Projects

15
NO Project Name Client Km. of cable laid Project location Completion Date Project cost ( SAR ) Cable Type Brief Description of Work 1 SUPERVISION ETIHAD MOBILY KSA ON GOING 17,424,556.00 SUPERVISION OF SNFN PROJECT 2009 2 MOBILY ODF MOBILY KINGDOM WIDE ON GOING 11,667,797.40 SUPPLY & INSTALLATION OF ODF, RACK PATCH PANELS LIST OF PROJECTS EXECUTED BY SITAF SAUDIA CO. 3 METRO RING INCLUDING HUB SITES MOBILY MADINAH 2008 14,521,648.00 4 OPERATION & MAINTENANCE SAUDI BELL KINGDOM WIDE 2008 6,693,030.00 OPERATION & MAINTENANCE OF EXISTING MODAFOTS NETWORK 20062008 5 PATRIOT INTEGRATION PHASE3 UNDER ROYAL AIR DEFENSE RSADF JEDDAH 2008 600,000.00 6 INTEGRATION OF PATRIOT SITES TO RSADF NETWORK PH. 3Additional Sites in Taif and Jeddah CLIENT: MODA PRIME, CONTRACTOR: SALTS 90 TAIF, Jeddah Jun08 1,255,000.00 24F Survey and staking, OSP Design, Inst’n of cable by Mole plough, Direct buried cable installatipn in rock and soil, cable crossing & directional drilling. SHEET 1 of 15

Transcript of Projects

Page 1: Projects

NO Project Name ClientKm. of cable laid

Project  location

Completion Date

Project cost     ( SAR ) 

Cable Type

Brief Description of Work

1 SUPERVISION ETIHAD MOBILY KSA ON GOING     17,424,556.00  SUPERVISION OF SNFN PROJECT 2009

2 MOBILY ODF MOBILYKINGDOM WIDE

ON GOING     11,667,797.40 SUPPLY & INSTALLATION OF ODF, RACK PATCH 

PANELS

LIST OF PROJECTS EXECUTED BY SITAF SAUDIA CO.

3METRO RING INCLUDING 

HUB SITESMOBILY MADINAH 2008     14,521,648.00 

4OPERATION & MAINTENANCE

SAUDI BELLKINGDOM WIDE

2008       6,693,030.00 OPERATION & MAINTENANCE OF EXISTING 

MODA‐FOTS NETWORK 2006‐2008

5PATRIOT INTEGRATION 

PHASE3 UNDER ROYAL AIR DEFENSE

RSADF JEDDAH 2008          600,000.00 

6

INTEGRATION OF PATRIOT SITES TO RSADF NETWORK PH. 3‐Additional Sites in Taif and Jeddah

CLIENT: MODA PRIME, 

CONTRACTOR: SALTS

90 TAIF, Jeddah Jun‐08       1,255,000.00  24F

Survey and staking, OSP Design, Inst’n of cable by Mole plough, Direct buried cable installatipn in rock and soil, cable crossing & directional drilling.

SHEET 1 of 15

Page 2: Projects

7INTEGRATION OF PATRIOT SITES TO RSADF NETWORK 

PH. 3

Electronics & Communication Dept‐ Air Defense Forces Command 

(ECD‐ADF)

60JEDDAH‐TAIF

FEB. 2008 6,773,424.00 24FSurvey and staking, OSP Design, Inst’n of cable 

by Mole plough, in rock, cable crossing & directional drilling.

8 PATRIOT CONNECTIVITY SAUDI BELL

RIYADH REFINARY, PSAB & KKMC

2008       1,633,617.00  PATRIOT SITES CONNECTIVITY

9 RAYTHEON RAYTHEON RIYADH 2008          405,420.00 FOC CONNECTIVITY OF HRH PRINCE BANDAR 

PALACE & HRH KING KHALID PALACE

10RELOCATION & PROTECTION

RSADFKKMC & NARIYA

2008          162,700.00 RELOCATION & PROTECTION OF FOC 

(RSADF/ECD)

