CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
MISSION GENERAL SERVICES TAKREER WAREHOUSE REFINERY
EPC for FIRE PROTECTION SYSTEMS (SPRINKLER, PRE‐ACTION, CLEAN AGENT, FOAM, DELUGE, STANDPIPE, FIRE
EXTINGUISHING, EXTERNAL HYDDRANT, HOSE REELS, FIRE & GAS, PAGA, CCTV, ACCESS CONTROL and TELEPHONE/DATA SYSTEMS)
FIRE DETECTION, FIRE PROTECTION and TELECOMMUNICATIONS SYSTEMS
2014
DRAKE &SCULL LOUVRE MUSEUM ABU DHABI
DESIGN, ENGINEERING, SUPPLY, INSTALLATION (TRAINING), TESTING, COMMISSIONING AND HANDOVER OF FIRE ALARM, VOICE EVACUATION, FIRE TELEPHONE, ASPIRATING SMOKE
DETECTION SYSTEMS
FIRE DETECTION SYSTEMS 2014
AL SHIRAWI ELEC & MECH ENGG LLCPRIMARY SCHOOL NURSERY BUILDING IN WADI AL
SAFA 7 DUBAI
ENGINEERING, SUPPLY, INSTALLATION, TESTING and COMMISIONING OF FIRE FIGHTING SYSTEM, SPRINKLER SYSTEM INCLUDING PUMPS, FM200, DELUGE FOAM and PRE‐ACTION
SYSTEMS
FIRE PROTECTION SYSTEMS 2014
PETROFAC EMIRATES LLCEXPANSION OF BAB GAS COMPRESSION PROJECT
PHASE 2
DESIGN, SUPPLY, ENGINEERING, TESTING & SUPPLY OF SINGLE DELUGE VALVE SKID, LOOSE SUPPLY OF STRAINER, MEDIUM
VELOCITY and HIGH‐VELOCITY NOZZLEFIRE PROTECTION SYSTEMS 2014
AL MAZROUEI BOWYER BUILDING LLC VVIP LIBRARY ABU DHABI UAEDESIGN, SUPPLY, INSTALLATION, TESTING & COMMISIONING OF
HIGH PRESSURE WATER MIST & VESDA SYSTEMSFIRE PROTECTION AND FIRE DETECTION
SYSTEMS2014
PROJECT MANAGEMENT, PLANNING, DOCUMENTATION
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
AL GHANIM WORMALD KOC ELAVATED SUBSTATIONSPROJECT MANAGEMENT, PLANNING, DOCUMENTATION
ASSISTANCE, SUPERVISION & SAFETY FOR INSTALLATION OF INERGEN SYSTEM
FIRE PROTECTION SYSTEMS 2014
SERCOMAINTENANCE AT CLEVELAND CLINIC ABU DHABI (3
YEARS)MAINTENANCE OF FIRE FIGHTING and FIRE SUPPRESSION SYSTEMS AT CLEVELAND CLINIC ABU DHABI (3 YEARS)
FIRE PROTECTION SYSTEMS 2014
ACTCO GENERAL CONTRACTING CO LLC NEW OFFICE BUILDING PROJECT AT RUWAIS
DESIGN, FABRICATION, INSTALLATION, TESTING & COMMISIONING OF FIRE FIGHTING SYSTEM (FIRE HYDRANT, UNDERGROUND GRE PIPEWORK, FIRE HOSE REEL and FIRE
EXTINGUISHERS, FIRE BLANKET and FIREST AID BOX)
FIRE PROTECTION SYSTEMS 2014
ROBT. STONE (ME) LLC HIGH‐PRESSURE PIPELINE CONNECTION for NGV
FILLING STATIONS PHASE 2
DESIGN, SUPPLY, FAT, INSTALLATION, SUPERVISION, TESTING & COMMISIONING OF ISAT TRAINING AND HANDOVER OF FIRE &
GAS SYSTEM AND DEVICES, HSSD & INERGEN SYSTEM
FIRE PROTECTION AND FIRE DETECTION SYSTEMS
2014
GASCOMAINTENANCE OF ONLINE ANALYZER AT ALL GASCO
SITESMAINTENANCE SERVICES CONTRACT FOR ONLINE ANALYZERS
FOR ASAB, HABSHAN & BAB, HABSHAN 5 and RUWAISANALYERS SYSTEM 2014
DANWAY ELECTRICAL & MECHNICAL LLC EMAL PHASE 2 RT BAYS SUPPLY, FABRICATION, FIELD INSTALLATION, SITE SUPERVISION, TESTING and COMMISIONING OF DELUGE WATER SPRAY FIXED
SYSTEMFIRE PROTECTION SYSTEMS 2014
Page 1 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
ADNOCLUBE OIL CARTON STORAGE SHED AT SAS AL NAKHIL LUBE & GREASE OIL DEPOT ‐ ADNOC DISTRIBUTION
DESIGN, SUPPLY, SUPERVISION, INSTALLATION, TESTING & COMMISIONING OF WATER SPRINKLE SYSTEM
FIRE PROTECTION SYSTEMS 2014
NPCC/TECHNIP ZADCO UZ750K‐EPC1 PROJECT DESIGN and SUPPLY OF FIRE FIGHTING, SAFETY, LIFE‐SAVING
EQUIPMENTS and SAFETY SIGNSFIRE PROTECTION SYSTEMS 2014
INTECSA INDUSTRIAL FLARE GAS RECOVERY PROJECT PHASE 2
DESIGN, PROCUREMENT, FABRICATION, PANEL BUILDING, SUPPLY, INSTALLATION and COMMISSIONING OF FIRE FIGHTING
EQUIPMENTS, DELUGE SYSTEM, FIRE ALARM PANEL, FIELD DEVICES FOR UMM AL NAR and RUWAIS REFINERIES
FIRE PROTECTION AND FIRE DETECTION SYSTEMS
2014
PETROFACEPC OF EXPANSION OF BAB GAS COMPRESSION
PROJECT (EBGCP) PHASE 2DESIGN, SUPPLY & FAT OF FIRE DETECTION, HSSD and FIRE GAS
DEVICES FIRE DETECTION SYSTEMS 2014
AMANA STEEL BUILDING CONTRACTING LLC
EKFC NEW COLD STORAGE AT AL RUWIYAH 3RDDESIGN, SUPPLY & INSTALLATION OF FIRE PUMP, SPRINKLER, HOSE REEL, HYDRANTS, EXTINGUISHERS, FIRE ALARM, VOICE EVACUATION, VESDA & INERGEN GAS SUPPRESSION SYSTEMS
FIRE PROTECTION SYSTEMS 2014
MATRIX CONSTRUCTIONEPC CONTRACT FOR AL AIN WATER TRANSMISSION
SCHEME (TRANSCO CONTRACT NO. N‐4381B)DESIGN, SUPPLY, TESTING & COMMISIONING OF FIRE ALARM
SYSTEM FOR AL AIN TRANSMISSION LINEFIRE DETECTION SYSTEMS 2014
DESIGN & SUPPLY OF INERGEN & FOAM SYSTEM SPECIALIST
GUMSUNG FIRE & SECURITY BRAKA NUCLEAR POWER PLANT
DESIGN & SUPPLY OF INERGEN & FOAM SYSTEM SPECIALIST EQUIPMENT, MANIFOLD & RACK STRUCTURE FABRICATION FOR INERGEN CYLINDER, SUPERVISION, TESTING, COMMISSIONING &
SITE INSTALLATION
FIRE PROTECTION SYSTEMS 2014
AMANA STEEL BUILDING CONTRACTING LLC
PROPOSED G+M FACTORY and OFFICE AT PLOT NO. 531‐5801, DUBAI INDUSTRIAL CITY
DESIGN, SUPPLY, INSTALLATION, & COMMISIONING OF FIRE PUMP, SPRINKLER, FIRE HOSE REEL, FIRE EXTINGUISHER, FM200
and FIRE DETECTION SYSTEMS
FIRE PROTECTION AND FIRE DETECTION SYSTEMS
2014
EMIRATES MAINTENANCE AT HANGARMAINTENANCE FIRE ALARM and FIRE FIGHTING AT
EMIRATESHANGARFIRE PROTECTION AND FIRE DETECTION
SYSTEMS2014
GS E&C CORPORATIONTAKREER INTER‐REFINERY PIPELINE (IRP) II
MODIFICATION WORKS
SUPPLY, TESTING, INSTALLATION & COMMISIONING OF IO MODULES INSIDE PANEL & HSSD PIPE MODIFICATION
INSTALLATION OF FIELD DEVICES BY GS E&C ,DCS RELATED WORKS BY OTHERS VISUAL
FIRE DETECTION SYSTEMS 2014
TYCO DBEBOOSTER SUBSTATION BS‐132 & ENHANCEMENTS TO
BS‐131 DESIGN, ENGINEERING, FABRICATION, SUPPLY, TESTING & COMMISIONING OF INERGEN FIRE EXTINGUISHING SYSTEMS
FIRE PROTECTION SYSTEMS 2014
Page 2 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
TOYO ENGINEERING FIRE ALARM SYSTEM FOR IFFCL, NIGERIA SUPPLY, FAT & DOCUMENTATION FIRE DETECTION SYSTEMS 2014
MERCURY INTERNATIONAL ELECTRO MECHANICAL
BOROUGE 3NOS PROCESS
DESIGN & PROCURMENT, FABRICATION, SUPPLY OF FOUR WAY FIRE HYDRANT C/W PUMPER CONNECTION N UPSTREAM
ISOLATION VALVE FIRE HYDRATN C/W PUMPER CONNECTION N UPSTREAM ISOLATION VALVE SET
FIRE PROTECTION SYSTEMS 2014
THE RITZ CARLTON ABU DHABIMAINTENANCE OF FIRE ALARM, FIRE SUPPRESSION & FIRE FIGHTING SYSTEM AT RITZ CARLTON HOTEL &
FACILITIES
MAINTENANCE OF FIRE ALARM, FIRE SUPPRESSION & FIRE FIGHITNG SYSTEMA AT RITZ CARLTON HOTEL & FACILITIES
FIRE PROTECTION AND FIRE DETECTION SYSTEMS
2013
DUBAI POLICE GHQ ANNUAL MAINTENANCE AT DUBAI CENTRAL PRISONMAINTENANCE OF FIRE ALARM AND PUBLIC ADDRESS SYSTEMA
AT DUBAI CENTRAL PRISONFIRE DETECTION and
TELECOMMUNICATIONS SYSTEMS2013
L&T ELECTRICAL & AUTOMATION QATAR RAS LAFFAN INDUSTRY PAGA SYSTEM FOR EXPORT GAS COMPRESSION TELECOMMUNICATIONS SYSTEMS 2013
LINDBERG POWER DIVISION NEW 132/33KV SUBSTATION AT AL RUWAISDESIGN, ENGINEERING, SUPPLY, FABRICATION, INSTALLATION, TESTING & COMM OF INERGEN FIRE EXTINGUISHER SYSTEM
FIRE PROTECTION SYSTEMS 2013
CONSOLIDATED CONTRACTORS ADP‐ASTANA‐KAZAHKISTANSUPPLY, INSTALLATION and COMMISSIONING OF EARTHCAM
SECURITY SYSTEMS 2013CONSOLIDATED CONTRACTORS ADP ASTANA KAZAHKISTANSYSTEM WITH ARCHIVING
SECURITY SYSTEMS 2013
L&T ELECTRICAL & AUTOMATION LEAN GAS PIPELINE FIRE AND GAS SYSTEM FOR 24 LEAN GAS PIPE LINE PROJECT FIRE DETECTION SYSTEMS 2013
FARAH LEISURE PARK MANAGEMENT LLC MAINTENANCE AT FERRARI WORLD MAINTENANCE OF FIRE DETECTION AND VESDA SYSTEM FIRE DETECTION SYSTEMS 2013
NATIONAL MARINA REAL ESTATE MAINTENANCE AT MARINA MALLMAINTENANCE OF FIRE ALARM & FIRE FIGHTING SYSTEMS AT
MARINA MALL FOR A DURATION OF 1 YEAR FIRE PROTECTION AND FIRE DETECTION
SYSTEMS2013
SMART WORLD SMART WORLD‐AIRPORT EXPANSION PHASE 3SUPPLY, INSTLLATION, TESTING & COMMISSIONING OF CEM
ACCESS CONTROL SYSTEMSECURITY SYSTEMS 2013
BILT MIDDLE EAST LLC NOVEC‐EMIRATES SKY CARGO DESIGN, SUPPLY, TESTING & COMMISSIONING OF NOVEC 1230 FIRE PROTECTION SYSTEMS 2013
GASCO GASCO‐WIRELESS CCTV GASCO‐WIRELESS CCTV SECURITY SYSTEMS 2013
Page 3 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
TECHNIP ABU DHABI ZADCO UZ750 EPC1 PROJECT DESIGN, ENGINEERING AND SUPPLY OF NOVEC 1230 FIRE PROTECTION SYSTEMS 2013
MERCURY QATAR MERCURY QATAR NATIONAL LIBRARYENGINEERING, SUPPLY, INSTALLATION, TESTING &
COMMSIIOING OF HIGH PRESSURE WATER MIST SYSTEMFIRE PROTECTION SYSTEMS 2013
BOROUGE NEW INCIDENT COMMAND CENTREDESIGN, SUPPLY & INSTALLATION OF LATEST
TELECOMUNICATION CENTRETELECOMMUNICATIONS SYSTEMS 2013
TOYO ENGINEERING‐JAPAN ETHYDCO ETHYLENE PLANT‐2DESIGN, DETAILED ENGINEERING & SUPPLY OF INERGEN FIRE
SUPPRESSION SYSTEMFIRE PROTECTION SYSTEMS 2013
MAB GENERAL MAINTENANCE POWER PLANT RUWAISSUPPLY, INSTALL & COMMISIONING OF 18 NOS OF WEB
CAMERAS WITH LOCAL STORAGE FOR 1 MONTHSECURITY SYSTEMS 2013
CONNEX TOTAL SOLUTIONS CONNEX ‐ SUBSTATION A (SHARJAH AIRPORT)DESIGN, SUPPLY, TESTING, & COMMISSIONING OF INERGEN GAS
SUPPRESSION SYSTEMFIRE PROTECTION SYSTEMS 2013
GASCO EXTINGUISHING PANEL REPLACMENT AT GASCCO
HABSHANREPLACEMENT OF EXISTING RELEASE PANEL AT GASCO HABSHAN FIRE DETECTION SYSTEMS 2013
AL RYUM CROWN PRINCE COURT‐K12 BOLLARDSDESIGN, SUPPLY, INSTALLATION & COMMISIONING OF DELTA
SECURITY SYSTEMS 2013AL RYUM CROWN PRINCE COURT‐K12 BOLLARDSK12 HYDROLLIC BOLLARDS
SECURITY SYSTEMS 2013
DHAFIR TECHNOLOGIES LLC EXPANSION OF AVIATION FUEL AT ABU DHABI
INTERNATIONAL AIRPORTDESIGN, ENGINEERING, INSTALLATION & COMMISIONING OF
INERGEN FIRE EXTINGUISHING SYSTEMFIRE PROTECTION SYSTEMS 2013
IDAMA MAINTENANCE OF FIRE FIGHTING SYSTEM AT JBRANNUAL MAINTENANCE CONTRACT FOR FIRE FIGHTING SYSTEM
AT JBRFIRE PROTECTION SYSTEMS 2013
AL HIKMA BUILDING MIRDIFF SCHOOL PH 111DESIGN, SUPPLY & INSTALLATION OF FIRE FIGHTING SYSTEMS, SPRINKLERS, FM2000 & FIRE ALARM SYSTEMS AT MIRDIFF
SCHOOL PH‐3
FIRE PROTECTION AND FIRE DETECTION SYSTEMS
2013
MACE MACRO MAINTENANCE of SECURITY MANAGEMENT SYSTEMS
at ABU DHABI INVESTMENT COUNCILMAINTENANCE at ABU DHABI INVESTMENT COUNCIL SECURITY SYSTEMS 2013
TECHNIP ADMA DAS ISLAND FLARE REVAMP PROJECTDESIGN, ENGINEERING, SUPPLY & DOCUMENTATION OF FIRE ALARM SYSTEM, VESDA & F&G SYSTEM FOR ADMA FLARE
REVAMP PROJECTFIRE DETECTION SYSTEMS 2013
GASCO REPLACEMENT OF EXISTING OBSOLETE CABINET CO2
FIRE EXTINGUISHER SYSTEM WITH CO2 SYSTEMDESIGN, PROCUREMENT AND SUPPLY OF HVAC CABINET CO2
SYSTEM ANSUL C/W STAND‐ALOE DETECTION SYSTEMFIRE PROTECTION AND FIRE DETECTION
SYSTEMS2013
Page 4 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
HABTOOR LEIGHTON GROUP ACCOMODATION & UTILITY PROJECTDESIGN, ENGINEERING, SUPPLY, INSTALLATION, TESTING AND
COMMSIONING OF FIRE & GAS DETECTION, FIRE PROTECTION & LEAK DETECTION SYSTEM
FIRE PROTECTION AND FIRE DETECTION SYSTEMS
2013
CCC CCC ‐ 100MBD DAS FACILITIES UPGRADE SUPPLY OF FIRE FIGHTING EQUIPMENTS, TECHNICAL SUBMITTAL
AND DRAWINGS FOR HYDRANTSFIRE PROTECTION SYSTEMS 2013
NATIONAL CONTRACTING COMPANY NATIONAL CONTRACTING CO‐FEWA ‐E18DESIGN, SUPPLY, INSTALLATION, TEST & COMMISSIONING OF
FIRE ALARM &FIRE FIGHTING SYSTEMS AT FEWA SITEFIRE PROTECTION and FIRE DETECTION
SYSTEMS2013
SAMSUNG ENG CO LTD CARBON BLACK DELAYED COKER PLANTDESIGN, INSTALL, TESTING & COMMISSIONING OF INERGEN SPECIALIST EQUIPMENTS, MANIFOLD, PIPES, FITTINGS KMS N
MIR SWITCH N OPV FOR BUILDINGS (29ROOMS)FIRE PROTECTION SYSTEMS 2013
SUWAIDI ENGG FITOUT AT ADNOC HQDESIGN, SUPPLY, TESTING & COMMISIONING OF INERGEN
200BAR FIRE SUPRESSION SYSTEMFIRE PROTECTION SYSTEMS 2013
NPCC‐TECHNIP UZ750 BROWNE FIELD SUPPLY, INSPECTION & DOCUMENTATION OF FIRE GAS DEVICES FIRE DETECTION SYSTEMS 2013
EURO MECHANICAL & ELECTRICAL ADMA OPCO SIMOPS PROJECTDESIGN, FABRICATION & SUPPLY OF 4SKIDS &SPRAY NOZZLE
&PIPEWORKFIRE PROTECTION SYSTEMS 2013
ASOLOUVRE JV THE LOUVRE MUSEUM ABU DHABI SECURITY SYSTEM FOR ABU DHABI LOUVRE MUSEUM SECURITY SYSTEMS 2013ASOLOUVRE JV THE LOUVRE MUSEUM ABU DHABI SECURITY SYSTEM FOR ABU DHABI LOUVRE MUSEUM SECURITY SYSTEMS 2013
KHANSAHEB CIVIL ENGINEERING DUBAI MALL INERGENDESIGN, SUPPLY, INSTALL, TESTING & COMMISSIONING OF
INERGEN 300BAR SYSTEMFIRE PROTECTION SYSTEMS 2013
POWER POINT BALLROOM AT LE MERIDIEN HOTEL DESIGN & SUPPLY OF FIRE FIGHTING EQUIPMENT FIRE PROTECTION SYSTEMS 2013
WAAGNER BIRO GULF MAINTENANCE AT RTA STRUCTURES ANNUAL MAINTENANCE OF FIRE FIGHTING SYSTEM FIRE PROTECTION SYSTEMS 2013
SOLAS SAFETY EQUIPMENTOFFSHORE ‐ FOAM EQUIPMENT HANDWARE AND
AGENTSUPPLY OF FOAM EQUIPMENT HANDWARE AND AGENT FIRE PROTECTION SYSTEMS 2013
LITWIN PEL GASCO NGL PIPELINE PROJECTDESIGN, PROCUREMENT, FABRICATION, SUPPLY, INSTALL &
COMMISSIONING OF INERGEN SYSTEM & DELUGE EXTINGUISHERS
FIRE PROTECTION SYSTEMS 2013
AMANA STEEL BLDG AMANA STEEL BUILDING‐ DESIGN, SUPPLY, INSTALLATION, SUPERVISION, TESTING & COMMISSIONING OF FIRE DETECTION & FIRE PROTECTION
SYSTEMS
FIRE PROTECTION and FIRE DETECTION SYSTEMS
2013
Page 5 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
ABU DHABI PORTS COMPANY (ADPC) KHALIFA PORT INDUSTRIAL ZONE (KPIZ) ‐ GMS
