EU consortium WASH Training Ethiopia 2012
PROJECT MANAGEMENT
Eoghan O’Suilleabhain, for EU WASH NGO Consortium group,Sidama, Ethiopia, 2012
![Page 2: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/2.jpg)
EU consortium WASH Training Ethiopia 2012
Schedule
Self Management / Time Management
People Management / Team
Project Planning / Fundamentals of WASH programmes
Project Management / Lifecycle Project Controls / Reporting
![Page 3: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/3.jpg)
EU consortium WASH Training Ethiopia 2012
![Page 4: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/4.jpg)
EU consortium WASH Training Ethiopia 2012
1/ TIME Management
ROLE MODEL
someone who appears calm, in control, well organised, Motivational, etc.
![Page 5: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/5.jpg)
EU consortium WASH Training Ethiopia 2012
Time Management – A HABIT
Must practice Everyone can improve Good habits become automatic Enjoy
![Page 6: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/6.jpg)
EU consortium WASH Training Ethiopia 2012
Manage Yourself First
Be organised before expecting others to be
Stress is contagious So is organisation & calmness
![Page 7: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/7.jpg)
EU consortium WASH Training Ethiopia 2012
Focus on ONE TASK at a time Identify tasks and allocate periods List items to do Complete ‘good enough’ Check off when complete
![Page 8: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/8.jpg)
EU consortium WASH Training Ethiopia 2012
Make time to Organise
If no time - you need to do it Files Shelf space (desk space) Tidy and organised
![Page 9: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/9.jpg)
EU consortium WASH Training Ethiopia 2012
Know where to find Information
Contacts / phone numbers, etc, Trays for invoices / receipts, etc. Archive old files
![Page 10: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/10.jpg)
EU consortium WASH Training Ethiopia 2012
Prioritising Time
Imp. UrgentImp. Not
Urg
Not ImpUrgent
Not ImpNot Urg
![Page 11: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/11.jpg)
EU consortium WASH Training Ethiopia 2012
Use Wall Space
Activity / work plans Maps Photographs Any information that you need
regularly
![Page 12: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/12.jpg)
EU consortium WASH Training Ethiopia 2012
Keep a Work Diary
Make this a habit Standard for all construction projects Date, weather, meetings, visits,
instructions given or received, etc Think of it as a ‘legal document’
![Page 13: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/13.jpg)
EU consortium WASH Training Ethiopia 2012
Weekly Schedule
Separate week into blocks of time (draw)
Vary desk work with field visits Organise tasks into these blocks Allow for unexpected jobs Remember ‘good enough’
![Page 14: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/14.jpg)
EU consortium WASH Training Ethiopia 2012
Email communication
Can be a distraction Check once or twice a day
![Page 15: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/15.jpg)
EU consortium WASH Training Ethiopia 2012
Work SMARTER not Harder
Busy and efficient 8 am to 5 pm / Mon to Fri
Don’t take work home as a rule Start every week and day relaxed If stressed you have to take time to
rest and organise your mind If sick you must rest
![Page 16: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/16.jpg)
EU consortium WASH Training Ethiopia 2012
Appreciate yourself
No job is more important than YOUR job
It is not what you do but how you do it!
![Page 17: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/17.jpg)
EU consortium WASH Training Ethiopia 2012
2/ PEOPLE Management
Also Team Building Results depend on the team not
individuals Delegate effectively Direct, Support, Manage You retain responsibility
![Page 18: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/18.jpg)
EU consortium WASH Training Ethiopia 2012
Give Clear Instructions
Explain what exactly is expected Clarify the priorities for each task Blaming others is a bad habit Mistakes will happen – support your
team to help them improve
![Page 19: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/19.jpg)
EU consortium WASH Training Ethiopia 2012
Training
Provide before and during project Help the team grow It should help motivate staff It should make them interested in
developing their potential
![Page 20: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/20.jpg)
EU consortium WASH Training Ethiopia 2012
Good work and RESPECT
Expect people to take work seriously Expect people to try their best Help them to succeed Manage through respect not fear
![Page 21: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/21.jpg)
EU consortium WASH Training Ethiopia 2012
Role Models for Leadership Football managers are motivators. Team more important than
individuals Manager
Supervisor
Site ATeam
Site BTeam
Administration
Support Staff
![Page 22: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/22.jpg)
EU consortium WASH Training Ethiopia 2012
Show appreciation
Be slow to criticise – try to understand and encourage
Be quick to thank others and show appreciation for efforts.
