![Page 1: Projects](https://reader036.fdocuments.in/reader036/viewer/2022081701/5447bda5b1af9fda018b4679/html5/thumbnails/1.jpg)
NO Project Name ClientKm. of cable laid
Project location
Completion Date
Project cost ( SAR )
Cable Type
Brief Description of Work
1 SUPERVISION ETIHAD MOBILY KSA ON GOING 17,424,556.00 SUPERVISION OF SNFN PROJECT 2009
2 MOBILY ODF MOBILYKINGDOM WIDE
ON GOING 11,667,797.40 SUPPLY & INSTALLATION OF ODF, RACK PATCH
PANELS
LIST OF PROJECTS EXECUTED BY SITAF SAUDIA CO.
3METRO RING INCLUDING
HUB SITESMOBILY MADINAH 2008 14,521,648.00
4OPERATION & MAINTENANCE
SAUDI BELLKINGDOM WIDE
2008 6,693,030.00 OPERATION & MAINTENANCE OF EXISTING
MODA‐FOTS NETWORK 2006‐2008
5PATRIOT INTEGRATION
PHASE3 UNDER ROYAL AIR DEFENSE
RSADF JEDDAH 2008 600,000.00
6
INTEGRATION OF PATRIOT SITES TO RSADF NETWORK PH. 3‐Additional Sites in Taif and Jeddah
CLIENT: MODA PRIME,
CONTRACTOR: SALTS
90 TAIF, Jeddah Jun‐08 1,255,000.00 24F
Survey and staking, OSP Design, Inst’n of cable by Mole plough, Direct buried cable installatipn in rock and soil, cable crossing & directional drilling.
SHEET 1 of 15
![Page 2: Projects](https://reader036.fdocuments.in/reader036/viewer/2022081701/5447bda5b1af9fda018b4679/html5/thumbnails/2.jpg)
7INTEGRATION OF PATRIOT SITES TO RSADF NETWORK
PH. 3
Electronics & Communication Dept‐ Air Defense Forces Command
(ECD‐ADF)
60JEDDAH‐TAIF
FEB. 2008 6,773,424.00 24FSurvey and staking, OSP Design, Inst’n of cable
by Mole plough, in rock, cable crossing & directional drilling.
8 PATRIOT CONNECTIVITY SAUDI BELL
RIYADH REFINARY, PSAB & KKMC
2008 1,633,617.00 PATRIOT SITES CONNECTIVITY
9 RAYTHEON RAYTHEON RIYADH 2008 405,420.00 FOC CONNECTIVITY OF HRH PRINCE BANDAR
PALACE & HRH KING KHALID PALACE
10RELOCATION & PROTECTION
RSADFKKMC & NARIYA
2008 162,700.00 RELOCATION & PROTECTION OF FOC
(RSADF/ECD)
11 EASTERN PROVICE RSADFFINANCE
2008 46,968.00 EASTERN PROVICE GROUP 511 EASTERN PROVICE RSADFBUILDING
2008 46,968.00 EASTERN PROVICE GROUP 5
12 MODA RSADFAL‐MANAR VILLAGE
2008 430,414.00 EASTERN PROVICE GROUP 5
13 MODA RSADFNAVAL CLUB
2008 254,264.00 EASTERN PROVICE GROUP 5
14 MOBILY TOWERS ETIHAD MOBILY MADINAH 2008 1,373,483.00 TOWER SITES CONNECTIVITY
15 RSADF IT DEP.RSADF IT
DEPARTMENTJEDDAH 2008 489,975.00
UPGRADING OF OSP NETWORK AT JEDDAH INSTITUTION
16 RSADF IT DEP.RSADF IT
DEPARTMENTUM SAIEK 2008 242,415.00 UPGRADING OF OSP NETWORK AT GROUP 5
17 RELOCATION OF FOCRSADF/SAUDI ARAMCO
DHARAN 2008 452,474.00 RELOCATION PROTECTION OF FOC
18 RELOCATION OF FOC RSADF/MOT HOFUF 2008 78,450.00 RELOCATION OF FOC (GCC)
19 EXPRESSWAY RSADF/MOT
RIYADH DAMMAM EXPRESSWA
Y
2008 190,930.00 PROTECTION OF FOC
SHEET 2 of 15
![Page 3: Projects](https://reader036.fdocuments.in/reader036/viewer/2022081701/5447bda5b1af9fda018b4679/html5/thumbnails/3.jpg)
20 RELOCATION FOC RSADF/MOTHAFUF SALWA ROAD
2008 1,523,555.00 RELOCATION OF FOC
21
RELOCATION AND PROTECTION OF MODA CABLE IN KING ABDULLAH ROAD