MODIFICATIONSMODIFICATIONS TO GMS SOFTWARE SECURITY SYSTEMS 2013
NATIONAL HOLDING and AL MOJIL LLC COMMANDER OF MILITARY WORKS (MW‐NF‐216‐2010DESIGN, ENGINEERING AND SUPPLY OF FULL FUNCTIONAL
LIQUID HYDRO CARBON LEAK DETECTION SYSTEMFIRE DETECTION SYSTEMS 2013
SKEC KOREA ELEVATED SUBSTATIONINERGEN SYSTEM SPECIALIST ITEMS, MANIFOLDS, PIPEWORK,
PANEL ALARMS & CONTROL DEVICESFIRE PROTECTION and FIRE DETECTION
SYSTEMS2013
DANWAY FIRE ALARM SYSTEM AT SOLAR PARKSUPPLY, INSTALLATION, TESTING & COMMISSIONING OF FIRE ALARM SYSTEM & FIRE EXTINGUISHERS FOR THE SOLAR PARK
PROJECT
FIRE PROTECTION and FIRE DETECTION SYSTEMS
2013
EMIRATES PALACE HOTEL TECHNICAL SUPPORTTECHNICAL SUPPORT FOR FIRE DETECTION, SMOKE CONTROL,
PAVA & VESDA SYSTEM FOR 3 YRSFIRE DETECTION and PAVA SYSTEM 2013
BANIYAS INVESTMENT MAINTENANCE OF FIRE DETECTION and FIRE PROTECTION SYSTEMSA AT BAWABAT MALL
ANNUAL MAINTENANCE OF FIRE DETECTION and FIRE PROTECTION SYSTEMS
FIRE DETECTION and FIRE PROTECTION SYSTEMS
2013
TAKREERPROVISION OF FIRE FIGHTING SYSTEM FOR FLOATING
ROOF TANKS and SPHERES IN RUWAIS REFINERY (AGREEMENT NO. 12RREDR10899)
EPC CONTRACT ‐ PROVISION OF FOAM SYSTEM/SKIDS, DELUGE SYSTEMS/SKIDS, FIRE & GAS SYSTEM, LHD SYSTEM, CIVIL, INSTRUMENTATION & SPECIALIST WORKS ON OIL STORAGE
TANKS
FIRE DETECTION and FIRE PROTECTION SYSTEMS
2013
CCC SHAH SULPHUR STATION & PIPELINESSUPPLY, DOCUMENTATION AND COMMISIONING OF FIRE & GAS
DETECTOR FOR SHAH SULPHUR STATIONFIRE DETECTION SYSTEMS 2013
ARCHIRODON CONSTRUCTIONEPC WORKS FOR CONSTRUCTION OF JETTY AT HAMRIYAH FREE ZONE FIRE & SAFETY WORKS
ENGINEERING, SUPPLY, SUPERVISION OF INSTALLATION, TESTING & COMMISSIONING OF FOAM FIRE PROTECTION SYSTEM, FIRE FIGHTING & SAFETY EQUIPMENT & CLEAN AGENT SYSTEM
FIRE PROTECTION SYSTEMS 2013
GASCO CCTV FOR GASCO SECURITY GATES AT RUWAISSUPPLY, INSTALLATION & COMMISSIONING OF CCTV SYSTEMS
FOR SECURITY GATES AT GASCO‐RUWAISSECURITY SYSTEMS 2013
CONTROL CONTRACTING &TRADINGZADCO UMM AL DALKH FACILITIES ‐ INSTALLATION OF ELECTRICAL SUBMERSIBLE PUMPS AT WHP‐7 & WHP‐
15
DESIGN, ENGINEERING, TESTING & SUPPLY OF SINGLE DELUGE VALVE SKID
FIRE PROTECTION SYSTEMS 2013
SAIPEM‐DOODSAL TECHNIMONT JV ETIHAD RAILWAY NETWORK PROJECT ‐ SHAH‐HABSHAN‐RUWAIS RAILWAY PROJECT (STAGE 1)
DESIGN, SUPPLY, INSTALL, TEST & COMMISSIONING OF FIRE PROTECTION SYSTEM
FIRE PROTECTION SYSTEMS 2013
AL SHIRAWI ELECTRICAL ENGG EMIRATES ENGINE PROJECTDESIGN, SUPPLY ENGINEERING, INSTALLATION, TESTING &
COMMISSIONING OF FIRE FIGHTING, FOAM SYSTEM &INERGEN 200BAR FIRE SUPPRESSION SYSTEM
FIRE PROTECTION SYSTEMS 2013
Page 6 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
CHICAGO MAINTENANCE & CONSTRUCTION
WINCHESTER SCHOOL EXTENSION PHASE 4 AT OUD METHA, DUBAI
SUPPLY & INSTALL OF FIRE ALARM &FIRE FIGHTING SYSTEMFIRE PROTECTION and FIRE DETECTION
SYSTEMS2013
ADNEC PA SYATEM IN ADNEC SUPPLY, DESIGN, INSTALL & COMMISSIONING OF PUBLIC
ADDRESS SYSTEM IN ADNECTELECOMMUNICATIONS SYSTEMS 2013
PUNJ LLOYD LTD SHAH GAS DEVELOPMENT (SGD) PROJECT AT SHAHINSTALL, TESTING & COMMISSION OF FIRE FIGHTING SYSTEM, INERGEN CABINET, CO2 SYSTEM, DELUGE SKID, HYDRANT
FIRE PROTECTION SYSTEMS 2013
GASCO VESDA FOR GASCO SUBSTATIONDESIGN, SUPPLY, INSTALL & COMMISSIONING OF VESDA SYSTEM
FOR GASCO SUBSTATIONFIRE DETECTION SYSTEMS 2013
DUBAI MUNICIPALITY MAINTENANCE AT ZABEEL PARKMAINTENANCE OF FIRE ALARM SYSTEM, CCTV & LOW VOLTAGE
SYSTEM AT ZABEEL PARKFIRE DETECTION and SECURITY
SYSTEMS2013
CONTROL&APPLICATIONS EMIRATES MODIFICATION WORKS AT GASCO BUHASA
DESIGN, SUPPLY, INSTALL & COMMISSIONING OF DELUGE WATER SPRAY SYSTEM FOR TRANSFORMER &EXISTING INERGEN SYSTEM MODIFICATION WORKS &SUPPLY OF CYLINDER STORAGE
ENCLOSURE
FIRE PROTECTION SYSTEMS 2013
EMAL MAINTENANCE AT EMAL PHASE 1 MAINTENANCE OF FIRE DETECTION & FIRE PROTECTION SYSTEMFIRE PROTECTION and FIRE DETECTION
SYSTEMS2013
GASCO MAINTANANCE AT HABSHANFIRE &GAS SAFETY SYSTEMS MAINTENANCE SERVICE CONTRACT
AT HABSHAN PLANTFIRE DETECTION SYSTEMS 2013
SITE TECHNOLOGY LTD CO DUBAI POLICE DATA CENTREDESIGN, SUPPLY, INSTALL, TEST & COMMISSIONING OF INERGEN
300BAR FIRE SUPPRESSION & VESDA DETECTION SYSTEMFIRE PROTECTION and FIRE DETECTION
SYSTEMS2013
ZADCO ZADCO UZ FACILITIES HALON REPLACEMENTREMOVAL OF EXISTING HALON SYSTEM WITH NOVEC, WATER
MIST, VESDA, SPRINKLER, CO2 & ASSOICIATED F&G MODIFICATION
FIRE PROTECTION and FIRE DETECTION SYSTEMS
2013
AL HIKMA CONTRACTING CO. LLC MIRDIFF NURSERY SCHOOL EXTENSION ‐
CONSTRUCTION OF PHASE II UPTOWN SCHOOL ON PLOT NO. 251‐4293 AT MIRDIFF DUBAI
DESIGN, SUPPLY, INSTALL, TESTING & COMMISSIONING OF FIRE FIGHTING, SPRINKLERS & FIRE ALARM SYSTEM WITH GRAPHIC
STATION EMERGENCY MONITORING SYSTEM
FIRE PROTECTION and FIRE DETECTION SYSTEMS
2013
BIN FARDAN GENERAL CONT. EST. (BIFCO) FIRE PROTECTION MAINTENANCE SERVICES AT SHEIK
KHALIFA ENERGY COMPLEX (SKEC)FIRE PROTECTION MAINTENANCE SERVICE AT SHEIK KHALIFA
ENERGY COMPLEXFIRE PROTECTION SYSTEMS 2013
ARABTECLOUVRE ABU DHABI ‐ RECONFIGURATION OF
EARTHCAM TIME LAPSE CAMERASTESTING & COMMISSIONING OF TIME LAPSE CAMERAS SECURITY SYSTEMS 2013
Page 7 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
GALFAR ENGINEERING and CONTRACTING
ADCO BUHASA RDS FIRE ALARM SYSTEM &HSSD ‐ EPC WORKS FOR UPGRADE/REPLACE MV SWITCH GEAR AT
BUHASA'S RDS'S P12341 (CONTRACT NO. 15253.01/EC10797)
SUPPLY, FAT, COMMISSIONING & SAT OF ADDITIONAL CALL POINTS FOR THE ADCO ‐ BUHASA PROJECT
FIRE DETECTION SYSTEMS 2013
TAKREER TAKREER F&G UPGRADE TAKREER F&G UPGRADE FIRE DETECTION SYSTEMS 2013
DODSAL ENGINEERINGHSSD SYSTEM FOR HABSHAN‐MAQTA‐TAWEELAH
(HMT) GAS PIPELINE PROJECTDESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING OF HSSD
SYSTEM FIRE DETECTION SYSTEMS 2013
DODSAL ENGINEERING INERGEN SYSTEM at HABSHAN SULPHUR GRANULATION PLANT (HSGP) PROJECT
DESIGN, SUPPLY, FABRICATION and TESTING OF INERGEN SYSTEM at HABSHAN SULPHUR GRANULATION PLANT (HSGP)
PROJECTFIRE DETECTION SYSTEMS 2013
TAKREER REPLACEMENT OF CO2 FLOODING REPLACEMENT OF CO2FLOODING FIRE PROTECTION SYSTEMS 2013
AL JABER GROUP RUWAID SUKLPHUR HANDLING (SHT) TERMINAL 2 SUPPLY, INSTALL and TESTING OF INERGEN and SPRINKLERS FIRE PROTECTION SYSTEMS 2013
GASCO MAINTENANCE at RUWAIS PIPELINE DIVISIONANNUAL MAINTENANCE of FIRE FIGHTING and BREATHING
(ADDITIONAL SERVICES)FIRE PROTECTION SYSTEMS 2013
ETIHAD AIRWAYS MAINTENANCE at ETIHAD AIRWAYS BUILDINGPLANNED PREVENTIVE MAINTENANCE OF FIRE DETECTION and PROTECTION SYSTEMS AT RESIDENTIAL, COMMERCIAL and
RETAIL LOCATIONS AT ETIHAD AIRWAYS BUILDING
FIRE DETECTION and PROTECTION SYSTEMS
2013
CCCSGAA ‐ SHAH SULPHUR STATION & PIPELINES (PROJECT
NO. 5268)DESIGN and SUPPLY OF REMOTE CONTROL MONITOR DELUGE
VALVEFIRE PROTECTION SYSTEMS 2013
DEUTSCHE BABCOCK LLCEMAL PHASE 2 BOP (BALANCE OF PLANT) ‐ POWER
PLANTDESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING OF FIRE
PROTECTION and DETECTION SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2013
ADAC ABU DHABI AIRPORTDESIGN, SUPPLY, INSTALL and MAINTENANCE at ABU DHABI
AIRPORTSECURITY SYSTEMS 2013
Page 8 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
FERTIL MAINTENANCE OF FIRE DETECTION MAINTENANCE OF FIRE DETECTION & FIRE PROTECTION
SYSTEMSFIRE PROTECTION and FIRE DETECTION
SYSTEMS2013
EMIRATES MAINTENANCE OF FIRE DETECTION and PROTECTION
SYSTEMS MAINTENANCE OF FIRE DETECTION and PROTECTION SYSTEMS
FIRE DETECTION and PROTECTION SYSTEMS
2013
EMAL PH.1 GT&ST TRANSFORMERSDESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING OF
DELUGE SPRAY SYSTEMFIRE PROTECTION SYSTEMS 2013
LARSEN & TOUBRO LTD. DUBAI AIRPORT CONCOURSE 4 and ASSOCIATED PROJECTCS SPECIAL AIRPORT SYSTEM PACKAGE 7
(CONTRACT NO. SP500)
DESIGN, SUPPLY, INSTALL, TEST and COMMISISONING OF SECURITY ACCESS CONTROL SYSTEM
SECURITY SYSTEMS 2013
CCC BARZAN ONSHORE PROJECT (PHASE 3)DESIGN and SUPPLY OF FIRE ALARM SYSTEM FOR BARZAN
ONSHORE FCAILITIESFIRE DETECTION SYSTEMS 2013
DESCON GASCO HAHBSHAN ACID FLARE GAS RECOVERY
(HAGFR 5265)DESIGN and SUPPLY OF TELECOMM.SYSTEM TELECOMMUNICATIONS SYSTEMS 2013
SK ENGINEERING RUWAIS REFINERY EXPANSION (RRE) SUPPLY OF SAFETY CABINET & WINDSOCK ‐ CLEAN AGENT GAS
EXTINGUISHING & HOSE REEL SYSTEMFIRE PROTECTION SYSTEMS 2013( )
EXTINGUISHING & HOSE REEL SYSTEM
CCC SG11‐ SHAH SULPHUR STATONPROCUREMENT, FABRICATION and SUPPLY OF FIRE FIGHTING
EQUIPMENTSFIRE PROTECTION SYSTEMS 2013
DUBAI POLICE MAINTENANCE AT CENTRAL PRISONMAINTENANCE OF FIRE ALARM & PA SYSTEMS AT DUBAI
CENTRAL PRISONFIRE DETECTION and PA SYSTEMS 2012
CROWN HOUSE TECHNOLOGY FIRE ALARM and FIRE FIGHTING FOR EMAL CARBONDESIGN, SUPPY, INSTALLATION, TESTING and COMMISSIONING
OF FIRE PROTECTION and FIRE DETECTION SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2012
CROWN HOUSE TECHNOLOGYFIRE ALARM and FIRE FIGHTING FOR EMAL REDUCTION
BLDG.DESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING OF FIRE PROTECTION,VESDA and FIRE DETECTION SYSTEMS
FIRE PROTECTION and DETECTION SYSTEMS
2012
AL JABER L.E.G.T ELECTROMECHANICAL CONTRACTING (ALEMCO) L.L.C.
RELOCATION OF DUBAI AIRSHOW & RELATED FACILITIES TO DWC
DESIGN, SUPPLY, INSTALLATION, TESTING, COMMISSIONING and ENGINEERING of PA SYSTEM
TELECOMMUNICATIONS SYSTEMS 2012
TAKREER LED DISPLAY FOR AUH REFINERYDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
OF LED DISPLAY IN AUH REFINERYTELECOMMUNICATIONS SYSTEMS 2012
Page 9 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
SAMSUNG ENGINEERING CO. LTD. PA SYSTEM FOR CARBON BLACK and DELAYED COKER
(CBDC) PROJECTSUPPLY, FAT and DELIVERY OF PA SYSTEM and EQUIPMENTS TELECOMMUNICATIONS SYSTEMS 2012
TAKREER LED DISPLAY FOR RUWAISDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
OF LED DISPLAY IN RUWAIS REFINERYTELECOMMUNICATIONS SYSTEMS 2012
SAMSUNG ENGINEERING CO. LTD. NITROGEN GAS INJECTION (NGI) PROJECTDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
OF INERGEN & HVAC CO2 SYSTEMFIRE PROTECTION SYSTEMS 2012
PETROFACCENTRAL PROCESSING FACILITIES PHASE 1 AT BADRA
OIL FIELD‐IRAQDESIGN, SUPPLY, FABRICATION and TESTING OF DELUGE SKID
SYSTEMFIRE PROTECTION SYSTEMS 2012
HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD.
INERGEN REFILLING AT INTEGRATED GAS DEVELOPMENT (IGD 5) PROJECT AT HABSHAN
REFILLING OF 36 NOS.INERGEN CYLINDERS FIRE PROTECTION SYSTEMS 2012
ABU DHABI MOTORSPORTS MGMT.LLC MAINTENANCE at YAS MARINA2 YRS.MAINTENANCE of FF SYSTEM ALONG W/24X7 PUMP
OPERATORFIRE FIGHTING SYSTEMS 2012
DESCONF&G SYSTEM FOR GASCO HAHBSHAN ACID FLARE GAS
RECOVERY (HAGFR 5265) PROJECTDESIGN and SUPPLY OF F&G SYSTEM FIRE DETECTION SYSTEM 2012
L&T ABU DHABIHABSHAN‐RUWAIS‐SHUWEIHAT (HRS) GAS PIPELINE
PROJECT NO. 5269DESIGN, SUPPLY, INSTALLATION and COMMISSIONING OF INERT
GAS SYSTEM FOR THAMAMA‐CFIRE PROTECTION SYSTEMS 2012
HONEYWELL GASCO SHT‐2 PROJECT DESIGN, SUPPLY and INSPECTION OF LINEAR HEAT DETECTOR FIRE DETECTION SYSTEMS 2012
NATIONAL MARINA REAL ESTATE MAINTENANCE AT MARINA MALLMAINTENANCE of FIRE ALARM, FIRE FIGHTING and FIRE
SUPPRESSION SYSTEMS at MARINA MALLFIRE PROTECTION and DETECTION
SYSTEMS2012
SAIPEM NEW BOOSTER STATION BS‐171 PROJECT AT WEST
KUWAITDESIGN & ENGINEERING OF INERGEN SYSTEM FIRE PROTECTION SYSTEMS 2012
HYUNDAI BOROUGE‐3 XLPE PROJECTDESIGN, SUPPLY, FABRICATION and TESTING of FF EQUIPMENT
and DELUGE SKIDSFIRE PROTECTION SYSTEMS 2012
PETROFAC RUWAIS 4TH NGL TRAIN ‐ GANESH SPARES FOR 4TH NGL TRAIN ‐ PART SUPPLY 2 YEARS FIRE DETECTION SYSTEMS 2012
CCC SHAH SULPHUR STATIONDESIGN, SUPPLY and COMMISSIONING OF INERGEN SYSTEM and
HVAC CO2 SYSTEMFIRE PROTECTION SYSTEMS 2012
TECHINT RUWAIS SULPHER HANDLING TERMINAL ‐ MAHESH SUPPLY OF FIRE FIGHTING FIXED SYSTEMS FIRE PROTECTION SYSTEMS 2012
AL SABBAH ELECTRO‐MECH. PETROLEUM INSTITUTE RESEARCHCENTREDESIGN, SUPPLY, INSTALLATION and COMMISSIONING OF
INERGEN SYSTEMSFIRE PROTECTION SYSTEMS 2012
TAKREER RUWAIS MCPDESGIN, SUPPLY, INSTALL, TEST and COMMISSIONING OF
MANUAL CALL POINTSFIRE DETECTION SYSTEMS 2012
Page 10 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
TRINITY ENGINEERING DU POP BUILDING ‐ UMM AL QUWAIN SUPPLY and COMMISSIONING OF NOVEC SYSTEM FIRE PROTECTION SYSTEMS 2012
TECHNIP SATAH FULL FIELD DEVELOPMENT (FFD) PROJECT DESIGN and SUPPLY of INERGEN SYSTEM FOR 3 BLDGS. FIRE PROTECTION SYSTEMS 2012
CROWN HOUSE TECHNOLOGY EMAL PH2‐SUBSTATIONS PACKAGE DESIGN, SUPPLY, INSTALL and COMMISSIONINGFIRE DETECTION and FIRE PROTECTION
SYSTEMS2012
A&P PARASKEVAIDES & PARTNERS 4 NOS.NEW LIGHT MAINTENANCE HANGARS AT
EMIRATES ENGINEERING CENTREDESIGN, SUPPLY, INSTALL, TESTING & COMMISSIONING OF FIRE
PROTECTION & DETECTION SYSTEMFIRE DETECTION and FIRE PROTECTION
SYSTEMS2012
SINOPEC INTERNATIONAL PETROLEUM SERVICE COPO.