![Page 23: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/23.jpg)
EU consortium WASH Training Ethiopia 2012
WASH programmes – 10 key points
![Page 24: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/24.jpg)
EU consortium WASH Training Ethiopia 2012
1/ Water & Sanitation & Hygiene combined All required for health impact Facilities + knowledge = good
practice People prioritise water Sanitation & hygiene more related to
disease Clean water source but not when
consumed Schools: Latrines + water + soap +
awareness
![Page 25: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/25.jpg)
EU consortium WASH Training Ethiopia 2012
2/ Respecting communities & cultures
Priority stakeholders Involvement not just labour Empower through decision making Flexible proposals allow for change Local power structures Local traditions and beliefs
![Page 26: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/26.jpg)
EU consortium WASH Training Ethiopia 2012
3/ Gender
What roles do women have that makes them priority water users?
Reach out to alienated / weak voices Latrine access / privacy / safety Mothers pass on hygiene habits to
children Don’t neglect boys and men
![Page 27: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/27.jpg)
EU consortium WASH Training Ethiopia 2012
4/ Creating DEMAND
Important first step Water: simple reliable improved
source Sanitation: less appreciation for
benefits Sanitation: Don’t focus only on
health benefits Next slide looks at the many benefits
that can encourage demand
![Page 28: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/28.jpg)
EU consortium WASH Training Ethiopia 2012
Many benefits of sanitation Time Pride Status Safety Caring School access Health
![Page 29: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/29.jpg)
EU consortium WASH Training Ethiopia 2012
5/ Sustainability
Greatest challenge for all WASH A successful project is not one that
has achieved its targets by the completion date – but one that has provided an impact that will last for generations!
Next slide : an example of prioritising sustainability for hand-pumps.
![Page 30: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/30.jpg)
EU consortium WASH Training Ethiopia 2012
Sustainable hand-pump prog. Assess and consult and agree need Clarify options / agree choice Inform leaders, Gov. offices, etc Agree responsibilities / ownership Train water committee Clarify costs, charges, tariff payments Use appropriate pumps Ensure supply chain for parts and trained mech. Agree maintenance schedule Discuss future needs & expansion Monitor and support.
![Page 31: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/31.jpg)
EU consortium WASH Training Ethiopia 2012
6/ Appropriate solution
Does it meet the needs? Has it been agreed? Was the process inclusive? Is there a demand? Is it affordable? Can it be maintained? Is it expandable / scalable? Can it be replicated?
![Page 32: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/32.jpg)
EU consortium WASH Training Ethiopia 2012
7/ Operation & Maintenance Consider from the start Who makes decisions? Who cleans? Products? Maintenance / repair / parts / schedule Who pays? / tariffs / subsidies Guidance to replicate Guards / ownership / access / key holders Future replacement – when? How? Who ?
(eg school latrines)
![Page 33: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/33.jpg)
EU consortium WASH Training Ethiopia 2012
8/ Partnerships & Capacity Building Who can benefit? GOAL / INGO staff Local Gov. Staff Village groups / committees Local mechanics / traders School staff / committees Private Enterprises
Well diggers / soap makers / latrine slab producers / etc
![Page 34: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/34.jpg)
EU consortium WASH Training Ethiopia 2012
9/ Integration between sectors Health – hygiene awareness and
practices Nutrition – WASH targets malnutrition Livelihoods – subsistence gardens Education – school access and
hygiene HIV / Aids – greater need for affected
and carers Gender
![Page 35: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/35.jpg)
EU consortium WASH Training Ethiopia 2012
10/ Disaster risk reduction Reduce vulnerability Events repeat over cycles Design for future crisis Community awareness Sensitive to environment Don’t create dependency
![Page 36: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/36.jpg)
EU consortium WASH Training Ethiopia 2012
PROGRAMME MANAGEMENT
NEEDS ASSESSME
NT
PROG. DESIGN
PROPOSAL APPRAISAL
IMPLEMENTATION
STRATEGY DEVELOPM
ENT
![Page 37: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/37.jpg)
EU consortium WASH Training Ethiopia 2012
Strategy
Where? Timeframe? Interventions? Partners?