SAUDI OGER/MODA
RIYADH Dec‐08 408,819.00 24F +
48Cu, 24F
Survey and OSP Design, Const. of duct bank, Inst'n of Manhole , Inst’n. of sub‐duct, FOC cable pulling in sub‐duct , After Lay Test, Perform cut‐over & Site Reinstatement
22CABLE DEPLOYMENT PROJECT FOR GROUP 5
RSADF/MODA 13EASTERN REGION
NOV. 2008 1,623,172.00 24F,
50PAIR CU
Survey and OSP Design, Const. of duct bank, Inst'n of Manhole & Handholes, Inst’n. of sub‐duct, Installation of Cable Trays, FOC cable pulling in sub‐duct and in cable trays , After Lay Test, & Site Reinstatement
El i & S d OSP D i C f d b k
23ARMED FORCES MEDICAL SERVICES PROJECT
Electronics & Communication Dept‐ Air Defense Forces Command/
ERICSSON
80KINGDOMW
IDEApr‐08 1,562,504.00 24F
Survey and OSP Design, Const. of duct bank, Inst'n of Manhole & Handholes, Inst’n. of sub‐duct, Installation of Cable Trays, FOC cable pulling in sub‐duct and in cable trays , After Lay Test, & Site Reinstatement
24FOC NETWORK BETWEEN PRINCE BANDAR PALACE AND KING KHALID PALACE
CLIENT: NATIONAL SECURITY
COUNCIL, PRIME CONTRACTOR: RAYTHEON
8 RIYADH Apr‐08 420,000.00 48F
Survey of cable route, Checking of existing duct and sub‐duct,installation of sub‐duct, installation of fiber cable in sub‐duct and main duct, jointing and termination of foc including documentation.
25
FOC NETWORK BETWEEN PICC AND DEWAN, AND PICC TO PRINCE BANDAR PALACE
NATIONAL SECURITY COUNCIL
12 RIYADH Mar‐08 634,474.45 24F, 48F
∙ Survey and OSP Design, Const. of duct bank, Inst'n of Manhole & Handholes, Inst’n. of sub‐duct, Installation of Cable Trays, FOC cable pulling in sub‐duct and in cable trays , After Lay Test, & Site Reinstatement
SHEET 3 of 15
![Page 4: Projects](https://reader036.fdocuments.in/reader036/viewer/2022081701/5447bda5b1af9fda018b4679/html5/thumbnails/4.jpg)
26RIYADH ‐ RING & KHALIDIYAH FARM
PROJECT
Electronics & Communication Dept‐ Air Defense Forces Command (ADF)/ ERICSSON
30 RIYADH DEC. 2007 1,639,241.0024F,36F, 48F
Survey and OSP Design, Const. of duct bank, 11km of Micro Trenching in Riyadh .Inst'n of Manhole & Hand holes, Inst’n. of sub‐duct, Installation of Cable Trays, FOC cable pulling and blowing in sub‐duct and in cable trays ,
After Lay Test, & Site Reinstatement
27KKIA Control and
Monitoring Upgrading
KING KHALID INT’L AIRPORT/ AL
ASASYAH BASIC ELECTRONICS
120JAN. 17, 2008
Aug‐07 1,090,000.00
8F, 12, 24F,
36F,60F,144F
OSP design, Construction of Duct banks including installation of Manholes, sub‐duct
and FO cable Pulling, Splicing & Testing including documentation.
28RELOCATION OF MODA
Electronics & Communication Dept‐ Air Defense 9.5 BISHA Aug‐07 924,576.00 8F + 16Cu
Survey and staking of existing cable route, OSP design, trenching over existing cable route, protection with PVC pipe encased with28
CABLEDept Air Defense Forces Command
(ECD‐ADF)
9.5 BISHA Aug 07 924,576.00 8F 16Cu protection with PVC pipe encased with concrete, rock breaking, installation of Marker
post and cut‐over job.
