Masala Company, Muzaffarpur.

Proposal for establishment of 450 MT per year capacity Spices and Spice Blends Manufacturing and Packaging unit at Muzaffarpur in proprietorship.

0.1249 25 13.08.10

334 M/S Skand Agri Power Pvt. Ltd, Patna.

Proposal for establishment of Biomass Based Power Plant of 7.5 MW each at Dehri, Rohtas and Industrial Area, Kahalgaon, Bhagalpur.

92.63 60 27.08.10

335 M/S Avant Garde Re-Energy Ltd, Kolkata.

Proposal for establishment of 10 MW Solar PV Power Plant unit at Bhojpur/Saran/Bhabhua.

160.00 31 27.08.10

336 M/S Pransukhka Cold Storage Pvt. Ltd, Purnea.

Proposal for establishment of 6000 MT Modern Multi Products Cold Storage unit under R.A.B.C. at Gulab Bagh, Purnea.

6.73 138 27.08.10

337 M/S Krishna Rice & Polisher Mills, Kaimur.

Proposal for Modernisation after establishment of 3 MT per hour capacity Modern Rice Mill in proprietorship in place of existing 1 MT per hour capacity Rice Mill at Bhopatpur, Mohania, Kaimur.

1.15 20 27.08.10 19.04.12

338 M/S Minakshi Rural Agri Business Pvt. Ltd, Patna.

Proposal for establishment of 10,000 MT Modern Multi Purpose Cold Storage at Chandpur, Baligaon, Patepur, Vaishali.

9.56 40 27.08.10 20.02.11

339 M/S Vijay Laxmi Dal Mill, Purnea.

Proposal for establishment of 1 MT per hour Dal Mill unit in proprietorship at Industrial Growth Centre, Purnea.

97.38 16 27.08.10

340 M/S Prasad Refrigeration and Agro Industries Pvt. Ltd, East Champaran. (Approval was given for establishment of 2500 TCD (expandable up to 5000 TCD) Sugar Mill and 5 MW Co-generation Power Plant at Sataha, Nauadih, Paharpur, East Champaran in SIPB meeting held on 27.08.10. Again on request of the company, approval has been given for 3500 TCD expandable up to 5000 TCD and 15 MW Co-generation Power Plant in place of 2500 TCD expandable up to 5000 TCD and 5 MW Co-generation Power Plant at Sataha, East Champaran in SIPB meeting held on 28.06.13.)

Proposal for establishment of 3500 TCD expandable up to 5000 TCD Sugar Mill and 15 MW Co-generation Power Plant at Sataha, Nauadih, Paharpur, East Champaran.

170.1500 209 27.08.10 28.06.13

341 M/S Jhunjhunwala Oil Mills Proposal for establishment of 8 MT 19.00 125 27.08.10 04.02.11

Page 34: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

34Ltd, Varanasi. per hour capacity Rice Mill at

Bangra, Kudra, Kaimur, Bhabhua. 342 M/S Bluestar Cement Ltd,

Varanasi. Proposal for production of 3,00,000 MT per year capacity Portland Pozzolana Cement unit at Karamnasha, Kaimur, Bhabhua.

27.75 42 27.08.10

343 M/S Ripuraj Agro Pvt. Ltd, Raxaul, East Champaran.

Proposal for establishment of 04 MT per hour Modern Rice Mill and 1000 MT Warehouse unit at Amodei, Ramgadhwa, East Champaran.

2.20 19 27.08.10 10.04.11

344 M/S Mangal Deep Rice Mill Pvt. Ltd, Motihari, East Champaran.

Proposal for establishment of 3 MT per hour capacity Rice Mill, 1000 MT Warehouse at Ekdari, Chaura Dano, East Champaran.

1.3782 44 27.08.10 11.07.11

345 M/S Lumbini Beverages Pvt. Ltd, Hajipur.

Proposal for capacity expansion from 39971250 Liters per year capacity to 67971250 Liters per year capacity and Modernisation in the existing unit of manufacturing of PET Bottle, Aerated Water and Juice Based Drinks at E.P.I.P, Hajipur.

31.89 220 27.08.10 07.10.11

346 M/S Shree Tel Fab Industries Pvt. Ltd, Hajipur.

Proposal for capacity expansion from 5000 MT per year capacity to 10,616 MT per year capacity in the existing unit of P.V.C. Pipe and P.V.C. Filter at Industrial Area, Vaishali, Hajipur.

1.35 53 27.08.10

347 M/S Orange Powergen Pvt. Ltd, New Delhi. (Earlier, in the meeting of SIPB held on 29.11.10 consent was given for establishment of Biomass based Power Plant of 7.5 MW in Rohtas district, 7.5 MW in Nalanda district, 10 MW in Vaishali district, 7.5 MW in Aurangabad district and 10 MW in Begusarai district in the name of Green Horsepower Pvt. Ltd. Again on request of the company, consent has been given on 28.09.11 for change of name of holding company from M/S Green Horsepower Pvt. Ltd to M/S Orange Powergen Pvt. Ltd and also for formation of five new SPV company as follows:- (1) Consent has been given for 10 MW Biomass based Power Plant in place of 7.5 MW in the name of new SPV company M/S Rohtas Biomass Pvt. Ltd. in Rohtas district. (2) Consent has been given for 10 MW in place of 7.5 MW Biomass based Power Plant in the name of new SPV company M/S Nalanda Biomass Pvt. Ltd. in Nalanda district. (3) Consent has been given for 10 MW Biomass based Power Plant in the name of new SPV company M/S Vaishali Biomass Pvt. Ltd. in Vaishali district. (4) Consent has been given for 10 MW Biomass based Power Plant in the name of new SPV company M/S Aurangabad Biomass Pvt. Ltd.

Proposal for establishment of Biomass based Power Plant of 10 MW in Rohtas district in the name of new SPV company M/S Rohtas Biomass Pvt. Ltd., 10 MW in Nalanda district in the name of new SPV company M/S Nalanda Biomass Pvt. Ltd., 10 MW in Vaishali district in the name of new SPV company M/S Vaishali Biomass Pvt. Ltd., 10 MW in Aurangabad district in the name of new SPV company M/S Aurangabad Biomass Pvt. Ltd and 10 MW in Begusarai district in the name of new SPV company M/S Begusarai Biomass Pvt. Ltd.

225.00 125 29.11.10 (Consent with condition) 28.09.11

Page 35: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

35in Aurangabad district. (5) Consent has been given for 10 MW Biomass based Power Plant in the name of new SPV company M/S Begusarai Biomass Pvt. Ltd. in Begusarai district.)

348 M/S Raunak Trade & Agencies Pvt. Ltd, Farbisganj, Araria.

Proposal for production of 600 MT per year capacity PVC Rigid Pipe, 567.54 MT per year capacity Ice-Cream Cone, Wafer Biscuit and 6000 MT per year capacity Laundry and Toilet Soap at Industrial Area, Farbisganj, Araria.

7.9576 141 29.11.10

349 M/S Godrej Agrovet Ltd, Mumbai. (Approval has been given for establishment of 1.20 Lac MT per year capacity Poultry Feed in place of earlier approved 84000 MT per year capacity at E.P.l.P., Hajipur in the SIPB meeting held on 20.01.14.)

Proposal for establishment of 1.20 Lac MT per year capacity Poultry Feed at EPIP, Hajipur, Vaishali.

57.65 204 29.11.10 20.01.14

350 M/S Om Shree Gramodyog Food Process Co-operative Society Ltd, Patna.

Proposal for establishment of 24 MT per hour capacity Modern Rice Mill at Danapur Biscuit Factory Road, Nasriganj, Patna.

7.54 101 29.11.10

351 M/S MMMJ Food Processing Industry, Madhubani.

Proposal for establishment of 12 MT per year capacity Makhana Processing unit in proprietorship at Mahtoregoth, Mahadeomath, Madhubani.

0.20 16 29.11.10

352 M/S Bihar Spices & Foods, Muzaffarpur.

Proposal for establishment of 40 MT per year capacity Spice Processing and Packaging unit in proprietorship at Bela Industrial Area, Muzaffarpur.

0.25 8 29.11.10

353 M/S Devlok Agro and Beverages Pvt. Ltd, Patna.

Proposal for establishment of 96 Lac Liters per year capacity Packaged Drinking Water unit at Hajipur.

1.58 32 29.11.10

354 M/S Aroma Feeds Pvt. Ltd, Muzaffarpur.

Proposal for establishment of 12000 MT per year capacity Cattle Feed unit at Kanti, Muzaffarpur.

1.1937 22 29.11.10

355 M/S Kumar Sunil Enterprises Pvt. Ltd, Bettiah.

Proposal for establishment of 40 Lac Liters per year capacity Fruit based Beverage Juice, 120 Lac Liters per year capacity Beverage Packaged Drinking Water and 10 Lac Liters per year capacity Soda Water unit at Bettiah.

3.93 40 29.11.10

356 M/S Gauri Mangla Cold Storage Pvt. Ltd, Kaimur, Bhabhua.

Proposal for establishment of 6000 MT Cold Storage at Mukhrao, Kuchila, Kaimur, Bhabhua.

3.60 13 29.11.10 16.08.11

357 M/S Saumya Industries, Darbhanga.

Proposal for establishment of 45 Lac Liters per year capacity Packaged Drinking Water/Mineral Water unit in proprietorship at Bela Industrial Area, Darbhanga.

1.0028 25 29.11.10

358 M/S Mishti Raj Foods Pvt. Ltd, Muzaffarpur.

Proposal for establishment of 2600 Kilo Liter per year capacity Packaged Drinking Water unit at Industrial Area, Bela, Muzaffarpur.

1.3227 19 29.11.10

Page 36: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

36359 M/S Elegance Power and

Infrastructure Pvt. Ltd, Patna. Proposal for establishment of 05 MW Biomass based Power Plant at Pandaul Industrial Area, Madhubani.

20.00 10 29.11.10

360 M/S Elegance Power and Infrastructure Pvt. Ltd, Patna.

Proposal for production of 60 Lac CFL Bulb and LED Lights at Giddha Industrial Area, Ara.

08.00 48 29.11.10

361 M/S Star Flour Mills Pvt. Ltd, Patna.

Proposal for establishment of 150 MT per day capacity Flour Mill at Pandaul Industrial Area, Madhubani.

9.3375 72 29.11.10 17.09.11

362 M/S Samras Products Pvt. Ltd, Sitamarhi

Proposal for establishment of 37 Thousand Liters per day capacity Edible Oil Packing unit at Industrial Area, Sitamarhi.

4.35 10 29.11.10 25.04.12

363 M/S Agro Industries, Muzaffarpur.

Proposal for establishment of 55,200 MT per year capacity Poultry Feed unit in proprietorship at Industrial Estate, Bela, Muzaffarpur.

7.0727 123 29.11.10 28.06.12

364 M/S Vina Paras Modern Rice Mill Pvt. Ltd, Kaimur, Bhabhua.

Proposal for establishment of 12 MT per hour capacity Modern Rice Mill unit at Bhabhua, Kaimur.

14.2378 83 29.11.10 18.07.11

365 M/S Gangotri Holy Products Pvt. Ltd, Muzaffarpur.

Proposal for establishment of 72 Thousand MT per year capacity Cattle Feed unit at Industrial Estate, Bela, Muzaffarpur.

5.9690 41 29.11.10

366 M/S Ambey Rice Mill, Bettiah. Proposal for establishment of 3 MT per hour capacity Modern Rice Mill unit in proprietorship at Industrial Area, Kumarbagh, Bettiah.

0.8725 30 29.11.10

367 M/S Chanakya Foods India Pvt. Ltd, Patna.

Proposal for establishment of 9000 MT per year capacity Turmeric & Ginger Processing unit, Ginger Garlic Paste Manufacturing unit, Spice Grinding and Packing unit, 10 Thousand MT capacity of Multi Purpose Cold Storage and 6000 MT capacity Modified Packing of Fresh Fruits and Vegetable unit at Khokshaha, Bibhutipur, Dist.-Samastipur.

8.45 60 29.11.10 10.04.12

368 M/S Sri Dewanjee Rice Mill Pvt. Ltd, Rohtas.

Proposal for establishment of 4 MT per hour capacity Modern Rice Mill at Nokha, Rohtas.

1.4697 20 29.11.10

369 M/S Bhojpur High Tech Agro Products Pvt. Ltd, Ara.

Proposal for establishment of 05 MT per hour capacity Modern Rice Mill, 1000 MT capacity Warehouse and 200 KW Gasifier unit at Sakhua, Udwantnagar, Ara.

1.2155 30 29.11.10 20.06.13

370

M/S Shirdi Foods Pvt. Ltd, Muzaffarpur.

Proposal for establishment of 1650 MT per year capacity Sugar Candy Manufacturing and Packing unit at Bela Industrial Estate, Muzaffarpur.

1.1965 17 29.11.10

05.02.12

371 M/S Nutan Bhabya Rural Agro Solution Pvt. Ltd, Patna.

Proposal for establishment of 3000 MT Warehouse, 01 MT per hour Multi Grading Line and Packing unit under R.A.B.C at Industrial Area, Fatuha, Patna.

1.0057 20 29.11.10 (Consent with condition)

01.02.13

372 M/S Green Earth Fertilizer Pvt. Ltd, Sitamarhi.

Proposal for establishment of 03 MT per hour capacity Modern Rice Mill unit at Industrial Area, Sitamarhi.

1.19 25 12.01.11 11.07.11

373 M/S Bhaskar Rice Mill Pvt. Ltd, Aurangabad.

Proposal for establishment of 04 MT per hour capacity Rice Mill, 1000 MT Warehouse and 125 KVA Gasifier at Biratpur, Malitola, Aurangabad.

1.5392 35 12.01.11

374 M/S Tathagata Bio Energy Pvt. Ltd, Gurgaon, Haryana.

Proposal for establishment of 12 MW Biomass based Power Plant at Churi, Dist.- Gaya.

52.00 50 12.01.11

Page 37: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

37(On request of M/S Emergent Ventures India Pvt. Ltd for its Gaya project approval has been given to its new subsidiary company namely M/S Tathagata Bio Energy Pvt. Ltd for establishment of 12 MW Biomass based Power Plant at Vill-Churi, Dist.-Gaya in SIPB meeting held on 12.01.11)

375 M/S Jira Devi Cold Storage Pvt. Ltd, Patna.

Proposal for establishment of 6000 MT capacity Cold Storage at Balipakar, Paliganj, Patna.

4.6121 40 12.01.11 (Consent with condition)

11.07.11

376 M/S Anubhav Agro Processing Pvt. Ltd, Patna.

Proposal for establishment of 500 MT per year capacity Fruit and Vegetable Processing unit at Baghikariho, Supaul.

0.5117 15 12.01.11

377 M/S KKK Biomass Power Pvt. Ltd, Faridabad, Haryana.

Proposal for establishment of 02 MW Biomass based Power Plant at Industrial Area, Purnea.

11.00 50 12.01.11 (Consent with condition)

378 M/S Satyam Agrofood Industries Pvt. Ltd, West Bengal.

Proposal for establishment of 02 MT per hour capacity Rice Mill at Bulachak, Kalyanpur, East Champaran.

3.5933 59 12.01.11 10.04.11

379 M/S M.B. Tiles & Constructions Pvt. Ltd, Bhubneshwar.

Proposal for establishment of 22,50,000 number Pavers, Designers and Wall Tiles production unit at Industrial Growth Centre, Purnea.

1.2516 31 12.01.11

380 M/S Swastik Refinery Pvt. Ltd, Kolkata.

Proposal for establishment of 31000 MT per year capacity Oil and Banaspati (Hydrogenated) and Vegetable Oil and Fats(other than Hydrogenated) production unit at Kahalgaon Industrial Area, Bhagalpur.

30.00 114 12.01.11

381 M/S Krishna & Fula Industries, Bettiah, West Champaran.

Proposal for establishment of 15,000 MT per year capacity Poultry Feed/Cattle Feed unit at Kumarbagh, Bettiah in Partnership.

0.8477 26 12.01.11

382 M/S Anand Feeds Pvt. Ltd, Patna.

Proposal for establishment of 15,000 MT per year capacity Poultry Feed unit at Industrial Area, Fatuha, Patna.

1.5424 60 12.01.11 10.04.11

383 M/S Plant Insecticides Industries, Patna.

Proposal for establishment of 1200 MT per year capacity Insecticides and Pesticides production unit at Industrial Area, Fatuha, Patna in partnership.

1.5355 31 12.01.11

384 M/S Maruti Nandan PU Foams Pvt. Ltd, Patna.

Proposal for establishment of 300 MT per year capacity PU Foam (Polyurethane Foam) production unit at Industrial Area, Fatuha, Patna.

1.4797 25 12.01.11

385 M/S Jaikrishna Steel Pvt. Ltd, Rajendra Nagar, Patna.

Proposal for establishment of 22,500 MT per year capacity Rolling Mill at Industrial Area, Fatuha, Patna.

5.00 60 12.01.11

386 M/S Mahadeva Feeds Industries, Raxual, East Champaran.

Proposal for establishment of 3600 MT per year capacity Poultry Feed unit at Industrial Area, Raxaul in proprietorship.

1.1448 21 12.01.11

387 M/S Khushi Polypack Pvt. Ltd, Muzaffarpur.

Proposal for establishment of 672 MT per year capacity Disposable Glasses and Cup unit at Industrial Area, Muzaffarpur.

3.1372 44 12.01.11

Page 38: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

38388 M/S Maa Shyama Rice Mills,

Darbhanga. Proposal for establishment of 01 MT per hour capacity Rice Mill unit at Industrial Area, Bela, Darbhanga in proprietorship.

0.508 10 12.01.11

389 M/S M.B. Organics Pvt. Ltd, Purnea.

Proposal for establishment of 2400 MT per year capacity Soya Bari and Finger Strip Bari production unit at Industrial Area, Purnea.

0.9628 30 12.01.11 (Consent with condition)

390 M/S Supermax Foods Pvt. Ltd, Dwarka, New Delhi.

Proposal for establishment of 2.34 MT per year capacity Fruit and Vegetable Processing unit at Radhanagar, Mushari, Muzaffarpur.

0.297 20 12.01.11 08.01.12

391 M/S Shubham Consumer Product, Sabour, Bhagalpur.

:Proposal for establishment of 72 Lacs Liters per year capacity Drinking Mineral Water unit at Industrial Area, Barari, Sabour, Bhagalpur in proprietorship.

0.73 12 12.01.11 (Consent with condition)

392 M/S Mundeshwari Bio Energy Pvt. Ltd, Gurgaon, Haryana. (On request of M/S Emergent Ventures India Pvt. Ltd for its Kaimur project approval has been given to new SPV company namely M/S Mundeshwari Bio Energy Pvt. Ltd for establishment of 12 MW Biomass based Power Plant at Kaimur, Bhabhua in SIPB meeting held on 12.01.11)

Proposal for establishment of 12 MW Biomass Based Power Plant at Kaimur, Bhabhua.

52.00 40 12.01.11

393 M/S Hitachi Refrigeration, Begusarai.

Proposal for establishment of 48,000 Liters per year capacity Ice Cream unit at Industrial Area, Barauni, Begusarai in proprietorship.

0.6592 23 12.01.11

394 M/S Krrish Rice Mills Pvt. Ltd, Patna.

Proposal for establishment of 08 MT per hour capacity Modern Rice Mill at Industrial Area, Fatuha, Patna.

10.3269 50 12.01.11 11.07.11

395 M/S Casecade Power Ltd, Lakhisarai.

Proposal for establishment of 1320 (2x660) MW coal based Thermal Power Plant at Lakhisarai District in Bihar.

8343.50 400 25.02.11

396 M/S Bettiah Industries Pvt. Ltd, Kumarbagh, Bettiah.

Proposal for establishment of 08 MT per hour capacity Modern Rice Mill and 1.2 M W Captive Power Plant at Kumarbagh Industrial Area, Chanpatiya, West Champaran.

21.2081 178 25.02.11

397 M/S Lama Bear Organic Extract Ltd, Kaimur, Bhabhua

Proposal for establishment of 55.33 MT per year capacity Spice Oils and Oleoresin unit at Mathura, Durgawati, Kaimur, Bhabhua.

16.1535 25 25.02.11 16.08.11

398 M/S Deepak Vegpro(P) Ltd., Bhabhua. (Cancelling the earlier proposal approved on 25.02.11 for establishment of 18,000 MT per year capacity Mustard Oil, 24,000 MT per year capacity RBD Palm Oil, 6000 MT per year capacity Soya Refined Oil unit at Durgawati, Kaimur, Bhabhua, approval has been given for expansion/diversification of 24000 MT per year capacity Banaspati Ghee, 30000 MT

Proposal for expansion/diversification of 24000 MT per year capacity Banaspati Ghee, 30000 MT per year capacity RBD Palm/Palmolien Oil and 8400 MT per year capacity Soya Refined Oil in the existing unit of 30000 MT per year capacity Banaspati Ghee at Durgawati, Kaimur, Bhabhua.

18.02 65 25.02.11 23.02.12

22.12.12

Page 39: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

39per year capacity RBD Palm/Palmolien Oil and 8400 MT per year capacity Soya Refined Oil in the existing unit of 30000 MT per year capacity Banaspati Ghee at Durgawati, Kaimur, Bhabhua in SIPB meeting held on 23.02.12.).

399 M/S The West Coast Paper Mills Ltd, Karnataka.

Proposal for establishment of one Lakh MT per year capacity Duplex Board unit in first phase at Dalmia Nagar, Rohtas.

350.00 500 25.02.11

400 M/S Era Infra Engineering Ltd, New Delhi.

Proposal for establishment of 2640(4x660) MW coal based Thermal Power Plant at Rajauli, Nawada and 1320(2x660) MW coal based Thermal Power Plant at Pirpainti, Bhagalpur.

14800.00 7374.00

700 350

25.02.11

401 M/S SCI India Limited, Bhagalpur. (Approval has been given on proposal for establishment of molasses based and grain based Alcohol Plant and 1.6 MW Power Plant in place of earlier approved proposal for establishment of grain based Alcohol Plant, 1.6 MW Power Plant at Banka in SIPB meeting held on 11.12.14.)

Proposal for establishment of molasses based and grain based Alcohol Plant and 1.6 MW Power Plant at Banka.

30.2316 25.02.11

11.12.14

402 M/S Mahalaxmi Industries, Bettiah. (Correction has been made from proprietorship to partnership vide letter no. 1125 dated 23.07.12 )

Proposal for establishment of 3200 MT per year capacity Modern Rice Mill at Industrial Area, Bettiah in partnership.

0.3629 06 25.02.11 19.04.12

403 M/S Winsome International Ltd, Samastipur ( Unit of M/S Rameshwara Jute Mills)

Proposal for establishment of 35 MT per day capacity Jute Processing Unit, 40 MT per day capacity Corn Flakes manufacturing unit and establishment of Marketing Complex at Dharmpur, Samastipur.

160.00 155 25.02.11

404 M/S Dalmia Power Ltd, New Delhi. (Amending the proposal approved on 25.02.11 for establishment of 1320(2x660) MW coal based Thermal Power Plant at Dona, Banka, approval has been given for establishment of 2640(4x660) MW coal based Thermal Power Plant at Dona, Banka in SIPB meeting held on 23.02.12.).

Proposal for establishment of 2640 (4x660) MW Coal based Thermal Power Plant at Dona, Banka

14600.0000 1500 25.02.11 23.02.12

405 M/S Sravanthi Rohtas Energy Pvt. Ltd, New Delhi. (Earlier, in the SIPB's 95th meeting held on 25.02.11 consent was given in the name of M/S Sravanthi Infratech Pvt. Ltd, Gurgaon, Haryana for

Proposal for establishment of 450 MW gas based Power Plant at Dehri-On-Sone, Rohtas.

1620.00 90 25.02.11 28.09.11

Page 40: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

40establishment of 450 MW gas based Power Plant at Dehri-On-Sone, Rohtas. Again on request of the company consent has been given for establishment 450 MW gas based Power Plant at Dehri-on-Sone, Rohtas. in the name of newly formed SPV company M/S Sravanthi Rohtas Energy Pvt. Ltd. New Delhi in SIPB meeting held on 28.09.11.)

406 M/S Adhish Enterprises Pvt. Ltd, Bettiah(West Champaran).

Proposal for establishment of 20 rooms Hotel and Motel at Ujjain Tola, Bettiah, West Champaran.

1.7752 07 25.02.11 18.07.11

407 M/S Ishwar Raj Beverages Pvt. Ltd, Patna.

Proposal for establishment of 120 Lac Crates capacity Soft Drinks and Packaged Drinking Water unit at Jethuli, Fatuha, Patna.

15.2854 88 25.02.11 11.09.11

408 M/S Patwari Steels Pvt. Ltd, Fatuha, Patna.

Proposal for establishment of 30,000 MT per year capacity Poultry Feed and Cattle Feed unit at Industrial Area, Fatuha, Patna.

6.1210 20 25.02.11 30.07.11

409 M/S T I Cycles of India (M/S Tube Investments of India Ltd.), Chennai, Tamil Nadu.

Proposal for establishment 20 Lac pieces per year capacity Cycle, Cycle Parts and Accessories manufacturing unit at E.P.I.P, Hajipur.

45.10 500 25.02.11

410 M/S Sanmati Bio Energy Pvt. Ltd, (Prom.- M/S Emergent Ventures India Pvt. Ltd), Gurgaon, Haryana (Approval was given in principle on 18.11.08 in SIPB meeting for establishment of 12 MW Biomass based Power Plant at Rohtas in the name of M/S Emergent Ventures India Pvt. Ltd. Again on company’s request amending the earlier approved proposal and approval has been given to the newly formed subsidiary company M/S Sanmati Bio Energy Pvt. Ltd for establishment of 12 MW Biomass based Power Plant at Songwa, Rohtas on 26.05.11)

Proposal for establishment of 12 MW Biomass based Power Plant at Songwa, Rohtas.

52.00 40 26.05.11

411 M/S National Plastic Industries Ltd, Mumbai.

Proposal for production of 5100 MT per year capacity Plastic Furniture, Plastic Mat and other Plastic Products at Fatuha Industrial Area, Patna.

5.75 100 26.05.11

412 M/S Tota Rai Food Products, Patna.

Proposal for establishment of 4.5 MT per day capacity Flour Mill in proprietorship at Industrial Area, Fatuha, Patna

0.9754 26 26.05.11

413 M/S Vishwa Laghu Udyog, Muzaffarpur.

Proposal for establishment of 1.80 MTPA Spice and 1.50 MTPA Besan and Sattu unit in proprietorship at Bela Industrial Area, Muzaffarpur.

0.316 11 26.05.11

414 M/S Kesho Food and Beverage Pvt. Ltd, Patna

Proposal for production of 11,500 MT per year capacity Noodles, Sauce,

2.9445 60 26.05.11 05.02.12

Page 41: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

41Ketchup and Pickles at Parsa Bazar, Patna.

415 M/S Harit Bio Energy Pvt. Ltd, (Prom.- M/S Emergent Ventures India Pvt. Ltd), Gurgaon, Haryana (Approval was given on 18.11.08 in SIPB meeting for establishment of 12 MW Biomass based Power Plant at Aurangabad in the name of M/S Emergent Ventures India Pvt. Ltd, again on request of the company approval has been given to newly formed subsidiary company M/S Harit Bio Energy Pvt. Ltd. for the production of 12 MW Biomass based Power Plant at Barwa, Aurangabad on 26.05.11.)

Proposal for establishment of 12 MW Biomass based Power Plant at Vill-Barwa, Aurangabad.

52.00 40 26.05.11

416 M/S Pristine Magadh Infrastructure Pvt. Ltd, New Delhi

Proposal for establishment of Rail Linked Logistic-cum- Industrial Park at Bihta, Patna.

48.26 100 26.05.11

417 M/S Anuj Dairy Pvt. Ltd, Patna

Proposal for production of 5475 MT per year capacity Milk Powder and 255.5 MT per year capacity Butter or 164.25 MT per year capacity Ghee at Industrial Area, Hajipur.

10.00 80 26.05.11 05.04.13

418 M/S Janardhan Ramjhari Enterprises Pvt. Ltd, Madhubani

Proposal for establishment of 18000 MT per year capacity Flour Mill at Pandaul Industrial Area, Madhubani.

1.6458 34 26.05.11 10.04.12

419 M/S Asra Agro Industries, Patna

Proposal for establishment of 7200 MT per year capacity Rice Polishing and Milling unit in proprietorship at Industrial Area, Fatuha, Patna.

2.3743 25 26.05.11

420 M/S Ranjan Foods Products, Darbhanga

Proposal for establishment of 72 MT per year capacity Spices manufacturing unit and 120 MT per year capacity Besan and Sattu production unit in proprietorship at Industrial Area, Donar, Darbhanga.

0.2735 10 26.05.11

421 M/S Avyn Enterprises Pvt. Ltd, Prunea

Proposal for establishment of 08 MT per hour Grain and Rice sorting and 03 MT per hour Rice Grading and 20,000 MT Dry Warehouse under R.A.B.C at Ghourdaur, Haveli, Purnea.

12.94 70 26.05.11

422 M/S Shyam Industries, Gaziabad

Proposal for establishment of 2400 MT per year capacity Washing Powder unit in proprietorship at Industrial Area, Fatuha, Patna.

1.2063 25 26.05.11

423 M/S Vinayak Food Industries, Saharsa

Proposal for establishment of 1440 MT per year capacity Sattu, Besan, Atta production unit in proprietorship at Industrial Area, Saharsa.

0.6725 09 26.05.11

424 M/S Shree Ganpati Enterprises, Patna

Proposal for establishment of Offset Printing, Binding and Stitching unit in proprietorship at Industrial Area, Fatuha, Patna.

2.3541 36 26.05.11

425 M/S Jagdamba Bhawani Enterprises Pvt. Ltd, East Champaran.

Proposal for establishment of 03 MT per hour capacity Modern Rice Mill, two Warehouse of 3225 sq ft and 150 KVA Gasifier unit at Adapur, East Champaran.

1.5750 30 26.05.11 17.09.11

426 M/S Moser Baer Power and Proposal for establishment of 1980 MW Coal 11000.00 2000 26.05.11

Page 42: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

42Infrastructures Ltd, New Delhi. (Earlier on 26.05.11 approval was given by SIPB for establishment of 1980 MW Coal based Thermal Power Plant at Morma, Lakhisarai. Again on company’s request, amending the above proposal consent has been given for change of place from Morma, Lakhisarai to Banka in SIPB meeting held on 18.09.12.)

based Thermal Power Plant at Banka. 18.09.12

427 M/S Kritika Rice Mill Pvt. Ltd, Samastipur

Proposal for establishment of 14400 MT per year capacity Modern Rice Mill and Warehouse at Basudeopur, Kalyanpur, Samastipur.

4.48 35 26.05.11 02.12.11

428 M/S Premier Cryogenics Ltd, Guwahati.

Proposal for establishment of Liquid Oxygen- 10800000 Cubic Meter per year capacity, Oxygen Gas- 2160000 Cubic Meter per year capacity, Liquid Nitrogen- 2880000 Cubic Meter per year capacity, Nitrogen Gas-720000 Cubic Meter per year capacity, Compressed Air-360000 Cubic Meter per year capacity at Fatuha, Patna.

27.00 50 26.05.11 23.06.13

429 M/S Ananya Agro Tech Pvt. Ltd, Patna

Proposal for establishment of 2.5 MT per hour Modern Rice Mill and 1000 MT Warehouse at Giddha Growth Centre, Ara(Bhojpur).

2.3275 60 26.05.11 16.08.12

430 M/S Bihar Distillers & Bottlers Pvt. Ltd., Chandigarh (unit-1)

M/S Bihar Distillers & Bottlers Pvt. Ltd., Chandigarh (unit-2) (Approval has been given only on proposal for production of IMFL except country Liquor in SIPB meeting held on 17.07.14.)

(Earlier on 26.05.11 approval was given for establishment of 330 KLPD capacity of Distillery Plant for production of ENA, RS, IMFL, Country Liquor, Industrial Alcohol, Absolute Alcohol, DNS, Ethanol in the name of M/S Chandigarh Distillers and Bottlers Ltd. at Patna/Vaishali. Again on company's request, Cancelling the above proposal, approval has been given for establishment of 660 KLPD capacity of

Proposal for establishment of 217800 KLPA (660 KLPD ) Molasses/Garin based Distillery Plant (ENA, RS/IA production unit at Bhojpur. Proposal for establishment of 24 Lac Cases per year capacity IMFL production unit at Bhojpur.

150.0000

10.0000

140 17.07.14

17.07.14

26.05.11

16.04.12

Page 43: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

43Distillery Plant for production of ENA, RS, IMFL, Country Liquor, Industrial Alcohol, Absolute Alcohol in the name of newly formed SPV company M/S Bihar Distillers and Bottlers Pvt. Ltd. at Bhojpur in SIPB meeting held on 16.04.12.)

431 M/S Maa Mundeshwari Cycle Udyog Pvt. Ltd., Aurangabad. . (Earlier, in the SIPB's 96th meeting held on 26.05.11 consent was given for establishment of 30,000 nos. of Bicycle Assembling & Bicycle parts production unit at Aurangabad. Again on promoter’s request amending the above proposal consent has been given for establishment of Bicycle manufacturing and assembling unit for 1000 Bicycle per day capacity in SIPB held on 28.09.11.) (Cancelling the earlier proposal approved on 28.09.11 in the name of M/S Maa Mundeshwari Cycle Udyog for establishment of 1000 pieces per day capacity Bicycle manufacturing and assembling unit at Aurangabad, approval has been given for newly formed company M/S Maa Mundeshwari Cycle Udyog Pvt. Ltd for establishment of 1000 pieces per day capacity Bicycle manufacturing and assembling unit at Aurangabad in SIPB meeting held on 23.02.12.)

Pro posal for establishment of 1000 pieces per day capacity Bicycle manufacturing and assembling unit at Aurangabad.

6.6870 77 26.05.11 28.09.11 23.02.12

01.06.13

432 M/S Maa Urmila Agro Pvt. Ltd, Rohtas

Proposal for establishment of 05 MT per hour Modern Rice Mill unit at Bikramganj, Rohtas.

4.2367 35 26.05.11 02.12.11

433 M/S United Breweries Ltd, Bangalore, Karnataka (U B Group)

Proposal for establishment of 10 lac Hecto Liter per year capacity Beer production unit at Kopakala, Naubatpur, Patna.

200.00 294 26.05.11 23.07.14

434 M/S Mahajan Rice Mills Pvt. Ltd, Patna.

Proposal for capacity expansion of existing Rice Mill from 02 MT per hour capacity to 07 MT per hour capacity and modernization at Nokha, Rohtas.

7.63 35 26.05.11 02.12.11

435 M/S Prasad Udyog, Purnea Proposal for establishment of 2400 MT per year capacity Dal Mill unit in proprietorship at Industrial Area, Maranga, Purnea.

1.5552 17 27.07.11

436 M/S Guptaji Brothers Rice Mills Pvt. Ltd, Rohtas.

Proposal for establishment of 12 MT per hour capacity Modern Rice Mill at Dalmia Nagar, Rohtas

14.2378 83 27.07.11 16.08.12

Page 44: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

44437 M/S Sri Hari Rice Mills Pvt.

Ltd, Kaimur, Bhabhua.

Proposal for establishment of 03 MT per hour capacity Modern Rice Mill at Dadava, Mohania, Kaimur, Bhabhua.

1.5661 42 27.07.11

438 M/S Kudra Rice Mill Pvt. Ltd, Kaimur, Bhabhua.

Proposal for establishment of 19,200 MT per year capacity Modern Rice Mill and 150 KVA Gasifier unit at Kudra, Kaimur, Bhabhua.

1.8871 44 27.07.11

439 M/S Muzaffarpur Modern Rice Mill, New Delhi.

Proposal for establishment of 144 MT per day capacity Modern Rice Mill unit in partnership at Chajan, Harishnagar, Turki, Muzaffarpur.

2.1664 38 27.07.11 25.04.12

440 M/S Pack Care Industries, Patna.

Proposal for establishment of 1200 MT per year capacity Corrugated Paper and Boxes unit in proprietorship at Industrial Area, Fatuha, Patna.

1.2154 23 27.07.11

441 M/S Shree Hanumanjee Modern Rice Mill Pvt. Ltd, Sasaram.

Proposal for establishment of 10 MT per hour Modern Rice Mill unit at Godwar, Shivsagar, Sasaram, Dist.-Rohtas.

10.0288 150 27.07.11 18.12.11

442 M/S Narayan Poly Tube, Siwan.

Proposal for establishment of 360 MT per year capacity PVC Rigid Pipe production unit in partnership at Industrial Area, Fatuha, Patna.

2.0869 21 27.07.11

443 M/S Nandita Poultry Integrators Pvt. Ltd, Ranchi.

Proposal for 30,000 MT per year capacity expansion in the existing unit of 18,000 MT per year capacity of Poultry Feed and Cattle Feed at Industrial Area, Hajipur.

5.4853 21 27.07.11

444 M/S Hari Om Narar Rice Mill Pvt. Ltd, Madhubani.

Proposal for establishment of 03 MT per hour Modern Rice Mill, 5000 MT Warehouse and Gasifier unit at Kaluahi, Madhubani.

1.2585 20 27.07.11

445 M/S Vaishali Fresh Fruits and Vegetables Pvt. Ltd, Patna.

Proposal for capacity expansion from 2500 MT per year capacity to 7500 MT per year capacity in the existing unit of Fresh Fruits and Vegetable Processing at Industrial Area, Hajipur.

0.7517 28 27.07.11

446 M/S Responce Renewable Energy Ltd, Kolkata. (Earlier on 27.07.11 approval was given for establishment of Power Generation unit with the help of 25 MW Solar PV Modules at Madhubani, Buxar or Chapra. Again on company's request, amending above, approval has been given for establishment of the same proposal at Nawada in the name of M/S Responce Renewable Energy Ltd., Kolkata in SIPB meeting held on 26.03.12.) (Approval has been given by SIPB on the proposal for calculating date of SIPB approval from the date of Power Purchase Agreement in SIPB meeting held on

Proposal for establishment of Power Generation unit with the help of 25 MW Solar PV Modules at Nawada.

425.00 150 27.07.11 26.03.12 24.05.13

Page 45: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

4524.05.13.)

447 M/S Shree Shree Dwarikaji Agro Pvt. Ltd, Patna City, Patna.

Proposal for establishment of 60,000 MT per year capacity Soya Oil and Soya Nugget production unit at Nagla, Malsalami, Patna City.

25.80 157 27.07.11

448 M/S Pandoul Flour Mills Pvt. Ltd, Darbhanga.

Proposal for establishment of 59, 100 MT per year capacity Folur Mill unit at Industrial Area, Pandaul, Madhubani.

8.6761 40 27.07.11 25.05.13

449 M/S Jai Kisan Food Products Pvt. Ltd, Sasaram, Rohtas.

Proposal for establishment of 15,360 MT per year capacity Grain Sorting and Grading unit and 6000 MT Warehouse under R.A.B.C. at Chandwa, Rohtas.

4.2977 30 27.07.11

450 M/S Good Health Dairy Products Pvt. Ltd, Kolkata.

Proposal for establishment of 3,65,00000 Liters per year capacity Milk Chilling Plant at Industrial Area, Samastipur.

0.80 25 27.07.11

451 M/S Phular Cold Storage Pvt. Ltd, Vaishali.

Proposal for establishment of 11,000 MT Multipurpose Cold Storage, Multiproduct Grading Line and Agri Mall Warehouse under R.A.B.C. at Mansoorpur, Kanti, Muzaffarpur.

8.5450 40 27.07.11 30.09.11

452 M/S Unique Food Industries, Aurangabad.

Proposal for establishment of 05 MT per hour Rice Mill, 2000 MT Warehouse and 250 KVA Gasifier unit in proprietorship at Aurangabad Industrial Area, Aurangabad.

1.3862 35 27.07.11 16.02.12

453 M/S Om Shakti Sitaram Rice Mill Pvt. Ltd, Rohtas.

Proposal for establishment of 04 MT per hour Rice Mill unit and 4000 MT Warehouse at Ghausiankala, Bikramganj, Rohtas.

5.6961 44 27.07.11 27.02.12

454 M/S Maa Mundeshwari Agro Mills Pvt. Ltd, Aurangabad.

Proposal for establishment of 12000 MT per year capacity Roller Flour Mill unit at Industrial Area, Aurangabad.

3.7519 30 27.07.11

455 M/S Lal Kesra Rice Mill Pvt. Ltd, Sasaram, Rohtas.

Proposal for establishment of 14400 MT per year capacity Rice Mill unit and 3000 MT Warehouse at Karhgar, Rohtas.

4.4640 36 27.07.11 18.01.14

456 M/S Maa Bhagwati Kalyanpur Cold Storage Pvt. Ltd, Samastipur.

Proposal for establishment of 6000 MT Multipurpose Cold Storage under R.A.B.C at Kalyanpur, Bibhutipur, Samastipur.

8.5450 100 27.07.11 30.09.11

457 M/S Laxmi Narayan Enterprises Pvt. Ltd, Patna.

Proposal for establishment of 08 MT per hour Modern Rice Mill, 1000 MT Warehouse at Rani, Bhojpur.

9.1260 68 27.07.11 19.04.12

458 M/S Narmedeshwar Rice Mills Pvt. Ltd, Howrah, West Bengal.

Proposal for establishment of 08 MT per hour Modern Rice Mill unit and 4 Warehouse of 5000 Square Feet at Industrial Growth Centre, Aurangabad.

9.6290 60 27.07.11 08.01.12

459 M/S Ganesh Edibles LLP, Muzaffapur.

Proposal for establishment of 60,000 MT per year capacity Refined and Hydrogenated Oil production unit at Baijnathpur, Ahiyapur, Muzaffarpur.

26.63 150 27.07.11

460 M/S L V Commercial Pvt. Ltd, Patna.

Proposal for establishment of 49,500 MT per year capacity Roller Flour Mill at E.P.I.P, Hajipur.

11.1410 69 27.07.11

461 M/S Nalanda Biscuit Company Ltd, Patna.

Proposal for establishment of 75,000 MT per year capacity Flour Mill unit at E.P.I.P, Hajipur.

14.6753 40 27.07.11

Page 46: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

46462 M/S Sai Dairy, Purnea. Proposal for establishment of

8,64,000 Liters per year capacity Pasteurized Milk and Toned/Double Toned Milk and 74,520 Kg per year capacity Ghee and Milk Cream unit in proprietorship at Industrial Growth Centre, Purnea.

0.4790 18 27.07.11 21.01.13

463 M/S Meena Binay Nishant Bhawani Cold Storage Pvt. Ltd. (M.B.N.B. Cold Storage Pvt. Ltd,), Patna.

Proposal for establishment of 9000 MT capacity Cold Storage under R.A.B.C. at Teghra, Begusarai.

9.3253 14 27.07.11 01.02.12

464 M/S Vaishali Enterprises and Cold Storage Pvt. Ltd, Patna.

Proposal for establishment of 11,000 MT Cold Storage unit under R.A.B.C. at Giddha Industrial Growth Centre, Ara, Bhojpur.

10.00 70 27.07.11 02.12.11

465 M/S Suman Grih Food Products Pvt. Ltd, Bhagalpur.

Proposal for establishment of 300 MT per year capacity production unit of different types of Papad at Sultanganj Bazar, Bhagalpur.

0.9441 15 27.07.11

466 M/S Claro Energy Pvt. Ltd, New Delhi.

Proposal for establishment of 2x5 MW Solar PV Power Project at Gopalganj and Khagaria.

160.00 500 27.07.11

467 M/S Bihar Milk Products Pvt. Ltd, Bhojpur.

Proposal for establishment of 4 Lakh Liter per day capacity Milk Processing unit at Industrial Area, Bihiya, Bhojpur.

21.35 77 27.07.11

468 M/S River Valley Flour Mills Pvt. Ltd, Hajipur, Vaishali.

Proposal for capacity expansion from 49,500 MT per year capacity to 75,000 MT per year capacity in the existing unit of Flour Mill at Industrial Area, Hajipur.

6.20 17 27.07.11 19.04.12

469 M/S Ganesh Laxmi Rice Mills Pvt. Ltd, Rajauli, Nawada.

Proposal for establishment of 1,20,000 MT per year capacity Rice Mill at Chautha, Nawada.

2.0203 24 27.07.11 26.04.13

470 M/S Buddha Packaging Industry, Patna. (Earlier, in the SIPB meeting held on 27.07.11 consent was given in the name of M/S Buddha Corrugated Industry for establishment of 120 MT per year capacity Corrugated Paper, Board and Boxes production unit in proprietorship at Industrial Area, Fatuha, Patna. Again on request of promoter consent has been given for establishment of 120 MT per year capacity Corrugated Paper, Board and Boxes production unit in proprietorship in the name of M/S Buddha Packaging Industry at Industrial Area, Fatuha, Patna.)

Proposal for establishment of 120 MT per year capacity Corrugated Paper, Board and Boxes production unit in proprietorship at Industrial Area, Fatuha, Patna.

1.00 23 27.07.11 28.09.11

471 M/S Girja Devi Polytechnic College(Promoter- M/S Suchit Singh Memorial Educational Trust), Patna.

Proposal for establishment of Polytechnic Institute in the name of Girja Devi Polytechnic College by the Trust at Bihiya, Bhojpur.

1.3593 52 27.07.11

472 M/S Bangur Cement ( Unit of Shree Cement Ltd.), New Delhi. (Cancelling the earlier proposal approved on 27.07.11 for establishment of

Proposal for establishment of 20 Lakh MT per year capacity Cement Plant and 12 MW Biomass based Captive Power Plant unit at Aurangabad.

337.0000 300 27.07.11 09.04.12 08.02.13

Page 47: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

4710 Lakh MT per year capacity Cement Plant and Captive Power Generation at Aurangabad, approval has been given for establishment of 10 Lakh MT capacity Cement Plant and 12 MW Biomass based Captive Power Plant at Aurangabad in SIPB meeting held on 09.04.12.) ( Approval has been given for establishment of 20 Lakh MT per year capacity Cement Plant and 12 MW Biomass based Captive Power Plant at Aurangabad in place of 10 MT per year capacity Cement Plant and 12 MW Biomass based Captive Power Generation Plant at Aurangabad in SIPB meeting held on 08.02.13.) (Approval has been given on the proposal for change of name as M/S Bangur Cement(Unit of Shree Cement Ltd., New Delhi) in place of earlier approved name M/S Shree Cement Ltd., New Delhi in SIPB meeting held on 11.06.14.)

11.06.14

473 M/S Mithila Rice Mills Pvt. Ltd, Darbhanga.

Proposal for establishment of 06 MT per hour Modern Rice Mill, 2000 MT Warehouse and 400 KW Biomass Gasifier unit at Darbhanga.

4.3720 50 27.07.11

474 M/S B K Industries Ltd, Patna.

Proposal for establishment of 12000 MT Cold Storage and 6000 MT Warehouse under R.A.B.C. at Ilmas Nagar, Samastipur.

14.93 50 27.07.11 18.12.11

475 M/S Tirhut Industries Ltd, New Delhi.

Proposal for establishment of 5000 TCD capacity Integrated Sugar Mill, 60 KLPD Distillery Plant and 28 MW Co-generation Power Plant at Ryam, Keoti, Darbhanga.

313.40 526 27.07.11

476 M/S Mor Mukat Marketing Pvt. Ltd, New Delhi.

Proposal for establishment of 150 BPM capacity RTS Juice Plant unit at Nasriganj, Danapur, Patna.

7.2990 40 27.07.11 30.09.11

477 M/S Chaucer Capital, London. (Approval was given on 27.7.11 in SIPB meeting for establishment of 20 MW Solar Power Project unit at Dobhi, Barachatti, Gaya Again on request of the company approval has been given on the proposal for change of place as Vill.- Kanodi, Wajirganj Block/Vill.- Naroghat, Manpur Block, Gaya in the place of Dobhi, Barachatti, Gaya., Patna in the SIPB meeting held on 24.05.13.)

Proposal for establishment of 20 MW Solar Power Project unit at Vill.- Kanodi, Wajirganj Block/Vill.- Naroghat, Manpur Block, Gaya.

328.00 125 27.07.11

24.05.13

Page 48: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

48

478 M/S Om Shri Laxminarayan Education Foundation Ltd., Patna

Proposal for establishment of 120 lakh Litres per year capacity of Packaged Drinking Water, 10 Lakh Litres per year capacity of Soda Water and 40 Lakh Litres per year capacity of Fruit based Beverage unit at Industrial Area, Patliputra, Patna.

15.8000 100 28.09.11

479 M/S Om Sai Cold Storage Pvt. Ltd., Samastipur.

Proposal for establishment of 6000 MT per year capacity Multipurpose Cold Storage under R.A.B.C. at Lohagir, Ujiarpur, Samastipur.

7.1500

70 28.09.11

480 M/S Kundan Food Industries, Saharsa

Proposal for establishment of 1200 MT per year capacity of Dal Mill unit in proprietorship at Industrial Area, Saharsa.

0.7083 16 28.09.11

481 M/S Swadist Udyog, Bhagalpur.

Proposal for establishment of production unit of 804 MT per year capacity of Masala, Vermicelli and Papad in proprietorship at Industrial Area, Barari, Bhagalpur.

0.6656 23 28.09.11

482 M/S Mahabali Water Products, Biharsharif

Proposal for establishment of 7200 Kilo Litre per year capacity Packaged Drinking Water and Soda Water unit in Partnership at Sosarai, Nalanda.

1.6359 21 28.09.11

483 M/S Ma Shitla Onion Storage Pvt. Ltd., Nalanda.

Proposal for establishment of 4200 MT per year capacity Onion Storage unit at Noorsarai, Nalanda.

1.4756 14 28.09.11

484 M/S Rambriksha Food and Beverage Pvt. Ltd., Patna

Proposal for establishment of 97.92 Lakh Litres per year capacity of Packaged Drinking Water and Soft Drink unit at Pahari, Transport Nagar, Patna.

0.6830 66 28.09.11

485 M/S Om Sai Ram Beverages and Food Pvt. Ltd, Patna.

Proposal for establishment of production unit of 72 Lakh Litres per year capacity Packaged Drinking Water at Nandlal Chapra, Patna.

0.7000 21 28.09.11

486 M/S Aahar Feeds and Agro Products Pvt. Ltd., Patna

Proposal for establishment of 33,000 MT per year capacity Poultry Feed unit at Fatuha Industrial Area, Fatuha, Patna.

10.3375 21 28.09.11

487 M/S Anjali Rice Mill Pvt. Ltd, Patna.

Proposal for expansion of 3 MT per hour capacity of Modern Rice Mill, 14000 Sq. Ft. Warehouse and Gasifier unit in the existing unit at Sadallichak, Patna.

2.6624 49 28.09.11

488 M/S Kalpana Foods Pvt. Ltd, Patna.

Proposal for establishment of 3 MT per hour capacity Modern Rice Mill and 1000 MT Warehouse unit at Fatuha Industrial Area, Fatuha.

2.2548 12 28.09.11

489 M/S Sunasi Food and Beverages Pvt. Ltd., Patna.

Proposal for establishment of production unit of 150 MT per year capacity Ethnic and Extruded Foods(Ready to eat Namkin Extruded Snacks, Packaged Food, Spices & Paste of Spices, Indian Sweets, Potato Chips and Wafer) at Industrial Growth Centre, Giddha.

1.6200 14 28.09.11

490 M/S Bhilwara Energy Ltd, Noida, Uttar Pradesh.

Proposal for establishment of 10 MW Solar Energy Power Generation Plant at Muzaffarpur.

169.0000 20 28.09.11 (Consent with condition)

Page 49: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

49491 M/S Carlsberg India Pvt. Ltd.,

Gurgaon,Haryana. (Cancelling the earlier proposal approved on 28.09.11 for establishment of 10 Lakh Hecto Litre per year capacity of Beer production unit at Koilwar, Bhojpur, approval has been given for establishment of 10 Lakh Hecto Litre per year capacity of Beer production unit at Bikram, Patna in SIPB meeting held on 11.06.12.)

Proposal for establishment of 10 Lakh Hecto Litre per year capacity of Beer production unit at Bikram, Patna.

140.00 600 28.09.11 11.06.12

22.10.13

492 M/S Thakur Modern Cold Storage Pvt. Ltd., East Champaran.

Proposal for establishment of 6000 MT per year capacity Cold Storage unit under R.A.B.C at Mathiyavrit, Chhouradano, East Champaran.

5.8021 40 28.09.11

493 M/S Recon, Patna. Proposal for establishment of I.T. Park and Five-Star Hotel-cum-Shopping Complex in proprietorship at Industrial Area, Patliputra, Patna.

190.0300 161 28.09.11 (Consent with condition)

494 M/S A 2 Z Powercom Ltd., Gurgaon, Haryana.

Proposal for establishment of 05-05 MT per hour capacity of Modern Rice Mill and 02-02 MW Biomass Based Power Plant in each district of Buxar and East Champaran.

37.8400 150 28.09.11

495 M/S Mansi Bijlee & Rice Mills Pvt. Ltd., Gurgaon, Haryana.

Proposal for establishment of 05-05 MT per hour capacity of Modern Rice Mill and 02-02 MW Biomass Based Power Plant in each district of Bhojpur, Rohtas and Kaimur.

56.7600 225 28.09.11

496 M/S IPL Sugar & Allied Industries Ltd., New Delhi.

Proposal for modernization and capacity expansion from 1219 TCD capacity to 3500 TCD capacity, 46 KLPD Distillery Plant and 20 MW Co-generation Plant in the existing Sugar Mill at Motipur, Muzaffarpur.

257.0000 413 28.09.11

497 M/S Usher Agro Ltd., Buxar Proposal for additional capacity expansion of 100,000 MT per year and 01 MW Rice Husk based Power Plant in the existing Rice Mill of 47,600 MT per year capacity.

48.8800 100 28.09.11

498 M/S Ganesh Steel Impex Ltd., Muzaffarpur.

Proposal for establishment of 21,900 MT per year capacity of Aluminum Profiles and Lead Ingot unit at Thuhwa, Kuddhani, Muzaffarpur.

8.9000 150 28.09.11

499 M/S Shivam Vincom Pvt. Ltd., Muzaffarpur.

Proposal for establishment of production unit of 42,000 MT per year capacity of Lead Ingot and Lead Plate at Baidhyanathpur, Muzaffarpur.

12.0000 150 28.09.11

500 M/S Sri Sri Cold Storage, Purnea.

Proposal for capacity expansion from 7000 MT to 14,000 MT in the existing Multipurpose Cold Storage unit in proprietorship at Industrial Growth Centre, Maranga, Purnea.

9.9500 60 28.09.11

501 M/S Tulsyan Cans & Cardboards Pvt. Ltd., Kolkata.

Proposal for establishment of production unit of 15000 MT per year capacity of Automatic Corrugated Cardboard Boxes at Bihiya, Bhojpur.

11.5500 260 28.09.11

502 M/S Sitamarhi Flour Mill Pvt. Ltd., Sitamarhi.

Proposal for establishment of 125 MT per day capacity of Roller Flour

9.4800 45 28.09.11 27.06.14

Page 50: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

50Mill unit at Banchauri, Dumra, Sitamarhi.

503 M/S Alok Harsh Rice Mill Pvt. Ltd., Danapur, Patna.

Proposal for establishment of 70 MT per day capacity of Modern Para Boiled Rice Mill unit at Giddha Industrial Growth Centre, Ara.

7.3600 42 28.09.11 27.02.12

504 M/S Achyut Shanti Foods Pvt. Ltd., Patna.

Proposal for establishment of production unit of 18,000 MT per year capacity of Besan, Sattu and Daliya at Industrial Area, Fatuha, Patna.

1.1100 25 28.09.11

505 M/S Mrigendra Cold Storage Pvt. Ltd., Begusarai.

Proposal for establishment of 50,000 Litre per day capacity of Milk Processing unit at Rajwara, Begusarai.

2.8730 30 28.09.11

506 M/S Danapur Flour Mills Ltd., Patna.

Proposal for modernization and capacity expansion from 33,000 MT per year capacity to 58,500 MT per year capacity in the existing Flour Mill at Nasriganj, Danapur, Patna.

5.0875 17 28.09.11 07.06.12

507 M/S Shri Sai Nath Enterprises, Muzaffarpur.

Proposal for establishment of production unit of 480 MT per year capacity of Vermicelli, Noodles, Disco Chips and Finger Chips in proprietorship at Industrial Area, Bela, Muzaffarpur.

0.8235 9 28.09.11

508 M/S Vaishali Flour Mills, Patna

Proposal for capacity expansion from 100 MT per day to 172 MT per day capacity in the existing unit of Flour Mill in proprietorship at Nasriganj, Digha, Patna.

1.8825 40 28.09.11

509 M/S Mithla Flour Mills, Darbhanga.

Proposal for capacity expansion from 200 MT per day to 310 MT per day capacity in the existing Roller Flour Mill unit in proprietorship at Gangwara, Makhwara, Darbhanga.

3.1207 40 28.09.11 (Consent with condition)

510 M/S Jass Agri Products Pvt. Ltd., New Delhi.

Proposal for establishment of 5 MT per hour capacity Modern Rice Mill and 4000 MT Warehouse unit at Jhumma, Rooni Saidpur, Sitamarhi.

4.9941 50 28.09.11

511 M/S Arihant Naturecrop Pvt. Ltd., Vadodara, Gujarat.

Proposal for establishment of 2500 MT/Kilo Litre per year capacity of Bio Fertilizer and Bio Pesticides unit at Lodipur, Rajgir, Nalanda.

2.3649 46 28.09.11

512 M/S Bhagwati Cylinders Pvt. Ltd., Samastipur.

Proposal for establishment of manufacturing unit of 3,00,000 piece per year capacity of LPG Cylinder at Rajajan, Mohiuddin Nagar, Samastipur.

8.3400 108 28.09.11 28.06.12

513 M/S Sona Sati Organics Pvt. Ltd., Patna. (Cancelling the earlier proposal approved on 28.09.11 for establishment of 60 KLPD Molasses Based Distillery and 1.5 MW Co-generation Power Plant at Rajpatti Kothi, Rajpatti, Gopalganj,approval has been given for establishment of 60 KLPD Distillery Plant (Grain/Molasses Based) and 3 MW Co-generation Power Plant at Rajpatti Kothi,

Proposal for establishment of 60 KLPD Distillery Plant(Grain/Molasses Based) and 3 MW Co-generation Power Plant at Rajpatti Kothi, Rajpatti, Gopalganj.

86.37

49

28.09.11 13.08.12

18.12.11

Page 51: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

51Rajpatti, Gopalganj in SIPB meeting held on 13.08.12.)

514 M/S Rameshwaram Rice Mills Pvt. Ltd., Patna.

Proposal for establishment of 4 MT per hour capacity of Boiled Rice Mill unit at Kaimur, Bhabhua.

