Project: WT Montgomery Road Phase I
Transcript of Project: WT Montgomery Road Phase I
PUBLIC WORKS DEPARTMENT
Project: WT Montgomery Road Phase I
Location / Limits:IH 90 West to Lucas Creekbridge.
Scope:The main purpose of the projectis to provide much neededdrainage improvements and roadreconstruction onWT Montgomery Road.
Status: Complete
Precinct: 1
Additional Information:Consultant: IDC, Inc. Advertise Date: June 26, 2015
Contractor: Curran Contracting Construction Start Date: 3 Q 2015
Construction Cost: $ 6,215,386.97 Construction End Date: 1 Q 2017
Joint Bid: SAWS
PUBLIC WORKS DEPARTMENT
Project: Talley Rd @ Culebra Rd Traffic Signal
Location / Limits:Talley Rd at Culebra Rd
Scope:The project contemplates thesignalization of the intersectionof Culebra Rd at Talley Rd.
Status: Complete
Precinct: 1
Additional Information:
Consultants: Dannenbaum Bid Opening: August 25, 2017
Contractor: EZ Bel Construction Start: January 9, 2018
Construction Cost: $ 173,809 Construction End Date: 1 Q 2019
PUBLIC WORKS DEPARTMENT
Project: Alamo Ranch Parkway at Westwood Loop Traffic Signal
Location / Limits:Intersection of Alamo RanchPkwy and Westwood Loop.
Scope:Project for the construction of athru acceleration lane alongAlamo Ranch with an adjustedtraffic signal and supplementalsignage and stripping.
Status: Complete
Precinct: 1
Additional Information:
Consultants: RPS Bid Opening: March 2, 2018
Contractor: EZ Bel Construction Start: 3 Q 2018
Construction Cost: $ 327,903 Construction End Date: 1 Q 2019
PUBLIC WORKS DEPARTMENT
Project: FM 1957 (Potranco Rd)
Location / Limits:Just west of SH 211 to Loop 1604
Scope:Construction will provide forenhanced connection betweentwo western relief routes of SH211 and Loop 1604. Theproposed improvements willexpand the existing two-lane ruralroadway section to an urbanroadway section consisting of two11-foot lanes, and two 14-footshared use lanes, continuous leftturn lane or 10-foot raised centermedian within an 80’ ROW(Minimum).
Status: Complete
Precinct: 1
Additional Information:Consultant: Pape-Dawson Advertise Date: November 20, 2015
Contractor: Texas Sterling Construction Construction Start Date: May 9, 2016
Construction Cost: $ 46,825,265 Construction End Date: July 19, 2019
Joint Bid: CPS , SAWS Pass Thru Project (TX DOT)
PUBLIC WORKS DEPARTMENT
Project: Marbach Rd & Bear Springs Traffic Signal
Location / Limits:Intersection of Marbach Rd &Bear Springs Dr
Scope:Signalize the intersection onMarbach Rd & Bear Springs Dr
Status: Complete
Precinct: 1
Additional Information:Consultants: Pape Dawson Engineers Bid Opening: July 20, 2018
Contractor: SAECO Construction Start: December 3, 2018
Construction Cost: $ 243,498 Construction End Date: June, 2019
PUBLIC WORKS DEPARTMENT
Project: Fischer Rd Phase I
Location / Limits:From Quintana Rd to IH 35 S
Scope:Project will expand the existingtwo-lane rural roadway section toan urban roadway section withreinforced concrete pavementconsisting of 16-foot travel lanesin each direction with 6 ft.shoulders with, curbs andsidewalks within an 86’ ROW(typical).
Status: Complete
Precinct: 1
Additional Information:Consultant: Garza EMC Advertise Date: June 7, 2019
Contractor: J3 Company Construction Start: October 28, 2019
Construction Cost: $ 2,108,824.38 Construction End Date: 3 Q 2020
Joint Bid: SAWS
PUBLIC WORKS DEPARTMENT
Project: FM 471 (Culebra Rd)
Location / Limits:From Old FM 471 to FM 1560
Scope:The construction will completethe capacity gap that currentlyexists on FM 471 from FM1560 to Old FM 471. Theproposed improvements willwiden Culebra Road from itsexisting two-lane configurationto a four-lane divided roadwaywith anticipated bicycle andpedestrian amenities.
Status: Complete
Precinct: 1 & 2
Additional Information:Consultant : CP&Y Advertise Date: March 11, 2016
Contractor: Curran Contracting Construction Start Date: August 15, 2016
Construction Cost: $ 14,542,27324 Construction End Date: August 9, 2018
Joint Bid: SAWS, CPS Gas. Pass Thru Project (TX DOT)
PUBLIC WORKS DEPARTMENT
Project: Bridgewood Subdivision
Location / Limits:15 Various Streets inBridgewood Subdivision.
Scope:The main purpose of the projectis to reconstruct 15 residentialstreets in the BridgewoodSubdivision with curb & guttersection, 4-foot sidewalk includingADA compliant ramps anddriveway approaches.