29FOC Connectivity of Katiba‐116 to RSADF Network
Electronics & Communication Dept‐ Air Defense Forces Command
(ECD ADF)
40 ABQAIQ Jun‐07 2,794,162.00 8F, 12 fSurvey, OSP Design, Construction of related OSP Civil Works, Termination and Testing including As Built Preparation Drawing
30ADF SCHOOL LAN /WAN
PROJECT
Electronics & Communication Dept‐ Air Defense Forces Command
(ECD‐ADF)
22 TAIF, KSA Mar‐07 467,200.00 12F
Survey and OSP Design, Const. of duct bank, Inst'n of Manhole & Handholes, Inst’n. of sub‐duct, Installation of Cable Trays, FOC cable
pulling in sub‐duct and in cable trays , After Lay Test, & Site Reinstatement
31IN BUILDING GSM
COVERAGESTC/QUTUB TECH. 20 MAKKAH Dec‐06 125,985.60 24F
Installation of cable in existing cable inside the tunnel and in existing duct including
termination, testing and documentation.
SHEET 4 of 15
![Page 5: Projects](https://reader036.fdocuments.in/reader036/viewer/2022081701/5447bda5b1af9fda018b4679/html5/thumbnails/5.jpg)
32MODA CABLE PROTECTION
& RELOCATION
Electronics & Communication Dept‐ Air Defense Forces Command
(ECD‐ADF)
5.8WADI HISBAL
Aug‐06 877,322.00 8F + 16Cu
Survey and staking of existing cable route, OSP design, trenching over existing cable route, protection with PVC pipe encased with
concrete, rock breaking, installation of Marker post and cut‐over job.
33COMMUNICATION
SHELTER INSTALLATION PROJECT
Electronics & Communication Dept‐ Air Defense Forces Command
(ECD‐ADF)
N/ABADIYAH‐SULAYIL
Aug‐06 244,865.00 N/APreparation of site, fencing, construction of
shelter foundation and installation of communication shelter.
34COMMUNICATION
SHELTER INSTALLATION HUAWEI/STC N/A NAJARAN Jul‐06 369,884.00 N/A
Preparation of site, fencing, construction of shelter foundation, generator foundation, fuel
tank foundation and installation of PROJECT
tank foundation and installation of communication shelter.
35RSADF KATIBA – 118
INTEGRATION PROJECT
Electronics & Communication Dept‐ Air Defense Forces Command
(ECD‐ADF)
8.5 JUBAIL, KSA May‐06 1,207,569.12 8FSurvey, OSP Design, Construction of related OSP Civil Works, Termination and Testing including As Built Preparation Drawing
36MODA CABLE PROTECTION
& RELOCATION (ROAD SECT 19)
Electronics & Communication Dept‐ Air Defense Forces Command
(ECD‐ADF)
16Khamis
Mushayit, KSA
APR. 2006 2,205,867.92 8F + 16Cu
Survey and staking of existing cable route, OSP design, trenching over existing cable route, protection with PVC pipe encased with
concrete, rock breaking, installation of Marker post and cut‐over job.
37MODA CABLE PROTECTION
& RELOCATION (ROAD SECT 18)
Electronics & Communication Dept‐ Air Defense Forces Command
(ECD‐ADF)
2.8Khamis
Mushayit, KSA
MAR. 2006 677,093.28 8F + 16Cu
Survey and staking of existing cable route, OSP design, trenching over existing cable route, protection with PVC pipe encased with
concrete.