7.6236 40 28.09.11 23.08.12

515 M/s Harinagar Sugar Mills Ltd., Harinagar, W. Champaran.

Proposal for diversification of existing 13,500 Kilo Litre per year capacity of Distillery Plant for Extra Neutral Alcohol production unit of its same capacity at Harinagar, Bagha, East Champaran.

12.0000 87 28.09.11

516 M/S Pawapuri Rice Mills, Nalanda.

Proposal for establishment of 4 MT per hour capacity of Para Boiled Rice Mill unit in proprietorship at Chausa, Pokharpur, Pawapuri, Nalanda.

4.7887 31 28.09.11 31.07.13

517 M/S ABG Cement Ltd., Mumbai.

Proposal for establishment of 1.5 MTPA (Million Ton per year) Cement Grinding Plant and 12 MW Coal Based Captive Power Plant at Pandarak, Barh.

548.6460 230 28.09.11

518 M/S Keshav Madhav Agro Enterprises Pvt. Ltd., Patna.

Proposal for establishment of 150 MT per day capacity of Roller Flour Mill unit at Fatehpur, Nawada.

10.4975 50 28.09.11 16.02.12

519 M/S Takshila Seas & Resorts Pvt. Ltd., Mumbai.

Proposal for establishment of Water Park and Pool Restaurant unit at Sona Gopalpur, Patna.

6.3000 102 28.09.11 (Consent with condition)

520 M/S Avon Cycles Ltd., Ludhiana, Punjab.

Proposal for establishment of production unit of 03 Lakh piece per year capacity of Bicycle and Cycle Parts at Patna or Vaishali.

8.0000 500 28.09.11 11.07.13 (For E.P.I.P., Hajipur)

521 M/S Standard Properties Pvt. Ltd., Patna.

Proposal for establishment of Hotel and Business Centre at Kidwaipuri, Patna.

32.5000 35 28.09.11 (Consent with condition)

522 M/S Mithla Dairy Pvt. Ltd., Mumbai.

Proposal for establishment of 35,000 Litres per day capacity of Milk Processing unit at Industrial Area, Pandaul, Madhubani.

5.0100 50 28.09.11 21.07.13

523 M/S Modern Amrit Feed Company Pvt. Ltd., Samastipur.

Proposal for establishment of 12,000 MT per year capacity Poultry Feed and Cattle Feed unit at Mohanpur, Samastipur.

3.9277 31 28.09.11 15.12.12

524 M/S Jai Shree Balaji Fats & Oils Pvt. Ltd., Kolkata.

Proposal for establishment of 250 TPD Edible Oil Refinery, 100 TDP Banaspati Oil Plant, 50 TPD Rice Bran Oil/ Sun Flower Oil / Solvent Oil and 01 MW Captive Power Plant at Akbar Malahi, Lalganj, Vaishali.

65.5000 130 28.09.11

525 M/S JRN Enterprises Pvt. Ltd., New Delhi.

Proposal for establishment of 360 MT per year capacity of Pickles manufacturing unit and 16,500 MT per year capacity of Besan manufacturing unit at Industrial Area, Fatuha, Patna.

1.7754 24 28.09.11 27.02.12

526 M/S Ultra Tech Cement Ltd., Mumbai.

Proposal for establishment of 02 Million Ton per year capacity of Cement Grinding unit at Fatuha, Patna.

326.1000 246 28.09.11 14.02.12

527 M/S Dumraon Textiles Ltd., Dumraon, Buxar.

Proposal for capacity expansion from 17,160 spindles per year to 17992 spindles per year capacity in the existing unit of cotton yarn at Dumraon.

6.7782 707 28.09.11

Page 52: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

52528 M/S Skill Foods Pvt. Ltd.,

Patna. Proposal for establishment of 1000 MT Multi Purpose Cold Storage and 5000 MT Dry Warehouse unit at Siljori, Chandan, Banka.

1.1700 30 28.09.11

529 M/S Nandan Biomatrix Ltd., Hyderabad.

Proposal for establishment of production unit of 45,000 MT per year capacity of Crude Jatropha oil under Public Private Panchayat Partnership Model at Jhajaha and Jamui.

200.0000 4576 28.09.11 (Consent with condition)

530 M/S Amar Roller Flour Mills Pvt. Ltd., Chapra.

Proposal for establishment of 100 MT per day capacity of Flour Mill unit at Chapra(Saran).

5.1700 39 28.09.11 01.02.13

531 M/S R.K. Poultry Feed Industries, Hajipur(Vaishali). (Earlier on 28.09.11 approval was given for capacity expansion from 6,000 MT per year capacity to 30,000 MT per year capacity in the existing Poultry Feed unit in partnership at Industrial Area, Hajipur in the name of M/S R.K. Feed Industries. Again request for adding the word 'Poultry' in the company's name, approval has been given for capacity expansion from 6,000 MT per year capacity to 30,000 MT per year capacity in the existing Poultry Feed unit in partnership at Industrial Area, Hajipur in the name of M/S R.K. Poultry Feed Industries in SIPB held on 23.02.12.)

Proposal for capacity expansion from 6,000 MT per year capacity to 30,000 MT per year capacity in the existing Poultry Feed unit in partnership at Industrial Area, Hajipur.

2.6365 21 28.09.11 23.02.12

29.06.13

532 M/S Tirupati Commodities Pvt. Ltd., Kolkata.

Proposal for establishment of 4870 MT per year capacity of Jute goods unit at Purnea.

9.6008 660 28.09.11

533 M/S R.M. Industries, Ara, Bhojpur.

Proposal for establishment of manufacturing unit of 600 MT per year capacity of Brass utensils in proprietorship at Industrial Area, Growth Centre, Giddha.

1.3293 29 28.09.11

534 M/S Parmeshwari Aqua Pvt. Ltd., Madhubani.

Proposal for establishment of 96 Lakh Litres per year capacity of Packaged Juice, Areated Fruit Drinks, Drinking Water and Soda Water unit at Industrial Area, Pandaul, Madhubani.

1.0381 21 28.09.11

535 M/S Unibell Polyplast Pvt. Ltd., Patna.

Proposal for establishment of production unit of 2220 MT per year capacity of PVC Rigid Pipe and Fittings at Bhaghakole, Bikram, Patna.

3.0315 25 28.09.11 31.10.12

536 M/S LV Enterprises Pvt. Ltd., Patna.

Proposal for establishment of 250 MT per day capacity of Roller Flour Mill unit at Hajipur(Vaishali).

15.3000 69 28.09.11 05.09.12

537 M/S Laxmivinayak Ventures Pvt. Ltd., Patna.

Proposal for capacity expansion from 01 Lakh MT per year capacity to 1.5 Lakh MT per year capacity in the existing unit of Detergent powder at Hajipur(Vaishali).

16.9400 150 28.09.11

538 M/S Krrish Engicon Pvt. Ltd., Proposal for establishment of 37.4800 72 28.09.11

Page 53: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

53Patna. Multiplex-cum-Shopping Mall and

Hotel at Sudarshan Path, Patna City, Patna.

(Consent with condition)

539 M/S Gandiv Builder and Engineers Pvt. Ltd., Patna.

Proposal for establishment of Hotel in the name of Hotel Gargee Grand in two stages at Exhibition Road, Patna.

14.1000 49 28.09.11 (Consent with condition)

10.04.12

540 M/S Rohit Surfactants Pvt. Ltd., Kanpur. (Approval has been given on the proposal for establishment of 2,50,000 MT per year capacity Detergent Cake, Detergent powder, LABSA (Linear Alkaline Benzene Sulforation, Acid Slurry for Soaps) unit at Vill.- Bithouli, Hajipur, Vaishali in place of Fatuha Industrial Area, Fatuha, Patna in the SIPB meeting held on 24.05.13.) (SIPB has noted the change of name of the company from M/S Rohit Surfactants Pvt. Ltd to M/S R. S. P. L. Ltd in the SIPB meeting held on 02.09.13.)

Proposal for establishment of 2,50,000 MT per year capacity Detergent Cake, Detergent powder, LABSA (Linear Alkaline Benzene Sulforation, Acid Slurry for Soaps) unit at Vill.- Bithouli, Hajipur, Vaishali.

79.0000 77 28.09.11

24.05.13

02.09.13

541 M/S Pearl Processing Industries, Patna.

Proposal for establishment of 4125 MT per year capacity of Sugar Cube and Candy production unit in partnership at Mohali Road, Karmalichak, Agamkuan, Patna City, Patna.

2.3800 16 28.09.11 01.02.13

542 M/S Meridian Budha Hotels Pvt. Ltd., Patna.

Proposal for establishment of Five Star Hotel of 90 Rooms at Budh Marg, Patna.

8.8100 160 28.09.11 (Consent with condition)

543 M/S Hotel Windsor, Patna (Unit of M/S Patliputra Fashion Pvt. Ltd.)

Proposal for capacity expansion from 51 Rooms to 79 Rooms in the existing Hotel at Umang Palace, Exhibition Road, Patna.

3.5500 71 28.09.11 (Consent with condition)

544 M/S Yatri Bihar Hospitality Pvt. Ltd., Patna.

Proposal for establishment of Three Star Hotel -cum- Resort of 80 Rooms at Bodh Gaya.

34.3000 135 28.09.11 (Consent with condition)

545 M/S La'-Elixier Ashiyan Estate Developers Pvt. Ltd., Bhagalpur.

Proposal for establishment of 3-4 Star Hotel, Marketing Complex and Amusement Park at Barari Industrial Area, Bhagalpur.

18.8200 400 28.09.11 (Consent with condition)

546 M/S Muskan Event Management and Caterers Pvt. Ltd., Patna.

Proposal for establishment of Resort-cum-Restaurant in the name of Ghar Aangan at Industrial Estate Road, Patliputra Colony, Patna.

1.2500 53 28.09.11 (Consent with condition)

547 M/S MV Hotels & Projects Pvt. Ltd., Patna.

Proposal for establishment of Five Star Hotel of 124 Rooms at Patliputra, Patna.

83.0900 70 28.09.11 (Consent with condition)

548 M/S Schanti Partners LLC, New York.

Proposal for establishment of 10 MW Solar Energy generation unit at Kaimur.

153.0000 210 28.09.11

549 M/S Adani Power Ltd., Ahmedabad, Gujarat.

Proposal for establishment of 1320 MW coal based Super Critical Thermal Power Plant at Lakhisarai.

7707.5700 600 28.09.11 (Consent with

Page 54: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

54condition)

550 M/S Hindustan Clean Energy Ltd., New Delhi. (Approval has been given by SIPB on the proposal for calculating date of SIPB approval from the date of Power Purchase Agreement in SIPB meeting held on 24.05.13.) (Approval has been given on proposal for making in the name of four SPV company in earlier approved project in SIPB meeting held on 28.06.13.) [Approval has been given for change of place and change of name of unit and SPV (Proposal:- Establishment of 10 MW Solar Photo Voltaic Power Plant at Sherghati, Gaya in place of earlier approved at Ramnagar, West Champaran, and proposal for change of name from M/S Moser Baer Clean Energy Ltd. to M/S Hindustan Clean Energy Ltd. and change of name of SPV from M/S Moser Baer Energy & Project Ltd. to M/S Sunmark Energy Project Ltd.) in the SIPB meeting held on 29.01.15. And it is also decided that increasing of time extension of schedule of commercial operation is not related to SIPB, Energy Department will take decision in the context and inform to SIPB.]

1-Proposal for establishment of 10 MW Solar Photo Voltaic Power Plant at Sherghati, Gaya to make a SPV company in the name of M/S Sunmark Energy Project Ltd. 2- Proposal for establishment of 10 MW Solar Photo Voltaic Power Plant at Ramnagar, West Champaran to make a SPV company in the name of M/S Moser Baer Energy System Ltd. 3- Proposal for establishment of 25 MW Solar Photo Voltaic Power Plant at Chakiya, East Champaran to make a SPV company in the name of M/S M.B. Power Projects Ltd. 4- Proposal for establishment of 40 MW Solar Photo Voltaic Power Plant at Banka to make a SPV company in the name of M/S Moser Baer Energy & Research Ltd.

1318.0000

(100.0000)

4200 28.09.11 (Consent

with condition)

24.05.13

28.06.13 29.01.15

551 M/S Hemkund Industries, Patna.

Proposal for establishment of production unit of 63.24 Lakh pieces per year capacity of Fly Ash Bricks, Pavers Block and Tiles in proprietorship at Industrial Area, Fatuha, Patna.

1.6927 23 28.09.11

552 M/S Khushi Beverages Pvt. Ltd., Gaya.

Proposal for establishment of 80 Lakh Liters per year capacity Fruit based Beverage and Carbonated Fruit Juice unit at Manpur, Buniyadganj, Gaya

2.3878 33 23.02.12 28.06.12

553 M/S Aditya Food Products, Patna.

Proposal for establishment of 420 MT per year capacity Noodles production unit in proprietorship at Kurji, Patna.

0.5000 21 23.02.12

554 M/S Shankar Agrotech and Food Pvt. Ltd., Patna.

Proposal for establishment of 18,000 MT per year capacity Roller Flour Mill unit at Chhitnama, Maner, Patna.

2.5200 21 23.02.12 16.10.12

555 M/S Shahabad Agro Pvt. Ltd., Bhojpur, Ara.

Proposal for establishment of 04 MT per hour capacity Modern Para Boiled Rice Mill, 2000 MT

6.7095 50 23.02.12 07.06.12

Page 55: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

55Warehouse and Captive Power Plant at Bihta, Bhojpur.

556 M/S Mahavir Grih Udyog, Patna.

Proposal for establishment of 180 MT per year capacity Vermicelli production unit in partnership at New Harnichak (Tej Pratap Nagar), Anisabad, Patna.

4.6800 6 23.02.12

557 M/S G.M. Exim Pvt. Ltd., Patna.

Proposal for establishment of 2400 MT per year capacity Packing Materials and Corrugated Boxes production unit at Hajipur (Vaishali).

4.5200 51 23.02.12

558 M/S Hotel U.S. Residency, Aurangabad.

Proposal for establishment of 29 Rooms Hotel Project in proprietorship at Aurangabad.

4.6300 40 23.02.12

559 M/S Wave Distilleries and Breweries Ltd., New Delhi.

Proposal for establishment of 5 Lakh HLPA(Hecto Litre per day) capacity Beer production unit in Bihar.

121.1400 375 23.02.12 (Consent with condition)

560 M/S A FP Manufacturing Company Pvt. Ltd, New Delhi.

Proposal for establishment of production unit of 20,000 MT per year capacity Namkin, Bakery and Extruded Snacks in unit-1 and unit-2 at E.P.I. P., Hajipur.

33.0430 142 23.02.12 05.05.13

561 M/S Rathi Feeds India Pvt. Ltd., Haryana.

Proposal for establishment of 36000 MT per year capacity Poultry Feed production unit at Maranga, Purnea.

10.3050 50 23.02.12 29.11.13

562 M/S Skylark Feeds Pvt. Ltd., Haryana.

Proposal for establishment of 200 MT per day capacity Poultry Feed Production unit at Maranga Industrial Area, Purnea

4.4282 22 23.02.12 10.06.14

563 M/S Inspiring Agro Ltd., West Bengal

Proposal for establishment of 100800 Eggs per day capacity Fully Automation Commercial Egg production unit and 80 KWH Power Plant at Mahuabari, Jiradei, Siwan.

17.9506 50 23.02.12

564 M/S Reshma Cold Storage Pvt. Ltd., Vaishali.

Proposal for establishment of 9000 MT Multi Purpose Cold Storage unit under R.A.B.C. at Fulwaria, Mahua, Vaishali.

10.6225 50 23.02.12 16.08.12

565 M/S Om Corrugated Pack Pvt. Ltd., Patna. (Earlier on 23.02.12 approval was given by SIPB for establishment of 7200 MT per year capacity Corrugated Card Board Boxes production unit at E.P.I.P., Hajipur. Again on company’s request, amending the above proposal consent has been given for change of place from E.P.I.P., Hajipur to Mauza-Painal, Bihta, Patna in SIPB meeting held on 18.09.12.)

Proposal for establishment of 7200 MT per year capacity Corrugated Card Board Boxes production unit at Mauza-Painal, Bihta, Patna.

8.5576 36 23.02.12 18.09.12

566 M/S Protech Feed Pvt. Ltd., Patna

Proposal for establishment of 2000 MT capacity Frozen Cold Storage at E.P.I.P., Hajipur.

17.4900 15 23.02.12

567 M/S Protech Feed Pvt. Ltd., Patna

Proposal for establishment of 6000 MT capacity Cold Storage under R.A.B.C., at E.P.I.P., Hajipur.

10.4800 15 23.02.12

568 M/S Panna Agrotech Coldstorage Pvt. Ltd.,

Proposal for establishment of 5000 MT capacity Multi Purpose Cold

2.1848 20 23.02.12 16.08.12

Page 56: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

56Purnea. Storage under R.A.B.C. at Gangoli,

K. Nagar, Purnea. 569 M/S Veer Hanuman Foods

Processing Pvt. Ltd., Kaimur, Bihar.

Proposal for establishment of 05-05 MT per hour capacity Modern Para Boiled Rice Mill and Modern Raw Rice Mill unit at Raziabandh, Mohania, Kaimur.

6.1300 30 23.02.12 27.07.12

570 M/S Millenium Infrastructures Pvt. Ltd., Delhi.

Proposal for establishment of 10 MW Waste to Energy Project(Build Own, Operate Basis) at Patna.

80.0000 50 23.02.12 (Consent with condition)

571 M/S MPOT Energy Ventures Pvt. Ltd., Hyderabad.

Proposal for establishment of 500 MW Natural Gas Based Combined Cycle Duel Fuel Thermal Power Plant at Rupauli, Ujiarpur, Samastipur.

2250.0000 240 23.02.12

572 M/S Balmukund Cement & Roofings Ltd., Patna.

Proposal for establishment of 3,00,000 MT per year capacity Asbestos Fibres Cement Corrugated Flat Sheets and Accessories Plant in two phases at Industrial Develpoment Area, Kahalgaon, Bhagalpur.

81.0000 147 23.02.12

573 M/S Jagat Bakers, Katihar. Proposal for establishment of 90,000 Loaves, 1,06,200 Buns, 90,000 Rusk and 468600 Biscuits/Cookies per year capacity Bakery Plant in proprietorship at Industrial Area, Katihar.

0.4680 31 23.02.12

574 M/S Sri Avantika Contractors (I) Ltd., Hyderabad. (Approval has been given by SIPB on the proposal for calculating date of SIPB approval from the date of Power Purchase Agreement in SIPB meeting held on 24.05.13.)

Proposal for establishment of 05 MW Grid Connected Solar PV Power Project at Rampurwa, Gaunaha, West Champaran.

76.9080 31 23.02.12 24.05.13

12.06.13

575 M/S Hotel Galaxy Intercontinental Pvt. Ltd., Bodh Gaya, Gaya.

Proposal for establishment of Hotel and Restaurant at Mastipur, Bodh Gaya, Gaya

4.9392 43 23.02.12 28.06.12

576 M/S Okpet Bicycles Pvt. Ltd., Patna.

Proposal for establishment of 2,40,000 pieces of Bicycles production unit at Simri, Darbhanga.

4.5203 73 23.02.12 28.06.12

577 M/S Mother's Society for Education and Child Development, Delhi.

Proposal for establishment of Engineering and Management Institute by the Society at Industrial Park, Bihta.

13.7300 82 23.02.12

578 M/S Iceland Beverages Pvt. Ltd., Patna. (Cancelling the earlier proposal approved on 23.02.12 for establishment of 30 Lacs Litres per year capacity IMFL production unit at Industrial Area, Giddha, Bhojpur, approval has been given for establishment of 30 Lacs Litres per year capacity IMFL Plant at Bisanpura, Mahua, Vaishali in SIPB meeting held on

Proposal for establishment of 30 Lacs Litres per year capacity IMFL Plant at Bisanpura, Mahua, Vaishali.

2.5226 37 23.02.12 11.06.12

Page 57: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

5711.06.12.)

579 M/S Kisan Seva Cold Storage Pvt. Ltd., Samastipur.

Proposal for establishment of 10000 MT Multi Purpose Cold Storage Unit under R.A.B.C. at Lakhnipur, Maheshpatti, Samastipur.

8.3000 50 23.02.12 16.08.12

580 M/S Vidyadaan, New Delhi. Proposal for establishment of Engineering College in the name of ''Vidyadaan Institute of Technology and Management'' at Ariaon, Dumraon, Buxar.

11.3295 165 23.02.12

581 M/S Kisan Hi-Tech Agro Foods Pvt. Ltd, Kochas, Rohtas.

Proposal for establishment of 05-05 MT per hour capacity Modern Para Boiled Rice Mill and Raw Rice Mill unit at Kochs, Rohtas.

10.2800 40 23.02.12

582 M/S Hari Narayan Singh Agro Pvt. Ltd., Rohtas.

Proposal for establishment of 08-08 MT per hour capacity Modern Para Boiled Rice Mill and Raw Rice Mill unit at Tilain, Nokha, Rohtas.

8.0057 38 23.02.12

583 M/S Nutrilite Agro Products Pvt. Ltd., Delhi.

Proposal for establishment of 08 MT per hour capacity Modern Para Boiled Rice Mill and 1 MW Husk Based Power Generation unit at Sinduria, Barun, Aurangabad.

18.5500 160 23.02.12

584 M/S ATN Agro Products Ltd., Patna.

Proposal for establishment of 2000 MW Thermal Power Plant at Babura, Bhojpur.

11500.0000 160 23.02.12

585 M/S Prabhakar Organics & Agro Foods Pvt. Ltd., Patna.

Proposal for establishment of 903 MT per year capacity Sauce, Jam, Jelly, Pickles, Custard, Baking Powder and Food Grade Colour Production unit at Industrial Area, Fatuha, Patna.

1.3165 57 23.02.12

586 M/S Sri Laxmi Food Industries, Raxaul, East Champaran.

Proposal for establishment of 16,200 MT per year capacity Dal Mill unit in Partnership at Raxaul.

1.2338 47 23.02.12

587 M/S Triveni Smelters Pvt. Ltd., Patna.

Proposal for 39,600 MT per year capacity Mild Steel Ingot unit at Raipura, Fatuha, Patna.

9.6932 36 23.02.12

588 M/S Pinax Steel Industries Pvt. Ltd., Patna.

Proposal for expansion/diversification of 18,000 MT per year capacity Electroforged Grating in the existing Rerolling Mill unit of 15,000 MT per year capacity at Devkuli, Bihta.

7.7200 36 23.02.12

589 M/S Vindhyawasini Agro Tech Pvt. Ltd., Patna.

Proposal for establishment of 15,000 MT per year capacity Poultry Feed unit at Chhapiya, Baniyapur, Saran.

1.3824 36 23.02.12

590 M/S Gupta and Sons Traders Pvt. Ltd., Araria. (Approval has been given on proposal for change of product for establishment of 64 MT per day capacity Whole Wheat Flour Mill unit in place of earlier approved 5300 MT capacity Multipurpose Cold Storage at Industrial Area, Forbesganj, Araria in SIPB meeting held on 11.06.14.)

Proposal for establishment of 64 MT per day capacity Whole Wheat Flour Mill unit at Industrial Area, Forbesganj, Araria.

2.7473 12 23.02.12

11.06.14

591 M/S Vindhyawasini Rice Mill, Samastipur.

Proposal for establishment of 2 MT per hour capacity Rice Mill unit in proprietorship at Bargaon, Hasanpur,

0.9550 11 23.02.12

Page 58: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

58Samastipur.

592 M/S Baba Baidhnath Agro Cold Storage Pvt. Ltd., Vaishali.

Proposal for establishment of 10,000 MT capacity Multi Purpose Cold Storage under R.A.B.C. at Vaishali.

9.9312 50 23.02.12 07.06.12

593 M/S Takshak Engineering Pvt. Ltd., Patna.

Proposal for establishment of 600 MT per year capacity PVC Rigid Pipe and Pipe Fittings production unit at Industrial Growth Centre, Giddha, Bhojpur.

2.6009 21 23.02.12

594 M/S Shakshi Industries, Bhagalpur.

Proposal for establishment of 900 MT per year capacity Noodles and Vermicelli production unit in Proprietorship at Bhagalpur.

0.4013 20 23.02.12

595 M/S Sharda Duro Plastics Pvt. Ltd., Patna.

Proposal for establishment of 511000 pieces per year capacity Moulded Plastic Furniture unit at Hajipur Industrial Area, Vaishali.

5.1606 34 23.02.12

596 M/S Piyush and Associates Pvt. Ltd., Patna.

Proposal for establishment of 22,500 MT per year capacity Rerolling Mill unit at Mahuli Road, Patna City, Patna.

5.0000 24 23.02.12

597 M/S Sanwara Pet Industies, Patna.

Proposal for establishment of 480 MT per year capacity Pet Preform and Plastic Goods production unit in proprietorship at Simli Murarpur, Kotia, Malsalami, Patna City, Patna.

1.3562 6 23.02.12

598 M/S Mani Cold Storage Pvt. Ltd., Samastipur.

Proposal for establishment of 15000 MT capacity Multi Purpose Cold Storage under R.A.B.C. at Nigopur, Saraisa, Sakra, Muzaffarpur.

16.5012 50 23.02.12 23.08.12

599 M/S Shashibhushan Cold Storage pvt. Ltd., Chhapra.

Proposal for establishment of 9000 MT Cold Storage unit under R.A.B.C. at Bhakura Bhitti, Sahabuddin, Chhapra.

10.1412 50 23.02.12 07.06.12

600 M/S Laheji Freezing House, Siwan.

Proposal for establishment of 6000 MT capacity Multi Purpose Cold Storage unit under R.A.B.C. at Laheji, Siwan.

9.6412 85 23.02.12

601 M/S Symbiosis Electronics Pvt. Ltd., Patna.

Proposal for establishment of 1,50,000 Hecto Litre per year capacity Beer Plant at Amjhour, Old PPCL, Dehri-on-Sone, Rohtas.

63.6425 82 23.02.12

602 M/S Jai Prakash Hotels and Resorts Pvt. Ltd., Gaya.

Proposal for establishment of 49 Rooms Hotel at Rajgir.

7.5220 30 23.02.12

603 M/S Shiva Laboratories Pvt. Ltd., Patna.

Proposal for establishment of 3000 MT per year capacity Ethyl Acetate unit at Shakin-Kharuara, Harnaut, Nalanda.

2.5740 46 23.02.12 28.06.12

604 M/S Keshiha Services Enterprises pvt. Ltd., Bettiah.

Proposal for establishment of 20000 MT Modern Dry Warehouse under R.A.B.C. at Fursatpur, Motihari.

12.6302 165 23.02.12 16.08.12

605 M/S Hestia & Hermes Realestate Pvt. Ltd., Kolkata.

Proposal for establishment of 10,000 MT Dry Warehouse under R.A.B.C. at Dalan, Katihar.

7.1830 30 23.02.12

606 M/S Malhotra Poly Plast, Patna.

Proposal for establishment of 1440 MT per year capacity PVC Pipe production unit in partnership at Industrial Area, Patliputra, Patna.

1.1195 24 23.02.12

607 M/S Madhuraj Enterpries Pvt. Ltd., Patna.

Proposal for establishment of 6000 MT Multi Purpose Cold Storage unit under R.A.B.C. at Mathbanwari,

10.9812 50 23.02.12 16.08.12

Page 59: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

59Chakia, East Champaran.

608 M/S Ritnand Balved Education Foundation, New Delhi.

Proposal for establishment of University in the name of Amity University Bihar at Patna.

83.1800 23.02.12 (Consent in principle)

609 M/S Electronic Equipment Company Pvt. Ltd., Kolkata.

Proposal for establishment of 03 MW Grid connected Solar PV Power Project at Gaya/Buxar or Chhapra.

57.0000 50 23.02.12

610 M/S Jai Jawan Food Processing Pvt. Ltd., Bokaro.

Proposal for establishment of 03 MT per hour Para Boiled Rice Mill unit at Chowk Kharwan, Dulhin Bazar, Danapur, Patna.

3.3550 25 23.02.12 01.06.13

611 M/S Mithila Food Processing, Darbhanga.

Proposal for Capacity expansion and Modernization of the existing Sattu production unit from 2400 MT per year to 6000 MT per year in proprietorship at Laxmi Nagar, Darbhanga.

0.3000 5 23.02.12 (Consent with condition)

612 M/S Balaji Udyog, Rohtas. Proposal for establishment of 03 MT per hour Rice Mill unit in proprietorship at Industrial Area, Dehri, Rohtas.

1.0205 16 23.02.12 27.07.12

613 M/S Shri Sita Rice Mill, Buxar.

Proposal for capacity expansion of the existing Rice Mill from 2 MT per hour to 06 MT per hour in partnership at Mohanpurwa, Chausa, Buxar.

1.5984 40 23.02.12 28.06.12

614 M/S Aparna Cold Storage Pvt. Ltd., Samastipur.

Proposal for capacity expansion of the existing Cold Storage from 3250 MT to 6500 MT under R.A.B.C. at Patori, Samastipur.

3.2336 30 23.02.12 16.08.12

615 M/S Hariom Feeds Pvt. Ltd., Gopalganj.

Proposal for establishment of 30,000 MT per year capacity Cattle Feed and Poultry Feed unit at Gopalganj Birtitola, Manjhagarh, Gopalganj.

5.6288 37 23.02.12 28.06.12

616 M/S Shiv Shakti Industries Pvt. Ltd., Raxaul.

Proposal for establishment of 10 MT per hour Poultry Feed unit at Majharia, Ramgarhwa, East Champaran.

15.1777 70 23.02.12 17.07.12

617 M/S Hotel Rohit International, Rohtas.

Proposal for establishment of Hotel in partnership at G.T. Road, Sasaram.

1.5744 61 23.02.12

618 M/S Dina Metals Ltd., Patna. Proposal for capacity expansion of the existing unit of Mild Steel Ingot from 200 MT per day capacity to 350 MT per day capacity at Abdul Rahmanpur Road, Deedarganj, Patna City, Patna.

42.8400 200 23.02.12

619 M/S Gayan Buddha Regency Pvt. Ltd., Patna.

Proposal for establishment of 50 Rooms Hotel at Bodh Gaya, Gaya.

6.3976 30 23.02.12

620 M/S Sunayana Cold Storage Pvt. Ltd., Begusarai.

Proposal for establishment of 6000 MT Cold Storage unit under R.A.B.C. at Fatehpur, Begusarai.

4.0903 25 23.02.12 16.10.12

621 M/S Amrapali Biotech India Pvt. Ltd., Gaziabad(U.P.).

Proposal for establishment of 6000 MT per year capacity Fruit and Vegetable Processing and Canning unit at Maranga Industrial Area, Purnea.

17.0712 120 23.02.12

622 M/S Swastik Agro Industries(Promoter Company M/S Swastik Hotels and inns Pvt. Ltd.,), Vaishali.

Proposal for establishment of 05 MT per hour capacity Cattle Feed and Poultry Feed unit in the name of M/S Swastik Agro Industries at Industrial Area, Hajipur.

3.3021 47 23.02.12 28.06.12

Page 60: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

60623 M/S Jagadamba Bhawani

Agro Pvt. Ltd., Raxaul (East Champaran)

Proposal for establishment of 150 MT per day capacity Roller Flour Mill unit at Raxaul, East Champarn.

9.3942 100 23.02.12

624 M/S Kumud Foods and Beverage Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 06 MT per hour Modern Rice Mill (Raw and Para Boiled) unit at Kanti, Muzaffarpur.

7.1075 60 23.02.12 01.12.12

625 M/S Celebrity Liquors Pvt. Ltd., Patna.

Proposal for establishment of 5 Lakh (expandable up to 10 Lakh) Hecto Litre per year capacity Beer production unit at Bhagwanpur, Vaishali.

135.1200 170 23.02.12

626 M/S Jagat Jagdamba Flour Pvt. Ltd., Hajipur(Vaishali).

Proposal for establishment of 300 MT per day capacity Roller Flour Mill unit at Kisanpura, Balukaram, Dist.-Vaishali.

12.0000 33 23.02.12 07.06.12

627 M/S Aasma Foods and Beverages Pvt. Ltd., Hajipur(Vaishali).

Proposal for establishment of 11442 MT per year capacity Milk Processing unit at E.P.I.P., Hajipur(Vaishali).

12.2162 107 23.02.12 23.04.13

628 M/S Minerva Power Corporation Ltd., Secundrabad (A.P.)

Proposal for establishment of 15 MW Biomass Based Power Plant at Gautholi, Barun, Aurangabad.

70.2200 52 23.02.12

629 M/S Pasupati Rice Mills Pvt. Ltd., Rohtas. ( Approval has also been given for establishment of 600 Kilowatt Captive Power Project with earlier approved proposal for establishment of 04 MT per hour capacity Boiled Rice Mill unit at Majhiaon, Paruhar, Darihat, Rohtas in SIPB meeting held on 28.11.12 & 29.11.12)

Proposal for establishment of 04 MT per hour capacity Boiled Rice Mill unit with 600 Kilowatt Captive Power Project at Majhiaon, Paruhar, Darihat, Rohtas.

7.4500 43 23.02.12 28.11.12 &29.11.12

630 M/S Stef Medical Care India Pvt. Ltd., New Delhi.

Proposal for establishment of 01 MT per hour capacity Fruit and Vegetables Processing unit at Industrial Area, Maranga, Purnea.

2.4561 23 23.02.12

631 M/S Saroj Ranjan Foods Pvt. Ltd., Kaimur, Bhabhua.

Proposal for establishment of 64 MT per day capacity Rice Mill unit at Salthua, Kaimur, Bhabhua.

6.9588 38 23.02.12 26.08.13

632 M/S Sampurnam Agro Foods Pvt. Ltd., Patna.

Proposal for establishment of 2400 MT per year capacity Cattle Feed unit at Industrial Area, Bihiya, Bhojpur.

1.4001 22 23.02.12

633 M/S Lakho Agriculture and Food Products Pvt. Ltd., Bhojpur.

Proposal for establishment of 04 MT per hour capacity Boiled Rice Mill unit at Raghunathpur, Brahampur, Buxar.

7.7850 42 23.02.12 28.06.12

634 M/S Unique Foods, Promoter- R.K. Agri Biz, LLP, Muzaffarpur

Proposal for capacity expansion of existing unit of Frozen / Aseptic Products, Ready to Drink and Processed Fruits from 4958 MT per year capacity to 9108 MT per year capacity at Rewa Road, Patahi, Muzaffarpur.

14.2506 70 23.02.12

635 M/S White Ocean Foods Pvt. Ltd., Patna Sadar, Patna.

Proposal for establishment of 120 Lakh Litre per year capacity Packaged Drinking Water at Jakariyapur, Zero Mile, Pahari,

1.0000 18 23.02.12

Page 61: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

61Patna.

636 M/S Raushan Agro Pvt. Ltd., Nokha, Rohtas.

Proposal for establishment of 04 MT per hour capacity Boiled Modern Rice Mill unit at Kusumtola, Baraon, Nokha, Rohtas.

6.2793 38 23.02.12

637 M/S Urmila Rice Mill Pvt. Ltd., Patna.

Proposal for establishment of 04 MT per hour capacity Boiled Modern Rice Mill unit at Pararia, Dinara, Rohtas.

5.4720 40 23.02.12 03.08.12

638 M/S Radhika Rice Mills, Silao, Nalanda.

Proposal for establishment of 03 MT per hour capacity Modern Rice Mill in partnership at Nirpur, Silao, Nalanda.

0.7871 15 23.02.12 27.02.14

639 M/S Pragana Danwar Food Processor Pvt. Ltd., Patna.

Proposal for establishment of 04 MT per hour capacity Modern Rice Mill unit at Danwar, Rohtas.

5.8949 30 23.02.12 28.06.12

640 M/S Danara Agro and Packaging Pvt. Ltd., Patna.

Proposal for establishment of 06 MT per hour capacity Modern Rice Mill unit at Danara, Bikram, Patna.

3.7406 25 23.02.12 12.12.12

641 M/S Vaishali Thread Mills, Patna City, Patna.

Proposal for establishment of 100 MT per year capacity Sewing Thread production unit in partnership at Industrial Area, Donar, Darbhanga.

1.2670 18 23.02.12

642 M/S Jest Liquors Pvt. Ltd., Patna.

Proposal for establishment of 6000 MT capacity Cold Storage unit at Nasriganj, Danapur, Patna.

6.6908 8 23.02.12 05.09.12

643 M/S Jagrity Motors Pvt. Ltd., Patna.

Proposal for establishment of 1200 pieces per year capacity Three Wheeler and Components, Chassis of Three Wheeler, Gear Box and Differential Box production unit at Bhusaula, Phulwarisharif, Patna.

2.6907 27 23.02.12

644 M/S Aneja Food Products India Pvt. Ltd., Patna.

Proposal for establishment of 05 Lakh Litre per day capacity Milk Powder, Pasteurized Milk, Butter, Ghee and Curd production unit at Parmanandpur, Lalganj, Vaishali.

17.2345 400 23.02.12

645 M/S Kamakhya Kaushlya Construction Pvt. Ltd., Sitamarhi.

Proposal for establishment of 25920 MT per year capacity Modern Rice Mill unit at Punauradham, Sitamarhi.

4.8467 30 23.02.12 30.08.12

646 M/S Ambey Mata Agro Industries Pvt. Ltd., Samastipur. (Earlier approval was given for establishment of 05 MT per hour capacity Modern Rice Mill unit at Duhiya Belar, Karpurigram, Samastipur in the SIPB meeting held on on 23.02.12. Again approval has been given for establishment 8 MT per hour capacity Modern Rice Mill in place of 05 MT per hour capacity Modern Rice Mill at Duhiya Belar, Karpurigram, Samastipur in the SIPB meeting held on 05.08.13.)

Proposal for establishment of 08 MT per hour capacity Modern Rice Mill at Duhiya Belar, Karpurigram, Samastipur.

15.6315

49 23.02.12

05.08.2013

Page 62: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

62

647 M/S Bhusari Cold Storage Pvt. Ltd., Begusarai.

Proposal for establishment of 7200 MT Cold Storage unit under R.A.B.C. at Korjana, Cheria Bariyarpur, Begusarai.

5.3843 15 23.02.12 17.06.12

648 M/S Bhabishya Rice Mill Ltd., Howrah. ( Approval for change of place has been given in earlier approved proposal for establishment of 08 MT per hour capacity Para Boiled Modern Rice Mill unit at Kishanpura, Vaishali to Visheshwar Patli, Saraiya, Muzaffarpur in SIPB meeting held on 13.03.13.)

Proposal for establishment of 08 MT per hour capacity Para Boiled Modern Rice Mill unit at Visheshwar Patli, Saraiya, Muzaffarpur

29.4650 28 23.02.12 13.03.13

19.08.12

649 M/S N.V.S. Industries, Patna. Proposal for establishment of 70 pieces per year capacity Plant -Machinery and Equipment production unit for Dairy and Food Processing Industries in proprietorship at E.P.I.P., Hajipur (Vaishali).

0.9232 17 23.02.12

650 M/S Parasnath Engicon Pvt. Ltd., Patna.

Proposal for establishment of 120 Rooms Hotel at Digha Road, Kurji, Patna.

41.0400 119 23.02.12

651 M/S Shrawasthi Agrotech Pvt. Ltd., Lucknow.

Proposal for capacity expansion of existing unit of Cattle Feed from 45000 MT per year capacity to 90,000 MT per year capacity at Giddha Industrial Growth centre, Ara.

5.1886 45 23.02.12 27.01.14

652 M/S Trimurti Flour Mill Pvt. Ltd., Deedarganj, Patna City, Patna.

Proposal for establishment of 100 MT per day capacity Roller and Chakki Flour Mill unit at Deedarganj, Patna City, Patna.

5.5505 30 23.02.12 26.08.13

653 M/S Naturals Dairy Pvt. Ltd., Patna.

Proposal for establishment of 75000 Litres per year capacity Milk Processing and Packaging unit at Patliputra Industrial Area, Patliputra.

5.0327 35 23.02.12

654 M/S Riga Sugar Company

Ltd, Kolkata. Proposal for capacity expansion from 5000 TCD to 6000 TCD in the existing Sugar Mill at Riga, Sitamarhi.

17.00 628 26.03.12

655 M/S Dumraon Agro Industries Pvt. Ltd., Buxar.

Proposal for establishment of 6 MT per hour Modern Rice Mill unit at Garatha Khurd, Buxar.

11.8609 86 26.03.12

656 M/S Dev Rice Mills Pvt. Ltd., Siwan.

Proposal for establishment of 04 MT per hour capacity Modern Rice Mill unit at Siswa Kala, Siwan.

4.6960 12 26.03.12

657 M/S Kolhaura Rice Mill Pvt. Ltd., Gaya.

Proposal for establishment of 48 MT per day capacity Modern Arwa Rice Mill unit at Kolhaura, Bodh Gaya.

2.6300 41 26.03.12

658 M/S Sai Plastic Industries, Patna.

Proposal for establishment of 40 Pieces per day capacity Plastic Overhead Tank production unit in Proprietorship at Gaganpura, Patna.

1.4235 47 26.03.12

659 M/S Chaman Rice Mill Pvt. Ltd., Shekhpura.

Proposal for establishment of 70 MT per day capacity Modern Rice Mill unit at Andauli , Chewara, Shekhpura.

2.5633 41 26.03.12

660 M/S Shushila Shankar Cold Proposal for establishment of 8000 9.8683 15 26.03.12 28.06.12

Page 63: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

63Storage Pvt. Ltd., Samastipur.

MT Cold Storage unit under R.A.B.C. at Hasan Sarai, Belgaon, Patepur, Vaishali.

661 M/S Bhagwati Metalloys Pvt. Ltd., Patna.

Proposal for establishment of 2700 MT per year capacity Lead Ingot and Plates production unit at Fatuha, Patna.

2.5205 34 26.03.12

662 M/S Srishyam Agro Pvt. Ltd., Patna.

Proposal for capacity expansion from 100 MT per day capacity to 150 MT per day capacity in the existing Poultry and Cattle Feed unit at Industrial Area, Hajipur.

0.7701 8 26.03.12

663 M/S Jamuna Nursing Home Pvt. Ltd., Vaishali.

Proposal for capacity Expansion and Modernization from 5200 MT to 7900 MT in the existing unit of Cold Storage under R.A.B.C at Jandaha, Vaishali.

7.3750 17 26.03.12

664 M/S Mums Mega Food Park Pvt. Ltd., Delhi.

Proposal for establishment of Food Park (Central Processing Centre, Common Facilities Cold Warehouse, Dry Warehouse, C.A. Storage, Sorting Grading Washing) unit at Nawa Nagar, Buxar.

75.3354 100 26.03.12 18.01.14

665 M/S Sakaldeep Cold Storage Pvt. Ltd., Bhojpur.

Proposal for establishment of 5000 MT Multi Purpose Cold Storage unit at Industrial Area, Bihiya.

4.1061 9 26.03.12 20.06.13

666 M/S Parwati Beverages and Foods Pvt. Ltd., Siwan.

Proposal for establishment of 9720000 Liters per year capacity Packaged Drinking Water unit at Orma Mukund, Mufasil Siwan.

1.1890 15 26.03.12

667 M/S Ashiana Heritage Hotels Pvt. Ltd., Patna.

Proposal for establishment of Hotel at Fraser Road, Patna.

3.1800 45 26.03.12

668 M/S Vaibhavaa Communication and Assets Pvt. Ltd., Patna.

Proposal for establishment of total 55 Safe Drinking Water(Piao) in 42 different places of Patna.

2.8875 55 26.03.12

669 M/S Magadh Institute of Higher Education, Patna

Proposal for establishment of B.Ed. Degree College at Dehri on Sone, Rohtas.

1.00 20 26.03.12 (Consent with condition)

670 M/S Ram Rati Devi Memorial Trust, Digha, Patna.

Proposal for establishment of B.Ed. Training College in the name of Magadh Teacher Training Centre at Industrial Area, Muzaffarpur.

1.00 20 26.03.12 (Consent with condition)

671 M/S Bhagwati Rice Mill, Katihar

Proposal for establishment of 3 MT per hour Para Boiled Modern Rice Mill unit at Bhorabari, Katihar.

4.2662 12 26.03.12 26.08.13

672 M/S National Plasto Products Pvt. Ltd., Kolkata.

Proposal for establishment of 4443 MT per year capacity Plastic Moulded Items production unit at E.P.I.P., Hajipur.

14.3890 41 26.03.12 04.07.13

673 M/S Sristhi Feeds Pvt. Ltd., Patna

Proposal for establishment of 9600 MT per year capacity Cattle and Poultry Feed unit at Industrial Area, Growth Centre, Giddha.

0.9939 35 09.04.12 29.06.13

674 M/S Maruti Meditech Pvt. Ltd., Patna.

Proposal for establishment of 1560 MT per year capacity Disposable Syringe and I.V. Set production unit at Mirchi Bhavania, Chowkkalan, Patna.

10.26 25 09.04.12

675 M/S Hargauri Recycling Plant Pvt. Ltd., Siliguri, Darjeeling,

Proposal for establishment of Recycling unit for production of

2.0663 13 09.04.12

Page 64: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

64West Bengal. Carbon Black, Furnace Oil and Steel

Wire from Waste Tuyre at Kurlicot, Kiashanganj.

676 M/S Excel Paper Packaging Pvt. Ltd., Patna.

Proposal for establishment of 10,200 MT per year capacity Corrugated Boxes production unit at Hajipur Industrial Area, Vaishali.

12.05 86 09.04.12

677 M/S Swastika Bakers, Gaya. Proposal for establishment of production unit of Bakery Product in proprietorship at Dubhal, Gaya.

0.9184 2 09.04.12

678 M/S Alex Green Energy Pvt. Ltd., Kolkata.

Proposal for establishment of 50 MW Solar Energy Power Plant at Katoria, Banka.

640.00 3750 09.04.12

679 M/S Maa Vindhyabasini Agro Product Pvt. Ltd., Rohtas.

Proposal for establishment of 04 MT per hour capacity Rice Mill at Khairahin, Bahuara, Dawath, Rohtas.

9.6154 25 09.04.12

680 M/S Maharshi Badri Pharmaceuticals, Jaipur.

Proposal for establishment of Awala based Food Products and Ayurvedic Medicine (Murabba, Squash syrup) production unit under proprietorship at Industrial Area, Giddha, Bhojpur.

1.4660 41 09.04.12 23.07.14

681 M/S Kakan Rice Mill Pvt. Ltd., Patna.

Proposal for establishment of 8 MT per hour capacity Para Boiled and Raw Rice Mill unit at Giddha, Ara, Bhojpur.

14.8213 12 09.04.12 08.09.12

682 M/S Gyani Distributors, Patna Proposal for establishment of Awala based Food Products and Ayurvedic Medicine (Murabba, Squash syrup, etc.) production unit at Industrial Growth Centre, Giddha, Bhojpur.

1.4275 41 09.04.12 05.06.14

683 M/S Gallantt Udyog Ltd., Gorakhpur.

Proposal for establishment of 400 MT per day capacity Roller Flour Mill unit at Durgawati, Chipali, Karamnasa, Bhabhua.

25.00 100 09.04.12 19.02.14

684 M/S Nawneet Raj Rice Mill Pvt. Ltd., Ara.

Proposal for establishment of 04 MT per hour capacity Rice Mill at Baligaon, Garhani, Bhojpur.

4.0951 15 09.04.12

22.12.12

685 M/S Jay Mata Rani Food and Grains Pvt. Ltd., Aurangabad.

Proposal for establishment of 08 MT per hour Para Boiled and Raw Rice Mill at Kaithi Siro, Goh, Aurangabad.

7.2634 25 09.04.12

686 M/S Vishnu Food Products, East Champaran.

Proposal for establishment of 108 MT per year capacity Oil Mill and 7200 MT Rice Polishing unit under proprietorship at Nakched Tola, Ward No.- 4, Motihari.

1.4634 34 09.04.12

687 M/S Bihar Agrochem Pvt. Ltd., Patna.

Proposal for establishment of 06 Lakh pieces per year capacity HDPE Pipe(High Density Polyethylene Pipe) and Sprinkler System production unit at Nariyar, Panapur, Minapur, Muzaffarpur.

3.4920 34 09.04.12

688 M/S Captain Ramesh Rice Mills Pvt. Ltd., Ara.

Proposal for establishment of 04 MT per hour capacity Boiled Rice Mill at Demha, Bagwa, Udwantnagar, Bhojpur.

6.4260 38 09.04.12 01.02.13

689 M/S Mahesh Engineering Works, Muzaffarpur.

Proposal for establishment of 900 MT per yea capacity Lead Ingot production unit under proprietorship at Bela Industrial Area, Bela, Muzaffarpur.

1.3799 19 09.04.12

690 M/S Stef Energy India Pvt. Proposal for establishment of 03 MW 50.70 40 09.04.12

Page 65: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

65Ltd., New Delhi. (Earlier on 09.04.12 approval was given by SIPB for establishment of 03 MW Solar Photo Voltaic Power Project unit at Udakishanganj, Madhepura. Again on company’s request, amending the above proposal consent has been given for change of place from Udakishanganj, Madhepura to Baunsi, Banka in SIPB meeting held on 18.09.12, but Tariff will be decided on the basis of competitive bidding.)

Solar Photo Voltaic Power Project unit at Baunsi, Banka.

18.09.12 (Consent with condition)

691 M/S Parwati Hatcheries, Vaishali.

Proposal for capacity expansion from 96000 pieces per year capacity to 28,80,000 pieces per year capacity in the existing Egg Hatchery unit under proprietorship at Industrial Area, Hajipur, Vaishali.

0.7955 7 09.04.12

692 M/S Inspiring Agro Ltd., Kolkata.

Proposal for establishment of 50 Lakh Eggs per day capacity, 50 Lakh Chicks per year capacity, 800 TDP capacity Poultry Feed unit, 20 MW Biomass Based Power Plant and 1500 Ton Pisces Culture unit in two phases at Sonahula, Guthni, Siwan.

1176.00 2100 09.04.12

693 M/S Alex Green Energy Pvt. Ltd., Kolkata.

Proposal for establishment of 25 MW Solar Energy Power Plant at Goryakothi, Siwan.

312.50 1875 09.04.12

694 M/S Kaushalya Infrastructure Development Corporation Ltd. Kolkata.

Proposal for establishment of 25 MW Solar PV Power Plant unit at Khulasa, Siwan.

312.00 09.04.12

695 M/S Nand Gopal Agro Industries Pvt. Ltd., Darbhanga.

Proposal for establishment of 04 MT per hour capacity Modern Rice Mill unit at Chandanpatti, Sara, Mohanpur, Darbhanga.

4.7299 30 16.04.12 26.04.13

696 M/S Nand R.A.B.C. Cold Storage, Darbhanga.

Proposal for establishment of 500 MT Multipurpose cold storage unit in proprietorship under R.A.B.C. at Katsaha, Bharwara, Singhwara, Darbhanga.

3.1450 130 16.04.12

697 M/S Vishnujee Oil Mill, Darbhanga.

Proposal for establishment of Mustard Oil Mill unit in proprietorship at Bela Industrial Area, Darbhanga.

0.6631 10 16.04.12

698 M/S Hariom Modern Rice Mill, Darbhanga.

Proposal for establishment of 15000 MT per year capacity Rice Mill unit in proprietorship at Katsa, Bharwara, Darbhanga.

2.3250 12 16.04.12

699 M/S Shivam Modern Rice Industries Pvt. Ltd., Raxaul.

Proposal for establishment of 36,000 MT per year capacity Rice Mill unit at Kaurihar, Raxaul.

8.4034 19 16.04.12 16.08.12

700 M/S Shashibhushan Agro Pvt. Ltd., Patna.

Proposal for establishment of Food Processing unit for production of 3000 MT per year capacity of Fruit, Jam, Jelly, Tomato Ketchup, Pickles, Ginger, Garlic Paste, RTS Beverage, Squash, Candy/Murabba etc. at Industrial Area, Bela, Muzaffarpur.

1.9275 15 16.04.12 04.12.13

701 M/S Iceberg Industries Ltd., Proposal for capacity expansion in 40.05 70 16.04.12 26.08.12

Page 66: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

66Patna. ( SIPB has taken cognizance for changing the name of the company from M/S Iceberg Industries Ltd. to M/S Molson Coors Cobra India Pvt. Ltd. in SIPB meeting held on 05.08.13.)

the existing unit from 168000 Hectoliter to 326000 Hectoliter for production of Beer in phase-1 and phase-2 at Bihta, Patna.

05.08.13

702 M/S Sharda Bhawani Cold Storage and Ware Housing Pvt. Ltd., Supaul.

Proposal for establishment of 6000 MT Multipurpose Cold Storage unit under R.A.B.C. at Sukhanagar, Pratapganj, Supaul.

5.7557 10 16.04.12 01.06.13

703 M/S P & R Infraprojects Ltd., Chandigarh, Punjab.

Proposal for establishment of 10 MW PV Solar Power Plant at Muzaffarpur.

130.00 100 16.04.12

704 M/S Nalanda Paper Mills Ltd., New Delhi.

Proposal for establishment of 66,000 MT per year capacity Craft Paper Production unit at Bhawnathpur, Sultanganj, Bhagalpur.

204.00 83 11.06.12

705 M/S Maa Shyama Ganga Agronomy Pvt. Ltd., Darbhanga.

Proposal for establishment of 21,600 MT per year capacity Flour Mill unit at New Industrial State, Bela, Darbhanga.

4.3310 67 11.06.12

706 M/S Indica Overseas Pvt. Ltd., New Delhi. (Approval has been given for 64 MT per day capacity Rice Mill in place of 32 MT per day capacity Rice Mill at Industrial Area, Maranga, Purnea in the SIPB meeting held on 24.05.13.)

Proposal for establishment of 64 MT per day capacity Rice Mill unit at Industrial Area, Maranga, Purnea

9.1070 36

11.06.12

24.05.13

707 M/S Lakshmi Wheat Products Pvt. Ltd., Samastipur.

Proposal for capacity expansion in the existing Flour Mill unit from 15000 MT per year capacity to 54000 MT per year capacity at Samastipur.

3.4200 28 11.06.12 05.06.14

708 M/S Mahashakti Industries, Varanasi.

Proposal for establishment of 66,000 MT per year capacity Poultry Feed unit in partnership at Industrial area, Pandaul,Madhubani.

9.3162 40 11.06.12 18.01.14

709 M/S Sri Hari Educational & Welfare Trust, Patna.

Proposal for expansion of Industrial Training Centre established by the trust in the name of Sri Hari Industrial Training Centre at Haridaspur, Khagaul Nahar Road,Rupaspur, Patna.

0.8700 17 11.06.12

710 M/S Green Mark Health Care System & Solution, Darbhanga.

Proposal for establishment of 4800 MT per year capacity Roasted Gram, Maize and Corn Flakes unit in proprietorship at Industrial Area, Donar, Darbhanga.

1.2575 24 11.06.12

711 M/S Krishna Food & Beverage Industries, Noida, U.P.

Proposal for establishment of 1200 MT per year capacity Fruits Vegetables and Cereals Processing and Health Drinks production unit in proprietorship at Industrial Area, Giddha, Bhojpur.

1.3197 28 11.06.12

712 M/S Baba lokenath Agrotech Proposal for establishment of 2541 5.4798 20 11.06.12 26.04.13

Page 67: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

67Industries Pvt. Ltd., Patna. MT per year capacity HDPE Pipe

production unit in the name of Mahashakti Pipe Industries at Saidpur Tola, Karauta, Bakhtiyarpur, Patna.

713 M/S Darbhanga Agro Pvt. Ltd., Darbhanga.

Proposal for establishment of 5500 MT capacity Cold Storage unit under RABC at Chanpatti, Saramohanpur, Darbhanga.

4.7443 20 11.06.12

714 M/S Globus Spirits Ltd., New Delhi. (Earlier on 11.06.12 approval was given by SIPB for establishment of grain based 120 K.L.P.D. Distillery Plant, Country Liquor and I.M.F.L. production unit at Andhrabar Chowk, Panapur, Vaishali. Again on company’s request, amending the above proposal consent has been given for establishment of grain based 120 K.L.P.D. Distillery Plant, Country Liquor and I.M.F.L. production unit from grain as well as from molasses at Andhrabar Chowk, Panapur, Vaishali in SIPB meeting held on 18.09.12.) (Amending the earlier approved proposal, approval has been given for establishment of grain based and molasses based 120 KLPD Distillery Plant production unit at Dhadhua, Jandaha, Andhrabar Chowk, Vaishali in SIPB meeting held on 04.12.13.)

Proposal for establishment of grain based and molasses based 120 K.L.P.D. Distillery Plant production unit at Dhadhua, Jandaha, Andhrabar Chowk, Vaishali.

160.0000 88 11.06.12 18.09.12 04.12.13

715 M/S Shree Hari Jee Agro Products Pvt. Ltd., Rohtas.

Proposal for establishment of 10 MT per hour Modern Para Boiled and Raw Rice Mill unit at Bairi Karmaini Kala, Bikramganj, Rohtas.

11.7418 30 11.06.12

716 M/S Jas Global Agriculture and Power Pvt. Ltd., Motihari.

Proposal for establishment of 08 MT per hour Para Boiled and Raw Rice Mill and 02 MW Co-generation Plant unit at Chintawanpur, Chakiya, Pipra, East Champaran.

18.9888 96 11.06.12

717 M/S Vaishali Industrial Products, Hajipur (Vaishali).

Proposal for establishment of 100 pieces Modular Furniture, 100 pieces Hospital Furniture/Equipment and 100 pieces Office Furniture per month production unit in partnership at Hajipur Industrial Area, Vaishali.

1.0010 16 11.06.12

718 M/S Shree Balajee Industries, Patna.

Proposal for establishment of 15,000 MT per year capacity Cement Plant unit in proprietorship at Industrial Area, Fatuha, Patna.

2.3845 35 11.06.12

719 M/S Tara Health Foods Ltd., Ludhiana, Punjab.

Proposal for establishment of 250 MT per day capacity Cattle Feed production unit at Industrial Area, Barauni, Begusarai.

14.8000 185 11.06.12 11.02.14

720 M/S JAK Hotel & Arcade LLP, Bettiah.

Proposal for establishment of Hotel and Restaurant Services unit at

16.8952 37 11.06.12

Page 68: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

68Nauranga Garden, Bettiah.

721 M/S Dumraon Power Pvt. Ltd., Dumraon.

Proposal for establishment of Biomass based 02 MW Captive Power Plant at Gurahatha Khurd, Buxar.

14.9386 55 11.06.12

722 M/S Sumedha Agro Products Pvt. Ltd., Sasaram.

Proposal for establishment of 18000 MT per year capacity Modern Rice Mill unit at Hurka Tillauthu, Dehri-on-Sone, Rohtas.

8.8314 30 11.06.12

723 M/S Shivshakti Hatchery Pvt. Ltd., Samastipur.

Proposal for establishment of 9600 MT per year capacity Poultry Feed unit at Hansa, Warisnagar, Samastipur.