OIL TERMINAL AT HAMRIYAH FREE ZONE DESIGN and SUPPLY OF LEAK DETECTION SYSTEMS FIRE DETECTION SYSTEMS 2012
Al ASAB EST. GEN.TRANS. & CONTRACTING
LAND PREPARATION FOR ABC FIRE TRAINING POOL AT GASCO BUHASA
DESIGN, SUPPLY and INSTALL OF FIRE WATER RING FIRE PROTECTION SYSTEMS 2012
NPCCNATURAL GAS SUPPLY PIPELINE FROM GASCO TO
FERTIL 2DESIGN and SUPPLY OF INERGEN SYSTEMS FIRE PROTECTION SYSTEMS 2012
HYUNDAI ENGINEERING BOROUGE XLPE & LAB DESIGN and SUPPLY OF INERGEN SYSTEMS FIRE PROTECTION SYSTEMS 2012
NPCCNATURAL GAS SUPPLY PIPELINE FROM GASCO TO
FERTIL 2DESIGN, SUPPLY, FABRICATION, IFAT and DOCUMENTATION OF
FIRE & GAS SYSTEMSFIRE DETECTION SYSTEMS 2012
GS ENGINEERING GREEN DIESEL PROJECT (GDP) DESIGN, SUPPLY, TEST and COMMISSIONING OF FIREMAN AUDIO FIREMAN AUDIO SYSTEM 2012
DANWAY ELECTRICAL & MECHANICAL EMAL PH2 CONTROL ROOMDESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING OF FIRE
ALARM and FIRE FIGHITING SYSTEMSFIRE ALARM and FIRE FIGHITING
SYSTEMS2012
IDAMA MAINTENANCE at JBRANNUAL MAINTENANCE of FIRE FIGHTING and FIRE
SUPPRESSION SYSTEMFIRE PROTECTION SYSTEMS 2012
SAMSUNG ENGINEERING FERTIL 2 AMMONIA / UREA EXPANSION PROJECTDESIGN, ENGINEERING, SUPPLY and INSTALLATION FOR AIRLINE
CASCADESAFETY EQUIPMENTS 2012
SENSAIRE SERVICES AL JALLIA CHILDREN'S SPECIALTY HOSPITAL (DUBAI)DESIGN, SUPPLY, TEST and COMMISSIONING OF FM200 and FIRE
FIGHTING SYSTEMSFIRE PROTECTION SYSTEMS 2012
DUBAI INTERNATIONAL REAL ESTATE MAINTENANCE at BINJUMA,LATIFA & HESSAANNUAL MAINTENANCE of FIRE ALARM, PAVA, CBS, FIRE
FIGHTING and FIRE SUPPRESSION SYSTEMSFIRE PROTECTION SYSTEMS 2012
PUNJ LLOYD SPIKING GAS COMPRESSORDESIGN, SUPPLY,FABRICATION, TEST and COMMISSIONING OF
DELUGE and FIRE FIGHTING SYSTEMSFIRE PROTECTION SYSTEMS 2012
Page 11 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
OUTOTEC EMAL PH2 GAP & RODDESIGN, SUPPLY, FABRICATION, INSTALLATION, TESTING &
COMMISSIONING OF FIRE PROTECTION & DETECTION SYSTEMFIRE DETECTION and FIRE PROTECTION
SYSTEMS2012
TECHINT E&C RUWAIS SULPHUR HANDLING TERMINAL‐2 DESIGN & SUPPLY OF INERGEN SYSTEMS FIRE PROTECTION SYSTEMS 2012
ADNEC MAINTENANCE OF FIRE ALARM and FIRE FIGHITNG
SYSTEMS2 YEARS MAINTENANCE OF FIRE ALARM and FIRE FIGHITING
SYSTEMSFIRE DETECTION and FIRE PROTECTION
SYSTEMS2012
ENOC MAINTENANCE AT EIL (EPPCO), JA TERMINALS2 YEARS MAINTENANCE of FIRE ALARM, FIRE EXTINGUISHERS, FIRE HYDRANTS, FOAM POURERS and SKIF FOR TANK FARM
FIRE DETECTION and PROTECTION SYSTEMS
2012
EMAL FDS INTEGRATIONREVIEW OF DESIGN & FDS INTEGRATION / DESIGN, SUPPLY, INSTALLATION, COMMISSIONING OF FIRE ALARM PANEL FOR
SHIP UNLOADER AREAFIRE DETECTION SYSTEMS 2012
CCC SHAH SULPHUR STATION & PIPELINE PROJECTDESIGN, SUPPLY, FAT and COMMISSIONING of HSSD
SYSTEM/VESDA PANELFIRE DETECTION SYSTEMS 2012
LARSEN & TOUBRO LTD.HABSHAN‐RUWAIS‐SHUWEIHAT PIPELINE PROJECT
ABU DHABIDESIGN, SUPPLY, FAT and MANUFACTURE OF FIRE & GAS
SYSTEMSFIRE DETECTION SYSTEMS 2012
DAEWOO E&CSUR INDEPENDENT POWER PROJECT (IPP) OMAN
PROJECTDESIGN, SUPPLY and FAT OF FIRE & GAS SYSTEMS FIRE DETECTION SYSTEMS 2012
SUWAIDI ENGINEERING GROUP C21105 ‐ SHAH GAS DEVELOPMENT (SGD) PROJECTDESIGN, ENGINEERING, SUPPLY, TESTING and COMMISSIONING
OF INERGEN SYSTEMSFIRE PROTECTION SYSTEMS 2012
TYCO DONGBANG‐ KOREA LAFFAN REFINERY ‐ DIESEL HYDRO‐TREATER (DHT)
PROJECTDESIGN, SUPPLY, TESTING and COMMISSIONING OF INERGEN
SYSTEMFIRE PROTECTION SYSTEMS 2012
EMCO GASCO HABSHAN LABDESIGN, SUPPLY, TEST and COMMISSIONING OF FIRE & GAS and
PA/GA SYSTEMSFIRE DETECTION and
TELECOMMUNICATIONS SYSTEMS2012
DODSAL HABSHAN SULPHUR GRANULATION PLANT (HSGP)
PROJECTDESIGN, SUPPLY, TESTING and COMMISSIONING OF FIRE & GAS
SYSTEMSFIRE DETECTION SYSTEMS 2012
TSJ TECNIMONT BOROUGE III‐LDPE PACKAGESUPPLY, FABRICATION and TESTING of EXTINGUISHERS and FIRE
FIGHTING EQUIPMENTSFIRE PROTECTION SYSTEMS 2012
TSJ TECNIMONT BOROUGE III‐PO PACKAGESUPPLY, FABRICATION and TESTING of EXTINGUISHERS andFIRE
FIGHTING EQUIPMENTSFIRE PROTECTION SYSTEMS 2012
Page 12 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
GASCO UPGRADE OF CO2 SYSTEM‐ASABDESIGN, SUPPLY, INSTALL, MODIFICATION, TEST and
COMMISSIONING OF CO2 SYSTEMSFIRE PROTECTION SYSTEMS 2012
HYUNDAI TAKREER GRP.III BOP PROJ. DESIGN, SUPPLY and FAT OF PA SYSTEMS TELECOMMUNICATIONS SYSTEMS 2012
SMART WORLDDUBAI INTERNATIONAL AIRPORT EXPANSION (PHASE
III) ‐ AX466DESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
OF ACCESS CONTROL SYSTEMS (ACS)SECURITY SYSTEMS 2012
KUEHNE + NAGEL WAREHOUSE EXPANSION SUPPLY, INSTALL, TEST and COMMISSIONING SECURITY SYSTEMS 2012
JASAF ELECTROMECH. NURSERY SCHOOL ‐ AL BARSHADESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
OF SPRINKLER and FIRE FIGHTING SYSTEMSFIRE PROTECTION SYSTEMS 2012
JASAF ELECTROMECH. NURSERY SCHOOL ‐ MIRDIFDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING OF ADDRESSABLE FIRE ALARM, EMERGENCY and EXIT LIGHT
SYSTEMSFIRE DETECTION SYSTEMS 2012
TECHNICAL INTEGRATED SYSTEMS & SOLUTIONS (TISS) / DESERT KNIGHT
MILITARY MAINTENANCE HANGAR AT QUSAHWIRA (ABU DHABI)
DESIGN, SUPPLY, TEST and COMMISSIONING OF WATER FOAM DELUGE SYSTEM, FIRE FIGHTING, SPRINKLER and NOVEC
SYSTEMS FIRE PROTECTION SYSTEMS 2012
PAGE EUROPA KHALIFA PORT INDUSTRIAL ZONE (KPIZ) 3 TEAMS TO RECTIFY INS.& PRE‐COMM OF ACCESS CONTROL
SECURITY SYSTEMS 2012PAGE EUROPAINSTALLATION SUPPORT SYSTEMS
SECURITY SYSTEMS 2012
ALBONIAN INTERNATIONAL ELECTROMECHANICAL
GREENFIELD FACTORY(PEPSI)DESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING OF FIRE
FIGHTING and FIRE & GAS SYSTEMSFIRE PROTECTION SYSTEMS 2012
SAMSUNG ENGINEERING GASCO NGI PROJECT DESIGN and SUPPY OF PLC HARDWARE‐ F&G SYSTEM FIRE DETECTION SYSTEMS 2012
AL REYAMI ELECTROMECHANICAL CAT SECURITY SYSTEMSSUPPLY, INSTALLATION, TESTING and COMMISSIONING OF CCTV
and ACCESS CONTROL SYSTEMSSECURITY SYSTEMS 2012
LINDE ENGG. BOROUGE 3 ‐EUSUPPLY OF MED.VELOCITY SPRAY NOZZLE/FIRE FIGHTING
SYSTEMSFIRE PROTECTION SYSTEMS 2012
EMAL MAINTENANCE at EMAL PH I ANNUAL MAINTENANCE FIRE DETECTION and FIRE FIGHITNG
SYSTEMS2012
BEZHAN PETRO CO. BAZIAN REFINERY EXPANSION PROJECT PHASE 2 DESIGN and SUPPLY OF FIRE ALARM and FIRE & GAS DEVICES FIRE DETECTION SYSTEMS 2012
SAMSUNG C&T EMAL PH2 CCPPDESIGN, SUPPLY, INSTALL & COMMISSIONING OF FIRE
PROTECTION & DETECTION SYSTEMFIRE PROTECTION and DETECTION
SYSTEMS2012
GASCO HABSHAN5‐MANPOWER SUPPORTMANPOWER SUPPLY FOR 5 MONTHS ‐ SUPPORT TO HABSHAN‐5
FIRE & GAS COMMISSIONING ACTIVITIESFIRE DETECTION SYSTEMS 2012
Page 13 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
DAEWOO E&C IPP OMAN PROJECTDESIGN and SUPPLY OF CO2 SYS.,FM200, SUPPRESSION PANEL,
DETECTORS & FIRE ALARM DEVICESFIRE PROTECTION and DETECTION
SYSTEMS2012
EURO MECHANICAL & ELECTRICAL SIMOPS PROJECT(ADMA‐OPCO)DESIGN, FABRICATION and SUPPLY OF DELUGE SKIDS,
PIPEWORKS, NOZZLES & HOSESFIRE PROTECTION SYSTEMS 2012
ADMA‐OPCO MAINTENANCE OF PA at ADMA OFFSHOREQUARTERLY VISIT FOR ALL LOCATION TO INSPECT OF PAGA
SYSTEMSTELECOMMUNICATIONS SYSTEMS 2012
HYUNDAI ENGG. GRP.III BASE OIL UNITDESIGN,BUILD,FAT,SUPPLY and COMMISSIONING OFFIRE &GAS
SYSTEMSFIRE DETECTION SYSTEMS 2012
DNATA EMIRATES MAINTENANCE at EMIRATES HANGAR MAINTENANCE AT EMIRATES HANGARFIRE DETECTION & FIRE PROTECTION
SYSTEMS2012
LARSEN & TOUBRO LTD.TAKREER INTER‐REFINERY PIPELINE (IRP) II EPC III
PAGADESIGNB & SUPPLY OF PAGA SYSTEM FOR IRPII PROJECT TELECOMMUNICATIONS SYSTEMS 2012
CCC QUSAHWIRA FIELD DEVT.PROJECTDESIGN, SUPPLY, INSTALLATIONS and COMMISSIONING of
INERGEN SYSTEMFIRE PROTECTION SYSTEMS 2012
HYUNDAI ENGG. GRP.3 BASE OIL PRODUCTION‐FF SYSTEMDESIGN, SUPPLY and FABRICATION of FIRE FIGHTING
EQUIPMENTSFIRE PROTECTION SYSTEMS 2012
HYUNDAI ENGG. GRP.3 BASE OIL PRODUCTION‐INERGEN DESIGN & SUPPLY OF INERGEN SYSTEM FIRE PROTECTION SYSTEMS 2012
DANWAY EMAL PH.2:220KV GIS BLDG.DESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
of FIRE PROTECTION and DETECTION SYSTEMFIRE PROTECTION and DETECTION
SYSTEMS2012
NPCC ADCO BAB THAMAMA PROJECT SUPPLY & COMM. OF FA SYSTEM FOR BAB THAMAMA FIRE DETECTION SYSTEMS 2012
AL AIN OILFIELD SERVICES CO. CNIA ZIRKU ISLAND (SUBSTATION #19)DESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
of INERGEN SYSTEMFIRE PROTECTION SYSTEMS 2012
SAMSUNG ENGINEERING SHAH GAS DEVELOPMENT PACKAGE #4 ‐ UTILITIES
&OFFSITE PROJECTDESIGN, SUPPLY, INSTALLATION and COMMISSIONING of
INERGEN and CO2 SYSTEMS for HVACFIRE PROTECTION SYSTEMS 2012
CONDOR BLDG.CONTRACTING DU POP EXCHANGE‐PH 2DESIGN, SUPPLY, TESTING and COMMISSIONING of NOVEC and
VESDA SYSTEMFIRE PROTECTION and DETECTION
SYSTEMS2012
DUBAI POLICE MAINTENANCE at CENTRAL PRISONRENEWAL OF ANNUAL MAINTENANCE AT DUBAI CENTRAL
PRISONFIRE ALARM and PA SYSTEMS 2012
L&T ABU DHABI ADCO BQ STATION FACILITIESDESIGN, PROCUREMENT, FABRICATION and TESTING of FOAM
SKID (1 SET), FABRICATED PIPEWORK, NOZZLESFIRE PROTECTION SYSTEMS 2012
Page 14 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
DIMENSION DATA FM200 AL AIN ARMED FORCESDESIGN, SUPPLY, TESTING and COMMISSIONING of FM200
SYSTEMFIRE PROTECTION SYSTEMS 2012
ATLAS TELECOM ATLAS TELECOM‐ SPARES SUPPLY OF PA SYSTEM SPARES TELECOMMUNICATIONS SYSTEMS 2012
CCC BARZAN ONSHORE FACILITIES DESIGN, SUPPLY, TESTING and FAT OF BLDG.FA SYSTEM FIRE DETECTION SYSTEMS 2012
TOPAZ ENGINEERING GPS CHEMOIL SUPPLY, TESTING and COMMISSIONING OF FIRE ALARM SYSTEMS FIRE DETECTION SYSTEMS 2011
McDERMOTT ARAMCO SAFANIYA UPGRADESUPPLY, DOCUMENTATION,FAT of FIRE ALARM and GAS
DETECTION SYSTEMSFIRE DETECTION SYSTEMS 2011
SIEMENS SIEMENS ‐ SITE SERVICE SITE SERVICES FORFIRE & GAS SYSTEMS FIRE DETECTION SYSTEMS 2011
GS ENGINEERING TAKREER INTER‐REFINERY PIPELINE (IRP) II PROJECT DESIGN, ENGINEERING and SUPPLY OF INERGEN SYSTEM FIRE PROTECTION SYSTEMS 2011
ADIB MAINTENANCE of SECURITY SYSTEMS MAINTENANCE of SHELL and CORE SECURITY WORKS SECURITY SYSTEMS 2011
ADIB SECURITY SYSTEMS AT ADIBDESIGN, SUPPLY, INSTALLATION and COMMISSIONING OF
SECURITY SYSTEMSSECURITY SYSTEMS 2011
PA SYSTEM t TAKREER RUWAIS REFINERYFALCON ELECTRO‐MECHANICAL
PA SYSTEM at TAKREER RUWAIS REFINERY EXPANSION (RRE) ‐ EPC6
DESIGN, FAT, COMMISISONING and SUPPLY OF PA SYSTEMS TELECOMMUNICATIONS SYSTEMS 2011
HYUNDAI BOROUGE3 U&O DESIGN and SUPPLY OF INERGEN SYSTEM, PIPING and STEEL FIRE PROTECTION SYSTEMS 2011
HYUNDAI KHALIFA PORT INDUSTRIAL ZONE (KPIZ) ‐ INERGEN
SYSTEMDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
of INERGEN SYSTEMFIRE PROTECTION SYSTEMS 2011
LINDE FA DEVICES FOR BOROUGE‐2DESIGN, SUPPLY, FAT and DOCUMENTATION OF FIRE ALARM
DEVICESFIRE DETECTION SYSTEMS 2011
SK E&CTAKREER RUWAIS REFINERY EXPANSION (RRE) ‐1
INERGEN INSTALLATIONINSTALLATION OF INERGEN SYSTEM, PORTABLE
EXTINGUISHERS,HOSE REEL SYSTEMFIRE PROTECTION SYSTEMS 2011
LINDE FA DEVICES FOR BOROUGE‐2DESIGN, SUPPLY, FAT and DOCUMENTATION OF FIRE ALARM
DEVICESFIRE DETECTION SYSTEMS 2011
INTERNATIONAL ELECTRO‐MECH INERGEN SYSTEM at ADNOC H.QDESIGN, SUPPLY, SUPERVISION, TESTING and COMMISSIONING
OF INERGEN SYSTEMFIRE PROTECTION SYSTEMS 2011
NPCC DEMOTHBALLING ADMADESIGN, SUPPLY, INSTALLATION, SUPERVISION, TESTING and
COMMISSIONING and FAT FOR TELECOMM SYSTEMTELECOMMUNICATIONS SYSTEMS 2011
SAMSUNG ENGINEERING FERTIL2 AMMONIA/UREA EXPANSION FIRE FIGHTING EQUIPMENTS ‐ DESIGN & SUPPLY FIRE PROTECTION SYSTEMS 2011
Page 15 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
GASCO VESDA SYSTEM at HABSHANSUPPLY, INSTALLATION and COMMISSIONING OF VESDA SYSTEM
at HABSHAN SUBSTATIONSFIRE DETECTION SYSTEMS 2011
SAMSUNG ENGINEERING FERTIL 2 PROJECTSUPPLY, INSTALLATION and COMMISSIONING OF SPRINKLER
SYSTEMS and HOSE REELFIRE PROTECTION SYSTEMS 2011
GS.ENGINEERING & CONSTRUCTION TAKREER RUWAIS REFINERY EXPANSION (RRE) 7
PROJECTDESIGN, SUPPLY and INSTALLATION OF INERGEN SYSTEM FIRE PROTECTION SYSTEMS 2011
CCC BAB THAMAMA PROJECT DESIGN, SUPPLY and INSTALLATION OF INERGEN SYSTEM FIRE PROTECTION SYSTEMS 2011
STANG KOREA TAKREER RUWAIS REFINERY EXPANSION (RRE)
PACKAGE 1SUPPLY OF D3 PROTECTOSPRAY FIRE PROTECTION SYSTEMS 2011
TRANSGULF ELECTROMECHANICAL L.L.C. TRANSGULF ‐ FCC INERGENSUPPLY, TESTING and COMMISSIONING OF INERGEN 200 BAR
FUJAIRAH CITY CENTREFIRE PROTECTION SYSTEMS 2011
CCC BOROUGE3‐EU3 PROJECTDESIGN, SUPPLY, INSTALLATION and COMMISSIONING OF 200
BAR INERGEN SYSTEMFIRE PROTECTION SYSTEMS 2011
TYCO FIRE PROTECTION SERVICES KOREA(DBE)
NEW BOOSTER STATION DESIGN, ENGINEERING and SUPPLY OF INERGEN SYSTEM FIRE PROTECTION SYSTEMS 2011
SILVERTECH FA SYSTEM at KHAFJIDESIGN, BUILD, TESTING and SUPPLY OF FIRE ALARM CONTROL
PANEL and DEVICESFIRE DETECTION SYSTEMS 2011
