PROJECTS - SAXUM at Elementia Group,...
Transcript of PROJECTS - SAXUM at Elementia Group,...
SAXUM at Elementia Group, Mexico.Since August 2014 SAXUM is assis-ting Elementia Group from Mexico, more precisely, CEMENTOS FORTA-LEZA, in search of the best techno-logy and potential contractor for an EPC – Enginee¬ring, Procurement, Construction - servi¬ce contract. The target was a new cement plant with a 3,000 tpd of clinker production ca-pacity, i.e. greater than 1.35 million tpy of cement, located in the State of Hidalgo, Mexico.
Firstly, a complete bid package was developed including full basis and quote procedure for tender condi-tions. Then, a comprehensive as-sistance was performed by SAXUM which is still in development.
SAXUM’s assistance to Cementos Forta-leza includes following services: • Development of feasibility studies
and conceptual engineering for the differentexpansionareas.
• Development of trade-off studiesconsidering alternative technicalsolutionsandCapEx.
• Definition of Design Criteria for each project area and enginee-ring specialty.
• Preparation of comprehensive biddocuments.
• Q&A rounds with Bidders. • Bids Technical analysis to assure ful-
fillmentofthetenderspecifications.• Equalization of the technical-eco-
nomical proposals by bidders. • Conclusions on the Equalization
Analysis and Recommendations toOwner on every project area.
• Development of legal contract phi-losophy and main terms & condi-tionsfortheEPCservice.
TRADE OFF STUDIES: Tooptimize the investmentsbyCemen-tos Fortaleza, SAXUM performed diffe-rentTrade-OffStudieswiththeobjectiveto obtain the best philosophy and tech-nological concept for each project area.
1
EXTERNAL BULLETIN FOR OUR CLIENTS
Issue #150 - June 2015
CONNECTIONPROJECTS - Cementos Fortaleza
PROJECT AREAS OPTIMIZED THROUGH TRADE-OFF STUDIES: • Preheater Tower • Clinker Silo • Cement Silo • Cement Mill • Kiln (2 and 3 piers) • Grinding System
ACHIVED PROJECT OBJECTIVES • Final project CapEx resulted in a
significant reduction compared to the original one .
• Final project plant capacity shows an increase of 10% with respect to the originally planned one.
• Best technical and economic warranties.
• Best indemnification and penaltyconditionsforOwner.
• Fullintegrationbetweendifferentpro-ject areas and equipment providers.
• Final project schedule in accordance withOwner’sneedsregardingpartialandfinalmilestones.
The achievement of the above indicated relevant objectives of the project waspossibleduetothestrongandeffectiveteamwork between Cementos Fortale-za and SAXUM, and the extensive expe-rience of the involved professionals.
2
SAXUM CONNECTION
SAXUM Technical Asisstance at SOBOCE for Kiln´s Hot Gas System Optimization
PROJECTS - SOBOCE
In the period March/May 2015, SAXUM developed a design for SOBOCE’s cement plant in Tarija, Bo-livia for the optimization of the gas conditioning system of the existing Fuller kiln. This is an old 170tpd kiln which originally had only one cyclone.
The gases emerging from the pyro-process do so at very high tempera-tures causing among other problems, blockages and vibrations in the fan. In addition, air is injected in an un-controllable manner into the system to reduce the temperature of the ex-haust gas until reaching a proper con-dition for the baghouse.
SAXUM performed a hot gas balance analysis and of the load loss for each section. Based on these studies, spe-cific modifications to the system were suggested aiming to improve pyro-process stability and production.
In parallel, other recommendations were made by SAXUM for different plant locations:
• Resizing of the process filter in Raw Mil 2.
• Evaluation of hot gases injection to Raw Mill 2.
• Evaluation of FLS kiln’s main filter
operation.• Sizing FLS kiln´s clinker cooler
new filter .• Recommendations for optimiza-
tion in the cement grinding.
SAXUM Pre-feasibility Study for HOLCIMIn 2011-2012 SAXUM performed a pre-feasibility study for HOLCIM with the objective to increase the clinker production of its Cantagalo Plant in Brazil.
HOLCIM operated a dry cement process in this plant with a clinker production of 1250 tpd and a much larger grinding capacity. HOLCIM wanted to upgrade the clinker pro-duction to fully utilize their grin-ding capacity without having to bring in clinker from their other plants in Brazil.
PROJECTS - Cantagalo
The scope of SAXUM service in this project was the evaluation of the feasibility to increase the clinker production by conside-ring different possible alterna-tives, the identification of the areas needing upgrades/impro-vements (in each alternative).
Also the selection of the opti-mum solution for clinker upgra-de, provide the conceptual engi-neering of the optimal solution, and the related CapEx/OpEx.
3
CONNECTIONisanewsletterpublishedbySAXUMforitsclients
BRAZIL USA ARGENTINA
[email protected] www.saxuming.net www.saxum.us
São Paulo +55 11 3042 7795
Irving/Dallas +1 972 876 0584 Tucumán
+54 381 4226151
Buenos Aires+54 11 43721815
SAXUM CONNECTION
SAXUM Participation in IEEE-IAS/PCA Cement Conference in Toronto, Canada
SAXUM´s Senior Project Manager: Mr. Rubén Tomassini
SAXUM Engineering LLC has an active participation in the last IEEE-IAS/PCA Cement Conference, last April 2015, in Toronto, Canada. We were presen-ting on this Event with a booth stra-tegically located.
There, our General Manager Nor-th America, Mr. Chris Hayman, and our Executive Director, Mr Guillermo Etse, were available to welcome the visitors and to respond the ques-tions and requirements of many dis-tinguished representants of cement producers from the different coun-tries in the Americas.
SAXUM has provided assistance servi-ces to a large amount of industry clients worldwide. These services were perfor-med through SAXUM’s team of expe-rienced and specialized engineers in all disciplines. All these achievements were impossible to assets without the proper interoffice project procedures,activeplanningandmanagement.
Project Management teams handles the interrelationship and understan-ding between the core of the business and the specialized engineering team. Leadership and collaboration concept
are essential to assure that our teams are well prepared and fit to deliver the best solutions to our clients throug-hout the world.
Ruben Tomassini is a Senior Project Ma-nager with more than 25 years of inter-nationalexperiencewithbackgroundinconstructionmanagement,scheduling,logisticandcontractanalysisforindus-trial projects as well residential buil-dings and infrastructure developments. Ruben is an asset in terms of engi-neering and construction manage-ment, featuring:
THE COMPANY
THE COMPANY
• Local and international experiencein Planning, Programming and Ma-nagement Control in Main Architec-tural, Civil and Industrial Projects.
• Experience in Project Coordi-nation, Engineering and Works Management. Client’s Represen-tation in Architectural, Civil and Industrial Projects.
• Experience in equipment start-up and systems (commissioning), on-site works supervision,
• Experience in training professionals for work planning and follow up.