0.9972 56 11.06.12 12.01.14

724 M/S Ocean Elevator Pvt. Ltd., Patna.

Proposal for establishment of 96 pieces per year capacity Elevator/Lift production and Fabrication unit at Industrial area, Fatuha, Patna.

0.9037 22 11.06.12

725 M/S Maa Durga Industries, Vaishali.

Proposal for establishment of 3000 MT per year capacity Maize Flour, Corn Flakes production unit in proprietorship at EPIP, Hajipur.

1.0971 16 11.06.12

726 M/S J. K. Lakshmi Cement Ltd., New Delhi.

Proposal for establishment of 05 lakh MT per year capacity Cement Plant at Industrial Area, Aurangabad.

120.4000 130 11.06.12

727 M/S J. K. Lakshmi Cement Ltd., New Delhi.

Proposal for establishment of 10 lakh MT per year capacity Cement Plant at Industrial Area, Kishanganj.

260.0000 175 11.06.12

728 M/S Parwati Buildtech Pvt. Ltd., Gaya.

Proposal for establishment of 7500 MT per year capacity Pack House for Fruits and Vegetable under R.A.B.C. at Sadar Gaya, Chandauli.

2.4175 15 11.06.12 07.03.13

729 M/S Suresh Kumar and Company, Khagaria.

Proposal for establishment of 12000 pieces per year capacity Diesel Engine Pumpset Assembling unit in proprietorship at Khagaria.

1.0442 15 11.06.12

730 M/S JKM Beverages Ltd., New Delhi.

Proposal for establishment of 2.5 lakh Hectoliters per year capacity Beer Plant at Jagdishpur, Bhojpur.

61.9500 88 11.06.12

731 M/S Kumar Commodity and Food Management Pvt. Ltd., Beguasarai.

Proposal for establishment of 04 MT per hour Rice Mill unit at Deona Industrial Area, Barauni.

2.6500 81 11.06.12 01.08.13

732 M/S Adya Packaging Pvt. Ltd., Patna. (Approval has been given on the proposal for establishment of 12000 MT per year capacity Corrugated Boxes production unit in the name of M/S Adya Packaging Pvt. Ltd., Patna in the same place of earlier approved proposal of Bread and Cake production in the name of M/S Astha Confectionaries Pvt. Ltd. at Industrial Area, Fatuha, Patna in SIPB meeting held on 11.12.14.)

Proposal for establishment of 12000 MT per year capacity Corrugated Boxes production unit at Industrial Area, Fatuha, Patna.

1.0550 31

11.06.12

11.12.14

733 M/S Loma Rice Mills(Proprietorship unit of M/S Blue Bird e Solutions Pvt. Ltd.), Kolkata.

Proposal for establishment of 43,200 MT per year capacity Para Boiled and Plain Rice Mill unit in proprietorship at Loma, Jandaha,

8.0359 38 11.06.12

Page 69: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

69Vaishali.

734 M/S Sai Sharan Foods, Patna.

Proposal for establishment of 6720 Loaves per day, 2520 Rusk per day and 336 Kg. Biscuit/Cookies per day capacity production unit in partnership at Dariyapur, Neura, Patna.

0.9954 41 11.06.12 18.01.14

735 M/S Kandla Energy and Chemicals Ltd., Ahmedabad, Gujarat.

Proposal for establishment of 2 X 250 MW coal based Thermal Power Plant in two phase at Sahebpur Kamal, Begusarai.

2750.0000 250 11.06.12

736 M/S Hentech Agrovet Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 45,000 MT per year capacity Cattle Feed, Poultry Feed, Fish Feed and Pig Feed production unit at Industrial Area, Muzaffarpur.

3.4025 55 11.06.12

737 M/S J K M Infra Projects Ltd., New Delhi.

Proposal for establishment of 4 Star Hotel at Bodh Gaya, Gaya.

29.3000 150 11.06.12

738 M/S Mother Teresa Nursing School,(Pro.- M/S Gandhi Educational Trust), Katihar.

Proposal for establishment of Nursing Training Institute in the name of Mother Teresa Nursing School at Mongra Fatak, Dalan, Katihar.

5.2560 29 11.06.12

739 M/S Natural Thermo Pvt. Ltd., Gorakhpur, U.P.

Proposal for establishment of 576 MT per year capacity Plastic Disposable Glasses and Cups production unit at E.P.I.P., Hajipur.

3.5566 39 11.06.12

740 M/S Sone Ojas Ltd.(Pro.- M/S Kalyanpur Cements Ltd.), Patna.

Proposal for establishment of 15 MW Co-generation Captive Power Plant (based on Coal and Waste Heat of Cement Plant) at Banjari, Kalyanpur, Rohtas.

100.0000 54 11.06.12

741 M/S Shrenuj & Co. Ltd.,Mumbai.

Proposal for establishment of 2,88,000 Crates per year capacity Diamond Manufacturing- Cutting and Polishing unit at Industrial Area, Patliputra, Patna.

47.8100 1395 11.06.12 23.06.13

742 M/S Lal Chinta Rice Mills Pvt. Ltd., Ara, Bhojpur. (Approval has been given on proposal for change of capacity in SIPB meeting held on 11.06.14.)

Proposal for establishment of 11 MT per hour Parboiled and Raw Rice Mill unit at Industrial Growth Centre, Giddha, Bhojpur.

8.4484 12 11.06.12

11.06.14

09.04.13

743 M/S Angel Farms, Haryana. Proposal for establishment of 192000,00 pieces per year capacity Egg Hatchery unit in partnership at Industrial Area, Fatuha, Patna.

2.6793 68 11.06.12

744 M/S Laxman Agro Enterprises Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 03 MT per hour capacity Modern Rice Mill unit at Industrial Area, Bela, Muzaffarpur

1.0584 25 11.06.12

745 M/S Technocrates, Forbesganj, Araria.

Proposal for establishment of 9000 MT per year capacity Cattle Feed and Poultry Feed unit in proprietorship at Industrial Area, Forbesganj.

2.5110 117 11.06.12

746 M/S Claro Energy Pvt. Ltd, New Delhi.

Proposal for establishment of 20 MW Solar Power Plant at Sahjadpur, Sarairanjan, Samastipur.

240.0000 100 11.06.12

747 M/S Jaimatadi Incorporation Proposal for establishment of 72 20.2158 119 11.06.12

Page 70: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

70Pvt. Ltd., Patna. Room Hotel in the name of J.M.D

International at Industrial Area, Patliputra, Patna.

748 M/S Kanodia Infratech Ltd., Varanasi. (Approval has been given on the proposal for change of place in the SIPB meeting held on 20.01.14.)

Proposal for establishment of 06 lakh MT per year capacity Cement Plant unit at Bhabhua, Kaimur.

78.5500 74 11.06.12 20.01.14

749 M/S Aroma Beauty & Health Care Pvt. Ltd., Patna.

Proposal for establishment of 192 MT per year capacity Spice Powder unit in the name of Aroma Spices at Fatuha, Patna.

1.0260 10 13.08.12

750 M/S Champaran Rice Mill Pvt. Ltd., Patna.

Proposal for establishment of 48 MT per day capacity Arwa Rice Mill unit at Mathiyavrit, Chauradano, East Champaran.

2.9647 26 13.08.12

751 M/S Bhimseria Agro Pvt. Ltd., Muzaffarpur. (Approval has been given on the proposal for establishment of 14 MT per hour Parboiled/Plain Rice Mill and 1.25 MW Captive Power Plant(Rice Husk Based) in place of earlier approved unit for establishment of 10 MT per hour Parboiled Rice Mill and Plain Rice Mill in SIPB meeting held on 31.10.13.)

Proposal for establishment of 14 MT per hour Parboiled/Plain Rice Mill and 1.25 MW Captive Power Plant(Rice Husk Based) at Industrial Estate, Bela, Mizaffarpur.

27.5405 36 13.08.12 31.10.13

752 M/S Jai Maa Kali Cold Storage Pvt . Ltd. Lakhisarai.

Proposal for establishment of 6000 MT Multipurpose Cold Storage under R.A. B.C. at Mohanpur, Lakhisarai.

9.9352 30 13.08.12 20.06.13

753 M/S Jyoti Moulders Pvt. Ltd., Patna.

Proposal for 200 MT per year capacity expansion in the existing Plastic Chair and Furniture unit at Mahuli Road, Karmalichak, Patna City, Patna.

3.4300 8 13.08.12 01.06.13

754 M/S Girdhari Murari Agro Food Products Pvt. Ltd., Rohtas.

Proposal for establishment of 15,000 MT per year capacity Modern Rice Mill unit at Noonsarai, Nokha, Sasaram.

2.00 21 13.08.12

755 M/S Shri Ji Enterprises, Bhabhua.

Proposal for establishment of 3 MT per hour Modern Rice Mill unit in partnership at Ratwar, Bhabhua.

3.4766 15 13.08.12 11.07.14

756 M/S Keventer Food Park Infra Ltd., Bhagalpur.

Proposal for establishment of 20 MW coal based Captive Power Plant unit at Kahalgaon Industrial Area, Bhagalpur.

130.00 100 13.08.12

757 M/S Om Shanti Rice Mill Pvt. Ltd., Kaimur, Bhabhua. (Earlier on 13.08.12 SIPB meeting, approval was given for establishment of 05 MT per hour Modern Para Boiled and Raw Rice Mill unit at Usri, Mohania, Kaimur. Again, approval has been given for change of project site from Usri, Mohania, Kaimur to Mauza-Sahpur, Mohania, Kaimur in SIPB meeting held on 18.04.13.)

Proposal for establishment of 05 MT per hour Modern Para Boiled and Raw Rice Mill unit at Mauza-Sahpur, Mohania, Kaimur.

7.4281 35 13.08.12 18.04.13

Page 71: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

71758 M/S G.C. Consumer

Products Pvt. Ltd,. Muzaffarpur.

Proposal for establishment of 80 MT per day capacity Whole Mill Atta production unit at Bela Industrial Area, Muzaffarpur.

2.6824 28 13.08.12

759 M/S Manju Cold Storage Pvt. Ltd., Nalanda.

Proposal for establishment of 10,000 MT Cold Storage unit under R.A.B.C. at Karampur-Dharampur, Pawapuri, Nalanda.

12.8912 50 13.08.12

760 M/S Kusum Agro Endeavor Pvt. Ltd., Patna

Proposal for establishment of 04 MT per hour Modern Rice Mill unit at Simra, Parsa Bazar, Phulwarisharif, Patna.

5.3145 48 13.08.12 17.11.13

761 M/S Patil Steel Wires Pvt. Ltd., Hyderabad

Proposal for establishment of 10,800 MT per year capacity High Tension Steel Wire production unit at Sabalpur, Patna City, Patna.

8.7913 65 13.08.12 20.06.13

762 M/S Ram Vilash Cold Storage Pvt. Ltd., Samastipur.

Proposal for capacity expansion from 3000 MT capacity to 7000 MT capacity under R.A.B.C. in the existing Cold Storage unit at Kushar, Nijhma, Mahua,Vaishali.

2.8487 105 13.08.12 25.11.13

763 M/S J K Hitech Rice Mill Pvt. Ltd., Patna.

Proposal for establishment of 8 MT per hour Modern Para Boiled Rice Mill unit at Raghunathpur, Ramgharwa, Raxaul, East Champaran.

13.800 75 13.08.12 27.01.14

764 M/S Om Shri Dhanushdhari Foods Ltd., Patna.

Proposal for establishment of 100 MT per day capacity Roller Flour Mill and 50 MT per day capacity Atta Chakki unit at Hajipur(Vaishali).

9.8442 100 13.08.12

765 M/S Shrinivas (G) Educational & Research Institute of Medical Sciences, Patna.

Proposal for establishment of Super Speciality Hospital and Higher Educational Institute- Medical College at Garkha, Chapra.

143.00 200 13.08.12

766 M/S Khatu Shyam Foods Pvt. Ltd., Patna

Proposal for establishment of 08 MT per hour Modern Rice Mill unit at Mohiuddinpur, Fatuha, Patna.

15.8586 57 13.08.12

767 M/S A.R. Mills, Patna. Proposal for establishment of 9600 MT per year capacity Rice Mill and Dal Mill unit in proprietorship at Fatuha, Patna.

1.7647 38 13.08.12

768 M/S Om Shri Laxminarain Warehouse Shoppers Ltd., Patna

Proposal for establishment of 8 MT per hour Boiled Rice Mill unit at Hajipur.

18.6678 60 13.08.12

769 M/S Kalyanpur Building Materials Pvt. Ltd., Patna. (Amending the approval given on proposal for establishment of 30,000 Cubic Meter per year capacity Autoclaved Aerated Concrete Blocks in two phases at Aurangabad in SIPB meeting held on 13.08.12, approval has been given for establishment of 3,00,000 Cubic Meter per year capacity Autoclaved Aerated Concrete(AAC) Blocks production unit in

Proposal for establishment of 3,00,000 Cubic Meter per year capacity Autoclaved Aerated Concrete(AAC) Blocks production unit in two phases at Aurangabad.

78.1700 64 13.08.12 28.11.12 &29.11.12

Page 72: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

72two phases at Aurangabad in SIPB meeting held on 28.11.12 & 29.11.12.)

770 M/S Kusum Rice Mill Pvt. Ltd., Buxar.

Proposal for establishment of 04 MT per hour Modern Arwa Rice Mill unit at Tiyara, Manoharpur, Buxar.

3.5440 12 13.08.12 23.01.14

771 M/S Sri Rani Sati Agri Feeds Pvt. Ltd., Darbhanga.

Proposal for establishment of 9600 MT per year capacity Poultry Feed and Cattle Feed unit at Industrial Area, Donar, Darbhanga.

1.3973 5 13.08.12 09.04.13

772 M/S SSF Industries Ltd., Hajipur(Vaishali).

Proposal for establishment of 600 MT per year capacity Flexible Polyurethane Foam production unit at E.P.I.P., Hajipur.

10.4387 39 13.08.12

773 M/S Anagha Energy and Infrastructure Pvt. Ltd., Patna.

Proposal for establishment of 1000 pieces per year capacity of 100 KVA Transformer production unit at Fatuha/Hajipur.

1.5000 33 13.08.12

774 M/S Parashmani Food & Chem Pvt. Ltd., Patna.

Proposal for establishment of 120 MT per year capacity Snacks and Puffs production unit at Danapur Cantt, Patna.

1.00 13 13.08.12

775 M/S Sony Air Gases Industries, Begusarai

Proposal for establishment of 900 Cubic Meter per year capacity Medical and Industrial Oxygen, Liquid Nitrogen and Nitrogen Gas production unit in partnership at Industrial Area, Barauni, Begusarai.

3.1146 38 13.08.12

776 M/S Bohra Sales & Services Ltd., Ranchi.

Proposal for establishment of 900 MT per year capacity Vermicelli and Noodles unit at Fatuha, Patna.

1.2856 18 13.08.12

777 M/S Mithila Feed, Darbhanga.

Proposal for establishment of 2400 MT per year capacity Poultry Feed and Cattle Feed unit in proprietorship at Darbhanga.

1.1239 27 13.08.12

778 M/S Mahua Co-operative Cold Storage Ltd., Mahua, Vaishali.

Proposal for establishment of 1 MT per hour Frozen Item-Fruits and Vegetable units at Kariho, Mirjanagar, Mahua, Vaishali.

24.00 13.08.12

779 M/S Shri Ashutosh Securities Pvt. Ltd., Patna.

Proposal for establishment of Multiplex and Food Court unit in the name of Rendezvous at Arya Kumar Road, Rajendra Nagar, Patna.

8.00 65 13.08.12

780 M/S Shakaldeep Cold Storage Pvt. Ltd., Bhojpur.

Proposal for establishment of 10,000 MT Multipurpose Cold Storage unit under R.A.B.C. at Industrial Area Bihiya, Bhojpur.

12.2123 60 13.08.12

781 M/S Kaveri Food Industry, Buxar.

Proposal for establishment of 5222 MT per year capacity Modern Rice Mill(Arwa) unit in proprietorship at Ahirauli, Buxar.

1.0300 15 13.08.12

782 M/S Pashupatinath Distributors Pvt. Ltd., Patna.

Proposal for establishment of 12,000 Kiloliter per year capacity Packaged Drinking Water and 276 MT per year capacity PET Bottle unit at Fatuha, Patna.

3.0323 55 13.08.12

783 M/S Savitri Horticulture Pvt. Ltd., Samastipur.

Proposal for establishment of 8500 MT Cold Storage unit under R.A.B.C. at Donar Industrial Area, Darbhanga.

8.3600 10 13.08.12 18.01.14

Page 73: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

73784 M/S AL Sameer Exports Pvt.

Ltd., Meerut. Proposal for establishment of 46,350 MT per year capacity Meat Processing unit at Araria/Kishanganj or Bhagalpur.

26.6235 426 13.08.12 26.04.13

785 M/S Mahaganpati Food and Agro Products Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 14,880 MT per year capacity Modern Para Boiled Rice Mill unit at Muzaffarpur.

6.9267 18 13.08.12

786 M/S Kavish Infrastructure Pvt. Ltd., Kolkata.

Proposal for establishment of 240 Lakh pieces per year capacity Fly Ash Bricks production unit at Barauni, Begusarai.

4.80 10 13.08.12

787 M/S Unique Properties Pvt. Ltd., Guwahati.

Proposal for establishment of Five Star Hotel at Patna. 92.0000 18.09.12

788 M/S D.R. Polymer, Patna. Proposal for establishment of 900 MT per year capacity Agarbatti stick production unit in proprietorship at Industrial Area, Hajipur, Vaishali.

1.0582 27

18.09.12 (Consent

with condition)

789 M/S Green Concretex Cements Pvt. Ltd., Kolkata.

Proposal for establishment of 01 million MT per year capacity cement plant unit at Kahalgaon.

137.6000 153 18.09.12

790 M/S Chandrika Infra Pvt. Ltd., New Delhi.

Proposal for establishment of 02 MW Solar P.V. Power Plant unit at Fatehli, Deepnagar, Nalanda. 20.0000 12

18.09.12 (Consent

with condition)

791 M/S Sureka Industries Pvt. Ltd., Darbhanga.

Proposal for establishment of 250 MT per year capacity spice production unit at Industrial Area, Donar, Darbhanga.

1.3250 12

18.09.12 (Consent

with condition)

792 M/S Om Sai Brick Industries, Purnea.

Proposal for establishment of 108 lakh pieces per year capacity Fly Ash Bricks production unit in partnership at Industrial Area, Maranga, Purnea.

1.0890 24

18.09.12 (Consent

with condition)

793 M/S Tegh Bahadur Carbons Pvt. Ltd., Begusarai.

Proposal for establishment of 19,800 MT per year capacity Calcined Petroleum Coke production unit at Barauni Industrial Area, Begusarai.

4.8000 31

18.09.12 (Consent

with condition)

794 M/S Dayal Products Pvt. Ltd., Hajipur, Vaishali.

Proposal for establishment of 105.60 lakh litres per year capacity Packaged Drinking Water unit at Industrial Area, Hajipur, Vaishali.

1.2421 11

18.09.12 (Consent

with condition)

795 M/S Technoculture Building Centre Pvt. Ltd., Patna.

Proposal for establishment of 3.5 MW Rice Husk Based Power Plant unit at Hajipur, Vaishali. 9.5200 25

18.09.12 (Consent

with condition)

796 M/S Thirteen Bulls Infra Pvt. Ltd., Purnea.

Proposal for establishment of Hotel and Restaurant and Resort unit at Industrial Growth Centre, Purnea. 9.0000 89

18.09.12 (Consent

with condition)

797 M/S Birla Urja Ltd., Mumbai. Proposal for establishment of 10 MW Solar Photo Voltaic Solar Power Plant unit at Darbhanga / Bhagalpur / Munger / Gaya / Muzaffarpur.

114.3100 250

18.09.12 (Consent

with condition)

798 M/S Acme Tele Power Ltd, Gurgaon, Haryana.

Proposal for establishment of 30 MW Solar Photo Voltaic Power Plant unit at Gaya. 350.0000 280

18.09.12 (Consent

with condition)

799 M/S Jhunjhunwala Oil Mills Ltd., Varanasi.

Proposal for capacity expansion from 28,800 MT per year capacity to 72,000 MT per year capacity in the existing Modern Rice Mill unit at Bangra, Kudra, Mohania, Kaimur,

21.0000 180 18.09.12

Page 74: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

74Bhabhua.

800 M/S Vaishnavi Industries, Darbhanga.

Proposal for establishment of 5520 MT per year capacity Rice Mill and Dal Mill production unit in proprietorship at Industrial Area, Donar, Dabhanga.

1.9413 34

18.09.12 (Consent

with condition)

801 M/S Shree Shashwatraj Agro Pvt. Ltd., Aurangabad.

Proposal for establishment of 3528 MT per year capacity Flour Mill unit at Industrial Growth Centre, Aurangabad.

1.0297 29

18.09.12 (Consent

with condition)

802 M/S Vishnu Industries, Gaya. Proposal for establishment of 4800 MT per year capacity Dal Mill unit in partnership at Industrial Area, Gaya. 1.7030 34

18.09.12 (Consent

with condition)

803 M/S Srinivash Food Industries, Patna.

Proposal for establishment of 3120 MT per year capacity Maize Poha, Rice Poha and Chilli Powders production unit in proprietorship at Fatuha Industrial Area, Fatuha, Patna.

1.2870 30

18.09.12 (Consent

with condition)

804 M/S Indo Gulf Fertilizers, Uttar Pradesh.

Proposal for establishment of 19,800 MT per year capacity Fertilizer and 4,15,800 pieces per year capacity bags production unit at Bela Industrial Area, Muzaffarpur.

15.5000 33

18.09.12 (Consent

with condition)

805 M/S Rozario Beverages Pvt. Ltd., West Bengal.

Proposal for establishment of 60,000 litre per day capacity Distillery unit at Bhagwanpur, Vaishali.

89.6770 18.09.12

806 M/S Aryan Agro Industries, Aurangabad.

Proposal for establishment of 10,000 MT Cold Storage unit in partnership at Industrial Growth Centre, Jasoiya, Aurangabad.

6.2944 7

18.09.12 (Consent

with condition)

807 M/S Moolchand Healthcare Pvt. Ltd., New Delhi.

Proposal for establishment of Multi Speciality Tertiary Care Hospital and Diagnostic Centre at E.P.I.P., Hajipur.

503.5000 2150

18.09.12 (Consent

with condition)

808 M/S Kisan Rice Industries Pvt. Ltd., Nalanda.

Proposal for establishment of 15,000 MT per year capacity Modern Rice Mill unit at Narsanda, Chandi, Nalanda.

3.9020 24

18.09.12 (Consent

with condition)

18.01.14

809 M/S Pratik Industries, Muzaffarpur.

Proposal for establishment of 8760 MT per year capacity Ice-Cream, Ice-Cream Block, Sorting and Packaging of Fruits and Vegetable unit in proprietorship at Industrial Area, Bela, Muzaffarpur.

3.9322 170

18.09.12 (Consent

with condition)

26.04.13

810 M/S Hotel Pushkar, Aurangabad.

Proposal for establishment of Three-Star Hotel in proprietorship at Industrial Growth Centre, Jasoiya, Aurangabad.

1.3050 16

18.09.12 (Consent

with condition)

811 M/S Rajhans Cold Storage Pvt. Ltd., Begusarai.

Proposal for capacity expansion from 7690 MT to 11,890 MT under R.A.B.C. in existing Cold Storage at Teghra, Begusarai.

2.7509 5 18.09.12

812 M/S Om Aastha Indo Energy Pvt. Ltd., Sasaram.

Proposal for establishment of 16,000 MT per year capacity Modern Rice Mill Unit at Belaon, Kharonda, Kaimur.

5.1759 40 18.09.12

27.01.14

813 M/S Mahabir Petroleum Products, Begusarai.

Proposal for establishment of 100 MT per day Calcined Petroleum Coke production unit in proprietorship at Barauni Industrial

3.0500 31

18.09.12 (Consent

with condition)

Page 75: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

75Area, Barauni.

814 M/S Pragati Food Products, Hajipur, Vaishali.

Proposal for establishment of 3960 MT per year capacity Ice-Cream and Ice-Cream Block production unit in partnership at E.P.I.P., Hajipur, Vaishali.

2.4426 33

18.09.12 (Consent

with condition)

815 M/S Frostberg Agritech Pvt. Ltd., Saharsa.

Proposal for establishment of 5000 MT Cold Storage under R.A.B.C. at Patuaha, Kahra, Saharsa.

3.2574 15 18.09.12

816 M/S Manokamna Enterprises Pvt. Ltd., Patna.

Proposal for establishment of 30,000 MT per year capacity M.S. Steel Bar and Structural Products production unit at Fatuha Industrial Area, Patna.

7.4800 47

18.09.12 (Consent

with condition)

817 M/S Vivek Vinayak Foods Pvt. Ltd., Hajipur.

Proposal for establishment of 97,20,000 litres per year capacity Packaged Drinking Water unit at Hajipur, Vaishali.

1.0016 15 18.09.12

818 M/S K.D. Liquor & Fertilizer Pvt. Ltd., Patna.

Proposal for establishment of 750 lakh pieces per year capacity Pet Bottles production unit at Fatuha Industrial Area, Fatuha, Patna.

4.9373 23

18.09.12 (Consent

with condition)

819 M/S Susheela Agro Industries, Patna.

Proposal for establishment of 9000 MT per year capacity Cattle Feed and Poultry Feed unit in proprietorship at Industrial Area, Fatuha, Patna.

1.2891 32

18.09.12 (Consent

with condition)

820 M/S Bansal Industries, Begusarai.

Proposal for establishment of 24000 MT per year capacity Whole Wheat Ata Chakki Plant (Flour Mill) unit in proprietorship at Barauni Industrial Area, Deona, Begusarai.

2.1436 25

18.09.12 (Consent

with condition)

821 M/S Dynamic Tarang Pvt. Ltd., Ranchi.

Proposal for establishment of 10 MT per year capacity Jaggery and allied Food Product unit at Industrial Area, Barari, Bhagalpur.

1.8723 20

18.09.12 (Consent

with condition)

822 M/S Emami Cement Ltd., Kokata.

Proposal for establishment of 1.5 MT per year capacity Cement Grinding unit and 10 MW Captive Power Plant1unit at Shivnarayanpur, Kahalgaon, Bhagalpur.

418.0000 166 18.09.12

823 M/S New Patliputra Gas Manufacturers, Ramgarh(Jharkhand).

Proposal for establishment of Industrial and Medical Oxygen, Carbondioxide Gas, Nitrogen Gas, Argon Gas, Dry Ice Mixed Gas production unit in partnership at Barari Industrial Area, Bhagalpur.

5.1185 40

18.09.12 (Consent

with condition)

824 M/S Lal Bhai Construction Equipments Pvt. Ltd., Patna.

Proposal for establishment of 580 pieces per year capacity Reversible Mixer, Batching Plant, Disaster and Safety Equipment and Machineries (Building Construction Equipment) production unit at Industrial Area, Fatuha, Patna.

8.7460 129

18.09.12 (Consent

with condition)

825 M/S Lal Bhai Construction Equipments Pvt. Ltd., Patna.

Proposal for establishment of 1500 pieces per year capacity Building Construction Tools production unit at Industrial Area, Fatuha, Patna.

2.0087 46

18.09.12 (Consent

with condition)

826 M/S K.K. Rice Mill, Aurangabad.

Proposal for establishment of 03 MT per hour Modern Rice Mill (Arwa And Usna) unit in proprietorship at Industrial Growth Centre, Aurangabad.

2.3560 15

18.09.12 (Consent

with condition)

Page 76: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

76827 M/S Shakambhari Agro

Foods Industries, Patna City, Patna. (Earlier approval was given for establishment of 1200 MT per year capacity Fryums and Soya Bari production unit in partnership at Bharatpur Simli, Patna City, Patna in the SIPB meeting held on 18.09.12. Again approval has been given for establishment of 960 MT per year capacity Fryums and Soyabari production unit in place of 1200 MT per year capacity in partnership at Bharatpur Simli, Patna City, Patna in the SIPB meeting held on 05.08.13.)

Proposal for establishment of 960 MT per year capacity Fryums and Soyabari production unit in partnership at Bharatpur, Simli, Patna City, Patna.

2.9151 34 18.09.12

05.08.2013

19.02.14

828 M/S Tanya Enterprises, Aurangabad.

Proposal for establishment of Air Separation unit for production of 150 Cubic Newton Meter per hour capacity Oxygen/Nitrogen Gas in proprietorship at Aurangabad.

3.2995 14 18.09.12

829 M/S Rikon Pharmaceuticals Pvt. Ltd., Patna.

Proposal for establishment of Allopathic medicine (Tablets, Capsule, Liquid Syrup, Eye Drop, Ointment, Injection Ampoule and Food Supplement) production unit at Industrial Area, Fatuha, Patna.

4.7160 55

18.09.12 (Consent

with condition)

830 M/S B.R. Irrigation System, Katihar.

Proposal for establishment of 1.20 Lakh pieces per year capacity H.D.P.E. Pipe (High Density Polyethylene Pipe) production unit in partnership at Industrial Growth Centre Maranga, Purnea.

1.7370 39

18.09.12 (Consent

with condition)

831 M/S Ayush Rice Mill, Aurangabad.

Proposal for establishment of 36000 MT per year capacity Arwa Rice Mill and Boiled rice Mill unit in proprietorship at Industrial Growth Centre, Jasoiya More, Aurangabad.

2.7100 9

18.09.12 (Consent

with condition)

832 M/S Protech Packaging Pvt. Ltd., Patna.

Proposal for establishment of 1200 Lakh pieces per year capacity Aluminium Bottle Cap production unit at Industrial Area, Fatuha, Patna.

1.3167 20

18.09.12 (Consent

with condition)

833 M/S Sri Shivam Rice Mill, Bhojpur.

Proposal for establishment of 7200 MT per year capacity Modern Rice Mill unit in partnership at Giddha Industrial Area, Giddha, Bhojpur.

1.5300 26

18.09.12 (Consent

with condition)

834 M/S M J & Sons Distillery & Breweries Pvt. Ltd., Banka.

Proposal for establishment of 150000 H.L.P.A. capacity Brewery Plant unit at Raghunathpur, Banka.

54.5200 75 18.09.12

835 M/S BMW Ventures Ltd., Patna.

Proposal for establishment of 25,000 MT per year capacity M.S.T.M.T.(Thermo Mechanically Twisted) and Sheet Cutting Processing unit at Industrial Area, Fatuha, Patna.

38.7000 300

18.09.12 (Consent

with condition)

836 M/S Swastik Poly Plast, Proposal for establishment of 450 1.3680 28 18.09.12

Page 77: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

77Patna. K.G. per hour Plastic Granules

production unit in proprietorship at Industrial Area, Fatuha, Patna.

(Consent with

condition) 837 M/S I.P. Threads, Dumraon,

Buxar. Proposal for establishment of 144 MT per year capacity twisted yarn unit in proprietorship at Dumraon Textiles Residential Colony, Dumraon.

1.1386 40 18.09.12

838 M/S Ankur Business Pvt. Ltd., Kolkata.

Proposal for establishment of 30,000 MT per year capacity Packaging of Iodised Salt unit at Fatuha Industrial Area, Fatuha, Patna.

2.5750 141

18.09.12 (Consent

with condition)

839 M/S Imperial Agrotech Pvt. Ltd., Patna.

Proposal for establishment of 36,000 MT per year capacity Modern Rice Mill unit at Industrial Growth Centre, Aurangabad.

2.9316 9

18.09.12 (Consent

with condition)

840 M/S S.K. Plast, Chapra. Proposal for establishment of 4,32,000 pieces per year capacity Pet Jar production unit in proprietorship at Industrial Area, E.P.I.P., Hajipur.

1.0800 25

18.09.12 (Consent

with condition)

841 M/S Ram Janki Cold Storage Pvt. Ltd., Bhojpur.

Proposal for establishment of 6000 MT Cold Storage unit at Karisath, Bhojpur.

4.0000 13 18.09.12

842 M/S Anupam Dispo Cons, Muzaffarpur.

Proposal for establishment of 440 MT per year capacity PP Glass and 318 Lakh pieces per year capacity Paper Cup production unit in proprietorship at Industrial Area, Bela, Muzaffarpur.

2.5168 17

18.09.12 (Consent

with condition)

843 M/S Jindal Moulded Furniture Pvt. Ltd., Aligarh.

Proposal for establishment of 450000 pieces per year capacity Moulded Plastic Chair production unit at Industrial Area, Fatuha, Patna.

2.1780 27

18.09.12 (Consent

with condition)

844 M/S Siddhi Vinayak Petro Chemicals, Begusarai.

Proposal for establishment of Cationic Bitumen Emulsion (15,600 MT per year capacity) production unit in proprietorship at Industrial Area, Barauni, Begusarai.

5.3900 15

18.09.12 (Consent

with condition)

845 M/S Ugraya Foods and Feeds Pvt. Ltd., Kolkata. (Approval has been given on proposal for change of name from M/S Ugraya Suppliers Pvt. Ltd. to M/S Ugraya Foods and Feeds Pvt. Ltd., New Delhi in SIPB meeting held on 11.06.14) (Proposal for change of name has been noted by SIPB in its meeting held on 17.07.14.)

Proposal for establishment of 1.20 Lakh MT per year capacity Poultry Feed unit at Industrial Estate, Bela, Muzaffarpur.

18.1801

66

18.09.12 (Consent

with condition)

11.06.14 17.07.14 (Noted in SIPB meeting)

846 M/S Mohit Polytech Pvt. Ltd., Jaipur, Rajasthan.

Proposal for establishment of 06 Lakh pieces per year capacity HDPE Pipes(High Density Polyethylene Pipes) and Sprinkler System Production unit at Industrial Growth Centre, Giddha, Ara.

11.9700 86

18.09.12 (Consent

with condition)

847 M/S L.K. Rice Mill, Patna. Proposal for establishment of 96 MT per day capacity Arwa Rice Mill unit in proprietorship at Industrial Area, Fatuha, Patna.

1.4391 39 18.09.12

Page 78: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

78848 M/S Shikha Breeding Farm &

Hatchery, Muzaffarpur. Proposal for establishment of 48 Lakh pieces per year capacity Day-Old Chicks(Hatchery) unit in proprietorship at Industrial Area, Donar, Darbhanga.

1.4938 23

18.09.12 (Consent

with condition)

849 M/S Shalimar Pellet Feeds Ltd., Kolkata. (Approval has been given on the proposal for change of capacity for establishment of 84,000 MT per year capacity Poultry Feed unit in place of earlier approved 60,000 MT per year capacity at Industrial Area Muzaffarpur in the SIPB meeting held on 05.03.14.)

Proposal for establishment of 84,000 MT per year capacity Poultry Feed unit at Industrial Area Muzaffarpur.

17.9964 144 18.09.12 (Consent with condition) 05.03.14

11.07.14

850 M/S Shilpee Educational Trust, Patna.

Proposal for establishment of Nurses Training College at Maranga Industrial Area, Maranga, Purnea. 1.7187 23

18.09.12 (Consent

with condition)

851 M/S Swadeshi Rice Mills Pvt. Ltd., Vaishali.

Proposal for establishment of 64,000 MT per year capacity Rice Mill unit at E.P.I.P., Hajipur. 21.0311 72

18.09.12 (Consent

with condition)

852 M/S Siddhi Bricks, Buxar. Proposal for capacity expansion from 75000 pieces per year capacity to 3,93,75,000 pieces per year capacity in the existing Mechanised Bricks unit in partnership at Navanagar, Buxar.

1.1478 21 18.09.12

853 M/S Lord Buddha Food Products Pvt. Ltd., Patna.

Proposal for establishment of 600 MT per year capacity Plastic Granules production unit at Industrial Area, Hajipur.

1.4355 21

18.09.12 (Consent

with condition)

854 M/S Mukesh Rice & Flour Mill, Madhepura.

Proposal for establishment of 7200 MT per year capacity Rice Mill and 14400 MT per year capacity Roller Flour Mill unit in proprietorship at Udakishanganj Industrial Area, Madhepura.

3.0037 36

18.09.12 (Consent

with condition)

855 M/S Shree Balajee Cement Industries Pvt. Ltd., Patna.

Proposal for establishment of 15,000 MT per year Capacity Cement Plant unit at Industrial Area, Fatuha, Patna. 2.3845 35

18.09.12 (Consent

with condition)

856 M/S Swastik Rice Mill, Aurangabad.

Proposal for establishment of 19200 MT per year capacity Arwa Rice Mill unit in proprietorship at Industrial Area, Barun, Aurangabad.

1.9260 51

18.09.12 (Consent

with condition)

857 M/S Rameshwar Sinha Poly Industries, Patna.

Proposal for establishment of 792 MT per year capacity P.V.C. Rigid Pipe production unit in proprietorship at Industrial Area, Fatuha, Patna.

1.2780 27

18.09.12 (Consent

with condition)

858 M/S Maa Mundeshwari Automobiles, Aurangabad.

Proposal for establishment of Tractor Servicing and Repairing unit in partnership at Aurangabad. 1.0526 25

18.09.12 (Consent

with condition)

859 M/S Shree Bajrang Foam, Patna.

Proposal for establishment of 300 MT per year capacity Polyurethane Foam unit in proprietorship at Industrial Area, Hajipur, Vaishali.

2.0592 12

18.09.12 (Consent

with condition)

860 M/S Sahu Industries, Proposal for establishment of 9600 3.4057 63 18.09.12

Page 79: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

79Darbhanga. MT per year capacity Poultry Feed

and Cattle Feed unit in partnership at Industrial Area, Donar, Darbhanga.

(Consent with

condition) 861 M/S Ashoka Cattle and

Poultry Feeds Pvt. Ltd., Darbhanga.

Proposal for establishment of 30,000 MT per year capacity Cattle and Poultry Feed unit at Industrial Area, Donar, Darbhanga.

4.0110 36

18.09.12 (Consent

with condition)

862 M/S Colambiya Paints Industries Pvt. Ltd., Patna. (Approval has been given on the proposal for change of name from M/S Berger Colours (India) Pvt. Ltd to M/S Colambiya Paints Industries Pvt. Ltd. in SIPB meeting held on 04.12.13.)

Proposal for establishment of Oxide Pigment-300 MT per year, Cement Paint-240 MT per year and Wall Putty -150 MT per year capacity production unit at Industrial Area, Fatuha, Patna.

1.0260 16

18.09.12 (Consent

with condition) 04.12.13

863 M/S Marps Organics, Patna. Proposal for establishment of Formaldehyde Plant unit in proprietorship at Fatuha Industrial Area, Fatuha, Patna.

3.0000 40

18.09.12 (Consent

with condition)

864 M/S Simplex Infrastructures Ltd., Kolkata.

Proposal for establishment of 25 MW Solar Power Project unit at Mahuli, Guraru, Gaya. 276.6027 1200

18.09.12 (Consent

with condition)

865 M/S Simplex Infrastructures Ltd., Kolkata.

Proposal for establishment of 25 MW Solar Power Project unit at Khaira, Suryagadha, Lakhisarai. 276.6027 1200

18.09.12 (Consent

with condition)

866 M/S Vaishali Enterprises Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 40320 MT per year capacity Para Boiled Rice Mill unit at Bela Industrial Area, Muzaffarpur.

7.5477 34 18.09.12

867 M/S Dayal Industries Ltd., New Delhi.

Proposal for establishment of 45,000 MT per year capacity Cattle Feed Unit at Industrial Area, Muzaffarpur. 6.7176 67

18.09.12 (Consent

with condition)

868 M/S Progressive Emulsion Bitumen Manufacturer(India) Pvt. Ltd., Patna.

Proposal for establishment of 96,000 MT per year capacity Bitumen Emulsion, Crum Rubber Modified Bitumen and Polymer Modified Bitumen unit at Sarsu, Atri, Gaya.

1.4850 50 18.09.12

869 M/S Jai Maa Sharda Rice Mill, Danapur Cantt., Patna.

Proposal for establishment of 14,400 MT per year capacity Modern Rice Mill unit in proprietorship at Giddha Industrial Area, Bhojpur.

2.0970 7

18.09.12 (Consent

with condition)

870 M/S Udhyam Vihar Industrial Infrastructure Corporation Ltd., Patna.

Proposal for establishment of 3500 KW Biomass Based (Rice Husk) Power Plant unit in the name of Technoculture Building Centre Pvt. Ltd. at Sonpur, Chapra.

9.5219 25 18.09.12

871 M/S Anamika Hitech Agro Industries Pvt. Ltd., Kaimur, Bhabhua.

Proposal for establishment of 19,200 MT per year capacity Modern Rice Mill unit at Kaimur, Bhabhua.

5.7518 12 18.09.12

872 M/S Kanti Nagendra Rice Mill Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 17280 MT per year capacity Rice Mill unit at Jarang Tekuna, Muzaffarpur.

8.3604 42 18.09.12

873 M/S Prabha Enterprises, Motihari.

Proposal for establishment of 10,500 MT per year capacity Rice Mill (Arwa) unit in proprietorship at Industrial Area, Bettiah, West Champaran.

1.1883 21

18.09.12 (Consent

with condition)

874 M/S Hentech Agrovet Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 42,240 MT per year capacity Para Boiled 10.4645 47 18.09.12

(Consent 02.10.13

Page 80: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

80Rice and Plain Rice Mill unit at Bela Industrial Area, Muzaffarpur.

with condition)

875 M/S Patna Iron Pvt. Ltd., Patna. (Approval has been given for 30600 MT per year capacity M.S Flat, M.S. Round, M.S. Square and M.S. Angle, E.R.W. Pipe in place of earlier approved 1224 MT per year capacity at phase-3, Industrial Area, Fatuha, Patna in SIPB meeting held on 04.12.13.)

Proposal for establishment of 30600 MT per year capacity M.S. Flat, M.S. Round, M.S. Square and M.S. Angle, E.R.W Pipe unit at Phase -3, Industrial Area, Fatuha, Patna.

11.1083 130 18.09.12

04.12.13

876 M/S Orion Solar Products Pvt. Ltd., Promoter-Lanco Group, Gurgaon, Haryana.

Proposal for establishment of 15 MW P.V. Solar Power Project unit each at three places in Phulli Dumar Block, Banka.

450.0000 60

18.09.12 (Consent

with condition)

877 M/S Maurya Co-operative Agro Industries Ltd., Madhepura.

Proposal for establishment of 9.9 lakh ton per year capacity Maize Processing (Corn Starch Gluten Germ Husk, Corn Oil, Steep Liquor) unit at Kalasan, Chausa Block, Madhepura.

400.0000 10000 18.09.12

878 M/S Radha Krishna Hi-Tech Agro Industries Pvt. Ltd., Patna.

Proposal for establishment of 19200 MT per year capacity Rice Mill unit at Mahadevpur, Phulari, Bihta.

5.4956 12 18.09.12 17.11.13

879 M/S Balajee Flour Mills, Begusarai.

Proposal for establishment of 24,000 MT per year capacity Ata Chakki Mill unit in partnership at Phulwaria, Begusarai.

2.1184 25 18.09.12

18.01.14

880 M/S Natraj Rice Mills Pvt. Ltd., Lakhisarai.

Proposal for establishment of 96,000 MT per year capacity Rice Mill and 1.2 MW Captive Power Plant unit at Dakra, Lakhisarai.

34.6938 68 18.09.12

05.06.14

881 M/S Claro Energy Pvt. Ltd., New Delhi.

Proposal for establishment of 60 MW Solar Power Plant unit at Basantpur, Supaul. 660.0000 170

18.09.12 (Consent

with condition)

882 M/S Sone Ganga Feeds Pvt. Ltd., Rohtas.

Proposal for establishment of Poultry Feed unit at Bharatkasba, Karakat, Rohtas.

5.0000 25 18.09.12

883 M/S Kushaan Energy Services Pvt. Ltd., Gurgaon, Haryana.

Proposals for establishment of Biomass Based Power Projects at 04 places- 1-12 MW Biomass Based Power Project at Durgawati Block, Kaimur

2-12 MW Biomass Based Power Project at Kochas Block, Rohtas

3-12 MW Biomass Based Power Project at Dinara Block, Rohtas

4-12 MW Biomass Based Power Project at Ramgarh Block, Kaimur.

72.0602

72.0602

72.0602

72.0602

57

57

57

57

18.09.12 (Consent

with condition)

884 M/S Intech Infrastructure Pvt. Ltd., Gurgaon, Haryana.

Proposal for establishment of 25 MW Solar Plant unit at Bihiya, Ara.

312.5000 18.09.12 (Consent

Page 81: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

81with

condition) 885 M/S Ganga Live Feed Pvt.

Ltd., Begusarai. Proposal for establishment of 30,000 MT per year capacity Cattle Feed unit at Ramjanpur, Begusarai.

5.3783 33 18.09.12

31.07.13

886 M/S Maa Padmawati Agro Foods Pvt. Ltd., Aurangabad.

Proposal for establishment of 76800 MT Rice Mill unit at Vill.- Radhua, Post-Siris, Dist.-Aurangabad.

17.4476 48 18.09.12

09.08.13

887 M/S Genial Polymers Pvt. Ltd., Vaishali.

Proposal for establishment of 750 MT per year capacity Pet Preform production unit at Hajipur Industrial Area, Vaishali.

1.1891 8

18.09.12

888 M/S Sone Ganga Modern Rice Mill Pvt. Ltd., Patna.

Proposal for establishment of 64 MT per day capacity Modern Arwa Rice Mill unit at Berkup, Darihat, Dehri-on-Sone, Rohtas

4.5864 41 28.11.12 &29.11.12

889 M/S Saphir Warehousing Services Pvt. Ltd., Uttar Pradesh.

Proposal for establishment of 160 MT per day capacity Energy Food production unit at Industrial Growth Centre, Giddha, Bhojpur.

5.0850 71 28.11.12 &29.11.12

890 M/S Sundram Cold Storage Pvt. Ltd., Saran.

Proposal for establishment of 4200 MT capacity Cold Storage unit under R.A.B.C. at Bhatoura, Gawandri, Marhaura, Saran.

5.3438 15 28.11.12 &29.11.12

891 M/S Sri Pawansut Food Industries Pvt. Ltd., Rohtas.

Proposal for establishment of 4 MT per hour Modern Rice Mill unit at Nokha, Rohtas.

7.4100 35 28.11.12 &29.11.12

892 M/S Mehta Feeds India Pvt. Ltd., Hazaribagh.

Proposal for establishment of 19,200 MT per year capacity Poultry Feed unit at Bela Industrial Area, Muzaffarpur.

5.9614 32 28.11.12 &29.11.12

893 M/S Shalimar Pellet Feeds Pvt. Ltd., Kolkata.

Proposal for establishment of 133.12 Lac pieces per year capacity Day-old Chicks production unit at Pandaul Industrial Area, Madhubani.

4.6600 24 28.11.12 &29.11.12

894 M/S Vikash Verma Agrotech Pvt. Ltd., Ara(Bhojpur).

Proposal for establishment of 15000 MT per year capacity Cattle Feed and Poultry Feed unit at Khajuata, Udwantnagar, Bhojpur.

1.9557 25 28.11.12 &29.11.12

895 M/S Ishan Industries, Muzaffarpur.

Proposal for establishment of 1200 MT per year capacity Corn Flakes, Potato Wafers and Fryum production unit in proprietorship at Industrial Area, Bela, Muzaffarpur.

1.4400 35 28.11.12 &29.11.12

896 M/S Guru Mahima Polytech Pvt. Ltd., Buxar.

Proposal for establishment of 72 Lac liters per year capacity Water Storage Tank and Plastic Container production unit at Industrial Area, Buxar.

1.0000 25 28.11.12 &29.11.12

897 M/S Shanti Cotton Industries, Muzaffarpur.

Proposal for establishment of 1,23,000 Kg. per year capacity Surgical Cotton, Bandage and Gauze production unit in proprietorship at Industrial Area, Bela, Muzaffarpur.

1.0942 22 28.11.12 &29.11.12

898 M/S Laheji Freezing House Pvt. Ltd., Siwan.

Proposal for establishment of 9600 MT Fruit Pulp processing unit under R.A.B.C. at Laheji, Daraunda, Siwan.

13.4312 55 28.11.12 &29.11.12 16.06.14

899 M/S Jai Durga Print & Packaging, New Delhi.

Proposal for establishment of 900 MT per year capacity Printed Cotton Box production unit in proprietorship at Bela Industrial Area, Muzaffarpur.

1.3116 16 28.11.12 &29.11.12

Page 82: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

82900 M/S Jain Cotton Industries,

Bhagalpur. Proposal for establishment of 1200 MT per year capacity of "B" Grade Cotton and Cotton Layer Sheet production unit in proprietorship at Industrial Area, Barari, Bhagalpur.

1.0440 30 28.11.12 &29.11.12

901 M/S Maya Foods and Drinks Pvt. Ltd., Patna.

Proposal for establishment of 18000 MT per year capacity Whole Wheat Plant(Atta Chakki) at Industrial Area, Gaya.

2.6262 21 28.11.12 &29.11.12

25.11.13

902 M/S J. P. Polyplasts, Patna. Proposal for establishment of 1920 MT per year capacity Plastic Granules and 1440 MT per year capacity Poly White Compound production unit in partnership at Banstal, Patna City, Patna.

1.9003 32 28.11.12 &29.11.12

903 M/S Maa Yakshini Food Processing Pvt. Ltd., Dinara, Rohtas.

Proposal for establishment of 30,000 MT per year capacity Modern Rice Mill unit at Dinara, Rohtas.

6.0000 21 28.11.12 &29.11.12

904 M/S Aricon Polymers, Forbesganj, Araria. (Earlier, approval was given for establishment of 36000 pieces per year capacity Water Storage Tank production unit in proprietorship at Mohammadpur Jalla, Patna City, Patna in SIPB meeting held on 28.11.12 &29.11.12. Again, approval has been given for change of place as Alampur, Katchi Dargah, Patna City, Patna in the proposal for establishment of 36000 pieces per year capacity Water Storage Tank production unit in proprietorship in SIPB meeting held on 18.04.13. )

Proposal for establishment of 36000 pieces per year capacity Water Storage Tank production unit in proprietorship at Alampur, Katchi Dargah, Patna City, Patna.

1.1600 9 28.11.12 &29.11.12 18.04.13

905 M/S Budh Bihar Rice Mill Pvt. Ltd., Nalanda.

Proposal for establishment of 19,200 MT per year capacity Arwa Rice Mill unit at Deep Nagar, Nalanda.

3.8520 32 28.11.12 &29.11.12

28.11.13

906 M/S Ma Vindhya Devi Rice Mills Pvt. Ltd., Buxar.

Proposal for establishment of 38400 MT per year capacity Modern Rice Mill unit at Bharkhara, Rajpur, Buxar.

11.5128 12 28.11.12 &29.11.12

907 M/S Mangal Deep Rice Mill Pvt. Ltd., Chhoradano, East Champaran. (Approval has been given for establishment of 8 MT per hour Modern Parboiled Rice Mill unit along with 1 MW Power Plant at Chhauradano, East Champaran in SIPB meeting held on 11.06.14.) (Approval has been given on proposal for 1 MW Captive Power Plant with earlier approved 08 MT per hour Modern Parboiled Rice Mill in SIPB meeting held on 17.07.14.) (Approval has been given on

Proposal for establishment of 8 MT per hour Modern Parboiled Rice Mill with 1 MW Captive Power Plant at Chhauradano, East Champaran.

22.7531

50

28.11.12 &29.11.12 11.06.14 17.07.14 29.01.15

Page 83: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

83proposal for establishment of Unit No.-2 in SIPB meeting held on 29.01. 15.)

908 M/S Aastha Fine Packaging Pvt. Ltd., Patna.

Proposal for establishment of 60 Lac pieces per year capacity Laminated Packaging Bags unit at Gosai Tola, Patliputra, Patna.

1.0891 20 28.11.12 &29.11.12

909 M/S Gopal & Company, Muzaffarpur.

Proposal for establishment of 600 MTPA capacity Sattu, 600 MTPA capacity Besan, 90 MTPA capacity Spice production unit in proprietorship at Industrial Area, Bela, Muzaffarpur.

1.5032 7 28.11.12 &29.11.12

910 M/S Tirupati Iron Foundry, Lakhisarai.

Proposal for establishment of 1224 MT per year capacity RPVC Pipes(Rigid PVC Pipes) production unit in proprietorship in the existing unit of Agriculture Implement at Industrial Estate, Lakhisarai.

1.5659 15 28.11.12 &29.11.12

911 M/S Shipra Agrotech Pvt. Ltd., Patna.

Proposal for establishment of 3000 MT per year capacity Organic Fertilizer, Bio Fertilizer, Bio Pesticide, Tissue Culture Plant at Nariar, Panapur, Minapur, Muzaffarpur.

1.1398 12 28.11.12 &29.11.12

912 M/S Bapuji Educational & Development Trust, Saran.

Proposal for establishment of Teacher Training College(B.Ed. College) in the name of "Ramadhar Singh Teacher Training College" at Amdhari, Ekma, Saran.

2.3780 16 28.11.12 &29.11.12 (Consent with condition)

913 M/S Laheji Freezing House Pvt. Ltd., Siwan.

Proposal for establishment of 200 MTPD capacity Roller Flour Mill unit in the name of M/S Laheji Roller Flour Mill at Laheji, Siwan.

20.2455 125 28.11.12 &29.11.12

27.06.14

914 M/S Om Suryay Namah, Chapra.

Proposal for establishment of 6000 MT Multi Purpose Cold Storage unit under R.A.B.C. in partnership at Mohammadpur, Garkha, Chapra.

9.9312 25 28.11.12 &29.11.12

915 M/S Ocean Filtration Pvt. Ltd., Delhi.

Proposal for establishment of 5000 pieces per year capacity Water Purifier and R.O. System production unit at Industrial Area, Muzaffarpur.

2.5635 25 28.11.12 &29.11.12

916 M/S Peerage Buildtech Pvt. Ltd., Delhi.

Proposal for establishment of 1200 MT per year capacity Extruded Cereal based Nutri Food unit at Industrial Area, Hajipur.

1.6685 20 28.11.12 &29.11.12

917 M/S Sri Ram Praikshan Cold Storage Pvt. Ltd., Jandaha, Vaishali.

Proposal for establishment of 8000 MT Multi Purpose Cold Storage unit under R.A.B.C. at Jandaha, Vaishali.

10.8305 50 28.11.12 &29.11.12

918 M/S Gajanan Siddhi Vinayak Foods Pvt. Ltd., Hajipur.

Proposal for establishment of 16 MT per hour Modern Rice Mill unit at Ibrahimpur, Padri, Chanari, Rohtas.

30.6523 50 28.11.12 &29.11.12

31.07.13

919 M/S Sri Radhakrishna Rice Mill, Buxar.

Proposal for establishment of 3 MT per hour Modern Rice Mill unit in proprietorship at Sarenja, Rajpur, Buxar.

1.0355 22 28.11.12 &29.11.12

920 M/S Ramond Ltd., Mumbai. Proposal for establishment of 1,30,200 pieces per year capacity Customised Garment production unit in two phases at Industrial Area, Bihta, Patna

5.2814 188 28.11.12 &29.11.12

921 M/S Alaknanda International Educational Society,

Proposal for establishment of Engineering College at Sahpur,

16.8000 55 28.11.12 &29.11.12

Page 84: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

84Dehradun. Bhojpur.

922 M/S Nu Creations, New Delhi.

Proposal for establishment of 200 MT per year capacity Makhana Processing unit in proprietorship at Forbesganj Industrial Area, Araria.

1.0000 15 28.11.12 &29.11.12

923 M/S Raj Mani Agro Pvt. Ltd., Daudnagar, Aurangabad.

Proposal for establishment 05 MT per hour Modern Rice Mill unit under R.A.B.C. at Daudnagar, Aurangabad.

9.6913 50 28.11.12 &29.11.12

18.01.14

924 M/S SRS Multispeciality Hospital, Aurangabad.

Proposal for establishment of 100 bed Super Multi Speciality Hospital in proprietorship at Jaosiya, Aurangabad.

14.8043 60 28.11.12 &29.11.12

925 M/S Jay Maa Laxmijee Rice Mill, Bhojpur.

Proposal for establishment of 3 MT per hour Modern Rice Mill unit in proprietorship at Piro, Bhojpur.

1.0584 25 28.11.12 &29.11.12

926 M/S Parampuri Rice Mills Pvt. Ltd., Raipurchor, Sasaram.

Proposal for establishment of 5 MT per hour Modern Rice Mill unit at Raipurchor, Sasaram.

4.8350 69 28.11.12 &29.11.12

927 M/S Laxmi Food and Agro Pvt. Ltd., Samastipur.

Proposal for establishment of 8 MT per hour Modern Rice Mill unit at Growth Centre, Maranga, Purnea.

16.6481 20 28.11.12 &29.11.12

928 M/S Swastik Plast, Bhagalpur.

Proposal for establishment of 9000 pieces per year capacity Rigid PVC Pipes and Roto Moulded Plastic Storage Tank production unit in proprietorship at Barari Industrial Area, Bhagalpur.

2.4840 60 28.11.12 &29.11.12

929 M/S Tirhut Industries Ltd., Pandaul, Madhubani.

Proposal for establishment of 2.5 Lac Hecto Liter per year capacity Brewery Plant unit at Sakri, Pandaul, Madhubani.

110.7405 80 28.11.12 &29.11.12

930 M/S Ashok Raj Preserve Pvt. Ltd., Samastipur.

Proposal for establishment of 10000 MT Multi Purpose Cold Storage unit under R.A.B.C. at Sadipur, Tajpur, Samastipur.

14.1212 30 28.11.12 &29.11.12

23.01.14

931 M/S Sinha Beverages and Eatables Pvt. Ltd., Patna.

Proposal for establishment of 120 Lac Liters per year capacity Packaged Drinking Water unit at Jalalpur, Rupaspur, Patna.

1.5000 18 28.11.12 &29.11.12

932 M/S Shubh Laxmi Flour Mills, Muzaffarpur.

Proposal for establishment of 24000 MT per year capacity Whole Wheat Atta Chakki unit in partnership at Patiyasa, Bochaha, Muzaffarpur.

2.8273 25 28.11.12 &29.11.12

933 M/S Manjusha Mini Rice Plant, Kaimur, Bhabhua.

Proposal for capacity expansion of 4 MT per hour of existing Rice Mill of 1 MT per hour in proprietorship at Sakri, Kudra.

1.6500 13 28.11.12 &29.11.12

11.07.14

934 M/S Lavanya Pure Food Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 45000 MT per year capacity Roller Flour Mill unit at Industrial Area, Bela, Muzaffarpur.

16.1100 50 28.11.12 &29.11.12

31.07.13

935 M/S Maa Vaishno Roller Flour Mill, Sasaram.

Proposal for establishment of 100 Ton per day capacity Roller Flour Mill unit in partnership at Industrial Area, Dehri, Rohtas.

