Proposal Assesment at Pltu
Transcript of Proposal Assesment at Pltu
7/30/2019 Proposal Assesment at Pltu
http://slidepdf.com/reader/full/proposal-assesment-at-pltu 1/12
TITLE :
Document Type : ‐
Project ID : Page 1 of 12
Document Number
ASSESMENT VALVES
PLTU
LONTAR
Revision : Status : Replace & Service
Date : 19/09/2012
ASSESMENT VALVES
PLTU LONTAR
TELUK NAGA‐BANTEN
PT. WASKITA NIAGA PRIMA
I 19/09/2012 Ass Ags JJ.LG
No Date Status Issued Checked ApprovedRevision Memo COMPANY
Survey PLTU ‐ LONTAR
7/30/2019 Proposal Assesment at Pltu
http://slidepdf.com/reader/full/proposal-assesment-at-pltu 2/12
TITLE :
Document Type : ‐
Project ID : Page 2 of 12
Inspection of PLTU LONTAR valves at Teluk nagam, Date: 19‐September‐2012 has finded a few result:
ASSESMENT VALVES
PLTU
LONTAR
PT. WASKITA NIAGA PRIMA
Document Number
Revision : Status : Replace & Service
Date : 19/09/2012
I.Globe valve size DN 20 , PN 16: 2. Globe valves DN 32 dan DN 40 PN 16 :
I 19/09/2012 Ass Ags JJ.LG
No Date Status Issued Checked Approved
PLTU ‐ LONTAR
Revision Memo COMPANY
Survey
7/30/2019 Proposal Assesment at Pltu
http://slidepdf.com/reader/full/proposal-assesment-at-pltu 3/12
TITLE :
Document Type : ‐
Project ID : Page 3 of 12
3. Globe valves size DN 20 PN 25 :
Revision : Status : Replace & Service
Date : 19/09/2012
PT. WASKITA NIAGA PRIMA
Document Number
ASSESMENT VALVES
PLTU
LONTAR
4. Butterfly valves DN 100 PN 10 / 16 :
I 19/09/2012 Ass Ags JJ.LG
No Date Status Issued Checked Approved
Survey PLTU ‐ LONTAR
Revision Memo COMPANY
7/30/2019 Proposal Assesment at Pltu
http://slidepdf.com/reader/full/proposal-assesment-at-pltu 4/12
TITLE :
Document Type : ‐
Project ID : Page 4 of 12
5. Globe valve sea water DN 200 PN 10 / 16 :
Revision : Status : Replace & Service
Date : 19/09/2012
ASSESMENT VALVES PLTU LONTAR
Document Number
PT. WASKITA NIAGA PRIMA
6. PSV DN 40 PN 16, This psv open is bonnet type, in open pressure was leak out from bonnet and will be
replaced with close bonnet type. See the picture :
I 19/09/2012 Ass Ags JJ.LG
No Date Status Issued Checked ApprovedRevision Memo COMPANY
Survey PLTU ‐ LONTAR
Leak out from here
7/30/2019 Proposal Assesment at Pltu
http://slidepdf.com/reader/full/proposal-assesment-at-pltu 5/12
TITLE :
Document Type : ‐
Project ID : Page 5 of 12
7. Inspection of Boiler valves, PLTU LONTAR are Plant design from China same like PLTU Labuan that have
11 ea Boiler valves, and 1 ea EBV from Unit 1 until 3.
We have recommendation all PSV unit on Boiler must be certification every 3 years so they want PT.WNP
make recommendation for certification of Boiler valves olso pricing about EVT and Hydrouset test.
If sparepart who will be need it.
Contact persons :
No1 Setyo Harsono
2 Juneven Sabar Siregar
3 Riyanto Dharu N
4
5
ASSESMENT VALVES PLTU LONTAR
Revision : Status : Replace & Service
Date : 19/09/2012
PT. WASKITA NIAGA PRIMA
Document Number
0811123312
085692216049
0811124651 namin.hida at indonesia ower.co.id
Name Position HP EmailSPV Logistik 085217414443 [email protected]
SPV Planner 081311440073 [email protected]
Nanang Supriyatna
Namin Hida at
SPV Pemaliharaan Machine
SPV Pemeliharaan Control
Mana er
18 "
PLTU LONTAR did't have the Valves Data every plant area
11 ea PSV Picture :
1. DA 24327
I 19/09/2012 Ass Ags JJ.LG
No Date Status Issued Checked Approved
Survey PLTU ‐ LONTAR
Revision Memo COMPANY
. . .
