Project System Training PPT BDC

75
Project System Module (PS) 1 1 MCGM ABM Knowledgeware Ltd Processing of Projects For Municipal Corporation of Greater Mumbai SAP Project System Module

Transcript of Project System Training PPT BDC

Page 1: Project System Training PPT BDC

Project System Module (PS)

11

MCGM ABM Knowledgeware Ltd

Processing of

Projects

For

Municipal Corporation of Greater Mumbai

SAP Project System Module

Page 2: Project System Training PPT BDC

Project System Module (PS)

22

MCGM ABM Knowledgeware Ltd

Project Identification

WHAT IS A PROJECT ?

Projects are tasks with special characteristics. They are generally complex, unique, & involve high degree of risk. They have precise goals which are agreed as per Contract. They are limited in duration and are cost and capacity intensive. They are subject to definite set of quality requirements. They are mostly of strategic importance for Client executing them.

PROJECTS IN MCGM PERSPECTIVE

Construction Works (Buildings / Bridges / Drainage System, etc). One time Repair works. Construction of Trenches. Treatment of Ward level & Departmental Projects is different in

MCGM SAP Process.

Page 3: Project System Training PPT BDC

Project System Module (PS)

33

MCGM ABM Knowledgeware Ltd

Dept. Level Projects

DEPARTMENTAL PROJECTProject Criteria

BOQ

MEASUREMENT BOOK

RUNNING BILLS

VALUE DURING PROJECT IS ACCOUNTED AS CWIP (CAPITAL WORK IN PROGRESS)

Page 4: Project System Training PPT BDC

Project System Module (PS)

44

MCGM ABM Knowledgeware Ltd

Ward & Hospital Projects

WARD NORMALLY ONLY CWC CONTRACTS

TRENCHING WO

HOSPITALS CWC CONTRACTS

LARGE SUPPLY

INSTALLATION PROJECTS

EXCEPTIONS

PURE PROCUREMENT OF STOCK OR ASSET ---------

PURE MAINTENANCE WORK OR AMC (HIRING OF VEHICLES, REPAIR OF AC’s)

SMALL REPAIR WORKS & PATTY WORKS OF HOSPITAL

Page 5: Project System Training PPT BDC

Project System Module (PS)

55

MCGM ABM Knowledgeware Ltd

Project Structuring

IDENTIFICATION OF PROJECT

CREATION OF PROJECT IDENTIFICATION OF PROJECT DEFN. (THE NEXT AVAILABLE NO.) PROJECT DESCRIPTION TYPE OF PROJECT CAPITAL PROJECT MAINTENANCE PROJECT BUSINESS AREA START DATE LONG TEXT

Page 6: Project System Training PPT BDC

Project System Module (PS)

66

MCGM ABM Knowledgeware Ltd

Project System Flow in MCGM

No.

Process T Code Authorization

Dept Ward

1 Create Project CJ20N SE/AE AE

2 Create WBS Element CJ20N SE/AE AE

3 Create Estimation ZPSEST SE/AE AE

4 Liability Booking ZPS_LBR AE AE

5 Budget Allocation CJ30 EE AE

6 Create Document CV01N AE AE

7 Send Notification CLM1 EE AE

8 Budget Release CJ32 AO AO

9 Release WBS Element CJ20N AO AO/AE

10 Reply Notification SBWP AO AO

11 Change Project Status CJ20N SE/AE AE

12 Put negation/premium ZPSEST SE/AE AE

13 Create Work Order ME21N SE/AE AE

Page 7: Project System Training PPT BDC

Project System Module (PS)

77

MCGM ABM Knowledgeware Ltd

Project System Flow in MCGM

No.