Status: Complete
Precinct: 2
Additional Information:Consultant: LNV Bid opening Date: February 15, 2019
Contractor: Winters Construction, Inc. Construction Start Date: May 27, 2019
Construction Cost: $ 3,877,600 Construction End Date: 4 Q 2020
Joint Bid: SAWS
PUBLIC WORKS DEPARTMENT
Project: Bridgewood Subdivision
Location / Limits:15 Various Streets inBridgewood Subdivision.
Scope:The main purpose of theproject is to reconstruct 15residential streets in theBridgewood Subdivision withcurb & gutter section, 4-footsidewalk including ADAcompliant ramps and drivewayapproaches.
Status: Complete
Precinct: 2
Additional Information:Consultant: LNV Bid opening Date: February 15, 2019
Contractor: Winters Construction, Inc. Construction Start Date: June 2019
Construction Cost: $ 3,877,600 Construction End Date: 4 Q 2020
Joint Bid: SAWS
PUBLIC WORKS DEPARTMENT
Project: Shaenfield PlaceSubdivision
Location / Limits:Various streets withinShaenfield Place Subdivision.
Scope:The scope of this project is toprovide mill/overlay andreconstruction of multiple streets,update pedestrian ramps andnew sidewalks along missingareas within ShaenfieldSubdivision.
Status: Complete
Precinct: 2
Additional Information:Consultant: Gonzalez De la Garza Bid Opening: May 12, 2017
Contractor: Tropical Constructions Construction Start Date: 2 Q 2017
Construction Cost: $ 2,581,989 Construction End Date: 4 Q 2019
Joint Bid: SAWS
PUBLIC WORKS DEPARTMENT
Project: Steubing Rd
Location / Limits:FM 1560 to Shaenfield Rd.
Scope:This project will reconstruct theexisting two roadway rural lanesection to a mixed rural/urbanroadway section withcontinuously reinforced concretepavement, curb & sidewalks onthe west side of the roadway anddrainage improvements.
Status: Complete
Precinct: 2
Additional Information:Consultant: Gonzalez De La Garza Bid Opening: April 13, 2017
Contractor: EZ Bel Construction Start Date: 2 Q 2017
Construction Cost: $ 465,827 Construction End Date: 4 Q 2017
PUBLIC WORKS DEPARTMENT
Project: Pct 2 Pavement Restoration
Location / Limits:On Wildhorse Pkwy, Cavern Hill and the streets within Stanton Run Subdivision
Scope:Pavement Restoration(Mill & Overlay, Base ReplacementSubgrade Stabilization).
Status: Complete
Precinct: 2
Additional Information:Consultant: ATKINS Bid opening: August 7, 2019
Contractor: Alamo City Constructors Construction Start: Dec. 2019
Construction Cost: $ 2,697,138 Construction End: 2 Q 2020
Joint Bid: SAWS
PUBLIC WORKS DEPARTMENT
Project: Boerne Stage Rd @ Cross Mountain Traffic Signal
Location / Limits:Boerne Stage Rd at CrossMountain Trail.
Scope:The project contemplates thesignalization of the intersectionof Boerne Stage Rd at CrossMountain St.
Status: Complete
Precinct: 3
Additional Information:Consultants: Dannenbaum Bid Opening: July 14, 2017
Contractor: SAECO Construction Start: 1 Q 2018
Construction Cost: $ 125,763 Construction End Date: 2 Q 218
PUBLIC WORKS DEPARTMENT
Project: Bulverde Rd Traffic Signal
Location / Limits:Bulverde Rd & Bulverde Oaks
Scope:The project contemplates thesignalization of the intersectionof Bulverde Rd & BulverdeOaks.
Status: Complete
Precinct: 3
Additional Information:Consultants: Kimley Horn Bid Opening: September 4, 2018
Contractor: SAECO Construction Start: March 26. 2018
Construction Cost: $ 106,515 Construction End Date: Sep 4, 2018 2019
PUBLIC WORKS DEPARTMENT
Project: Borgfeld Dr Phase II
Location / Limits:From Timberline Dr to FM 2696(Blanco Rd) including OldBlanco Rd south of BorgfeldDrive.
Scope:The project consists of 2 miles ofroadway reconstruction to two-12ft. travel lanes in each directiondesignated turn lanes atintersections, two 4-footshoulders and necessarydrainage.
Status: Complete
Precinct: 3
Additional Information:Consultant: CDS Muery Services Advertise Date: January 6, 2017
Contractor: Texas Sterling Construction Start Date: March 20, 2017
Construction Cost: $ 10,309,219.44 Construction End Date: 3 Q 2019
Joint Bid: SAWS Water & CPS Gas
PUBLIC WORKS DEPARTMENT
Project: Borgfeld Dr Phase II
Location / Limits:From Timberline Dr to FM 2696(Blanco Rd) including OldBlanco Rd south of BorgfeldDrive.
Scope:The project consists of 2 miles ofroadway reconstruction to two-12ft. travel lanes in each directiondesignated turn lanes atintersections, two 4-footshoulders and necessarydrainage.