11 EASTERN PROVICE RSADFFINANCE 

2008 46,968.00 EASTERN PROVICE GROUP 511 EASTERN PROVICE RSADFBUILDING

2008            46,968.00  EASTERN PROVICE GROUP 5

12 MODA RSADFAL‐MANAR VILLAGE

2008          430,414.00  EASTERN PROVICE GROUP 5

13 MODA RSADFNAVAL CLUB

2008          254,264.00  EASTERN PROVICE GROUP 5

14 MOBILY TOWERS ETIHAD MOBILY MADINAH 2008       1,373,483.00  TOWER SITES CONNECTIVITY

15 RSADF IT DEP.RSADF IT 

DEPARTMENTJEDDAH 2008          489,975.00 

UPGRADING OF OSP NETWORK AT JEDDAH INSTITUTION

16 RSADF IT DEP.RSADF IT 

DEPARTMENTUM SAIEK 2008          242,415.00  UPGRADING OF OSP NETWORK AT GROUP 5

17 RELOCATION OF FOCRSADF/SAUDI ARAMCO

DHARAN 2008          452,474.00  RELOCATION PROTECTION OF FOC

18 RELOCATION OF FOC RSADF/MOT HOFUF 2008             78,450.00  RELOCATION OF FOC (GCC)

19 EXPRESSWAY RSADF/MOT

RIYADH DAMMAM EXPRESSWA

Y

2008          190,930.00  PROTECTION OF FOC

SHEET 2 of 15

Page 3: Projects

20 RELOCATION FOC RSADF/MOTHAFUF SALWA ROAD

2008       1,523,555.00  RELOCATION OF FOC

21

RELOCATION AND PROTECTION OF MODA CABLE IN KING ABDULLAH ROAD 

SAUDI OGER/MODA

RIYADH Dec‐08          408,819.00 24F + 

48Cu, 24F

Survey and OSP Design, Const. of duct bank, Inst'n of Manhole , Inst’n. of  sub‐duct, FOC cable pulling in sub‐duct , After Lay Test, Perform cut‐over & Site Reinstatement

22CABLE DEPLOYMENT PROJECT FOR GROUP 5

RSADF/MODA 13EASTERN REGION

NOV. 2008       1,623,172.00 24F, 

50PAIR CU

Survey and OSP Design, Const. of duct bank, Inst'n of Manhole & Handholes, Inst’n. of  sub‐duct, Installation of Cable Trays, FOC cable pulling in sub‐duct and in cable trays , After Lay Test, & Site Reinstatement

El i & S d OSP D i C f d b k

23ARMED FORCES MEDICAL SERVICES PROJECT

Electronics & Communication Dept‐ Air Defense Forces Command/ 

ERICSSON

80KINGDOMW

IDEApr‐08       1,562,504.00  24F

Survey and OSP Design, Const. of duct bank, Inst'n of Manhole & Handholes, Inst’n. of  sub‐duct, Installation of Cable Trays, FOC cable pulling in sub‐duct and in cable trays , After Lay Test, & Site Reinstatement

24FOC NETWORK BETWEEN PRINCE BANDAR PALACE AND KING KHALID PALACE

CLIENT: NATIONAL SECURITY 

COUNCIL, PRIME CONTRACTOR: RAYTHEON

8 RIYADH Apr‐08          420,000.00  48F

Survey of cable route, Checking of existing duct and sub‐duct,installation of sub‐duct, installation of fiber cable in sub‐duct and main duct, jointing and termination of foc including documentation.

25

FOC NETWORK BETWEEN PICC AND DEWAN, AND PICC TO PRINCE BANDAR PALACE

NATIONAL SECURITY COUNCIL

12 RIYADH Mar‐08          634,474.45  24F, 48F

∙      Survey and OSP Design, Const. of duct bank, Inst'n of Manhole & Handholes, Inst’n. of  sub‐duct, Installation of Cable Trays, FOC cable pulling in sub‐duct and in cable trays , After Lay Test, & Site Reinstatement

SHEET 3 of 15

Page 4: Projects

26RIYADH ‐ RING & KHALIDIYAH FARM 

PROJECT

Electronics & Communication Dept‐ Air Defense Forces Command (ADF)/ ERICSSON

30 RIYADH DEC. 2007 1,639,241.0024F,36F, 48F

Survey and OSP Design, Const. of duct bank, 11km of Micro Trenching in Riyadh .Inst'n of Manhole & Hand holes, Inst’n. of  sub‐duct, Installation of Cable Trays, FOC cable pulling and blowing in sub‐duct and in cable trays , 