Process T Code Authorization

Dept Ward

14 Release Work Order ME29N EE/DYCE AC/DMC

15 Maintain Progress of work ZPSPRO SE/AE AE

16 Create Service Entry Sheet ML81N SE/AE AE

17 Generate Payment Cert ZPSCERT SE/AE AE

18 Release SE Sheet ML81N EE AC

19 Invoice Booking (HOLD) MIRO EE AC/AE

20 Notification CLM1 EE AO

21 Invoice Posting (POST) MIRO AO AO

22 Block Removal FB02 AO AO

23 Project Settlement CJ88 AO AO

24 Project Closing CJ20N AE AE

Page 8: Project System Training PPT BDC

Project System Module (PS)

88

MCGM ABM Knowledgeware Ltd

Project Coding

PROJECT NUMBERING THE 1ST ## 3 LETTERS IDENTIFIES THE RESPECTIVE DEPT.S AND

WARDS.

THE NEXT ## 2 LETTERS ARE FOR THE SPECIFIC FISCAL YEARS

THE LAST ## 3 LETTERS ARE THE SERIAL NUMBER OF THE PROJECT

BUSINESS AREA BUSINESS AREA SHOULD BE 2001, 2002, 2003, 1000, 5000

IF BUSINESS AREA IS CUTTING ACROSS DIFFERENT ZONES ---1000

IF OUTSIDE CITY LIMIT-----------------------------------------------------------5000

FOR WARD LEVEL THERE ARE RESPECTIVE BUSINESS AREAS

Page 9: Project System Training PPT BDC

Project System Module (PS)

99

MCGM ABM Knowledgeware Ltd

Project Coding Mask

Page 10: Project System Training PPT BDC

Project System Module (PS)

1010

MCGM ABM Knowledgeware Ltd

Project coding

Page 11: Project System Training PPT BDC

Project System Module (PS)

1111

MCGM ABM Knowledgeware Ltd

Project Builder

Page 12: Project System Training PPT BDC

Project System Module (PS)

1212

MCGM ABM Knowledgeware Ltd

Nomenclature

Nomenclature

Project Description

Project Creation

Page 13: Project System Training PPT BDC

Project System Module (PS)

1313

MCGM ABM Knowledgeware Ltd

Proposed Project Definition

Next Available No. in Series

Page 14: Project System Training PPT BDC

Project System Module (PS)

1414

MCGM ABM Knowledgeware Ltd

Project Profile

Page 15: Project System Training PPT BDC

Project System Module (PS)

1515

MCGM ABM Knowledgeware Ltd

Basic Data for Project

Page 16: Project System Training PPT BDC

Project System Module (PS)

1616

MCGM ABM Knowledgeware Ltd

Project Creation….

Project Structuring : WBS Elements

The project is structured with multiple wbs elements at 2nd Level if :

If the value of the project is more than Rs. 100 Cr,

If sections of the projects are using different rebate percentages/charges.

If sections of the projects are using different budget allocations.

Page 17: Project System Training PPT BDC

Project System Module (PS)

1717

MCGM ABM Knowledgeware Ltd

Accessing the Project

Put no. of required project

Page 18: Project System Training PPT BDC

Project System Module (PS)

1818

MCGM ABM Knowledgeware Ltd

Creation Of WBS Elements

Level 1 WBS

Level 2 WBS

Click on WBS Element Overview

Page 19: Project System Training PPT BDC

Project System Module (PS)

1919

MCGM ABM Knowledgeware Ltd

WBSe Parameters

Cost center

G/L A/C, FA & F

Page 20: Project System Training PPT BDC

Project System Module (PS)

2020

MCGM ABM Knowledgeware Ltd

Project Estimation

• Carrying out Block Estimate

• Carrying out Detail Estimate per WBS element with Schedule items with measurement details

Block Estimate

Detail Estimate

Page 21: Project System Training PPT BDC

Project System Module (PS)

2121

MCGM ABM Knowledgeware Ltd

Project Estimation

Page 22: Project System Training PPT BDC

Project System Module (PS)

2222

MCGM ABM Knowledgeware Ltd

GREY AREA

Detail of activity

Summary

Project Estimation..

Page 23: Project System Training PPT BDC

Project System Module (PS)

2323

MCGM ABM Knowledgeware Ltd

Claim_Notification Process

Page 24: Project System Training PPT BDC

Project System Module (PS)

2424

MCGM ABM Knowledgeware Ltd

Notification Process

Page 25: Project System Training PPT BDC

Project System Module (PS)

2525

MCGM ABM Knowledgeware Ltd

Notification Process..