IDAMA MAINTENANCE t JBR MAINTENANCE OF FIRE FIGHTING SYSTEMS t JBR FIRE PROTECTION SYSTEMS 2011IDAMA MAINTENANCE at JBR MAINTENANCE OF FIRE FIGHTING SYSTEMS at JBR FIRE PROTECTION SYSTEMS 2011
SAMSUNG ENGINEERING FA SYSTEM at FERTIL EXPANSIONFA SYSTEM FOR THE FERTIL2 AMMONIA/UREA EXPANSION
PROJECTFIRE DETECTION SYSTEMS 2011
INTERGULF GENERAL CONTRACTING TAKREER PERMANENT FACILITIESDESIGN, BUILD, TESTING, SUPPLY and COMMISSIONING OF FIRE
& GAS SYSTEMSFIRE DETECTION SYSTEMS 2011
TECHMEP ELECTROMECHANICAL CO.LLC TECHMEP ‐ DU(AUH)RACK EXPANSIONDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
OF NOVEC 1230 FIRE EXTINGUISHING SYSTEMFIRE PROTECTION SYSTEMS 2011
G.S. E&C CORPORATION RUWAIS REFINERY EXPANSION (RRE) ‐ PKG2 DESIGN, ENGINEERING and SUPPLY OF INERGEN SYSTEM FIRE PROTECTION SYSTEMS 2011
SAIPEM S.P.A. ITALY SAIPEM ‐ SGD PKG5DESIGN, ENGINEERING, FABRICATION, TESTING, SUPPLY of
MANIFOLDS and HYDRANT SPOOLS ‐ INERGEN SYSTEM,HYDRANT,MONITORS and EXTINGUISHERS
FIRE PROTECTION SYSTEMS 2011
HYUNDAI ENGINEERING CO. FIRE ALARM SYSTEMS at GR.3 BASE OIL DESIGN and SUPPLY of SERVICES at DAYRATE BASIS FIRE DETECTION SYSTEMS 2011
Page 16 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
SK ENGINEERINGTAKREER RUWAIS REFINERY EXPANSION (RRE) ‐
PACKAGE 1DESIGN, ENGINEERING, FABRICATION, PROCUREMENT, TESTING
& SUPPLY OF DELUGE SKID ENCLOSUREFIRE PROTECTION SYSTEMS 2011
SAMSUNG ENGG.CO. FERTIL2 EXPANSION PROJECTDESIGN, SUPPLY, INSTALLATION and COMMISSIONING OF
INERGEN SYSTEMFIRE PROTECTION SYSTEMS 2011
DAEWOO E&C CO.LTD.TAKREER INTER‐REFINERY PIPELINE (IRP) II (MUSSAFAH
TERMINAL)DESIGN, SUPPLY, FAS,FAT OF F&G, FIRE ALARM and INERGEN
SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2011
LARSEN & TOUBRO LTD. 132/KV at SIR BANIYAS ISLANDDESIGN, ENGINEERING, FAT, SUPPLY,INSTALLATION and
COMMISSIONING of FIRE EXTINGUISHING, FIRE FIGHTING and PA SYSTEMS
FIRE PROTECTION, DETECTION and SECURITY SYSTEMS
2011
RAMBOLL FEED FOR HRP at UZ FACILITIESDESIGN and ENGINEERING FOR NOVEC, DELUGE, FOAM, WATER
MIST and VESDA SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2011
AFRA TECHNICAL SOLUTIONS ESTABLISHMENT
AFRE TECH.‐CCTV SPARES SUPPLY OF CCTV SPARES at BANIYAS SECURITY SYSTEMS 2011
CEGELEC PKG at TAKREER NEW CONTROL ROOMDESIGN, SUPPLY and COMMISSIONING of PA, RADIO and AIR
SAMPLING SYSTEMSTELECOMMUNICATIONS SYSTEMS 2011
TAKREER TAKREER ‐ F&G SYS.REPLACEMENTDESIGN, BUILD, SUPPLY, INSTALLATION and COMMISSIONING of
F&G SYSTEM / REPLACEMENT OF MINIMAXFIRE DETECTION SYSTEMS 2011
NPCC FA SYSTEM at ADCO QUSAHWIRA DESIGN, BUILD, TESTING and SUPPLY OF FIRE ALARM SYSTEM FIRE DETECTION SYSTEMS 2011
NPCC HSSD SYSTEM at DEMOTHBALLING PROJECTDESIGN, MANUFACTURE and SUPPLY OF HSSD SYSTEM FOR THE
ADMA DEMOTHBALLING PROJECTFIRE DETECTION SYSTEMS 2011
SK ENGINEERING RUWAIS REFINERY EXPANSION PKG1 DESIGN and SUPPLY OF INERGEN SYSTEM FIRE PROTECTION SYSTEMS 2011
PAGE EUROPA KHALIFA PORT INDUSTRIAL ZONE (KPIZ) ‐ GMSSUPPLY, TESTING and COMMISSIONING of GATE MANAGEMENT
SYSTEMSECURITY SYSTEMS 2011
LARSEN & TOUBRO LTD. 132/33 KV SUBSTATION at KALBASPRINKLERS, HYDRANTS,DELUGE, FIRE ALARM, CO2, VALVES and
FIRE EXTINGUISHING SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2011
SAMSUNG ENGINEERING RRF‐PKG3 SUPPLY OF FIRE FIGHTING EQUIPMENTS FIRE PROTECTION SYSTEMS 2011
TOURISM DEVELOPMENT & INVESTMENT COMPANY (TDIC)
MAINTENANCE at SCVMAINTENANCE of FIRE DETECTION and FIRE PROTECTION
SYSTEMS FOR 2 MONTHS ONLYFIRE PROTECTION and DETECTION
SYSTEMS2011
DAEWOO ENGINEERING & CONSTRUCTION CO.
RUWAIS REFINERY EXPANSION‐PKG4 DESIGN, ENGINEERING and SUPPLY of INERGEN SYSTEM FIRE PROTECTION SYSTEMS 2011
Page 17 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
PETROFAC FIRE ALARM SYSTEM at 4TH NGL TRAIN PROJECT DESIGN and SUPPLY of FIRE ALARM EQUIPMENTS FIRE DETECTION SYSTEMS 2011
EMCO NPB‐EXTENSION & JETTY BLDG. DESIGN, SUPPLY and COMMISSIONING of FIRE ALARM SYSTEM FIRE DETECTION SYSTEMS 2011
BILT MIDDLE EAST BILT ‐ EPTH INERGENDESIGN, SUPPLY, TESTING and COMMISSIONING OF INERGEN
SYSTEMSFIRE PROTECTION SYSTEMS 2011
ADMA ‐ OPCO ADMA‐OPCO HALON REPLACEMENTDESIGN, SUPPLY, INSTALLATION and COMMISSIONING of NOVEC,
CO2, FIRE ALARM and VESDA SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2011
JGC‐TECHNIMONT JGC‐3539‐GT HABSHAN(UAE)EPC SUPPLY OF FIRE POINT EQUIPMENT,HYDRANT,ETC.. FIRE PROTECTION SYSTEMS 2011
THALES INTERNATIONAL MIDDLE EAST (DUBAI)
DUBAI AIRPORT INTEGRATIONSOFTWARE INTERFACE / SUPPLY and COMMISSIONING of
SECURITY ACCESS SYSTEMSSECURITY SYSTEMS 2011
PAGE EUROPA KHALIFA PORT INDUSTRIAL ZONE (KPIZ) ‐ ACESS
CONTROL SYSTEMSUPPLY and COMMISSIONG of ACCESS CONTROL SYSTEMS
EQUIPMENTSSECURITY SYSTEMS 2011
BILT MIDDLE EAST IRANIAN HOSPITAL ‐ BILT S&C OF FM200 SYSTEM / FOAM DELUGE SYSTEM FIRE PROTECTION SYSTEMS 2011
NPCC HSSD SYSTEM at QUSHAWIRA DESIGN, MANUFACTURE and SUPPLY of HSSD SYSTEM FIRE DETECTION SYSTEMS 2011
HYUNDAI ENGINEERING & CONSTRUCTION LTD
TAKREER‐GROUP III BASE OIL PROD.DESIGN, FABRICATION and SUPPLY of FIRE FIGHTING
EQUIPMENTS and DELUGE SKIDSFIRE PROTECTION SYSTEMS 2011
CONSTRUCTION LTD. EQUIPMENTS and DELUGE SKIDS
HYUNDAI ENGINEERING & CONSTRUCTION LTD.
TAKREER‐GROUP III BASE OIL PROD.DESIGN, FABRICATION and SUPPLY of INERGEN SYSTEM and
ENCLOSURE FOR CYLINDERSFIRE PROTECTION SYSTEMS 2011
TRANSTEL ENGINEERING RUWAIS TRAIN 4 SUPPLY OF CEM EQUIPMENTS TO TRANSTEL ON EX‐WORKS BASIS SECURITY SYSTEMS 2011
GS E&C CORPORATION PA SYSTEM at TAKREER SUPPLY OF PA SYSTEM & EQUIPMENTS TELECOMMUNICATIONS SYSTEMS 2011
FERTIL FERTIL FOAM DELUGE SYSTEMDESIGN, FABRICATION, DETAILED ENGINEERING, SUPPLY, INSTALLATION, TESTING and COMMISSIONING of DELUGE
SYSTEMFIRE PROTECTION SYSTEMS 2011
CCC HABSHAN FLARE GAS RECOVERYDESIGN, FABRICATION and SUPPLY of FIRE ALARM and FIRE
FIGHTING SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2011
AREVA T&D F&G and PA SYSTEM at TAKREERCOMPLETE DESIGN, ENGINEERING, SUPPLY, INSTALLATION, TESTING and COMMISSIONING OF F&G , FIRE ALARM and PA
SYSTEMSFIRE DETECTION and PA SYSTEMS 2011
POWERPOINT ELECTRICAL and MECHANICAL WORKS
PLATINUM TOWERSUPPLY, TESTING and COMMISSIONING of FIRE FIGHTING
SYSTEMFIRE PROTECTION SYSTEMS 2011
Page 18 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
EMIRATES MAINTENANCE at EMIRATES HANGARS MAINTENANCE OF FIRE PROTECTION and DETECTION SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2011
SAMSUNG ENGINEERING CO. LTD.TAKREER RUWAIS REFINERY EXPANSION (RRE) ‐
PACKAGE 3 ‐ OFFSITES and UTILITIES
SUPPLY OF BUTTERFLY VALVES and CO2 SYSTEMS for HVAC CABINET COMPLETE WITH STAND‐ALONE NON‐ADDRESSABLE
DETECTION SYSTEMFIRE PROTECTION SYSTEMS 2011
LARSEN & TURBO (OMAN) LLC132KV D/C OHL FOR IWPP INTERCONNECTION
PROJECTDESIGN and SUPPLY of LIVE LINE INSULATOR WASHING
EQUIPMENTSHOTLINE WASHING SYSTEM FOR
INSULATORS2011
GASCO INERGEN SYSTEM FOR SS‐1 at ASABDESIGN, ENGINEERING, PROCUREMENT, FABRICATION, PANEL
BUILD, TESTING, INSTALLATION and COMMISSIONING of INERGEN SYSTEM, FIRE ALARM and PLC MODIFICATION WORKS
FIRE PROTECTION and DETECTION SYSTEMS
2011
GS ENGINEERING & CONSTRUCTION CO.PA SYSTEM AT TAKREER RUWAIS REFINERY EXPANSION
(RRE) PROJECT ‐ PACKAGE 2 SUPPLY OF PA SYSTEM and EQUIPMENTS TELECOMMUNICATIONS SYSTEMS 2011
SAMSUNG ENGINEERING RUWAIS REFINERY EXPANSION (RRE) ‐ PKGSDESIGN andSUPPLY of INERGEN SYSTEM EQUIPMENTS and
OTHER SPARESFIRE PROTECTION SYSTEMS 2011
LITWIN PEL TAKREER IQI PROJECTDESIGN, PROCUREMENT, FABRICATION, SUPPLY, and COMMISSIONING of DELUGE SWD, HYDRANTS ETC.
FIRE PROTECTION SYSTEMS 2011
TOURISM DEVELOPMENT & INVESTMENT COMPANY (TDIC)
STREET OF DREAMSSUPPLY, INSTALL, COMMISSIONING OF SECURITY SYSTEMS ‐
CCTV/INTRUDER/INTERCOM and NETWORKSECURITY SYSTEMS 2011
ELECTRO MECHANICAL COMPANY LLC KV SUBSTATIONS at ADNEC & ZAYED SPORTS CITYDESIGN, SUPPLY, INSTALLATION, TESTING COMMISSIONING and
SATFIRE PROTECTION SYSTEMS 2011
WESTFALIA LOGISTIC SOLUTIONS PPM CORNAD HOTEL ACPSDESIGN, SUPPLY, FABRICATION, INSTALLATION, TESTING and COMMISSIONING of FIRE PROTECTION and FIRE DETECTION
SYSTEMS
FIRE PROTECTION and DETECTION SYSTEMS
2011
CCCSAHIL & SHAH FULL FIELD DEVELOPMENT (FFD)
PROJECTDESIGN, SUPPLY, INSTALLATION and COMMISSIONING of 200
BAR INERGEN SYSTEMFIRE PROTECTION SYSTEMS 2011
TOTAL ABU AL BUKHOOSH HALON PHASING OUT PROJECT AT KPP PLATFORM
DECOMMISSIONING OF HALON‐BASED FIRE PROTECTION SYSTEMS and DESIGN, ENGINEERING, PROCUREMENT, SUPPLY, CONSTRUCTION and COMMISSIONING OF CLEAN AGENT FIXED FLOODING TYPE EXTINGUISHING SYSTEMS AT TABK OFFSHORE
FACILITIES
FIRE PROTECTION SYSTEMS 2011
TARGET ENGINEERING CONSTRUCTION CO. LTD.
SEAWATER INTAKE 3 PROJECTDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
OF INERGEN FIRE EXTINGUSIHING SYSTEM FIRE PROTECTION SYSTEMS 2011
Page 19 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
SAMSUNG ENGINEERINGPA SYSTEM at TAKREER RUWAIS REFINERY EXPANSION (RRE) PROJECT ‐ PACKAGE 3, OFFSITES and UTILITIES
SUPPLY OF PA SYSTEM and EQUIPMENTS and FAT,SAT and ISAT TELECOMMUNICATIONS SYSTEMS 2011
DAEWOO E&CPA SYSTEM at TAKREER RUWAIS REFINERY EXPANSION
(RRE) PROJECT EPC ‐ 4 PACKAGESUPPLY OF PA SYSTEM & EQUIPMENTS AND FAT,SAT & ISAT TELECOMMUNICATIONS SYSTEMS 2011
SK ENGINEERING & CONSTRUCTIONPA SYSTEM atTAKREER RUWAIS REFINERY EXPANSION
(RRE) PROJECTSUPPLY OF PA SYSTEM and EQUIPMENTS and FAT,SAT and ISAT TELECOMMUNICATIONS SYSTEMS 2011
TECHNICAS REUNIDASEPC FOR SAHIL&SHAH FULL FIELD DEVELOPMENT
PROJECTFIRE DETECTION & FIRE ALARM SYSTEM ‐ SPARES SUPPLY &
COMMISSIONINGFIRE DETECTION SYSTEMS 2011
LARSEN & TURBO ‐ ECC DIVISIONNEW 132/83/ 11 KV S.S at WATHBA and 132/22KV S.S. at MOHD. BIN ZAYED CITY (CONTRACT NO. N‐6384)
DESIGN, ENGINEERING, SUPPLY, INSTALLATION, TESTING and COMISSIONING OF COMPLETE FIRE PROTECTION, DETECTION anf
FIRE FIGHTING SYSTEMS
FIRE PROTECTION and DETECTION SYSTEMS
2011
SKEC BAB GAS COMPRESSION PROJECTINSTALLATION, TESTING and COMMISSIONING OF FIRE ALARM
SYSTEMFIRE DETECTION SYSTEMS 2011
CONDOR BLDG. CONTRACTING LLC DU POP, DUBIOTECH and BUSINESS BAYDESIGN, SUPPLY, SUPERVISION OF INSTALLATION, TESTING and COMMISSIONING FOR NOVEC 1230 and VESDA DETECTION
SYSTEM
FIRE PROTECTION and DETECTION SYSTEMS
2011SYSTEM
PETROFAC‐GS E&C JV RUWAIS 4TH NGL TRAIN PROJECTDESIGN, SUPPLY, FABRICATION, FIELD INSTALLATION, SITE
SUPERVISION, TESTING and COMMISSIONING OF INERGEN FIRE EXTINGUISHING SYSTEM
FIRE PROTECTION SYSTEMS 2011
GASCO MAINTENANCE at HABSHAN and ASAB FIRE & GAS SAFETY SYSTEM MAINTENANCE FIRE DETECTION SYSTEMS 2010
LARSEN & TOUBRO LTD.TRANSCO ‐ 132/11KV PRIMARY SUBSTATION AT
SUDHA PORT IN FUJAIRAH
DESIGN, SUPPLY, INSTALLATION and COMMISSIONING of INERGEN CLEAN AGENT, SPRINKLER, EXT. HYD, FIRE PUMPS,
DELUGE SYSTEM, HOSE REEL, FIRE EXT., FA SYSTEMS
FIRE PROTECTION and DETECTION SYSTEMS
2010
DUBAI POLICE MAINTENANCE at CENTRAL PRISONMAINTENANCE of FIRE ALARM and PA SYSTEMS at DUBAI
CENTRAL PRISONFIRE DETECTION and PA SYSTEMS 2010
TAKREER MAINTENANCE of ANALYZER SYSTEMS MAINTENANCE of ANALYZER SYSTEMS at RUWAIS CAMP ANALYZER SYSTEMS 2010
CCC HABSHAN FLARE GAS RECOVERY PROJECTDESIGN, SUPPLY, INSTALLATION and COMMISSIONING of
INERGEN SYSTEMSFIRE PROTECTION SYSTEMS 2010
Page 20 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
ABU DHABI NEW EXHIBITION CENTRE (ADNEC)
MAINTENANCE at ADNEC PHASE I, II and IIB MAINTENANCE of FIRE PROTECTION and ELV SYSTEMS at ADNECFIRE PROTECTION and SECURITY
SYSTEMS2010
EMIRATES TECHNICAL ASSOCIATES CLEVELAND CLINIC ‐ ABU DHABIDESIGN, SUPPLY, FABRICATION, COMMISSIONING,
INSTALLATION, SUPPLY, TESTING and COMMISSIONING of ANSUL SAPPHIRE SYSTEM and FIRE ALARM SYSTEM
FIRE PROTECTION and DETECTION SYSTEMS
2010
BK GULF LLC ABU DHABI INVESTMENT COUNCIL (ADIC) HQDESIGN, SUPPLY, INSTALLATION and COMMISSIONING of
SECURITY SYSTEMSSECURITY SYSTEMS 2010
TARGET ENGINEERING & CONSTRUCTION SEAWATER INTAKE 3DESIGN, BUILD, TESTING, SUPPLY, FABRICATION, TESTING,
INSTALLATION, SUPPLY and COMMISSIONING INC.SAT OF FIRE & GAS SYSTEMS
FIRE DETECTION SYSTEMS 2010
RUWAIS FERTILIZER INDUSTRIES CCTV and GAS DETECTION SYSTEMSSUPPLY, INSTALLATION, TESTING and COMMISSIONING of CCTV
and GAS DETECTION SYSTEMSFIRE DETECTION and SECURITY
SYSTEMS2010
SOLAS MARINE ENI CAMP ‐ IRAQSUPPLY, TESTING, COMMISSIONING, SUPPLY and INSTALLATION
of FIRE ALARM SYSTEMFIRE DETECTION SYSTEMS 2010
HYUNDAI E&CHABSHAN INTEGRATED GAS DEVELOPMENT (IGD‐HAP)
PROJECT ‐ F&G EXPANSIONDESIGN, BUILD, TESTING, ENGINEERING, COMMISSIONING and
TESTING of FIRE & GAS SYSTEMSFIRE DETECTION SYSTEMS 2010
HYUNDAI ENGINEERING & INTEGRATED GAS DEVELOPMENT (IGD HAP) PROJECT DESIGN FABRICATION TESTING SUPPLY d COMMISSIONINGHYUNDAI ENGINEERING & CONSTRUCTION LTD.