18 "18 "
18 "
7/30/2019 Proposal Assesment at Pltu
http://slidepdf.com/reader/full/proposal-assesment-at-pltu 6/12
TITLE :
Document Type : ‐
Project ID : Page 6 of 12
2. DA 24326
Status : Replace & Service
Date : 19/09/2012
PT. WASKITA NIAGA PRIMA
Document Number
ASSESMENT VALVES PLTU LONTAR
Revision :
18 "
3. DA
24328
I 19/09/2012 Ass Ags JJ.LG
No Date Status Issued Checked Approved
Survey PLTU ‐ LONTAR
Revision Memo COMPANY
7/30/2019 Proposal Assesment at Pltu
http://slidepdf.com/reader/full/proposal-assesment-at-pltu 7/12
TITLE :
Document Type : ‐
Project ID : Page 7 of 12
4 DA 24336
ASSESMENT VALVES
PLTU
LONTAR
Revision : Status : Replace & Service
Date : 19/09/2012
PT. WASKITA NIAGA PRIMA
Document Number
18 "
5 DA 24335
I 19/09/2012 Ass Ags JJ.LG
No Date Status Issued Checked Approved
Survey PLTU ‐ LONTAR
Revision Memo COMPANY
7/30/2019 Proposal Assesment at Pltu
http://slidepdf.com/reader/full/proposal-assesment-at-pltu 8/12
TITLE :
Document Type : ‐
Project ID : Page 8 of 12
6 DA 24348
Document Number
ASSESMENT VALVES
PLTU
LONTAR
Revision : Status : Replace & Service
Date : 19/09/2012
PT. WASKITA NIAGA PRIMA
18 "
7 DA 243349
I 19/09/2012 Ass Ags JJ.LG
No Date Status Issued Checked Approved
Survey PLTU ‐ LONTAR
Revision Memo COMPANY
7/30/2019 Proposal Assesment at Pltu
http://slidepdf.com/reader/full/proposal-assesment-at-pltu 9/12
TITLE :
Document Type : ‐
Project ID : Page 9 of 12
8 DA 24344
Date : 19/09/2012
PT. WASKITA NIAGA PRIMA
Document Number
ASSESMENT VALVES
PLTU
LONTAR
Revision : Status : Replace & Service
18 "
9 DA 24347
I 19/09/2012 Ass Ags JJ.LG
No Date Status Issued Checked Approved
Survey PLTU ‐ LONTAR
Revision Memo COMPANY
7/30/2019 Proposal Assesment at Pltu
http://slidepdf.com/reader/full/proposal-assesment-at-pltu 10/12
TITLE :
Document Type : ‐
Project ID : Page 10 of 12
10. DA 24346
Revision : Status : Replace & Service
Date : 19/09/2012
PT. WASKITA NIAGA PRIMA
Document Number
ASSESMENT VALVES
PLTU
LONTAR
18 "
11 DA 24343
I 19/09/2012 Ass Ags JJ.LG
No Date Status Issued Checked Approved
Survey PLTU ‐ LONTAR
Revision Memo COMPANY
Spreader
7/30/2019 Proposal Assesment at Pltu
http://slidepdf.com/reader/full/proposal-assesment-at-pltu 11/12
TITLE :
Document Type : ‐
Project ID : Page 11 of 12
12 DA 24341
PT. WASKITA NIAGA PRIMA
Document Number
ASSESMENT VALVES
PLTU
LONTAR
Revision : Status : Replace & Service
Date : 19/09/2012
18 "
EBV and Isolation Valve Still goodCondition
I 19/09/2012 Ass Ags JJ.LG
No Date Status Issued Checked Approved
Survey PLTU ‐ LONTAR
Revision Memo COMPANY
Spreader
7/30/2019 Proposal Assesment at Pltu
http://slidepdf.com/reader/full/proposal-assesment-at-pltu 12/12
TITLE :
Document Type : ‐
Project ID : Page 12 of 12
8. PLTU LONTAR need a like control valve can reduce pressure from high to low pressure(like CCI valve),
Contact person is Pak Burhan, Mobille phone : 087802016160
For the specification of valve Pak Burhan will be send email later.
CONCEQUENCE FOR THIS NOW:
1. PLTU LONTAR want PT.Waskita Niaga Prima submit price of valves ( new valves ).
2.
Costing about
EVT
and
Hydroset
Boiler
Valves.
3. Costing of service valves ( after get data from PLTU‐Lontar)
Revision : Status : Replace & Service
PT. WASKITA NIAGA PRIMA
Document Number
ASSESMENT VALVES PLTU LONTAR
Date : 19/09/2012
18 "
I 19/09/2012 Ass Ags JJ.LG
No Date Status Issued Checked Approved
Survey PLTU ‐ LONTAR
Revision Memo COMPANY
Spreader