Details date , Time & the concerned person.

Page 26: Project System Training PPT BDC

Project System Module (PS)

2626

MCGM ABM Knowledgeware Ltd

Document Mgmt. System

Page 27: Project System Training PPT BDC

Project System Module (PS)

2727

MCGM ABM Knowledgeware Ltd

DMS- In Project / WBS

Document

Page 28: Project System Training PPT BDC

Project System Module (PS)

2828

MCGM ABM Knowledgeware Ltd

DMS-In Notification

Page 29: Project System Training PPT BDC

Project System Module (PS)

2929

MCGM ABM Knowledgeware Ltd

Notification Process : Business Workplace

Business Workplace

Page 30: Project System Training PPT BDC

Project System Module (PS)

3030

MCGM ABM Knowledgeware Ltd

Business Workplace for Claim

Page 31: Project System Training PPT BDC

Project System Module (PS)

3131

MCGM ABM Knowledgeware Ltd

Double Click to open

Business Workplace for Claim..

Page 32: Project System Training PPT BDC

Project System Module (PS)

3232

MCGM ABM Knowledgeware Ltd

Save after giving comments

Business Workplace : Inbox..

Page 33: Project System Training PPT BDC

Project System Module (PS)

3333

MCGM ABM Knowledgeware Ltd

Login ID

Business Workplace : Forwarding

Page 34: Project System Training PPT BDC

Project System Module (PS)

3434

MCGM ABM Knowledgeware Ltd

Notification Process**

Page 35: Project System Training PPT BDC

Project System Module (PS)

3535

MCGM ABM Knowledgeware Ltd

Estimation–Deviation

Page 36: Project System Training PPT BDC

Project System Module (PS)

3636

MCGM ABM Knowledgeware Ltd

Approval Still PendingQuantity yet to get updated

Estimation–Deviation..

Page 37: Project System Training PPT BDC

Project System Module (PS)

3737

MCGM ABM Knowledgeware Ltd

Details of Deviation

Business Workplace : Inbox

Page 38: Project System Training PPT BDC

Project System Module (PS)

3838

MCGM ABM Knowledgeware Ltd

Estimation – after Approval

Notification No. after approval

Page 39: Project System Training PPT BDC

Project System Module (PS)

3939

MCGM ABM Knowledgeware Ltd

Project Budgeting• Allocate Overall and Annual

Budget for the Project

• Check the fund, fund center and functional area for the Project WBS elements

• Release the budget

• Release the WBS elements

Project Budgeting

THE BUDGET WILL BE ALLOCATED BY THE

EE ------------------IN DEPT LEVEL

AE-------------------IN THE WARD LEVEL

THE BUDGET WILL BE RELEASED BY THE ACCOUNTS OFFICER

Page 40: Project System Training PPT BDC

Project System Module (PS)

4040

MCGM ABM Knowledgeware Ltd

Basis for Allocation

Budget Allocation is determined based on Following :

Estimated Value of the Project

Contractors rebate (if applicable),

Water / Sewerage Ch/ Supervision Charges, etc.,

Contingencies (if applicable).

Budget for the respective Project will be booked in the Liability Register which shows outstanding liability.

Budget Allocation

Page 41: Project System Training PPT BDC

Project System Module (PS)

4141

MCGM ABM Knowledgeware Ltd

Budgeted Amount to be Released

Budget Allocation.. CJ30

Page 42: Project System Training PPT BDC

Project System Module (PS)

4242

MCGM ABM Knowledgeware Ltd

Budget Allocation.. CJ30

Page 43: Project System Training PPT BDC

Project System Module (PS)

4343

MCGM ABM Knowledgeware Ltd

Liability Register :ZPS_LBR

Page 44: Project System Training PPT BDC

Project System Module (PS)

4444

MCGM ABM Knowledgeware Ltd

Liability Register..