6.1074 100 28.11.12 &29.11.12

936 M/S Shristi Rice Mill Pvt. Ltd., Patna.

Proposal for establishment of 4 MT per hour Rice Mill unit at Dumraitha, Kaimur, Bhabhua.

3.6250 42 28.11.12 &29.11.12

937 M/S Reliance Marts Pvt. Ltd., Gaya.

Proposal for establishment of 1200 MT per year capacity Fruits, Vegetable Processing and

3.7312 42 28.11.12 &29.11.12

Page 85: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

85Preservation unit at Industrial Area, Bodhgaya, Gaya.

938 M/S Sarvoday Rice Mill Pvt. Ltd., Vaishali.

Proposal for establishment of 48000 MT per year capacity Modern Para Boiled Rice Mill unit at Balnathpur, Kudi, Patepur, Mahua, Vaishali.

20.0570 75 28.11.12 &29.11.12

939 M/S Satya Enterprises Pvt. Ltd., Patna.

Proposal for establishment of 840 MT per year capacity Fuel Oil production in the existing unit at Industrial Area, Patliputra, Patna.

1.0716 9 28.11.12 &29.11.12

940 M/S Kanchan Jangha Food Products Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 19,200 MT per year capacity Raw Rice Mill unit at Industrial Area, Bela, Muzaffarpur.

4.2570 20 28.11.12 &29.11.12

941 M/S Shree Singhal Flyash Products, Patna.

Proposal for establishment of 63.24 Lac pieces per year capacity Flyash Bricks, Pavers Blocks and Tiles production unit in proprietorship at Industrial Area, Fatuha, Patna.

3.6937 34 28.11.12 &29.11.12

942 M/S Akash Agro Developers Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 36000 MT per year capacity Para Boiled Modern Rice Mill unit at Silaut, Baijnath, Kudhani, Muzaffarpur.

11.4287 54 28.11.12 &29.11.12

943 M/S Amrapali Biotech India Pvt. Ltd., Gaziabad. Uttar Pradesh.

Proposal for establishment of 32000 MT per year capacity Corn Grit, Rice Grit and Wheat Grit production unit at Navanagar, Dumaraon, Buxar.

18.3493 175 28.11.12 &29.11.12

04.12.13

944 M/S Sarojani & Sarojani Cold Storage Pvt. Ltd., Jahanabad.

Proposal for establishment of 6000 MT Multi Purpose Cold Storage unit under R.A.B.C. at Neuru, Jahanabad.

9.7912 50 28.11.12 &29.11.12

945 M/S Neogenetics Foods Pvt. Ltd., Bangalore.

Proposal for establishment of 50000 MT per year capacity Maize based Poultry Feed unit at Muzaffarpur.

4.0260 58 28.11.12 &29.11.12

946 M/S Amrapali Biotech India Pvt. Ltd., Gaziabad, Uttar Pradesh.

Proposal for establishment of 5000 MT per year capacity Corn Flakes and Wheat Flakes production unit at Navanagar, Dumraon, Buxar.

18.5643 120 28.11.12 &29.11.12

04.12.13

947 M/S Nand Rice Mill Pvt. Ltd., Patna.

Proposal for establishment of 38400 MT per year capacity Arwa Rice Mill unit at Babhinav, Jagdihspur, Bhojpur.

7.4493 47 28.11.12 &29.11.12

948 M/S Maa Bhawani Super Agro Products Pvt. Ltd., Rohtas.

Proposal for establishment of 19,200 MT per year capacity Rice Mill unit at Paduhar, Darihat, Rohtas.

5.9577 12 28.11.12 &29.11.12

19.02.14

949 M/S Aaryapoorna Food Processing Pvt. Ltd., Belapur, Navi Mumbai. (Approval has been given on proposal for change of capacity in SIPB meeting held on 17.07.14.)

Proposal for establishment of 56 MT per day capacity Dal Mill unit at Selgarh, Saidabad, Bikram, Patna.

6.4106 17 28.11.12 &29.11.12

17.07.14

950 M/S Riga Sugar Company Ltd., Kolkata.

Proposal for establishment of 03 MW New Co-generation Power Plant in addition to the existing 8 MW Co-generation Power Plant in Sugar Mill at Riga, Sitamarhi.

3.5000 666 28.11.12 &29.11.12

29.11.13

951 M/S J.K. Plast, Patna. Proposal for establishment of 480 MT per year capacity PVC Rigid Pipes production unit in partnership at Industrial Area, Fatuha.

2.9247 22 28.11.12 &29.11.12

Page 86: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

86952 M/S Shiv Shakti Rice Mill,

Dinara, Rohtas. Proposal for establishment of 7200 MT per year capacity Arwa Rice Mill unit in proprietorship at Chorpokhar English, Dinara, Rohtas.

1.0500 30 28.11.12 &29.11.12

953 M/S Dadiji Steels Ltd., Patna. Proposal for capacity expansion of 28800 MT in the existing 62400 MT per year capacity of MS Billet/Ingot unit and 30000 MT per year capacity expansion in the existing 90000 MT per year capacity of TMT Tour(Re-rolling Mill) at Sabalpur, Patna City, Patna.

14.6903 6 28.11.12 &29.11.12

954 M/S Tridev Rice Mill, East Champaran.

Proposal for establishment of 9600 MT per year capacity Arwa Rice Mill Unit in proprietorship at Mathkolasi,Chiraiya, East Champaran.

1.1835 26 28.11.12 &29.11.12

17.11.13

955 M/S Sai Kamal Agro Pvt. Ltd., Patna.

Proposal for establishment of 14,400 MT per year capacity Arwa Rice Mill unit at Nagwa, Naubatpur,Patna.

2.8170 30 28.11.12 &29.11.12

31.07.13

956 M/S Neel Kanth Agrofood Products Pvt. Ltd., Patna.

Proposal for establishment of 150 MT per day capacity Roller Flour Mill unit at Mahuli, Parsabazar, Patna.

11.2095 115 28.11.12 &29.11.12

26.04.13

957 M/S Chanakya Agro Products Pvt. Ltd., Patna. (Approval has been given on proposal for establishment of 10 lac Kg per year capacity CTC-Tea production unit at Pothiya, Kishanganj in SIPB meeting held on 04.12.13.)

Proposal for establishment of 10 lac Kg per year capacity CTC-Tea production unit at Pothiya, Kishanganj.

4.7994 62 28.11.12 &29.11.12 (Consent with condition) 04.12.13

958 M/S Maa Mundeshwari Automobiles, Aurangabad.

Proposal for establishment of 1400 pieces per year capacity Agriculture Equipment manufacturing unit and Mahindra Tractor Workshop unit in proprietorship at Industrial Growth Centre, Aurangabad.

3.5975 28.11.12 &29.11.12

959 M/S Sunil Singh Hatchery(India) Pvt. Ltd., Hajipur(Vaishali).

Proposal for establishment of 4800 MT per year capacity Poultry Feed unit at Industrial Area, Hajipur, Vaishali.

1.0261 9 28.11.12 &29.11.12

960 M/S Maa Durgeshwari Metal Products Pvt. Ltd., Patna.

Proposal for expansion/diversification of 3000 MTA capacity MS Wire and 360 MTPA capacity of Wire Nails in existing unit of 85 MTPA capacity Wire Nails at Industrial Area, Fatuha, Patna.

1.0998 26 28.11.12 &29.11.12

961 M/S Maa Agro Food Industries Pvt. Ltd., Patna.

Proposal for establishment of 19200 MT per year capacity Para Boiled Rice Mill unit at Majhion, Hasanbazar, Piro, Bhojpur.

8.5140 43 28.11.12 &29.11.12

962 M/S Pankaj International, Purnea.

Proposal for establishment of 216 MT per year capacity Button Mushroom Processing, Packaging and Canning unit in proprietorship at Maranga Growth Centre, Purnea.

2.6000 50 28.11.12 &29.11.12

963 M/S Sumitra Sahu and Sons Agro Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 24000 MT per year capacity Roller Flour Mill unit at Bela Industrial Area, Muzaffarpur.

3.5323 20 28.11.12 &29.11.12

964 M/S Jacksons Homeo, Patna.

Proposal for establishment of 48,000 Litres per year capacity Homeopathic

1.0035 18 02.01.13 (consent

Page 87: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

87Medicine unit in proprietorship at Industrial Area, E.P.I.P, Hajipur.

with condition)

965 M/S Maa Flour Mill, Paduhar, Darihat, Rohtas.

Proposal for establishment of 24,000 MT per year capacity Flour Mill unit in proprietorship at Darihat, Rohtas.

2.4158 15 02.01.13

966 M/S Upendra Prasad Singh Hi-Tech Constructions Pvt. Ltd., Begusarai.

Proposal for establishment of production unit of 3,000 MT per year capacity Fabricated Steel Product at Industrial Area, Barauni.

6.5831 281 02.01.13

967 M/S Eco Pavers and Bricks Pvt. Ltd., Patna.

Proposal for establishment of 72 Lac pieces per year capacity of Fly Ash Bricks unit at Badipur, Naubatpur, Patna.

1.0411 22 02.01.13

968 M/S Pashupati Modern Rice Mill Pvt. Ltd., Rohtas.

Proposal for establishment of 19,200 MT per year capacity Rice Mill unit at Sagarpur, Ghordihan, Kargahar, ,Rohtas.

4.2726 20 02.01.13

969 M/S Anirudhjee Modern Rice Mill Pvt. Ltd., Sasaram.

Proposal for establishment of 06 MT per hour Para Boiled Rice Mill unit at Sukulpur, Barki Mahuli, Kargahar, Rohtas.

8.9987 17 02.01.13

970 M/S Hero Cycles Ltd., Punjab.

Proposal for establishment of 09 Lac pieces per year capacity Cycle and Cycle Parts production unit at Bihta.

22.00 300 02.01.13 29.06.13

971 M/S Shiv Shakti Hatchery Pvt. Ltd., Vaishali.

Proposal for establishment of 19,200 MT per year capacity Poultry Feed unit at Industrial Area, Donar, Darbhanga.

1.9437 12 02.01.13 (consent with condition)

972 M/S Shiv Shakti Hatchery Pvt. Ltd., Vaishali.

Proposal for establishment of 25,71,400 pieces per year(Birds) capacity Hatchery unit at Industrial Estate, Samastipur.

1.0511 10 02.01.13 (consent with condition)

973 M/S Pannalal Agro Products Pvt. Ltd., Hajipur. (Change of place has been noted in SIPB meeting held on 05.03.14. )

Proposal for establishment of 18,000 MT per year capacity Dal Mill unit at Industrial Area, Hajipur.

2.6434 40 02.01.13 (Consent with condition) 05.03.14 (Noted in SIPB meeting)

974 M/S Shree Sai Polymers, Muzaffarpur.

Proposal for establishment of 300 MT per year capacity Laminated Multi Colour Pouch unit in Proprietorship at Industrial Area Muzaffarpur.

1.4968 14 02.01.13 (consent with condition)

975 M/S Shree Milk and Food Industries Ltd., Kolkata.

Proposal for establishment of 6200 MT per year capacity Milk Processing unit at Bankat, Motihari.

28.93 120 02.01.13

976 M/S Simanchal Dairy Pvt. Ltd., Kishanganj.

Proposal for establishment of 3,60,000 Litres per year capacity Milk Processing unit at Dharmganj, Kishanganj.

1.413 37 02.01.13

977 M/S Purnea Dairy, Darjeeling, West Bengal.

Proposal for establishment of 3420 Kilo Litre per year capacity Milk, Curd and Lassi unit in proprietorship at Moria Sadar, Purnea.

1.2019 25 02.01.13

978 M/S Renew Power Ventures Pvt . Ltd.,Gurgaon, Haryana

Proposal for establishment of 10 MW Solar Photo Voltaic Plant Unit at Banka/Lakhisarai/East Champaran.

100.00 08.02.13 (consent with condition)

Page 88: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

88979 M/S Renew Power Ventures

Pvt Ltd, Gurgaon, Haryana. Proposal for establishment of 50 MW Solar Voltaic Plant unit at Banka/Lakhisarai/East Champaran.

500.00 08.02.13 (consent with condition)

980 M/S Roha Dye Chem Pvt. Ltd., Mumbai.

Proposal for establishment of 25 MW Solar Photo Voltaic Power Plant Unit at Patna/Jahanabad/Nalanda.

225.00 50 08.02.13 (consent with condition)

981 M/S Welspun Renewables Energy Ltd., Delhi.

Proposal for establishment of 100 MW Solar Power Project unit at Nawada.

1000.00 200 08.02.13 consent with condition)

982 M/S Solar Field Energy Four Pvt. Ltd. and L & T, Mumbai.

Proposal for establishment of 100 MW Solar Power Project Unit at Gaya/Hajipur.

1050.00 2875 08.02.13 (consent with condition)

983 M/S Dayal Products Pvt. Ltd., Hajipur.

Proposal for establishment of 18000 MT per year capacity Dal Mill unit at Industrial Area, Hajipur, Vaishali.

2.4380 40 08.02.13 (Consent with condition)

16.06.14

984 M/S GSR Agro Mills Pvt. Ltd., Aurangabad.

Proposal for establishment of 4.5 MT per hour capacity Modern Rice Mill Unit at Growth Center, Aurangabad.

6.045 48 08.02.13

16.06.14

985 M/S Shiv Shakti Mini Rice Mill, Kaimur.

Proposal for 2 MT per day capacity expansion of existing Rice Mill unit in proprietorship at Chakiya, Durgawati , Kaimur.

1.32 9 08.02.13

986 M/S Shri Hanuman Mini Rice Mill, Kaimur.

Proposal for 2 MT per hour capacity expansion of existing Rice Mill in proprietorship.

1.3800 9 08.02.13 (Consent with condition)

987 M/S Golden Flour Mill Pvt. .Ltd., Kaimur.

Proposal for establishment of 9000 MT per year capacity Flour Mill unit for production of Maida, Atta, Suzi at Bharkhar, Kaimur.

8.00 35 08.02.13 11.02.14

988 M/S Jai Mata Rani Rice Mill, Mohania, Kaimur.

Proposal for establishment of 02 MT per hour capacity Arwa Rice Mill Unit in proprietorship at Bharkhar, Mohania, Kaimur.

1.38 8 08.02.13

989 M/S Pushpanjali Mini Rice Mill, Kaimur.

Proposal for capacity expansion of 02 MT per hour in the existing Arwa Rice Mill unit in proprietorship at Bharkhar, Patelnagar, Mohania, Kaimur.

1.25 9 08.02.13 27.02.14

990 M/S Jhandu Mini Rice Mill, Kaimur.

Proposal for capacity expansion of 02 MT per hour in the existing Rice Mill unit in proprietorship at Bharkhar, Mohania, Kaimur.

1.25 9 08.02.13 27.02.13

991 M/S Maa Mundeshwari Flour Mill Pvt. Ltd., Mohania, Kaimur.

Proposal for establishment of 10,800 MT per year capacity Flour Mill unit for Atta, Maida , Suzi at Mohania, Kaimur.

8.50 23 08.02.13

992 M/S Malahi Cold Storage Pvt. Ltd., East Champaran.

Proposal for 6000 MT capacity expansion and modernization of existing 4000 MT capacity Cold Storage under R.A.B.C. at Malahahi, Areraj, East Champaran.

11.6912 15 08.02.13

993 M/S Maa Ambika Bhawani Industries, Patna.

Proposal for establishment of 6000 MT per year capacity Modern Rice Mill unit in partnership at Industrial Area, Fatuha, Patna.

2.4074 24 08.02.13 (consent with condition)

Page 89: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

89994 M/S Bodhi Hotel and Resorts

Pvt. Ltd., Haryana. Proposal for establishment of Three Star Hotel at Bodhgaya, Gaya.

32.50 70 08.02.13 (consent with condition)

995 M/S Nasco Metals Pvt. Ltd., Patna City, Patna.

Proposal for establishment of 600 MT per year capacity Hinges and Wire Nails production unit at Didarganj, Patna City, Patna.

1.0762 16 08.02.13 (consent with condition)

996 M/S Shiv Sai Metal Products Pvt. Ltd., Patna.

Proposal for establishment of 1.5 MT per day capacity Aluminium Wire Products production unit at Maner, Patna.

1.7826 31 08.02.13

997 M/S Devi Prasad Bhimseria Hospital Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 112 bed Hospital and Diagnostics Facility at Purani Gudri, Muzaffarpur.

8.3568 97 08.02.13

998 M/S Nath Consumer Products Pvt. Ltd., Hajipur.

Proposal for capacity expansion of 3600 MT per year capacity in the existing Fruit and Vegetable Processing unit at Industrial Area, Hajipur.

3.0429 23 08.02.13

999 M/S Meceka Graphite Pvt. Ltd., Maharashtra.

Proposal for establishment 75,000 pieces per year capacity Graphite Products- Crucible, Dies and Mould production unit at Jamalpur Industrial Area, Munger.

1.32 31 08.02.13

1000 M/S Raveena Rice Mills India Pvt. Ltd., Buxar.

Proposal for establishment of 19,200 MT per year capacity Modern Rice Mill unit at Dehariya, Basudhar, Buxar.

6.8487 15 08.02.13

1001 M/S Sona Biscuits Ltd., Kolkata.

Proposal for capacity expansion of 8000 MT per year capacity expansion in the existing Biscuit unit of 15000 MT per year capacity at Industrial Area, Hajipur.

20.2019 35 08.02.13

1002 M/S Arena Food and Agro Industries Pvt. Ltd., Sheikhpura.

Proposal for establishment of 14,400 MT per year capacity Arwa Rice Mill unit at Maharath, Sheikhpura.

1.5090 21 08.02.13

1003 M/S Abhyodya Agro and Infrastructure Pvt .Ltd., Kaimur, Bhabhua.

Proposal for establishment of 12,000 MT per year capacity Seeds Processing unit-cum-Seed Research Centre at Araiya, Chand, Kaimur.

2.0305 8 08.02.13

1004 M/S Pristine Mega Food Park Pvt. Ltd., New Delhi.

Proposal for establishment of Mega Food Park at Mansi, Khagaria.

146.00 10790 08.02.13

1005 M/S Neelkamal Steels Pvt. Ltd., Patna.

Proposal for capacity expansion of 30,000 MT per year M.S. Billet and 30,000 MT per year T.M.T. Tor in the existing unit of M.S. Ingot and T.M.T. Tor at Sabalpur, Patna.

20.0300 21 08.02.13

1006 M/S Kalpshrijan Rice Mill Pvt. Ltd., Kaimur, Bhabhua.

Proposal for establishment of 24,000 MT per year capacity Modern Rice Mill unit at Rewra, Mohania, Kaimur, Bhabhua.

5.2907 58 08.02.13 25.06.14

1007 M/S Bihar Trade Tower(Joint Venture of M.V. Hotels and Projects Pvt. Ltd. And Ashwarya Foundation), Patna.

Proposal for establishment of I.T. Park in the name of M/S Bihar Trade Tower in a joint venture by M/S M.V. Hotels and Projects Pvt. Ltd. And M/S Ashwarya Foundation at Patliputra Industrial Area, Patna.

98.78 15 08.02.13 (consent with condition)

1008 M/S Sunny Star Hotels Pvt. Ltd., Patna.

Proposal for establishment of 4 Star Hotel and restaurant at South Gandhi Maidan, Patna.

31.6768 33 08.02.13 (consent with condition)

Page 90: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

901009 M/S Prakash Roller Flour

Mills Pvt. Ltd., Gaya. Proposal for establishment of Three Star Hotel at Bodhgaya, Gaya.

40.80 350 08.02.13 (consent with condition)

1010 M/S Pankaj Nirala Steel Pvt. Ltd., Purnea.

Proposal for establishment of 55.92 T.P.D capacity Iron Ingot unit at Kathpul Chowk, Kasba, Purnea.

4.1888 30 08.02.13

1011 M/S Patliputra Infotech Park Pvt. Ltd., Patna.

Proposal for establishment of I.T Services, I.T. Enabled Services and I.T. Industries at Patliputra Colony, Patna.

9.79 1000 08.02.13 (consent with condition)

1012 M/S Uno Digital Pvt. Ltd., Patna.

Proposal for capacity expansion of Software, I.T. Park at Industrial Area, Patna.

20.2370 582 08.02.13

1013 M/S Foot Steps of Buddha Hotels Pvt. Ltd., Mumbai.

Proposal for establishment of International Convention Centre and Star Category Hotel at Bodhgaya, Gaya.

112.10 150 08.02.13 (consent with condition)

1014 M/S Mithila Polymers Pvt. Ltd., Darbhanga. (Approval has been given on proposal for change of place

in SIPB meeting held on 17.07.14.)

Proposal for establishment of unit for production of 480 MT per year capacity P.V.C. Rigid Pipes at New Industrial Estate, Bela, Darbhanga.

1.9306 20 08.02.13 (consent

with condition)

17.07.14

1015 M/S Sitwanto Devi Mahila Kalyan Sansthan, Jamshedpur.

Proposal for establishment of Medical College and Hospital in the name of Netaji Subhash Medical College at Dumri, Bihta, Patna.

53.50 150 08.02.13

1016 M/S Ayesha Export Pvt. Ltd., Kolkata.

Proposal for establishment of 7.66 Lac Kg Made-Tea per year capacity production unit at Bagalbari, Pothia, Kishanganj.

4.9039 22 08.02.13 (consent with condition)

1017 M/S Dhiraj Herbs Pvt. Ltd., Patna.

Proposal for establishment of 7,200 MT per year capacity Processed Fruits, Vegetables and Ayurvedic Medicine (Herbal Products) production unit at Industrial Area, Bihiya, Bhojpur.

10.3798 79 08.02.13

1018 M/S Universal Agro Corporation Ltd., Begusarai.

Proposal for establishment of 38,400 MT per year capacity Rice Mill unit at Bagrahadih, Barauni, Begusarai.

17.7941 18 08.02.13

1019 M/S V N Udyog Pvt. Ltd., Bhagalpur.

Proposal for establishment of 15,360 MT per year capacity Rice Mill unit at Barari Industrial Area, Bhagalpur.

3.9609 48 08.02.13

1020 M/S Arya Agrofoods Pvt. Ltd., Sasaram.

Proposal for establishment of 28,800 MT per year capacity Modern Rice Mill unit at Adampur, Sasaram, Rohtas.

5.9257 54 08.02.13 11.07.14

1021 M/S Shivnandni Agro Pvt. Ltd, East Champaran.

Proposal for establishment of 24,000 MT per year capacity Rice Mill unit at Adapur, East Champaran.

4.4404 54 08.02.13 11.07.14

1022 M/S Shree Riddhi Siddhi Agriproducts Pvt . Ltd., Bettiah.

Proposal for establishment of 03 MT per hour Rice Mill and Pulse unit at Kumarbagh, Industrial Area, Bettiah.

1.4752 35 08.02.13 19.02.14

1023 M/S Gauri Shankar Agri Products Pvt. Ltd., West Champaran. (Approval has been given on proposal for change of place for establishment of

Proposal for establishment of 12,600 MT per year capacity Modern Rice Mill unit at Singhpur Road, Sathi, Narkatiyaganj, West Champaran.

1.5835 35 08.02.13

02.09.13

18.01.14

Page 91: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

9112,600 MT per year capacity Modern Rice Mill unit at Singhpur Road, Sathi, Narkatiaganj, West Champaran in place of Satahi, Chanpatia, West Champaran in the SIPB meeting held on 02.09.13.)

1024 M/S Kalawati Manas Rice Mill Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 30,240 MT per year capacity Para Boiled Rice Mill unit at Chandua Tola, Barkurwa, Kurhani, Turki, Muzaffarpur.

5.8850 29 08.02.13

1025 M/S Jai Mata Di Industries, Vaishali.

(1) Proposal for establishment of 5,49,120 pieces per year capacity Plastic Moulded Chair production unit in partnership at Industrial Area, Kumarbagh, Bettiah.

(2) Proposal for establishment of 5,49,120 pieces per year capacity Plastic Moulded Chair production unit in partnership at Industrial Area, Samastipur.

3.5942 3.2862

27 27

08.02.13 (consent with condition)

1026 M/S Hindustan Medicines Pvt. Ltd., Kolkata.

Proposal for establishment of 95,730 Litres per year capacity Drugs and Pharmaceuticals Formulation unit at Fulwaria, Barauni, Begusarai.

3.3500 27 08.02.13

1027 M/S Laxmi Mini Rice Mill, Rohtas.

Proposal for establishment of 6400 MT per year capacity Arwa Rice Mill unit in proprietorship at Bilaspur, Kargahar, Rohtas.

1.3624 9 08.02.13 11.07.14

1028 M/S Indian Potash Ltd., Chennai.

Proposal for establishment of 60,000 MT per year capacity Sulphuric Acid production unit at Industrial Area, Muzaffarpur.

29.0701 50 08.02.13 (consent with condition)

1029 M/S Santosh Kumar Gupta Rice Mill Pvt. Ltd., Fatuha, Patna.

Proposal for establishment of 4 Ton per hour Rice Mill unit at Industrial Area, Fatuha, Patna.

4.8361 12 08.02.13 (consent with condition)

1030 M/S Swastik Rice and Chura Mill, Purnea.

Proposal for establishment of 19,200 MT per year capacity Rice Mill and 21.6 MT per day capacity Chura Mill unit in partnership at Industrial Growth Centre, Maranga, Purnea.

3.3000 54 08.02.13 (consent with condition)

1031 M/S Lali Flour Mill L.L.P., Gopalganj. (Approval has been given on the proposal for change of name from M/S Lali Atta Mill L.L.P. to M/S Lali Flour Mill L.L.P. in SIPB meeting held on 31.10.13.)

Proposal for establishment of 18,000 MT per year capacity Whole wheat Atta Mill unit in partnership.

4.1180 34 08.02.13 31.10.13

1032 M/S Rupam Manufacturing and Trading Pvt. Ltd., Katihar.

Proposal for establishment of 30,000 MT per year capacity Cattle Feed and Poultry Feed unit at Industrial Growth centre, Maranga, Purnea.

3.4740 36 08.02.13 23.01.14

1033 M/S Maharashtra Feeds Pvt. Ltd., Delhi.

Proposal for establishment of 38,400 MT per year capacity Cattle feed and

6.31 39 08.02.13

Page 92: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

92Poultry Feed unit at Industrial Area, Bela, Muzaffarpur.

1034 M/S Harsh Fresh Agro Foods Pvt. Ltd., Patna.

Proposal for establishment of 14,400 MT per year capacity Rice Mill Unit at Lakhna Balipur, Patna.

2.3348 12 08.02.13 18.01.14

1035 M/S Jai Malikaarjun Rice Mill Pvt. Ltd., Kaimur, Bhabhua.

Proposal for establishment of 15,360 MT per year capacity Rice Mill unit at Bhundi, Tekari, Mohania, Kaimur.

5.0337 12 08.02.13

1036 M/S Shiv Vijay Udyog, Araria. Proposal for capacity expansion of 7,600 MT in the existing Rice Mill of 7,600 MT in partnership at Forbesganj, Araria.

2.3457 30 08.02.13

1037 M/S Sinha Rice and Agro Pvt. Ltd., Patna.

Proposal for establishment of 19,200 MT per year capacity Rice Mill unit at Verni, Masaurhi, Patna.

2.7438 12 08.02.13

1038 M/S Rajkishori Flour & Rice Mills Pvt. Ltd., Buxar.

Proposal for establishment of 19,200 MT Rice Mill unit at Chhotka Naun, Buxar.

4.3813 12 08.02.13 23.07.14

1039 M/S A.B.Z. Agro Foods Pvt. Ltd., New Delhi.

Proposal for establishment of 23000 MT per year capacity Buffalo Meat Production and Processing unit at Raipur and Lodhabari, Pothia, Kishanganj.

17.30 175 08.02.13 (consent with condition)

1040 M/S A.B.Z. Agro Foods Pvt. Ltd., New Delhi.

Proposal for establishment of 27,000 MT per year capacity Blast Freezer Storage and Processing unit at Lodhabari and Raipur, Surajpur, Pothia, Kishanganj.

12.30 175 08.02.13 (consent with condition)

1041 M/S Shri Janki Food Grains Pvt. Ltd., Varanasi (Cancelling the earlier approved proposal for establishment of 72000 MT per year capacity Rice Bran Solvent Extraction Plant at Kudra, Kaimur, approval has been on proposal for establishment of 8 MT per hour Rice Mill at Kudra, Kaimur in the SIPB meeting held on 31.10.13.)

Proposal for establishment of 8 MT per hour Rice Mill at Kudra, Kaimur.

16.8509 20 13.03.13 31.10.13

1042 M/S Lord Buddha Food Products Pvt. Ltd., Hajipur.

Proposal for establishment of 5.49 Lac pieces per year capacity Moulded Plastic Chair Production unit at Industrial Area, Hajipur, Vaishali.

3.3092 43 13.03.13

1043 M/S Annapurna Industries, Muzaffarpur.

Proposal for establishment of 4320 MT per year capacity Biomass Briquette production unit in partnership at Industrial Area, Bela , Muzaffarpur.

1.2608 16 13.03.13 (consent with condition)

1044 M/S Classic Hotel, Purnea. Proposal for establishment of two Star Hotel in partnership at Industrial Growth Centre, Purnea.

4.9500 60 13.03.13 (consent with condition)

1045 M/S Dev Shiva Agro Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 10,000 MT capacity Cold Storage under R.A.B.C. at Chandrahatti, Kurhani, Muzaffarpur.

15.8412 20 13.03.13 11.07.14

1046 M/S J.G. Foundry Ltd., Patna City, Patna.

Proposal for capacity expansion of 21,600 MT per year capacity in the existing unit of M.S. Ingot at

7.6912 12 13.03.13

Page 93: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

93Chimochak, Kothia, Didarganj, Patna City, Patna.

1047 M/S Agritech Engineering Pvt. Ltd., Bangalore.

Proposal for establishment of 05 MW Solar Power Plant at Muzaffarpur

69.9715 10 13.03.13 (consent with condition)

1048 M/S Ruchi Soya Industries Ltd, Kaimur, Bhabhua.

Proposal for establishment of 10 MW Solar Power Plant at Karnpura, Durgawati, Kaimur.

85.24 10 13.03.13 consent with condition)

1049 M/S Rajput Agro Food Products, Mohania, Kaimur, Bhabhua.

Proposal for establishment of 02 MT per hour Rice Mill unit in proprietorship at Piparia, Mohania, Kaimur.

1.3843 15 13.03.13 27.01.14

1050 M/S Goenka Bricks Pvt. Ltd., Patna.

Proposal for establishment of 57.60 Lac pieces per year capacity Fly Ash Bricks production unit at Mahajpura, Bikaram, Patna.

2.5700 45 13.03.13

1051 M/S Chandan Agro Foods Pvt. Ltd., Patna.

Proposal for establishment of 10 MT per hour Modern Rice Mill (Para Boiled and Arwa) unit at Kanti, Muzaffarpur.

13.5900 69 13.03.13

1052 M/S Sone Ganga Seeds, Rohtas.

Proposal for establishment of 10,800 MT per year capacity Seed Processing unit at in partnership at Industrial Area, Bikramganj, Rohtas.

1.2000 30 13.03.13

1053 M/S N N Sang Biotech Pvt. Ltd., Patna.

Proposal for establishment of 86.40 Lac pieces per year capacity Fly Ash Bricks production unit at Sadatpur, Kanti, Muzaffarpur.

1.8500 15 13.03.13

1054 M/S P.S. Oil Industries Pvt. Ltd., Darbhanga.

Proposal for establishment of 12000 MT per year capacity Mustard Oil unit at Brahampur, Singhwara, Darbhanga.

8.0183 77 13.03.13

1055 M/S Manju Modern Rice Mills Pvt. Ltd., Patna.

Proposal for establishment of 6000 MT per year capacity Modern Rice Mill at Lalbagh, Dhanarua, Patna.

1.7805 21 13.03.13

1056 M/S Rathi Hatcheries Pvt. Ltd., Haryana.

Proposal for establishment of 252 Lac pieces per year capacity Chicks Production unit at Maranga Industrial Area, Purnea.

4.1247 30 13.03.13 (consent with condition)

1057 M/S Pentagon Maritime Training and Research Institute, Navi Mumbai.

Proposal for establishment of Maritime Institute nearby Patna.

15.0000 80 13.03.13 (consent with condition)

1058 M/S Harsh Tejas Packaging Ltd., Patna. (Consent with condition has been given on Non Woven Fabrics Bag production unit in place of earlier approved 7.608 Lac Kg per year capacity Woven Fabrics Bag production at East Pahari, New Bypass Road, Patna in SIPB meeting held on 21.10.14.)

Proposal for establishment of 7.608 Lac Kg per year capacity Non Woven Fabric Bags production unit at East Pahari, New Bypass Road, Patna.

1.5818 16 13.03.13 21.10.14 (consent with condition)

1059 M/S Shahi Fresh Food India Pvt. Ltd., Patna.

Proposal for establishment of 10,000 MT Cold Chain, Pack House, Ripening Chamber and Logistic at Nayanagar, Hasanpur, Samastipur.

5.3987 30 13.03.13

1060 M/S Sharma Rice Mill, Proposal for establishment of 14,400 2.3550 30 13.03.13

Page 94: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

94Sheikhpura. MT per year capacity Rice Mill unit in

proprietorship at Mafo, Ghatkushumbha, Barbhigha, Sheikhpura.

1061 M/S Trikut Cement Works, Bhagalpur.

Proposal for establishment of 34,500 MT per year capacity Portland Cement, Fly Ash Bricks and Pavers Blocks and Tiles Production unit in partnership at Anadipur, Kahalgaon, Bhagalpur.

5.0662 79 13.03.13

1062 M/S Gauri Shankar Rice Mill, Kaimur, Bhabhua.

Proposal for establishment of 9600 MT per year capacity Rice Mill in proprietorship at Jagariya, Chainpur, Kaimur.

1.9669 23 13.03.13 11.02.14

1063 M/S Savitri Memorial Trust, Aurangabad.

Proposal for establishment of Para Medical College in the name of M/S Surendra-Savitri Memorial Institute of Para Medical and Allied Sciences at Industrial Growth Centre, Aurangabad.

1.9432 21 13.03.13

1064 M/S Shiv Shakti Udyog, Kumarbagh, West Champaran.

Proposal for establishment of 03 MT per hour Arwa Rice Mill production unit in proprietorship at Industrial Area, Kumarbagh, West Champaran.

1.4818 12 13.03.13

1065 M/S Chintamaniaditya International Pvt. Ltd., Ramgarh, Mohania, Kaimur.

Proposal for establishment of 15,300 MT per year capacity Rice Mill unit at Sahuka, Ramghar, Kaimur, Mohania.

6.3000 10 13.03.13 23.07.14

1066 M/S Yog Badri Pharmaceuticals, Panapur, Patna.

Proposal for establishment of 1,15,000 Kg. per year capacity Amla based Food Products and Ayurvedic Medicine Production unit in proprietorship at Industrial Growth Centre, Giddha, Bhojpur.

2.6550 39 13.03.13

1067 M/S Nampa Electricals Pvt. Ltd., Howrah.

Proposal for capacity expansion of 30,000 MT per year capacity in the existing unit of Fabricated Structural Products of Iron and Steel at Patna.

30.0000 120 13.03.13

1068 M/S Sone Valley International Pvt. Ltd., Ramgarh, Kaimur, Bhabhua.

Proposal for establishment of 45,300 MT per year capacity Rice Mill unit at Sahuka, Ramgarh, Kaimur.

8.0000 15 13.03.13 11.07.14

1069 M/S Veena Edibles Pvt. Ltd., Begusarai.

Proposal for establishment of 14,400 MT per year capacity Arwa Rice Mill at Daulatpur Kothi, Khodawandpur, Begusarai.

2.5110 28 13.03.13

1070 M/S Samrat Laboratories, Unit-2, Samastipur.

Proposal for establishment of unit-2 for production of 16,500 Ton per year capacity Formaldehyde at Harpur Alloth, Industrial Area, Samastipur.

3.3800 49 13.03.13

1071 M/S Baba Baijnath Agro Pvt. Ltd., Aurangabad.

Proposal for establishment of 12,000 MT per year capacity Rice Mill unit at Tengra Barun, Aurangabad.

8.2283 20 13.03.13 05.06.14

1072 M/S Maa Chhinmastika Enterprises Pvt. Ltd., Samastipur.

Proposal for establishment of 28,800 MT per year capacity Rice Mill unit at Industrial Area, Samastipur.

9.0756 40 13.03.13 11.07.14

1073 M/S Shri Sita Ram Jee Modern Rice Mill Pvt. Ltd., Rohtas.

Proposal for establishment of 19,200 MT per year capacity Rice Mill unit at Karup, Bhabhani, Kargahar, Rohtas.

5.6765 20 13.03.13

1074 M/S Maa Kali Super Agro Products Pvt. Ltd., Dehri-on-sone, Rohtas.

Proposal for establishment of 19,200 MT per year capacity Rice Mill unit at Akorigola, Rajapur Road, Rohtas.

8.3535 18 13.03.13

Page 95: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

951075 M/S Social Welfare

Organization of India, Patna. Proposal for establishment of Food Technology Entrepreneurship and Testing Laboratory at Mega Industrial Park, Bihta, Patna.

10.6900 53 13.03.13 (consent with condition)

1076 M/S Kanhaiya Jee Rice Mill Pvt. Ltd., Aurngabad.

Proposal for establishment of 06 MT per hour Modern Rice Mill unit at Industrial Growth Centre, Aurangabad.

3.9030 128 13.03.13

1077 M/S Srijagannath Cold Storage Pvt. Ltd., Samastipur.

Proposal for establishment of 10,000 MT capacity Multi Purpose Cold Storage under R.A.B.C. at Wajidpur, Samastipur.

12.6912 65 13.03.13 18.01.14

1078 M/S Maa Parvati Agotech & Food Pvt. Ltd., Natwar, Rohtas.

Proposal for establishment of 9,600 MT per year capacity Arwa Rice Mill at Natwar, Rohtas.

2.5000 30 13.03.13 (consent with condition)

1079 M/S Babajee Rice Mill, Bhojpur.

Proposal for capacity expansion of 02 MT per hour in the existing Rice Mill in partnership at Besiyan, Jamua, Bhojpur.

3.7980 44 13.03.13

1080 M/S SAR Capital Pvt. Ltd., New Delhi.

Proposal for establishment of 10 MW Solar Photo Voltaic Power Plant unit at Sangrampur Block, Indragachi, East Champaran.

100.000 120 13.03.13 (consent with condition)

1081 M/S Telesolar Solutions Pvt. Ltd., Chennai.

Proposal for establishment of 1200 KW Solar Power Generation unit at 200 different places in addition to the existing Solar Power unit of 120 KW capacity at 20 different places in Bihar for Telecom Tower.

20.00 40 13.03.13

1082 M/S S.S. Agro Projects Pvt. Ltd., Bhojpur.

Proposal for establishment of 14,400 MT per year capacity Rice Mill unit at Gyanpura, Bhojpur.

3.8592 17 13.03.13

1083 M/S Sai Feeds Pvt. Ltd., Darbhanga.

Proposal for establishment of 05 MT per hour Poultry Feed unit at Industrial Area, Donar, Darbhanga.

1.9835 31 13.03.13

1084 M/S Kumar Food Product Madhubani. (Approval has been given for establishment of 50 MT per day capacity Whole Wheat Atta Chakki in place of 05 MT per hour capacity Roller Flour Mill unit in partnership at Industrial Area Jhanjharpur, Madhubani, in the SIPB meeting held on 24.05.13.) .

Proposal for establishment of 50 MT per day capacity Whole Wheat Atta Chakki in partnership at Industrial Area, Jhanjharpur, Madhubani.

1.06 11 13.03.13

24.05.13

1085 M/S Kisan Rice & Dal Mill, Darbhanga.

Proposal for establishment of 15,000 MT per year capacity Rice and Dal Mill unit in proprietorship at New Industrial Estate, Bela, Darbhanga.

1.7883 27 13.03.13 (consent with condition)

1086 M/S B.K. Polytech Pvt. Ltd., Patna. (Approval has been given on proposal for establishment of 300 Lac pieces per year capacity HDPE/PP Bags production unit in the name of new formed company M/S B.K. Polytech Pvt. Ltd., at Industrial Growth Centre, Aurangabad in place of

Proposal for establishment of 300 Lac pieces per year capacity HDPE/PP Bags production unit at Industrial Growth Centre, Aurangabad.

8.8191 54 13.03.13 (consent with condition) 04.12.13

Page 96: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

96earlier approved proposal for 300 Lac pieces per year capacity HDPE/PP Bags production unit in the name of B.K. Polytech at Industrial Area, Bihiya, Bhojpur in SIPB meeting held on 04.12.13.)

1087 M/S Vaishali Rice Mill Pvt. Ltd., Hajipur.

Proposal for establishment of 24,000 MT per year capacity Modern Rice Mill unit at Industrial Area, Hajipur.

5.0000 15 13.03.13

1088 M/S SNSR Infra Ventures Pvt. Ltd., Araria.

Proposal for establishment of 5000 MT capacity Grain Storage Unit under R.A.B.C. Rajganj, Narpatganj, Araria.

7.9312 15 13.03.13

1089 M/S Bihari Soya Foods Processing Pvt. Ltd., Gaya.

Proposal for establishment of 1680 MT per year capacity Soya Bari unit at Hariharpur, Bodhgaya, Gaya.

1.3704 12 13.03.13

1090 M/S Litchica Products Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 14400 MT per year capacity Fruits and Vegetable Processing unit at Industrial Area, Bela, Muzaffarpur.

5.1329 35 18.04.13

1091 M/S Zafar Industries Pvt. Ltd., Gaya.

Proposal for establishment of 4800 MT per year capacity Iron Wire and Nails production unit at Baijubigha, Bodh Gaya, Gaya.

4.1083 36 18.04.13

1092 M/S Maa Kali Rice Mill, Mohania, Kaimur.

Proposal for establishment of 04 MT per hour Arwa Rice Mill in proprietorship at Bharkhar, Mohania, Kaimur.

3.0919 20 18.04.13

1093 M/S Astha Mini Rice Mill, Kaimur.

Proposal for establishment of 03 MT per hour Arwa Rice Mill in proprietorship at Dohra, Mohania, Kaimur.

1.3407 19 18.04.13

1094 M/S New Shanti Rice Mill, Mohania.

Proposal for establishment of 03 MT per hour Arwa Rice Mill in proprietorship at Akodhi, Mohania, Kaimur.

1.4246 17 18.04.13

1095 M/S Akshay Rice Mill, Mohania, Kaimur.

Proposal for establishment of 03 MT per hour Arwa Rice Mill in proprietorship at Duhra, Mohania, Kaimur.

1.3490 18 18.04.13 11.07.14

1096 M/S Shivam Rice Mill, Mohania, Kaimur.

Proposal for establishment of 04 MT per hour Arwa Rice Mill in proprietorship at Bharkhar, Mohania, Kaimur.

2.2093 20 18.04.13 11.02.14

1097 M/S Sarojini Rice Mill, Kaimur, Bhabhua.

Proposal for establishment of 04 MT per hour Arwa Rice Mill in proprietorship at Harnathpur, Bhabhua, Kaimur.

2.3757 18 18.04.13 11.02.14

1098 M/S Shobhnathji Rice Mill, Kaimur, Bhabhua.

Proposal for establishment of 03 MT per hour Arwa Rice Mill in proprietorship at Nibi, Chand, Kaimur.

1.2871 21 18.04.13

1099 M/S Puja Rice Mill, Rohtas

Proposal for establishment of 04 MT per hour Rice Mill in proprietorship at Beda More, Sarai, Shivsagar, Rohtas.

2.6756 20 18.04.13

1100 M/S Dharti Agro Food Products, Muzaffarpur.

Proposal for establishment of 60 MT per day capacity Whole Wheat Flour Mill in partnership at Bela Industrial Area, Muzaffarpur.

2.1186 25 18.04.13

Page 97: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

971101 M/S Jai Bajrang Agro Farm

Pvt. Ltd., Rohtas. Proposal for establishment of 38400 MT per year capacity Rice Mill at Harnathpur, Kochas, Rohtas.

11.1000 40 18.04.13 11.07.14

1102 M/S Kisan Rice Industries, Gopalganj.

Proposal for establishment of 04 MT per hour Modern Rice Mill in partnership at Chanpatti, Gopalganj.

4.5691 25 18.04.13

1103 M/S Maharshi Badri Ayurved, Patna.

Proposal for establishment of 115 MT per year capacity Awala based Food Product and Ayurvedic Medicine production unit in proprietorship at Industrial Growth Centre, Giddha, Ara, Bhojpur.

2.6550 39 18.04.13

1104 M/S Aditi Deva Mills Pvt. Ltd., Patna.

Proposal for establishment of 06 MT per hour Boiled Rice Mill at Barun, Aurangabad.

7.6284 40 18.04.13 16.06.14

1105 M/S C G Foods India Pvt. Ltd., Delhi.

Proposal for establishment of 6000 MT per year capacity Noodles production unit at Industrial Estate, Maranga, Purnea.

22.7500 450 18.04.13 (consent with condition)

1106 M/s Shree Sai Organic Foods Pvt. Ltd., Bettiah. (Approval was given on 18.4.13 in SIPB meeting for establishment of 38,400 MT per year capacity Rice Mill at Bettiah, West Champaran). Again on company’s request approval has been given for establishment of 16 MT per hour capacity Rice Mill and 1200 Kilowatt Rice Husk based Captive Power Plant in place of 38,400 MT per year(8 MT per hour, Two shift) capacity Rice Mill at Bettiah, West Champaran in SIPB meeting held on 24.05.13.)

Proposal for establishment of 16 MT per hour capacity Rice Mill and 1200 Kilowatt Rice Husk based Captive Power Plant at Bettiah, West Champaran.

23.4340 87 18.04.13 (consent

with condition)

24.05.13 (Consent

with condition)

11.07.14

1107 M/S Shanta Nursing Institute, Aurangabad.

Proposal for establishment of ANM Nurses Training Institute by Trust at Industrial Growth Centre, Aurangabad.

1.0116 27 18.04.13

1108 M/S Amar Jyoti Industries Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 38400 MT per year capacity Para Boiled Rice Mill at Jamlabad, Mushari, Minapur, Muzaffarpur.

18.3316 20 18.04.13

1109 M/S Pawandeo Rice Mill, Kaimur.

Proposal for establishment of 19200 MT per year capacity Rice Mill in proprietorship at Pachpokhari, Kudra, Kaimur.

3.2804 12 18.04.13

1110 M/S Hotel Simna International, Muzaffarpur.

Proposal for establishment of Hotel in the name of Hotel Simna International in partnership at Maripur, Muzaffarpur.

4.5665 41 18.04.13

1111 M/S Reliance Marts Pvt. Ltd., Gaya.

Proposal for establishment of 3360 MT per year capacity Soya Nuggets and Vermicelli at Bodh Gaya, Gaya.

2.0338 48 18.04.13

1112 M/S Prakash Udyog, Patna. Proposal for capacity expansion from 27 Lakh Bottles per year capacity to 82.80 Lakh Bottles in the existing units of Packaged Drinking Water production unit in partnership at

1.3500 16 18.04.13 (consent with condition)

Page 98: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

98Industrial Estate, Patna.

1113 M/S Jamuna Nursing Home Pvt. Ltd., Vaishali.

Proposal for establishment of 50-55 Ton per day capacity Flour Mill at Chakmadhin, Jandaha, Vaishali

8.5829 18.04.13 (consent with condition)

1114 M/S Wayss Food Products Pvt. Ltd., Hajipur, Vaishali.

Proposal for establishment of 2640 MT per year capacity Ice-cream production unit at Hajipur, Vaishali

2.4309 30 18.04.13 (consent with condition)

1115 M/S Vishwakarma Rice Mill, Rohtas.

Proposal for establishment of 15000 MT per year capacity Rice Mill unit in partnership at Industrial Area, Barun, Aurangabad.

2.3354 24 18.04.13 (consent with condition)

1116 M/S Madhan Foods and Bakers Pvt. Ltd., Patna.

Proposal for establishment of 2.5 MT per day capacity Mechanised Bakery Products, Bread Rusk, Baked Biscuit Production unit at Patliputra Industrial Area, Patna.

1.5882 15 18.04.13

1117 M/S Nilnikhil Cement Manufacturing (India) Pvt. Ltd., Lakhisarai.

Proposal for establishment of 30,000 MT per year capacity Cement Plant unit at Khemtarini Asthan, Suryagarha, Lakhisarai.

1.6482 27 18.04.13 (consent with condition)

1118 M/S Angel Papers Pvt. Ltd., Bettiah.

Proposal for establishment of 12000 MT per year capacity Craft Paper Production unit at Industrial Area, Bettiah.

8.1497 41 18.04.13 (consent with condition)

1119 M/S Jai Bajrang Modern Agro Products Pvt. Ltd., Rohtas.

Proposal for establishment of 19200 MT per year capacity Rice Mill unit at Pahari, Babhani, Kargahar, Rohtas.

9.5635 18 18.04.13

1120 M/S Raghubansh International Pvt. Ltd., Kaimur.

Proposal for establishment of 04 MT per hour Rice Mill unit at Devhaliya, Ramgarh, Kaimur, Mohania.

9.5800 20 18.04.13 04.08.14

1121 M/S Maa Ambey Anshika International Pvt. Ltd., Mohania, Kaimur.

Proposal for establishment of 04 MT per hour Rice Mill unit at Kavilaspur, Durgawati, Kaimur.

9.5100 20 18.04.13

1122 M/S Maa Mundeshwari Mini Rice Mill, Rohtas.

Proposal for capacity expansion from 02 MT per hour to 06 MT per hour in the existing Rice Mill unit in proprietorship at Barhari, Kargahar, Rohtas.

3.4500 8 18.04.13

1123 M/S Anvi Food & Beverages Pvt. Ltd., New Delhi. (Approval has been given on the proposal for establishment of 8 MT per hour Rice Mill in place of earlier approved proposal for 4 MT per hour Rice Mill in SIPB meeting held on 31.10.13.)

Proposal for establishment of 8 MT per hour Rice Mill unit at Industrial Growth Centre, Maranga, Purnea.

11.0263 50 18.04.13 (consent with condition) 31.10.13

1124 M/S Vinayak Binod Agro Product Pvt. Ltd., Kaimur.

Proposal for establishment of 04 MT per hour Rice Mill unit at Sultanpur, Ramgarh, Kaimur.

5.8210 10 18.04.13

1125 M/S Janhvi and Shrishti Agro Product Pvt. Ltd., Kaimur.

Proposal for establishment of 04 MT per hour Rice Mill unit at Sahuka, Ramgarh, Kaimur.

9.9400 20 18.04.13

1126 M/S Kisan Food Processing Udyog, Darbhanga.

Proposal for establishment of 13000 MT per year capacity Para Boiled Rice Mill unit in partnership at New Industrial Estate, Bela, Darbhanga.

5.4652 24 18.04.13

Page 99: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

991127 M/S Vikash Agro Industries

Pvt. Ltd., Nalanda. Proposal for establishment of 04 MT per hour Para Boiled Rice Mill unit at Sartha, Chandi, Nalanda.

7.9745 18 18.04.13

1128 M/S Chandra Palace, Muzaffarpur.

Proposal for establishment of Hotel Project unit in proprietorship at Maripur, Muzaffarpur.

3.1674 35 18.04.13

1129 M/S Skyfisher Airways Ltd., New Delhi

Proposal for Air Connectivity at JPNI Airport, Patna and its vicinity.

46.5000 370 18.04.13

1130 M/S Tara Proteins Pvt. Ltd., Kolkata.

Proposal for establishment of 25200 MT per year capacity Biscuit production unit at Bihta Industrial Estate, Patna.

41.0129 275 18.04.13 (consent with condition)

1131 M/S Osard, Patna. Proposal for establishment of Educational/Technical Institute in the name of "Centre for Leadership Development" at Mega Industrial Park, Bihta, Patna.

9.0974 27 18.04.13 (consent with condition)

1132 M/S Inspira Enterprise India Pvt. Ltd., Mumbai.

Proposal for establishment of 60 MW Solar Photo Voltaic Power Plant at Khulsa, Jamo Bazar, Goriakothi, Siwan.

660.0000 140 18.04.13 (consent with condition)

1133 M/S Sanwara Pet Industries, Patna.

Proposal for capacity expansion from 480 MT per year capacity to 960 MT per year capacity in the existing unit of Pet Preform in proprietorship at Simli Morarpur, Devi Asthan, Kotia, Patna City.

1.1277 6 18.04.13

1134 M/S Herbal Remedies India Pvt. Ltd., Patna. (Approval has been given only on proposal for establishment of Ayurvedic Medicine production unit at Anandichak, Navhatta, Rohtas in place of earlier approved proposal for establishment of Ayurvedic Medicine production and Super Specialist Ayurvedic Hospital and Research Centre at Anandichak, Navhatta, Rohtas in SIPB meeting held on 04.12.13.)

Proposal for establishment of only Ayurvedic Medicine Production unit at Anandichak, Navhatta, Rohtas.

1.2500 210 18.04.13 04.12.13

1135 M/S Life Plus Food, New Delhi.

Proposal for establishment of Corn Flakes/Cereals, Soya Milk and Paneer, Kefir, Fruit Juice and Fruit Purees/Crushed, Dehydrated Fruits and Vegetables production unit in two phases in proprietorship at Industrial Area, Bhagalpur.

1.9823 31 18.04.13 (consent with condition)

1136 M/S ARG (Groups), Hajipur. Proposal for establishment of (i) PVC Pipes(ii) PVC Fittings (iii) Casing and Capping (iv) PVC Electrical Boards (v) Electrical Fans (vi) Lighting Systems (vii) Sewing Machine (viii) Electrical Transformer in partnership at E.P.I.P., Hajipur.

13.0300 112 18.04.13 (consent with condition)

1137 M/S PMB Industries, Patna City, Patna.

Proposal for establishment of 672 MT per year capacity Disposable Glasses and Cups production unit in partnership at Industrial Area, Fatuha, Patna.

3.3933 44 18.04.13 (consent with condition)

1138 M/S Super Aadarsh Private Proposal for establishment of ITI in 1.6608 14 18.04.13

Page 100: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

100 ITI, Promoter- Super Aadarsh ITC, Aurangabad

the name of Super Aadarsh Private ITI in proprietorship at Growth, Jasoiya, Aurangabad.

(consent with condition)

1139 M/S Budha Caprient, Patna. Proposal for establishment of 3135 MT per year capacity Edible Oil production unit in partnership at Industrial Area, Fatuha, Patna.

3.1663 40 18.04.13 (consent with condition)

1140 M/S Pramila Enterprises, Purnea.

Proposal for establishment of 24000 Litres per day capacity Packaged Drinking Water unit in proprietorship at Growth Centre, Maranga, Purnea.

1.0827 23 18.04.13 (consent with condition)

1141 M/S Sita Agrofoods Industries Pvt. Ltd., Patna.

Proposal for establishment of 19200 MT per year capacity Rice Mill at Maranga Industrial Area, Purnea.

6.0352 26 18.04.13 (consent with condition)

1142 M/S T & P Agro Multifood Pvt. Ltd., Darbhanga. (Earlier, approval was given for establishment of 50 MT per day capacity Roller Flour Mill unit at Singhwara, Darbhanga in the SIPB meeting held on 18.04.13. Again, approval has been given on proposal for change of capacity and product for establishment of 60 MT per day capacity Whole Wheat Atta Chakki unit in place of earlier approved proposal for 50 MT per day capacity Roller Flour Mill unit at Singhwara, Darbhanga in the SIPB meeting held on 02.09.13.)

Proposal for establishment of 60 MT per day capacity Whole Wheat Atta

Chakki unit at Singhwara, Darbhanga.

1.9200

15 18.04.13

02.09.13

1143 M/S Jai Aryan Agro Pvt. Ltd., Motihari

Proposal for establishment of 06 MT per hour capacity Rice Mill at Kesaria, Motihari.

9.6792 46 18.04.13 (consent with condition)

1144 M/S Dhanlaxmi Vastu Pvt. Ltd., Kolkata.

Proposal for establishment of 72000 MT per year capacity Rice Mill at Aurangabad Industrial Area, Aurangabad.

22.5469 61 18.04.13 (consent with condition)

1145 M/S Ashwini Polymers, Raipur, Rajasthan.

Proposal for establishment of 960 MT per year capacity Rigid PVC Pipe production unit in proprietorship at Growth Centre, Aurangabad.

1.2839 25 18.04.13 (consent with condition)

1146 M/S Om Prakash Roller Flour Mill Pvt. Ltd., Nalanda.

Proposal for establishment of 80 Ton per day capacity Roller Flour Mill and 40 Ton per day capacity Whole Wheat (Atta Chakki) unit at Hasanpur, Rajgir, Nalanda.

7.9000 60 18.04.13 (consent with condition)

05.06.14

1147 M/S Shri Ganpati Rice Mill and Rice Bran Industries Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 400 MT per year capacity Rice Bran based Solvent Extraction unit at Gaighat, Muzaffarpur.

27.6500 20 18.04.13 (consent with condition)

1148 M/S Nav Bihar Media Pvt. Ltd., Patna.

Proposal for establishment of 2.66 crore pieces per year capacity News paper publishing , Print Media and Electronic Media at Patliputra Industrial Area, Patna.

8.3986 139 24.05.13

Page 101: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

101 1149 M/S Khetan Chemicals

Works, Muzaffarpur. Proposal for establishment of 979.20 MT per year capacity Naphthalene Ball Production unit in Proprietorship at Industrial Area, Bela, Muzaffarpur.

1.4616 17 24.05.13

1150 M/S Laxmipati Vishnu Enterprises, Muzaffarpur.

Proposal for establishment of 1380 MT per year capacity Atta, Besan & Sattu Production unit in Proprietorship at Industrial Area Bela, Muzaffarpur.

1.12 09 24.05.13 (consent

with condition)

1151 M/S Maa Shanti Poly Container Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 1344 MT per year capacity Disposable Cups & Glasses Production Unit at Industrial Area Bela, Muzaffarpur.

8.8706 17 24.05.13 (consent

with condition)

1152 M/S Balanath Infra Projects Pvt. Ltd., Mumbai.

Proposal for establishment of 2.5 MW Solar Photo Voltaic Power Plant at Banthu, Bhagwanpur, Vaishali.

27.25 22 24.05.13 (consent

with condition)

1153 M/S U M Solar Pvt. Ltd. , New Delhi.

Proposal for establishment of 2.5 MW Solar Photo Voltaic Power Plant at Banthu, Bhagwanpur, Vaishali.

27.25 30

24.05.13 (consent with condition)

1154 M/S U. P. Renewables Pvt. Ltd. , Allahabad

Proposal for establishment of 2.5 MW Solar Photo Voltaic Power Plant at Banthu, Bhagwanpur, Vaishali.

27.25 22 24.05.13 (consent

with condition)

1155 M/S Maa Ambey Rice Mill, Fatuha, Patna.

Proposal for establishment of 03 MT per hour Rice Mill in Proprietorship at Sonaru, Fatuha, Patna.