After Lay Test, & Site Reinstatement

27KKIA Control and 

Monitoring Upgrading

KING KHALID INT’L AIRPORT/ AL 

ASASYAH BASIC ELECTRONICS

120JAN. 17, 2008

Aug‐07 1,090,000.00

8F, 12, 24F, 

36F,60F,144F

OSP design, Construction of Duct banks including installation of   Manholes, sub‐duct 

and FO cable Pulling, Splicing & Testing including documentation.

28RELOCATION OF MODA 

Electronics & Communication Dept‐ Air Defense 9.5 BISHA Aug‐07 924,576.00 8F + 16Cu

Survey and staking of existing cable route, OSP design, trenching over existing cable route, protection with PVC pipe encased with28

CABLEDept  Air Defense Forces Command 

(ECD‐ADF)

9.5 BISHA Aug 07 924,576.00 8F   16Cu protection with PVC pipe encased with concrete, rock breaking, installation of Marker 

post and cut‐over job.

29FOC Connectivity of Katiba‐116 to RSADF Network

Electronics & Communication Dept‐ Air Defense Forces Command 

(ECD ADF)

40 ABQAIQ Jun‐07 2,794,162.00 8F, 12 fSurvey, OSP Design, Construction of related OSP Civil Works, Termination and Testing including As Built Preparation Drawing

30ADF SCHOOL LAN /WAN 

PROJECT

Electronics & Communication Dept‐ Air Defense Forces Command 

(ECD‐ADF)

22 TAIF, KSA Mar‐07 467,200.00 12F

Survey and OSP Design, Const. of duct bank, Inst'n of Manhole & Handholes, Inst’n. of  sub‐duct, Installation of Cable Trays, FOC cable 

pulling in sub‐duct and in cable trays , After Lay Test, & Site Reinstatement

31IN BUILDING GSM 

COVERAGESTC/QUTUB TECH. 20 MAKKAH Dec‐06 125,985.60 24F

Installation of cable in existing cable inside the tunnel and in existing duct including 

termination, testing and documentation.

SHEET 4 of 15

Page 5: Projects

32MODA CABLE PROTECTION 

& RELOCATION

Electronics & Communication Dept‐ Air Defense Forces Command 

(ECD‐ADF)

5.8WADI HISBAL

Aug‐06 877,322.00 8F + 16Cu

Survey and staking of existing cable route, OSP design, trenching over existing cable route, protection with PVC pipe encased with 

concrete, rock breaking, installation of Marker post and cut‐over job.

33COMMUNICATION 

SHELTER INSTALLATION PROJECT

Electronics & Communication Dept‐ Air Defense Forces Command 

(ECD‐ADF)

N/ABADIYAH‐SULAYIL

Aug‐06 244,865.00 N/APreparation of site, fencing, construction of 

shelter foundation and installation of communication shelter.

34COMMUNICATION 

SHELTER INSTALLATION  HUAWEI/STC N/A NAJARAN Jul‐06 369,884.00 N/A

Preparation of site, fencing, construction of shelter foundation, generator foundation, fuel 

tank foundation and installation of PROJECT

tank foundation and installation of communication shelter.

35RSADF KATIBA – 118 

INTEGRATION PROJECT

Electronics & Communication Dept‐ Air Defense Forces Command 

(ECD‐ADF)

8.5 JUBAIL, KSA May‐06 1,207,569.12 8FSurvey, OSP Design, Construction of related OSP Civil Works, Termination and Testing including As Built Preparation Drawing

36MODA CABLE PROTECTION 

& RELOCATION            (ROAD SECT 19)

Electronics & Communication Dept‐ Air Defense Forces Command 

(ECD‐ADF)

16Khamis 

Mushayit, KSA

APR. 2006 2,205,867.92 8F + 16Cu

Survey and staking of existing cable route, OSP design, trenching over existing cable route, protection with PVC pipe encased with 

concrete, rock breaking, installation of Marker post and cut‐over job.