Page 45: Project System Training PPT BDC

Project System Module (PS)

4545

MCGM ABM Knowledgeware Ltd

Work Order Structure

WO STRUCTURES

AS MANY ITEMS ARE REQUIRED AS THERE ARE WBS ELEMENTS

QUANTITY ---- UNPAID,

EXT.SER.NO.------PAID UP TO 31ST MARCH

IF COMPLETE PAID QTY.------- PUT 0.001 IN QUANTITY COLUMN.

Page 46: Project System Training PPT BDC

Project System Module (PS)

4646

MCGM ABM Knowledgeware Ltd

T CODE----ME21N

TYPE------- PROJECT WORK ORDER(ZTPS) PUT VENDOR CODE ACCOUNTING ASSIGNMENT-------P ITEM CATEGORY -------------------D SHORT TEXT -----------------------WBS ELEMENT MATERIAL CODE -------------------PROJECT WORK PLANT STORAGE LOCATION---------------0001 PURCHASING ORGANISATION-----MCGM PURCHASE GROUP

Work Order Structure..

Page 47: Project System Training PPT BDC

Project System Module (PS)

4747

MCGM ABM Knowledgeware Ltd

G/L A/C

Work Order Structure..ME21n

Page 48: Project System Training PPT BDC

Project System Module (PS)

4848

MCGM ABM Knowledgeware Ltd

Variation In Work Order

Project Work Orders

IF THERE ARE MORE THAN 1 WBS THE work order SHOULD HAVE AS MANY HEADER ITEMS AS WBS ELEMENTS , UNDER WHICH SERVICES ARE SPECIFIED.

This is to ensure that payment certificates are created properly ----as rebates / additional charges etc. Would be different for different WBSe elements.

FOR RELATED ADDITIONAL WO AS ARBITATION FEES, CONSULTATION FEES-----

A SEPARATE WBS ELEMENT IS TO BE CREATED

WO --- WITH ACCOUNT ASSIGNED AS (P) [WITH NO ITEM CATEGORY AS (D)]

FOR LS CONTRACT ------------------------- WO --- WITH ACCOUNT ASSIGNED AS (P) [WITH NO

ITEM CATEGORY AS (D)]

Page 49: Project System Training PPT BDC

Project System Module (PS)

4949

MCGM ABM Knowledgeware Ltd

Consultancy PO .. ME21n

Page 50: Project System Training PPT BDC

Project System Module (PS)

5050

MCGM ABM Knowledgeware Ltd

PO Release .. ME29n

Page 51: Project System Training PPT BDC

Project System Module (PS)

5151

MCGM ABM Knowledgeware Ltd

Work Order Printout.. ZPSWORD

Page 52: Project System Training PPT BDC

Project System Module (PS)

5252

MCGM ABM Knowledgeware Ltd

Project Execution.. ZPSPRO

PHYSICAL PROGRESS

Enter date wise executed Quantities for various Activities.

You can enter executed quantities for the Activity for duration (from / to) also.

You can maintain text description for the entered executed quantity.

Once the executed quantities are saved it cannot be deleted

Page 53: Project System Training PPT BDC

Project System Module (PS)

5353

MCGM ABM Knowledgeware Ltd

Executed Quantity

Details of Execution

Project Execution..ZPSPRO

Page 54: Project System Training PPT BDC

Project System Module (PS)

5454

MCGM ABM Knowledgeware Ltd

Payment Certification

Service Selection

Service Entry Sheet..ML81n

Page 55: Project System Training PPT BDC

Project System Module (PS)

5555

MCGM ABM Knowledgeware Ltd

Services Selected

Service Entry Sheet..ML81n

Page 56: Project System Training PPT BDC

Project System Module (PS)

5656

MCGM ABM Knowledgeware Ltd

T CODE----ML81N

THE SERVICE ENTRY SHEET WILL BE REALEASED BY THE HIGHER AUTHORITY

THE SERVICE ENTRY SHEET WILL BE RELEASED ONLY AFTER THERE IS SUFFICIENT BUDGET AVAILABLE IN BUDCON FOR THE GIVEN COMBINATION.