SHEET 5 of 15
![Page 6: Projects](https://reader036.fdocuments.in/reader036/viewer/2022081701/5447bda5b1af9fda018b4679/html5/thumbnails/6.jpg)
38MODA CABLE PROTECTION AND RELOCATION‐SEC 19
MODAKHAMIS TAREEB ROAD
2006 2,210,655.00 MODA CABLE PROTECTION AND RELOCATION‐
SEC 19
39FOC LINK FROM COMM
CENT TO PLATOON #1 AND #2
MODAJUBAIL (KATIBA‐118)
2006 1,204,358.00 FOC LINK FROM COMM CENT TO PLATOON #1
AND #2
40 SALTS RUMAH 2005PATRIOT INTEGRATION TO RSADF NETWORK
PH.2
41 SALTS KKIA 2005PATRIOT INTEGRATION TO RSADF NETWORK
PH.2
42 SALTS KKMC 2006PATRIOT INTEGRATION TO RSADF NETWORK
PH.2
43 SALTSDIRAB ROAD
2006PATRIOT INTEGRATION TO RSADF NETWORK
PH.2
RELOCATION OF SDHHAFR
PATRIOT INTEGRATION 6,962,775.00
44RELOCATION OF SDH
EQUIPMENTMODA ALBATN
ROAD2005 275,481.00 RELOCATION OF SDH EQUIPMENT
45PLOUGHING OPERATION
WITH AL NAJDAINNAJDAIN NAJARAN 2005 455,000.00 PLOUGHING OPERATION WITH AL NAJDAIN
46MODA CABLE PROTECTION AND RELOCATION‐SEC 17
MODATAHLEET TAREEB ROAD
2005 337,399.00 MODA CABLE PROTECTION AND RELOCATION‐
SEC 17
47MODA CABLE PROTECTION AND RELOCATION‐SEC 18
MODATAHLEET TAREEB ROAD
2005 675,293.00 MODA CABLE PROTECTION AND RELOCATION‐
SEC 18
48
RELOCATION OF SDH EQUIPMENMT FROM
TROPO SITE (MS3) TO AL MINAR VILLAGE
Electronics & Communication Dept‐ Air Defense Forces Command
(ECD‐ADF)
1.67HAFAR AL BATIN. KSA
NOV. 2005 276,217.12 8F
Survey of Cable Route including detecting of existing Cable and Marking, Trenching by hand digging over existing route, directional drilling, Cut‐over Job, Installation of Flexible Marker
Post
SHEET 6 of 15
![Page 7: Projects](https://reader036.fdocuments.in/reader036/viewer/2022081701/5447bda5b1af9fda018b4679/html5/thumbnails/7.jpg)
49MODA CABLE PROTECTION
& RELOCATION
Electronics & Communication Dept‐ Air Defense Forces Command
(ECD‐ADF)
1.5
MAJMAH‐HAFAR AL BATIN
ROAD, KSA
OCT. 2005 221,670.80 8F + 16Cu
Survey of Cable Route including detecting of existing Cable and Marking, Trenching by hand digging over existing route, Protecting of cable by placing spit pipe plus one extra including concrete encasement and Site reinstatement
50MODA CABLE PROTECTION
& RELOCATION (ROAD SECT 14 & 17)
Electronics & Communication Dept‐ Air Defense Forces Command
(ECD‐ADF)
1.2Khamis
Mushayit, KSA
OCT. 2005 337,922.48 8F + 16Cu
Survey and staking of existing cable route, OSP design, trenching over existing cable route, protection with PVC pipe encased with
concrete, realignment of direct buried cable and cut‐over job
Electronics & 12F & 24F Survey and OSP Design, Const. of duct bank,
51LAN/WAN PROJECT FOR ADF INSTITUTE‐JEDDAH
Communication Dept‐ Air Defense Forces Command
(ECD‐ADF)
22JEDDAH, KSA
30‐Jun‐05 858,862.96TERRA SPEED FOC CABLE
Inst'n of Manhole & Handholes, Inst’n. of sub‐duct, Installation of Cable Trays, FOC cable
pulling in sub‐duct and in cable trays , After Lay Test, & Site Reinstatement
52MODA CABLE PROTECTION & RELOCATION @ BISHA TECHNICAL COLLEGE SITE
Electronics & Communication Dept‐ Air Defense Forces Command
(ECD‐ADF)
1 BISHA, KSA 7‐May‐05 169,448.16 8F + 16Cu
Survey and staking of existing cable route, OSP design, Construction of 2way duct in concrete, Inst’n of handhole, Inst’n of cable in duct and
Cut‐over job.