37MODA CABLE PROTECTION 

& RELOCATION            (ROAD SECT 18)

Electronics & Communication Dept‐ Air Defense Forces Command 

(ECD‐ADF)

2.8Khamis 

Mushayit, KSA

MAR. 2006 677,093.28 8F + 16Cu

Survey and staking of existing cable route, OSP design, trenching over existing cable route, protection with PVC pipe encased with 

concrete.

SHEET 5 of 15

Page 6: Projects

38MODA CABLE PROTECTION AND RELOCATION‐SEC 19

MODAKHAMIS TAREEB ROAD

2006       2,210,655.00 MODA CABLE PROTECTION AND RELOCATION‐

SEC 19

39FOC LINK FROM COMM 

CENT TO PLATOON #1 AND #2

MODAJUBAIL (KATIBA‐118)

2006       1,204,358.00 FOC LINK FROM COMM CENT TO PLATOON #1 

AND #2

40 SALTS RUMAH 2005PATRIOT INTEGRATION TO RSADF NETWORK 

PH.2

41 SALTS KKIA 2005PATRIOT INTEGRATION TO RSADF NETWORK 

PH.2

42 SALTS KKMC 2006PATRIOT INTEGRATION TO RSADF NETWORK 

PH.2

43 SALTSDIRAB ROAD

2006PATRIOT INTEGRATION TO RSADF NETWORK 

PH.2

RELOCATION OF SDHHAFR 

PATRIOT INTEGRATION       6,962,775.00 

44RELOCATION OF SDH 

EQUIPMENTMODA ALBATN 

ROAD2005          275,481.00  RELOCATION OF SDH EQUIPMENT

45PLOUGHING OPERATION 

WITH AL NAJDAINNAJDAIN NAJARAN 2005          455,000.00  PLOUGHING OPERATION WITH AL NAJDAIN

46MODA CABLE PROTECTION AND RELOCATION‐SEC 17

MODATAHLEET TAREEB ROAD

2005          337,399.00 MODA CABLE PROTECTION AND RELOCATION‐

SEC 17

47MODA CABLE PROTECTION AND RELOCATION‐SEC 18

MODATAHLEET TAREEB ROAD

2005          675,293.00 MODA CABLE PROTECTION AND RELOCATION‐

SEC 18

48

RELOCATION OF SDH EQUIPMENMT FROM 

TROPO SITE (MS3) TO AL MINAR VILLAGE

Electronics & Communication Dept‐ Air Defense Forces Command 

(ECD‐ADF)

1.67HAFAR AL BATIN. KSA

NOV. 2005 276,217.12 8F

Survey of Cable Route including detecting of existing Cable and Marking, Trenching by hand digging over existing route, directional drilling,  Cut‐over Job, Installation of Flexible Marker 

Post

SHEET 6 of 15

Page 7: Projects

49MODA CABLE PROTECTION 

& RELOCATION

Electronics & Communication Dept‐ Air Defense Forces Command 

(ECD‐ADF)

1.5

MAJMAH‐HAFAR AL BATIN 

ROAD, KSA

OCT. 2005 221,670.80 8F + 16Cu

Survey of Cable Route including detecting of existing Cable and Marking, Trenching by hand digging over existing route, Protecting of cable by placing spit pipe plus one extra including concrete encasement  and Site reinstatement

50MODA CABLE PROTECTION 

& RELOCATION            (ROAD SECT 14 & 17)

Electronics & Communication Dept‐ Air Defense Forces Command 

(ECD‐ADF)

1.2Khamis 

Mushayit, KSA

OCT. 2005 337,922.48 8F + 16Cu

Survey and staking of existing cable route, OSP design, trenching over existing cable route, protection with PVC pipe encased with 

concrete, realignment of direct buried cable and cut‐over job

Electronics &  12F & 24F  Survey and OSP Design, Const. of duct bank, 

51LAN/WAN PROJECT FOR ADF INSTITUTE‐JEDDAH

Communication Dept‐ Air Defense Forces Command 

(ECD‐ADF)

22JEDDAH, KSA

30‐Jun‐05 858,862.96TERRA SPEED FOC CABLE

Inst'n of Manhole & Handholes, Inst’n. of  sub‐duct, Installation of Cable Trays, FOC cable 

pulling in sub‐duct and in cable trays , After Lay Test, & Site Reinstatement

52MODA CABLE PROTECTION & RELOCATION @ BISHA TECHNICAL COLLEGE SITE

Electronics & Communication Dept‐ Air Defense Forces Command 

(ECD‐ADF)

1 BISHA, KSA 7‐May‐05 169,448.16 8F + 16Cu

Survey and staking of existing cable route, OSP design, Construction of 2way duct in concrete, Inst’n of handhole, Inst’n of cable in duct and 

Cut‐over job.