1.8453 15 24.05.13

1156 M/s Samriddhi Snacks Food, West Champaran.

Proposal for establishment of 900 MT per year capacity Potato Chips Processing & Packing unit in proprietorship at Narwal , Borewal, Bagaha, West Champaran.

7.90 40 24.05.13 11.02.14

1157 M/s Shital Rice Mill Pvt. Ltd., West Champaran.

Proposal for establishment of 05 MT per hour capacity Rice Mill unit at Bansgaon, Bagaha, West Champaran.

5.6413 20 24.05.13 11.02.14

1158 M/S Ripuraj Agro Pvt. Ltd., Raxaul.

Proposal for capacity expansion of 38400 MT per year capacity in the existing Rice Mill of 28800 MT per year capacity at Raxaul, West Champaran.

4.73 12 24.05.13

1159 M/S Janki Nandan Food Pvt. Ltd., Sitamarhi.

Proposal for establishment of 6720 MT per year capacity Rice Mill at Industrial Area, Sitamarhi.

2.05 12 24.05.13

1160 M/S Amul Feed Pvt. Ltd., Patna.

Proposal for establishment of 08 MT per hour Poultry Feed unit at Ranipur, Patna City, Patna.

12.6194 43

24.05.13 04.12.13

1161 M/S Gaurav Rice & Food Processing Pvt. Ltd., Patna.

Proposal for establishment of 38,400 MT per year capacity Rice Mill unit at Majhauli, Muhammadpur, Bujurg, Hajipur, Vaishali.

9.7537 30

24.05.13 27.06.14

1162 M/S Vijayatej Hospitality Pvt. Ltd., Patna.

Proposal for establishment of Hotel with Banquet Hall in P&M Mall at Patliputra Industrial Area, Patna.

15.6043 68 24.05.13 (consent

with

Page 102: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

102 condition)

1163 M/S Srivastava Petro Carbons, Patna City, Patna.

Proposal for establishment of 3000 Kilo Litre/ MT per year capacity Pyrolysis Oil, Carbon Black, Steel Scrap and Hydro Carbon Gas production unit in Partnership at Industrial Area Fatuha, Patna.

1.3987

18 24.05.13 (consent

with condition)

1164 M/S Srivastava Petro Carbons Pvt. Ltd., Patna City, Patna. (Approval has been given on the proposal for change of name from M/S Srivastava Petro Carbons to M/S Srivastava Petro Carbons Pvt. Ltd. in SIPB meeting held on 31.10.13.)

Proposal for establishment of 3000 Kilo Litre/ MT per year capacity Pyrolysis Oil, Carbon Black, Steel Scrap and Hydro Carbon Gas production unit at Industrial Growth Centre Giddha, Bhojpur.

1.1447 18 24.05.13 (consent

with condition)

31.10.13

1165 M/s S.R.S. Refrigeration Pvt. Ltd., Patna.

Proposal for establishment of 14,400 MT per year capacity Modern Rice Mill at Nawahi, Naubatpur, Patna.

5.2094 29 24.05.13

1166 M/s Sea Hawk Enterprises Pvt. Ltd., Lucknow.

Proposal for establishment of 90,000 MT per year capacity Solvent Extraction Plant of Rice Bran at Aurangabad Industrial Area, Aurangabad.

21.5234 170

24.05.13 05.06.14

1167 M/S Patel Rice Mill, Kochas, Rohtas.

Proposal for establishment of 04 MT per hour Rice Mill in Proprietorship at Sarosar, Kochas, Rohtas.

2.0191 14 24.05.13

1168 M/S Mithilanchal Rice & Agro Pvt. Ltd., Madhubani.

Proposal for establishment of 04 MT per hour Modern Para Boiled Rice Mill unit at Industrial Area Pandaul, Madhubani.

5.8210 40

24.05.13 (consent

with condition)

1169 M/S Pushpa Electrode Industries., Patna.

Proposal for establishment of 600 MT per year capacity Welding Electrodes production unit in proprietorship at Moujipur, Fatuha, Patna.

1.1260 19

24.05.13

1170 M/S Maharani Tyre Recycling Plant, Gaya.

Proposal for establishment of 266.40 MT per year capacity Waste Tyre Recycling Plant in proprietorship at Niyamatpur, Belaganj, Gaya.

1.0420 10 24.05.13

1171 M/S Comet Power Pvt. Ltd., Mumbai.

Proposal for establishment of 2.5 MW Solar Photo Voltaic Power Plant at Banthu, Hajipur, Vaishali.

26.48 15 24.05.13 (consent

with condition)

1172 M/S Arwal Food Products Pvt. Ltd., Arwal.

Proposal for establishment of 38,400 MT per year capacity Rice Mill unit at Rampur, Waina, N.H.-98, Arwal.

11.4344 24

24.05.13 11.02.14

1173 M/S Iqra International Pvt. Ltd., Darbhanga.

Proposal for establishment of 19,200 MT per year capacity Cattle and Poultry Feed at Industrial Area, Donar, Darbhanga.

2.1120 42

24.05.13 (consent

with condition)

1174 M/S Maa Yashoda Rice Mill Pvt. Ltd., Patna City, Patna.

Proposal for establishment of 05 MT per hour Rice Mill at Gauharpur,

5.4763 20 24.05.13

Page 103: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

103 Didarganj, Patna City, Patna.

1175 M/S Radhe Krishna Agro Food and Enterprises Pvt. Ltd., Aurangabad.

Proposal for establishment of 48,000 MT per year capacity Para Boiled and Raw Rice Mill unit at Kusuma, Ankohra, Khaira, Aurangabad.

14.60 69 24.05.13

1176 M/S Sheela Foam Pvt. Ltd., Gaziabad, U.P.

Proposal for establishment of 20,000 MT per year capacity Poly Urethane Foam unit at Kishanganj.

47.10 100 24.05.13

1177 M/S Jai Prakash Industries, Darbhanga.

Proposal for establishment of 63.24 lac pieces per year capacity Fly Ash Bricks, Pavers Block and Checkers production unit in proprietorship at Industrial Area Donar, Darbhanga.

1.2418 37 24.05.13 (consent

with condition)

1178 M/s S.E.I. Star Solar Energy Pvt. Ltd., Delhi.

Proposal for establishment of 50 MW Solar Photo Voltaic Project at Kandaul, Jahanabad/Belaganj, Gaya/Samastipur/Supaul.

600.00 100

24.05.13 (consent

with condition)

1179 M/S Patliputra Polymer Pvt. Ltd., Patna. (Approval has been given for change of capacity for establishment of 1200 MT per year capacity Disposable Glass & Cup and 64,000 Litres per day capacity Packaged Drinking Water unit in place of 1200 MT per year capacity Disposable Glass & Cup and 64,000 Litres per year capacity Packaged Drinking Water production unit at Industrial Area Fatuha, Patna in SIPB meeting held on 28.06.13.)

Proposal for establishment of 1200 MT per year capacity Disposable Glass & Cup and 64,000 Litres per day capacity Packaged Drinking Water unit at Industrial Area Fatuha, Patna.

6.0030 84 24.05.13 28.06.13

1180 M/S Patliputra Entertainment Pvt. Ltd., Patna.

Proposal for establishment of Hotel & Restaurant at P. Mall, Exhibition Road, Patna.

21.7410 191 24.05.13 (consent

with condition)

1181 M/S Vitra India Glass Pvt. Ltd., Patna City, Patna.

Proposal for establishment of 1,87,200 square metre per year capacity Toughened Glass Production unit at Sri Rampur, Fatuha , Patna.

7.1572 44

24.05.13

1182 M/S Cimage Promoter-Vijayam Educational Trust, Patna.

1- Proposal for establishment of U.G. & P.G. Level Courses in Management, Engineering, Architecture, Computer Application, Hotel Management and Mass Communication Stream in the name of Catalyst Group of College at Mega Industrial Park, Bihta, Patna. 2- Corporate Interaction-cum-Training Centre and City Office at Vivekanand Marg, Boring Road, Patna. 3- Proposal for establishment of Digital Media Production Lab and Practical Training Centre at Patliputra Industrial Area, Patna.

25.7590 350 24.05.13

1183 M/S Gurukripa Wovens Sack Pvt. Ltd., Kaimur, Bhabhua.

Proposal for establishment of 1080 lakh Litre per year capacity Plastic Water Tank production unit at Korari,

08.00 55

24.05.13

Page 104: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

104 Durgawati, Kaimur.

1184 M/S Mansa Jute Pvt. Ltd., Katihar.

Proposal for capacity expansion of 3428 MT per year capacity in the existing unit of Jute Twine of 2500 MT per year capacity at Sirsa Dalan, Katihar.

9.58 48 24.05.13

1185 M/S Tridev Tobacco Products Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 6000 carton per year capacity Non Filter Cigarette production unit at Muzaffarpur.

1.4233 15 24.05.13

1186 M/S Gandhar Concrete Pole, Ajmer, Rajasthan.

Proposal for establishment of 68,400 pieces per year capacity P.S.C. Pole production unit in two phases in proprietorship at Industrial Area Bihiya, Bhojpur.

2.9796 68

24.05.13

1187 M/S Shri Shivam Oil Refinery Udyog Pvt. Ltd., Raxaul.

Proposal for approval of established unit of 100 T.P.D. MT per year capacity Vanaspati Ghee, Refined Palm Oil production unit at Kaurjhar Nagar, Manokamna Mandi, Raxaul.

12.0105 18 24.05.13 01.08.13

1188 M/S Sone Hardeo Flour Mills Pvt. Ltd., Buxar.

Proposal for approval of established unit of 04 MT per hour capacity Flour Mill at Lahnachakki, Brahmpur, Buxar .

2.4267

24.05.13 03.03.14

1189 M/S Hebe Steels Pvt. Ltd., Patna.

Proposal for establishment of 19,200 MT per year capacity Steel Re-Rolling Mill unit at Fatuha Industrial Area, Fatuha, Patna.

10.8806 19 24.05.13 (consent

with condition)

1190 M/S Pawansut Rice Udyog, Kaimur, Bhabhua.

Proposal for establishment of 03 MT per hour Arwa Rice Mill in proprietorship at Amarhi, Bhabhua, Kaimur.

1.1190 14 28.06.13

1191 M/S Puja Rice Mill, Mohania, Kaimur, Bhabhua.

Proposal for establishment of 04 MT per hour Arwa Rice Mill in proprietorship at Bharkhar, Mohania, Kaimur, Bhabhua.

2.1433 13 28.06.13

04.08.14

1192 M/S Mega Rice Mill Pvt. Ltd., Jehanabad.

Proposal for capacity expansion of 03 MT per hour Para Boiled Rice Mill in existing 03 MT per hour Raw Rice Mill unit at Algana More, Kako, Jehanabad.

1.8025 10 28.06.13

1193 M/S Fatima Rice Industries Pvt. Ltd., Narkatiaganj, West

Champaran.

Proposal for establishment of 04 MT per hour Rice Mill unit at Narkatiaganj, West Champaran.

4.6513 20 28.06.13

1194 M/S Maa Durga Shakti Agro Pvt. Ltd., Rohtas.

Proposal for establishment of 04 MT per hour Para Boiled Rice Mill unit at Nokha, Rohtas.

6.9258 18 28.06.13

1195 M/S Sri Bihariji Cattle Feeds Pvt. Ltd., Bhabhua.

Proposal for establishment of 25,200 MT per year capacity Cattle Feed unit at Kudari, Bheriya, Mohania, Bhabhua.

6.7365 33 28.06.13

1196 M/S Siaram AgroTech Food Products Pvt. Ltd., Lauriya,

West Champaran.

Proposal for establishment of 14,400 MT per year capacity Arwa Rice Mill unit at Laakad, Lauriya, West Champaran.

2.3130 49

28.06.13 (Consent

with condition)

1197 M/S Sona Agri Food Processing Pvt. Ltd.,

Madhepura.

Proposal for establishment of 04 MT per hour Modern Rice Mill at Madheli, Alamgarh, Madhepura.

3.9027 20 28.06.13

1198 M/S Sakshi Rice Industries Proposal for establishment of 04 MT 4.6513 20 28.06.13

Page 105: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

105 Pvt. Ltd., Narkatiyaganj, West

Champaran. per hour Modern Rice Mill at Kumarbagh Industrial Area Bettiah, West Champaran.

1199 M/S Surendra Prasad Singh Nijee Industrial Training

Institute, Nawada. Promoter- Surendra Prasad

Educational Trust.

Proposal for establishment of Industrial Training Institute (ITI) at Bajra, Hisua, Nawada. 4.6422 28.06.13

1200 M/S Valencia Logistics Pvt. Ltd, Khagaria.

Proposal for establishment of 20,000 MT Modern Warehouse Under R.A.B.C at Bachhota, Farkiya, Khagaria.

9.5600 10

28.06.13 (Consent

with condition)

1201 M/S Century Poly Plast Industries (Unit-2), Patna.

Proposal for capacity expansion of 889176 Pieces per year capacity in existing 1456476 Pieces per year capacity unit of Plastic Moulded Furniture, Table and Household Goods in proprietorship at Sheetala Nagar, Sadalpur, Agamkuan, Patna.

4.4619 25 28.06.13

1202 M/S G.D. Health Care, New Delhi.

Proposal for establishment of 36,000 MT per year capacity Poultry Feed F.F.S. and Toasted Guar Korma unit in proprietorship at Industrial Area, Aurangabad.

7.2300 36

28.06.13 (Consent

with condition)

1203 M/S Unnat Feeds Pvt. Ltd., Haryana. (Earlier approval was given for establishment of 60,000 MT per year capacity Poultry Feed unit at Industrial Area, Fatuha, Patna in the SIPB meeting held on 28.06.13. Again approval has been given on the above project to establish at Industrial Growth Centre, Maranga, Purnea in place of Industrial Area, Fatuha, Patna in the SIPB meeting held on 05.08.13.)

Proposal for establishment of 60,000 MT per year capacity Poultry Feed unit at Industrial Growth Centre, Maranga, purnea.

10.6053 40 28.06.13 (Consent

with condition)

05.08.2013 (Consent

with condition)

1204 M/S Maruti Foods & Nutrients, Darbhanga.

Proposal for establishment of 03 MT per day/shift capacity Whites Sandwich Bread/Cakes unit in partnership at Donar Industrial Area, Darbhanga .

1.6500 22 28.06.13

1205 M/S M.V.S. Industries Pvt. Ltd., Patna.

Proposal for establishment of 6,00,000 Pieces per year capacity Moulded Plastic Chair production unit at Industrial Area, Fatuha, Patna.

6.5700 30

28.06.13 (Consent

with condition)

1206 M/S Shail Mini Rice Mill, Kaimur, Bhabhua.

Proposal for establishment of 04 MT per hour Arwa Rice Mill unit in proprietorship at Sakari, Kudra, Kaimur, Bhabhua.

1.9280 18 28.06.13

1207 M/S Ravi Mini Rice Mill, Kaimur, Bhabhua.

Proposal for establishment of 03 MT per hour Arwa Rice Mill unit in proprietorship at Sakari, Kudra, Kaimur, Bhabhua.

1.0439 18 28.06.13

1208 M/S Bisalachhi Agro Pvt. Ltd., Bhabhua, Kaimur.

Proposal for establishment of 14,400 MT per year capacity Rice Mill unit at Labedhan. Ramgarh, Kaimur, Bhabhua.

4.9079 42 28.06.13

1209 M/S Pyrocare Pharma Pvt. Ltd., Patna.

Proposal for establishment of 800 Litre per day capacity Bottling and Packing of Medicine unit at Bela

1.1500 44 28.06.13 (Consent

with

Page 106: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

106 Industrial area, Muzaffarpur. condition)

1210 M/S Maa Narayani Agro Mill Pvt. Ltd., Patna.

Proposal for establishment of 04 MT per hour capacity Rice Mill unit at Korhar, Bihta, Patna.

2.7383 20 28.06.13 16.06.14

1211 M/S Surpal Cycles Pvt. Ltd., Ludhiana.

Proposal for establishment of 12 lakh pieces per year capacity Cycle Frame, Fork, Mudguard and Chain Cover manufacturing unit at Bihta Industrial Area, Patna.

7.0000 450 28.06.13

1212 M/S Jai Agri products Pvt. Ltd., Begusarai.

Proposal for establishment of 245.45 MT per year capacity Bio-Gas Plant and 180 MT per year capacity Organic Fertilizer production unit at Tetari, Begusarai.

3.6990 24

28.06.13 (Consent

with condition)

1213 M/S Simri Agro Foods Pvt. Ltd., Samastipur.

Proposal for establishment of 30,000 MT per year capacity Poultry & Cattle Feed unit at Simari, Vidyapati Nagar, Samastipur.

10.0000 22 28.06.13

1214 M/S Lalita Cement Industries., Bhagalpur.

Proposal for establishment of 22,500 MT per year capacity Portland Cement unit in partnership at Aalampur, Kahalgaon, Bhagalpur.

2.9710 51 28.06.13

1215 M/S Kochas Power Pvt. Ltd., New Delhi.

Proposal for establishment of 20 MT per hour Rice Mill and 05 MW Captive Power Plant unit at Jagdishpur, Bhojpur.

46.5600 90 28.06.13

1216 M/S Durgawati Power Pvt. Ltd., New Delhi.

Proposal for establishment of 20 MT per hour Rice Mill and 05 MW Captive Power Plant unit at Durgawati, Kaimur.

46.5600 90 28.06.13

1217 M/S Hasanpur Sugar Mills, Samastipur

(Pro.-Upper Ganges Sugar & Industries Ltd.)

Proposal for establishment of 10 MW Bagasse based Co-generation Power Plant unit at Hasanpur, Rosera, Samastipur.

32.8000 233

28.06.13 (Consent

with condition)

1218 M/S Yash Lakshmi Solvent Pvt. Ltd., Varanasi.

Proposal for establishment of 400 MT per day capacity Solvent Extraction Plant unit at Durgawati, Kurari, Bhabhua.

18.3800 125 28.06.13

1219 M/S Abhay Tea Pvt. Ltd., Purnea.

Proposal for establishment of 10 Lakh Kg per year capacity C.T.C. Tea Processing unit at Nejagach, Thakurganj, Galgaliya, Kishanganj.

6.9000 25 28.06.13

1220 M/S Hi-Tech Plastics, Pro.- M/S Patna Rolling Mills Ltd,

Patna.

Proposal for capacity expansion of 3,00,000 Pieces per year capacity in existing 1,60,000 Pieces per year capacity Moulded Plastic Goods unit at Rajdhani Road, Simli, Patna City, Patna.

1.6500 18 28.06.13

1221 M/S NextGen Tech Impex Ltd., Patna.

Proposal for establishment of 45 lakh Pieces per year capacity Fly Ash Bricks production unit at Maharajpura, Bikram, Patna.

1.6664 17 28.06.13

1222 M/S Jaya Enterprises, Araria. Proposal for establishment of 480 MT per year capacity Instant Fried Noodles unit in proprietorship at Jogbani, Araria.

1.7820 12 28.06.13

1223 M/S Umashankar Agrotech Pvt. Ltd., Nalanda.

Proposal for establishment of 23,040 MT per year capacity Rice Mill unit at Parwalpur, Ekangarsarai, Nalanda.

2.3400 20 28.06.13

1224 M/S Sone Valley International Pvt. Ltd., Kaimur.

Proposal for establishment of 25,000 MT Dry Warehouse under R.A.B.C. 1.1940 10 28.06.13

Page 107: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

107 at Kusaria, Chainpur, Durgawati, Kaimur.

1225 M/S Nunawati Agro Industries L.L.P., Nawada.

Proposal for establishment of 15,360 MT per year capacity Rice Mill in partnership at Kumbhi, Warsaliganj, Nawada.

2.3110 15 28.06.13

1226 M/S Japfa Comfeed India Pvt. Ltd., New Delhi.

Proposal for establishment of 1,44,000 MT per year capacity Poultry Feed unit at Chakjado, Baligaon, Hajipur, Vaishali.

28.0800 38 28.06.13

1227 M/S Sarita Concrete, Patna. Proposal for establishment of 63,52,800 pieces per year capacity P.C.C. Pole, Fly Ash Bricks and Paver Blocks production unit in partnership at Industrial Growth Center, Aurangabad.

2.3905 65 28.06.13

1228 M/S Metal Craft & Coating Technology, Patna.

Proposal for establishment of Electronic Hardware (Sheet Metal Cabinet and Casing) Steel Accessories and Powder Coating unit in proprietorship at Industrial Area, Fatuha, Patna.

1.6030 30

28.06.13 (Consent

with condition)

1229 M/S Bihar Ma Durga Agro Industries Pvt. Ltd., Samastipur.

Proposal for establishment of :- 1. Unit-1- 24,000 MT per year capacity Rice Mill 2. Unit-2- 12,000 MT per year capacity Cold Storage 3. Captive Power Generation Plant at Industrial Area, Pandaul, Madhubani.

7.8431

10.2170

5.9447

87 05.08.2013 (Consent

with condition)

1230 M/S Akash Energy and Infrastructure Pvt. Ltd., New Delhi.

Proposal for establishment of 2x7.5 MW Biomass Fuel based Thermal Power Plant at Naun, Dumraon.

77.3075 140 05.08.2013 (Consent

with condition)

23.01.14

1231 M/S Ma Sarswati Educational Trust, Patna.

Proposal for establishment of Engineering College in the Name of Krishive Institute of Technology at Jhali, near Krishna Niketan Girls School, Patna.

32.8312 89 05.08.2013 (Consent

with condition)

1232

M/S Crestia Polytech Pvt. Ltd., Patna.

Proposal for establishment of 810 MT per year capacity Plastic Water Storage Tank/ Container unit at Plot No.- A-7, phase-1, Industrial Area, Fatuha, Patna.

5.4220 28 05.08.2013

1233 M/S Shree Parshuram Jee Cold Storage Pvt. Ltd., Saran

Proposal for establishment of 6000 MT Cold Storage Under R.A.B.C. at Janta Bazar, Saran.

6.4868 20 05.08.2013

1234 M/S Bhawani Agro, East Champaran.

Proposal for establishment of 3843 MT per year capacity Modern Rice Mill in partnership at Bhawanipur, Sangrampur, East Champaran.

1.2886 29 05.08.2013

1235 M/S Sanwaria Foods, Darbhanga.

Proposal for establishment of 1440 MT per year capacity Rusk (Suji Toast) production unit in proprietorship at Donar Industrial Area, Darbhanga.

2.0000 50 05.08.2013 11.07.14

1236 M/S Kamakhaya Shakti Food Fair Pvt. Ltd., Kaimur.

Proposal for establishment of 04 MT per hour Modern Para Boiled Rice Mill at Gorasar, Ramgarh, Kaimur.

5.9427 17 05.08.2013

1237 M/S Ram Janki Rice Mill Pvt. Ltd., Patna.

Proposal for establishment of 05 MT capacity Para Boiled/Arwa Rice Mill unit at Sihuli, Harnaut, Biharsharif.

10.8300 30 05.08.2013

1238 M/S Anmol Biscuits Ltd., Proposal for establishment of 64,110 186.1000 1093 05.08.2013

Page 108: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

108 Kolkata. MT per year capacity Green Field

Bakery Plant (Biscuit, Cakes, Pastries and Cookies & Rusk) production unit at Sikandarpur, Bihta, Patna.

(Consent with

condition)

1239 M/S Amarpali Packaging Pvt. Ltd.,Patna.

Proposal for establishment of 1800 MT per year capacity Corrugated Boxes production unit at Industrial Area, Hajipur, Vaishali.

1.6789 31 05.08.2013

1240 M/S Kapil Oxynitro Company, Durg, Chhattisgarh.

Proposal for establishment of 1, 20,000 Cylinder per year capacity Oxygen Gas and Nitrogen Gas production unit in partnership at Navinagar, Aurangabad.

3.2730 20 05.08.2013

1241 M/S Crown Furnitures Pvt. Ltd., Kolkata.

Proposal for establishment of 2700 MT per year capacity Moulded Plastic Furniture and Household Goods production unit at Industrial Area, Hajipur, Vaishali.

10.8820 39 05.08.2013 (Consent

with condition)

1242 M/S Aashish Re-Rollers Pvt. Ltd., Patna City, Patna.

Proposal for capacity expansion from 7000 MT per year capacity to 14,000 MT per year capacity in the existing Re-Rolling Mill at Ranipur, Milkichak, Patna City, Patna.

2.1690 21 05.08.2013

1243 M/S Relent Enterprises Pvt. Ltd., Nalanda.

Proposal for establishment of 108 lakh Litres per year capacity packaged Drinking Water Production unit at Visthapit Colony, Nagdih-2, Rajgir, Nalanda.

1.1162 22 05.08.2013 (Consent

with condition)

1244 M/S Aryadeep Silki Rice Mill Pvt. Ltd., Bhojpur.

Proposal for establishment of 03 MT per hour capacity Modern Rice Mill at Jagdishpur, Ara, Bhojpur.

1.4144 19 05.08.2013 11.07.14

1245 M/S Annpurna Modern Rice Mill, East Champaran.

Proposal for establishment of 9600 MT per year capacity Modern Rice Mill unit in proprietorship at Industrial Area Pandaul, Madhubani.

1.5120 30 05.08.2013 (Consent

with condition)

1246 M/S Infusion & Drug (I) India Pvt. Ltd.,New Delhi.

Proposal for establishment of 480 lakh Bottles per year capacity I.V. Fluid production unit at Sikandarpur, Bihta, Patna.

54.1406 268 05.08.2013 (Consent

with condition)

1247 M/S J J S Aqua Industries, Araria.

Proposal for establishment of 40,000 Litres per day capacity Packaged Drinking Water unit in proprietorship at Industrial Area, Forbesganj, Araria.

1.0147 20 05.08.2013 (Consent

with condition)

1248 M/S Maa Tara Agro Foods Pvt. Ltd., Motihari.

Proposal for establishment of 04 MT per hour Modern Rice Mill unit at Mahuawa, East Champaran.

6.6200 15 05.08.2013

1249 M/S Dadiji Polytubes, Patna. Proposal for establishment of 3.60 Lakh K.G. per year capacity R.P.V.C. Pipes production unit in proprietorship at Sabalpur Patna City, Patna.

1.1709 12 05.08.2013

1250 M/S Shree Mahadeoji Rice Mill Pvt. Ltd., Patna.

Proposal for establishment of 06 MT per hour Modern Rice Mill unit at Nokha, Rohtas.

7.1047 25 05.08.2013

1251 M/S K B G Kitchenkraft Pvt. Ltd., Dehradun, Uttrakhand.

Proposal for establishment of - 1-Pressure Cooker- 06 Lakh pieces per year, 2- L.P.G. Gas Stove- 1.80 Lakh pieces per year capacity and Kitchenware & Utensils production

8.7449 131 05.08.2013 (Consent

with condition)

Page 109: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

109 unit at Fatuha Industrial Area, Fatuha, Patna.

1252 M/S Purnea Dal Mill, Purnea. Proposal for establishment of 2400 MT per year capacity Dal Mill unit in proprietorship at Industrial Area, Purnea.

1.3000 18 05.08.2013 (Consent

with condition)

1253 M/S Paras Rice Mill, Kaimur. Proposal for capacity expansion of 19,200 MT per year in the existing 5600 MT per year capacity Arwa Rice Mill unit in proprietorship at Lalpur, Kudra, Kaimur.

2.1770 13 05.08.2013

1254 M/S Aryan Food Products, Mohania, Kaimur.

Proposal for establishment of 03 MT per hour capacity Arwa Rice Mill unit in proprietorship at Kauriram, Mohania, Kaimur.

2.2824 7 05.08.2013

1255 M/S Paras Enterprises, Kudra, Kaimur.

Proposal for establishment of 04 MT per hour Arwa Rice Mill unit in proprietorship at Jehanabad, Kudra, Kaimur

3.6614 12 05.08.2013

1256 M/S Jay Bajrang Rice Mill, Mohania, Kaimur.

Proposal for establishment of 04 MT per hour Arwa Rice Mill unit in proprietorship at Jonhiya, Kauriram, Mohania, Kaimur.

3.2418 6 05.08.2013

1257 M/S Om Sai Rice Udyog, Mohania, Kaimur.

Proposal for establishment of 04 MT per hour Arwa Rice Mill unit in proprietorship at Bharkhar, Mohania, Kaimur.

2.5020 8 05.08.2013

1258 M/S Gayatri Modern Food Products Pvt. Ltd., West Champaran.

Proposal for establishment of 04 MT per hour capacity Modern Para Boiled Rice Mill at Mangalpur, Bagaha, West Champaran.

7.6902 20 05.08.2013

1259 M/S Kuldeep Ash Techno Biotech Pvt. Ltd., Patna.

Proposal for establishment of 72 lakh pieces per year capacity Fly Ash Bricks production unit at Chipura, Sampatchak, Patna.

2.0000 15 05.08.2013

1260 M/S Usha Agro Industries Pvt. Ltd., Patna.

Proposal for establishment of 2340 MT per year capacity P.V.C. Pipes production unit at Sampatchak, Patna.

1.4500 30 05.08.2013

1261 M/S P.K. Agro Foods Industries Pvt. Ltd., West Champaran.

Proposal for establishment of 19,200 MT per year capacity Arwa Rice Mill at Industrial Area, Kumarbagh, Bettiah, West Champaran.

5.6400 32 05.08.2013 (Consent

with condition)

1262 M/S Hindustan Hatcheries Pvt. Ltd., Haryana.

Proposal for establishment of Hatcheries unit for 86.40 Lakh pieces per year capacity Chicks production at Industrial Area Maranga, Purnea.

2.7274 20 05.08.2013

1263 M/S Jai Bharat Breeding Farm, Haryana.

Proposal for establishment of Hatcheries unit for 86.40 Lakh pieces per year capacity Chicks production in partnership at Industrial Area, Maranga, Purnea.

1.0042 20 05.08.2013

1264 M/S Shekhar Polytubes Pvt. Ltd., Patna.

Proposal for capacity expansion in the existing unit of P.V.C. Pipes and Water Tank from 1600 MT per year capacity to 2830 MT per year capacity at Industrial Area, Koilwar, Bhojpur.

1.3500 44 05.08.2013

1265 M/S Mother India Agro Foods Pvt. Ltd., Patna.

Proposal for establishment of 08 MT per hour Para Boiled Rice Mill at Bikram, Patna.

17.6130 69 05.08.2013

Page 110: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

110 1266 M/S Basanti Food Products,

Gaya. Proposal for establishment of 6,000 MT per year capacity Arwa Rice Mill in proprietorship at Industrial Area, Gaya.

1.3180 20 05.08.2013

1267 M/S Maa Vaishno Enterprises, Patna.

Proposal for establishment of 9600 MT per year capacity Rice Mill and Dal Mill unit in proprietorship at Industrial Area, Fatuha, Patna.

1.7647 38 05.08.2013 (Consent

with condition)

1268 M/S Yash Raj Food Processing, Patna.

Proposal for establishment of 9600 MT per year capacity Rice and Dal Mill unit in proprietorship at Industrial Area, Fatuha, Patna.

1.7647 38 05.08.2013 (Consent

with condition)

1269 M/S Hariom Fly Bricks Pvt. Ltd., Patna.

Proposal for establishment of 23 lakh pieces per year capacity Fly Ash Bricks production unit at Maranchhi, Mokama, Patna.

1.6255 32 05.08.2013

1270 M/S Metalite Food Processing Pvt. Ltd., Nalanda.

Proposal for establishment of 5000 MT Multipurpose Cold Storage and 450 MT Onion Storage under R.A.B.C. In the existing 3000 MT Cold Storage at Ekangarsarai, Nalanda.

10.2000 55 05.08.2013 16.06.14

1271 M/S Om Namo Bhagwata Rice Mill Pvt. Ltd., Aurangabad.

Proposal for establishment of 15,000 MT capacity Modern Rice Mill at Industrial Growth Centre, Aurangabad.

5.9394 24 05.08.2013 (Consent

with condition)

1272 M/S Maa Skamini Agro Food Products Pvt. Ltd., Aurangabad.

Proposal for establishment of 21,600 MT per year capacity Whole Wheat Atta Chakki plant unit at Tengra, Barun, Aurangabad.

5.1660 40 05.08.2013

1273 M/S Aman Agro Foods Pvt. Ltd., Rohtas.

Proposal for establishment of 64 MT per day capacity Arwa Rice Mill unit at Industrial Area, Dehri- -on-Sone, Rohtas.

4.7826 41 05.08.2013 (Consent

with condition)

1274 M/S Global Industries, Sitamarhi.

Proposal for establishment of 22.50 lakh pieces per year capacity Jayam Fly Ash Bricks production unit in proprietorship at Kapraol, Sitamarhi.

1.3561 27 05.08.2013

1275 M/S Jai Maa Bhagwati Rice Mill Pvt. Ltd., Aurangabad.

Proposal for establishment of 05 MT per hour capacity Modern Rice Mill unit at Nawada, Barun, Aurangabad.

5.0062 50 05.08.2013

1276 M/S Nirmal Agri Products Pvt. Ltd., West Champaran.

Proposal for establishment of 12,000 MT per year capacity Modern Rice Mill unit at Shikarpur, West Champaran.

5.2612 21 05.08.2013

1277 M/S Dr. Arvind Teachers Traning College, Pro.- Indrasna Raji Nandan Sewa Sansthan, Ara.

Proposal for establishment of Teachers Training College (B.Ed. Degree) in the name of Dr. Arvind Teachers Traning College at Araura, Dularpur, Ara.

2.3793 22 05.08.2013 (Consent

with condition)

1278 M/S Shubhwanti Institute of Education, pro.- Subhwati Sudama Rai Foundation, Pachhaura, Siwan.

Proposal for establishment of Teachers Training College (B.Ed. Degree) in the name of Shubhwanti Institute of Education at Pachhaura, Siwan.

2.3725 22 05.08.2013 (Consent

with condition)

1279 M/S M.J. Agri Services, Gurgaon, Haryana.

Proposal for establishment of 15,000 MT Dry Warehouse and 04 MT per hour Rice Mill in proprietorship at Rasulpur Tola, Karanbigha, Noorsarai, Nalanda.

17.8824 180 05.08.2013

1280 M/S Rosemerry Solvent Pvt. Ltd., Varanasi.

Proposal for establishment of 81,000 MT per year capacity Solvent

17.2800 60 05.08.2013

Page 111: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

111 Extraction Plant at Durgawati, Kaimur, Bhabhua.

1281 M/S White Crystal Industries Pvt. Ltd., Patna City, Patna.

Proposal for establishment of 4800 MT per year capacity Crystallised Sugar Candy/Mishri production unit at Abadulrahmanpur, Didarganj, Patna City, Patna.

2.7441 48 05.08.2013

1282 M/S Sri Radhey Krishna Agro Processing Pvt. Ltd., Aurangabad

Proposal for establishment of 28080 MT per year capacity Modern Arwa and Para Boiled Rice Mill at Pritampur, Tengra, Barun, Aurangabad.

9.0125 89 05.08.2013

1283 M/S Hibza Rice Mill Pvt. Ltd., Bhawanipur, Madhubani.

Proposal for establishment of 14,220 MT per year capacity Arwa Rice Mill unit at Bhawanipur, Sakari, Madhubani.

6.1329 128 05.08.2013

1284 M/S Sri Ram Janki Agro Processing Pvt. Ltd., Aurangabad.

Proposal for establishment of 14,880 MT per year capacity Arwa and Para Boiled Modern Rice Mill unit at Jinoriya, Khairadeep, Aurangabad.

1.7859 89 05.08.2013

1285 M/S Om Jai Vishnu Rice Mills Pvt. Ltd., Aurangabad

Proposal for establishment of 28080 MT per year capacity Arwa and Para Boiled Modern Rice Mill unit at Jamhaur, Aurangabad.

9.3212 125 05.08.2013

1286 M/S Green Farmers Agro Pvt. Ltd., Patna.

Two proposals:- 1. Establishment of 100 MT per day capacity Roller Flour Mill unit at Beldumarbana, Bairganiyan, Sitamarhi. 2. Establishment of 3500 MT capacity Multipurpose Cold Storage under R.A.B.C. at Beldumarbana, Bairganiyan, Sitamarhi.

10.8476

8.7255

50 05.08.2013

1287 M/S Sarita Concrete Pvt. Ltd., Patna.

Proposal for establishment of 31.62 lakh pieces per year capacity Fly Ash Bricks, Pavers Blocks and Checkers Tiles production unit in proprietorship at Industrial Area, Fatuha, Patna.

1.0110 17 05.08.2013

1288 M/S Ram Nandi Hotel & Resorts Ltd., Gaya.

Proposal for establishment of Super Deluxe Hotel of 140 Room/Suites at Bodhgaya, Gaya.

159.9300 190 05.08.2013

1289 M/S Aashi Agrotech Pvt. Ltd., Patna.

Proposal for establishment of 14,880 MT per year capacity Modern Arwa Rice Mill at Lalganj Sehra, Paliganj, Patna.

2.8885 128 05.08.2013

1290 M/S M M Agro Ventures Pvt. Ltd., Patna.

Proposal for establishment of 10,000 MT capacity Cold Storage unit under R.A.B.C. at Kuwahi, Barhariya, Siwan.

10.0281 127 05.08.2013

1291 M/S Shri Ganpati Rice Mill and Rice Bran Industries Pvt. Ltd., Muzaffarpur.

Two proposals :- 1. Establishment of 30,000 MT per year capacity Edible Oil Refinery unit at Ibrahimpur, Gaighat, Muzaffarpur . 2. Establishment of 10 MT per hour Modern Rice Mill unit at Gaighat, Muzaffarpur.

23.6500

30.7500

30 05.08.2013

1292 M/S Quality Industries, Patna.

Proposal for capacity expansion from 14,400 pieces per year capacity to 43,200 pieces per year capacity in the existing Pre-Stressed Concrete Pole unit in partnership at Industrial Area, Fatuha, Patna.

1.7675 31 05.08.2013

Page 112: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

112 1293 M/S AL Kareem Agro

Industries, Kanpur. Proposal for establishment of 49,500 MT per year capacity Meat Processing unit in partnership at Bhadakala, Siwan.

44.5535 600 05.08.2013 (Consent

with condition)

1294 M/S Ardent Polymers Pvt. Ltd., Patna.

Proposal for establishment of 05 MT per hour Poultry and Cattle Feed unit at Giddha Growth Centre, Bhojpur.

6.6555 38 05.08.2013

1295 M/S Kisan Industries, Darbhanga.

Proposal for establishment of 600 MT per year capacity Flour and Spice Mill unit in proprietorship at Industrial Area, Bela, Darbhanga.

1.3720 5 05.08.2013 (Consent

with condition)

1296 M/S Ambedkar Institute of Higher Education, Patna.

Proposal for establishment of Hallmarking and Training Centre at Patna.

1.5550 15 05.08.2013 (Consent

with condition)

1297 M/S Tesco Engineering & Consultancy Services, New Delhi.

Establishment of following proposals in partnership at Plot No.-644, Khesra No.- 1345, Sanchipatti, N.H.-19, Hajipur, Vaishali:- 1. L.E.D Solar Lantern - 60,000 pieces per year. 2. Solar C.F.L. Inverters- 7500 pieces per year capacity.

1.1700 41 05.08.2013

1298 M/S Wilson Medical System Pvt. Ltd., Patna.

Proposal for establishment of 1140 pieces per year capacity Medical Equipment production unit at Industrial Area Fatuha, Patna.

2.7564 18 05.08.2013 (Consent

with condition)

1299 M/S Symbosis Food Park Pvt. Ltd., Patna. (Approval has been given on change of name from earlier approved proposal for establishment of Mega Food Park in the name of M/S Symbosis Electronics Pvt. Ltd. at Amjhor, Rohtas to new formed SPV Company as M/S Symbosis Food Park Pvt. Ltd., in SIPB meeting held on 31.10.13.)

Proposal for establishment of Mega Food Park at Amjhor, Rohtas.

86.6500 187 05.08.2013

31.10.13

1300 M/S Kritika Agro Industries Pvt. Ltd., Samastipur.

Proposal for establishment of 15,000 MT capacity I.Q.F Plant at Birsinghpur, Samastipur.

16.5000 113 05.08.2013 (Consent

with condition)

11.07.14

1301 M/S Jindal Agri Foods Pvt. Ltd., New Delhi.

Proposal for establishment of 08 MT per hour Modern Rice Mill and 1.5 MW Co-generation Power Plant at Karanbigha, Rasulpur, Noorsarai,

Nalanda.

29.5700 50 02.09.13

1302 M/S Manju Chaudhari, Bettiah.

Proposal for establishment of 25,000 (5X5) MT under R.A.B.C. only Dry Warehouse, Agri Shop and Farmer Information Center in proprietorship at Nimoia, Bairia, West Champaran.

14.8500 25 02.09.13 (consent

with condition)

1303 M/S Vijay Shree Offset Printers, Patna.

Proposal for establishment of Unit-2 of 720 Lakh Forma pieces per year

capacity Offset Printing Press in proprietorship at Pahari, Patna

Sadar, Patna.

1.2864 9 02.09.13

1304 M/S Khushal Agro Engineering Pvt. Ltd.,

Bhabhua.

Proposal for establishment of 1200 MT per year capacity Agriculture

Implement production unit at Gauwan, Sonhan, Kaimur, Bhabhua.

2.0000 16 02.09.13

Page 113: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

113 1305 M/S Harit Krishi Products Pvt.

Ltd., Patna. Proposal for establishment of 30,000

MT per year capacity Cattle Feed and Poultry Feed unit at Parsa,

Patna.

4.8890 36 02.09.13

1306 M/S S. H. Food Products, Aurangabad.

Proposal for establishment of 60 MT per day capacity Whole Wheat Atta Chakki plant unit in proprietorship at

Punauradham, Punaurachowk, Sitamarhi.

5.1270 42 02.09.13

1307 M/S Bhawani Shakti Rice Mill & Infra Pvt. Ltd., Nawada.

Proposal for establishment of 04 MT per hour Arwa Rice Mill unit at Sherpur, Warsaliganj, Nawada.

1.9800 14 02.09.13

1308 M/S Ganinath Flour Mills Pvt. Ltd., Bihta, Patna.

Proposal for establishment of 36,000 MT per year capacity Flour Mill and

Whole Wheat Atta Chakki unit at Bihta, Danapur, Patna.

8.8100 22 02.09.13

1309 M/S Patna Board Boxes Industries, Patna.

Proposal for establishment of 300 MT per year capacity Board Boxes

production unit in partnership at Mahadev Asthan, Marcha- Marchi

Road, Bypass Thana, Patna.

1.4063 10 02.09.13

1310 M/S New Annpurna Rice Mill, Kaimur.

Proposal for establishment of 04 MT per hour capacity Arwa Rice Mill in proprietorship at Patkauliya, Kudra,

Kaimur.

4.9839 20 02.09.13

1311 M/S Sabita Agro Products, Kaimur.

Proposal for establishment of 03 MT per hour Arwa Rice Mill unit in

proprietorship at Dewrakala, Kudra, Kaimur.

1.9983 17 02.09.13

1312 M/S Samridhi Milk & Allied Products Pvt. Ltd., West

Champaran.

Proposal for establishment of 50 Thousand Ton per year capacity Biscuit, Cookies and Namkeen

production unit at Narwal, Borewal, Bagha, West Champaran.

17.4000 105 02.09.13

1313 M/S J. V. L. Agro Industries Ltd., Varanasi.

Proposal for establishment of 12 MT per hour Modern Rice Mill at Banka,

Jorawarpur and Ugra, Rohtas.

19.6200 30 02.09.13 11.07.14

1314 M/S Anushka Agro Food Products Pvt. Ltd., Buxar.

Proposal for establishment of 04 MT per hour capacity Modern Rice Mill at

Baksara, Buxar.

2.4996 20 02.09.13

1315 M/S Ganesh Foundry and Casting Ltd., Muzaffarpur. (Approval has been given on the proposal for capacity expansion from 12,000 MT per year capacity to 30,000 MT per year capacity in the SIPB meeting held on 11.06.14.) (Decisions of SIPB meeting held on 20.08.14 :-

Approval was given on the proposal for capacity expansion from 12000 MT per year to 19800 MT per year in Phase-1

Action plan of Phase-1 and Phase-2 may be obtained from company.)

Proposal for capacity expansion from 12,000 MT per year capacity to 30,000 MT per year capacity in the existing unit of M.S. Ingot and T.M.T. Bar at Ahiyapur, Sipahpur, Muzaffarpur.

7.6000 115 02.09.13

11.06.14

20.08.14

1316 M/S Radhika Sweets and Proposal for capacity expansion of 2.7486 40 02.09.13

Page 114: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

114 Milk Products Pvt. Ltd.,

Patna. 5,40,000 K.G. per year capacity

Salted Snacks, Kurkure, Sonepapri and 20,16,000 pieces per year

capacity Rusk/Bread production in the existing unit of Sweets at

Industrial Area, Fatuha, Patna.

(consent with

condition)

1317 M/S Bihar State Milk Co-operative Federation Ltd.,

Patna.

Three proposals:- 1- Proposal for establishment of Integrated Cold Chain project at

Dairy Development Complex, Patna. 2- Proposal for establishment of

Integrated Cold Chain project at Kosi Dairy project Maranga, Purnea. 3- Proposal for establishment of Integrated Cold Chain project at

Biharsharif Dairy project Nalanda.

1.8080

3.2318

8.8366

30

30

30

02.09.13

1318 M/S Nirman Engicon Pvt. Ltd., Begusarai.

Proposal for establishment of 36,000 MT per year capacity Cattle Feed

unit at Mohanpur, Begusarai.

8.5833 70 02.09.13 05.06.14

1319 M/S Gauri Shankar Agro Processing Pvt. Ltd.,

Aurangabad.

Proposal for establishment of 06 MT per hour Arwa Rice Mill at

Maharajganj Road, Rafiganj, Aurangabad.

6.2014 128 02.09.13

1320 M/S Narayan Agri Products Pvt. Ltd., Aurangabad.

Proposal for establishment of 06 MT per hour Modern Arwa Rice Mill unit

at Aranda, Obra, Aurangabad.

6.1329 128 02.09.13

1321 M/S Ramnandi Motor Pvt. Ltd., Gaya.

Proposal for establishment of 83 pieces per month capacity Body

Building project of Buses and Truck at Kharanti, Gaya Dobhi Road, Near

Airport, Gaya.

22.0450 162 02.09.13

1322 M/S Vindhyawasini Agro Processing Pvt. Ltd.,

Aurangabad.

Proposal for establishment of 06 MT per hour Modern Arwa Rice Mill unit

at Risiyup Tola, Siwan Bigha, Aurangabad.

6.1753 128 02.09.13

1323 M/S A. C. C. Cement Ltd., Mumbai.

Proposal for establishment of 11 Lakh MT per year capacity Cement Grinding unit at Manikpur, Saraiya,

Muzaffarpur.

364.5000 205 02.09.13

1324 M/S J. V. L. Cement Ltd., Kolkata.

Proposal for establishment of 9,98,000 MT per year capacity Cement Grinding unit at Bunk, Karakat, Akorhi Gola, Rohtas.

102.6200 97 02.09.13

1325 M/S Maa Aranya Rice Mill, Bhojpur, Ara.

Proposal for establishment of 7200 MT per year capacity Rice Mill unit in

proprietorship at Industrial Estate Bihiyan, Bhojpur.

1.4783 10 02.09.13 (consent

with condition)

1326 M/S Kiran Enterprises, Bhagalpur.

Proposal for establishment of 320 Lakh Meters per year capacity

Weaving and Dying and Textiles Processing unit in proprietorship at Industrial Area Barari, Jagdishpur,

Bhagalpur.

1.7098 34 02.09.13 (consent

with condition)

1327 M/S Shiva Fly Ash Bricks, Darbhanga.

Proposal for establishment of 120 Lakh pieces per year capacity Fly

Ash Bricks production unit in proprietorship at Industrial Area,

Donar, Darbhanga.

1.5255 25 02.09.13 (consent

with condition)

1328 M/S Amrit Industries Pvt. Ltd., Samastipur.

Proposal for establishment of 08 MT per hour Arwa and Para Boiled Rice Mill unit at Industrial Area, Harpur,

12.2200 38 02.09.13

Page 115: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

115 Alauth, Samastipur.

1329 M/S Bagla Agro Ltd., Kolkata. Proposal for establishment of 2.10 Lakh MT per year capacity Poultry Feed unit at Industrial Area, Bihta,

Patna.

45.0540 36 02.09.13 (consent

with condition)

1330 M/S Shivam Industries, Patna.

Proposal for establishment of 11,400 pieces per year capacity Plastic

Moulded Water Tank production unit in proprietorship at Industrial Area,

Bihta, Patna.

1.4705 20 02.09.13 (consent

with condition)

1331 M/S Bhole Bhagwati Agrotech Pvt. Ltd., West

Champaran.

Proposal for establishment of 10 MT per hour capacity Modern Rice Mill at

Kumarbagh Industrial Area, West Champaran.

8.2913 25 02.09.13 (consent

with condition)

1332 M/S Nina Snacks Foods, West Champaran.

Proposal for establishment of 450 MT per year capacity Kurkure,

Snacks production unit in proprietorship at Kumarbagh

Industrial Area, West Champaran.

3.3000 12 02.09.13 (consent

with condition)

1333 M/S Hibza Rice Mills Pvt. Ltd., Madhubani.

Proposal for establishment of 28,080 MT per year capacity Arwa and Para Boiled Modern Rice Mill at Industrial

Area, Pandaul, Madhubani.

11.2020 104 02.09.13 (consent

with condition)

1334 M/S Mosan Ricetech Pvt. Ltd., Patna.

Proposal for establishment of 28,080 MT per year capacity Arwa and Para Boiled Modern Rice Mill at Industrial

Growth Center, Jasoiya, Aurangabad.

11.8503 125 02.09.13 (consent

with condition)

1335

M/S Sri Vaishno Foods Pvt. Ltd., Aurangabad.

Proposal for establishment of 60,000 MT per year capacity Roller Flour Mill

and Atta Chakki plant at Industrial Growth Center, Aurangabad.

19.8330 139 02.09.13 (consent

with condition)

1336 M/S Maksi Food Pvt. Ltd., Patna.

Proposal for establishment of 200 Ton per day capacity Solvent

Extraction Plant at Industrial Growth Center, Jasoiya More, Aurangabad.

33.6499 260 02.09.13 (consent

with condition)

1337 M/S Triyojasi Feed Industries, Darbhanga.

Proposal for establishment of 2400 MT per year capacity Poultry and

Cattle Feed at Industrial Area, Donar, Darbhanga.

1.2508 22 02.09.13 (consent

with condition)

1338 M/S Bansal Biscuits Pvt. Ltd., Kolkata.

Proposal for establishment of 7,650 MT per year capacity Cake

production unit at E.P.I.P. Hajipur.

33.3424 60 02.09.13 27.06.14

1339 M/S Alaknanda International Educational Society, Greater Noida, Uttar

Pradesh.

Proposal for establishment of 06 MW Solar Photo Voltaic Power Plant at

Shahpur, Ara, Bhojpur.

83.1300 41 02.09.13 (consent

with condition)

1340 M/S Puja Printech Pvt. Ltd., Patna. (Unit-2)

Proposal for establishment of Unit-2 of Printing Press for Printed Books, Children Pictures Books, Printing of Advertising Materials at Patliputra

Industrial Area, Patna.

6.1141 36 02.09.13

1341 M/S Rajpati Agro Godowns Pvt. Ltd., Patna.

Proposal for establishment of 3,000 MT Warehouse under R.A.B.C. at

Lodipur, Balwanttola, Vyapur, Maner, Patna.

3.9821 14 02.09.13 (consent

with condition)

1342 M/S Ramjanki Agro Godowns Pvt. Ltd., Aurangabad.

Proposal for establishment of 2200 MT Warehouse under R.A.B.C. at Jinoriya, Khairadeep, Daudnagar,

Aurangabad.

2.7921 14 02.09.13 (consent

with condition)

1343 M/S Ramnandi Cold Storage Proposal for establishment of 10,000 10.0281 127 02.09.13

Page 116: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

116 Pvt. Ltd., Gaya. MT Multi Purpose Cold Storage at

Kusha Beeja, Dobhi, Gaya. (consent

with condition)

1344 M/S Shankar Shri & Sons Cold Storage Pvt. Ltd.,

Samastipur.

Proposal for establishment of 7,000 MT Multi Purpose Cold Storage and

1,000 MT Dry Warehouse under R.A.B.C. at Shri Rampur Ayodhya,

Samastipur.

7.6800 40 02.09.13 (consent

with condition)

1345 M/S Shree Vishwakarma Modern Udyog Pvt. Ltd., Kaimur.

Proposal for establishment of 05 MT per hour Modern Parboiled Rice Mill at Pachpokhari, Sakari, Kudra, Bhabhua.

6.7827 20 31.10.13

1346 M/S Vindhyachal Food Products Pvt. Ltd., Bhojpur.

Proposal for establishment of 04 MT per hour Arwa Rice Mill at Bhadwara Bagentola, Buxar.

3.9027 16 31.10.13

1347 M/S GD Rice Mills Pvt. Ltd., Sitamarhi. (Approval has been given on the proposal for change of capacity for 08 MT per hour Modern Rice Mill in place of earlier 05 MT per hour Modern Arwa Rice Mill at Sonar, Riga, Sitamarhi in the SIPB meeting held on 05.03.14.)

Proposal for establishment of 08 MT per hour Modern Rice Mill at Sonar, Riga, Sitamarhi.

11.7228 25 31.10.13 05.03.14 (Consent with Condition)

1348 M/S Patel Agri Industries Pvt. Ltd., Patna.

Proposal for establishment of 16 MT per hour Modern Rice Mill at Nadiaw, Noorsarai, Nalanda.

16.72 65 31.10.13 11.07.14

1349 M/S Shiv Sagar Industries Ltd., Nalanda. (Approval has been given on the proposal for change of capacity in the SIPB meeting held on 20.01.14.)

Proposal for establishment of 3.5 MT per hour capacity Masoor Dal unit at Deepnagar, Nalanda.

3.7178 12 31.10.13

20.01.14

1350 M/S Godambe Foods & Beverages Pvt. Ltd., Patna.

Proposal for establishment of 4800 KL per year capacity Fruit Juice production unit at Industrial Area, phase-1, Fatuha, Patna.

3.511 17 31.10.13

1351 M/S Raj Kumar Agro Pvt. Ltd., Vaishali.

Proposal for establishment of 12 MT per hour capacity Modern Rice Mill at Dharara, Salempur, Hajipur, Vaishali.

28.0768 20 31.10.13 31.07.14

1352 M/S Lord Radhe Krishna Flour Mills Pvt. Ltd., Aurangabad.

Proposal for establishment of 350 MT per day capacity Modern Roller Flour Mill at Radhua, Barun, Aurangabad.

26.57 20 31.10.13

1353 M/S Om Shakti Metal Casts & Alloys Pvt. Ltd., Patna.

Proposal for establishment of 85,000 MT per year capacity M.S Billet and T.M.T. Bar production unit at Bankipur, Machhriyawa, Fatuha- Daniyawa Road, Fatuha, Patna.

24.55 250 31.10.13

1354 M/S Manju Nutrition Pvt. Ltd., Patna.

Proposal for establishment of 24,000 MT per year capacity Whole Wheat Flour Mill unit at Agamkuan, Link Road, Patna.

4.1519 40 31.10.13

1355 M/S Mahashakti Cement Industries Pvt. Ltd., Madhubani.

Proposal for establishment of 22,500 MT per year capacity Cement production unit at Saurath, Madhubani.

2.4293 62 31.10.13

1356 M/S Om Shri Ram Phuleshwari Kashi Enterprises Pvt. Ltd., Ara,

Proposal for establishment of 04 MT per hour Parboiled Rice Mill at Bhopatpur, Udwantnagar, Bhojpur.

7.9764 20 31.10.13

Page 117: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

117 Bhojpur.

1357 M/S Grada Foods Pvt. Ltd., Rohtas.

Proposal for establishment of 06 MT per hour Modern Rice Mill at Barela Mauni, Shivsagar, Rohtas.

5.2156 16 31.10.13

1358 M/S Kapil Dev Agro Products Pvt. Ltd., Rohtas.

Proposal for establishment of 08 MT per hour Modern Rice Mill at Jalalpur, Kargahar, Rohtas.

15.5903 40 31.10.13

1359 M/S Maa Annpurna Industry Pvt. Ltd., Aurangabad.

Proposal for establishment of 22 MT per hour Mega Modern Rice Mill at Jamhor, Aurangabad.

34.00 25 31.10.13

1360 M/S Ganpati Rice Mill, Kaimur, Bhabhua.

Proposal for establishment of 7200 MT per year capacity Modern Arwa Rice Mill in Proprietorship.

2.6862 19 31.10.13

1361 M/S Sanjul Agro Food, Kaimur, Bhabhua.

Proposal for establishment of 19,200 MT per year capacity Modern Arwa Rice Mill in proprietorship at Kudra, Kaimur, Bhabhua.

6.1296 31 31.10.13

1362 M/S Gupta Nutritions Pvt. Ltd., Patna.

Proposal for capacity expansion from 26,000 MT per year capacity to 52,000 MT per year capacity of existing Flour Mill at Nasriganj, Danapur, Patna.

6.7113 21 31.10.13

1363 M/S Quais Water & Beverage, Purnea.

Proposal for establishment of 144 Lakh Liters per year capacity packaged Drinking Water unit in proprietorship at Industrial Area Maranga, Purnea.

1.233 28 31.10.13 (Consent

with condition)

1364 M/S Henraajh Feeds India Pvt. Ltd., Patna City, Patna.

Proposal for establishment of 99,000 MT per year capacity Poultry and Cattle Feed unit at Industrial Area Fatuha, Patna.

17.4793 39 31.10.13

1365 M/S Ram Raj Cold Storage, Lakhisarai.

Proposal for establishment of 05 MT per hour capacity Cattle and Poultry Feed unit in partnership at Pateli, Saraisa, Ujiyarpur, Samastipur.

5.264 20 31.10.13

1366 M/S R.B. Food Grains Pvt. Ltd., East Champaran.

Proposal for establishment of 04 MT Modern Arwa Rice Mill unit at Math Lohsiyar, Harsiddhi, East Champaran.

5.175 32 31.10.13

1367 M/S Shivam Rice Industries Pvt. Ltd., Rohtas.

Proposal for establishment of 04 MT per hour Modern Arwa Rice Mill unit at Kauakhoch, Dinara, Rohtas.

3.1434 15 31.10.13

1368 M/S Patna Offset Press, Patna.

Proposal for establishment of 436.80 Lakh Sheet per year printing capacity printing Press in proprietorship at Patna Sadar, Patna.

6.2542 14 31.10.13

1369 M/S Consam Industries Pvt. Ltd., Araria.

Proposal for establishment of 04 MT per hour Modern Arwa Rice Mill unit at Forbesganj, Araria.