53MODA CABLE PROTECTION
& RELOCATION (ROAD SECT 4, 5 & 12)
Air Defense Forces Command
6.7LAYLA‐SULAYEL ROAD, KSA
FEB. 2005 1,610,283.92FOC & COPPER CABLE
Survey and staking of existing cable route, OSP design, trenching over existing cable route, protection with PVC pipe encased with
concrete, realignment of direct buried cable and cut‐over job
SHEET 7 of 15
![Page 8: Projects](https://reader036.fdocuments.in/reader036/viewer/2022081701/5447bda5b1af9fda018b4679/html5/thumbnails/8.jpg)
54MARKING OF MODA CABLE (INST’N OF MARKER POST)
Air Defense Forces Command
(ADF)/ERICSSONN/A
RIYADH ‐ KHAMIS
MUSHAYIT ‐ RANIA
MAR. 2005 1,042,760.80 N/A
Survey and staking of existing cable route, identifying Splice Locations, end of duct
protection, and installation of Flexible Marker Posts including preparation of Red Line
Drawing.
55Upgrading of Existing MODA FOC NETWORK’
Repeater Housing
Air Defense Forces Command
(ADF)/ERICSSONN/A
RIYADH TO KHAMIS
MUSHAYIT, KSA
FEB. 2005 1,226,700.00 N/A
Survey and staking of proposed Shelter Location, Supply and Installation Equipment
Shelter including Fencing and other related Civil Works.
56Upgrading of ADF Telecom Network INSIDE Dhahran
Air Base
Air Defense Forces Command
40Dhahran Air Base, KSA
DEC. 2004 1,226,700.00COPPER CABLE
Installation, Splicing, Testing of approximately 40 kms of Copper Cable Network & related Civil
Work.
57EXPANSION OF TELEPHONE
NETWORKRSADF
EASTERN REGION
Jul‐04 1,755,769.60EXPANSION OF TELEPHONE NETWORK IN
EASTERN PROVINCE FOR RSADF
58Supply & Installation of Microwave Towers
Royal Saudi Naval Forces (RSNF)
N/AJEDDAH & JUBAIL, KSA
May‐04 1,872,397.28 N/ASurvey of Tower locations, soil investigation, preparation of foundation and supply and
installation of towers
59Expansion of STC Network
STC 450K Project (Key Accounts)
Saudi Telecom Company
292JEDDAH & RIYADH
AREA, KSADec. 2003 8,520,160.00
1800,900, 600, 300, 200, 100, 50, BSW Copper Cables & 24, 36, 48,
Inst. Splicing, termination of FOC & copper cable (secondary & primary)
STC JEDDAH & Riyadh DISTRICT60STC KEY ACCOUNT 450K,
550K, 150KSTC
Jeddah & Riyadh
2002 11,269,880.00
SHEET 8 of 15
![Page 9: Projects](https://reader036.fdocuments.in/reader036/viewer/2022081701/5447bda5b1af9fda018b4679/html5/thumbnails/9.jpg)
61Patriot Sites Integration
Project‐ Phase 1L.M.
Ericsson,SALTS64
Dhahran, Dammam,
KSAFeb. 2002 6,392,000.00 24F
Survey and staking, OSP Design, Inst’n of cable by Mole plough, in rock, cable crossing &
directional drilling.