INTEGRATED GAS DEVELOPMENT (IGD‐HAP) PROJECT ‐ HABSHAN 5 UTOS ‐ INERGEN SYSTEM
DESIGN, FABRICATION, TESTING, SUPPLY and COMMISSIONING ‐ INERGEN SYSTEM
FIRE PROTECTION SYSTEMS 2010
SIEMENS132/11KV SUBTSTATION at NEW AIRPORT, CAPITAL
DISTRICT ‐ ABU DHABIDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
of FIRE FIGHTING and INERGEN SYSTEMSFIRE PROTECTION SYSTEMS 2010
BP IRAQ N.V. CONTROL RISK SUPPLY, TESTING and COMMISSIONING of ID BADGING SYSTEM SECURITY SYSTEMS 2010
IDAMA MAINTENANCE at JBR MAINTENANCE of FIRE FIGHTING SYSTEMS at ALL SECTORS in JBR FIRE PROTECTION SYSTEMS 2010
TECHNIP FRANCE ‐ ABU DHABI ASAB(A3) PROJECTDESIGN and SUPPLY of DELUGE VALVE, TRIM PANEL and SPRAY
NOZZLESFIRE PROTECTION SYSTEMS 2010
TECHNIMONT ‐ JGC INTEGRATED GAS DEVELOPMENT (IGD‐HAP) PROJECT ‐
HABSHAN 5DESIGN, ENGINEERING, FABRICATION, A,TESTING and SUPPLY of
DELUGE VALVE SKIDSFIRE PROTECTION SYSTEMS 2010
TECHNIMONT ‐ JGC INTEGRATED GAS DEVELOPMENT (IGD‐HAP) PROJECT ‐
HABSHAN 5DESIGN, ENGINEERING and SUPPLY of INERGEN SYSTEMS FIRE PROTECTION SYSTEMS 2010
Page 21 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
SUWAIDI ENGINEERING GROUP SOWWAH SQUARE PROJECT DESIGN, SUPPLY, TESTING and COMMISSIONING ‐ NOVEC,VESDAFIRE PROTECTION and DETECTION
SYSTEMS2010
EMIRATES PALACE HOTEL MAINTENANCE at EMIRATES PALACE HOTELQUARTERLY INSPECTION of FIRE ALARM, VESDA, P.A. & SMOKE
CONTROL SYSTEMSFIRE DETECTION and PA SYSTEMS 2010
JGC CORPORATIONINTEGRATED GAS DEVELOPMENT (IGD‐HAP) HABSHAN
5 PROJECTDESIGN, ENGINEERING and FABRICATION of INERGEN SYSTEM
and DELUGE VALVE SKIDSFIRE PROTECTION SYSTEMS 2010
CCC HABSHAN 5, PROCESS PLANT DESIGN, ENGINEERING and SUPPLY of INERGEN SYSTEMS FIRE PROTECTION SYSTEMS 2010
TECHNIP ASAB 3 PLANT PROJECT DESIGN, ENGINEERING and SUPPLY of INERGEN SYSTEMS FIRE PROTECTION SYSTEMS 2010
ADMA ‐ OPCOMAINTENANCE of FIRE FIGHTING SYSTEMS at ADMA
OPCO HQMAINTENANCE of FIRE FIGHTING SYSTEMS at ADMA OPCO HQ FIRE PROTECTION SYSTEMS 2010
LARSEN & TOUBRO LTD.
33/11KV PRIMARY SUBSTATION at KHALIFA PORT and INDUSTRIAL ZONE (KPIZ) MV POWER SYSTEM at
TAWEELAH, ABU DHABI ‐ CONSTRUCTION of 3 NOS. 33/11kv SUBSTATIONS
DESIGN, SUPPLY, INSTALLATION and COMMISSIONING OF WATERSPRAY DELUGE, CO2 and FIRE ALARM SYSTEMS
FIRE PROTECTION SYSTEMS 2010
ENOC ‐EPPCO INT'L ENOC‐EPPCO ‐ UPGRADING OF SECURITY SYSTEMS UPGRADING SECURITY SYSTEMS of JEBEL ALI TERMINALS SECURITY SYSTEMS 2010
PETROFACEPC for ASAB FULL FIELD DEVELOPMENT (FFD)
PROJECTSUPPLY of PORTABLE and SAFETY EQUIPMENT FIRE PROTECTION SYSTEMS 2010
PETROFACEPC for ASAB FULL FIELD DEVELOPMENT (FFD)
PROJECTDESIGN, ENGINEERING, FABRICATION and SUPPLY of INERGEN
SYSTEM and CYLINDER ENCLOSUREFIRE PROTECTION SYSTEMS 2010
ADMA ‐ OPCO ADMA OPCO TELECOM ‐ STOREX BLDG.DESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
of FIRE ALARM SYSTEMSFIRE DETECTION SYSTEMS 2010
TAKREER TAKREER ‐ JETTY BERTHSUPGRADATION of FIXED FIRE FIGHTING SYSTEMS at JETTY
BERTHSFIRE PROTECTION SYSTEMS 2010
AMANA STEEL BLDG. CONT. LLC FUJAIRAH CABLE LANDING 2DESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
of INERGEN and NOVEC 1230 SYSTEMSFIRE PROTECTION SYSTEMS 2010
NPCC INTEGRATED GAS DEVELOPMENT (IGD‐HAP) PROJECTDESIGN, SUPPLY, TESTING and COMMISSIONING of TELECOM
EQUIPMENTSTELECOMMMUNICATIONS SYSTEMS 2010
Page 22 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
CCC GASCO HFGR TELECOM SUPPLY, DESIGN, TESTING and COMMISSIONING TELECOMMMUNICATIONS SYSTEMS 2010
SUWAIDI ENGINEERING SOWWAH SQUARE PROJECTDESIGN, SUPPLY, TESTING and COMMISSIONING of INERGEN 200
BAR FIRE EXTINGUISHING SYSTEMFIRE PROTECTION SYSTEMS 2010
HYUNDAI HEAVY INDUSTRIESINTEGRATED GAS DEVELOPMENT (IGD‐HAP) ‐ DAS
ISLAND PROJECT
DESIGN, ENGINEERING, FABRICATION, TESTING and SUPPLY OF INERGEN, DELUGE VALVE SKIDS, FIRE FIGHTING and SAFETY
EQUIPMENTSFIRE PROTECTION SYSTEMS 2010
NPCC INTEGRATED GAS DEVELOPMENT (IGD‐HAP) PROJECT DESIGN and SUPPLY of INERGEN SYSTEM FIRE PROTECTION SYSTEMS 2010
ATA OILFIELD SUPPLY REFILLING of INERGEN at YEMEN REFILLING of ANSUL 200 BAR INERGEN CYLINDER FIRE PROTECTION SYSTEMS 2010
DESCON ENGINEERINGINTEGRATED GAS DEVELOPMENT (IGD‐HAP) PROJECT ‐
PROCESSING PLANTDESIGN, SUPPLY andINSTALLATION of INERGEN FIRE
EXTINGUISHING SYSTEMSFIRE PROTECTION SYSTEMS 2010
SUWAIDI ENGINEERING GROUP DETAINEES BUILDINGDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
of FM200 SYSTEMSFIRE PROTECTION SYSTEMS 2010
SIBCAABU DHABI FINANCIAL CENTRE (ADFC) ‐ VESDA
SYSTEMS DESIGN, SUPPLY, TESTING and COMMISSIONING of VESDA
SYSTEMSFIRE DETECTION SYSTEMS 2010
INVENSYS RAS LAFFAN PORT EXPANSIONSUPPLY, LABEL, INSPECTION and SITE SERVICES FOR FIRE & GAS
SYSTEMSFIRE DETECTION SYSTEMS 2010
CCC FLARE GAS ‐ FIRE & GAS SYSTEMSSUPPLY, INSTALLATION, DESIGN, TESTING and COMMISSIONING
OF FIRE & GAS SYSTEMSFIRE DETECTION SYSTEMS 2010
QATARGAS TECHNICAL MANPOWER SERVICES MANPOWER SERVICES for 3 YEARS MANPOWER SERVICES 2010
EMIRATESMAINTENANCE of FIRE DETECTION and FIRE PROTECTION SYSTEMS at EMIRATE HANGARS
MAINTENANCE of FIRE DETECTION and FIRE PROTECTION SYSTEMS at EMIRATE HANGARS
FIRE PROTECTION and DETECTION SYSTEMS
2010
KAMAL ABBASSI & SONS SAMRA POWER STATION PHASE III DESIGN and SUPPLY of INERGEN EXTINGUISHING SYSTEMS FIRE PROTECTION SYSTEMS 2010
QATAR FERTILIZER COMPANY WATERMIST SYSTEM and HALON CYLINDERSDESIGN, ENGINEERING, PROCUREMENT, SUPPLY, INSTALLATION,
COMMISSIONING and TESTING of HALON CYLINDERSFIRE PROTECTION SYSTEMS 2010
EMAL EPC ‐ FIRE PROTECTION and SPRINKLER SYSTEMSDESIGN, SUPPLY, FABRICATION, INSTALLATION, TESTING and
COMMISSIONING of FIRE PROTECTION SYSTEMSFIRE PROTECTION SYSTEMS 2010
Page 23 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
TOURISM DEVELOPMENT & INVESTMENT COMPANY (TDIC)
CONSTRUCTION VILLAGEDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
of SECURITY and COMMUNICATIONS SYSTEMSSECURITY SYSTEMS 2010
GENCO AL BUSTAN TOWERDESIGN, SUPPLY, TESTING and COMMISSIONING of FM200 and
DELUGE FOAM WATER SPRINKLER SYSTEMSFIRE PROTECTION SYSTEMS 2010
TOTAL ABK ‐ JV HALON PHASING ‐ PHASE 3 ‐ OFFSHOREINSTALLATION, TESTING and COMMISSIONING of CLEAN
AGENT(ANSUL 200 BAR INERGEN) SYSTEMS FIRE PROTECTION SYSTEMS 2010
Q‐ENERGYNGV FILLING STATIONS ‐ HIGH PRESSURE PIPELINE
CONNECTIONSDESIGN, SUPPLY and INSTALLATION of INERGEN EXTINGUISHING
SYSTEMSFIRE PROTECTION SYSTEMS 2010
TOTAL E&P ‐QATAR CO2 SYSTEM DPISUPPLY of CO2 FIRE EXTINGUISHING SYSTEMS, SITE
SUPERVISION, FUNCTIONAL TEST and COMMISSIONINGFIRE PROTECTION SYSTEMS 2010
TAKREERUPGRADING of FOAM and WATERSPRAY SYSTEMS for
TANKS and PROCESS UNITS ‐ UMM AL NARUPGRADING of FOAM and WATERSPRAY SYSTEMS for TANKS and
PROCESS UNITS ‐ UMM AL NARFIRE PROTECTION SYSTEMS 2010
CODE CONTRACTING LAB and SAFETY BUILDING ‐ TAKREERDESIGN, TESTING, SUPPLY and BUILD of FIRE ALARM PANELS,
FIRE DETECTION SYSTEMS 2010CODE CONTRACTING LAB and SAFETY BUILDING TAKREERCOMMISSIONING and INSPECTION
FIRE DETECTION SYSTEMS 2010
DUBAI POLICE GENERAL HQ MAINTENANCE at CENTRAL PRISONMAINTENANCE of FIRE ALARM and PA SYSTEMS at DUBAI
CENTRAL PRISONFIRE DETECTION and PA SYSTEMS 2010
ASCON (ETA GROUP) GASCO ‐ NON‐PROCESS BUILDINGSDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISISIONING
of INERGEN SYSTEMFIRE PROTECTION SYSTEMS 2009
PETROFAC KOC 40'' PIPELINE PROJECT DESIGN, BUILD, TESTING and SUPPLY of FIRE ALARM SYSTEMS FIRE DETECTION SYSTEMS 2009
SIEMENS LTD.ABU DHABI CRUDE OIL PIPELINE (ADCOP) PROJECT ‐
HABSHAN TO FUJAIRAHDESIGN, BUILD, TESTING and SUPPLY of FIRE & GAS‐FIRE ALARM
& FIELD EQUIPMENTSFIRE DETECTION SYSTEMS 2009
PETROFAC ASAB FUL FIELD DEVELOPMENT (AFFD) PROJECT SUPPLY and COMMISSIONING of FIRE ALARM & HSSD SYSTEMS FIRE DETECTION SYSTEMS 2009
SK ENGINEERING and CONSTRUCTIONANSUL 200 BAR INERGEN SYSTEM ‐ BAB GAS
COMPRESSIONDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
of ANSUL 200 BAR INERGEN SYSTEMFIRE PROTECTION SYSTEMS 2009
Page 24 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
TOTAL ABK ‐ JV TOTAL ABK ‐ HALON PHASING OUTPHASE 2 OFFER ‐ PROCUREMENT and SUPPLY of INERGEN
SPECIALIST EQUIPMENT and PIPEWORKFIRE PROTECTION SYSTEMS 2009
ASCON NON‐PROCESS BUILDING ‐ GASCO RUWAISDESIGN, SUPPLY, TESTING and COMMISSIONING of FIRE & GAS
SYSTEMSFIRE DETECTION SYSTEMS 2009
EMIRATES INTEGRATED TELECOM COMPANY
DIB‐4SUPPLY, INSTALLATION, TESTING and COMMISSIONING of NOVEC
1230 SYSTEMSFIRE PROTECTION SYSTEMS 2009
YOKOGAWA ELECTRIC KOREA CO. ADCO‐BAB GAS COMPRESSION(FAS)DESIGN, BUILD, TESTING and SUPPLY of FIRE & GAS DETECTION
CONTROL PANELS and EQUIPMENT FIRE DETECTION SYSTEMS 2009
PJSC STROYTRANSGAZDOLPHIN PROJECT ‐ TAWEELAH TO FUJAIRAH GAS
PIPELINE (INERGEN SYSTEM)DESIGN, ENGINEERING, SUPPLY, INSTALLATION, TESTING and
COMMISSIONING of INERGEN SYSTEMSFIRE PROTECTION SYSTEMS 2009
EMIRATES EK ‐ SUPPLY of FOAMSUPPLY and DESIGN of 3% AFFF FOAM CONCENTRATE of QTY 186
DRUMS ‐ FOAM SYSTEMSFIRE PROTECTION SYSTEMS 2009
QATAR PETROLEUM MAINTENANCE at QP/MICMAINTENANCE of FIRE ALARM and FIRE FIGHTING SYSTEMS at
VARIOUS FACILITIESFIRE PROTECTION and DETECTION
SYSTEMS2009
CONDOR BUIDLING CONTRACTING YAHSAT SGS A+B ‐ ABU DHABI and AL AINDESIGN, SUPPLY, INSTALLATION,TESTING, COMMISSIONING and fABRICATION of 200 BAR INERGEN FIRE EXTINGUISHING SYSTEMS
FIRE PROTECTION SYSTEMS 2009
DUBAI MUNICIPALITY MAINTENANCE at ZABEEL PARK INSPECTION + QUARTERLY PPM of ELV SYSTEMS SECURITY SYSTEMS 2009
GS ENGINEERING & CONSTRUCTION GREEN DIESEL PROJECT (GDP) SUPPLY of BUTTERFLY VALVE + GATE VALVE + CHECK VALVE FIRE PROTECTION SYSTEMS 2009
ASRAQ for TRADE and AGENCIES SHINWAH INERGEN SYSTEN ‐ YEMEN SUPPLY of INERGEN CYLINDER SPARES FIRE PROTECTION SYSTEMS 2009
TECHNIP FUJAIRAH PHASE 2 ‐ WATER TRANSMISSION SYSTEMDESIGN, SUPPLY, TESTING and COMMISSONING of WATERSPRAY
and FIRE FIGHTING SYSTEMSFIRE PROTECTION SYSTEMS 2009
TYCO QATAR FIRE & SECURITYCALL OFF CONTRACT FOR MANPOWER SUPPLY ‐ ELECTRICAL & INSTRUMENTATION ANALYZER
CALL OFF CONTRACT FOR MANPOWER SUPPLY ‐ ELECTRICAL & INSTRUMENTATION ANALYZER
ANALYSER SYSTEMS 2009
TECHNIP ‐ FRANCE FUJAIRAH PHASE‐II DESIGN, SUPPLY and COMMISSIONING of FIRE ALARM SYSTEMS FIRE DETECTION SYSTEMS 2009
SUWAIDI ENGINEERING GROUP ABU DHABI FINANCIAL CENTRE (ADFC) NOVEC SYSTEMDESIGN, SUPPLY, TESTING and COMMISSIONING of NOVEC 1230
FIRE EXTINGUISHING SYSTEMS FIRE PROTECTION SYSTEMS 2009
Page 25 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
IDAMA MAINTENANCE at JBRQUARTERLY PREVENTIVE MAINTENANCE of FIRE FIGHTING
SYSTEMS at JBRFIRE FIGHTING SYSTEMS 2009
INTERGULF GENERAL CONTRACTING LLC CIVIL WORK PACKAGE ‐ ASAB 2008DESIGN, TESTING, SUPPLY, INSTALLATION and COMMISSIONING, FABRICATION and DETAILED ENGINEERING of INERGEN SYSTEMS
FIRE PROTECTION SYSTEMS 2009
TARGET ENGINEERING & CONSTRUCTION EMAL ABOVE GROUND PROJECT IN TAWEELAHSURVEY, DESIGN, SUPPLY, INSTALLATION, SUPERVISION and
COMMISSIONING of OIL LEAK DETECTION SYSTEMFIRE DETECTION SYSTEMS 2009
SUWAIDI ENGINEERING GROUP ABU DHABI FINANCIAL CENTRE (ADFC) DESIG, SUPPLY and TESTING of SPRINKLERS, FOAM FLOW FIRE PROTECTION SYSTEMS 2009
PJSC STROTRANSGAZ BUILDING FIRE ALARM SYSTEMSDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
of FIRE & GAS SYSTEMSFIRE DETECTION SYSTEMS 2009
RASGAS COMPANY LIMITED MAINTENANCE of FIRE EXTINGUISHERS at RASGASINSPECTION, MAINTENANCE and RECHARGING of PORTABLE FIRE
EXTINGUISHERS at RASGASFIRE PROTECTION SYSTEMS 2009
TECHNIMONT ‐ ITALY TECHNIMONT ‐ BOROUGE 2 ‐ DELUGE INSTALLATION PIPING INSTALLATION for DELUGE WATERSPRAY SYSTEMS FIRE PROTECTION SYSTEMS 2009
TAKREER OUTDOOR VIDEO DISPLAY TAKREERSUPPLY, INSTALLATION, PROCUREMENT, PROGRAMMING, TESTING and COMMISSIONING of SYSTEM SITE TRAINING of SECURITY SYSTEMS 2009TAKREER OUTDOOR VIDEO DISPLAY ‐ TAKREER TESTING and COMMISSIONING of SYSTEM. SITE TRAINING of
OUTDOOR DISPLAY SYSTEMS.SECURITY SYSTEMS 2009
IMDAAD MAINTENANCE at PALM TUNNELMAINTENANCE of ELV and FIRE FIGHTING SYSTEMS for 3 YEARS
(15/6/09 to 14/06/12)FIRE DETECTION and SECURITY
SYSTEMS2009
LARSEN & TOUBRO LTD.33/11KV PRIMARY SUBSTATION in AL AIN (CONTRACT
NO. A‐3900.1)DESIGN, SUPPLY, INSTALLATION and COMMISSIONING OF WATERSPRAY DELUGE, CO2 and FIRE ALARM SYSTEMS
FIRE PROTECTION and DETECTION SYSTEMS
2009
AL MASAOOD BERGUN TOC TECHNICAL FACILITYDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSONING of INERGEN, FIRE EXTINGUISHING and FIRE DETECTION SYSTEM
FIRE PROTECTION and DETECTION SYSTEMS
2009
PETROFAC INTERNATIONAL PETROFAC ‐ ASAB F.F.D. SUPPLY and INSTALLATION of FIRE ALARM SYSTEM FIRE DETECTION SYSTEMS 2009
EMIRATES DNATA EMIRATES ADDITIONAL IN‐RACK SPRINKLERSDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
OF SPRINKLER SYSTEMSFIRE PROTECTION SYSTEMS 2009
BILT MIDDLE EAST LLC EMIRATES CALL CENTRE SUPPLY, TESTING and COMMISSIONING of INERGEN SYSTEMS FIRE PROTECTION SYSTEMS 2009
Page 26 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