53MODA CABLE PROTECTION 

& RELOCATION            (ROAD SECT 4, 5 & 12)

Air Defense Forces Command

6.7LAYLA‐SULAYEL ROAD, KSA

FEB. 2005 1,610,283.92FOC & COPPER CABLE

Survey and staking of existing cable route, OSP design, trenching over existing cable route, protection with PVC pipe encased with 

concrete, realignment of direct buried cable and cut‐over job

SHEET 7 of 15

Page 8: Projects

54MARKING OF MODA CABLE (INST’N OF MARKER POST)

Air Defense Forces Command 

(ADF)/ERICSSONN/A

RIYADH ‐ KHAMIS 

MUSHAYIT ‐ RANIA

MAR. 2005 1,042,760.80 N/A

Survey and staking of existing cable route, identifying Splice Locations, end of duct 

protection, and installation of Flexible Marker Posts including preparation of Red Line 

Drawing.

55Upgrading of Existing MODA FOC NETWORK’ 

Repeater Housing

Air Defense Forces Command 

(ADF)/ERICSSONN/A

RIYADH TO KHAMIS 

MUSHAYIT, KSA

FEB. 2005 1,226,700.00 N/A

Survey and staking of proposed Shelter Location, Supply and Installation Equipment 

Shelter including Fencing and other related Civil Works.

56Upgrading of ADF Telecom Network INSIDE Dhahran 

Air Base

Air Defense Forces Command

40Dhahran Air Base, KSA

DEC. 2004 1,226,700.00COPPER CABLE

Installation, Splicing, Testing of approximately 40 kms of Copper Cable Network & related Civil 

Work.

57EXPANSION OF TELEPHONE 

NETWORKRSADF

EASTERN REGION

Jul‐04 1,755,769.60EXPANSION OF TELEPHONE NETWORK IN 

EASTERN PROVINCE FOR RSADF

58Supply & Installation of Microwave Towers

Royal Saudi Naval Forces (RSNF)

N/AJEDDAH & JUBAIL, KSA

May‐04 1,872,397.28 N/ASurvey of Tower locations, soil investigation, preparation of foundation and supply and 

installation of towers

59Expansion of STC Network 

STC 450K Project           (Key Accounts)

Saudi Telecom Company

292JEDDAH & RIYADH 

AREA, KSADec. 2003 8,520,160.00

1800,900, 600, 300, 200, 100, 50, BSW Copper Cables  & 24, 36, 48, 

Inst. Splicing, termination of FOC & copper cable (secondary & primary)

STC JEDDAH & Riyadh DISTRICT60STC KEY ACCOUNT 450K, 

550K, 150KSTC

Jeddah & Riyadh

2002     11,269,880.00 

SHEET 8 of 15

Page 9: Projects

61Patriot Sites Integration 

Project‐ Phase 1L.M. 

Ericsson,SALTS64

Dhahran, Dammam, 

KSAFeb. 2002 6,392,000.00 24F

Survey and staking, OSP Design, Inst’n of cable by Mole plough, in rock, cable crossing & 

directional drilling.