62LAN/WAN & TELECOM UPGRADING PROJECT IN PRINCE SULTAN AIR BASE
ATTI 110Kingdom of Saudi Arabia
Feb‐02 6,392,000.00
12, 24Fiber &
UTP Cables
Survey and OSP Design, Inst’n. of multiple sub‐duct, cable pulling in sub‐duct, const. of duct
bank, splicing , termination & testing
63Upgrade of Telecom Network– Dhahran Air
BaseBTC Networks 8
Kingdom of Saudi Arabia
FEB. 2002 2,506,664.16Copper & 24 FOC
Survey and OSP Design, Inst’n. of multiple sub‐duct, cable pulling in sub‐duct, const. of duct
bank, splicing, termination & testing
Saudi TelecomJEDDAH &
36F 48F Inst Splicing termination of FOC & copper64 STC 550K Project – Riyadh
Saudi Telecom Company
230 RIYADH AREA, KSA
OCT. 2001 5,514,667.9236F, 48F, & 96F
Inst. Splicing, termination of FOC & copper cable (secondary & primary)
65
MINISTRY OF INFORMATION
CONNECTIVITY WITH DIGITAL NETWORK
MOI/SIEMENS AG 120
AL KHARJ, ARTAWIYAH BURAYDAH, DAMMAM, RAWDAW
BIN HABBAS,HAIL, AL HISSI, HOFUF, LINAH,
MAJMAH,AL
OCT. 2001 4,512,000.00 24 FOCSurvey, OSP Design, Construction of related OSP Civil Works, Termination and Testing including As Built Preparation Drawing
SHEET 9 of 15
![Page 10: Projects](https://reader036.fdocuments.in/reader036/viewer/2022081701/5447bda5b1af9fda018b4679/html5/thumbnails/10.jpg)
66MODA‐NAJARAN COMMUNICATION
NETWORK
AIR DEFENSE FORCES
COMMAND20
NAJRAN, KSA
DEC. 2000 1,041,770.64COPPER CABLE
Survey and OSP Design, Supply & Inst'n of Comm. Shelter, Inst'n of Cabinet and Pillar DPs,
Const. of duct bank, Inst'n of Handholes, Copper cable pulling in duct,Copper cable laying by direct buried, Directional Drilling, Splicing ,
Termination & Testing Copper Cable
67SHOIBA POWER PLANT FOC
NETWORKL.M. Ericsson, ABB 44
SHOIBA, KSA
SEP. 2000 1,504,000.00 24F
Survey and OSP Design, Const. of duct bank, Inst'n of Manholes & Handholes, Inst’n. of multiple sub‐duct, FOC cable pulling in sub‐duct, Copper cable pulling in duct, Directional Drilling, Splicing , Termination & Testing of FOC
& Copper Cable& Copper Cable
68KHURAIS EXCHANE TO ECD
FOC LINK
Electronics & COMM. DEPT./ AIR DEFENSE COMMAND
3.5 RIYADH, KSA JUL. 2000 208,548.40 16FSurvey of Manholes, Inst’n of sub‐duct, cable pulling, Splicing, Termination and Testing.
69RABIGH CEMENT FACTORY
FOC NETWORKSAUDI ARABIAN CEMENT FACTORY
40RABIGH, KSA
May‐00 1,403,733.32 24F
Survey and OSP Design, Inst’n of Cable by Mole Plough, by Direct Buried, Const. of duct bank,
Inst’n. of handholes, Inst'n of multiple sub‐duct, cable pulling in sub‐duct, Splicing , Termination
& Testing
70CCASG Communication
Network ERICSSON, CCASG
Committee1,600
KUWAIT, SAUDI ARABIA, BAHRAIN, UAE, OMAN
MAR. 2000 82,720,000.00 24FInstallation of approximately 1600Km. fiber optic cables for Telecommunications in five
countries of GCC.
SHEET 10 of 15
![Page 11: Projects](https://reader036.fdocuments.in/reader036/viewer/2022081701/5447bda5b1af9fda018b4679/html5/thumbnails/11.jpg)
71 Ras Lafan Onshore Project Qatar Telecom.
LTD.200
Doha – Qatar
JUL. 1999 1,383,680.00 24 F.O.C.Inst’n, splicing, testing & commissioning of inside plant single and multimode fiber optic
cables for Telecom. & CCTV network.
72B1‐3360 WEST
CONNECTIVITY PROJECT
LUCENT TECHNOLOGY
(SAUDI ARAMCO)6.5 KSA JUN. 1999 439,160.48 24 FOC
Inspection of existing duct bank, Inst’n of sub ducts, Inst’n of FO cable, splicing, termination,
& testing
73Riyadh–Qassim Pipeline
Telecommunication ProjectLucent
Technologies84.8
Riyadh – Majmah ‐ Buraidah
JUL. 1998 5,640,000.00Copper 50p & 8F
Inst’n. of cable by Mole plough, in rock, cable crossing & directional drilling.