TOLEDO ELECTRO‐MECHANICAL THIRD INTERBUSTRANSDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
of DELUGE WATER SYSTEMSFIRE PROTECTION SYSTEMS 2009
GASCO GASCO‐ F&G MAINT. HABSHAN/ASAB MAINTENANCE SERVICES CONTRACT for FIRE & GAS SYSTEMS FIRE DETECTION SYSTEMS 2009
EMIRATES ALUMINUM EMAL ‐ FIRE ALARM SYSTEM DESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING FIRE DETECTION SYSTEMS 2009
EASTERN BECHTEL CO. LTD. HABSHAN 3 INSTALLATION of PNEUMATIC PIPING for DELUGE SYSTEMS FIRE PROTECTION SYSTEMS 2009
SIMPLEX GRINNELL QATALUM CONSTRUCTION VILLAGE INSTALLATION of FIRE ALARM and FIRE FIGHTING SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2009
VOLTAS LIMITED FERRARI EXPERIENCEDESIGN, SUPPLY, INSTALLATION,TESTING, COMMISSIONING and
SUPERVISIONFIRE DETECTION SYSTEMS 2009
SIEMENS ABU DHABIELIXIER 2 ‐ 220kv SUBSTATION at MIRFA for AIR SEPARATION PLANT for NITROGEN GENERATION
INSTALLATION of FIRE FIGHTING SYSTEMS, CO2 SYSTEMS, FIRE DETECTION & ALARM SYSTEMS
FIRE PROTECTION and DETECTION SYSTEMS
2009
TOSHIBA CORPORATIONTOSHIBA GRID STATION‐ICAD‐3 (400/200/33kv SS) ‐
CONTRACT NO. 5767 LOT 1AEPC for FIRE PROTECTION SYSTEMS FIRE PROTECTION SYSTEMS 2009
IMECO HEXANE PROJECTDESIGN, SUPPLY AND Installation ‐ ELECTRICAL and MECHANICAL
SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2009
SYSTEMS SYSTEMS
ITT SYSTEMS DIVISIONMAINTENANCE of FIRE FIGHTING and FIRE ALARM
SYSTEMS at U.S. AIRBASEMAINTENANCE of FIRE FIGHTING and FIRE ALARM SYSTEMS
FIRE PROTECTION and DETECTION SYSTEMS
2009
FLUOR MIDDLE EAST LTD. A20H HABSHAN GAS COMPLEX EXPANSION PROJECT DESIGN and SUPPLY of DELUGE SYSTEMS FIRE PROTECTION SYSTEMS 2009
TFIS UK OGD III‐ F&G SUPPLY of ENGINEERING SERVICES ‐ FIRE & GAS SYSTEMS FIRE DETECTION SYSTEMS 2009
TAKREER UMM AL NAR CCTV SYSTEMSSUPPLY, INSTALLATION, COMMISISONING and UPGRADING of
OBSOLETE CCTV SYSTEMSSECURITY SYSTEMS 2009
RUWAIS FERTILIZER INDUSTRIES FERTIL CONTENT DESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
of INERGEN SYSTEMSFIRE PROTECTION SYSTEMS 2009
EMIRATES MAINTENANCE AT EMIRATES HANGAR MAINTENANCE of FIRE ALARM and FIRE PROTECTION SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2009
QATAR STEEL MAINTENANCE AT QATAR STEEL MAINTENANCE of FIRE ALARM and FIRE FIGHTING SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2009
Page 27 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
GS ENGINEERING & CONSTRUCTION GREEN DIESEL PROJECT (GDP) ‐ FIRE ALARM SYSTEM DESIGN, SUPPLY, TEST and BUILD FIRE DETECTION SYSTEMS 2009
GS ENGINEERING & CONSTRUCTION G.S.ENGG. ‐ GREEN DIESEL PROJECT (GDP) CLEAN AGENT INERGEN EXTINGUISHING SYSTEMS FIRE PROTECTION SYSTEMS 2009
ROLLS ROYCE MAINTENANCE at ROLLS ROYCE MAINTENANCE of FIRE PROTECTION and DETECTION SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2009
FERTIL AMMONIA GAS DETECTION SYSTEMSSUPPLY, INSTALLATION and COMMISSIONING OF GAS DETECTION
SYSTEMSFIRE DETECTION SYSTEMS 2009
TECHNIMONT PP/PE BOROUGE 2 INSTALLATION of INERGEN SYSTEMS FIRE PROTECTION SYSTEMS 2009
VOLTAS LIMITED FAS ‐ AL UDEID RELOCATION PACKAGE 2 DELIVERY, DESIGN, SUPPLY, TESTING and INSTALLATION FIRE DETECTION SYSTEMS 2009
DUBAI POLICE GHQ MAINTENANCE at DUBAI PRISON MAINTENANCE of FIRE DETECTION and PA SYSTEMS FIRE DETECTION and PA SYSTEMS 2009
GASCO MAINTENANCE at ASAB & RUWAIS MAINTENANCE of ONLINE ANALYZERS ANALYZERS SYSTEMS 2009
QATAR PETROLEUM MAINTENANCE AT QP ‐ DUKHAN MAINTENANCE of FIRE PROTECTION and DETECTION SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2009
SYSTEMS
TECNICAS REUNIDAS BOROUGE 2 PROJECT SUPERVISION and INSTALLATION of FIRE PROTECTION and GAS‐
BASED EXTINGUISHING SYSTEMSFIRE PROTECTION SYSTEMS 2009
PUNJ LLOYD ‐ QATAR INERGEN SYSTEM FOR 18 MPPL DESIGN and SUPPLY of INERGEN SYSTEMS FIRE PROTECTION SYSTEMS 2009
MAZROUI SUPPLIES PROJECT 8 MSCM P‐123 DESIGN and SUPPLY of INERGEN SYSTEMS FIRE PROTECTION SYSTEMS 2008
QATAR PETROLEUM MAINTENANCE at NGL Plants ‐ QP MAINTENANCESAFETY INSTRUMENTS and
EQUIPMENTS2008
CONSOLIDATED CONTRACTORS INTL. CO. RLCC SEAWATER SYSTEM PHASE IIDESIGN, SUPPLY, TESTING and COMMISSIONING of ADDITIONAL
FIRE & GAS EQUIPMENTSFIRE DETECTION SYSTEMS 2008
LINDE AG BOROUGE 2 ‐ RUWAIS SUPPLY of FIRE ALARM and VESDA MATERIALS FIRE DETECTION SYSTEMS 2008
ETA LLC THE LANDMARK TOWERDESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING OF NOVEC
SYSTEMSFIRE PROTECTION SYSTEMS 2008
RADIO HOLLAND ‐ SINGAPORE UMM SHAIF GIF ‐ PA SUPPLY and INSTALLATION TELECOMMUNICATIONS SYSTEMS 2008
AMANA STEEL PLASTER BOARD FACTORYSUPPLY, DESIGN, INSTALLATION, TESTING, COMMISSIONING of
ACCESS CONTROL SYSTEMSSECURITY SYSTEMS 2008
Page 28 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
FATA SPA QATALUM‐FATA Pk DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING FIRE DETECTION and CCTV SYSTEM 2008
DODSAL ENGINEERING RUWAIS SULPHUR EXPANSION ‐ PA SYSTEMDESIGN, SUPPLY, SUPERVISION, TESTING and COMMISSIONING
OF PA SYSTEMSTELECOMMUNICATIONS SYSTEMS 2008
DODSAL ENGINEERING RUWAIS SULPHUR EXPANSION ‐ TEL & LAN SYSTEMS DESIGN, SUPPLY, SUPERVISION, TESTING and COMMISSIONING TELECOMMUNICATION SYSTEMS 2008
DODSAL ENGINEERING RUWAIS SULPHUR EXPANSION IIISUPPLY, TESTING and COMMISSIONING of UV FLAME DETECTORS
/ DESIGN and SUPPLY of CO2 SYSTEM for MCC PANELFIRE PROTECTION and DETECTION
SYSTEMS2008
TECTON ENGINEERING and CONSTRUCTION LLC
MIRFA and MADINAT ‐ M3850SUPPLY and INSTALLATION of ADDITIONAL CO2 CYLINDER / SUPPLY, INSTALLATION, TESTING and COMMISSIONING of
ADDITIONAL FIRE ALARM SYSTEMSFIRE DETECTION SYSTEMS 2008
VOLTAS LIMITED DFIC ‐ NORTH PLANT CONSTRUCTION WORKS SUPPLY of MUELLER STEAM CHECK VALVE FIRE PROTECTION SYSTEMS 2008
NPCC GAS PROCESSING FACILITIESSUPPLY, INSTALLATION, COMMISSIONING SUPPORT for INERGEN
FIXED FIRE EXTINGUISHING SYSTEMFIRE PROTECTION SYSTEMS 2008
IDAMA MAINTENANCE AT JBR SECTOR 16 MAINTENANCE of 204 FIRE EXTINGUISHER and 204 FIRE BLANKET FIRE FIGHTING SYSTEMS 2008
TAKREER TAKREER REVAMPDESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF
FIRE & GAS SYSTEMSFIRE DETECTION SYSTEMS 2008
CCC RUWAIS BOROUGE 2 EU2 PROJECTDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
OF INERGEN SYSTEMSFIRE PROTECTION SYSTEMS 2008
OUTOTEC EMAL GREEN CARBON PLANT and BUTTS CRUSHING DESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING FIRE PROTECTION SYSTEMS 2008
DOLPHIN MAINTENANCE of ANALYZER SYSTEMS MAINTENANCE ANALYZERS SYSTEMS 2008
TECNIMONT SPABOROUGE 2 PROJECT ‐ 3435 PP/PE RUWAIS (AE)
EPCBODESIGN and SUPPLY of FIRE FIGHTING SYSTEM & FIRE
EXTINGUISHERSFIRE PROTECTION SYSTEMS 2008
ETA POWER PROJECTTRANSCO ‐ 132/11KV SUBSTATIONS at AL RAHA‐A
SECTOR E‐40 and W‐41 ‐ 3 NOS. (CONTRACT NO. N‐5208)
DESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING of WATERSPRAY DELUGE, CO2 and FIRE ALARM SYSTEMS
FIRE FIGHTING SYSTEMS 2008
DODSAL ENGINEERING FUJAIRAH PHASE 2 ‐ WATER TRANSMISSIONSUPPLY, INSTALLATION and COMMISSIONING of FIRE ALARM
SYSTEMFIRE DETECTION SYSTEMS 2008
Page 29 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
DESCON ENGINEERING FERTIL ‐ UREA DEBOTTLENECKING PROJECTDESIGN, SUPPLY, TESTING and COMMISSIONING OF INERGEN
SYSTEMSFIRE PROTECTION SYSTEMS 2008
TECHNICAS REUNIDAS 1940‐1518 BOROUGE 2DESIGN, ENGINEERING, SUPPLY, FABRICATION, TESTING and
COMMISSIONING OF INERGEN SYSTEMSFIRE PROTECTION SYSTEMS 2008
TECHNICAS REUNIDAS 1940‐1506 BOROUGE 2DESIGN, ENGINEERING, SUPPLY and FABRICATION OF INERGEN
SYSTEMSFIRE PROTECTION SYSTEMS 2008
BK GULF INDEX BUILDINGDESIGN, SUPPLY, TESTING and COMMISSIONING of FM200
EXTINGUISHING SYSTEMSFIRE PROTECTION SYSTEMS 2008
BK GULF P002AE‐JEBEL ALI TANKER BERTH SUPPLY OF INLINE BALANCE PRESSURE PROPORTIONER FIRE PROTECTION SYSTEMS 2008
EC HARRIS ABU DHABI MEDIA ZONESUPPLY, INSTALL and COMMISSIONING of CCTV, ACCESS
CONTROL SYSTEMSSECURITY SYSTEMS 2008
DANZAS DANZAS DLC 3SUPPLY, INSTALL, TEST and COMMISSIONING of ACCESS
CONTROL, CCTV and TURNSTILESSECURITY SYSTEMS 2008
DUBAI POLICE GENERAL HQ MAINTENANCE at DUBAI PRISONMAINTENANCE of FIRE DETECTION and PA/VA SYSTEMS at AL
AWEER CENTRAL PRISONFIRE DETECTION and
TELECOMMUNICATIONS SYSTEMS2008
TECHNIMONT SpA 3435PP/PE RUWAIS (AE)DESIGN and SUPPLY of VESDA, FIRE & GAS and INERGEN FIRE PROTECTION and DETECTION
2008TECHNIMONT SpA 3435PP/PE RUWAIS (AE)SYSTEMS SYSTEMS
2008
ADNOC MAINTENANCE of FIRE FIGHTING SYSTEMS at ADNOC MAINTENANCE OF FIRE FIGHTING SYSTEMS FIRE PROTECTION SYSTEMS 2008
SINGLE BOUY MOORINGS INC FPSO FRADE MRF 1512‐01.17492.0239 SUPPLY of FOAM CONCENTRATE FIRE PROTECTION SYSTEMS 2008
ADNOC ADNOC OLD IMAGE FILLING STATIONDESIGN, SUPPLY, INSTALLATION and COMMISSIONING of
INTRUDER ALARM SYSTEMSECURITY SYSTEMS 2008
ETA LLC SAMA TOWERDESIGN, SUPPLY, TEST and COMMISSIONING OF INERGEN
SYSTEMSFIRE PROTECTION SYSTEMS 2008
AL HOSNEI DU POP EXCHANGE BUILDINGDESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING OF
INERGEN SYSTEMSFIRE PROTECTION SYSTEMS 2008
TAISEI CORPORATION WIDENING of EMIRATES ROAD‐ ARABIAN RANCHES
DESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING of SPRINKLER SYSTEMS / DESIGN, SUPPLY, INSTALLATION,
TESTING and COMMISSIONINNG of FIRE ALARM SYSTEM for FIRE PUMP ROOM
FIRE DETECTION SYSTEMS 2008
FALCON ELECTRO‐MECHANICAL NEW ADMINISTRATION BUILDING ‐ GASCO RUWAISDESIGN, SUPPLY, INSTALL and COMMISSIONING of FIRE
PROTECTION, INERGEN and FIRE ALARM SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2008
Page 30 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
LARSEN & TOUBRO LTD.ADWEA/TRANSCO ‐ 33/11KV TYPICAL PRIMARY
SUBSTATION at ICAD LOT II (CONTRACT No. G‐4224‐1)
DESIGN, SUPPLY, INSTALLATION and COMMISSIONING OF WATERSPRAY DELUGE, CO2 and FIRE ALARM SYSTEMS
FIRE PROTECTION and DETECTION SYSTEMS
2008
TAKREERREPLACEMENT of HALON WITH WATERMIST SYSTEMS ‐
RUWAIS REFINERY
REPLACEMENT of HALON WITH WATERMIST SYSTEMS for STG‐01 & STG‐02 and DELUGE WATER SPRAY SYSTEM for
TRANSFORMERS 4021‐TMM01 & 4022‐TMM‐02 at RUWAISFIRE PROTECTION SYSTEMS 2008
TARGET ENGINEERING & CONSTRUCTION OAG PACKAGE 1DESIGN, SUPPLY, FABRICATE and DELIVERY of DELUGE SKIDS,
HRYDRANTS and MONITORSFIRE PROTECTION SYSTEMS 2008
EMCOR FACILITIES SERVICES MAINTENANCE at ADNEC MAINTENANCE for 2 YEARS FIRE FIGHTING and ELV SYSTEMS 2008
TYCO SIMPLEX GRINNELL QATALUM CONSTRUCTION VILLAGESUPPLY and INSTALLATION of DEVICES and SUPPLY of
MANPOWERFIRE PROTECTION & DETECTION
SYSTEMS2008
ADAT/GAMCOHANGAR NO. 5 ‐ FIRE PUMPING SYSTEM and PAINT HANGAR FIRE PROTECTION and DETECTION SYSTEMS
DESIGN, SUPPLY, INSTALL, TEST and COMMISSIONINGFIRE PROTECTION and DETECTION
SYSTEMS2008
LARSEN & TOUBRO LTD.ADWEA TANSCO ‐ 33/11KV PRIMARY SUBSTATION at
MADINAT ZAYED W6 and GAYATHY (CONTRACT NO. D 6624‐1)
DESIGN, SUPPLY, INSTALLATION and COMMISSIONING OF WATERSPRAY DELUGE, CO2 and FIRE ALARM SYSTEMS
FIRE PROTECTION SYSTEMS 2008
LARSEN & TOUBRO LTD.ADWEA ‐ 33/11KV SUBSTATION at AL AIN (CONTRACT
NO. A 3938 1‐5 NOS.)DESIGN, SUPPLY, INSTALLATION and COMMISSIONING OF WATERSPRAY DELUGE, CO2 and FIRE ALARM SYSTEMS
FIRE PROTECTION SYSTEMS 2008
THERMO LLC QC LAB BOROUGE PHASE 2 SUPPLY, TEST and COMMISSIONING TELECOMMUNICATIONS SYSTEMS 2008
CCC OAG PACKAGE III ‐ FIRE & GAS SYSTEMSDESIGN, ENGINEERING, SUPPLY, TEST and COMMISSIONING OF
FIRE & GAS SYSTEMS FIRE DETECTION SYSTEMS 2008
NPCCMAERSK OIL QATAR ‐ AL SHAHEEN FIELD
DEVELOPMENTSUPPLY of FIRE FIGHTING SYSTEMS FIRE FIGHTING SYSTEMS 2008
ZADCOPA SYSTEM ‐ ARZANAH ‐ REPLACEMENT of ARZANAH
PAGE/PARTY and PUBLIC ADDRESS PHASE 2DESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
OF PA SYSTEMSTELECOMMUNICATIONS SYSTEMS 2008
THERMO LLC QC LAB ‐ BOROUGESUPPLY, TESTING, COMMISSIONING and TRAINING for FIRE &
GAS PROTECTION SYSTEMFIRE DETECTION SYSTEMS 2008
ITT CORPORATIONMAINTENANCE of FIRE DETECTION and PROTECTION
SYSTEMS at QATARMAINTENANCE
FIRE PROTECTION and DETECTION SYSTEMS
2008
NPCC PROJECT ‐ 6044 ‐ ONGC ‐ C SERIES PROJECT SUPPLY of DCP SKIDS FIRE PROTECTION SYSTEMS 2008
Page 31 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
METRONIC GLOBALBEHRAD GAMCO NEW HANGAR ( 80 x 80 M ) DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONINGFIRE PROTECTION & DETECTION
SYSTEMS2008
TARGET ENGINEERING & CONSTRUCTION BUHASA POWER INTERCONNECTION UPGRADE SUPPLY and INSTALLATION of SS PIPING for DELUGE SYSTEM FIRE PROTECTION SYSTEMS 2008
GASCO GASCO‐ FIRE & GAS MAINTENANCE AT GASCO RUWAIS MAINTENANCE of FIRE & GAS SYSTEMS FIRE DETECTION SYSTEMS 2008
MARGHAM DUBAI ESTABLISHMENT (MDE)
MDE‐07‐417 PLANT & BPC FIRE PROTECTION SYSTEM UPGRADE WORKS FIRE PROTECTION SYSTES 2008
TAKREER MAINTENANCE at RUWAIS REFINERYMAINTENANCE of FIRE & GAS DETECTION SYSTEM and OTHER
MONITORING SYSTEM for 1 YEARFIRE DETECTION SYSTEMS 2008
GUSTO MSC TALISMAN YME REDEVELOPMENTDESIGN, MANUFACTURE, TESTING and SUPPLY of 13 NOS. of DELUGE VALVE BOXES, SUPPLY of SELF‐OSCILLARTING FIRE