62LAN/WAN & TELECOM UPGRADING PROJECT IN PRINCE SULTAN AIR BASE

ATTI 110Kingdom of Saudi Arabia

Feb‐02 6,392,000.00

12, 24Fiber & 

UTP Cables

Survey and OSP Design, Inst’n. of multiple sub‐duct, cable pulling in sub‐duct, const. of duct 

bank, splicing , termination & testing

63Upgrade of Telecom Network– Dhahran Air 

BaseBTC Networks 8

Kingdom of Saudi Arabia

FEB. 2002 2,506,664.16Copper & 24 FOC

Survey and OSP Design, Inst’n. of multiple sub‐duct, cable pulling in sub‐duct, const. of duct 

bank, splicing, termination & testing

Saudi TelecomJEDDAH & 

36F 48F Inst Splicing termination of FOC & copper64 STC 550K Project – Riyadh

Saudi Telecom Company

230 RIYADH AREA, KSA

OCT. 2001 5,514,667.9236F, 48F, & 96F

Inst. Splicing, termination of FOC & copper cable (secondary & primary)

65

MINISTRY OF INFORMATION 

CONNECTIVITY WITH DIGITAL NETWORK

MOI/SIEMENS AG 120

AL KHARJ,  ARTAWIYAH BURAYDAH, DAMMAM, RAWDAW 

BIN HABBAS,HAIL, AL HISSI, HOFUF, LINAH, 

MAJMAH,AL 

OCT. 2001 4,512,000.00 24 FOCSurvey, OSP Design, Construction of related OSP Civil Works, Termination and Testing including As Built Preparation Drawing

SHEET 9 of 15

Page 10: Projects

66MODA‐NAJARAN COMMUNICATION 

NETWORK

AIR DEFENSE FORCES 

COMMAND20

NAJRAN, KSA

DEC. 2000 1,041,770.64COPPER CABLE

Survey and OSP Design, Supply & Inst'n of Comm. Shelter, Inst'n of Cabinet and Pillar DPs, 

Const. of duct bank, Inst'n of Handholes, Copper cable pulling in duct,Copper cable laying by direct buried,  Directional Drilling, Splicing , 

Termination & Testing Copper Cable

67SHOIBA POWER PLANT FOC 

NETWORKL.M. Ericsson, ABB 44

SHOIBA, KSA

SEP. 2000 1,504,000.00 24F

Survey and OSP Design, Const. of duct bank, Inst'n of Manholes & Handholes, Inst’n. of multiple sub‐duct, FOC cable pulling in sub‐duct, Copper cable pulling in duct, Directional Drilling, Splicing , Termination & Testing of FOC 

& Copper Cable& Copper Cable

68KHURAIS EXCHANE TO ECD 

FOC LINK

Electronics & COMM. DEPT./ AIR DEFENSE COMMAND

3.5 RIYADH, KSA JUL. 2000 208,548.40 16FSurvey of Manholes, Inst’n of sub‐duct, cable pulling, Splicing, Termination and Testing.

69RABIGH CEMENT FACTORY 

FOC NETWORKSAUDI ARABIAN CEMENT FACTORY 

40RABIGH, KSA

May‐00 1,403,733.32 24F

Survey and OSP Design, Inst’n of Cable by Mole Plough, by Direct Buried, Const. of duct bank, 

Inst’n. of handholes, Inst'n of multiple sub‐duct, cable pulling in sub‐duct, Splicing , Termination 

& Testing

70CCASG Communication 

Network ERICSSON, CCASG 

Committee1,600

KUWAIT, SAUDI ARABIA, BAHRAIN, UAE, OMAN

MAR. 2000 82,720,000.00 24FInstallation of approximately 1600Km. fiber optic cables for Telecommunications in five 

countries of GCC.

SHEET 10 of 15

Page 11: Projects

71 Ras Lafan Onshore Project Qatar Telecom. 

LTD.200

Doha – Qatar

JUL. 1999 1,383,680.00 24 F.O.C.Inst’n, splicing, testing & commissioning of inside plant single and multimode fiber optic 

cables for Telecom. & CCTV network.

72B1‐3360 WEST 

CONNECTIVITY PROJECT

LUCENT TECHNOLOGY 

(SAUDI ARAMCO)6.5 KSA JUN. 1999 439,160.48 24 FOC

Inspection of existing duct bank, Inst’n of sub ducts, Inst’n of FO cable, splicing, termination, 

& testing

73Riyadh–Qassim Pipeline 

Telecommunication ProjectLucent 

Technologies84.8

Riyadh – Majmah ‐ Buraidah

JUL. 1998 5,640,000.00Copper 50p & 8F

Inst’n. of cable by Mole plough, in rock, cable crossing & directional drilling.