9.09 34 31.10.13

1370 M/S Raju Rice Mill, Aurangabad.

Proposal for establishment of 02 MT per hour Rice Mill in partnership at Badgaon, Rafiganj, Aurangabad.

1.85 18 31.10.13

1371 M/S Sidhi Vinayak Modern Mill, Buxar.

Proposal for establishment of 04 MT per hour Rice Mill in proprietorship at Kathrain, Dhansoi, Buxar.

1.3682 19 31.10.13

1372 M/S Kisan Rice Mill, Rohtas. Proposal for establishment of 04 MT per hour Arwa Rice Mill in proprietorship at Marual, Dinara, Rohtas.

3.0486 15 31.10.13

1373 M/S Mansi Mini Rice Mill, Kaimur.

Proposal for establishment of 04 MT per hour Arwa Rice Mill unit in

1.9421 19 31.10.13

Page 118: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

118 proprietorship at Narsingpur, Chainpur, Kaimur.

1374 M/S Chandramukhi Rice Mill, Kaimur.

Proposal for establishment of 04 MT per hour Arwa Rice Mill in proprietorship at Patnakauliya, Kudra, Kaimur.

2.1727 19 31.10.13

1375 M/S K.R. Ventures Pvt. Ltd., New Delhi.

Proposal for establishment of 05 MT per hour capacity Parboiled Rice Mill unit at Lalganj, Vaishali, Hajipur.

8.0071 20 31.10.13

1376 M/S Bum Bashuki Agro Processing Pvt. Ltd., Bhagalpur.

Proposal for establishment of 08 MT per hour Modern Rice Mill unit at Dauna, Banka.

18.4969 48 31.10.13

1377 M/S Sai Engicon and Construction Pvt. Ltd., Patna.

Proposal for establishment of 64,800 pieces per year capacity P.S.C. Pole production unit at Patna City, Patna.

2.4884 32 31.10.13

1378 M/S Babylone Agro Products Pvt. Ltd., Kolkata.

Proposal for establishment of 16 MT per hour Modern Parboiled Rice Mill unit at Gurusa, Kudra, Kaimur.

45.1596 54 31.10.13

1379 M/S Balaji Enterprises, Patna.

Proposal for capacity expansion of 45,000 MT per year in the existing unit of 11,390 MT per year capacity of Aluminium Conductors (A.A.C., A.A.A.C., A.C.S.R.) and D.P.C. Wires and Strips in proprietorship.

2.30 56 31.10.13

1380 M/S Vaishali Agrotech Pvt. Ltd., Patna.

Proposal for establishment of 04 MT per hour Modern Parboiled Rice Mill unit at Mathura, Sultanpur, Hajipur, Vaishali.

5.3498 20 31.10.13

1381 M/S Sikriwar Aqua Beverage, Kaimur.

Proposal for establishment of 96,000 Litres per day capacity Packaged Drinking Water and 28,800 Bottles per day capacity Soda Water unit in proprietorship at Kulahadiya, Karmnasa, Durgawati, Kaimur.

3.2346 66 31.10.13 (Consent

with condition)

1382 M/S Bhagwati Agro Food Processing Pvt. Ltd., Rohtas.

Proposal for establishment of 05 MT per hour capacity Modern Rice Mill unit at Katha Barun, Aurangabad.

7.8062 25 31.10.13

1383 M/S Mangalmurti Agri Business Pvt. Ltd., Patna.

Proposal for establishment of 03 MT per hour Arwa Modern Rice Mill unit at Amhara, Bihta, Patna.

2.2932 30 31.10.13

1384 M/S Maa Druga Rice Mill, Jehanabad.

Proposal for establishment of 04 MT per hour Arwa Rice Mill unit in proprietorship at Hati, Kako, Jehanabad.

2.57 31 31.10.13

1385 M/S Mamta Rice Mills Pvt. Ltd., Araria.

Proposal for establishment of 06 MT per hour Parboiled Rice Mill at Hasanpur, Raniganj, Araria.

10.4812 35 31.10.13

1386 M/S Narayani Mini Rice Mill, Rohtas.

Proposal for establishment of 02 MT per hour Arwa Rice Mill in proprietorship at Sidi, Kargahar, Rohtas.

1.2569 25 31.10.13

1387 M/S Radha Krishna Rice Mill, Arwal.

Proposal for establishment of 02 MT per hour Rice Mill in proprietorship at Usari, Mehdiya, Arwal.

1.1136 15 31.10.13

1388 M/S Hanumanjee Agrotech Pvt. Ltd., Rohtas.

Proposal for establishment of 04 MT per hour Arwa Rice Mill at Belaspur, Ghordihan, Kargahar, Rohtas.

3.2581 15 31.10.13

1389 M/S Ramkala Agro Industries Pvt. Ltd., Samastipur.

Proposal for establishment of 08 MT per hour Modern Parboiled Rice Mill at Rampur, Dudhpura, Samastipur.

18.432 42 31.10.13

1390 M/S Raj Kamal Rice Mills, Proposal for establishment of 04 MT 2.6024 16 31.10.13

Page 119: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

119 Proprietor:- Janki Construction Pvt. Ltd., Sitamarhi.

per hour Arwa Rice Mill at Bhasar, Machhaha, Sitamarhi.

1391 M/S Sri Jagdish Industries, Patna.

Proposal for establishment of 03 MT per hour Arwa Rice Mill in partnership at Industrial Area, Hajipur.

1.35 28 31.10.13

1392 M/S Bihar Spunj Pipe Pvt. Ltd., Hajipur, Vaishali.

Proposal for establishment of 63,000 Pieces per year capacity Hume Pipe production unit at Ejara, Sadpur, Vaishali.

2.0964 19 31.10.13

1393 M/S Maa Durga Rice Mill, East Champaran.

Proposal for establishment of 03 MT per hour Arwa Rice Mill unit in proprietorship at Pakaridayal, East Champaran.

1.455 10 31.10.13

1394 M/S Teknotuff Pvt. Ltd., Patna.

Proposal for establishment of 20,73,600 Square Feet per year capacity Toughened Glass production unit at Mohammadpur, Baratpur, Didarganj, Patna City, Patna.

13.4248 46 31.10.13

1395 M/S Jitendra Rice Mill, East Champaran.

Proposal for establishment of 2.5 MT per hour capacity Arwa Rice Mill unit in proprietorship at Kaurihar, Raxaul, East Champaran.

1.5203 11 31.10.13

1396 M/S Kumar Agro Mills Pvt. Ltd., Lakhisarai.

Proposal for establishment of 04 MT per hour capacity Modern Rice Mill unit at Pachena Road, Damodarpur, Lakhisarai.

2.2756 18 31.10.13

1397 M/S Rashmi Rice Mills, Promoter- Prabha Software and Technology Pvt. Ltd., Patna.

Proposal for establishment of 7200 MT per year capacity Rice Mill in the name of M/S Rashmi Rice Mill at Industrial Area Fatuha, Patna.

1.4783 22 31.10.13 (Consent

with condition)

1398 M/S Shree Ridhi Sidhi Agro Industries, Darbhanga.

Proposal for establishment of 4800 MT per year capacity Maize Starch production unit in proprietorship at Industrial Area, Pandaul, Madhubani.

2.90 45 31.10.13 (Consent

with condition)

1399 M/S Kabir Rice Mill, Bhojpur. Proposal for establishment of 9000 MT per year capacity Rice Mill unit in proprietorship at Industrial Area, Bihiya, Bhojpur.

2.7934 28 31.10.13 (Consent

with condition)

1400 M/S Trans Clingfilms Pvt. Ltd., Patna.

Proposal for establishment of 03 MT per hour capacity Corrugated Box, Corrugated Sheets and 2 Ply Rolls production unit at Industrial Area, Fatuha, Patna.

1.05 15 31.10.13 (Consent

with condition)

1401 M/S Aryan Food & Agro Enterprises Pvt. Ltd., Patna.

Proposal for establishment of 15,000 MT per year capacity Cattle & Poultry Feed unit at Industrial Growth Center Giddha, Bhojpur.

2.001 30 31.10.13 (Consent

with condition)

1402 M/S Jai Hanuman Agro Products, Chhatisgarh.

Proposal for establishment of 10 MT per hour Modern Arwa Rice Mill unit in proprietorship at Industrial Area, Aurangabad.

6.7243 91 31.10.13 (Consent

with condition)

1403 M/S Pawansut Agrotech Rice Mill Pvt. Ltd., Aurangabad.

Proposal for establishment of 14 MT per hour Modern Rice Mill at Industrial Area, Aurangabad.

11.06 70 31.10.13

1404 M/S Jai Hanuman Agrotech Pvt. Ltd., Samastipur.

Proposal for establishment of 10,000 MT Multipurpose Cold Storage under R.A.B.C. at Madhaipur, Dalsingsarai, Samastipur.

11.3085 35 31.10.13 (Consent

with condition)

Page 120: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

120 1405 M/S Raj Kumar Agro Pvt.

Ltd., Vaishali. Proposal for establishment of Cold Chain (Non Horticulture), Value Addition and Preservation Infrastructure Projects (25,000 Litres per day capacity Milk Processing Plant) under Govt. of India scheme "National Mission of Food Processing (N.M.F.P.)" at E.P.I.P., Hajipur, Vaishali.

5.2139 30 31.10.13 (Consent

with condition)

1406 M/S Usha Ramchandra Narayan College, Patna.

Proposal for establishment of B. Ed. College at Industrial Area, Murliganj, Madhepura.

1.782 17 31.10.13 (Consent

with condition)

1407 M/S Jagran Prakashan Ltd., Patna.

Proposal for establishment of Printing and Publishing unit for 1331 Lakh Pieces per year capacity News Paper, Books & Magazine at Patliputra, Industrial Area, Patna.

44.81 98 31.10.13

1408 M/S Bol Bum Agri Centre Pvt. Ltd., Siwan.

Proposal for establishment of 6,000 MT Cold Storage Under R.A.B.C. at Paterha, Mahrajganj, Siwan.

7.7482 21 31.10.13 (Consent

with condition)

1409 M/S Kingway Technical Institute, Promoter:- Sone Valley Development Foundation, Kaimur, Bhabua.

Proposal for establishment of B.Ed. College at Kulhariya, Durgawati, Kaimur, Bhabhua.

1.78 27 31.10.13

1410 M/S Cardo Pharma Pvt. Ltd., Patna.

Proposal for establishment of Restaurant and Hotel in the name of Hotel Pardesi Cardo at V.I.P. Road, Saharsa.

2.4544 25 31.10.13

1411 M/S Sri Ram Chatradhari Industrial Area Pvt. Ltd., Patna.

Proposal for development of 26 Acre Private Industrial Area at Mokama, Barh, Patna.

57.97 8 31.10.13

1412 M/S G.S. Shakti Agro Pvt. Ltd., Aurangabad.

Proposal for establishment of 04 MT per hour Modern Arwa Rice Mill at Fesar, Aurangabad.

4.8277 60 31.10.13

1413 M/S SSF Buildmat Pvt. Ltd., Patna.

Proposal for establishment of 24 Lakh pieces per year capacity Fly Ash Bricks production unit at Baikunthpur, Patna.

1.8745 17 31.10.13

1414 M/S Trayambakam Foods Pvt. Ltd., Patna.

Proposal for establishment of 04 MT per hour Modern Rice Mill at Naubatpur, Patna.

6.00 12 31.10.13

1415 M/S Chhinnamasta Food Processor Pvt. Ltd., Darbhanga. (Approval has been given on the proposal for change of capacity in the SIPB meeting held on 20.01.14.) (Approval has been given on the proposal for change of capacity in the SIPB meeting held on 11.06.14.)

Proposal for establishment of 12 MT per hour Parboiled and Arwa Rice Mill at Barun, Dinara, Rohtas.

17.4353 40 31.10.13

20.01.14

11.06.14

1416 M/S Annapurna Industries, West Champaran.

Proposal for establishment of 7200 MT per year capacity Modern Rice Mill in proprietorship at Kumarbag, West Champaran.

1.9927 12 31.10.13

1417 M/S Hari Rice Udyog, Kaimur.

Proposal for capacity expansion from 01 MT per hour capacity to 04 MT per hour capacity of existing Rice Mill

3.1748 10 31.10.13 16.06.14

Page 121: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

121 in proprietorship at Dadwa, Kaimur.

1418 M/S Sarweshwari Rice Mill Pvt. Ltd., Rohtas.

Proposal for establishment of 04 MT per hour Modern Rice Mill at Bamhaur, Shivsagar, Rohtas.

3.3728 12 31.10.13

1419 M/S Chakrapani Rice Industries Pvt. Ltd., Nawada.

Proposal for establishment of 04 MT per hour Modern Rice Mill at Bali, Nawada.

3.4961 30 31.10.13

1420 M/S Aster Medicine Pvt. Ltd., Hajipur.

Proposal for establishment of Allopathic Medicine production unit at Industrial Area, Hajipur.

1.4955 31 31.10.13 (Consent

with condition)

1421 M/S Green Leaf Energy Pvt. Ltd., Gaya.

Proposal for establishment of production unit of Non Edible Crude Oil-6000 MT per year, Cattle Feed-6300 MT per year and Organic Fertilizer-6300 MT per year capacity at Angada, Dobhi, Gaya.

9.20 169 31.10.13

1422 M/S S.S. Enterprises, Patna. Proposal for establishment of Hotel and Restaurant in partnership at Exhibition Road, Patna.

3.0625 45 31.10.13

1423 M/S Shivam Agro Rice Mill Pvt. Ltd., Bhojpur.

Proposal for establishment of 04 MT per hour capacity Arwa and Parboiled Rice Mill at Giddha Industrial Growth Center, Bhojpur.

7.21 24 31.10.13

1424 M/S Ma Vaibhav Lakshami Rice Mill Pvt. Ltd., Rohtas.

Proposal for establishment of 04 MT per hour Modern Parboiled Rice Mill at Parmapur, Navanagar, Baxur.

9.8360 35 04.12.13

1425 M/S Koshi Uday Food Products Pvt. Ltd., Supaul.

Proposal for establishment of 14,400 MT per year capacity Modern Rice Mill unit at Basaha, Pipra, Supaul.

6.8572 58 04.12.13

1426 M/S Sadaf Food Processor Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 12 MT per year capacity Makhana Processing unit at Khanpur, Berai, Katra, Muzaffarpur.

1.0200 10 04.12.13

1427 M/S Hindwali Agro Products Pvt. Ltd., Sasaram, Rohtas.

Proposal for establishment of 04 MT per hour Rice Mill at Beladhi, Darigaon, Moresarai, Rohtas.

2.9225 16 04.12.13

1428 M/S Ganpati Starch & Chemicals Pvt. Ltd., Samastipur.

Proposal for establishment of 48,000 MT per year capacity Maize Processing unit at Sathgawa, Khidarpur, Samastipur.

37.7100 95 04.12.13

1429 M/S M.S.B. Polymers, Patna. Proposal for establishment of 825 MT per year capacity Disposable Glass and Cups production unit in proprietorship at Biscuit Factory Area, Industrial Area, Nasariganj, Danapur, Patna.

1.9200 31 04.12.13

1430 M/S Pashupati Roller Flour Mill Pvt. Ltd., East Champaran.

Proposal for establishment of 100 MT per day capacity Roller Flour Mill at Industrial Estate, Muzaffarpur.

4.3955 25 04.12.13

1431 M/S Millenium Agritech Pvt. Ltd., Sasaram, Rohtas.

Proposal for establishment of 6912 MT per year capacity Oil Extraction Plant unit at Poiwan, Aurangabad.

3.6542 40 04.12.13

1432 M/S Sakar Bricks Pvt. Ltd., Patna.

Proposal for establishment of 72 lakh pieces per year capacity Fly Ash Bricks production unit at Makhdumpur, Sarari Road, Sandalpur, Danapur, Patna.

1.6008 18 04.12.13

1433 M/S Manthan Agro Industries, Saran.

Proposal for establishment of 240 MT per year capacity Awala Murabba and candy production unit in

1.0200 15 04.12.13

Page 122: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

122 proprietorship at Jajauli, Vansoi, Masarakh, Saran.

1434 M/S Jaya Nutritions Pvt. Ltd., Patna.

Proposal for capacity expansion of 80 MT per day in the existing Roller Flour Mill unit at Didarganj, Patna City, Patna.

5.9894 10 04.12.13

1435 M/S Devi Vashno Mata Electricals Pvt. Ltd., Saran.

Proposal for establishment of 84 pieces of 5 K.V.A.-25 K.V.A. and 84 pieces of 30 K.V.A.-250 K.V.A. capacity Assembling unit of Diesel Generating Set at Marar, Parsa Chapra, Saran.

1.3140 42 04.12.13

1436 M/S Satyam Rice Mill, Jamshedpur.

Proposal for establishment of 52,800 MT per year capacity Parboiled Rice Mill in partnership at Khaira.

9.2100 20 04.12.13

1437 M/S Vidyashri Ventures Pvt. Ltd., Patna.

Proposal for establishment of 4800 MT per year capacity M.S. Ring (Stirrups) (4 M.M.-12 M.M.) production unit at Sipara, Phulwarisarif, Patna.

2.7150 26 04.12.13

1438 M/S Ma Bhagwati Sponge Iron Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 160 MT per day capacity M.S. Ingot production unit at Ramtomha, Minapur, Muzaffarpur.

10.8655 04.12.13

1439 M/S Ganpati Blocks Manufacturing Pvt. Ltd., Patna.

Proposal for establishment of 150 lakh pieces per year capacity Fly Ash Bricks and Blocks production unit at Bankipur, Machiriyawan, Fatuha, Patna.

4.1924 26 04.12.13

1440 M/S Rishikesh Rice Pvt. Ltd., Patna.

Proposal for establishment of 04 MT per hour Modern Parboiled Rice Mill at Jagmal Bigha, Katauna, Khusrupur, Patna.

9.7279 25 04.12.13

1441 M/S Balram Agro Feeds Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 4050 MT per year capacity Cattle and Poultry Feed unit at Talboari, Tola, Gausnagar, Gaighat, Muzaffarpur.

1.2393 12 04.12.13

1442 M/S Thakur Rambriksh Food Pvt. Ltd., Madhepura.

Proposal for establishment of 04 MT per hour Arwa Rice Mill at Alamnagar, Madhepura.

3.1025 20 04.12.13

1443 M/S K.G.N. Comtrade Pvt. Ltd., East Champaran.

Proposal for establishment of 175 ton per day capacity Roller Flour Mill unit at Rajepur, Dhaka, East Champaran.

20.9450 40 04.12.13 11.07.14

1444 M/S S.K. Narayan Infratech Pvt. Ltd., Patna.

Proposal for establishment of 72 lakh pieces per year capacity Fly Ash Bricks production unit at Baruna, Sampatchak, Patna.

1.3630 16 04.12.13

1445 M/S Kushwaha Poultry Feed, Kaimur, Bhabhua.

Proposal for establishment of 2700 MT per year capacity Poultry Feed unit in proprietorship at Mohanpur, Bharaula, Lasara, Kaimur, Bhabhua.

2.2794 21 04.12.13

1446 M/S Herbals (A.P.S.) Pvt. Ltd., Patna (Unit-2).

Proposal for establishment of Ayurvedic Medicine production unit at Dhawalpura, Bypass Road, Patna.

5.5000 150 04.12.13

1447 M/S S.S. Infratech and Aquakem Pvt. Ltd., Lakhisarai.

Proposal for establishment of 24,000 pieces per day capacity Fly Ash Bricks production unit at Durdih, Kalsi, Lakhisarai.

1.3147 32 04.12.13

1448 M/S Ram Janki Agro Ventures Pvt. Ltd., Rohtas.

Proposal for establishment of 04 MT per day capacity Arwa Rice Mill unit at Nauva, Dadha, Dinara, Rohtas.

3.0650 15 04.12.13

Page 123: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

123 1449 M/S Uttam Pipes Pvt. Ltd.,

Patna. Proposal for establishment of 60 lakh pieces per year capacity Fly Ash Bricks and 30,000 Square Meter per year capacity Pavers Blocks production unit at Industrial Area, Patliputra, Patna.

2.3742 32 04.12.13

1450 M/S Shiv Sai Metal Products Pvt. Ltd., Patna.

Proposal for capacity expansion from 450 MT per year to 18,450 MT per year capacity in the existing unit of D.P.C.Wire and Strips and A.C.S.R. Conductor at Main Road, Maner Bazar, Patna.

9.9588 21 04.12.13

1451 M/S Priyadarshini Food Processing Pvt. Ltd., Patna.

Proposal for establishment of 20 MT per day capacity Fruits and Vegetable unit at Sabalpur Chipura, Phulwarisarif, Patna.

1.4185 20 04.12.13

1452 M/S Akash Rice & Agro Industries Pvt. Ltd., East Champaran.

Proposal for establishment of 04 MT per hour Parboiled Rice Mill at Bhelwatola, Balirama, Chhauradano, East Champaran.

6.9478 25 04.12.13

1453 M/S Maa Sharda Grain Food Products Pvt. Ltd., Jamshedpur.

Proposal for establishment of 18,000 MT per year capacity Roller Flour Mill at Pipariya, Mohania, Kaimur.

5.7500 28 04.12.13

1454 M/S Khatu Shree Agrotech Pvt. Ltd., Supaul.

Proposal for establishment of 70 MT per day capacity Roller Flour Mill unit at Dharhara, Raghopur, Supaul.

4.2580 25 04.12.13

1455 M/S Priyadarshi Modern Rice Mill Pvt. Ltd., Patna.

Proposal for establishment of 06 MT Modern Arwa Rice Mill at Mohammadpur, Maner, Bihta, Patna.

4.8858 128 04.12.13

1456 M/S Sri Ranisati Enterprises Pvt. Ltd., Patna.

Proposal for establishment of production unit of 30,000 MT per year capacity Ingot and Steel Products at Fatuha Industrial Area, Fatuha, Patna.

3.4700 22 04.12.13 (Consent

with condition)

1457 M/S Uday Shree Agro Udyog Pvt. Ltd., Purnea.

Proposal for establishment of 10 MT per hour Arwa and Parboiled Modern Rice Mill at Industrial Growth Center, Maranga, Purnea.

13.1400 69 04.12.13 (Consent

with condition)

1458 M/S Bajaj Foams Pvt. Ltd., Patna.

Proposal for establishment of 2016 MT per year capacity Plastic Recycling unit at Industrial Area, Fatuha, Patna.

2.1282 22 04.12.13 (Consent

with condition)

1459 M/S Bebo Poultry & Agro Pvt. Ltd., Katihar.

Proposal for establishment of 9600 MT per year capacity Cattle and Poultry Feed unit at Industrial Growth Center, Maranga, Purnea.

2.1690 36 04.12.13 (Consent

with condition)

1460 M/S Mandholia Industries, Muzaffarpur.

Proposal for establishment of 1499.40 lakh pieces per year capacity Paper Plate and P.V.C. Cups, Glass and Jar production unit in propietorship at Bela Industrial Area, Muzaffarpur.

1.6384 12 04.12.13 (Consent

with condition)

1461 M/S Friends Product, Patna. Proposal for establishment of 1639.44 lakh pieces Ice-Cream Cone production unit in proprietorship at plot no. D-2, Industrial Area, Fatuha, Patna.

1.0706 69 04.12.13 11.07.14

1462 M/S Ensole Energy Pvt. Ltd., Darbhanga.

Proposal for establishment of 05 MT per hour Modern Parboiled Rice Mill and 2.5 MT per hour Rice Flake production unit at Donar Industrial Area, Donar, Darbhanga.

5.8620 25 04.12.13

Page 124: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

124 1463 M/S Aasray Concept Foods

Pvt. Ltd., Guwahati. Proposal for establishment of 7.20 lakh K.G. per year capacity Instant Food (R.T.E.) and Baby Food unit at Industrial Area, Hajipur, Vaishali.

5.0310 56 04.12.13 (Consent

with condition)

1464 M/S Surpal Cycle Pvt. Ltd., Punjab.

Proposal for establishment of 03 lakh pieces per year capacity Cycle Handle, Cycle Chain, Wheel and Crank Set, Cycle Basket Set, Cycle Saddle and Cycle Paddle production unit at Bihta Industrial Area, Bihta, Patna.

3.5800 450 04.12.13

1465 M/S Urmila & Sons Agricon Pvt. Ltd., Patna.

Proposal for establishment of 5000 MT Warehouse and Other Components under R.A.B.C. at Samaspur, Khagaria.

7.9312 50 04.12.13 (Consent

with condition)

1466 M/S Shakti Shree Feeds Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 6000 MT Cold Storage and Other Components under R.A.B.C. at Industrial Estate, Muzaffarpur.

8.4185 40 04.12.13 (Consent

with condition)

1467 M/S Shakti Shree Feeds Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 80 MT per day capacity Roller Flour Mill unit at Industrial Estate, Muzaffarpur.

5.2525 25 04.12.13

1468 M/S Bihar Spunj Pipe Pvt. Ltd., Vaishali.

Proposal for establishment of 6000 MT Cold Storage and Other Components under R.A.B.C. at Gauspur, Ejra, Hajipur, Vaishali.

16.4385 40 04.12.13 (Consent

with condition)

04.08.14

1469 M/S Mars Mountain Securities and Trade Pvt. Ltd., Patna.

Proposal for establishment of 10,000 MT Warehouse and Other Components under R.A.B.C. at Fatuha Industrial Area, Rampur, Patna.

4.5300 12 04.12.13 (Consent

with condition)

1470 M/S Keshiha Ware House Pvt. Ltd., Motihari.

Proposal for establishment of 15,000 MT Warehouse and Other Components under R.A.B.C. at Jhakhara, Motihari.

10.9500 20 04.12.13 (Consent

with condition)

1471 M/S Keshiha Agro Products Pvt. Ltd., Motihari.

Proposal for establishment of 20,000 MT Warehouse and Other Components under R.A.B.C. at Malopur, Pakari, Dumra, Sitamarhi.

14.10 22 04.12.13 (Consent

with condition)

1472 M/S Sanjeevni Arogya Sansthan, Patna.

Proposal for establishment of Nursing School/College at Industrial Area, Fatuha, Patna.

2.6812 16 04.12.13 (Consent

with condition)

1473 M/S C N S Hospital Pvt. Ltd., Patna.

Proposal for establishment of 66 bed Super Speciality Hospital at Patliputra Industrial Area, Patna.

9.9677 145 04.12.13

1474 M/S S.A. Food Products, Vaishali.

Proposal for establishment of 960 MT per year capacity Ice-Cream production unit in partnership at Hajipur, Vaishali.

1.1805 25 04.12.13 (Consent

with condition)

1475 M/S Patel Ware Housing Pvt. Ltd., Chaibasa, West Singhbhum.

Proposal for establishment of 20,000 MT Dry Warehouse and Other Components under R.A.B.C. at Noorsarai, Nalanda.

10.4353 20 04.12.13 (Consent

with condition)

1476 M/S Aaditi Tech Industries Ltd., Ludhiyana, Punjab.

Two proposals have been submitted by Company for Industrial Growth Center Maranga, Purnea:- 1- Proposal for establishment of 7200 MT per year capacity Hand Pumps and Agriculture Products production unit. 2- Proposal for establishment of

6.7620

83

04.12.13 (Consent

with condition)

Page 125: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

125 production unit of 2419.200 MT per year capacity Plastic Furniture and House Hold Products.

7.6950

1477 M/S Imagine Infratech Pvt. Ltd., Patna.

Proposal for establishment of IT Park enabled Services Project at Patliputra Industrial Area, Patna.

19.3500 25 04.12.13

1478 M/S Baijnath Rice Industries Pvt. Ltd., Buxar.

Proposal for establishment of 04 MT per hour Modern Arwa Rice Mill at Gopnuaon, Buxar.

3.0120 14 20.01.14

1479 M/S Govardhan Ispat (India) Pvt. Ltd., Patna.

Proposal for establishment of 60,000 MT per year capacity Structural Steel Products (Angle, Channel, Patti) production unit at Simali, Murarpur, Patna City, Patna.

17.2523 46 20.01.14

1480 M/S Rockhil Hitech Cement Pvt. Ltd., Patna.

Proposal for capacity expansion of 30,000 MT per year capacity in the existing 9,000 MT per year capacity Cement Plant at Industrial Area, Fatuha, Patna.

2.1771 22 20.01.14

1481 M/S Keshav Rice Mill Pvt. Ltd., Ara.

Proposal for establishment of 04 MT per hour Modern Rice Mill at Giddha, Koilawar, Bhojpur.

7.4936 15 20.01.14

1482 M/S Anjali Buildcon Pvt. Ltd., Patna.

Proposal for establishment of 03 MT per hour Modern Arwa Rice Mill unit at Khaspur, Maner, Patna.

3.7800 28 20.01.14

1483 M/S Millan & Shubham Rice Mill Pvt. Ltd., Rohtas.

Proposal for establishment of 03 MT per hour Modern Arwa Rice Mill unit at Midnipur, Nasriganj, Rohtas.

1.9827 28 20.01.14

1484 M/S Prasad Agrico Industries Pvt. Ltd., Motihari.

Proposal for establishment of 12 MT per hour Parboiled Rice Mill at Satha, Areraj, Motihari.

30.2500 50 20.01.14

1485 M/S Baba Vasuki Nath Rice Mill, Saran.

Proposal for establishment of 03 MT per hour Parboiled Rice Mill in proprietorship at Daudpur, Manjhi, Saran.

3.9240 20 20.01.14

1486 M/S Mithu Agro Processor Pvt. Ltd., Gaya.

Proposal for establishment of 50 MT per day capacity Modern Pulse Milling unit at Itwan, Gaya.

3.6800 10 20.01.14

1487 M/S Sri Ram Rice Agrotech, Aurangabad.

Proposal for establishment of 03 MT per hour Arwa Rice Mill unit in proprietorship at Ratanpura, Daudnagar, Aurangabad.

1.8252 16 20.01.14

1488 M/S Tiger Agrofood Processing Industries Pvt. Ltd., Begusarai. (Approval has been given on proposal for change of capacity in SIPB meeting held on 11.06.14.)

Proposal for establishment of 50 MT per day capacity Mustard Oil production unit at Surdasha Dhala, Begusarai.

6.8000 11 20.01.14

11.06.14

1489 M/S Magadh Enviro Industries Pvt. Ltd., Patna.

Proposal for establishment of 67.50 lakh Pieces per year capacity Fly Ash Bricks production unit at Sampatchak, Patna.

1.0994 23 20.01.14

1490 M/S Shree Sharda Agro Foods and Power Pvt. Ltd., Patna.

Proposal for establishment of 26,400 MT per year capacity Cattle Feed and 26,400 MT per year capacity Whole Wheat Flour Mill unit at Belon, Kharaunda, Kaimur, Bhabhua.

11.6724 57 20.01.14

1491 M/S Shree Shree Mudran, Patna.

Proposal for establishment of 144.00 Lakh Pieces per year capacity Farma(Printing Press) production

1.2758 13 20.01.14

Page 126: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

126 unit in partnership at Industrial Area, Fatuha, Patna.

1492 M/S Shree Durga Modern Rice Mills Pvt. Ltd., Buxar.

Proposal for establishment of 05 MT per hour Modern Parboiled Rice Mill unit at Akhouripur, Gola, Chausa, Buxar.

13.1000 24 20.01.14

1493 M/S Sri Radhikajee Modern Rice Mill Pvt. Ltd., Buxar.

Proposal for establishment of 4.5 MT per hour Modern Parboiled Rice Mill unit at Mustafapur, Etarhi, Buxar.

11.0000 20 20.01.14

1494 M/S Jai Maa Vindhyvasini Food Products Pvt. Ltd., Buxar.

Proposal for establishment of 04 MT per hour Modern Arwa Rice Mill at Buxsara, Etarhi, Buxar.

3.5000 10 20.01.14

1495 M/S Maa Kali Agrifood Products Ltd., Patna.

Proposal for establishment of 48 MT per day capacity Modern Arwa Rice Mill unit at Mahajpura, Bikram, Patna.

1.7650 30 20.01.14

1496 M/S Ganpati Pet Bottle Industries, Hajipur.

Proposal for establishment of 120 MT per year capacity Pet Bottle and 4800 KL per year capacity packaged Drinking Water unit in proprietorship at Industrial Area, Hajipur, Vaishali.

1.2292 16 20.01.14 (Consent

with condition)

1497 M/S Mahalaxmi Ricetech Pvt. Ltd., Aurangabad.

Proposal for establishment of 19,200 MT per year capacity Modern Arwa Rice Mill unit at Industrial Growth Center, Aurangabad.

3.2568 10 20.01.14

1498 M/S Zakaria Agro Pvt. Ltd., Kanpur.

Proposal for establishment of 10815 MT per year capacity Integrated Meat Processing unit at Simraha, Araria.

11.0250 52 20.01.14

1499 M/S Marhaba Frozen Foods, Kanpur.

Proposal for establishment of 9,000 MT per year capacity Integrated Meat Processing unit in partnership at Simraha, Araria.

10.8540 50 20.01.14

1500 M/S Dina Iron and Steel Ltd., Didarganj, Patna City, Patna. (Earlier on 20.01.14 approval was given for capacity expansion of M.S Billet from 28,800 MT per year to 67,200 MT per year and of M.S Wire & Rod from 30,000 MT per year capacity to 66,000 MT per year capacity in the existing unit at Abdul Rahmanpur Road, Didarganj, Patna. Again on company's request, approval has been given with condition for modernization and capacity expansion of existing Rolling Mill unit at Abdul Rahmanpur Road, Didarganj, Patna City, Patna in SIPB meeting held on 11.12.14.)

Proposal for modernization and capacity expansion of existing Rolling Mill unit at Abdul Rahmanpur Road, Didarganj, Patna City, Patna.

8.8825

95

20.01.14

11.12.14 (Consent

with Condition)

1501 M/S Neel Jal, Muzaffarpur. Proposal for establishment of 16,000 Litres per day capacity Packaged Drinking Water unit in proprietorship

1.1085 15 20.01.14 (Consent

with

Page 127: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

127 at Industrial Area, Phase-2 Bela. condition)

1502 M/S R.K Engineering Works, Saran.

Proposal for establishment of 7200 Kilo Litre per year capacity Packaged Drinking Water unit in partnership at C-11, Phase-2, Hajipur Industrial Area, Vaishali.

1.0226 18 20.01.14

1503 M/S Bageshwari Agro Foods Pvt. Ltd., Purnea.

Proposal for establishment of 06 MT per hour Modern Parboiled Rice Mill unit at Gulabbagh, Purnea Sadar, Purnea.

12.2400 43 20.01.14

1504 M/S Nav Durga Agrotech Pvt. Ltd., Nawada.

Proposal for establishment of 04 MT per hour Arwa Rice Mill unit at Manjhila, Rajauli, Nawada.

6.9480 41 20.01.14

1505 M/S Shree Saibaba Plasto Products Pvt. Ltd., Vaishali.

Proposal for capacity expansion form 1996.50 MT per year capacity to 3074.61 MT per year capacity in existing unit of Plastic Mold Goods at E.P.I.P, Hajipur, Vaishali.

3.0951 52 20.01.14

1506 M/S Shubham & Saurabh Agro Foods Pvt. Ltd., East Champaran.

Proposal for establishment of 03 MT per hour Capacity Maize processing unit at Govindganj,East Champaran.

3.0000 20 20.01.14

1507 M/S Girija Agri Rice Mill Pvt. Ltd., Madhubani.

Proposal for establishment of 04 MT per hour Modern Rice Mill unit at Saharghat, Kerwa, Madhavpur, Madhubani.

13.8029 27 20.01.14

1508 M/S Om Sai Ram Ricetech Pvt. Ltd., Rohtas.

Proposal for establishment of 03 MT per hour Modern Arwa Rice Mill unit at Dehri-on-Sone, Sasaram, Rohtas.

2.8992 15 20.01.14

1509 M/S Om Sai Nath Rice Mill Pvt. Ltd., Rohtas.

Proposal for establishment of 05 MT per hour Modern Parboiled Rice Mill unit at Nasriganj, Dehri-on-Sone, Rohtas.

5.6000 25 20.01.14

1510 M/S Vaishali Industrial Park Pvt. Ltd., Patna.

Proposal for development of 100 Acre Industrial Area at Mahua, Vaishali.

115.2500 N.A 20.01.14

1511 M/S Trio Satya Sai Foods Pvt. Ltd., Patna.

Proposal for establishment of 04 MT per hour Modern Arwa Rice Mill unit at Kauria, Kujwa, Bihta, Patna.

5.0000 20 20.01.14

1512 M/S Ashok Trading Company, Araria.

Proposal for capacity expansion of 06 MT per hour capacity of existing 03 MT per hour capacity Rice Mill unit in proprietorship at Chakardaha, Narpatganj, Araria.

5.9992 10 20.01.14

1513 M/S Shree Gopal Govind Agrotech Pvt. Ltd., Kolkata.

Proposal for establishment of 08 MT per hour Modern Parboiled Rice Mill unit at Kudra, Kaimur, Bhabhua.

18.8600 40 20.01.14

1514 M/S Tirupati Tech Pack Pvt. Ltd., Patna.

Proposal for establishment of 1200 MT per year capacity Corrugated Boxes unit at Mahuli Road, Karmali Chak, Patna City, Patna.

3.1863 20 20.01.14

1515 M/S Anjali Food Products, Bhojpur.

Proposal for establishment of 03 MT per hour Arwa Modern Rice Mill in proprietorship at Bihiya Industrial Area, Bhojpur.

2.8630 10 20.01.14

1516 M/S Sri Ganga Jee Industries, Bihiya, Bhojpur.

Proposal for establishment of 8000 MT per year capacity Modern Rice Mill in partnership at Bihiya Industrial Area Bhojpur.

1.1335 28 20.01.14

1517 M/S Maa Tarachandi Overseas Pvt. Ltd, Aurangabad.

Proposal for establishment of 12 MT per day capacity Arwa and Parboiled Rice Mill at Bhopatpur, Barun,

17.70 78 20.01.14

Page 128: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

128 Aurangabad.

1518 M/S Shubhangi Agritech Pvt. Ltd., Gaya.

Proposal for establishment of 04 MT per hour Parboiled Rice Mill at Mouja- Randanar and Bairaka, Atari, Gaya.

4.6440 28 20.01.14

1519 M/S Baliram Rice Mill, Gopalganj.

Proposal for establishment of 04 MT per hour Modern Rice Mill in proprietorship at Koyni, Gopalganj.

1.4930 20 20.01.14

1520 M/S Radium Purefood and Beverages Pvt. Ltd., Nalanda.

Proposal for establishment of 05 MT per hour Parboiled and Arwa Rice Mill at Mauza- Arwa, Parwalpur, Biharsharif, Nalanda.

5.3800 28 20.01.14

1521 M/S Premium Pressure Vessels Pvt. Ltd., New Delhi.

Proposal for establishment of 05 lakh pieces per year capacity Gas Cylinders (Industrial or House hold) production unit at Plot No.-5146, Vill.-Bank Form, Dehri-on-Sone, Rohtas.

8.8500 140 20.01.14

1522 M/S Hitech Nutrisol Pvt. Ltd., Vaishali.

Proposal for establishment of 36000 MT per year capacity Automatic Poultry Feed unit at Mangurahi, Hajipur, Vaishali.

3.8224 41 20.01.14

1523 M/S Kapilo Rice Mills Pvt. Ltd., Kaimur.

Proposal for establishment of 04 MT per hour Modern Parboiled Rice Mill at Paura, Kaimur.

4.2700 28 20.01.14

1524 M/S Ranju Rice Mill Pvt. Ltd., Begusarai.

Proposal for establishment of 04 MT per hour Modern Parboiled Rice Mill at Akhauripur Gola, Barauni, Begusarai.

4.3275 24 20.01.14

1525 M/S Ganesh Laxmi Rice Mills Pvt. Ltd., Nawada.

Proposal for capacity expansion from 15360 MT per year capacity to 30720 MT per year capacity in the existing Rice Mill unit at Chautha, Rajauli, Nawada.

4.0000 20 20.01.14

1526 M/S Anuv Royal Plastic Pvt. Ltd., Patna.

Proposal for establishment of 2000 MT per year capacity P.V.C Profile and Casing Bit unit at Sabalpur, Patna.

2.1000 28 20.01.14

1527 M/S Keshav Enterprises, Madhubani.

Proposal for establishment of 2000 MT per year capacity Gur production unit at Andauli, Madhwapur, Madhubani.

2.0898 20 20.01.14

1528 M/S Binod Diet Cereals Energy Pvt. Ltd., Patna.

Proposal for establishment of 20 MT per hour Rice Sheller and 05 MT MW Biomass based Captive Power Plant at Amjhor, Rohtas.

46.5600 102 20.01.14 (Consent

with condition)

1529 M/S Welco Distillery Pvt. Ltd., Gurgaon, Hariyana.

Proposal for establishment of 1.5 Lakh Hecto Litre per year capacity Brewery unit at Hajipur.

22.0000 130 20.01.14 (Consent

with condition)

1530 M/S Siddhi Vinayak Rice Mill, Bhabhua, Kaimur.

Proposal for establishment of 7200 MT per year capacity Arwa Rice Mill at Betri, Bhabhua, Kaimur.

1.9529 14 20.01.14

1531 M/S New Ratanpriya, Patna. Proposal for establishment of 8.40 crore sheet pieces per year capacity Web Offset Printing, Offset Printing and Web Printing unit in proprietorship at Ashokpuri, Khagaul Road, Danapur, Patna.

1.4375 24 20.01.14

1532 M/S Madhav Industries, Patna.

Proposal for establishment of 28.80 Lakh pieces per year capacity Fly Ash Bricks production unit in

1.1586 8 20.01.14

Page 129: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

129 partnership at Singriyama, Shahjahnpur, Patna City, Patna.

1533 M/S R.B.C. Industries Pvt. Ltd., Purnea.

Proposal for establishment of 08 MT per hour Modern Parboiled Rice Mill at Muhammadpur, Purnea.

24.1236 75 20.01.14

1534 M/S Telephone Vermicelli, Patna.

Proposal for establishment of 4.80 lakh K.G. per year capacity Vermicelli, Pasta, Micromic, Maggie production unit in proprietorship at Industrial Area, Fatuha, Patna.

1.2780 21 20.01.14 (Consent

with condition)

1535 M/S Jai Bajrang Agro Industries, Bhojpur.

Proposal for establishment of 2400 MT per year capacity Cattle Feed unit in proprietorship at Industrial Area, Dehri-on-Sone, Rohtas.

1.1025 16 20.01.14 (Consent

with condition)

1536 M/S Kishan Food Products, Bhojpur.

Proposal for establishment of 1044 MT per year capacity Dalmot, Mixture, Rusk Bread and other Bakery Products production unit in proprietorship at Industrial Area, Bihiya, Bhojpur.

1.0608 29 20.01.14 (Consent

with condition)

1537 M/S Yuvraj Surfactant, Patna. Proposal for establishment of 2400 MT per year capacity Detergent Powder production unit in proprietorship at Industrial Area, Hajipur, Vaishali.

1.4913 25 20.01.14 (Consent

with condition)

1538 M/S Thakur Engineering Works, Darbhanga.

Proposal for establishment of 480 pieces per year capacity Agriculture Implement unit in proprietorship at Industrial Area Donar, Darbhanga.

1.3435 5 20.01.14

1539 M/S Sun Shine Autos Pvt. Ltd., Aurangabad.

Proposal for establishment of Servicing and Bodybuilding of Vehicles unit at Jasoiya, Aurangabad.

1.8476 40 20.01.14

1540 M/S Raghav C.L.C. Bricks, Darbhanga.

Proposal for establishment of 63.24 lakh pieces per year capacity Fly Ash Bricks, Pavers Blocks and Checkers Tiles production unit in proprietorship at Industrial Area Donar, Darbhanga.

1.1053 37 20.01.14

1541 M/S Shree Durga Jee Rice Mill, Rohtas.

Proposal for Modernisation under scheme of Government of India, "Scheme for National Mission of Food Processing Industries" of the existing 03 MT per hour capacity Arwa Rice Mill in partnership.

2.0365 20 20.01.14 (Consent

with condition)

1542 M/S Sunayana Cold Storage Pvt. Ltd., Begusarai.

Proposal for capacity expansion of 6000 MT in the existing Cold Storage of 6000 MT under R.A.B.C. at Tara Bariyarpur, Khodabandpur, Manjhaul, Begusarai

4.6300 10 20.01.14 (Consent

with condition)

1543 M/S Prasad Agrico Industries Pvt. Ltd., East Champaran.

Proposal for establishment of 9000 MT Cold Storage and other Components under R.A.B.C, at Sataha, Areraj, East Champaran.

10.00 70 20.01.14 (Consent

with condition)

1544 M/S Shree Lakshman Jee Rice Mill, Rohtas.

Proposal for Modernisation under scheme of Government of India, "Scheme for National Mission for Food Processing Industries" of the existing 03 MT per hour capacity Arwa Rice Mill in partnership at Nokha, Rohtas.

2.1456 20 20.01.14 (Consent

with condition)

1545 M/S Shree Radhika Jee Proposal for Modernisation under 2.3304 20 20.01.14

Page 130: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

130 Hanuman Jee Rice Mill, Rohtas.

scheme of Government of India, "Scheme for National Mission for Food Processing Industries"of the existing 03 MT per hour capacity Arwa Rice Mill in partnership at Nokha, Rohtas.

(Consent with

condition)

1546 M/S Shree Pawansut Rice Mill, Rohtas.

Proposal for Modernisation under scheme of Government of India, "Scheme for National Mission for Food Processing Industries" of the existing 03 MT per hour capacity Arwa Rice Mill in partnership at Nokha, Rohtas.

1.9354 20 20.01.14 (Consent

with condition)

1547 M/S Mother Teressa Medical Trust, Patna.

Proposal for establishment of Nursing School/College and Para Medical College at Mega Industrial Park, Bihta, Patna.

8.5449 15 20.01.14

1548 M/S Bhushan Singh Kesariya Cold Storage Pvt. Ltd., East Champaran.

Proposal for establishment of 5500 MT Cold Storage and other Components under R.A.B.C. at Kesariya, East Champaran.

7.3144 18 20.01.14 (Consent

with condition)

1549 M/S Sparrow Logistic Pvt. Ltd., Kolkata.

Proposal for establishment of 18,100 MT capacity Cold Storage and other Components under R.A.B.C. at Thariya, Wakiya, Sonapur, Simraha, Araria.

15.5978 150 20.01.14 (Consent

with condition)

1550 M/S Happy Shop Horticulture Pvt. Ltd., Kolkata.

Proposal for establishment of 18,100 MT Cold Storage and Other Components under R.A.B.C. at Andeli, Thana-Ranipatra, Purnea.

15.5072 110 20.01.14 (Consent

with condition)

1551 M/S Centurion Cement Pvt. Ltd., Madhepura. (Earlier on 20.01.14 approval was given for establishment of 500 TPD capacity Cement Grinding unit at Industrial Area, Udakishanganj, Madhepura. Again on company's request, approval has been given for establishment of 500 T.P.D. capacity Cement Grinding unit at Vishanpur, Patarghat, Dist.- Saharsa in SIPB meeting held on 11.12.14.)

Proposal for establishment of 500 T.P.D. capacity Cement Grinding unit at Vishanpur, Patarghat, Dist.- Saharsa.

9.2340 60 20.01.14 (Consent

with condition)

11.12.14

1552 M/S Jai Maa Durga Jee Foods Udyog Pvt. Ltd., Nokha, Rohtas.

Proposal for establishment of 04 MT per hour capacity Modern Parboiled Rice Mill unit at Nokha, Rohtas.

9.8360 75 05.03.14

1553 M/S Raj Bricks and Tiles, Patna.

Proposal for establishment of 60 Lakh pieces per year capacity Fly Ash Bricks unit in proprietorship at Chandeli, Punpun, Patna.

1.0068 8 05.03.14

1554 M/S Nalanda Cement Products, Nalanda.

Proposal for establishment of 50,000 Pieces per year capacity P.S.C. Pole production unit in proprietorship at Tina, Chandi, Nalanda.

1.9054 17 05.03.14

1555 M/S Amritesh Agro Products Pvt. Ltd., Jamui.

Proposal for establishment of 120 MT per day capacity Modern Dal Mill and Besan unit at Silfari, Chandramadih, Jamui.

5.0000 30 05.03.14

Page 131: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

131 1556 M/S Poddar Consolidated

Ltd., Lakhisarai. Proposal for establishment of 60 Lakh pieces per year capacity Fly Ask Bricks and Pavers Block unit at Lakhisarai.

1.1925 16 05.03.14

1557 M/S Reliable India Pvt. Ltd., Kolkata.

Proposal for establishment of 01 MW Solar Power Project at Maner, Bihta, Patna.

7.9800 11 05.03.14 (Consent with Condition)

1558 M/S Ansika Agro Pvt. Ltd., Buxur.

Proposal for establishment of 04 MT per hour Boiled Rice Mill unit at Naya Bhojpur, Buxur.

9.4455 43 05.03.14

1559 M/S D.R.C. Infracons Pvt, Ltd., Patna.

Proposal for establishment of 24,000 pieces per day capacity Fly Ash Bricks unit at Kopa Khurd, Naubatpur, Patna.

1.4171 26 05.03.14

1560 M/S Rajdeep Rice Mill Pvt. Ltd., Patna.

Proposal for establishment of 06 MT per hour Modern Rice Mill and Raw-Rice Mill unit at Bahadurpur, Chandi, Nalanda.

6.4800 45 05.03.14 (Consent with Condition)

1561 M/S Pan Asia Aluminium Pvt. Ltd., Pandarak, Patna.

Proposal for establishment of 10 MT per day capacity Aluminium Channel, Angle, Pipe, Window/ Door Profile and Architecture Production unit at Lamuabad, Pandarak, Patna.

7.9550 65 05.03.14

1562 M/S Bhasker Agro Mill Pvt. Ltd., Aurangabad.

Proposal for establishment of 03 MT per hour Modern Rice Mill unit at Chandpur, Dev, Aurangabad.

3.0486 15 05.03.14

1563 M/S Aakansha Rice Mills Pvt. Ltd. , Purnea.

Proposal for establishment of 08 MT per hour capacity Parboiled Rice Mill at Belauri, Purnea.

15.5070 63 05.03.14

1564 M/S Kumar Agro Fertilizer Pvt. Ltd., Gaya.

Proposal for establishment of 50 Lakh Packet per year capacity Bio Fertilizer production unit at Chhotaka Bahera, Jhadi, Gaya.

2.0702 24 05.03.14

1565 M/S Maa Jagdamba Rice Mill, Madhepura.

Proposal for establishment of 7200 MT per year capacity Rice Mill in proprietorship at Singheshwar, Madhepura.

1.2215 24 05.03.14

1566 M/S Shri Narayan Ganesh Rice Mills Pvt. Ltd., Ranchi.

Proposal for establishment of 08 MT per hour capacity Parboiled Rice Mill unit at OP, Ekangarsarai, Nalanda.

24.3386 20 05.03.14

1567 M/S Maa Janki Rice Mills Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 08 MT per hour Parboiled Rice/Raw Rice Mill and 10000 MT Dry Warehouse and 600 K.V.A. D.G set and Gasifire at Hasanpur, Baghai, Narsinghpur, Muzaffarpur.

12.1175 30 05.03.14

1568 M/S Om Maa Bhawani Rice Mill Pvt. Ltd., Darbhanga.

Proposal for establishment of 04 Ton per hour Parboiled Rice Mill at Madhopur, Darbhanga.

6.9478 20 05.03.14

1569 M/S Adarsh Flour and Rice Processors Pvt. Ltd., Gopalganj.

Proposal for establishment of 04 MT per hour Raw Rice Mill, 5000 MT Warehouse, 500 MT Rice Warehouse and 250 K.V.A. D.G. set unit at Bhelwatiya, Saguli, East Champaran.

4.5380 28 05.03.14

1570 M/S Haribansh Rice Mill Pvt. Ltd., Rohtas.

Proposal for establishment of 04 MT per hour Raw Rice Mill, 5000 MT Warehouse and 250 K.V.A. D.G. Set at Dinara, Rohtas.

4.6550 28 05.03.14

1571 M/S Radhika Jyoti Agri Proposal for establishment of 04 MT 5.5000 28 05.03.14

Page 132: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

132 Industries Pvt. Ltd, Bettiah. per hour Parboiled Rice Mill at Banu

Chhapra, Bettiah. 1572 M/S Ram Ji Rice Mills Pvt.

Ltd, Rohtas. Proposal for establishment of 04 MT per hour Modern Raw Rice Mill at Rajpur, Rohtas.

3.2950 10 05.03.14

1573 M/S Laxmi Food Products, Ramgarh, Kaimur.

Proposal for establishment of 02 Ton per hour Cattle Feed unit in proprietorship at Ramgarh, Kaimur.

2.8348 30 05.03.14

1574 M/S Maa Kalika Rice Mill, Kaimur.

Proposal for establishment of 04 MT per hour Modern Rice Mill in proprietorship at Awaharia Road, Durgawati Kaimur.

2.7853 18 05.03.14

1575 M/S Pham Farm Products Pvt. Ltd, Siwan.

Proposal for establishment of 50 Ton per day capacity Modern Flour Mill Unit at Dindayalpur, Siwan.

3.4397 12 05.03.14

1576 M/S Jyoti Modern Rice Industries Pvt. Ltd, Purnea.

Proposal for establishment of 06 MT per hour Parboiled Rice Mill at Gulabbag, Hansda, Purnea.

9.9493 30 05.03.14 (Consent with Condition)

1577 M/S Siddhidatri Modern Rice Mill Pvt. Ltd, Arah.

Proposal for establishment of 08 MT per hour Modern Parboiled Rice Mill at Kritpura, Koilwar, Bhojpur.

21.7660 18 05.03.14

1578 M/S A One Construction, Katihar.

Proposal for establishment of 03 MT per hour Maize Processing in partnership at Kodha, Katihar.

3.2404 10 05.03.14

1579 M/S JP Spices Pvt. Ltd, Raxaul.

Proposal for establishment of 4000 Kg. per day Soyabari, 800 Kg per day Gold Finger and 800 Kg. per day capacity Vermicelli (Sewai) at New By pass Road Kanna, Raxaul, East Champaran.

1.5345 37 05.03.14

1580 M/S Bajrang Rice Mill, Kudra, Kaimur.

Proposal for establishment of 04 MT per hour capacity Modern Rice Mill in proprietorship at Bajarkona, Kudra, Kaimur.

2.7561 18 05.03.14

1581 M/S Arya Nandani Agro Modern Industries Pvt. Ltd., East Champaran.

Proposal for establishment of 05 MT per hour Boiled Rice Mill at Sri Rampur, Noniadih, Raxaul.

13.1760 58 05.03.14

1582 M/S Chaman Hi-Tech Rice Mill Pvt. Ltd., Rohtas.

Proposal for establishment of 04 MT per hour Rice Mill at Baliyan Kothi, Nasriganj, Rohtas.

3.4290 34 05.03.14

1583 M/S Priya Rice Mill, Bettiah. Proposal for establishment of 04 MT per hour Arwa Rice Mill in proprietorship at Mathkotha, Yogapatti, West Champaran.

1.3615 23 05.03.14

1584 M/S Maa Modern Rice Mill Pvt. Ltd., Rohtas.

(Approval has been given on proposal for change of

capacity for establishment of 04 MT per hour capacity

Parboiled Rice Mill in place of earlier approved 03 MT per hour capacity Arwa Rice Mill at Gamahariya, Akodhi Gola, Rohtas in SIPB meeting held

on 17.07.14.) .

Proposal for establishment 04 MT per hour Parboiled Rice Mill at

Gamahariya, Akodhi Gola, Rohtas.

6.3045 36 05.03.14

17.07.14

1585 M/S Vishal Paddy Products Pvt. Ltd., Rohtas. (Approval has been given on proposal for change of

Proposal for establishment 08 MT per hour Parboiled Rice Mill at Sariao, Nokha, Rohtas.

14.1090 49 05.03.14

11.06.14

Page 133: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

133 capacity in SIPB meeting held on 11.06.14.)

1586 M/S Ray Agrifoods Pvt. Ltd., Rohtas.

Proposal for establishment of 03 MT per hour Arwa Rice Mill at Taraon, Nasriganj, Rohtas.

2.7000 27 05.03.14

1587 M/S Ravi Vinay Hotels Pvt. Ltd., Purnea.

Proposal for establishment of Restaurant and Hotel at Khiru Chowk, Bhattha Bazar, Purnea.

2.3360 15 05.03.14

1588 M/S Om Sai Rice Mill, Nalanda.

Proposal for establishment of 24 MT per day capacity Arwa Rice Mill in proprietorship at Jalalpur, Noorsarai, Nalanda.

2.1510 25 05.03.14 (Consent with Condition)

1589 M/S Shivam Shubham Rice Mill Pvt. Ltd., East Champaran.

Proposal for establishment 03 MT per hour Arwa Rice Mill at Bharwalia, Raxaul.

2.2536 27 05.03.14

1590 M/S Anamika agro Industries Pvt. Ltd., Bettiah.

Proposal for establishment of 04 MT per hour Modern Rice Mill at Belwa More, Padrauna, Bettiah.

4.5000 28 05.03.14

1591 M/S Narayani Technocontainers Pvt. Ltd., Nagpur, Maharashtra.

Proposal for establishment of 3600 MT per year capacity Corrugated Boxes production unit at Plot No.- 1023, Alampur, Kachchi Dargah, Deedarganj, Patna City, Patna.

6.6600 56 05.03.14

1592 M/S Buddha Soya Agro Industry Pvt. Ltd., Gaya.

Proposal for establishment of 1200 MT per year capacity Soyabari production unit at Technofarm, Hariharpur, Bodhgaya, Gaya.

1.2302 18 05.03.14

1593 M/S Prasad Agrico Industries Pvt. Ltd., East Champaran.

Proposal for establishment of 900 MT per year capacity Turmeric Processing at Maguraha, Paharpur, East Champaran.

3.2500 12 05.03.14

1594 M/S Tirupati Sugar Ltd., Bagaha, West Champaran.

Proposal for establishment of 06 MW Co-Generation Power Plant in the existing Sugar Mill.

27.9000 17 05.03.14

1595 M/S Sona Developer & Cold Storage Pvt. Ltd., Madhepura.

Proposal for establishment of 7000 MT per year Cold Storage and Other Components under R.A.B.C. at Industrial Area, Madhepura.

9.1060 10 05.03.14

1596 M/S Bettiah Agro Industries Pvt. Ltd., Bettiah.

Proposal for establishment of 8000 MT Cold Storage and Other Components under R.A.B.C. at Bettiah Industrial Area, Bettiah.

8.9300 31 05.03.14 (Consent with Condition)

1597 M/S Unicorn Snacks Pvt. Ltd., Darbhanga.

Proposal for establishment of 1920 MT per day capacity Kurkure, Puffs and Rings production unit at Donar Industrial Area, Darbhanga.

