Projects Name Scope of Work Proponent Project Date SHY-1 NGL Pipeline, Loop N0. 1, 2 &3. Diameter of 30" Length of 585 KM Pre-Commissioning (Drying, Purging and Packing 500 PSI) Pre-commissioning (Scrapping, Dewatering & Flushing) Pre-Commissioning (Drying, Purging and Packing 500 PSI) Pre-Commissioning (Purging and Packing to 50 PSI) Pre-Commissioning (Purging and Packing to 50 PSI) SHAYBAH NGL Pipeline, Diameter of 36" Length of 633 km SHAYBAH NGL Pipeline, Diameter of 36" Length of 633 km RTDB-2 Refined Products Pipeline, Diameter of 30” Length of 106 KM DR-2 Refined Products Pipeline, Diameter of 30” Length of 135 KM Exploration Drilling N2 Purging for Train B Trail Test Nitrogen Unit. Nitrogen Well Lifting Services and Purging Emergency N2 Purging for Train B at SNGL-III Trial test to determine the capability and limitation of a new Nitrogen Generation Unit Saudi Aramco Abqaiq Saudi Aramco SGPED Saudi Aramco Pipelines and Communications Projects May, 2014 February, 2015 April, 2015 January, 2014 January, 2014 March, 2011 Exploration Drilling Nitrogen Well Lifting Services and Purging Saudi Aramco Offshore/Onshore Exploration Department Saudi Aramco Offshore/Onshore Exploration Department October, 2012 January,2012 October, 2011 Offshore T/A of MHRH-50 Water Flushing & ILI Run & Nitrogen Purging and Leak Test Saudi Aramco Offshore Projects Department June, 2016 Saudi Aramco Projects

Transcript of Projects Name Proponent Scope of Work Project Date · Projects Name Proponent Scope of Work Project...

Page 1: Projects Name Proponent Scope of Work Project Date · Projects Name Proponent Scope of Work Project Date ... (Pressure Testing, ... Saudi Aramco Projects Name Proponent Scope of Work

Projects Name Scope of WorkProponent Project Date

SHY-1 NGL Pipeline, Loop N0. 1, 2 &3. Diameter of 30"Length of 585 KM

Pre-Commissioning (Drying, Purging andPacking 500 PSI)

Pre-commissioning (Scrapping, Dewatering &Flushing)

Pre-Commissioning (Drying, Purging andPacking 500 PSI)

Pre-Commissioning (Purging and Packing to50 PSI)

Pre-Commissioning (Purging and Packing to50 PSI)

SHAYBAH NGL Pipeline, Diameter of 36"Length of 633 km

SHAYBAH NGL Pipeline, Diameter of 36"Length of 633 km

RTDB-2 Re�ned Products Pipeline, Diameter of 30”Length of 106 KM

DR-2 Re�ned Products Pipeline, Diameter of 30”Length of 135 KM

Exploration Drilling

N2 Purging for Train B

Trail Test Nitrogen Unit.

Nitrogen Well Lifting Services and Purging

Emergency N2 Purging for Train B at SNGL-III

Trial test to determine the capability and limitation ofa new Nitrogen Generation Unit

Saudi AramcoAbqaiq

Saudi AramcoSGPED

Saudi AramcoPipelines andCommunicationsProjects

May, 2014

February, 2015

April, 2015

January, 2014

January, 2014

March, 2011

Exploration Drilling Nitrogen Well Lifting Services and PurgingSaudi AramcoO�shore/OnshoreExploration Department

Saudi AramcoO�shore/OnshoreExploration Department

October, 2012

January,2012

October, 2011

Offshore T/A of MHRH-50 Water Flushing & ILI Run & Nitrogen Purging andLeak Test

Saudi Aramco O�shoreProjects Department June, 2016

Saudi Aramco Projects

Page 2: Projects Name Proponent Scope of Work Project Date · Projects Name Proponent Scope of Work Project Date ... (Pressure Testing, ... Saudi Aramco Projects Name Proponent Scope of Work

Projects Name Scope of WorkProponent Project Date

Aramco Hawyah Day Light

Aramco Shadgham GOSP

Aramco Day Light Project Contract

Aramco Wasit Project Contract

Aramco Manifa Project Contract

Aramco Berri Power Plant

Aramco Ain Dar Plant

Onshore Maintain Potential Program-Southern Zone

Pre-Commissioning (Purging & Drying)

Pre-Commissioning (Purging & Drying)

Pre-Commissioning (Pressure Testing, Drying& Purging)

Pre-Commissioning (Pressure Testing, Drying& Purging)

Pre-Commissioning (Pressure Testing, Drying& Purging)

Re-Validation (Purging)

Re-Validation (Drying & Purging)

Re-Validation (Drying & Purging)

July, 2015

August, 2015

February, 2016

January, 2016

March, 2016

March, 2016

October, 2016

May, 2016

Saudi Aramco PMT

Saudi KAD Projects

Page 3: Projects Name Proponent Scope of Work Project Date · Projects Name Proponent Scope of Work Project Date ... (Pressure Testing, ... Saudi Aramco Projects Name Proponent Scope of Work

SEPCOIII Mechanicaldept.

