Projects in the Forest Grove area
Presented by: David Kim, ODOT Metro West Area Manager
August 13, 2012
U.S. 26: Glencoe Road Interchange Project
• Improve safety, capacity and traffic flow of the interchange
• $32 million dollars from the 2009 Jobs and Transportation Act
• Most traffic impacts at night. During any ramp or road closures, a signed detour will be in place.
• Complete in summer 2014
• Replace the Glencoe Road bridge over U.S. 26 with a new, four-lane bridge, and improve vertical clearance
• Improve pedestrian and bicycle connections on the new bridge
• Lengthen and widen the U.S. 26 westbound off-ramp
• $3.3 million funded through the Statewide Transportation Improvement Program (STIP)
• Daytime and nighttime lane closures on OR 8
• Completion in December 2012.
• Repair pavement, grind, pave and restripe OR 8 from 331st Avenue to Quince Street
• Upgrade sidewalk curb ramps to ADA standards
• Stripe a new crosswalk across OR 8 on the east side of intersection with Quince Street:– Add a pedestrian signal for the new
crosswalk– Add a raised pedestrian island at the
south end of the new crosswalk
Local Agency Projects
• Council Creek Trail: Banks to Hillsboro – trail master plan. $218,000 federal money.
• Harvey Clarke Elementary School Sidewalk Improvement – Safe Routes to School. $300,000 federal money.
• OR8/OR47 Intersection Improvements - $1.3 million federal money.