2.9145 38 05.03.14

1598 M/S Darbhanga Flour Pvt. Ltd., Kolkata.

Proposal for expansion/diversification of 70 MT per day extra capacity of Atta, Chokar, Suji in the existing 30 MT per day capacity Atta, Chokar production unit at Industrial Estate Bela, Darbhanga.

3.9960 67 05.03.14 (Consent with Condition)

1599 M/S BMW Ventures Ltd., Patna.

Proposal for establishment of I.T. Park at Industrial Area, Patliputra, Patna.

12.0600 15 05.03.14

1600 M/S Orchid Profiles Pvt. Ltd., Ara.

Proposal for establishment of 2240 MT per year capacity P.V.C. Profiles at Giddha Industrial Area, Ara.

1.2769 14 05.03.14

1601 M/S Cyberark Infotech Proposal for establishment of I.T. 17.5382 368 05.03.14

Page 134: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

134 Solutions, Patna. Park in partnership at Industrial Area,

Patna. 1602 M/S SCI India Ltd.,

Bhagalpur. Proposal for establishment of I.T. Park at Industrial Area, Patliputra, Patna.

13.6260 15 05.03.14

1603 M/S Aryan Industries, Muzaffarpur.

Proposal for establishment of 60 MT per year capacity Wheat Grass Powder unit in proprietorship at Industrial Area Bela, Muzaffarpur.

1.5238 18 05.03.14

1604 M/S Poonamika Foods India Pvt. Ltd., Patna.

Proposal for capacity expansion of existing Bakery Product unit from 12 MT per day capacity to 72 MT per day capacity at Yusufpur, Hajipur.

15.0000 60 05.03.14 (Consent with Condition)

1605 M/S Kali Roller Flour Mills Pvt. Ltd., Purnea.

Proposal for establishment of One Lakh Square Feet Dry Warehouse and other Components under R.A.B.C. at Purnea.

7.0000 30 05.03.14 (Consent with Condition)

1606 M/S Mohammad Israil Cold Storages Pvt. Ltd., Bhojpur.

Proposal for establishment of 6800 MT Multi Purpose Cold Storage, Sorting Grading, Agri Input and Other Components under R.A.B.C. at Giddha, Koilwar, Bhojpur.

4.2150 30 05.03.14 (Consent with Condition)

1607 M/S J K S Ago Farm & Cold Storage Pvt. Ltd., Chhapra.

Proposal for establishment of 10,000 MT Multi Purpose Cold Storage and other Components under R.A.B.C. at Chorma, Pakaridayal, East Champaran.

15.8612 20 05.03.14 (Consent with Condition)

1608 M/S G.B.M. Networks Asia Pvt. Ltd., Vaishali. (Approval has been given on proposal for change of capacity in SIPB meeting held on 17.07.14.) .

Proposal for establishment of 10000 Litres per day capacity Low Fat Energy Drink and 05 MT per day capacity Cereal Health Foods production unit at Industrial Area, Hajipur, Vaishali.

10.0000 25 05.03.14 (Consent

with Condition)

17.07.14

1609 M/S Sipada Foods Solutions Pvt. Ltd., Patna.

Proposal for establishment of 1020 MT per year capacity Soyabari production unit at Industrial Area, Donar, Darbhanga.

1.7172 35 05.03.14

1610 M/S V.I.P. Agro Industries Pvt. Ltd., Patna.

Proposal for establishment of 200 K.g. per hour Biscuit production unit at Chhapia, Isuapur, Chhapra.

1.6800 26 05.03.14

1611 M/S Maa Mundeshwari Rice Mill, Bhojpur.

Proposal for establishment of 03 MT per hour capacity Arwa Rice Mill in proprietorship at Growth Centre, Giddha, Bhojpur.

2.7000 27 05.03.14

1612 M/S Shree Laxmiji Rice Mill, Garhani, Bhojpur.

Proposal for establishment of 12,000 MT per year capacity Rice Mill in partnership at Garhani, Bhojpur.

1.2293 10 05.03.14

1613 M/S Amrapali Biotech India Pvt. Ltd., (Unit-5), New Delhi.

Proposal for establishment of 12000 MT per year capacity I.Q.F. Frozen Food at Navanagar, Buxar.

23.6500 50 05.03.14

1614 M/S Amrapali Biotech Pvt. Ltd., (Unit-3), New Delhi.

Proposal for establishment of 36,000 MT per year capacity Fruit Juice Processing at Navanagar, Buxar.

53.2700 70 05.03.14

1615 M/S Kanhaiya Lal Agro Pvt. Ltd., East Champaran.

Proposal for establishment of 04 MT per hour capacity Modern Rice Mill at Ahirwaliya, Ramgarhwa, East Champaran.

4.2300 34 05.03.14

1616 M/S Banke Bihari Foods Pvt. Ltd., Patna.

Proposal for capacity expansion and Modernisation of existing Roller Flour Mill unit from 28,000 MT per

9.4528 36 05.03.14

Page 135: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

135 year capacity to 50,000 MT per year capacity at Digha Ghat, Patna.

1617 M/S Shivam Polytubes Pvt. Ltd., Patna.

Proposal for establishment of 600 MT per year capacity P.V.C. Pipe, P.V.C. Fitting, H.D.P.E. Water Storage Tank, P.V.C. Profile and Recycling of Scrap unit at Industrial Area, Fatuha, Patna.

1.7115 9 05.03.14 (Consent with Condition)

1618 M/S Forbesgunj Food Processing Pvt. Ltd., Kolkata.

Proposal for establishment of 120 MT per day capacity Atta, Maida, Suji & Bran and 50 MT Whole Wheat Flour Mill unit at Narpatganj Road, Matiyari, Forbesgunj, Araria.

12.2604 60 05.03.14

1619 M/S Ornate Labs Pvt. Ltd., Muzaffarpur.

Proposal for Addition of I.T Park in existing unit at Industrial Area, Bela, Muzaffarpur.

9.8800 05.03.14

1620 M/S Rampari Agro Products Pvt. Ltd., Hajipur.

Proposal for establishment of 5500 MT Multi Purpose Cold Storage under R.A.B.C. at Manibhkurahar, Sarai, Hajipur.

7.3284 24 05.03.14 (Consent with Condition)

1621 M/S Carving Dreams Foods Pvt. Ltd., Patna.

Proposal for establishment of 08 Ton per hour Parboiled Rice Mill at Moriyawan, Datiyana, Bikram, Patna.

20.2140 30 05.03.14

1622 M/S Jugal Kishore Lohiya Shyam Sundar Lohiya Commercial Godown, Purnea.

Proposal for establishment of 4180.40 MT per year capacity Dry Warehouse under R.A.B.C. at Gulab Bagh, Purnea.

4.0269 16 05.03.14 (Consent with Condition)

1623 M/S Anand Industries, Darbhanga.

Proposal for establishment of 12,000 MT per year capacity Poultry Feed unit in proprietorship at Industrial Area Donar, Darbhanga.

4.2700 15 05.03.14

1624 M/S Sankat Mochan Agro Pvt. Ltd., Aurangabad.

Proposal for establishment of 02 MT per hour capacity Rice Mill at Singha, Aurangabad.

1.6725 10 05.03.14 (Consent with Condition)

1625 M/S Sharma Rice Mill, Daudnagar, Aurangabad.

Proposal for establishment of 08 MT per hour Modern Rice Mill in proprietorship at Daudnagar, Aurangabad.

4.4365 9 05.03.14

1626 M/S Hargauri Recycling Plant Pvt. Ltd., Kolkata.

Proposal for capacity expansion of 32 MT per year capacity in the existing unit of 10.67 MT per year of Recycling of Non Metal Waste and Scrap (Carbon Black, Furnace Oil, Steel from Waste Tyre) at Kurlikote, Thakurganj, Kishanganj.

3.8637 19 05.03.14 (Consent with Condition)

1627 M/S Vindhyawasini Rice Mill Pvt. Ltd., Aurangabad.

Proposal for establishment of 06 MT per hour Modern Rice Mill at Birai Arai, Daudnagar, Aurangabad.

4.4680 128 05.03.14

1628 M/S Sri Nikhil Jee Agrotech Pvt. Ltd., Aurangabad.

Proposal for establishment of 06 MT per hour Modern Rice Mill at Rishiup Shiwan Bigha, Aurangabad.

11.8503 135 05.03.14

1629 M/S Maa Vaishno Rice Mill Pvt. Ltd., West Champaran.

Proposal for establishment of 04 MT per hour Arwa Rice mill and Chura production unit at Industrial Area, Kumarbagh, Bettiah.

2.5644 23 05.03.14 (Consent with Condition)

1630 M/S Maksi Agro Cool Chain Pvt. Ltd., Patna.

Proposal for establishment of 10 MT per hour Modern Rice Mill at Industrial Growth Centre, Giddha, Ara.

22.9628 170 05.03.14 (Consent with Condition)

1631 M/S Maharani Manufacturer Proposal for establishment of 1.6860 10 05.03.14

Page 136: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

136 & Constructions, Patna. 5475360 Pieces per year capacity

Fly Ash Bricks production unit in proprietorship at Malia Gora, Naubatpur, Danapur, Patna.

1632 M/S Om Sai Ram Bricks Pvt. Ltd., Patna.

Proposal for establishment of 2250000 Pieces per year capacity Fly Ash Bricks production unit at Bakhtiyarpur, Barh, Patna.

1.1338 14 05.03.14

1633 M/S Gwala Cattle Feeds Pvt. Ltd., New Delhi.

Proposal for establishment of 60,000 MT per year capacity Cattle/Poultry Feed unit at Navanagar, Buxar.

19.4000 25 05.03.14

1634 M/S Amrapali Biotech India pvt. Ltd., New Delhi.

Proposal for establishment of 12,000 MT per year capacity Fruits and Vegetable Processing unit at Navanagar, Buxar.

24.2500 100 05.03.14

1635 M/S Ganga Agro Product & Polytubes Pvt. Ltd., Hajipur.

Proposal for capacity expansion of existing unit of H.D.P.E Pipe and Rigid Pipe from 48459 Kg. per year capacity to 124568 Kg. per year capacity at Industrial Area, Hajipur, Vaishali.

2.0776 05.03.14

1636 M/S Vishnu Agro Food Processing Pvt. Ltd., Saharsa.

Proposal for establishment of 2400 MT per year capacity Rice Mill at Baijnathpur, Saharsa.

1.1960 24 05.03.14

1637 M/S Tota Rai Food Products, Patna.

Proposal for establishment of 60 MT per day capacity Atta Chakki unit in proprietorship at Industrial Area, Fatuha, Patna.

2.1570 29 05.03.14

1638 M/S Model Foods & Bakery, Bhagalpur.

Proposal for establishment of Bakery unit in proprietorship at Large Industrial Estate, Barari, Bhagalpur.

1.3308 13 05.03.14

1639 M/S Samastipur Frozen Foods Pvt. Ltd., Samastipur.

Proposal for establishment of 6970 MT per year capacity Fruits and Vegetable Processing unit at Virsingpur, Kalyanpur, Samastipur.

17.7442 90 05.03.14

1640 M/S Maa Janki Toofan Agro Industries Pvt. Ltd., Begusarai.

Proposal for establishment of 10,000 MT Cold Storage and other Components under R.A.B.C. at Bhawanipur, Mansurchak, Begusarai.

10.5818 31 05.03.14 (Consent with Condition)

1641 M/S Paverick Works Manufacturing Pvt. Ltd., Mumbai.

Proposal for establishment of 156 Lakh pieces per year capacity Concrete Block, Semi Hollow Concrete Block, Interlocking Blocks, Pavers Retaining Wall Block, Window Frame and Tiles production unit at Bihta, Patna.

5.6541 18 05.03.14

1642 M/S Maa Durga Rice Mill, Bhojpur. (Approval has been given on proposal for change of capacity for 04 MT Rice Mill unit at Kohra, Sonpur, Udwantnagar, Bhojpur in place of earlier approved 6000 MT per year capacity Rice Mill unit in partnership in SIPB meeting held on 11.06.14.)

Proposal for establishment of 04 MT Rice Mill unit in partnership at Kohra, Sonpur, Udwantnagar, Bhojpur.

4.5100 15 05.03.14

11.06.14

1643 M/S Vaishnavi Industries, Darbhanga.

Proposal for establishment of 3855 MT per year capacity Rice Poha, Rice Murhi, Sattu, Besan, Spices,

1.7963 39 05.03.14

Page 137: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

137 Edible Oil and Re-Packing unit in partnership at Plot No.- B-4, B-5, B-6, New Industrial Estate, Bela, Darbhanga.

1644 M/S J A Udyog Pvt. Ltd., Sitamarhi.

Proposal for establishment of 19,200 MT per year capacity Whole Wheat Atta Chakki unit at Bariyarpur, Near Barapokhar, Sitamarhi.

3.9753 45 05.03.14

1645 M/S Asha Construction Pvt. Ltd., Patna.

Proposal for establishment of 60 Lakh pieces per year capacity Fly Ash Bricks production unit at Fatehpur, Gaurichak, Patna.

1.6785 18 05.03.14

1646 M/S Aastha Agro Industries Pvt. Ltd., Sitamarhi.

Proposal for establishment of 10,000 MT cold Storage and other Components under R.A.B.C. at Chorapuri, Sitamarhi.

9.6118 31 05.03.14 (Consent with Condition)

1647 M/S Raj Kumar Hatcheries & Farming Pvt. Ltd., Vaishali. (Earlier on 05.03.14 SIPB meeting, approval was given on proposal for capacity expansion of existing Hatchery unit from 46,000 pieces per year capacity to 4,50,000 pieces per year capacity at Industrial Area, Hajipur, Vaishali. Again approval has been given on amended proposal of capacity expansion from 46,000 pieces per month to 4,50,000 pieces per month in SIPB meeting held on 29.01.15.)

Proposal for capacity expansion of existing Hatchery unit from 46,000 Chicks per month to 4,50,000 per month at Industrial Area, Hajipur, Vaishali.

24.5500

25

05.03.14 29.01.15

1648 M/S Nutrifarm Foods Pvt. Ltd., Patna.

Proposal for establishment of 29,232 MT per year capacity Parboiled Rice Mill at Sima, Jalalgarh, Purnea.

24.5500 48 05.03.14

1649 M/S Shree Samridhi Agro Pvt. Ltd., Raxaul, East Champaran.

Proposal for establishment of 29,232 MT per year capacity Parboiled Rice Mill at Champapur, Ramgardhwa, Raxaul, East Champaran.

23.7900 69 05.03.14

1650 M/S Umageshwari Rice Mill, Aurangabad.

Proposal for establishment of 03 MT per hour Rice Mill in partnership at Kusa Road, Deo More, Madanpur, Aurangabad.

1.2440 15 05.03.14

1651 M/S Yanoma Food Products, Patna.

Proposal for establishment of 03 MT per hour Mustard Oil production unit in proprietorship at Nasariganj, Danapur, Patna.

4.0100 28 05.03.14

1652 M/S Maa Janki Enterprises, Vaishali.

Proposal for establishment of 14,400 MT Parboiled Rice Mill in proprietorship at Chhitrauli, Bhagwanpur, Vaishali.

3.9060 36 05.03.14

1653 M/S Maa Mundeshwari agrotech Pvt. Ltd., Bhabhua, Kaimur.

Proposal for establishment of 19,200 MT per year capacity Arwa Rice Mill at Bhadaula, Kudra, Kaimur.

4.9121 34 05.03.14

1654 M/S J.G. Foundry Ltd., Patna.

Proposal for capacity expansion of existing M.S. Ingot unit from 21,600 MT per year capacity to 43,200 MT per year capacity at Chimochak, Kothiya, Didarganj, Patna City, Patna.

6.2327 12 05.03.14

Page 138: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

138 1655 M/S Baba Ganeshwar Nath

Agrotech Pvt. Ltd., Rohtas. Proposal for establishment of 04 MT per hour Modern Arwa Rice Mill at Rohtas.

3.2550 15 05.03.14

1656 M/S Triveni Smelter Pvt. Ltd., Patna.

Proposal for capacity expansion of existing M.S. Ingot unit from 39,600 MT per year capacity to 59,400 MT per year capacity at Industrial Area, Fatuha, Patna.

5.2567 21 05.03.14

1657 M/S A.V. Ispat Pvt. Ltd., Patna.

Proposal for establishment of 80,000 MT per year capacity H.R. Sheet, C.R. Sheet and G.P. Coil processing unit at Agamkuan, Patna.

6.2000 14 05.03.14

1658 M/S Maa Parwati Ricetech Pvt. Ltd., Rohtas. (Approval has been given on proposal for change of capacity and place in SIPB meeting held on 17.07.14.)

Proposal for establishment of 04 MT per hour Arwa Rice Mill at Saraiya Panchayat, Vill.-Harnathpur, Kochas, Rohtas.

4.9100 15 05.03.14

17.07.14

1659 M/S Kushwaha Mini Rice Mill, Bhojpur.

Proposal for establishment of 8,000 MT per year capacity Rice Mill in proprietorship at Industrial Area, Bihiya, Bhojpur.

1.0683 15 05.03.14

1660 M/S Bihar Ma Durga Agro Industries Pvt. Ltd., Samastipur.

Proposal for establishment of 3900 MT per year capacity Agriculture Implement unit at Industrial Area, Pandaul, Madhubani.

8.5289 88 05.03.14

1661 M/S Raj Kumar Agro Pvt. Ltd., Vaishali.

Proposal for establishment of 08 MT per hour Poultry Feed unit at A-3, E.P.I.P. Industrial Area, Hajipur, Vaishali.

13.3000 41 05.03.14

1662 M/S Vaishnavi Rice Mill Pvt. Ltd., Rohtas. (Approval has been given on

proposal for change of capacity in SIPB meeting

held on 17.07.14.)

Proposal for establishment of 06 MT per hour Parboiled Rice Mill at Sariao, Nokha, Rohtas.

5.6000 40 05.03.14

17.07.14

1663 M/S Maa Gayatri Agro Pvt. Ltd., Rohtas.

Proposal for establishment of 04 MT per hour Arwa Rice Mill at Sawanbahar, Karghar, Rohtas.

4.7500 20 05.03.14

1664 M/S Rajshree Agro Product Pvt. Ltd., Bhojpur.

Proposal for establishment of 06 MT per hour Parboiled and 04 MT per hour Arwa Rice Mill at Akwana, Tetrai, Udwantnagar, Bhojpur.

9.7422 70 05.03.14

1665 M/S Ganga Agro Mills Pvt. Ltd., Buxar.

Proposal for establishment of 19,200 MT per year capacity Rice Mill at Parwatchak, Dhansoi, Buxar.

4.3600 20 05.03.14

1666 M/S Arwa Rice Mill Pvt. Ltd., Aurangabad.

Proposal for establishment of 7680 MT per year capacity Arwa Rice Mill at Karmakala, Tarar, Daudnagar, Aurangabad.

2.6975 28 05.03.14

1667 M/S Vishnu Priya Agro Industries, Gaya.

Proposal for establishment of 19,200 MT per year capacity Rice Mill in partnership at Parsawan Konch, Gaya.

3.8948 8 05.03.14

1668 M/S Shree Shyam Foods, Hajipur, Vaishali.

Proposal for establishment of 4.80 Lakh Kg. per year capacity Extruded Snacks/Puff/ Kurkure production unit in partnership at Industrial Area, Hajipur, Vaishali.

1.2420 29 05.03.14

1669 M/S Magadh Industries Pvt. Proposal for establishment of 01 17.0068 89 05.03.14

Page 139: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

139 Ltd., Patna. Lakh MT per year capacity Automatic

Re-rolling Mill unit at Abdul Rahmanpur Road, Didarganj, Patna City, Patna.

1670 M/S SRS Satyam Foods Pvt. Ltd., Gaya.

Proposal for establishment of 19,200 MT per year capacity Rice Mill at Manjaur, Warsaliganj, Nawada.

4.7241 47 05.03.14

1671 M/S Jyoti Household Products Pvt. Ltd., Patna.

Proposal for establishment of 900 MT per year capacity Household Plastic Product production unit at Patna.

5.2500 18 05.03.14

1672 M/S Rajarvind Techno & Services Pvt. Ltd., Rohtas.

Proposal for establishment of 38,400 MT per year capacity Rice Mill at Babhni, Kargahar, Rohtas.

12.1000 30 05.03.14

1673 M/S Trycon Infrastructure Pvt. Ltd., Patna.

Proposal for establishment of 38,400 MT per year capacity Rice Mill at Jagdishpur, Bhojpur.

17.0380 30 05.03.14 (Consent with Condition)

1674 M/S Akshara Agro Pvt. Ltd., Patna.

Proposal for establishment of 7200 MT per year capacity Cattle Feed unit at Gulabchak, Hilsa, Nalanda.

1.8270 20 05.03.14

1675 M/S Anjali Agrotech Pvt. Ltd., Gaya.

Proposal for establishment 24,000 MT per year capacity Rice Mill at Bhalua Dobhi, Gaya.

14.8112 25 05.03.14

1676 M/S Chowk Foods Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 200 MT per day capacity Flour Mill unit either on private land or BIADA land at Muzaffarpur.

18.0000 35 05.03.14 (Consent with Condition)

1677 M/S Magadh Fabrics, Nalanda.

Proposal for establishment of 3.60 lakh meters per year capacity Fabrics Clothes production unit in partnership at Ghostava,Silao, Nalanda.

1.3000 28 11.06.14

1678 M/S Aditya Agro Industries, Sheikhpura.

Proposal for establishment of 60 Ton per day capacity Whole Wheat Flour Mill unit in proprietorship at Ahiyapur, Shivshakti, Bypass Road, Shekhpura.

2.8437 15 11.06.14

1679 M/S Naraini Pashu Aahar Industries Pvt. Ltd., Bettiah

Proposal for establishment of 32 MT per day capacity Cattle Feed unit at Industrial Area, Bettiah.

2.8357 31 11.06.14

1680 M/S Dev Pragya Enterprises, Purnea.

Proposal for establishment of 9000 pieces per year capacity R.C.C. Pillars, 36 Lakh pieces per year capacity Fly Ash Bricks and 30,000 Square Meter per year capacity Interlocking Paving Blocks production unit in Partnership at Industrial Growth Centre, Maranga, Purnea.

1.0350 22 11.06.14

1681 M/S Omdev packaging, Patna.

Proposal for establishment of 600 MT per year capacity Corrugated Boxes and Paper production unit in proprietorship at Industrial Area, Hajipur.

2.7797 19 11.06.14

1682 M/S Annpurna Disposable Pvt. Ltd., Purnea.

Proposal for establishment of 10,000 K.G. per hour capacity Polypropylene Disposable Products production unit at Gulabbag, Purnea.

2.3540 10 11.06.14

1683 M/S Ridhisiddhi Agri (Power) Ltd., Madhepura.

Proposal for establishment of 5760 MT per year capacity Briquettes/Bio Fuels production unit at Alamnagar,

1.6590 28 11.06.14

Page 140: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

140 Madhepura.

1684 M/S Rama Plastic Udyog, Siwan.

Proposal for establishment of 300 MT per year capacity P.V.C. Rigid Pipe production unit in proprietorship at Industrial Area, Hajipur, Vaishali.

1.3134 11 11.06.14

1685 M/S Maa Mathin Dal Mill, Bhojpur.

Proposal for establishment of 15,000 MT per year capacity Dal Mill unit in proprietorship at Industrial Area, Bihiya, Bhojpur.

1.0280 21 11.06.14

1686 M/S Jagdamba Agro Mill Pvt. Ltd., Patna.

Proposal for establishment of 57,600 MT per year(12 Ton per hour) capacity Modern Rice Mill at Gadhbanaily, Kasba, Purnea.

26.1600 59 11.06.14

1687 M/S Bajrang Rice Mill, Purnea.

Proposal for establishment of 02 MT per hour Modern Arwa Rice Mill in proprietorship at Abadullahnagar, Purnea.

1.4092 20 11.06.14

1688 M/S Osho Rice Mill, Kaimur. Proposal for establishment of 04 MT per hour Arwa Rice Mill in proprietorship at Chandui, Kudra.

2.8490 20 11.06.14

1689 M/S S.A.I. Rice Mills, Raxaul. Proposal for establishment of 7200 MT per year capacity Arwa Rice Mill in proprietorship at Kanan (Laxmipur), East Champaran.

3.1200 27 11.06.14

1690 M/S Jai Matadi Mini Rice Mill, Rohtas.

Proposal for establishment of 9600 MT per year capacity Rice Mill unit in proprietorship at Balia, Sarwan, Bikramganj, Rohtas.

1.9096 20 11.06.14

1691 MS Samsun Electro Control, Vaishali.

Proposal for establishment of 2400 pieces per year capacity of 440 volts and 215 volts Electrical Control Panel production unit in partnership at Industrial Area, Hajipur, Vaishali.

1.3320 17 11.06.14

1692 MS Maa Ashkamni Rice Mill, Rohtas.

Proposal for establishment of 7200 MT per year capacity Arwa Rice Mill in proprietorship at Khelariya, Bikramganj, Rohtas.

1.1135 10 11.06.14

1693 MS Manas Rice Mill, Banka. Proposal for establishment of 04 MT per hour capacity Arwa Rice Mill in proprietorship at Amarpur, Banka.

2.4178 11 11.06.14

1694 MS Aaryapoorna Brick (H.U.F), Patna.

Proposal for establishment of 6,000 MT per year capacity Fly Ash Bricks and 60,000 Square Meter per year capacity Pavers Block production unit in proprietorship at Selgarh, Saidabad, Ranitalab, Kanpa, Bikram, Patna.

1.0260 24 11.06.14

1695 MS Ramayraman Foods Pvt. Ltd., Varanasi.

Proposal for establishment of 50,400 MT(8MT per hour) per year capacity Modern Rice Mill unit at Chandan, Banka.

21.6520 69 11.06.14

1696 MS V.K. Rice Processing Pvt. Ltd, Gaya.

Proposal for establishment of 04 MT per hour Parboiled Rice Mill at Amwa, Bodhgaya, Gaya.

10.1901 43 11.06.14

1697 MS Ravisuman Agro Industries Pvt. Ltd., East Champaran.

Proposal for establishment of 04 MT per hour capacity Modern Arwa Rice Mill unit at Charrahiya, Areraj, East Champaran.

3.1546 19 11.06.14

1698 MS Global Agri Products Pvt. Ltd., Patna.

Proposal for establishment of 08 MT per hour Modern Parboiled Rice Mill at Kaithi Siro, Goh, Aurangabad.

14.8400 30 11.06.14

Page 141: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

141 1699 M/S Venky Ferrous India Pvt.

Ltd., Begusarai. Proposal for establishment of 15,000 MT per year capacity MS Ingot & Billet and TMT Bar production unit at Phulwaria, Barauni, Begusarai.

4.9791 46 11.06.14

1700 M/S Sidhashram Rice Mills Cluster Pvt. Ltd., Buxar.

Proposal for capacity expansion of 12 MT per hour (Rice Mill) and 01 MW (Captive Power Plant) in the existing 10 MT per hour Modern Parboiled Rice Mill and 02 MW Captive Co-Generation Power Plant at Rambagh, Buxar.

14.5150 50 11.06.14

1701 M/S KBA Agrotech Pvt. Ltd., Bhagalpur.

Proposal for establishment of 38,400 MT per year capacity Parboiled Rice Mill at Muhammadchak, Jagdishpur, Bhagalpur.

18.0100 59 11.06.14

1702 M/S Abhishek Rice Mill Pvt. Ltd., Vaishali.

Proposal for establishment of 19,200 MT per year capacity Arwa Rice Mill unit at Rasulpur, Piroy, Goraul, Vaishali.

2.5065 31 11.06.14

1703 M/S M.S. Enterprises, Purnea.

Proposal for establishment of 84 Lakh litters per year capacity Packaged Drinking Water unit in proprietorship at Ranipatra, Purnea.

1.4800 26 11.06.14 (Consent

with Condition)

1704 M/S Gurukripa Wovensack Pvt. Ltd., Varanasi.

Proposal for establishment of 38.40 Lakh K.G. per year capacity P.V.C. Pipes production unit at Kurari, Durgawati, Kaimur.

7.3800 18 11.06.14

1705 M/S Laxmi Food Products, Kaimur.

Proposal for establishment of 4800 MT per year capacity Cattle Feed unit in proprietorship at Ramgardh, Kaimur.

2.3848 30 11.06.14

1706 M/S Nand Rani Food Products, Patna.

Proposal for establishment of 7200 MT per year capacity Arwa Rice Mill in proprietorship at Gyaspur, Maner, Patna.

1.5150 25 11.06.14

1707 M/S Impex Agro Pvt. Ltd., Begusarai.

Proposal for establishment of 5000 MT per year capacity Bio Fertilizer production unit at Parihara, Begusarai.

1.2080 35 11.06.14

1708 M/S Shanti Rice Mill, Katihar. Proposal for establishment of 64 MT per day capacity Arwa Rice Mill unit in proprietorship.

3.5842 31 11.06.14

1709 M/S Agrawal Rotoplast Pvt. Ltd., Patna.

Proposal for establishment of 1200 MT per year capacity Roto Moulded Plastic and Water Storage Tank at Industrial Area, Hajipur, Vaishali.

4.6350 23 11.06.14

1710 M/S Neel Kamal Steels Pvt. Ltd., Patna. (Unit-2),

Proposal for establishment of 36,000 MT per year capacity M.S Billet at Sabalpur, Deedarganj, Patna-City, Patna.

9.9825 30 11.06.14

1711 M/S Shiv Shakti Agro Food Products, Patna.

Proposal for establishment of 1200 MT per year capacity Soya Nuggets Production unit in proprietorship at Baikunthpur, Khusrupur, Patna.

1.4220 27 11.06.14

1712 M/S Pratik Industries, Muzaffarpur, (unit-2)

Proposal for establishment of 1000 Litre per hour Fruit Drink Plant in proprietorship at Industrial Area, Bela, Muzaffarpur.

7.5000 40 11.06.14 (Consent

with Condition)

1713 M/S Kumar Enterprises, Samastipur

Proposal for establishment of 19,200 MT per year capacity Parboiled Rice Mill in proprietorship at Veersinghpur Chowk, Samastipur.

5.7213 18 11.06.14

Page 142: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

142 1714 M/S Venky Steels Pvt. Ltd.,

Patna. Proposal for capacity expansion of existing unit of M.S. Billet and Ingot from 6600 MT per year capacity to 20,000 MT per year capacity at N.H- 31, Bypass Road, Belauri, Purnea.

11.4000 48 11.06.14

1715 M/S Kumkum Pashuaahar Pvt. Ltd., Kaimur.

Proposal for establishment of 02 MT per hour Cattle Feed unit at Nonar, Ramgarh, Kaimur.

3.6822 30 11.06.14

1716 M/S RPC Projects Pvt. Ltd., Patna.

Proposal for establishment of 24.02 Lakh Pieces per year capacity Fly Ash Bricks production unit at Gaura Jagdishpur, Dariyapur, Naubatpur, Patna.

1.6125 26 11.06.14

1717 M/S Mani Agro, Barauni. Proposal for establishment of 19,200 MT per year capacity Flour Mill unit in proprietorship at Phulwariya, Begusarai.

3.5932 31 11.06.14

1718 M/S Jay Maharani Rajnandni Industries, Kaimur.

Proposal for establishment of 03 MT per hour Arwa Rice Mill unit in proprietorship at Satowanti, Nuaw, Kaimur.

2.1626 11 11.06.14

1719 M/S Arihant Beverages, Darbhanga.

Proposal for establishment of 72 Lac Liters per year capacity Packaged Drinking Water unit in partnership at Basudeopur, Darbhanga.

1.7642 17 11.06.14 (Consent

with Condition)

1720 M/S Swarnbhoomi International Pvt. Ltd., Uttar Pradesh.

Proposal for establishment of 80,000 pieces per year capacity Plastic Water Storage Tank production unit at Kurari, Mohania, Kaimur.

9.2559 20 11.06.14

1721 M/S Amritashway Stambh Udyog LLP, Patna.

Proposal for establishment of 57,600 pieces per year capacity P.S.C. Pole production unit in partnership at N.H-57, Pachgachhia, Khaira, Araria.

2.6586 118 11.06.14

1722 M/S Shubh Ashirvad Foods Pvt. Ltd., Patna.

Proposal for establishment of 28,800 MT per year capacity Parboiled Rice Mill at Erai, Fatuha, Patna City, Patna.

12.9870 40 11.06.14

1723 M/S Sangita Inpo & Electricals Pvt. Ltd., Saharsa.

Proposal for establishment of 1000 pieces per year capacity Electric Motors, Generators and Transformers production unit at Chandour, Thana no-106, Saur Bazar, Saharsa.

2.8200 64 11.06.14

1724 M/S Duratech Cements India Limited, Maharashtra, (Approval has been given on proposal for change of place from Kanti Road Muzaffarpur to Tajpur, Samastipur in SIPB meeting held on 29.01.15.)

Proposal for establishment of 06 lakh MT per year capacity Cement Lime and Plaster production unit at Tajpur, Samastipur.

60.0000

140

11.06.14 29.01.15

1725 M/S ITC Limited, Munger. Proposal for establishment of 400 K .W.P. Captive Roof Top Solar Power Project in the existing unit at Munger.

223.6772 11.06.14

1726 M/S Ultra Strong Cement Pvt. Ltd., Patna.

Proposal for establishment of 75000 MT per year capacity Mini Cement Plant unit at Plot No. A-6, Phase -1, Fatuha Industrial Area.

5.0185 21 11.06.14

1727 M/S Ganga Memorial Educational and Development Society, Patna.

Proposal for establishment of Polytechnic College at Kharuar, Harnaut, Nalanda.

23.4866 81 11.06.14

1728 M/S Classic Flour Mill, Madhubani.

Proposal for establishment of 52.00 Quintal per day capacity Flour Mill

1.3200 23 11.06.14

Page 143: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

143 unit in proprietorship at Sunderpur, Basopatti, Madhubani.

1729 M/S Ankita Polytubes Pvt. Ltd., Patna.

Proposal for establishment of 15000 MT per year capacity P.V.C., S.W.R. Pipes production unit at Mirchak, Kothiya, Didarganj, Patna City, Patna.

1.7892 35 11.06.14

1730 M/S Maa Janki Agro Pvt. Ltd., East Champaran.

Proposal for establishment of 19000 MT per year capacity Arwa Rice Mill at Bakhri, East Champaran.

5.0138 20 11.06.14

1731 M/S Muni Vishwamitra Rice Mill., Buxar.

Proposal for establishment of 96000 MT per year capacity Rice Mill in partnership at Buxar.

18.3933 98 11.06.14

1732 M/S Maa Durgeshwari Metal Products Pvt. Ltd., Patna.

Proposal for establishment of 60 Lakh pieces per year capacity Fly Ash Bricks and 30000 Sq. Mt. per year capacity Pavers Block production unit at Industrial Area, Fatuha, Patna.

1.1574 11.06.14

1733 M/S Anand Steemet India Pvt. Ltd., Patna.

Proposal for establishment of I.T. Park at Patliputra Industrial Area, Patna.

11.3011 130 11.06.14

1734 M/S Triveni Educational Trust, Patna.

Proposal for establishment of I.T.I. Institute at Industrial Area, Patliputra, Patna.

1.1000 19 11.06.14

1735 M/S Ram Jag Singh Memorial Trust, Rohtas.

Proposal for establishment of B.Ed. College at Bastipur, Anchal, Dehri, Rohtas.

2.5540 20 11.06.14

1736 M/S Jai Maa Kali Emu Farming & Hatchery Enterprises, Ara.

Proposal for establishment of Emu Farming and Hatchery unit at Growth Centre Giddha, Bhojpur.

1.1989 10 11.06.14 (Consent

with suggestion)

1737 M/S Saha & Bright Polytech Pvt. Ltd., Patna.

Proposal for establishment of Disposal Thermocol Plate and Dona production unit at Khirodharpur, Khusrupur, Patna.

3.7600 31 17.07.14

1738 M/S Chandan Modern Rice Mill Pvt. Ltd., Kaimur.

Proposal for establishment of 05 MT per hour Modern Rice Mill unit at Sizua Kala, Ramgarh, Kaimur.

6.3832 24 17.07.14

1739 M/S Sakshi Riya Modern Rice Mill Pvt. Ltd., Ramgarh, Kaimur.

Proposal for establishment of 05 MT per hour Modern Rice Mill unit at Darwan, Ramgarh, Kaimur.

5.6441 24 17.07.14

1740 M/S Maximus Foods Pvt. Ltd., New Delhi.

Proposal for establishment of 30,000 MT per year capacity Meat Processing unit at Basantpur, Kushar, Araria.

16.0000 150 17.07.14

1741 M/S Golcha Udyog, Araria. Proposal for capacity expansion from 04 MT per hour to 10 MT per hour in the existing unit of Rice Mill in partnership at Forbesganj, Araria.

14.9000 25 17.07.14

1742 M/S JVL Food Park Pvt. Ltd., Varanasi. (Change of name from M/S JVL Food Park Pvt. Ltd. to M/S JVL Mega Food Park Pvt. Ltd. has been noted by SIPB in its meeting held on 23.09.14.)

Proposal for establishment of Private Industrial Park and Mega Food Park at Jorawarpur, Dehri/Akhorigola, Rohtas.

158.3800 4 17.07.14

23.09.14 (Noted in

SIPB meeting)

1743 M/S Hindustan Media Ventures Ltd., New Delhi.

Proposal for establishment of 45,000x355 Pieces per year capacity

14.0000 70 17.07.14

Page 144: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

144 New Paper Publishing unit at Chhotki Nawada, Gaya.

1744 M/S Cadeberg Foods India Pvt. Ltd., Patna.

Proposal for establishment of 1500 MT per year capacity Bakery Product unit at Sonaru, Fatuha, Patna.

3.9545 15 17.07.14

1745 M/S Vikash Goldi Modern Rice Mill Pvt. Ltd., Kaimur.

Proposal for establishment of 03 MT per hour Parboiled Rice Mill at

Dadwa, Mohania, Kaimur.

3.2000 24 17.07.14

1746 M/S Shree Ram Agronomy Pvt. Ltd., Patna.

Proposal for establishment of 04 MT per hour Rice Mill at Mukundpur,

Purkhauli, Vaishali.

10.8360 74 17.07.14

1747 M/S R.N.S. Enterprises Pvt. Ltd., Vaishali.

Proposal for establishment of 49.50 Lakh Pieces per year capacity Fly

Ash Bricks production unit at Khilwat, Bidupur, Hajipur, Vaishali.

1.1200 18 17.07.14

1748 M/S Sri Sai Industries, Aurangabad.

Proposal for establishment of 8,640 MT per year capacity Re-rolling Mill

unit in proprietorship at Poywa, Pachrukhiya Road Dehri,

Aurangabad.

2.9250 46 17.07.14

1749 M/S Maa Mundeshwari Rice Mill, Kaimur.

Proposal for establishment of 03 MT per hour capacity Arwa Rice Mill in proprietorship at Baheriya Road,

Dulhi Chainpur, Kaimur.

2.3588 17 17.07.14

1750 M/S Globus Bottling (A unit of Globus spirits Ltd.), New Delhi. (Change of Place has been noted by SIPB in its meeting held on 20.08.14)

Proposal for establishment of 03 Lakh Cases per year capacity I.M.F.L Bottling Plant at Vill.-Dhadhua, Block-Jandaha, Dist.-Vaishali in place of Panapur, Deosari, Vaishali.

15.5400 90 17.07.14 (Consent

with Condition)

20.08.14 (Noted in

SIPB meeting)

1751 M/S Vaishnavi Agro Industries Pvt. Ltd.,

Muzaffarpur.

Proposal for establishment of 28,800 MT per year (06 MT per day)

capacity Modern Parboiled Rice Mill at Simrahan, Chaturbhuj Jhapha,

Bochahan, Ahiyarpur, Muzaffarpur.

14.4194 20 17.07.14

1752 M/S Sai Iron (India) Ltd., Kolkata.

Proposal for capacity expansion of 3000 MT in the existing unit of

Iron/Steel Angle, Channel, Patti and Rod Production at Sabalpur, Didarganj, Patna City, Patna.

1.0600 44 17.07.14 (Consent

with Condition)

1753 M/S Balaji Namkeen Udyog, Vaishali.

Proposal for establishment of 12,000 MT per year capacity Namkeen

Udyog (Salted Snacks and Potato Chips) production unit in

proprietorship at Lomatanda, Chakmadin, Jandaha, Hajipur.

Vaishali,

1.2313 20 17.07.14 (Consent

with Condition)

1754 M/S Satyam Chura Udyog, Vaishali.

Proposal for establishment of 3000 MT per year capacity Modern Rice

Flakes unit in partnership at Khirkhuwa, Warishpur, Bhagwanpur,

Vaishali.

1.1371 20 17.07.14 (Consent

with Condition)

1755 M/S Sagar Rice Mill, Madhubani.

Proposal for establishment of 2.5 MT per hour capacity Arwa Modern Rice

Mill in partnership at Manoharpur, Bentaparsa, Harlakhi, Madhubani.

2.0150 20 17.07.14

1756 M/S Mrigendra Cold Storage Pvt. Ltd., Begusarai.

Proposal for capacity expansion of existing Cold Storage from 7000 MT

to 11,500 MT under R.A.B.C. at

11.6237 50 17.07.14

Page 145: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

145 Rajaura, Barauni, Begusarai.

1757 M/S Bibhav Motors Pvt. Ltd., Bhagalpur.

Proposal for establishment of Service Industry for Repairing of Vehicle at Marwa, Chhai, Bihpur,

Bhagalpur.

1.0052 24 17.07.14 (Consent

with Condition)

1758 M/S Sahu Agro Business Pvt. Ltd., Bhagalpur.

Proposal for establishment of 100 MT per day capacity Maize

Processing unit at Sahu Parbatta, Bhagalpur.

14.0000 70 17.07.14

1759 M/S Hotel Kapil, Promoter- Satendra

Construction Gaya Pvt. Ltd., Gaya.

Proposal for establishment of 33 Rooms Hotel at Rasulpur, Manpur,

Gaya.

2.8481 20 17.07.14

1760 M/S Jai Gurudeo Agro Foods Pvt. Ltd., Aurangabad.

Proposal for establishment of 04 MT per hour Parboiled Rice Mill at Fesra,

Aurangabad.

6.4774 15 17.07.14

1761 M/S Samta Bricks, Patna Proposal for establishment of 6000 MT per year capacity Fly Ash Bricks and 60,000 Sq. Mt. per year capacity Pavers Block production unit in proprietorship at Brahamchari, Sherpur, Maner, Patna.

1.0260 24 17.07.14

1762 M/S Giriraj Enterprises, Ahmednagar, Maharashtra.

Proposal for establishment of 30 Megawatt Power Generation Project from Solar P.V. Module in partnership at Makhdumpur, Jehanabad.

300.0000 150 17.07.14

1763 M/S Shree Ganga Jee Rice Mill, Bhojpur.

Proposal for establishment of 03 MT per hour capacity Parboiled Rice Mill in partnership at Majhiao, Hasan Bazar, Pero, Bhojpur.

5.3770 34 17.07.14

1764 M/S Aryan Food Products, Patna.

Proposal for establishment of 7200 MT per year capacity Soya Nuggets production unit in proprietorship at Dasratha, Phulwarisharif, New By-pass Road, Patna.

1.6109 14 17.07.14

1765 M/S Maa Sharda Rice Mill, Sheikhpura.

Proposal for establishment of 19,200 MT per year (4 MT per hour) Parboiled Rice Mill in proprietorship at Ariyari, Brindawan, Sheikhpura.

3.5000 31 17.07.14

1766 M/S Ganga Sriram Hitech Agro Pvt. Ltd., Nalanda.

Proposal for establishment of 28,800 MT (06 MT per hour) capacity Modern Parboiled Rice Mill at Madhopur, Chandi, Nalanda.

13.9140 40 17.07.14

1767 M/S Achala Annapurna Agro Industries Pvt. Ltd., Samastipur.

Proposal for establishment of 04 MT per hour Arwa Rice Mill at Gangapur, Sarairanjan, Samastipur.

2.0791 25 17.07.14 (Consent

with Condition)

1768 M/S Modern Wilmer Refinery Pvt. Ltd.,

Proposal for establishment of 2,880 MT per year capacity Mustard Oil production unit at Industrial Area, Samastipur.

3.3354 35 17.07.14 (Consent

with Condition)

1769 M/S Sanjay Food Products, Bhojpur.

Proposal for establishment of 1500 MT per year capacity Atta, Besan, Sattu and Masala production unit in proprietorship at Industrial Area, Bihiyan, Bhojpur.

1.0350 28 17.07.14 (Consent

with Condition)

1770 M/S Raunak Trade & Agency Pvt. Ltd., Forbesganj.

Proposal for establishment of 24 MT per day capacity Biscuit Manufacturing unit at Forbesganj Industrial Area, Forbesganj.

9.1395 20 17.07.14

Page 146: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

146 1771 M/S Shyam Industries,

Patna. Proposal for establishment of 512 MT per year capacity Bakery unit in proprietorship at Industrial Area, Fatuha, Patna.

1.1120 17 17.07.14

1772 M/S Pam Tech, Ludhiyana, Punjab.

Proposal for establishment of Bicycle Parts production unit in proprietorship at Mega Industrial Park, Bihta, Patna.

6.4222 250 17.07.14

1773 M/S Mithila Rice Mill, Darbhanga.

Proposal for establishment of 9600 MT (02 MT per hour) capacity Rice Mill unit in proprietorship at Industrial Area, Donar, Darbhanga.

1.7830 20 17.07.14 (Consent

with Condition)

1774 M/S Surya Hatchery Pvt. Ltd., New Delhi.

Proposal for establishment of 10000 Eggs per hour capacity of Hachery unit at Growth Centre, Maranga, Purnea.

8.3410 15 17.07.14 (Consent

with Condition)

1775 M/S Synergy Ecotech Pvt. Ltd., Patna.

Proposal for establishment of 30 lakh pieces per year capacity Fly Ash Bricks production unit at Industrial Area, Fatuha, Patna.

1.2861 18 17.07.14 (Consent

with Condition)

1776 M/S Tel Fab Industries Pvt. Ltd., Patna.

Proposal for capacity expansion of existing unit of U.P.V.C., H.D.P.E. Suction Garden Hose Pipes from 10,500 MT per year capacity to 17,100 MT per year capacity at Industrial Estate, Hajipur, Vaishali.

2.7000 48 17.07.14

1777 M/S Banshi Air Gases Pvt. Ltd., Patna.

Proposal for capacity expansion of existing Oxygen, Co2, N2, N2O Gas production unit from 3600 Cubic meter per day to 9000 Cubic Meter per day capacity at Fatuha Industrial Area, Fatuha, Patna.

4.7758 19 17.07.14

1778 M/S Anmol Feeds Pvt. Ltd., Howrah.

Proposal for capacity expansion of existing unit of Poultry and Cattle Feed from 81,000 MT per year capacity to 1,23,000 MT per year capacity at Industrial Area, Muzaffarpur.

2.5000 17 17.07.14

1779 M/S Herbal Industries, Muzaffarpur.

Proposal for establishment of 15,000 MT per year capacity Poultry and Cattle Feed unit in proprietorship at Industrial Area Muzaffarpur.

2.5400 69 17.07.14

1780 M/S Ram Rahim Agro Industries Pvt. Ltd., Samastipur.

Proposal for establishment of 7200 MT per year capacity of Mustard Oil production unit at Udaipur, Rosra, Samastipur.

1.7331 17 20.08.14

1781 M/S Sri Sai Rice Mill, West Champaran.

Proposal for establishment of 04 MT per hour capacity of Arwa Rice Mill in proprietorship at Sisva, Saraiya, Bairiya, West Champaran.

1.7607 18 20.08.14

1782 M/S Kailashjee Agro Ventures Pvt. Ltd., Buxar.

Proposal for establishment of 04 MT per hour capacity of Modern Parboiled Rice Mill unit at Etarhi, Buxar.

5.1560 30 20.08.14

1783 M/S Shiv Vatika Agro Pvt. Ltd., Muzaffarpur.

Proposal for establishment of Canning and Bottling of Fruits and Vegetable unit at Hussainpur, Bochaha, Muzaffarpur.

1.5835 15 20.08.14

1784 M/S Shiva Poly Packaging Pvt. Ltd., Patna.

Proposal for establishment of two Unit, in the form of Unit-1 and Unit-2 for production of 8400 Lac pieces per year capacity of P.P. Caps and 46

10.5548 216 20.08.14

Page 147: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

147 Lac Kg per year capacity of Pet Preform at Pipra and Abdullahchak, Parsa, Sampatchak Road, Parsabazar, Patna.

1785 M/S C.R. Green Power Pvt. Ltd., Bolpur, West Bengal.

Proposal for establishment of 100 MT per day capacity of Modern Roller Flour Mill at Ibrahimpur, Saraiya, Muzaffarpur.

17.0500 20.08.14

1786 M/S Maitreyee Chemicals Industries Pvt. Ltd.,

Bolpur, West Bengal.

Proposal for establishment of 36000 MT per year capacity of Mustard Oil production unit at Ibrahimpur, Saraiya, Muzaffarpur.

26.5000 100 20.08.14

1787 M/S Padma Laxmi Shree Rice Mill Pvt. Ltd., Bolpur, West Bengal.

Proposal for establishment of 10 MT per hour Raw/Parboiled Rice Mill unit at Godhia Chaman, Bhagwanpur, Vaishali.

21.5900 60 20.08.14

1788 M/S Laxmishree Rice Mill Pvt. Ltd., Bolpur, Kolkata.

Proposal for establishment of 08 MT per hour Raw/Parboiled Rice Mill unit at Ibrahimpur, Saraiya, Muzaffarpur.

17.5000 50 20.08.14

1789 M/S Colin Mills Pvt. Ltd., Kolkata.

Proposal for establishment of 3150 MT per year capacity of Jute Cloths and Bags production unit at Raniganj, Forbesganj, Araria.

2.0000 20 20.08.14

1790 M/S Abhay Tea Pvt. Ltd., Darjeeling, West Bengal.

Proposal for establishment of 08 MT per hour Raw/Parboiled Rice Mill at Nejagach, Thakurganj, Kishanganj.

23.0300 77 20.08.14

1791 M/S Ranjan Rice Mill, Shekhpura.

Proposal for establishment of 03 MT per hour Arwa Rice Mill in proprietorship at Maheshpur, Chewra, Shekhpura.

1.5400 23 20.08.14

1792 M/S Akhilesh Feeds Pvt. Ltd., Chhapra, Saran.

Proposal for establishment of 20,000 MT per year capacity of Cattle Feed unit at Bankerwa, Parswan, Parsa, Chhapra.

12.8300 54 20.08.14

1793 M/S Mahadeo Rice Mill, West Champaran.

Proposal for establishment of 04 MT per hour Arwa Rice Mill unit in proprietorship at Marjadwa, Purushottampur, West Champaran.

2.4396 23 20.08.14

1794 M/S Adarsh & Sons, Gaya. Proposal for establishment of 60 Lac pieces per year capacity of Fly Ash Bricks production unit in partnership at Kujapi, Chandauti, Gaya.

1.7992 87 20.08.14

1795 M/S Jagran Prakashan Ltd., Patna.

Proposal for establishment of 355 Lac pieces per year capacity of News Paper, Books, Magazines Printing and Publishing unit at Umashankar Prasad Marg, Pani Ki Tanki Chowk, Ramna, Mithanpura, Muzaffarpur.

16.3000 66 20.08.14

1796 M/S Jagran Prakashan Ltd., Patna.

Proposal for establishment of 53 Lac pieces per year capacity of News Paper, Books, Magazine Printing and Publishing unit at Chotki Nawada, Ramsheela Road, Gaya Cotton and Jute Mill, Gaya.

13.0700 35 20.08.14

1797 M/S J P Spice Pvt. Ltd., Raxaul.

Proposal for capacity expansion from 240 MT per year capacity to 600 MT per year capacity of existing unit of Masala Udyog at Kanana, Raxaul.

1.0776 15 20.08.14

1798 M/S Sarswati Agro Rice Mill Pvt. Ltd, Rohtas.

Proposal for establishment of 04 MT per hour capacity of Rice Mill unit at Dharpur, Bikramganj, Rohtas.

4.0273 10 20.08.14

Page 148: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

148 1799 M/S Himanshu Agro Rice

Mill, Bhojpur. Proposal for establishment of 04 MT per hour Rice Mill in proprietorship at Mahabir Tola, Garhni, Ara, Bhojpur.

3.7273 10 20.08.14

1800 M/S Trishakti Agro Industries, Sitamarhi.

Proposal for establishment of 02 MT per hour capacity of Rice Mill unit in proprietorship at Bhorha, Sitamarhi.

1.2979 6 20.08.14

1801 M/S New Maa Sharde Rice Mill, Nalanda.

Proposal for establishment of 04 MT per hour capacity of Arwa Rice Mill unit in proprietorship at Sima, Silao, Nalanda.

3.0380 11 20.08.14

1802 M/S S.S. Kisan Agro Industries Pvt. Ltd., Gaya.

Proposal for establishment of 04 MT per hour capacity of Parboiled Rice Mill at Khiriyawa, Wazirganj, Gaya.

13.6800 24 20.08.14

1803 M/S Swastika Industries, Kishanganj.

Proposal for establishment of 1000 Litre per year capacity of Furnace Oil production unit from Waste Tyre Recycling in partnership at Dermari, Surajpur, Kochdhaman, Kishanganj.

1.3006 13 20.08.14

1804 M/S Devi Dal Mill Pvt. Ltd., Supaul.

Proposal for establishment of 72 MT per day capacity of Dal Mill unit at Bhavangama, Triveniganj, Supaul.

2.4130 31 20.08.14

1805 M/S Akash Rice Mill, Vaishali.

Proposal for establishment of 03 MT per hour capacity of Arwa Rice Mill unit in partnership at Amritpur, Vaishali.

2.1050 37 20.08.14

1806 M/S Gautam Sushil Rice Mill Pvt. Ltd., Nalanda.

Proposal for establishment of 7200 MT per year capacity of Rice Mill at Angari, Ekangarsarai, Nalanda.

3.8610 22 20.08.14

1807 M/S Khushi Agro Foods Pvt. Ltd., Nalanda.

Proposal for establishment of 06 MT per hour Arwa Rice Mill at Sare, Asthawan, Nalanda.

4.9190 25 20.08.14

1808 M/S Hazarika Polymers, Rohtas.

Proposal for establishment of 720 MT per year capacity of Plastic Granules production unit in proprietorship at Dehri, Akhorigola, Rohtas.

1.0317 20.08.14

1809 M/S Magadh Hitech Agro Foods, Aurangabad. (Approval has been given on the proposal for change of place in SIPB meeting held on 11.12.14.)

Proposal for establishment of 04 MT per hour Arwa Rice Mill in partnership at Vill.-Kusha, P.O.-Dadhati, Madanpur, Dist.-Aurangabad.

3.4290 34 20.08.14

11.12.14

1810 M/S Keshav Madhav Agro Enterprises Pvt. Ltd., Nawada.

Proposal for capacity expansion from 150 MT per day to 250 MT per day capacity of existing Roller Flour Mill at Fatehpur, Akabarpur, Nawada.

6.6200 30 20.08.14

1811 M/S Bajrang Rice Mill, Purnea.

Proposal for establishment of 02 MT per hour capacity of Arwa Rice Mill in proprietorship at Chandan Nagar(Abdullahnagar), Purnea.

1.3092 20 20.08.14

1812 M/S Sanjay Rice Mill, Darbhanga.

Proposal for establishment of 02 MT per hour capacity of Arwa Rice Mill unit in proprietorship at Tulapatti, Alinagar, Darbhanga.

1.3014 20 20.08.14

1813 M/S Shivam Agro Industries Pvt. Ltd., Shekhpura.

Proposal for establishment of 04 MT per hour capacity of Arwa Rice Mill at Maldah, Shekhpura.

4.3152 20 20.08.14

Page 149: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

149 1814 M/S Maa Maharani Rice Mill,

Nawada. Proposal for establishment of 06 MT per hour Raw/Parboiled Rice Mill in partnership at Maharath, Wajidpur, Nawada.

6.5220 30 20.08.14

1815 M/S Jai Mata Di Agency Pvt. Ltd., Muzaffarpur.

Proposal for establishment of manufacturing of LPG Cylinder at Rohua, Mushari, Muzaffarpur.

4.3100 17 20.08.14

1816 M/S Synrub Energy Solutions Pvt. Ltd., Nalanda.

Proposal for establishment of 9.60 Lac Litre per year capacity of Green Fuel Oil Extraction Plant from Waste Tyre at Mubarakpur, Nalanda.

1.0793 21 20.08.14

1817 M/S Magadh Fabrics Pvt. Ltd., Patna.

Proposal for establishment of 110.77 Lac pieces per year capacity of Fly Ash Bricks production unit at Painal, Bihta, Patna.

1.1179 24 20.08.14

1818 M/S Emerald Recycles Works, Patna.

Proposal for establishment of 2400 MT per year capacity of Crude, Carbon Black, Steel Oil production unit from Waste Tyre and Plastic Waste in proprietorship at Bhakhra, Sahobigha, Ghosi, Jehanabad.

1.1160 14 20.08.14

1819 M/S Pinax Steel Industries Pvt. Ltd., Patna.

Proposal for establishment of 3000 MT per year capacity of Cable Trays and Hand Rails production unit at Devkuli, Musepur, Bihta, Patna.

6.1608 33 20.08.14

1820 M/S Rising Homes, Patna. Proposal for establishment of 48 Lac pieces per year capacity of Fly Ash Bricks and 30000 Sq. Mt. per year capacity of Pavers Block production unit in partnership at Sabalpur, Didarganj, Patna City, Patna.

1.0440 21 20.08.14

1821 M/S Citizen Bikes, Ludhiana. Proposal for establishment of 38.73 Lac pieces per year capacity of Bicycle Parts production unit in partnership at Mega Industrial Park, Bihta, Patna.

10.1300 450 20.08.14

1822 M/S Cura Pharmaceuticals, Patna.

Proposal for establishment of Ayurvedic Medicine production unit in proprietorship at Industrial Area, Fatuha, Patna.

1.4236 80 20.08.14

1823 M/S Vikash Industries, Begusarai.

Proposal of diversification for establishment of 25000 MT per year capacity of Poultry Feed and Cattle Feed unit in existing unit of Paraffin Wax in proprietorship at Industrial Area, Barauni.

5.3062 49 20.08.14

1824 M/S Maa Radhika Enterprises, West Champaran.

Proposal for establishment of 04 MT per hour capacity of Arwa Rice Mill in proprietorship at Kumarbagh Industrial Area, West Champaran.

2.4865 23 20.08.14

1825 M/S Jagran Prakashan Ltd., Patna.

Proposal for establishment of 524 Lac pieces per year capacity of News Paper, Books and Magazine production and Publishing unit at Industrial Growth Centre , Barari, Bhagalpur.