Release- Service Entry Sheet

Page 57: Project System Training PPT BDC

Project System Module (PS)

5757

MCGM ABM Knowledgeware Ltd

Release of Service Entry Sheet

Release Flag

Page 58: Project System Training PPT BDC

Project System Module (PS)

5858

MCGM ABM Knowledgeware Ltd

Payment Certificate

T CODE----ZPSCERT

DEDUCTIONS

ADDITIONS

OTHER PROJECT COST

PRICE ESCLATION

Page 59: Project System Training PPT BDC

Project System Module (PS)

5959

MCGM ABM Knowledgeware Ltd

Payment Certificate..ZPSCERT

Page 60: Project System Training PPT BDC

Project System Module (PS)

6060

MCGM ABM Knowledgeware Ltd

Deductions WCT

TDS

PENALTY

RECOVERY

ADHOC RECOVERY

DEFERRED PAYMENT

DIFFERENCE IN TAXES

LIQUIDATED DAMAGES

Payment Certificate..ZPSCERT

Page 61: Project System Training PPT BDC

Project System Module (PS)

6161

MCGM ABM Knowledgeware Ltd

ADDITIONS SERVICE TAX

EXCISE DUTY & TAXES

TDS ON MOBILISATION ADVANCE RECOVERY

WITHHELD AMOUNT TO BE RELEASSED

OTHER PROJECT COST SUPERVISION CHAGES

WATER TAXES

SEW. CHARGES

ESCLATION PRICE

LABOUR CHARGES

Payment Certificate..ZPSCERT

Page 62: Project System Training PPT BDC

Project System Module (PS)

6262

MCGM ABM Knowledgeware Ltd

Payment Certificate..ZPSCERT

Page 63: Project System Training PPT BDC

Project System Module (PS)

6363

MCGM ABM Knowledgeware Ltd

Goods Receipt_MIGO

Page 64: Project System Training PPT BDC

Project System Module (PS)

6464

MCGM ABM Knowledgeware Ltd

Payment Processing- MIRO

Page 65: Project System Training PPT BDC

Project System Module (PS)

6565

MCGM ABM Knowledgeware Ltd

MIRO

Page 66: Project System Training PPT BDC

Project System Module (PS)

6666

MCGM ABM Knowledgeware Ltd

MIRO

Page 67: Project System Training PPT BDC

Project System Module (PS)

6767

MCGM ABM Knowledgeware Ltd

Reports on Work

BOQ Details ...ZPSBOQ

Project Structure..CN41

PO History.. ME2J

Change History..ME2J Budcon .. Budcon report

Page 68: Project System Training PPT BDC

Project System Module (PS)

6868

MCGM ABM Knowledgeware Ltd

Reports on Work

Total WO value on GL basis.. ME2J

Service Entry Sheet Ward Wise

Status Service Entry Sheet.. ML84

Status of WBS till date Project Score Card Project Cockpit

Page 69: Project System Training PPT BDC

Project System Module (PS)

6969

MCGM ABM Knowledgeware Ltd

Project Cockpit

Page 70: Project System Training PPT BDC

Project System Module (PS)

7070

MCGM ABM Knowledgeware Ltd

Project Score Card

Page 71: Project System Training PPT BDC

Project System Module (PS)

7171

MCGM ABM Knowledgeware Ltd

REPORTS- VENDOR PO VALUE

Page 72: Project System Training PPT BDC

Project System Module (PS)

7272

MCGM ABM Knowledgeware Ltd

Project Structure

Page 73: Project System Training PPT BDC

Project System Module (PS)

7373

MCGM ABM Knowledgeware Ltd

Reports-PO Release status

Page 74: Project System Training PPT BDC

Project System Module (PS)

7474

MCGM ABM Knowledgeware Ltd

PO-Released.. ME80FN

Page 75: Project System Training PPT BDC

Project System Module (PS)

7575

MCGM ABM Knowledgeware Ltd

Thank You