L H l Fib O ti C bl U it d A bInstallation of Cable by Mole Plough,
I t ll ti f C bl i S I t ll ti f74
Long Haul Fiber Optic Cable Project
ETISALAT 1,950United Arab Emirates
JUN. 1998 22146400 6F, 20FInstallation of Cable in Swamp, Installation of Cable in Rock, Pipeline Crossing, Cable Route
Crossings, Plantation
75 TEP‐6 PROJECTAT&T
International Saudi Arabia
3,480
Riyadh‐Dammam, Dammam‐Hofuf, Hofuf‐Al Kharj, Al Kharj‐
Riyadh, Al Kharj‐Layla, Medina‐
Badr‐Yanbu,
FEB. 1998 161,203,984.00 24F, 36F
Supply & install of MH, HH. Inst’n of cable in sub duct & 50mm PE pipe, by direct buried & in rock Construction of duct banks,Road crossing by open cut & directional drilling method,
Splicing, termination & testing
76RSAF PEACE SHIELD FOC LINK PROJECT RAFAH ‐
ARAR
ASEC International (RSAF Peace
Shield)797 Arar/Rafha SEP. 1996 44,819,200.00 24F, 12F
Inst’n of cable by Mole plough, in rock, cable crossing & directional drilling. Splicing,
termination & testing
SHEET 11 of 15
![Page 12: Projects](https://reader036.fdocuments.in/reader036/viewer/2022081701/5447bda5b1af9fda018b4679/html5/thumbnails/12.jpg)
77 “PICC” FOC PROJECT
ALCATEL‐TELETRA, Telecom. &
Electronic Dept. Air Defense Forces
(MODA)
84Kingdom of Saudi Arabia
JUL.1994 6,515,594.96 FOC (16F)Installation of cables & manholes, Const. of 4‐
way duct system.
78Fiber Optic Connectivity
Expansion of SIGNAL CORP SITES IN AL KHARJ
Electronic & Communication Dept. (ECD)/Air Defense Forces Command (ADF)
13.1 AL KHARJ 1994 374,082.40 4FConstruction of 4‐way duct system. Installation of FOC in ducts. Installation of direct buried
cable.
79FOC CONNECTIVITY OF GUN SITES AT KKMC
Electronic & Communication Dept. (ECD)/Air 12.6
King Khalid Military City (KKMC)‐ 1994 629,017.92 8F Installation of Direct Buried cable.
GUN SITES AT KKMCp ( )/
Defense Forces Command (ADF)
( )Hafar Al Batin
,
80FIBER OPTIC CABLE SYSTEM HAWTAH
ALCATEL‐TELETRA (SAUDI ARAMCO)
390
HAWTAH BANI
TAMIM TO P.S. # 3, KSA
JUN. 1994 35,081,928.00 24F
Const. of Contractor’s camp and office, Installation of Cable by Mole Plough,
Installation of Cable in rock Cable Route Crossings: SAG Highways by thrust boring method, SAG Railways by thrust boring method, Road Crossing by open‐cut method. Pipeline Crossing, Sand Stabilization of Cable
Route in sand dunes
81FOC LINK BETWEEN S/S
8026‐80845‐8083
SECO CENTRAL/ASEA BROWN BERI
12.68 RIYADH, KSA 1993 133,318.32 6F Cable Installation, jointing and testing
82LONG HAUL FIBER OPTIC CABLE PROJECT (STA. Q –
STA. QD)
ROYAL SAUDI AIR FORCE (PEACE
SHIELD)41
AL KHARJ, KSA
1993 2,038,672.00 4FInstallation & direct buried cable. Cable
Installation in existing ducts.
SHEET 12 of 15
![Page 13: Projects](https://reader036.fdocuments.in/reader036/viewer/2022081701/5447bda5b1af9fda018b4679/html5/thumbnails/13.jpg)
83Fiber Optic Connectivity of SIGNAL CORP SITES IN AL
KHARJ
TELECOM. & ELECTRONIC DEP‐ AIR DEFENSE
FORCES MINISTRY OF DEFENSE AND
25AL KHARJ,
KSA1993 684,120.72 4F Installation of direct buried cable
84HAIL AIR BASE, FIBER OPTIC CABLE LINK.
Electronic & Communication Dept. (ECD)/Air Defense Forces Command (ADF)
16 HAIL, KSA 1993 137,375.36 4F Installation of direct buried cable
85MISFAH EXCHANGE TO
RSNF HOUSING COMPOUND FOC LINK
Electronic & Communication Dept. (ECD)/Air Defense Forces C d (ADF)
35.4 RIYADH, 1993 1,044,779.92 4F, 8F
Construction of 8‐way duct system. Installation of Manholes. Installation of FOC in existing ducts system as well as in newly constructed
duct system.