L H l Fib O ti C bl U it d A bInstallation of Cable by Mole Plough, 

I t ll ti f C bl i S I t ll ti f74

Long Haul Fiber Optic Cable Project

ETISALAT 1,950United Arab Emirates

JUN. 1998 22146400 6F, 20FInstallation of Cable in Swamp, Installation of Cable in Rock, Pipeline Crossing, Cable Route 

Crossings, Plantation 

75 TEP‐6 PROJECTAT&T 

International   Saudi Arabia

3,480

Riyadh‐Dammam, Dammam‐Hofuf, Hofuf‐Al Kharj, Al Kharj‐

Riyadh, Al Kharj‐Layla, Medina‐

Badr‐Yanbu, 

FEB. 1998 161,203,984.00 24F, 36F

Supply & install of MH, HH. Inst’n of cable in sub duct & 50mm PE pipe, by direct buried & in rock Construction of duct banks,Road crossing by open cut & directional drilling method, 

Splicing, termination & testing

76RSAF PEACE SHIELD FOC LINK PROJECT  RAFAH ‐ 

ARAR

ASEC International (RSAF Peace 

Shield)797 Arar/Rafha SEP. 1996 44,819,200.00 24F, 12F

Inst’n of cable by Mole plough, in rock, cable crossing & directional drilling. Splicing, 

termination & testing

SHEET 11 of 15

Page 12: Projects

77 “PICC” FOC PROJECT

ALCATEL‐TELETRA, Telecom. & 

Electronic Dept. Air Defense Forces 

(MODA)

84Kingdom of Saudi Arabia

JUL.1994 6,515,594.96 FOC (16F)Installation of cables & manholes, Const. of 4‐

way duct system.

78Fiber Optic Connectivity  

Expansion of SIGNAL CORP SITES IN AL KHARJ

Electronic & Communication Dept. (ECD)/Air Defense Forces Command (ADF)

13.1 AL KHARJ 1994 374,082.40 4FConstruction of 4‐way duct system. Installation of FOC in ducts. Installation of direct buried 

cable.

79FOC CONNECTIVITY OF GUN SITES AT KKMC

Electronic & Communication Dept. (ECD)/Air  12.6

King Khalid Military City (KKMC)‐ 1994 629,017.92 8F Installation of Direct Buried cable.

GUN SITES AT KKMCp ( )/

Defense Forces Command (ADF)

( )Hafar Al Batin

,

80FIBER OPTIC CABLE SYSTEM HAWTAH

ALCATEL‐TELETRA (SAUDI ARAMCO)

390

HAWTAH BANI 

TAMIM TO P.S.  # 3, KSA

JUN. 1994 35,081,928.00 24F

Const. of Contractor’s camp and office, Installation of Cable by Mole Plough, 

Installation of Cable in rock                    Cable Route Crossings: SAG Highways by thrust boring method, SAG Railways by thrust boring method, Road Crossing by open‐cut method.    Pipeline Crossing,   Sand Stabilization of Cable 

Route in sand dunes                          

81FOC LINK BETWEEN S/S 

8026‐80845‐8083

SECO CENTRAL/ASEA BROWN BERI

12.68 RIYADH, KSA 1993 133,318.32 6F Cable Installation, jointing and testing

82LONG HAUL FIBER OPTIC CABLE PROJECT (STA. Q – 

STA. QD)

ROYAL SAUDI AIR FORCE  (PEACE 

SHIELD)41

AL KHARJ, KSA

1993 2,038,672.00 4FInstallation & direct buried cable. Cable 

Installation in existing ducts.

SHEET 12 of 15

Page 13: Projects

83Fiber Optic Connectivity  of SIGNAL CORP SITES IN AL 

KHARJ 

TELECOM. & ELECTRONIC DEP‐ AIR DEFENSE 

FORCES MINISTRY OF DEFENSE AND 

25AL KHARJ, 

KSA1993 684,120.72 4F Installation of direct buried cable

84HAIL AIR BASE, FIBER OPTIC CABLE LINK.