WATER MONITOR ‐ 5 NOSFIRE PROTECTION SYSTEMS 2008
GALFAR ENGINEERING and CONTRACTINGFIRE & GAS SYSTEM, F/SEA WATER EXPANSION
PROJECTDESIGN, SUPPLY, TESTING and COMMISSIONING of FIRE & GAS
SYSTEMS and PA SYSTEMSFIRE DETECTION and PA SYSTEMS 2008
RASGAS COMPANY LIMITED ADMIN SERVER ROOM at RAS LAFFANINSTALLATION of CLEAN AGENT FIRE SUPPRESSION SYSTEMS
(INERGEN SYSTEMS)FIRE PROTECTION SYSTEMS 2008
SUWAIDI ENGINEERING GROUP FLOAT GLASS PLANTDESIGN, SUPPLY, INSTALLATION and COMMISSIONING of LHD
SYSTEMSFIRE DETECTION SYSTEMS 2008
ENGINEER'S OFFICEENGINEER'S OFFICE ‐ PHASE 2 ‐ NEW ATG BOLLARD
SYSTEMSUPPLY, INSTALL and COMMISSIONING OF BOLLARDS SYSTEMS SECURITY SYSTEMS 2008
CONSOLIDATED CONTRACTORS INTERNATIONAL (CCC)
PEARL GTL ‐ QATAR DESIGN and SUPPLY of FIRE ALARM SYSTEMS FIRE DETECTION SYSTEMS 2008
KUEHNE + NAGEL KUEHNE + NAGEL NEW FACILITYSUPPLY, INSTALLATION and COMMISSIONING of ACCESS
CENTRAL CCTVSECURITY SYSTEMS 2008
INTERNATIONAL MECHANICAL & ELECTRICAL
LHD SYSTEM ‐ IMECOSUPPLY and INSTALLATION of LHD DETECTION SYSTEM for FUEL
TANKSFIRE DETECTION SYSTEMS 2008
MARGHAM DUBAI ESTABLISHMENT (MDE)
MDE‐BOOSTER COMPRESSIONDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING of FM200 / ADDITIONAL SUPPLY and COMMISSIONING of UV/IR
FLAME DETECTORS
FIRE PROTECTION and DETECTION SYSTEMS
2008
ARCHIRODON CONSTRUCTION CO. RUWAIS 3rd NGL TRAINDESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING OF
INERGEN SYSTEMSFIRE PROTECTION SYSTEMS 2008
Page 32 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
EMIRATES PALACEMAINTENANCE of FIRE ALARM and PA SYSTEMS at
EMIRATES PALACEMAINTENANCE OF FIRE DETECTION and PA SYSTEMS
FIRE DETECTION and TELECOMMUNICATIONS SYSTEMS
2007
BABCOCK BORSIG SERVICE NEW LIQUID SULPHUR SUM for UNITS 50/51SUPPLY, INSTALLATION and COMMISSIONING OF FIRE & GAS
DETECTION SYSTEMSFIRE DETECTION SYSTEMS 2007
SIEMENS P.T. & D.132/11KV SUBSTATION at KHALIFA PARK, KHALIFA II‐A, W6 and E1 in SAADIYAT ISLAND (CONTRACT NO. N‐
4351.1B)
DESIGN, SUPPLY, INSTALLATION and COMMISSIONING OF WATERSPRAY DELUGE, CO2 and FIRE ALARM SYSTEMS
FIRE PROTECTION and DETECTION SYSTEMS
2007
CCC ‐ ABU DHABI GASCO ‐ OAG ‐ PACKAGE 3 ‐ DELUGE SKIDSDESIGN, FABRICATION and SUPPLY of DELUGE SKID and SPRAY
NOZZLESFIRE PROTECTION SYSTEMS 2007
DODSAL MUKHAIZANA CPFS COMMISSIONING of FOAM BLADDER DELUGE SKIDS FIRE PROTECTION SYSTEMS 2007
POWERFLOW ENGINEERING WATER SUPPLY to ADCO/GASCO FACILITIESDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING of HIGH PRESSURE CO2 FIRE SUPPRESSION SYSTEMS, PORTABLE FIRE EXTINGUISHERS, FIRE DETECTION and ALARM SYSTEMS
FIRE PROTECTION and DETECTION SYSTEMS
2007
DEWA DEWA Halon Replacement 2007
LARSEN & TOUBRO LTD.TRANSCO ‐ 132/22KV S/S SAADIYAT ISLAND SS2 & SS4
(CONTRACT NO. N‐5701.1)EPC WORKS ‐ DESIGN, SUPPLY, INTSALL and COMMISSIONING of
WATERSPRAY DELUGE, CO2 and FIRE ALARM SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2007
JUMA AL MAJID GROUP AX324 ‐ FM200 SYSTEMS DESIGN, SUPPLY, TEST and COMMISSIONING OF FM200 SYSTEMS FIRE PROTECTION SYSTEMS 2007
DOLPHIN ENERGY LTD. MAINTENANCE of ANALYZER SYSTEMS MAINTENANCE of ANALYZER SYSTEMS ‐ 4 MONTHS ANALYZER SYSTEMS 2007
TFIS‐MANCHESTER RELOCATION of TELECOM EQUIPMENTRELOCATION of TELECOM EQUIPMENT and PROVISION of
SPECIALIST ASSISTANCETELECOMMUNICATIONS SYSTEMS 2007
TAKREER HALON REPLACEMENT ‐ REF. RUWAISDESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING OF
INERGEN SYSTEMS FIRE PROTECTION SYSTEMS 2007
TECTON ENGINEERING and CONSTRUCTION LLC
ADWEA CONTRACT NO. N‐4028 DESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING FIRE PROTECTION SYSTEMS 2007
HONEYWELL MIDDLE EAST ZADCO MOSAICS PHASE II‐B DESIGN, SUPPLY and COMMISSIONING OF FIRE & GAS SYSTEMS FIRE DETECTION SYSTEMS 2007
ADMA OPCO MAINTENANCE at ADMA OPCO HQMODIFICATION of FIRE FIGHTING SYSTEMS (INERGEN SYSTEM) /
MODIFICATION of SPRINKLER SYSTEMFIRE PROTECTION SYSTEMS 2007
Page 33 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
EASTERN BECHTEL CO. LTD.ASAB GAS DEVELOPMENT (AGD) II PROJECT ‐
HYDRANT and MONITORSSUPPLY of 2 NOS. of YDRANTS c/w MONITOR FIRE PROTECTION SYSTEMS 2007
TAKREER UMM AL NAR MAINTENANCEINSPECTION, TESTING and COMMISSIONING of FIRE PROTECTION
SYSTEMFIRE PROTECTION SYSTEMS 2007
WGI MIDDLE EAST INC. QATARGAS COMMON SULPHUR PROJECT DESIGN & CALCULATION ‐ DELUGE/WET PIPE SPRINKLER SYSTEM FIRE PROTECTION SYSTEMS 2007
THALES SECURITY SOLUTION and SERVICES
DUBAI METRO SUPPLY and COMMISSIONING of ACCESS CONTROL SYSTEMS SECURITY SYSTEMS 2007
CONSOLIDATED CONTRACTORS INTL. CO. EGDS PROJECTDESIGN, SUPPLY, TESTING, INSTALLATION, PRE‐COMMISSIONING and COMMISSIONING of INERGEN and DETECTION SYSTEMS for
SERVER ROOM
FIRE PROTECTION and DETECTION SYSTEMS
2007
TOYO ENGINEERING FLARE GAS PROJECT ‐ TOYODESIGN, SUPPLY of MATERIALS, SUPERVISION and COMMISSIONING of F&G and PA/GA SYSTEM
FIRE DETECTION and TELECOMMUNICATIONS SYSTEMS
2007
EMCO NEW OPERATION SHELTER ‐ EMCODESIGN, SUPPLY, INSTALL and COMMISSIONING of PA and FIRE &
GAS SYSTEMSFIRE DETECTION and
TELECOMMUNICATIONS SYSTEMS2007
ALI ALGHANIM SONS BUILDING F&G ‐ PETROFAC DESIGN and SUPPLY OF FIRE & GAS SYSTEMS FIRE DETECTION SYSTEMS 2007
ENGINEERING MAINTENANCE CO. MISC. CIVIL BLDG. GASCO HABSHAN DESIGN, SUPPLY and COMMISSIONING of FIRE ALARM SYSTEMS FIRE DETECTION SYSTEMS 2007
DUBAI POLICE GHQ MAINTENANCE at DUBAI PRISON MAINTENANCE of FIRE ALARM and PUBLIC ADDRESS SYSTEMSFIRE DETECTION and
TELECOMMUNICATIONS SYSTEMS2007
JUMEIRAH INTERNATIONAL MAINTENANCE at BURJ AL ARAB MAINTENANCE of PAVA SYSTEMS (3 YEARS) TELECOMMUNICATIONS SYSTEMS 2007
AL JABER ENERGY SERVICES COMMON SULPHUR PROJECT ‐ QATARDESIGN, SUPPLY, INSTALLATION and COMMISSIONING of FM200
SYSTEMFIRE PROTECTION SYSTEMS 2007
SBM CHEVRON FPSO FRADE
ADDITIONAL SCOPE OF WORK TO INCLUDE FOAM CONNECTION FOR DELUGE SKID and ADDITIONAL PRESSURE CONTROL OPTION for DELUGE VALVES. SUPPLY of COLLAR‐TYPE GASKET for FOAM
MONITORS.
FIRE PROTECTION SYSTEMS 2007
LARSEN & TOUBRO LTD.ADWEA ‐ 33/11KV SUBSTATION WITH ASSOCIATED
WORK In 33/11KV CABLES IN AL AIN (CONTRACT No. 3486)
DESIGN, SUPPLY, INSTALLATION and COMMISSIONING OF WATERSPRAY DELUGE, CO2 and FIRE ALARM SYSTEMS
FIRE PROTECTION and DETECTION SYSTEMS
2007
Page 34 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
CONSOLIDATED CONTRACTORS INTL. CO. HABSHAN GAS COMPLEX EXPANSION PROJECTSUPPLY and COMMISSIONING of FIRE ALARM and FIRE FIGHTING
SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2007
CONTROL and APPLICATIONS EMIRATES (CAE)
NON‐PROCESS BUILDING ‐ HABSHANDESIGN, SUPPLY and COMMISSIONING of FIRE & GAS and PUBLIC
ADDRESS SYSTEMSFIRE DETECTION and PA SYSTEMS 2007
ESSA ENGINEERING & MARINE SERVICES AL ZAWRA POWER STATION FUEL FARM FACILITIESSUPPLY, SUPERVISION of INSTALLATION, TESTING and
COMMISSIONING of FIRE PROTECTION VALVESFIRE PROTECTION SYSTEMS 2007
EMIRATES ‐ DNATA MAINTENANCE at EMIRATES HANGARMAINTENANCE of FIRE PROTECTION and FIRE DETECTION
SYSTEMS (2 YEARS ‐ LABOUR ONLY)FIRE PROTECTION and DETECTION
SYSTEMS2007
NPCC DCP SKID HOSE REEL SUPPLY of DCP SKID HOSE REEL FIRE PROTECTION SYSTEMS 2007
BK GULF MAINTENANCE of NBD HQMAINTENANCE of FIRE ALARM, CCTV, SECURITY and BMS
SYSTEMSFIRE DETECTION and SECURITY
SYSTEMS2007
DODSAL PTE LTD. RAS LAFFAN COMMON COOLING SEA WATER SYSTEM ‐
PHASE II CATEGORY 1DESIGN, SUPPLY, INSTALLATION, SUPERVISION and
COMMISSIONINGFIRE & GAS DETECTION SYSTEM 2007
RUWAIS FERTILIZER INDUSTRIES (FERTIL) REVAMPING of FIRE DETECTION and ALARM SYSTEMS DESIGN, SUPPLY, INSTALL and COMMISSIONING FIRE DETECTION SYSTEMS 2007
EASTERN BECHTEL CO. LTD. ASAB GAS DEVELOPMENT (AGD) PROJECT PHASE IIDESIGN, SUPPLY, INSTALL and COMMISSIONING of INERGEN, DELUGE, CO2, VESDA, FIRE ALARM and FIRE & GAS SYSTEMS
FIRE PROTECTION and DETECTION SYSTEMS
2007
EMCO PA SYSTEMS at GASCO HABSHANRELOCATION, TESTING and COMMISSIONING of PA NODE on HSE
BUILDING at GASCO HABSHANTELECOMMUNICATIONS SYSTEMS 2007
TAKREER GUP CCTV SYSTEMDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
OF CCTV SYSTEMSSECURITY SYSTEMS 2006
TYCO FIRE & INTEGRATED SOLUTION HABSHAN GAS COMPLEX FABRICATION and ASSEMBLY of DELUGE SYSTEMS FIRE PROTECTION SYSTEMS 2006
WAJDI ELECTRICAL CONT. CO. WAJDI ‐ AL ZAWRA POWER PLANTDESIGN, SUPPLY, INSTALLATION and COMMISSIONING of FM200,
WATERSPRAY, DELUGE and HYDRANT SYSTEMSFIRE PROTECTION SYSTEMS 2006
TYCO FIRE & SECURITY PTE LTD OGD III FIRE FIGHTING EQUIPMENT FABRICATION and ASSEMBLY OF DELUGE SYSTEMS FIRE PROTECTION SYSTEMS 2006
DUBAI PETROLEUM COMPANY DPC HALON REPLACEMENT PHASE 2DESIGN, SUPPLY, INSTALLATION and COMMISSIONING OF NOVEC
SYSTEMSFIRE PROTECTION SYSTEMS 2006
Page 35 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
CONSOLIDATED CONTRACTORS HABSHAN GAS COMPLEXDESIGN, SUPPLY, SUPERVISION of INSTALLATION and COMMISSIONING of INERGEN EXTINGUISHING SYSTEM
FIRE PROTECTION SYSTEMS 2006
DOLPHIN ENERGY LTD DOLPHIN MAINTENANCELTSA for THE MAINTENANCE of FIRE & GAS, CCTV and PA
SYSTEMS for DOLPHIN ENERGY at QATAR (5 YEARS)FIRE DETECTION and SECURITY
SYSTEMS2006
WASHINGTON GROUP INTERNATIONAL COMMON SULPHUR ‐ CCTV SUPPLY OF CCTV SYSTEMS SECURITY SYSTEMS 2006
DODSAL PTE LTD CAMP FIRE DETECTION ‐ DODSAL SUPPLY, INSTALLATION and COMMISSIONING FIRE DETECTION SYSTEMS 2006
ADMA OPCOREPLACEMENT of OBSOLETE FIRE & GAS at ZWSC &
USSC PLATFORMSENGINEERING, SUPPLY, INSTALLATION and COMMISSIONING OF
FIRE & GAS SYSTEMS FIRE DETECTION SYSTEMS 2006
CONSOLIDATED INTERNATIONAL RGX 6‐7 CAMPDESIGN, SUPPLY and COMMISSIONING of FIRE ALARM,
SPRINKLER and WET CHEMICAL SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2006
SNAMPROGETTI SpA GASCO ‐ 3rd NGL TRAIN RUWAISSUPPLY of F&G DETECTORS and NOTIFICATION DEVICES +
ENGINEERING of VESDA SYSTEM (LAYOUTS and CALCULATIONS)FIRE DETECTION SYSTEMS 2006
ETA ETA‐ABU DHABI NEW EXHIBITION CENTRE (ADNEC) PA/VA/GM , VESDA, FIRE ALARM, ACCESS CONTROL and FM200FIRE PROTECTION, FIRE DETECTION and
SECURITY SYSTEMS2006
DESIGN SUPPLY INSTALLATION d COMMISSIONING f HSSDEASTERN BECHTEL LTD ONGC ‐ BECHTEL VESDA
DESIGN, SUPPLY, INSTALLATION and COMMISSIONING of HSSD SYSTEM
FIRE DETECTION SYSTEMS 2006
DODSAL PTE LTDTAKREER INTER‐REFINERY PIPELINE (IRP) PROJECT ‐
ADR, MAQTA, RUWAIS, MUSSAFAHDESIGN, SUPPLY and COMMISSIONING FIRE DETECTION SYSTEMS 2006
ADCO ‐ BUHASA ADCO ‐ BUHASA GAS DESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING FIRE PROTECTION SYSTEMS 2006
DODSAL PTE LTDTAKREER INTER‐REFINERY PIPELINE (IRP) PROJECT ‐
PORTABLE MOBILESUPPLY of PORTABLE and MOBILE FIRE FIGHTING EQUIPMENTS FIRE PROTECTION SYSTEMS 2006
DODSAL PTE LTD TAKREER INTER‐REFINERY PIPELINE (IRP) PROJECT DESIGN and SUPPLY FIRE PROTECTION SYSTEMS 2006
TOYO ENGINEERING INDIA ADDITIONAL WORKS ‐ MARGHAMDESIGN, SUPPLY, INSTALLATION and COMMISSIONING OF FIRE &
GAS SYSTEMSFIRE DETECTION SYSTEMS 2006
ADGAS F&G UPGRADE ‐ TRAIN I and IISUPPLY, INSTALLATION and COMMISSIONING OF FIRE & GAS
SYSTEMSFIRE DETECTION SYSTEMS 2006
NPCC ONGC‐BS‐NH4 PLATFORM ‐ FOAM SKID DRY CHEM SKIDS ‐ 10 NOS. FIRE PROTECTION SYSTEMS 2006
Page 36 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
BELLELI ENERGY SPATAKREER INTER‐REFINERY PIPELINE (IRP) PROJECT ‐
FIRE FIGHTING EQUIPMENTDESIGN, SUPPLY, INSTALL and COMMISSIONING OF FIRE
FIGHTING SYSTEMSFIRE PROTECTION SYSTEMS 2006
JUMA AL MAJID GROUP DUBAI INTERNATIONAL AIRPORT EXPANSION SUPPLY, TEST and COMMISSIONING OF VESDA SYSTEMS FIRE DETECTION SYSTEMS 2006
ETA EMIRATES HANGAR HDESIGN, SUPPLY, INSTALL and COMMISSIONING of FIRE
DETECTION, PRE‐ACTION and INERGEN SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2006
TAISEI CORPORATION DOLPHIN SUPPLY OF FIRE FIGHTING SYSTEMS FIRE PROTECTION SYSTEMS 2006
JBK CONTROLS NCC VESDA SYSTEMS SUPPLY OF VESDA SYSTEMS FIRE DETECTION SYSTEMS 2006
GROUP FIVE CONSTRUCTION / WAY ENGINEERING
EMIRATES AEROPLANE TEST CENTRES DESIGN, SUPPLY, INSTALL, TEST and COMMISSIONINGFIRE PROTECTION and DETECTION
SYSTEMS2006
DODSAL PTE LTDTAKREER INTER‐REFINERY PIPELINE (IRP) PROJECT ‐
INERGEN SYSTEMSDESIGN, SUPPLY, INSTALL and COMMISSIONING of INERGEN and
FIRE ALARM SYSTEMSFIRE PROTECTION SYSTEMS 2006
CONSOLIDATED CONTRACTORS RUWAIS 3rd NGL PROJECTDESIGN, SUPPLY, INSTALLATION and COMMISSIONING OF
INERGEN SYSTEMSFIRE PROTECTION SYSTEMS 2006
INERGEN SYSTEMS
CEGELEC ABICS INERGENDESIGN, SUPPLY, SUPERVISION and COMMISSIONING of
WORMALD INERGEN SYSTEMSFIRE PROTECTION SYSTEMS 2006
DODSAL PTE LTDTAKREER INTER‐REFINERY PIPELINE (IRP) PROJECT ‐
FOAM SYSTEMSDESIGN and SUPPLY OF FOAM SYSTEMS FIRE PROTECTION SYSTEMS 2006
SD(MIDDLE EAST) LLC AX104 MEGA CARGO TERMINALDESIGN, SUPPLY, INSTALL and COMMISSIONING OF IN‐RACK
SPRINKLERS SYSTEMFIRE PROTECTION SYSTEMS 2006
NATIONAL PETROLEUM CONS. CO. OGD III ‐ CONDENSATE ‐ ELV SYSTEMSDESIGN, SUPPLY and COMMISSIONING of FIRE & GAS, PUBLIC ADDRESS and TELECOM SYSTEMS, WATERSPRAY, TELECOM,
INERGEN, VESDA and FIRE DETECTION SYSTEMS