TELECOM. & Construction of 4 way duct system Installation
86 USMTM FOC LINK
ELECTRONIC DEPT‐ AIR DEFENSE
FORCES MINISTRY OF DEFENSE AND
0.4AL KHARJ,
KSA1993 110,622.96
Construction of 4‐way duct system. Installation of Manholes. Installation of FOC in existing ducts system as well as in newly constructed
duct system.
87TELEPHONE EXPANSION PROJECT @ STA. Q.
TELECOM. & ELECTRONIC DEPT‐
AIR DEFENSE FORCES/MINISTRY OF DEFENSE AND
AVIATION
12AL KHARJ,
KSA1992 1,422,784.00
FIBER OPTIC CABLE (4F),
COPPER CABLE
Construction of 4‐way duct system. Installation of buried cable.
88FOC LINK, HQ TO SIGNAL CORP & RIYADH AIR BASE
TELECOM. & ELECTRONIC DEPT‐
AIR DEFENSE FORCES/MINISTRY OF DEFENSE AND
AVIATION
11.4 RIYADH, KSA 1992 6,049,809.92 FOC
Construction of 4‐way duct system. Installation of Manholes. Installation of FOC in existing ducts system as well as in newly constructed
duct system.
SHEET 13 of 15
![Page 14: Projects](https://reader036.fdocuments.in/reader036/viewer/2022081701/5447bda5b1af9fda018b4679/html5/thumbnails/14.jpg)
89FOC LINK, HQ TO ADCC (INTRACITY PROJECT)
TELECOM. & ELECTRONIC DEPT‐
AIR DEFENSE FORCES MINISTRY OF DEFENSE AND
AVIATION
4.5 RIYADH, KSA 1992 3,133,474.96
FOC (24F,12F,4F) Copper Cable 2400P, 1800P, 900P, 600P, 300P
Const. Of 8‐way duct system. Inst. of manholes. Inst. Of FOC. Inst. Of Copper cables
90INSTALLATION OF LONG
HAUL FOC
SAUDI TAL FOR COMMERCE & CONTRACTS/AIR 648
Riyadh to KKMC KSA
JUN. 1992 29,236,677.12 24F
Cable Ploughing. Cable inst’n in rock. Const. of 4‐Way Duct. Const. of 2‐Way Duct. Supply & installation of manholes Type A‐R. Supply & installation of hand holes (3 cover) Supply &HAUL FOC
DEFENCE FORCES COMMAND (ADF)
KKMC, KSA installation of hand holes (3‐cover). Supply & installation of 4‐Way Sub ducts. Installation of
cable in Sub ducts. Wadi Crossings
91INTRACITY SIGNAL CORP.
PROJECT
AIR DEFENSE FORCES
COMMAND26
Riyadh Area, KSA
OCT.1991 5,201,790.804F FOC & Copper Cables
Const. of 9‐Way Duct System. Const. of 4‐Way Duct System. Const. of 2‐Way Duct System. Supply & installation of manholes Type A‐I. Supply & installation of hand holes (3‐cover). Thrust boring under SAG Highways. Supply & installation of 3‐Way Sub duct. Installation of F.O. Cable in Sub ducts. Installation of Copper
Cable:
SHEET 14 of 15
![Page 15: Projects](https://reader036.fdocuments.in/reader036/viewer/2022081701/5447bda5b1af9fda018b4679/html5/thumbnails/15.jpg)
92FO CABLE INSTALLATION PROJECT (LONG HAUL)
ERICSSON, AIR DEFENSE FORCES
COMMAND1,190
Riyadh to Khamasin, Riyadh to
Muzamiyah, KSA
DEC. 1989 33,809,920.00
FIBER OPTIC CABLE
(2F,4F, 8F)
Cable Ploughing, Cable inst’n in rock, Const. of 4‐Way Duct, Const. of 12‐Way Duct, Supply & installation of manholes Type B‐R, Supply & installation of hand holes (3‐cover), Supply & installation of 4‐Way Sub ducts, Installation of
cable in Sub ducts.
SHEET 15 of 15