![Page 38: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/38.jpg)
EU consortium WASH Training Ethiopia 2012
Needs Assessment
Understanding Community Demand
![Page 39: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/39.jpg)
EU consortium WASH Training Ethiopia 2012
Programme Design
Options Advantages & Disadvantages Agreement Understanding Logframe
![Page 40: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/40.jpg)
EU consortium WASH Training Ethiopia 2012
Proposal
Prepare Agree Submit
![Page 41: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/41.jpg)
EU consortium WASH Training Ethiopia 2012
Implementation
Appoint managers Build team Financial and logistical systems Define targets Set controls
![Page 42: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/42.jpg)
EU consortium WASH Training Ethiopia 2012
Work Plan
Consider – weather Farming seasons Feast days School holidays Water table
![Page 43: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/43.jpg)
EU consortium WASH Training Ethiopia 2012
Monitoring & Evaluation
Monitoring – during implementation – highlights issues to address or change
Evaluation – On completion or after some time – measures results against initial objectives
![Page 44: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/44.jpg)
EU consortium WASH Training Ethiopia 2012
Contract Management
Advertising, selecting, accepting and signing contracts with providers of goods or service.
As per your org.s systems Clearly define responsibilities Consider future problems Define payment schedule (refer
sheets 1 & 2)
![Page 45: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/45.jpg)
EU consortium WASH Training Ethiopia 2012
Site supervision
Regular Quality control Solve problems Sign off on work complete
![Page 46: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/46.jpg)
EU consortium WASH Training Ethiopia 2012
3 Key issues for project control (see sheet 3)
TIME
BUDGET
QUALITY
![Page 47: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/47.jpg)
EU consortium WASH Training Ethiopia 2012
Time
Set timeframe for programme – projects – activities
Plan allowing for delays Keep to tight schedule
![Page 48: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/48.jpg)
EU consortium WASH Training Ethiopia 2012
Budget
Clear realistic budget Monitor spend constantly Agree any overspend Contingency for unexpected
![Page 49: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/49.jpg)
EU consortium WASH Training Ethiopia 2012
Quality
Know the minimum standards Supervise, test, accept or reject As good as possible within budget Think sustainability
![Page 50: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/50.jpg)
EU consortium WASH Training Ethiopia 2012
Progress / Gantt chart
Show planned activities within timeframe
Monitors actual activities / progress
Can control expenditure (see excel sheet)
![Page 51: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/51.jpg)
EU consortium WASH Training Ethiopia 2012
Meetings
Regular / brief Have clear purpose Identify issues Clarify actions / responsibilities Report
![Page 52: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/52.jpg)
EU consortium WASH Training Ethiopia 2012
Microsoft Project
Software relating to Progress / Gantt charts
(show video)
![Page 53: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/53.jpg)
EU consortium WASH Training Ethiopia 2012
Mapping
Overview of programme area Show villages Traditional sources Past interventions Current activities Future schemes Schools / clinics Understand transport difficulties
![Page 54: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/54.jpg)
EU consortium WASH Training Ethiopia 2012
Completion
Activities complete Within timeframe Within budget
Community systems in place Celebrate with beneficiaries
Learn – improve – expand
![Page 55: Proj.man. training eu wash](https://reader036.fdocuments.in/reader036/viewer/2022062319/55863c19d8b42a3c348b4a25/html5/thumbnails/55.jpg)
EU consortium WASH Training Ethiopia 2012
THANK YOU !