FIRE PROTECTION, FIRE DETECTION and SECURITY SYSTEMS
2006
AL ARABIA / JUMA AL MAJID AX324 FM200 SYSTEMDESIGN, SUPPLY, COMMISSIONING, SUPERVISION and INTEGRITY
TESTING of FM200 SYSTEMFIRE PROTECTION SYSTEMS 2006
TAKREER VIDEO PROJECTION ‐ TAKREERREPLACEMENT OF EXISTING VIDEO PROJECTORS WITH BARCO
PROJECTORSTELECOMMUNICATIONS SYSTEMS 2006
CEGELEC VESDA ABICS CEGELECDESIGN, SUPPLY, INSTALL and COMMISSIONING OF VESDA
SYSTEMSFIRE DETECTION SYSTEMS 2006
Page 37 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
CSHK DUBAI CONTRACTING JAFZA TWIN TOWERSDESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING OF FIRE
FIGHTING SYSTEMSFIRE PROTECTION SYSTEMS 2006
KINDEN CORPORATION PALM JUMEIRAH TUNNEL PROJECTDESIGN, SUPPLY, INSTALL and COMMISSIONING of CCTV, FIRE DETECTION & ALARM SYSTEMS, VOICE EVACUATION, FIRE FIGHTING SYSTEMS, TELEPHONE SYSTEMS and SCADA
FIRE DETECTION, FIRE PROTECTION and SECURITY SYSTEMS
2006
NWJ&D / ABU DHABI J&P LLC OGD III SP6 PROCESS BUILDINGSDESIGN, SUPPLY, INSTALL and COMMISSIONING OF INERGEN
SYSTEMFIRE PROTECTION SYSTEMS 2006
QATAR FUEL (WOQOD)REPLACEMENT / UPDATE of FIXED FIRE FIGHTING
SYSTEMREPLACEMENT/UPDATE OF FIXED FIRE FIGHTING SYSTEMS PHASE
IIFIRE PROTECTION SYSTEMS 2006
THERMO SCHLUMBERGER LEARNING CENTREDESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING of FIRE
FIGHTING and FIRE HYDRANT SYSTEMSFIRE PROTECTION SYSTEMS 2006
DUBAI PETROLEUM COMPANY DPC ACCESS CONTROL and PA SYSTEMSDESIGN, SUPPLY, INSTALL and COMMISSIONING OF ACCESS
CONTROL and PA SYSTEMSSECURITY and TELECOMMUNICATIONS
SYSTEMS2006
MARGHAM DUBAI EST.FIRE & GAS DETECTION UPGRADE for MARGHAM
PLANTDESIGN, SUPPLY, INSTALLATION and COMMISSIONING OF FIRE &
GAS SYSTEMSFIRE DETECTION SYSTEMS 2005
SNC LAVALIN P‐823 FIRE & GAS SYSTEM DESIGN, SUPPLY and COMMISSIONING OF FIRE & GAS SYSTEMS FIRE DETECTION SYSTEMS 2005SNC LAVALIN P 823 FIRE & GAS SYSTEM DESIGN, SUPPLY and COMMISSIONING OF FIRE & GAS SYSTEMS FIRE DETECTION SYSTEMS 2005
DUBAI PETROLEUM COMPANYDPC HALON REPLACEMENT for OFFSHORE CONTROL
BLDG. ‐ PHASE 1DESIGN, SUPPLY and INSTALLATION of NOVEC FIRE SUPPRESSION
SYSTEMFIRE PROTECTION SYSTEMS 2005
AL ARABIA DUBAI MALLDESIGN, SUPPLY, TESTING and COMMISSIONING of 200 BBAR
INERGEN SYSTEM for GSDC and MULTIMEDIA PRODUCTION SUITFIRE PROTECTION SYSTEMS 2005
BILT MIDDLE EAST DIFC GATE PRECINCT TOWERSDESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING OF
INERGEN SYSTEMS FIRE PROTECTION SYSTEMS 2005
AL KHARAFI NATIONAL COMPANY DUBAI FESTIVAL CITYDESIGN, SUPPLY, SUPERVISION, INSTALLATION, TESTING and
COMMISSIONING of ANSUL INERGEN 200 BAR SYSTEMFIRE PROTECTION SYSTEMS 2005
AL JABER ENERGY SERVICES TAWEELAH RECEIVING FACILITYDESIGN, SUPPLY, INSTALL and COMMISSIONING of FIRE & GAS
DETECTION & ALARM SYSTEMS and INERGEN SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2005
TAKREER RUWAIS MAINTENANCEMAINTENANCE of FIRE & GAS DETECTION SYSTEMS and
MONITORING SYSTEMSFIRE DETECTION SYSTEMS 2005
Page 38 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
TAISEI CORPORATION DOLPHIN RAS LAFFAN PLANT ‐ UPSTREAM FACILITIESDESIGN, SUPPLY, INSTALL and COMMISSIONING of INERGEN, CO2, SPRINKLER, HOSE REELS and PORTABLE EXTINGUISHERS
FIRE PROTECTION SYSTEMS 2005
SNAMPROGETTI ADCO BUHASA FACILITIES DEVELOPMENT/UPGRADEDESIGN, SUPPLY and COMMISSIONING OF FIRE & GAS
DETECTIONFIRE DETECTION SYSTEMS 2005
GULF PIPING COMPANYQPD OFFSHORE FIELD DEVELOPMENT ‐ OFFSHORE
PLATFORMSDESIGN, SUPPLY and COMMISSIONING of FOAM DELUGE, FM200,
WATERSPRAY DELUGE and TWIN AGENT SYSTEMSFIRE PROTECTION SYSTEMS 2005
BUNDUQHALON SYSTEMS REPLACEMENT for PHASE 3 and 4 AT
BUBDUQ COMPLEX (TENDER NO. T‐05‐011)ENGINEERING, PROCUREMENT, INSTALLATION and
COMMISSIONING OF INERGEN SYSTEMSFIRE PROTECTION SYSTEMS 2005
SAMSUNG CORPORATIONADIA HEADQUARTERS ‐ HIGH‐END SECURITY
MANAGEMENT SYSTEMSDESIGN, SUPPLY, INSTALL and COMMISSIONING of HIGH‐END
SECURITY SYSTEMSSECURITY SYSTEMS 2005
ARABIAN CONSTRUCTION CO. CPH BOAT JETTYDESIGN, SUPPLY, INSTALL and COMMISSIONING of FOAM and
FIRE FIGHTING SYSTEMSFIRE PROTECTION SYSTEMS 2005
ETISALAT ETISALAT MAINTENANCE MAINTENANCE OF INERGEN at ETISALAT FIRE PROTECTION SYSTEMS 2005
TMT & D CORPORATION 400 & 220kv SS MEDINA ZAYEDDESIGN, SUPPLY, INSTALL and COMMISSIONING of
WATERSPRAY DELUGE, CO2 and FIRE ALARM SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2005
CONTROL CONTRACTING and TRADING COMPANY
DOLPHIN DP1 & DP2 ‐ CO2ENGINEERING, SUPPLY, TEST and COMMISSIONING OF CO2
SYSTEMSFIRE PROTECTION SYSTEMS 2005
LARSEN & TOUBRO LTD.GASCO BUHASA SS BU5 S/S ‐ BUHASA FACILITIES
UPGRADINGSUPPLY OF INERGEN SYSTEMS FIRE PROTECTION SYSTEMS 2005
INTL ELECTRO‐MECHANICAL SEVICES (IEMS) / ASCON
EMIRATES HANGAR ‐ LANDSIDE FADSDESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING of FIRE
DETECTION and INERGEN SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2005 / 2004
ZUBLINGASCO POWER INTERCONNECTION SUBSTATION NO. 9
‐ FIRE PROTECTION and DETECTIONDESIGN, SUPPLY, INSTALL and COMMISSIONING of FIRE & GAS
DETECTION and INERGEN SYSTEMFIRE PROTECTION and DETECTION
SYSTEMS2005
SITE TECHNOLOGY DUBAI CENTRAL PRISONSUPPLY and COMMISSIONING of SECURITY MANAGEMENT
SYSTEMSSECURITY SYSTEMS 2004
INTL ELECTRO‐MECHANICAL SEVICES (IEMS)
EMIRATES HANGAR ‐ LANDSIDEDESIGN, SUPPLY, INSTALLATION and COMMISSIONING OF
INERGEN SYSTEMFIRE PROTECTION SYSTEMS 2004
VOLTAS CABLES REPLACEMENT SUPPLY and INSTALLATION of FIRE ALARM SYSTEMS FIRE DETECTION SYSTEMS 2004
TOTAL ABU AL BUKHOOSH LQ1/LQ2 PROJECTDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
OF SPRINKLER SYSTEMSFIRE PROTECTION SYSTEMS 2004
Page 39 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
BK GULF AL YASSAT AALI ISLAND PHASE 2DESIGN,SUPPLY,INSTALLATION,TESTNG and COMMISSIONING of FOAM DELUGE SYTEMS, INERGEN SYSTEMS and FIRE ALARM
SYSTEMS
FIRE PROTECTION and DETECTION SYSTEMS
2004
GASCOHALON REPLACEMENT PROJECT at GASCO‐HABSHAN
(CONTRACT NO. OHB.52.04)DESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
OF INERGEN SYSTEMSFIRE PROTECTION SYSTEMS 2004
LARSEN & TOUBRO LTD. 4 NOS 33/11kv SUBSTATIONS AT AL AIN
(CONTRACT NO. G‐1409)DESIGN, SUPPLY, INSTALLATION and COMMISSIONING OF WATERSPRAY DELUGE, CO2 and FIRE ALARM SYSTEMS
FIRE PROTECTION and DETECTION SYSTEMS
2004
A&P ZABEEL PARKDESIGN, SUPPLY and COMMISSIONING of FIRE DETECTION, PAVA,
CCTV, STRUCTURED CABLING and NURSE CALL SYSTEMSFIRE DETECTION and SECURITY
SYSTEMS2004
QATAR SECURITY SERVICES AL UDEID PACKAGE 4SUPPLY and COMMISSION of FIRE DETECTION and ALARM
SYSTEMSFIRE DETECTION SYSTEMS 2004
UNISAFEABU DHABI INVESTMENT AUTHORITY (ADIA) HQ ‐
INERGENDESIGN, SUPPLY, INSTALL, COMMISSION of INERGEN SYSTEMS FIRE PROTECTION SYSTEMS 2004
ALSTOM GUP RUWAISDESIGN, SUPPLY, INSTALL and COMMISSIONING OF PAVA
SYSTEMTELECOMMUNICATIONS SYSTEMS 2004
DESIGN SUPPLY INSTALL d COMMISSIONING f INERGEN d FIRE PROTECTION d DETECTIONRUWAIS FERTILIZER INDUSTRIES (FERTIL) FERTIL SUBSTATION
DESIGN, SUPPLY, INSTALL and COMMISSIONING of INERGEN and FIRE ALARM SYSTEMS
FIRE PROTECTION and DETECTION SYSTEMS
2004
ETA EMIRATES HANGARDESIGN, SUPPLY, INSTALLATION, TESTING and COMMISSIONING
of FIRE PROTECTION SYSTEMSFIRE PROTECTION SYSTEMS 2004
NPCC UMM AL NAR ‐ F&G SYSTEMSDESIGN, SUPPLY and COMMISSIONING OF FIRE & GAS
DETECTIONFIRE DETECTION SYSTEMS 2004
ETA DUBAI CENTRAL PRISONDESIGN, SUPPLY and COMMISSIONING of FIRE ALARM, VOICE
ALARM and IT SYSTEMSFIRE DETECTION SYSTEMS 2004
TOTAL ABU AL BUKHOOSH TOTAL ABU AL BUKHOOSH PLATFORMSDESIGN, SUPPLY, INSTALL and COMMISSIONING OF INERGEN
SYSTEMFIRE PROTECTION SYSTEMS 2003
GASCO NEW ADMINISTRATION BUILDINGDESIGN, SUPPLY, INSTALL and COMMISSIONING OF INERGEN
SYSTEMFIRE PROTECTION SYSTEMS 2003
GUSTO/SBM MARLIM SULDESIGN, FABRICATION, ASSEMBLY and SUPPLY of FOAM SKIDS /
DELUGE VALVEFIRE PROTECTION SYSTEMS 2003
Page 40 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
PRIVATE DEPARTMENT EMIRATES PALACE HOTELDESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING of BMS, SECURITY, ACCESS CONTROL, FIRE FIGHTING and STRUCTURED
CABLING
FIRE PROTECTION, FIRE DETECTION and SECURITY SYSTEMS
2002
EMIRATES EMI GAMCO HANGARDESIGN, SUPPLY, INSTALL and COMMISSIONING of FOAM,
WATER and FIRE DETECTION SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2002
BK GULFDUBAI WORLD TRADE CENTRE ‐
HALLS 1 and 2SUPPLY OF PAVA SYSTEM TELECOMMUNICATIONS SYSTEMS 2002
ETA DUBAI CONVENTION CENTRESUPPLY, TEST, COMMISSIONING OF CONCOURSE and SHARED
HALL PAVA SYSTEMTELECOMMUNICATIONS SYSTEMS 2002
ZADCO UMM AL DALKH PLATFORMS PU15/16DESIGN, SUPPLY, INSTALL and COMMISSIONING OF FIRE & GAS
SYSTEMSFIRE DETECTION SYSTEMS 2002
BK GULFDUBAI CONVENTION CENTRE ‐
OFFICE and PODIUMDESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING OF PUBLIC
ADDRESS SYSTEMTELECOMMUNICATIONS SYSTEMS 2002
GASCO BUHASA‐HALON REPLACEMENTDESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING OF
INERGEN SYSTEMFIRE PROTECTION SYSTEMS 2001
ADNOCRUWAIS REFINERY and UMM AL NAR DETECTION
UPGRADEEPC CONTRACT for the REVAMPING of FIRE DETECTION SYSTEM FIRE DETECTION SYSTEM 2000
ABB SADELMI RUWAIS GUP SUBSTATIONSDESIGN, SUPPLY, INSTALLATION and COMMISSIONING of
INERGEN and FIRE ALARM SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS2000
ADMA‐OPCO HQ BUILDINGDESIGN, SUPPLY, INSTALL and COMMISSIONING of SPRINKLER
and INERGEN SYSTEMSFIRE PROTECTION SYSTEMS 2000
ADNOC RUWAIS REFINERY GUP EXPANSION DESIGN, SUPPLY, INSTALL and COMMISSIONING FIRE DETECTION SYSTEM 2000
GASCO HALON REPLACEMENTDESIGN, SUPPLY, INSTALL and COMMISSIONING OF INERGEN
SYSTEMFIRE PROTECTION SYSTEMS 1999 / 2000
NATIONAL DRILLING COMPANY NEW HEADQUARTERS BUILDINGDESIGN, SUPPLY, INSTALL and COMMISSIONING OF INERGEN
SYSTEMFIRE PROTECTION SYSTEMS 1998 / 1999
VERGER ET DELPORT ABU DHABI AVIATION ‐ 2 HANGARS AND TERMINALDESIGN, SUPPLY, INSTALL and COMMISSIONING of SPRINKLER,
FOAM and DETECTION SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS1998 / 1999
ADNOCONSHORE GAS DEVELOPMENT (OGD) PROJECT PHASE
IIDESIGN, SUPPLY, INSTALL, TEST and COMMISSIONING OF
INERGEN SYSTEMFIRE PROTECTION SYSTEMS 1999
ETISALAT T & A BUILDINGDESIGN, SUPPLY, INSTALL and COMMISSIONING OF INERGEN
SYSTEMFIRE PROTECTION SYSTEMS 1999
Page 41 of 42
CLIENT PROJECT NAME SCOPE OF WORKS PRODUCT / SYSTEM YEAR
PROJECTS REFERENCE LIST ‐ MAJOR CONTRACTS and SERVICE & MAINTENANCE JOBS
(AED 500K and ABOVE)
C.C.C.RUWAIS REFINERY EXPANSION ‐ SUBSTATIONS and SATELLITES
DESIGN, SUPPLY, INSTALLATION and COMMISSIONING of INERGEN and FIRE ALARM SYSTEMS
FIRE PROTECTION and DETECTION SYSTEMS
1998
ADGAS HQ BUILDINGDESIGN, SUPPLY, INSTALL and COMMISSIONING of SPRINKLER
and INERGEN SYSTEMSFIRE PROTECTION SYSTEMS 1998
ADGAS E3 BUILDINGDESIGN, SUPPLY, INSTALL and COMMISSIONING OF INERGEN
SYSTEMFIRE PROTECTION SYSTEMS 1998
DEWA NAJMA SUBSTATIONDESIGN, SUPPLY, INSTALL and COMMISSIONING of INERGEN and
FIRE ALARM SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS1998
KHANSAHEB JETTY EXPANSIONDESIGN, SUPPLY, INSTALL and COMMISSIONING of HIGH
EXPANSION FOAM SYSTEMFIRE PROTECTION SYSTEMS 1998
ETISALAT FUJAIRAH / RAK HEAD OFFICE DESIGN, SUPPLY and COMMISSIONING OF INERGEN SYSTEM FIRE PROTECTION SYSTEMS 1996 / 1998
BK GULF NATIONAL BANK OF DUBAI HEADQUARTERS BUILDINGDESIGN, SUPPLY and COMMISSIONING of FIRE ALARM, VOICE
ALARM, BMS, SECURITY SYSTEM, ACCESS CONTROL, CCTV, SMOKE CONTROL and LIGHTING CONTROL SYSTEMS
FIRE PROTECTION, FIRE DETECTION and SECURITY SYSTEMS
1997
ABB MADINAT KHALIFA SUBSTATIONDESIGN, SUPPLY, INSTALL and COMMISSIONING of WATERSPRAY
DELUGE, CO2 and FIRE ALARM SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS1997
ETISALAT SHARJAH HEADQUARTERSDESIGN, SUPPLY, INSTALL and COMMISSIONING OF INERGEN
SYSTEMFIRE PROTECTION SYSTEMS 1997
ARABTEC NEW EMIRATES TECHNICAL CENTREDESIGN, SUPPLY, INSTALL and COMMISSIONING of FOAM,
SPRINKLERS, INERGEN and ALARM SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS1996
BK GULFTD51 ‐ DUTY FREE and G.S.E COMPLEX DUBAI AIRPORT
EXPANSIONDESIGN, SUPPLY, INSTALL and COMMISSIONING of SPRINKLER,
INERGEN, VESDA and ALARM SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS1996
ADNOC RUWAIS SULPHUR PROJECTDESIGN, SUPPLY, INSTALL and COMMISSIONING OF INERGEN
SYSTEMFIRE PROTECTION SYSTEMS 1996
THERMO TD59 FUEL FARM DUBAI AIRPORT EXPANSIONDESIGN, SUPPLY and COMMISSIONING of FOAM, WATER and
ALARM SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS1996
ZADCO / GASCO NEW HEADQUARTERS BUILDINGDESIGN, SUPPLY, INSTALL and COMMISSIONING OF INERGEN
SYSTEMSFIRE PROTECTION SYSTEMS 1996
ADNOC HABSHAN CONTROL ROOMDESIGN, SUPPLY, INSTALL and COMMISSIONING OF INERGEN
SYSTEMSFIRE PROTECTION SYSTEMS 1995 / 1996
AL WIMPEY AMIRI FLIGHT HANGARDESIGN, SUPPLY, INSTALL and COMMISSIONING of FOAM,
SPRINKLERS and DETECTION SYSTEMSFIRE PROTECTION and DETECTION
SYSTEMS1995
Page 42 of 42