Electronic & Communication Dept. (ECD)/Air Defense Forces Command (ADF)

16 HAIL, KSA 1993 137,375.36 4F Installation of direct buried cable

85MISFAH EXCHANGE TO 

RSNF HOUSING COMPOUND FOC LINK

Electronic & Communication Dept. (ECD)/Air Defense Forces C d (ADF)

35.4 RIYADH, 1993 1,044,779.92 4F, 8F

Construction of 8‐way duct system. Installation of Manholes. Installation of FOC in existing ducts system as well as in newly constructed 

duct system.

TELECOM. & Construction of 4 way duct system Installation

86 USMTM FOC LINK

ELECTRONIC DEPT‐ AIR DEFENSE 

FORCES MINISTRY OF DEFENSE AND 

0.4AL KHARJ, 

KSA1993 110,622.96

Construction of 4‐way duct system. Installation of Manholes. Installation of FOC in existing ducts system as well as in newly constructed 

duct system.

87TELEPHONE EXPANSION PROJECT @ STA. Q.

TELECOM. & ELECTRONIC DEPT‐ 

AIR DEFENSE FORCES/MINISTRY OF DEFENSE AND 

AVIATION

12AL KHARJ, 

KSA1992 1,422,784.00

FIBER OPTIC CABLE (4F), 

COPPER CABLE

Construction of 4‐way duct system. Installation of buried cable.

88FOC LINK, HQ TO SIGNAL CORP & RIYADH AIR BASE

TELECOM. & ELECTRONIC DEPT‐ 

AIR DEFENSE FORCES/MINISTRY OF DEFENSE AND 

AVIATION

11.4 RIYADH, KSA 1992 6,049,809.92 FOC

Construction of 4‐way duct system. Installation of Manholes. Installation of FOC in existing ducts system as well as in newly constructed 

duct system.

SHEET 13 of 15

Page 14: Projects

89FOC LINK, HQ TO ADCC (INTRACITY PROJECT)

TELECOM. & ELECTRONIC DEPT‐ 

AIR DEFENSE FORCES MINISTRY OF DEFENSE AND 

AVIATION

4.5 RIYADH, KSA 1992 3,133,474.96

FOC (24F,12F,4F) Copper Cable 2400P, 1800P, 900P, 600P, 300P

Const. Of 8‐way duct system. Inst. of manholes. Inst. Of FOC. Inst. Of Copper cables

90INSTALLATION OF LONG 

HAUL FOC

SAUDI TAL FOR COMMERCE & CONTRACTS/AIR  648

Riyadh to KKMC KSA

JUN. 1992 29,236,677.12 24F

Cable Ploughing. Cable inst’n in rock. Const. of 4‐Way Duct. Const. of 2‐Way Duct. Supply & installation of manholes Type A‐R. Supply & installation of hand holes (3 cover) Supply &HAUL FOC

DEFENCE FORCES COMMAND (ADF)

KKMC, KSA installation of hand holes (3‐cover). Supply & installation of 4‐Way Sub ducts. Installation of 

cable in Sub ducts. Wadi Crossings     

91INTRACITY SIGNAL CORP. 

PROJECT

AIR DEFENSE FORCES 

COMMAND26

Riyadh Area, KSA

OCT.1991 5,201,790.804F FOC & Copper Cables

Const. of 9‐Way Duct System. Const. of 4‐Way Duct System. Const. of 2‐Way Duct System. Supply & installation of manholes Type A‐I. Supply & installation of hand holes (3‐cover). Thrust boring under SAG Highways.  Supply & installation of 3‐Way Sub duct. Installation of F.O. Cable in Sub ducts. Installation of Copper 

Cable:

SHEET 14 of 15

Page 15: Projects

92FO CABLE INSTALLATION PROJECT (LONG HAUL)

ERICSSON, AIR DEFENSE FORCES 

COMMAND1,190

Riyadh to Khamasin, Riyadh to 

Muzamiyah, KSA

DEC. 1989 33,809,920.00

FIBER OPTIC CABLE 

(2F,4F, 8F)

Cable Ploughing, Cable inst’n in rock, Const. of 4‐Way Duct, Const. of 12‐Way Duct, Supply & installation of manholes Type B‐R, Supply & installation of hand holes (3‐cover), Supply & installation of 4‐Way Sub ducts, Installation of 

cable in Sub ducts.    

SHEET 15 of 15