Ras Al-KHair Industrial City, New Power Plant. Pre-Commissioning (Purge and Pressurize) Block No.1,2,3,4, and 5

May, 2013

Saudi Aramco

Projects Name Scope of WorkProponent Project Date

Nitrogen Pigging Services for Yasref Pipelines Nitrogen Pigging Services May, 2016

Projects Name Scope of WorkProponent Project Date

Projects Name Scope of WorkProponent Project Date

Saudi AramcoBerri Gas Plant Shut Down Pre-Commissioning (Purging & Leak Testing) December, 2014

Saudi AramcoHawyeh Power Plant Shut Down Pre-Commissioning (Drying and Packing) November, 2015

DAYIM PUNJI LLOYD Projects

SEPCO Projects

RISAL Projects

Page 4: Projects Name Proponent Scope of Work Project Date · Projects Name Proponent Scope of Work Project Date ... (Pressure Testing, ... Saudi Aramco Projects Name Proponent Scope of Work

Saudi Aramco

Saudi Aramco

Purging & Drying Royal Commission Pipeline in Jubail Pre-Commissioning (Drying and Packing) May, 2015

Shy 023 Re-Validation (Purging and Packing) December, 2014

Saudi AramcoShaybah Pipeline Project Re-validation (Dewatering) December, 2015

SadaraSupply Of Nitrogen Services For Drying Activities Pre-Commissioning (Draying and Layup) August, 2016

Projects Name Scope of WorkProponent Project Date

Projects Name Scope of WorkProponent Project Date

Projects Name Scope of WorkProponent Project Date

NSH Projects

DIALOG Projects

The C.A.T Group Projects

Page 5: Projects Name Proponent Scope of Work Project Date · Projects Name Proponent Scope of Work Project Date ... (Pressure Testing, ... Saudi Aramco Projects Name Proponent Scope of Work

Saudi AramcoSHEDGUM/JUAYMAH 56” Pipeline (UBTG-4) Gas Displacement February, 2016

Project DateProjects Name Scope of WorkProponent

Saudi Aramco

Saudi Aramco

Projects Name Scope of WorkProponent Project Date

Hawiyah Power Plant

Fuel gas system`s Re-Validation (Purging andLeak test)

Fuel gas system`s Re-Validation (Purging andLeak test)

December, 2015

March, 2016

Abd El-Rahman El-Badr Establishment Projects

SAMSUNG Engineering Projects

Page 6: Projects Name Proponent Scope of Work Project Date · Projects Name Proponent Scope of Work Project Date ... (Pressure Testing, ... Saudi Aramco Projects Name Proponent Scope of Work

Saudi AramcoPipeline De-Cruding, Nitrogen Displacement & PurgingUA-6 P/L from Km-138 & KM-90 - Udailyah

De-Cruding & Re-validation activities July, 2016

Pipeline Scope of Work N2 (M3) N2 (US GAL) Length DiameterID

212 M3

3,493 M3

227 M3

0 M3

1,217 M3

De-Cruding, Nitrogen Displacement &Purging

KM-109.935

KM-102.643

KM-127.30

KM-113.624

KM-129.250

1

2

3

4

5

80.3 Gal

1,323 Gal

86 Gal

0 Gal

461 Gal

50 m

300 m

10 m

100 m

50 m

24”

24”

24”

24”

24”

1,409 M3KM-94.106 534 Gal 100 m 24”

Projects Name Scope of WorkProponent Project Date

AL ROBAYA HOLDING CO. Group Projects

Page 7: Projects Name Proponent Scope of Work Project Date · Projects Name Proponent Scope of Work Project Date ... (Pressure Testing, ... Saudi Aramco Projects Name Proponent Scope of Work

Saudi Aramco

Saudi Aramco

Saudi Aramco

Saudi Aramco

Quraiah Power Plant Pre-Commissioning (Purging and PressureTesting)

February, 2016

Projects Name Scope of WorkProponent Project Date

Hawyeh Gas Plant

Abqaiq Plant

Ras Tanura Re�nery

Fuel Gas Systems Purging and Leak Test

Fuel Gas Systems Purging and Leak Test

Fuel Gas Systems Purging and Leak Test

December, 2015

June, 2016

August, 2016

Project DateProjects Name Scope of WorkProponent

South Ghawar AramcoProducing Dpt.