Status: Complete
Precinct: 3
Additional Information:Consultant: CDS Muery Services Advertise Date: January 6, 2017
Contractor: Texas Sterling Construction Start Date: March 20, 2017
Construction Cost: $ 9,056,127 Construction End Date: 3 Q 2019
Joint Bid: SAWS Water & CPS Gas
PUBLIC WORKS DEPARTMENT
Project: Candlewood Streets Phase I
Location / Limits:Candlebrook, Candlecreek,Candlewind, Candlestone,Candlebluff, Candlecrest,Candlecrown, Candleglade,Candleknoll, Woodglow,Candleridge, Candlerock,Candlefire, Candlewick,Candleview.
Scope:Project will reconstruct 15residential streets in Candlewoodsubdivision with curb & guttersection, 4-foot sidewalk includingADA complaint ramps anddriveway approaches.
Status: Complete
Precinct: 4
Additional Information:Consultant: LNV Engineering Bid Opening: August 22, 2014
Contractor: San Antonio Cons. Construction Start Date: Nov. 17, 2014
Construction Cost: $ 5,068,761 Construction End Date: September 9, 2018
Joint Bid: SAWS
PUBLIC WORKS DEPARTMENT
Project: Glen Mont Drive
Location / Limits:From Crestway Rd to OldWalzem Rd
Scope:Proposed improvements willrehabilitate the existing GlenMont Drive two lane urbanconfiguration by incorporatinga new pavement section, buspads, necessary drainage, andpedestrian amenities within a50’ ROW .
Status: Complete
Precinct: 4
Additional Information:Consultants: Halff & Assoc. Bid Opening: July 22, 2014
Contractor: Sterling Delaware Holding Inc. Construction Start Date: 4 Q 2014
Construction Cost: $ 12,332,423 Construction End Date: 1 Q 2017
Joint Bid: SAWS, SARA, CPS-Gas MPO Project
PUBLIC WORKS DEPARTMENT
Project: Palm Park Subdivision
Location / Limits:Ideal Ave, Parkett Drive, andPalm Park Blvd.
Scope:Construction to reestablish barditches and add pipe culvertsunder existing driveways andintersections.
Status: Complete
Precinct: 4
Additional Information:
Consultant: Young Professional Bid Opening: December 15, 2017
Contractor: EZ Bel Construction Start Date: February 14, 2018
Construction Cost: $ 1,199,318 Construction End Date: 2 Q 2019
Joint Bid: CPS‐Gas
PUBLIC WORKS DEPARTMENT
Project: Candlewood Phase II
Location / Limits:On next streets: CandleheadLn, Cameron Spgs, AshleySpgs, Candlehill, Candletree,Candleglenn and Lyndell Spgs.
Scope:Project will be reconstruct 7streets (7,147 L.F.) in theCandlewood Subdivision withcurbs & gutter section, 4 footsidewalk including ADAcompliant ramps and drivewayapproaches.
Status: Complete
Precinct: 4
Additional Information:Consultant: Halff Bid opening: July 27, 2018
Contractor: EZ Bel Construction, LLC Construction Start Date: January , 2019
Construction Cost: $ 4,077,203.10 Construction End Date: 2 Q 2020
Joint Bid: SAWS
PUBLIC WORKS DEPARTMENT
Project: Binz-Engleman Rd Sidewalk and Traffic Signals
Location / Limits:From N Foster Rd to Woodlake Parkway.
Scope:Signalize the intersection onBinz-Engleman Rd and Woodlake Pky.
Status: Complete
Precinct: 4
Additional Information:Consultant: Dannenbaum Advertise Date: June 2, 2017
Contractor: The Levy Co Construction Start Date: October 2019
Construction Cost: $ 327,948 Construction End Date: January 2020
Joint Bid: N/A
PUBLIC WORKS DEPARTMENT
Project: Binz-Engleman Rd Sidewalk and Traffic Signals
Location / Limits:From N Foster Rd to Woodlake Parkway.
Scope:Signalize the intersection onBinz-Engleman Rd and Woodlake Pky.
Status: Complete
Precinct: 4
Additional Information:Consultant: Dannenbaum Advertise Date: June 2, 2017
Contractor: The Levy Co Construction Start Date: October 2019
Construction Cost: $ 327,948 Construction End Date: January 2020
Joint Bid: N/A
PUBLIC WORKS DEPARTMENT
Project: Pedestrian Crossing Improvements
Location / Limits:
County Wide, 25 locations.
Scope:
The project consists of 49different sites across BexarCounty that include additionalsignage, additional pavementmarking, 16 rectangular rapidflash beacons (RRFB), upgradedhandicap ramps, and pedestrianrefuge islands. .
Status: Complete
Precinct: CW
Additional Information:
Consultant: Dannenbaum Bid opening: August 18, 2017
Contractor: EZ Bel Construction Construction Start Date: January , 2018
Construction Cost: $ 1,573,692 Construction End Date: 2 Q 2019