27.6600 58 20.08.14

1826 M/S Shreya Tools Enterprises, Purnea.

Proposal for establishment of 4.5 Lac pieces per year capacity of Hand Tape(Threading Tape) and Round Dies production unit in proprietorship

1.4094 20 20.08.14

Page 150: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

150 at Industrial Growth Centre, Maranga, Purnea.

1827 M/S Shankar Flour Mill, Madhubani.

Proposal for establishment of 3600(12 MTPD) MT per year capacity of Flour Mill in proprietorship at Industrial Area, Pandaul, Madhubani.

1.0500 16 20.08.14 (Consent

with Condition)

1828 M/S Amrit Flour Mill, Sitamarhi.

Proposal for establishment of 50 MT per day capacity of Roller Flour Mill in proprietorship at Industrial Area, Sitamarhi.

6.5200 52 20.08.14

1829 M/S Indian Oil Corporation Ltd., Mumbai.

Proposal for establishment of 500 KW Captive Solar PV(Photo Voltaic) Power Plant at IOCL LPG Bottling Plant, Industrial Growth Centre, Giddha, Bhojpur.

4.5250 1 20.08.14 (Consent

with Condition)

1830 M/S Anuradha Iron Wire and Nail Industries, Hajipur, Vaishali.

Proposal for establishment of 1500 MT per year capacity of Iron Wire and Nails production unit in proprietorship at C-12(P), Industrial Area, Hajipur, Vaishali.

1.2837 17 20.08.14

1831 M/S Shiv Shakti Industries, Bhojpur.

Proposal for establishment of 18000 MT per year capacity of Wheat Flour Mill in partnership at Industrial Area, Bihiya, Bhojpur.

2.1827 40 20.08.14

1832 M/S Anurag Shitbhandar Pvt. Ltd., Patna.

Proposal for capacity expansion of 3400 MT in the existing 3300 MT Cold Storage under R.A.B.C. at Kasbeahar, Tajpur, Samastipur.

5.7100 50 20.08.14

1833 M/S Aradhya Enterprises, Hajipur.

Proposal for establishment of Cold Storage and Logistic Facility for Dairy Product and Ice-cream under Cold Chain (Non Horticulture), Value Addition and Preservation Infrastructure Projects under the Government of India Plan "National Mission on Food Processing (NMFP)" in proprietorship at Ward No-7, Hajipur Town.

1.3470 14 20.08.14 (Consent

with Condition)

1834 M/S Madhusudan Agro Industries, Banka.

Proposal for establishment of 8000 MT Multipurpose Cold Storage under R.A.B.C. in partnership at Baunsi, Banka.

11.0694 55 20.08.14

1835 M/S Sunita Cold Storage Pvt. Ltd., Supaul.

Proposal for establishment of 5000 MT Multipurpose Cold Storage at Khutaha, Basantpur, Birpur, Supaul.

9.3632 34 20.08.14

1836 M/S Captain Ramesh Rice Mill Pvt. Ltd., Bhojpur.

Proposal for Modernisation and Technology upgradation of existing 1536 MT per year capacity of Rice Mill under Government of India Plan(National Mission on Food Processing) at Baligaon, Jagdishpur, Bhojpur.

1.2594 10 20.08.14

1837 M/S Harsiddhi Biotech(India) Pvt. Ltd., East Champaran.

Proposal for establishment of 10,000 MT Maze based Dry Warehouse under R.A.B.C. at Dhankharaiya, Harsiddhi, East Champaran.

7.4430 10 20.08.14

1838 M/S Radiant Agro Food & Beverage Pvt. Ltd., Ashiana, Digha.

Proposal for establishment of 04 MT per hour capacity Modern Rice Mill at Dalippur, Bihiya, Dhangai, Bhojpur.

7.9650 30 23.09.14

1839 M/S Baba Narsinghnath Industries Pvt. Ltd.,

Proposal for establishment of 04 MT per hour capacity Parboiled Rice Mill 5.7213 18 23.09.14

Page 151: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

151 Samatipur. at Kalyanpur Chowk, Samastipur.

1840 M/S Sanskar Agro Food Products Pvt. Ltd., Muzaffarpur.

Proposal for establishment of 04 per hour capacity parboiled Rice Mill at Subadhianur, Tole Chhapki, Muzaffarpur.

7.2316 35 23.09.14

1841 M/S Shiv Shaki Feed Industries, Barauni, Begusarai.

Proposal for establishment of 6000 MT per year capacity Modernized Poultry Feed unit in proprietorship.

4.0670 25 23.09.14

1842 M/S Vindhyabasini Rice Mills cluster Pvt. Ltd., Nokah, Rohtas.

Proposal for expansion of 06 MT per hour capacity Arwa Rice Mill in the existing unit of 05 MT per hour capacity Parboiled Rice Mill at Jakhini, Penarh, Nokha, Rohtas.

1.7464 47 23.09.14

1843 M/S Takshashila Mould Poly Plant Pvt. Ltd., Kankarbagh, Patna.

Proposal for establishment of 90,000 Kg per year capacity Plastic Cap production unit at Udyani, Mitanchak, Gopalpur, Patna.

2.3064 10 23.09.14

1844 M/S Jai Mata Di Agro Products Pvt. Ltd., Jagdishpur, Bhojpur.

Proposal for establishment of 04 MT per hour capacity Modern Rice Mill at Baligaon, Bihiya, Bhojpur.

3.6875 28 23.09.14

1845 M/S Mangal Murti Rice Mill, Piro, Bhojpur.

Proposal for establishment of 04 MT per hour capacity Rice Mill in partnership at Deochanda, Bhojpur.

2.2371 8 23.09.14

1846 M/S Robinson Pigment Pvt. Ltd., Patna City, Patna.

Proposal for establishment of 2700 MT per year capacity Cement Paint and 1500 MT per year capacity Wall Putty production unit at Marchi, Bhawniyan, Bypass Road, Patna.

1.1110 15 23.09.14

1847 M/S Jai Ma Durga Rice Mill, Kaimur.

Proposal for establishment of 04 MT per hour capacity Arwa Rice Mill in proprietorship. 2.7403 10

23.09.14 (Consent

with Condition)

1848 M/S Ultimo Concretofab Pvt. Ltd., Patna.

Proposal for establishment of 36,000 Pieces per year capacity P.S.C. Pole production unit at Arap, Bikram, Patna.

1.1637 15 23.09.14

1849 M/S Jyoti Rice Industries, Rohtas.

Proposal for establishment of 03 MT per hour capacity Arwa Rice Mill in proprietorship at Khairahan, Dehri, Rohtas.

3.0000 27 23.09.14

1850 M/S Bibha Agro Food Products, Muradabad, Sasaram.

Proposal for establishment of 03 MT per hour capacity Arwa Rice Mill in proprietorship at Muradabad, Sasaram, Rohtas.

2.3000 23 23.09.14

1851 M/S Shiv Mini Rice Mill, Gamaharia, Rohtas.

Proposal for establishment of 02 MT per hour capacity Rice Mill in proprietorship a Gamarhia, Rohtas.

1.2678 15 23.09.14

1852 M/S Chanchala Food Products, Gaya.

Proposal for establishment of 03 MT per hour capacity Raw Rice Mill in proprietorship.

3.5000 25 23.09.14

1853 M/S Singh Industries, Bihta, Patna.

Proposal for establishment of 01 crore 92 Lakh Litres per year capacity packed Drinking Water unit in proprietorship at Bihta, Patna.

1.5080 54

23.09.14 (Consent

with Condition)

1854 M/S Kishore Food and Beverages Pvt. Ltd., Patna.

Proposal for establishment of 64 Ton per day capacity Flour Mill production unit at Maner, Bihta, Patna.

4.1461 25 23.09.14

1855 M/S Aradhya Enterprises, Ara, Bhojpur.

Proposal for establishment of 04 MT per hour capacity parboiled Rice Mill in Proprietorship.

3.2141 15 23.09.14

1856 M/S Ganpati Starch and Proposal for establishment of Iron 10.0000 119 23.09.14

Page 152: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

152 Chemical Pvt. Ltd., Samastipur.

and Steel unit at Sathgawa, Khidarpur, Vidhyapati, Mathurapur, Samastipur.

(Consent with

Condition) 1857 M/S Rohtas Mills and Foods

Pvt. Ltd., Sasaram. Proposal for establishment of 19,200 MT per year capacity Poultry and Cattle feed unit at Nokha, Rohtas.

3.2095 8 23.09.14

1858 M/S Maa Vindhwasini Rice Mill, Barunkala, Dehri on Sone, Rohtas.

Proposal for establishment of 03 MT per hour capacity Rice Mill in proprietorship at Barunkala, Dehri on sone, Rohtas.

1.1135 10 23.09.14

1859 M/S Supriya Agrotech Pvt. Ltd., Rajiv Nagar, Patna.

Proposal for establishment of 04 MT per hour capacity Modern Rice Mill at Baheri, Darbhanga.

4.4000 30 23.09.14

1860 M/S Jagdamba Foods, Chichri Bujurg, Rajnagar, Dist.-Madhubani, Bihar.

Proposal for establishment of 900 Ton per year capacity Bakery unit in proprietorship at Chichari Bujurg, Raj Nagar, Madhubani.

1.1057 48 23.09.14

1861 M/S Mahalakshmi Food Industries, Bela Dulha, Nav Toliya, Darbhanga.

Proposal for establishment of 300 MT per year capacity Rusk (Bakery) production unit in proprietorship at Darbhanga.

1.1091 39 23.09.14

1862 M/S Balajee Food Products, Chakia, East Champaran.

Proposal for establishment of 2400 MT per year capacity Soyabari Production unit in partnership. 2.1690 31

23.09.14 (Consent

with Condition)

1863 M/S Raushan Agritech Pvt. Ltd., Rani Talab, Bikram, Patna.

Proposal for establishment of 02 MT per hour capacity Arwa Rice Mill. 1.2573 14 23.09.14

1864 M/S Vaishnavi Processed Grain Pvt. Ltd., Mohania, Kaimur.

Proposal for establishment of 04 MT per hour capacity Rice Mill at Atarliya, Mohania, Distt.- Kaimur.

3.4230 9 23.09.14

1865 M/S Laxmi Agro Industries Pvt. Ltd., Sakri, Kaimur.

Proposal for establishment of 02 MT per hour capacity Arwa Rice Mill in proprietorship at Bhakri, Near G.T. Road, Kudra, Dist.-Kaimur.

1.4400 14 23.09.14

1866 M/S Golden Real Prop Developers Pvt. Ltd., Krishnapuri, Purnea.

Proposal for establishment of 04 MT per hour Arwa Rice and 06 Ton per hour capacity Parboiled Rice Mill at Maran, Purnea.

9.9442 24 23.09.14

1867 M/S Bhawani Rice Mill, Maulabagh, Pakri, Ara, Dist.- Bhojpur.

Proposal for establishment of 03 MT per hour capacity Arwa Rice Mill in partnership.

3.7125 34 23.09.14

1868 M/S Laxmi Narayan Enterprises Pvt. Ltd., Ashiana Nagar, Patna.

Proposal for additional capacity expansion of 08 MT per hour Steam Rice Mill in the existing unit at Rani, Bhojpur.

22.1500 105 23.09.14

1869 M/S Bhudh Vihar Infrastructure Pvt. Ltd., Bodh Gaya. (Approval has been given on the proposal for change of place in SIPB meeting held on 11.12.14.) (Approval has been given on the proposal of Food Park in SIPB meeting held on 29.01.15.)

Proposal for establishment of Food Park at Dhanaut, Makhdumpur, Dist.-Jehanabad.

100.2700

800

23.09.14 (Consent

with Condition)

11.12.14

29.01.15

1870 M/S Paradise JBS Tyre Recycling Plant, Nalanda.

Proposal for establishment of 2280 MT per year capacity Waste Tyre Recycling Plant (Carbon Black, Steel

1.1800 14 23.09.14

Page 153: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

153 Oil) in partnership at Mauza- Kul, Dist.-Nalanda.

1871 M/S Treat Industries Ltd., West Bengal.

Proposal for capacity expansion in the existing Ice Cream unit from 46.72 Lakh Litres per year capacity to 75.92 Lakh Litres per year capacity at Industrial Area, Hajipur, Vaishali.

2.1175 22 23.09.14

1872 M/S Saurabh Pole Industries, Rajasthan.

Proposal for establishment of 68,400 Pieces per year capacity P.S.C. Pole unit in proprietorship at Industrial Growth Centre, Aurangabad.

5.6483 29 23.09.14

1873 M/S Amit Sandeep Foods Pvt. Ltd., Patna.

Proposal for establishment of production unit of 4200 MT per year capacity Bakery Products at Industrial Area, Patliputra, Patna.

1.2187 62 23.09.14

1874 M/S S.P.S. Medical India Pvt. Ltd., Patna.

Proposal for establishment of 900 K. Cubic Metres per year capacity Medical and Industrial Gases production and Bottling unit at Plot No.- 11(P), Industrial Growth Centre, Gidha, Bhojpur.

1.2392 22 23.09.14

1875 M/S Maa Mahthin Mini Rice Mill, Bhojpur.

Proposal for establishment of 02 MT per hour capacity Rice Mill in proprietorship at Industrial Area, Bihiya, Bhojpur.

1.2994 15 23.09.14

1876 M/S Ashmit Hatcheries Feeds Pvt. Ltd., Hajipur.

Proposal for establishment of 13,344 MT per year capacity Poultry and cattle feed unit at Industrial Area, Hajipur, Vaishali.

2.8722 51

23.09.14 (Consent

with Condition)

1877 M/S Sone Hardeo Flour Mills Pvt. Ltd., Buxar.

Proposal for construction for 5000 MT capacity Grain Storage Facility at Lahna Chakki, Buxar. 2.2611 28

23.09.14 (Consent

with Condition)

1878 M/S Jagdamba Value Steel Pvt. Ltd., Patna.

Proposal for establishment of 1,48,500 MT per year capacity T.M.T. Bar production unit at Matiya chowk, Raniganj, Purnea.

48.6000 59

23.09.14 (Consent

with Condition)

1879 M/S Nikhileshwara Nand Rice Mill, Aurangabad.

Proposal for establishment of 03 MT per hour capacity Arwa Rice Mill in proprietorship. 1.3127 13

23.09.14 (Consent

with Condition)

1880 M/S Shershah Institute of Medical Science and Hospital(a unit of Mojbil And Asma Educational Trust), Patna.

Proposal for establishment of 500 Bed Hospital-cum-Medical College at Banbhag, Bangampur Road, Purnea. 142.3800 1435

23.09.14 (Consent

with Condition)

1881 M/S Leal Infra Pvt. Ltd., Maulanachak Road, Muzahidpur, Bhagalpur.

Proposal for establishment of Private Industrial Area in 50 Acre land at Panchkathiya, Anchal- Bhakund, Distt.- Bhagalpur.

33.4700 22

23.09.14 (Consent

with Condition)

1882 M/S Annapurna Agro Products, Fatehpur, Aurangabad.

Proposal for establishment of 03 MT per hour capacity Arwa Rice Mill in partnership at Vill- Fatehpur, P.O.-Sihri, Hasanpura, Dist.- Aurangabad.

1.3009 14 21.10.14

1883 M/S Rishikesh Rice Mill Pvt. Ltd., Mahendrapur, Hathidah, Patna.

Proposal for capacity expansion of existing Parboiled Rice Mill unit from 04 MT per hour capacity to 08 MT per hour capacity at Katauna, Patna.

14.4442 11 21.10.14 (Consent

with Condition)

1884 M/S Kalpana Industries, Prahladpur, Muzaffarpur

Proposal for establishment of 30 Lakh Pieces per year capacity Fly

1.0452 14 21.10.14

Page 154: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

154 Ash Bricks production unit in proprietorship at Prahladpur, Musahari, Muzaffarpur.

1885 M/S Sri Krishna Steam Rice & Oil Mill Pvt. Ltd., Pitamber Nagar, Bihta, Patna.

Proposal for establishment of 04 MT per hour capacity Parboiled Rice Mill at Vill.- Bishunpura, Bihta, Patna.

5.6070 40 21.10.14

1886 M/S Sure Cure Herbal Medicines, 4 th Floor, Old H.C. Building, Exhibition Road, Patna.

Proposal for establishment of 10,18,260 Packet Ayurvedic Medicine Production unit in proprietorship at 4th Floor, Purana H.C. Building, in front of Kuber Hotel, Sahyogi Marg, Exhibition Road, Patna.

1.0890 20 21.10.14

1887 M/S Narayani Feeds Pvt. Ltd., Nepsitola, Ram Nagar, West Champaran

Proposal for establishment of 10 MT per hour capacity Poultry Feed unit at Bakhraha, Ramnagar, Distt.- West Champaran, Bettiah.

10.6417 35 21.10.14

1888 M/S Vaishali Kisan Uday Sugar Mill Pvt. Ltd., Tarwa, Majhouli, Paroo, Muzaffarpur.

Proposal for establishment of 1500 T.C.D. capacity Mini Sugar Plant (Pressure Boiling Process Based) at Tarba, Muzaffarpur.

38.3800 83 21.10.14 (Consent

with Condition)

1889 M/S Jai Hanuman Ji Rice Mill, Risiup, Aurangabad.

Proposal for establishment of 03 MT per hour capacity Arwa Rice Mill in partnership at Risiup, Sevanbigha, Aurangabad.

1.6503 15 21.10.14

1890 M/S Girdhari Lal Brothers Agro Pvt. Ltd., Chandivyapar Bhawan, Exhibition Road, Patna.

Proposal for establishment of 04 MT per hour capacity Modern Rice Mill at Lahthan, Anchal- Piro, Distt.- Bhojpur.

5.2500 24 21.10.14

1891 M/S B.M.J. Bricks, Murli Basantpur, Bangaon, Saharsa.

Proposal for establishment of 36 Lakh pieces per year capacity Fly Ash Bricks in proprietorship at Bariyahi, Bangaon Road, Saharsa.

1.1300 23 21.10.14

1892 M/S Shree Dhanwantri Agro Food Pvt. Ltd., Vill.- Madhe, P.O.-Ankohra, Aurangabad.

Proposal for establishment of 08 MT per hour capacity Modern Parboiled Rice Mill unit at Madhe, Aurangabad.

12.0676 17 21.10.14

1893 M/S Sri Sai Ram Modern Rice Mill, Barka Gaon, Tarari, Bhojpur.

Proposal for establishment of 04 MT per hour capacity Arwa Rice Mill at Barka Gaon, Tarari, Bhojpur.

4.5132 8 21.10.14

1894 M/S Koshi Beverage & Foods Pvt. Ltd., Simri Bakhtiyarpur, Saharsa.

Proposal for establishment of 33,000 MT per year capacity Poultry and Cattle Feed unit at Sulindabad, Simri Bakhtiyarpur, Saharsa.

4.9400 21 21.10.14

1895 M/S Anuj Nutri Tech Pvt. Ltd., Kadamkuan, Patna.

Proposal for establishment of 10,000 Litre per day capacity Ice Cream production unit at Maner, Patna.

4.6700 21 21.10.14 (Consent

with Condition)

1896 M/S Shraddha Green Energy Ventures Pvt. Ltd., S.K. Puri, Boring Road, Patna.

Proposal for establishment of 9,000 Kilo Litre per year capacity Grain Based Starch, Glucose and Extra Neutral Alcohol (E.N.A) unit at Rampur, Kharhra, Ekchari, Bhagalpur.

154.2045 142 21.10.14 (Consent

with Condition)

1897 M/S Maa Bindhyawasini Rice Mill, Narkatiyaganj, Bettiah, West Champaran.

Proposal for establishment of 04 MT per hour capacity Arwa Rice Mill unit in proprietorship at Narkatiyaganj, near Sugar Mill.

2.5607 23 21.10.14

1898 M/S Aradhya Enterprises, Kashipur Market, Ara, Bhojpur.

Proposal for establishment of 04 MT per hour capacity Parboiled Modern Rice Mill unit in proprietorship at

8.0352 15 21.10.14

Page 155: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

155 Kritpura, Virampur, Koilwar, Bhojpur.

1899 M/S Globus Bottling (A unit of Globus Spirits Ltd.), New Delhi.

Proposal for establishment of 30 Lakh Cases per year capacity I.M.F.L. Bottling Plant at Vill- Dhadhua, Block-Jandaha, Distt.- Vaishali.

15.5400 90 21.10.14

1900 M/S R.R. Prescon Industries, A-30, A, Albar House, Shastri Nagar, Jaipur, Rajasthan.

Proposal for manufacturing of 60,000 Pole per year capacity of P.S.C. Pole in patnership at Bihta, Pennal, Patna.

1.0619 18 21.10.14

1901 M/S Neeraj Ice Plant, Siwan.

Proposal for establishment of 12,000 MT yearly capacity Ice Block/Ice Slab production unit in proprietorship at Laheji, Siwan.

1.5732 25 21.10.14

1902 M/S Raj Lakshmi Agro Business Centre, Karma Bhagwan, Dist.-Aurangabad.

Proposal for establishment of 2500 MT capacity Dry Warehouse under R.A.B.C. in proprietorship at Karma Bhagwan, Dist.- Aurangabad.

1.6762 12 21.10.14 (Consent

with Condition)

1903 M/S Aryadeep Silky Rice Mill Pvt. Ltd., Unit-2, Jagdishpur, Bhojpur.

Proposal for establishment of 06 MT per hour capacity Parboiled Rice Mill at Jagdishpur, Bhojpur.

7.8867 18 21.10.14

1904 M/S Mountain View Resort, Sasaram, Rohtas.

Proposal for establishment of Hotel & Restaurant in partnership Near Tarachandi Mandir, Dhankara, Sasaram, Rohtas.

4.9469 36 21.10.14

1905 M/S Maa Sharda Agency, Transport Nagar, Near Krishnaniketan School, New Bypass Road, Patna.

Proposal for establishment of 1020 MT yearly capacity Agriculture P.V.C. Hose Pipe production unit in proprietorship at Industrial Area, Fatuha, Phase-II.

1.0546 18 21.10.14

1906 M/S Maa Subhadra Rice Mill, Kumarbagh, Bettiah, West Champaran.

Proposal for establishment of 04 MT per hour capacity Arwa Rice Mill unit in proprietorship at Industrial Area, Kumarbagh, Bettiah.

2.5425 23 21.10.14

1907 M/S Balajee Annapurna Pvt. Ltd., City Centre, Haji Ganj, Patna City, Patna.

Proposal for establishment of 120 MT yearly capacity Aluminium Foil Container production unit at Industrial Area, Fatuha.

1.5352 11 21.10.14

1908 M/S Apex Pet Products Pvt. Ltd., Hajipur, Vaishali.

Proposal for establishment of 7,14,000 Pieces Pet Bottles production unit at Industrial Area, Hajipur, Vaishali.

2.0415 11 21.10.14

1909 M/S Hotel Corporate-Inn, Patna.

Proposal for establishment of 33 Room Hotel in partnership at Rajabazar, Bailey Road, Patna.

6.5521 54 21.10.14 (Consent

with Condition)

1910 M/S Raj Polytubes, Patna City, Patna.

Proposal for establishment of 95 MT per year capacity P.V.C. Pipe production unit in partnership at Sabalpur, Didarganj, Patna City, Patna.

1.8116 8 21.10.14 (Consent

with Condition)

1911 M/S Dadiji Polytubes, Patna.

Proposal for establishment of 360 MT per year capacity R.P.V.C. Pipe production unit in proprietorship at Karmalichak, Begampur, Patna City, Patna.

1.1543 12 21.10.14 (Consent

with Condition)

1912 M/S Shekhar Plastic Industries Pvt. Ltd., Patna.

Proposal for establishment of 150 MT per month capacity Plastic Products (Disposable Glass etc.) production unit at Didarganj, Patna City, Patna.

2.4564 32 21.10.14 (Consent

with Condition)

Page 156: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

156 1913 M/S T.L. Enterprises Pvt.

Ltd., Patna. Proposal for capacity expansion of existing Restaurant from100 Seats to 200 Seats at Biscoman Tower, South Gandhi Maidan, Patna.

3.1500 19 21.10.14

1914 M/S Platinum Ispat Energy Pvt. Ltd., Patna.

Proposal for establishment of 99,000 MT per year capacity Re-Rolling Mill at Chamanchak, Pothiya, Simli Murarpur, Didarganj, Patna City.

22.0000 36 21.10.14 (Consent

with Condition)

1915 M/S Piyush & Associates Pvt. Ltd., Patna.

Proposal for establishment of 42,000 MT per year capacity M.S. Ingot production unit at Mahuli Road, Karmlichak, Patna City, Patna.

7.3300 76 21.10.14 (Consent

with Condition)

1916 M/S Century Polyplast Industries(Unit-2), Patna.

Proposal for establishment of new unit in the name of Unit-2 at Sandalpur, Azimabad, Bahadurpur with the same capacity(8,89176 pieces per year) in place of capacity expansion of 8,89176 pieces per year capacity in the existing unit of Plastic Furniture, Table and Household goods having present capacity of 14,56,476 pieces per year.

4.8619 21.10.14 (Consent

with Condition)

1917 M/S Pointer Fashion Pvt. Ltd., Patna.

Proposal for establishment of 1.5 Lakh Pieces per year capacity Readymade Garment unit at Jagat Narayan Road, Patna.

2.1000 22 21.10.14 (Consent

with Condition)

1918 M/S Punjab Print Pack, Patna.

Proposal for establishment of 3.60 Lakh Kg per year capacity Sweet Boxes and Offset Printing unit in proprietorship at Bypass Road, Bhupati Nagar, Dhelwa, Ramkrishan Nagar, Patna.

1.2050 17 21.10.14 (Consent

with Condition)

1919 M/S Budha Industries, Patna.

Proposal for establishment of 1.8 Lakh Kg per year capacity Sweet Boxes and 08 Lakh Kg per year capacity Non Oven Fabrics Bag production unit in proprietorship at Bibhutipur, Bypass Road, Patna.

2.2000 17 21.10.14 (Consent

with Condition)

1920 M/S Tesco Engineering & Consultancy Services, New Delhi.

Proposal for establishment of 60,000 Pieces per year L.E.D. Solar Lanterns, 7500 Pieces per year capacity Solar C.F.L. Inverters unit in partnership at 6H/7, Bhutnath Road, Kankarbagh, Patna.

1.1700 41 21.10.14 (Consent

with Condition)

1921 M/S Jay Bhole Makhana Udyog, Bathnaha, Madhubani.

Proposal for establishment of 252 MT per year capacity Makhana Processing unit in proprietorship at Belha, Phulparas, Madhubani.

1.2500 15 11.12.14

1922 M/S Neelkamal Steels Pvt. Ltd., (unit-2) Patna.

Proposal for establishment of unit-2 for production of 72,000 MT per year capacity M.S. Billet at Sabalpur, Didarganj, Patna City, Patna.

15.3300 60 11.12.14

1923 M/S Aishanya Bricks & Construction, Saharsa.

Proposal for establishment of 3,60,000 pieces per year capacity Fly Ash Bricks production in proprietorship at Bharauli, Saharsa.

1.1700 23 11.12.14

1924 M/S Gaurav Foods and Cool Connections Pvt. Ltd., Bhutnath Road, Patna.

Proposal for capacity expansion from 100 MT per day capacity to 200 MT per day capacity in the existing Roller Flour Mill unit at Didarganj, Patna City, Patna.

2.6300 24 11.12.14 (Consent

with Condition)

Page 157: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

157 1925 M/S Jay Maa Durga Rice Mill,

Dadar, Kaimur. Proposal for establishment of 03 MT per hour capacity Arwa Rice Mill in proprietorship at Dadar, Kaimur.

2.4400 25 11.12.14

1926 M/S Shree Durgajee Rice Mill, Katar, Bhojpur.

Proposal for establishment of 03 MT per hour capacity Arwa Rice Mill in proprietorship at Katar, Hasan Bazar, Bhojpur.

2.3397 20 11.12.14

1927 M/S Om Sai Rice Mill, Bihiya, Bhojpur.

Proposal for establishment of 03 MT per hour capacity Arwa Rice Mill in proprietorship at Raja Bazar, Bihiya, Bhojpur.

1.6100 28 11.12.14

1928 M/S Sakshi Priya Agro Industries Pvt. Ltd., Pasavana Tola, Raghopur, Supaul.

Proposal for establishment of 04 MT per hour capacity Modern Parboiled Rice Mill at Fakirana, Karjain Bazar, Raghopur, Supaul.

10.3360 48 11.12.14

1929 M/S Subh Ashirbad Food, Rikabganj, Patna.

Proposal for establishment of 2160 MT per year capacity Pasta, Macaroni, Vermicelli production unit in partnership at Rikabganj, Katra Bazar, Malsalami, Patna.

4.0875 37 11.12.14 (Consent

with Condition)

1930 M/S Maa Sharde Rice Mill, Bhojpur.

Proposal for establishment of 03 MT per hour capacity Modern Arwa Rice Mill in proprietorship at Bharsara, Kakila, Jagdishpur, Bhojpur.

2.3400 15 11.12.14

1931 M/S AL Kareem Agro Industries LLP, Taria, Kishanganj.

Proposal for establishment of 37,000 MT per year capacity Meet Processing unit with Cold Chain unit in partnership at Taria, Pargana-Pothiya, Thakurganj, Kishanganj.

44.8693 600 11.12.14

1932 M/S Ayush Flour Mill Pvt. Ltd., Nalanda.

Proposal for establishment of 64 Ton per day capacity Flour Mill at Bhikhani Bigha, Onda, Sare, Nalanda.

3.7649 25 11.12.14

1933 M/S Himalaya Height Cement Pvt. Ltd., Bharauli, Baliya, Uttar Pradesh.

Proposal for establishment of 90,000 MT per year capacity Cement production unit at Kurhni, Karmnasha, Bhabhua, Kaimur.

9.6185 56 11.12.14

1934 M/S Shivajee Grain Industries Pvt. Ltd., Moradabad, Sasaram, Rohtas.

Proposal for establishment of 04 MT per hour capacity Arwa Rice Mill at Moradabad, Sasaram, Rohtas.

4.7763 34 11.12.14

1935 M/S Bluejey Udyog Pvt. Ltd., Parsa, Chhapra.

Proposal for establishment of 200 MT per day capacity Cattle/Poultry Feed unit at Bankedwa, Parsauna, Parsa, Saran.

12.8300 50 11.12.14

1936 M/S Bluejey Udyog Pvt. Ltd., Kadamkuan, Patna.

Proposal for establishment of 200 MT per day capacity Modern Flour Mill unit at Bankedwa, Chhapra.

16.2300 50 11.12.14

1937 M/S Paradise T.R.P., (Tyre Recycling Plant), Shahpur, Nalanda.

Proposal for establishment of 2400 Ton per year capacity Tyre Recycling unit in proprietorship at Malikpur(Silao), Rajgir Sahpur, Nalanda.

1.1800 14 11.12.14

1938 M/S JVL Textile Park Pvt. Ltd., Jhunjhunwala Bhawan, Nati Imli, Varanasi.

Proposal for establishment of Textile Park at Jorawarpur, Akodhigola, Dehri-on-Sone, Rohtas.

113.1100 10000 11.12.14

1939 M/S Sri Astha Vinayak Agro Pvt. Ltd., Anisabad, Patna.

Proposal for establishment of 02 MT per hour capacity Modern Arwa Rice Mill at Karmakala, Tarar, Daudnagar, Aurangabad.

2.6975 28 11.12.14

Page 158: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

158 1940 M/S Mateshwari Paper Mill

Pvt. Ltd., Kachitalab, Gardanibagh, Patna.

Proposal for establishment of 9500 MT per year capacity Paper Board production unit at Mahuli, Didarganj, Patna City, Patna.

2.1114 32 11.12.14 (Consent

with Condition)

1941 M/S Durga Nandini Flour Mill, Sri Rampur, Raxaul, East Champaran.

Proposal for establishment of 60 MT per day capacity Modern Flour Mill unit in proprietorship at Sri Rampur, Raxaul, East Champaran.

2.4300 12 11.12.14

1942 M/S Hariom Feeds Pvt. Ltd., Gopalganj.

Proposal for capacity expansion from100 MT per day capacity to additional 200 MT per day capacity of Poultry Cattle Feed at Birtitola, Manjhagarh, Gopalganj.

8.8650 50 11.12.14

1943 M/S Sone Haradeo Flour Mills Pvt. Ltd., Brahmpur, Simri, Buxar.

Proposal for establishment of 1000 MT per year capacity Grain Storage unit at Brahmpur, Simri, Buxar.

1.1511 13 11.12.14 (Consent

with Condition)

1944 M/S Kiran Rice Mill, Nalanda.

Proposal for establishment of 03 MT per hour capacity Arwa Rice Mill in partnership at Bari Chhariyari, Raju Bigha, Nalanda.

2.7173 16 11.12.14

1945 M/S Sahil Foodtech Pvt. Ltd., Purnea.

Proposal for establishment of 04 MT per hour capacity Modern Parboiled Rice Mill unit at Dogachhi, Haweli, Purnea.

8.4000 48 11.12.14

1946 M/S J.P. Rice Mill, Patna.

Proposal for establishment of 03 MT per hour capacity Modern Rice Mill unit in proprietorship at Patoot, Rani Talab, Bikram, Patna.

3.0250 28 11.12.14

1947 M/S Prem Polypropyle Products Pvt. Ltd., Patna.

Proposal for establishment of 12,000 Pieces per year capacity U.P.V.C. Windows production unit at Phulwarisharif, near Dairy Project, Pethia Bazar, Patna.

1.6291 20 11.12.14 (Consent

with Condition)

1948 M/S Tirupati Bala Ji Krishi Udyog, Sanjhauli, Rohtas.

Proposal for establishment of 06 Ton per hour capacity Modern Parboiled Rice Mill unit in partnership at Sanjhauli, Rohtas.

17.0100 15 11.12.14

1949 M/S Shree Balaji Tubes, Jamal Road, Patna.

Proposal for manufacturing of 1500 MT yearly capacity S.S. Pipe, Square Rectangle, Oval etc. in partnership at Sonaroo, Fatuha, Patna.

1.3235 8 11.12.14 (Consent

with Condition)

1950 M/S Asco Food & Beverage Pvt. Ltd., S.K. Puri, Patna.

Proposal for establishment of production unit for 1000 MT per year capacity Barley Based Product at Rampur, Kharhara, Kahalgaon, Bhagalpur.

159.0565 146 11.12.14

1951 M/S Girija Agri Rice Mill Pvt. Ltd., Saharghat, Kerwa, Madhubani.

Proposal for establishment of 08 Ton per hour capacity Parboiled Rice Mill unit at Kerwa, Saharghat, Madhubani.

17.1704 47 11.12.14

1952 M/S Sidhant Rice Mills Pvt. Ltd., Ramgarhwa, East Champaran.

Proposal for establishment of 03 MT per hour capacity Arwa Rice Mill at Sargatia, Sikta, East Champaran, Bettiah.

1.9069 15 11.12.14

1953 M/S Aashishya Food Products Pvt. Ltd., Manopur, Dighwara, Saran.

Proposal for establishment of 100 MT per year capacity Bakery Production unit at Manopur, Dighwara, Saran.

1.1200 20 11.12.14

1954 M/S Tirupati Balajee Nutrition Pvt. Ltd., Patna.

Proposal for capacity expansion in the existing Flour Mill unit from 150 MT per day capacity to 350 MT per

6.9100 25 11.12.14

Page 159: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

159 day capacity at Khedalpura, Bihta, Patna.

1955 M/S Maa Kamakhya Grain Mills & Agro Products Pvt. Ltd., Kaimur.

Proposal for establishment of 04 MT per year capacity Arwa Rice Mill unit at Asaura, Ramgarh, Kaimur.

7.1000 28 11.12.14

1956 M/S Shubham Modern Hitech Agro Pvt. Ltd., Kaimur.

Proposal for establishment of 05 MT per hour capacity Arwa Rice Mill unit at Kharkhauli, Durgawati, Kaimur.

5.5431 28 11.12.14

1957 M/S Vaishno Food Product, Chainpur, Kaimur.

Proposal for establishment of 05 MT per hour capacity Raw Rice Mill unit in partnership at Akorhi, Ramgarh, Distt.- Kaimur.

4.7342 28 11.12.14

1958 M/S Sheetal Flour Mill, East Champaran. (Proposal has been noted in SIPB meeting held on 29.01.15)

Proposal for establishment of production of 14,400 MT per year capacity (48 MT per day capacity) Whole Wheat Flour Grinding Mill unit in partnership.

3.1925

19

11.12.14 (Consent with Condition) 29.01.15 (Proposal noted in SIPB meeting)

1959 M/S Shree Nath Rice Mill, Patna.

Proposal for establishment of 04 MT per hour capacity Arwa Rice Mill unit in partnership at Ranitalab, Patna.

1.7998 13 11.12.14

1960 M/S Maa Vaishno Devi Rice Mill, Dabhawani, Bhadaur, Patna.

Proposal for establishment of 04 MT per hour capacity Arwa Rice Mill in proprietorship at Dabhawan, Bhadaur, Patna.

3.3830 36 11.12.14

1961 M/S Jalan Traders, Shekhpur, Akharaghat Road, Muzaffarpur.

Proposal for establishment of 14,400 Ton per year capacity G.I. Profile Sheet production unit in proprietorship at Chakmohammad, Ahiyapur, Muzaffarpur.

1.9213 15 11.12.14

1962 M/S Satyam Chura Udyog, Hirakhana, Warispur, Vaishali.

Proposal for establishment of 50 MT per day capacity Chura production unit in partnership at Hirakhana, Warispur, Vaishali.

3.0000 25 11.12.14

1963 M/S Spicy Beverage Pvt. Ltd., Gandhi Road, Dhanbad, Jharkhand.

Proposal for establishment of 2099.52 MT per year capacity Pet Preform and Pet Bottle production unit at Mohammadpur Hari, Lalganj, Vaishali.

4.9772 28 11.12.14

1964 M/S Shipra Beverage Pvt. Ltd., Patna City, Patna.

Proposal for establishment of 2099.52 MT per year capacity Pet Preform and Pet Bottle production unit at Begampur, Patna City, Patna.

4.9413 28 11.12.14 (Consent

with Condition)

1965 M/S Nikhil Engicon Works Pvt. Ltd., Patna.

Proposal for establishment of 90 MT per day capacity Modern Roller Flour Mill unit at Industrial Area, Giddha, Bhojpur.

7.0000 25 11.12.14

1966 M/S Sahyogi Mini Rice Mill, Rambagh, Buxar.

Proposal for establishment of 04 MT per hour capacity Arwa Rice Mill in proprietorship.

2.0932 20 11.12.14

1967 M/S Sri Sar Balajee Food Products, Dumrao Palace, Patna.

Proposal for establishment of 72000 MT per year capacity Bread and Biscuit, extruded Snacks production in partnership at Industrial Area, Hajipur, Vaishali.

2.8200 62 11.12.14

1968 M/S Narmada Food Industries, Pandaul,

Proposal for establishment of 75 MT per year capacity Potato Chips and

1.1044 7 11.12.14

Page 160: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

160 Madhubani. Snacks production unit in

proprietorship at Industrial Estate, Pandaul, Madhubani.

1969 M/S Uma Prakash Natural Food Industries, Bettiah.

Proposal for establishment of 90 Ton per day capacity Roller Flour Mill unit in partnership at Industrial Area, Bettiah.

4.1895 37 11.12.14

1970 M/S Janki Nandan Foods Pvt. Ltd., Kuama, Parsauni, Sitamarhi.

Proposal for establishment of 200 MT per year capacity Makhana Processing unit at Industrial Area, Sitamarhi.

1.2400 8 11.12.14

1971 M/S Maksi Agro Cool Chains Pvt. Ltd., Patna.

Proposal for establishment of 40000 Ton per year capacity Solvent Extraction unit at Industrial Area, Giddha, Bhojpur.

35.8200 60 11.12.14

1972 M/S Maa Durga Steel Industries, Pandaul, Madhubani.

Proposal for establishment of 900 MT per year capacity Fabricated Metal Products, Agriculture Implements production unit in proprietorship at Industrial Area, Pandaul, Madhubani.

1.7625 8 11.12.14

1973 M/S Kosi Agrico, Madhepura. Proposal for establishment of 900 MT per year capacity Agriculture and Forestry Machinery production unit in partnership at Industrial Estate, Murliganj, Madhepura.

1.6800 15 11.12.14

1974 M/S Green Land Agro Industries, Industrial Area, Donar, Darbhanga.

Proposal for establishment of 900 MT per year capacity Agriculture and Forestry Machinery production unit in proprietorship at Industrial Area, Donar, Darbhanga.

1.4861 15 11.12.14

1975 M/S Indira Paper Mill Pvt. Ltd., Patna City, Patna.

Proposal for establishment of 7500 MT per year capacity Writing paper production unit at Dhawalpura, Patna City, Patna.

4.5435 16 29.01.15 (Consent with Condition)

1976 M/S Shivam Agro Food Products, Durgawati, Kaimur.

Proposal for establishment of 03 MT per hour capacity Arwa Rice Mill unit in proprietorship at Shahpur, Kaimur.

2.6868 8 29.01.15 (Consent with Condition)

1977 M/S Mithila Agri Care Pvt. Ltd., Madhubani.

Proposal for establishment of Paddy and Wheat Seeds processing unit at Laheriaganj, Madhubani.

1.3100 28 29.01.15 (Consent with Condition)

1978 M/S Nalanda Rice Mill LLP, Kankarbagh, Patna.

Proposal for establishment of 06 MT per hour capacity Modern Parboiled Rice Mill at Chak Chandasi, Biharsharif, Noorsarai, Nalanda.

4.6500 70 29.01.15 (Consent with Condition)

1979 M/S Maa Sarvmangla Agro Mill, Bettiah.

Proposal for establishment of 02 MT per hour capacity Modern Arwa Rice Mill in proprietorship at Bahuarwa, Babul Tola, West Champaran.

1.0900 20 29.01.15 (Consent with Condition)

1980 M/S Kanhaiya Jee Rice Mill, Baniapur, Saran.

Proposal for establishment of 02 MT per hour capacity Raw Rice Mill unit in proprietorship at Kolhua, Baniapur, Saran.

1.3300 20 29.01.15 (Consent with Condition)

1981 M/S Manoj Kumar Rice Mill, Khushilal Chowk, Patna.

Proposal for establishment of 06 MT per hour capacity Arwa Rice Mill unit at Gaurichak, Khushilal Chowk, Sampatchak, Patna.

6.7000 38 29.01.15 (Consent with Condition)

1982 M/S Muskan & Kajal Rice Mill, Purnea.

Proposal for establishment of 06 MT per hour capacity Raw Rice Mill unit in proprietorship at Gyandobh,

2.7800 30 29.01.15 (Consent with

Page 161: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

161 Amaur,Purnea. Condition)

1983 M/S Jai Vaishnavi Rice Mill, Nadwan, Masaurhi, Patna.

Proposal for establishment of 02 MT per hour capacity Raw Rice Mill unit in partnership at Nadwa Pargana, Dhanarua, Masaurhi, Patna.

1.1800 20 29.01.15 (Consent with Condition)

1984 M/S Dhana Rice Mill Pvt. Ltd., Gaya.

Proposal for establishment of 02 MT per hour capacity Raw Rice Mill unit in at Mahtha, Karsawan, Aurangabad.

2.1800 28 29.01.15 (Consent with Condition)

1985 M/S Chaudhary Food Corporation, Bilarpur, Shyampur, Gopalganj.

Proposal for establishment of 6000 MT capacity Cold Storage unit in partnership at Bilarpur.

6.0497 12 29.01.15 (Consent with Condition)

1986 M/S Amigo Food Products, Bagha.

Proposal for establishment of 3000 MT per year capacity Bakery production unit in proprietorship at Narwal, Barwal, Bagha.

7.9813 20 29.01.15 (Consent with Condition)

1987 M/S Samundri Industries, Patna.

Proposal for establishment of 4800 Ton per year capacity Pet Preform Bottle production unit in proprietorship at Bhelwara, Gopalpur,Patna.

3.9522 9 29.01.15 (Consent with Condition)

1988 M/S Mir and Mir Rice Mill Pvt. Ltd. Kaimur.

Proposal for establishment of 04 MT per hour capacity Arwa Rice Mill unit at Bellauri, Kaimur, Mohania.

4.9041 29.01.15 (Consent with Condition)

1989 M/S Royal Manufacturing & Technology Pvt. Ltd.,Gaya.

Proposal for establishment of 220 MT per year capacity Polypropylene Plastic production unit at Haripur, Bodhgaya, Gaya.

1.3200 29.01.15

1990 M/S G.M.S. Industries, Patna.

Proposal for establishment of 90 Lakh pieces per year Fly Ash Bricks production unit in partnership at Punpun,Manorah, Patna.

1.4430 14 29.01.15 (Consent with Condition)

1991 M/S Mahavir Ware Housing, Mariawan, Bikram, Patna.

Proposal for establishment of 4000 Ton per year capacity Primary Processing Centre/ Collection Centre Ware Housing unit in partnership at Mariawan, Bikram, Datiyana, Patna.

4.4417 27 29.01.15

1992 M/S Prasad Flour Mill Pvt. Ltd., Holasachak, P.O. Shorampur, Janipur, Patna.

Proposal for establishment of 15,000 MT per year ( 50 MT per day) capacity Flour Mill unit at Alampur, Gonpura Panchayat, Patna.

5.2472 29 29.01.15 (Consent with Condition)

1993 M/S A.B. Grain Spirit Pvt. Ltd., Gurdaspur, Panjab.

Proposal for establishment of 2000 K.L.P.D. capacity Distillery Plant , 0.5 Million Hectolitre capacity Beverage Plant and 09 Mega Watt Power Plant production unit at Ara, Bhojpur.

390.0000 200 29.01.15

1994 M/S Jagatguru Mahadev Rice Mill Pvt. Ltd., Sakrohar, Beldaur, Khagaria.

Proposal for establishment of 03 MT per hour capacity Arwa Rice Mill unit at Chakarmania, P.O.- Sakrohar, Dist.-Khagaria.

1.4040 25 29.01.15 (Consent with Condition)

1995 M/S Ramnagar Khadi Gramodyog Vikas Samiti, Akodhi, Mohania. Kaimur.

Proposal for establishment of 9600 MT per year capacity Detergent Powder Production unit at Akodhi, Mohania, Kaimur.

2.4086 16 29.01.15

1996 M/S Shyam Modern Rice Mill, Dhanibar, Rishiup, Aurangabad.

Proposal for establishment of 03 MT per hour capacity Raw Rice Mill unit in proprietorship at Dhanibar, Rishiup, Aurangabad.

1.9000 28 29.01.15 (Consent with Condition)

1997 M/S Karuna Rice Mill, Baheri, Proposal for establishment of 03 MT 2.1600 33 29.01.15

Page 162: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

162 Chand, Kaimur. per hour capacity Arwa Rice Mill and

4,000 MT capacity Warehouse unit in proprietorship at Baheri, Chand, Kaimur.

1998 M/S Saima Sahil Rice Mill (L.L.P.), Fatehpur, Kasba, Purnea.

Proposal for establishment of 04 MT per hour capacity Parboiled Rice Mill and 3000 MT Warehouse unit in partnership at Fatehpur, Kasba, Purnea.

8.5000 40 29.01.15

1999 M/S Rinku Rai, Mirganj, Bangtal, Ara Nagar, Bhojpur.

Proposal for establishment of 3000 MT Dry Warehouse in proprietorship at Mirganj, Bangtal, Ara Nagar, Bhojpur.

2.0184 11 29.01.15

2000 M/S Mooday Food Product, Daulatpur, Bari Tola, Hajipur.

Proposal for establishment of 120 MT per year capacity Ice Cream production unit in proprietorship at Daulatpur, Bari Tola, Hajipur.

1.3753 27 29.01.15 (Consent with Condition)

2001 M/S Drishti Foods And Beverages Pvt. Ltd., Nizampur, Pachrukhi, Siwan.

Proposal for establishment of 72 Lakh Liters per year capacity Packaged Drinking Water production unit at Nizampur, Pachrukhi, Siwan.

1.4314 19 29.01.15

2002 M/S Gujrat Growmed Marketing India Pvt. Ltd., Biscoman Colony, Alamganj, Patna.

Proposal for establishment of Allopathic and Ayurvedic Medicine production unit at Yusufpur, Hajipur, Vaishali.

3.2092 31 29.01.15

2003 M/S Maa Vindhyawasini Agro Pvt. Ltd., Bhojpur.

Proposal for establishment of 08 MT per hour capacity Parboiled Rice Mill unit at Devchanda, Piro, Bhojpur.

8.0000 38 29.01.15 (Consent with Condition)

2004 M/S Sun Agro, Pandui House, Maharani Road, Gaya.

Proposal for establishment of 04 MT per hour capacity Raw Rice Mill and 3000 MT Warehouse unit in proprietorship at Pathra, Zindapur, Bodh Gaya, Gaya.

2.6000 28 29.01.15 (Consent with Condition)

2005 M/S Bajrang Grain Mills Pvt. Ltd., Kudra, Kaimur.

Proposal for establishment of 05 MT per hour capacity Arwa Rice Mill and 5000 MT Warehouse unit at Bastalwa, Kudra, Kaimur.

7.4500 10 29.01.15 (Consent with Condition)

2006 M/S Anjani Rice Mill, Wazirganj, Gaya.

Proposal for establishment of 04 MT per hour capacity Arwa Rice Mill unit in proprietorship at Riula, Atri, Gaya.

2.7077 15 29.01.15 (Consent with Condition)

2007 M/S Sona Gold Agrochem Pvt. Ltd., Karmali Chak, Patna City, Patna.

Proposal for establishment of 5000 MT per year capacity Maize Silo Warehouse unit at Mahuli Road, Karmali Chak, Patna City, Patna.

2.6869 29.01.15 (Consent with Condition)

2008 M/S D.R.G. Infra Flyash Pvt. Ltd., Patna City, Patna.

Proposal for establishment of 144 Lakh pieces per year capacity Fly Ash Briks unit at Jethuli, Kachhi Dargah, Patna.

1.3320 14 29.01.15 (Consent with Condition)

2009 M/S Shree Hanumat Jee Infracon Pvt. Ltd., Siwan.

Proposal for establishment 43200 pieces per year capacity P.S.C. Pole and Base Plate unit at Panchaura, Siwan.

1.2107 20 29.01.15

2010 M/S Shree Maruti Agro Food Products, Haldipatti, Marufganj, Patna.

Proposal for establishment of 1440 MT per year capacity Pasta unit in proprietorship at Mohammadpur, Raksha Bandh, Didarganj, Patna City, Patna.

2.0450 12 29.01.15 (Consent with Condition)

2011 M/S Opus Polysel Technologies Pvt. Ltd., Kolkata.

Proposal for establishment of 1056000 K.G. per year capacity Light Furnace Oil production unit at Harpur

1.1600 11 29.01.15 (Consent with

Page 163: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

163 Aloth, Samastipur. Condition)

2012 M/S Mithu Agro Processors Pvt. Ltd, Purana Godown, Kotwali, Gaya.

Proposal for establishment of 64 Ton per day capacity Besan production unit at Itwan, Gaya.

4.6001 12 29.01.15

2013 M/S Namo Pashu Ahar, Madhubani.

Proposal for establishment of 04 MT per hour capacity Agriculture based Cattle Feed unit in proprietorship at Bhawanipur, Pandaul, Madhubani.

1.0275 15 29.01.15 (Consent with Condition)

2014 M/S Leoline Foods Pvt. Ltd., Mirchaigali Chowk, Patna City, Patna.

Proposal for establishment of 3600 MT per year capacity 2D and 3D Pellet, 1440 MT per year capacity Pasta and 1440 MT per year capacity Vermicelli production unit at Chhoti Nawada, Khusrupur.

21.4682 32 29.01.15

2015 M/S Satguru Mill, Varanasi. Proposal for establishment of 08 MT per hour capacity Parboiled Rice Mill unit in partnership at Vill.-Purari, P.O.-Durgawati, Kaimur.

18.1495 54 29.01.15

2016 M/S Jitu Rice Mill LLP, Purab Mohalla, Jagdishpur, Bhojpur.

Proposal for establishment of 04 MT per hour capacity Modern Rice Mill unit at Utawali Jungle, Bhojpur.

3.1719 12 29.01.15

2017 M/S ITC Limited, Kolkata. Proposal for establishment of 663 Kilowatt Roof Top Solar Power production unit at Munger.

6.8800 29.01.15

2018 M/S Raj Laxmi Enterprises, Patna.

Proposal for establishment of 02 MT per hour capacity Raw Rice Mill unit in proprietorship at Manoharpur, Kathuara, Patna.

1.0352 16 29.01.15 (Consent with Condition)

2019 M/S Richa Agro Food Products, Teghra, Begusarai.

Proposal for establishment of 4800 MT per year capacity Mustard Oil Mill unit in proprietorship at Raghunandanpur, Teghra, Begusarai.

1.6990 23 29.01.15 (Consent with Condition)

2020 M/S Om Sai Baba Modern Rice Mill Pvt. Ltd., Kaimur.

Proposal for establishment of 04 MT per hour capacity Arwa Rice Mill at Barhuli, Mohania, Kaimur.

5.2776 32 29.01.15

2021 M/S Sharma and Sons Food Pvt. Ltd., Sheikhpura.

Proposal for establishment of 04 MT per hour capacity Parboiled Rice Mill unit at Sheikhpura.

4.3034 12 29.01.15 (Consent with Condition)

2022 M/S Khushi Mini Rice Mill, Kudra, Kaimur.

Proposal for establishment of 04 MT per hour capacity Arwa Rice Mill and 3000 MT capacity Warehouse in proprietorship at Khanethi, Kudra, Kaimur.

5.9000 28 29.01.15 (Consent with Condition)

2023 M/S Metropole Vinimay Pvt. Ltd., Durgawati, Kaimur.

Proposal for establishment of 100 MT per day capacity Refine Rice Bran Oil unit at Kurari, Durgawati, Kaimur.

21.2858 60 29.01.15

2024 M/S Pavitra Agrotech Pvt. Ltd., Baijalpur, Kesho, Hajipur.

Proposal for establishment of 10000 MT per year capacity Multi Purpose Cold Storage unit under R.A.B.C. at Harpur, Bochaha, Samastipur.

11.3085 25 29.01.15 (Consent with Condition)

2025 M/S Maa Vaishno Food Products, Ranipur Hat, Patna City, Patna.

Proposal for establishment of 60 MT Jam, Jelly and 120 MT per year capacity Vermicelli production unit in proprietorship at Industrial Area, Dehri-on-Sone, Rohtas.

1.3200 22 29.01.15

2026 M/S G.M. Exim Pvt. Ltd., 303, Ashiana Chamber, Exhibition Road, Patna.

Proposal for establishment of 1200 MT per year capacity Fryums and other extruded production unit at

10.6100 51 29.01.15

Page 164: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

164 E.P.I.P., Hajipur, Vaishali.

2027 M/S Raxaul Roller Flour Mill, Airport Road, Industrial Area, Raxaul, East Champaran.

Proposal for establishment of (03 MT) 60 MT per hour capacity Whole Wheat Atta and Chokar production unit in partnership at Industrial Area, Airport Road, Raxaul, East Champaran.

2.2501 27 29.01.15

2028 M/S Aparna Industrial Promotion Council (Pvt. Ltd. Co.), Industrial Area, Fatuha, Patna.

Proposal for establishment of Leather Industrial Cluster at Industrial Area, Fatuha, Patna.

46.0200 2046 29.01.15

2029 M/S Gangotri Holy Products Pvt. Ltd., Industrial Estate, Muzaffarpur.

Proposal for establishment of 3300 Ton per year capacity Bakery (Rusk, Muffins and Cakes and Cookies) production unit at Industrial Estate, Muzaffarpur.

3.6038 150 29.01.15

2030 M/S Shree Vishnu Vishal Paper Mills Pvt. Ltd., Industrial Growth Centre, Giddha, Ara.

Proposal for establishment of 4800 MT per year capacity MS Ingot production unit at Industrial Growth Centre, Giddha, Ara.

1.5500 15 29.01.15

2031 M/S Coaltar Coal Packs Pvt. Ltd., Patna.

Proposal for establishment of 1710 Lakh pieces per year capacity Preform Pet Bottles production unit at Phase-3 , Industrial Area, Fatuha, Patna.

4.9400 19 29.01.15

2032 M/S Mahadeva Feeds Industries, Mahadeva, Noniadih, Raxaul, E.Champaran.

Proposal for establishment of 03 MT per hour capacity Raw Rice Mill unit in proprietorship at Mahadeva, Noniadih, Raxaul, E.Champaran.

1.8278 11 29.01.15

2033 M/S Maharani Mithilanchal Gas Services, Madhubani.

Proposal for establishment of 60,000 MT per year capacity Poultry Feed/Cattle Feed/Fish Feed unit in partnership at Industrial Area, Pandaul, Madhubani.

9.9000 50 29.01.15

2034 M/S Wonder Weave, Industrial Area, Barari, Bhagalpur.

Proposal for establishment of 2,30,400 Meter Fabric Weaving unit in proprietorship at Industrial Area, Barari, Bhagalpur.

1.1610 16 29.01.15

2035 M/S Madhav Industries, Industrial Area, Donar, Darbhanga.

Proposal for establishment of 03 Lakh K.G. Rusk and 1,50,000 K.G. Biscuit capacity Bakery unit in proprietorship.

1.0500 15 29.01.15

2036 M/S Amrit Feeds Limited, Patna.

Proposal for capacity expansion from 06 MT per hour capacity to 10 MT per hour capacity in the existing unit of Poultry Feeds at Industrial Area, Hajipur, Vaishali.

11.9704 160 29.01.15

2037 M/S Netaji Subhash Polytechnic, Amhara, Bihta.

Proposal for establishment of Engineering Institute for M.Tech and M.B.A. Curriculum at M.I.P. Amhara, Bihta, Patna.

8.0000 29.01.15

2038 M/S M/S Sri Krishna Engineering, New Industrial Estate, Bela, Darbhanga.

Proposal for establishment of 150 MT yearly capacity Steel Window, Gate, Aluminium Furniture, Steel Furniture, Agriculture Products production unit in proprietorship at Industrial Estate, Bela, Darbhanga.

0.3505 7 29.01.15

2039 M/S Bihar Ma Durga Agro Industries Pvt. Ltd., Anisabad, Patna.

Proposal for establishment of 3900 MT per year capacity Agriculture and Forestry Machineries production unit at Industrial Area, Pandaul, Madhubani.

13.9195 82 29.01.15

Page 165: Proposals Approved by State Investment Promotion … · Proposals Approved by State Investment Promotion Board (SIPB) ... Engineering College in Purnea. ... Establishment of Engineering

Report-3

165 2040 M/S Rahi Agro Foods, Dehri-

on-Sone, Rohtas. Proposal for capacity expansion from 01 MT per hour capacity to 04 MT per hour capacity in the existing unit in proprietorship at Industrial Area, Dehri-on-Sone, Rohtas.

3.0125 25 29.01.15