Re-Validation Program for 130 Flow lines Re-Validation (Dewatering, Purging andPacking)

October, 2015

Project DateProjects Name Scope of WorkProponent

GSP( Engineered Industrial Services) Projects

ULTIMATE Trading Est. Projects

SISCO Projects

Page 8: Projects Name Proponent Scope of Work Project Date · Projects Name Proponent Scope of Work Project Date ... (Pressure Testing, ... Saudi Aramco Projects Name Proponent Scope of Work

Well Name Scope of Work N2 (M3) N2 (GAL) Pipe Length Pipe SizeID1 MDRK-1 340 M3

765 M3

3,002 M3

793 M3

1,133 M3

510 M3

2,294 M3

2,124 M3

425 M3

1,359 M3

319 M3

1,580 M3

340 M3

1,359 M3

810 M3

178 M3

700 M3

1,274 M3

480 M3

637 M3

375 M3

4,948 M3

1,600 M3

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

NJYN-35

MDRK-20

MDRK-31

TINAT-12

HRD-910

HRD-939

HRD-971

TINAT-32

NJYN-34

MDRK-3

TINAT-31

TINAT-16

MDRK-16

TINAT-27

TINAT-6

TINAT-27

NJYN-4

NJYN-4

HRD-679

TINAT-46

HRD-621

TINAT-29

2

3

4

5

6

7

8

9

10

11

12

13

14

15

17

16

19

20

21

22

23

24

18

129.0 Gal

290.0 Gal

1,137.0 Gal

300.0 Gal

429.0 Gal

193.0 Gal

869.0 Gal

805.0 Gal

161.0 Gal

515.0 Gal

121.0 Gal

598.0 Gal

128.8 Gal

514.8 Gal

306.8 Gal

67.4 Gal

265.0 Gal

483.0 Gal

182.0 Gal

241.0 Gal

142.0 Gal

1,874.0 Gal

606.1 Gal

600 m

5 Km

6 Km

4 Km

9 Km

1 Km

4 Km

4 Km

1.5 Km

3 Km

4 Km

6 Km

4 Km

5 Km

800 m

2 Km

5 Km

5 Km

5 Km

4 Km

3 Km

5 Km

4 Km

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

TINAT-33 2,266 M3 858.3 Gal 4 Km 8''

FLOW LINES TRACK RECORD

Page 9: Projects Name Proponent Scope of Work Project Date · Projects Name Proponent Scope of Work Project Date ... (Pressure Testing, ... Saudi Aramco Projects Name Proponent Scope of Work

Well Name Scope of Work N2 (M3) N2 (GAL) Pipe Length Pipe SizeID2,825 M3

991 M3

297 M3

2,492 M3

2,265 M3

3,060 M3

1,439 M3

1,973 M3

2,620 M3

3,568 M3

396 M3

363 M3

1,813 M3

1,532 M3

2,260 M3

1,791 M3

1,592 M3

1,359 M3

1,246 M3

1,388 M3

4,094 M3

1,076 M3

1,133 M3

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

Dewatering, Purging & Packing

HRD 1033

NJYN 22

HRD 1112

TINAT-34

NJYN 15

HRD 691

HRD 1046

MDRK 35

NJYN 25

N-HRD 632

WDHY J/O

N-HRD 1101

S-HRD W 680

Tinat 27

Tinat 28

Tinat 18

HRD 19

HRD 44

Njyn 14

Ghzal 24

RJH-1

HRD-1077

C-HRD 913

26

27

28

29

30

31

32

33

34

35

36

37

38

39

41

40

43

44

45

46

47

42

1,070 Gal

375.3 Gal

112.5 Gal

943.9 Gal

858 Gal

1,159 Gal

545 Gal

748 Gal

992 Gal

1,352 Gal

150 Gal

138 Gal

687 Gal

580 Gal

856 Gal

678.4 Gal

603 Gal

515 Gal

471.96 Gal

525.75 Gal

1,550.75 Gal

407.57 Gal

429.16 Gal

6.7 Km

1.7 Km

1Km

4 Km

2 Km

6.8 Km

1.5 Km

2.5 Km

3.5 Km

4 Km

900 m

900 m

4 Km

4 Km

6 Km

3.5 Km

3 Km

2.5 Km

1.8 Km

4.5 Km

8 Km

2 Km

3.3 Km

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

8''

25

FLOW LINES TRACK RECORD