Project Sustainability Management Plan 411-421 Smith ... · The SMP will need to set out how this...
Transcript of Project Sustainability Management Plan 411-421 Smith ... · The SMP will need to set out how this...
November 12th, 2018 Reference 2064V2
Project
Sustainability Management Plan for 411-421 Smith Street, Fitzroy
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
411-421 Smith Street, Fitzroy Proposed Mixed Use Residential Development
Table of Contents 1. Introduction 3
1.1 City of Yarra Requirements 3
1.2 ESD Assessment Tools 3
1.2.1 Green Star Design and As Built v.1.2 Benchmark 3
1.2.2 FirstRate 5 4
1.2.3 Melbourne Water STORM Tool 4
1.3 Site and Development Description 5
2. Sustainability Initiatives 6
2.1 Building Management 6
2.2 Indoor Environment Quality 8
2.3 Energy Efficiency 10
2.4 Transport 12
2.5 Water Efficiency 13
2.6 Building Materials and Waste Management 14
2.7 Land Use and Ecology 15
2.8 Emissions and Innovation 15
3. Implementation of Initiatives 16
Appendix 1 - Green Star Design and As-Builtv1.2 17
Appendix 2 — FirstRate 5 Assessment 22
Appendix 3 — STORM Assessment & WSUD Report 25
Objectives 25
Site Characteristics 25
Stormwater Management Initiatives 26
Stormwater Management Initiatives 27
Appendix 4 — Green Star VOC and Formaldehyde Limits 28
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy
Ref: 2064V2.doc Page 2 of 28
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
1. Introduction This Sustainability Management Plan has been prepared to assist the design, construction and operation of the proposed residential mixed use development at 411-421 Smith Street, Fitzroy to achieve a range of sustainable development objectives which have the potential to achieve 'Best Practice' in accordance with a benchmark of 4 Stars in the Green Star Design & As Built v1.2 rating tool.
MacCormack Associates Consultants has assessed the proposed development and provided input to the design team and this SMP captures initiatives necessary to ensure that the development meets the sustainability requirements of the City of Yarra, in particular Clauses 22.16 Stormwater Management and 22.17 Environmentally Sustainable Design.
1.1 City of Yarra Requirements
City of Yarra requires large projects within their municipality, to include as part of the town planning application, a Sustainability Management Plan (SMP). The SMP will need to set out how this project will meet sustainability targets in the areas of energy reduction, water use reduction and water sensitive urban design, indoor environment quality, materials selection, transportation, waste management, urban ecology and bicycle storage by achieving a preliminary design benchmark for 4 Star rating under the current version of Green Star Design and As-built rating tool.
In addition the project will be required to demonstrate the minimum performance objectives of Clause 58 of the planning scheme, of which particular emphasis is placed on energy efficiency and internal amenity of apartments and the overall stormwater management of the development.
1.2 ESD Assessment Tools
There are a number of calculators and modelling programs available in Victoria to assess proposed developments against benchmarks set by the Victorian government, local councils and the Building Code of Australia. Different tools are used to assess different aspects of the development including:
• Green Building Council of Australia's (GBCA) Green Star Design and As-Built v1.2 tool, which covers the overall sustainability of the development;
• Stormwater Treatment Objective — Relative Measure (STORM) calculator, which addresses stormwater quality considerations for the entire development; and
• FirstRate5, which covers the thermal efficiency of the building envelope.
All tools have minimum compliance requirements. STORM and FirstRate which have requirements that are mandatory for Victoria. Green Star is typically used to demonstrate how a level of compliance has been achieved to meet the typical planning requirements set by the City of Melbourne.
1.2.1 Green Star Design and As Built v.1.2 Benchmark
The Green Star Design & As-built tool was created by the Green Building Council of Australia (GBCA) to help assess and benchmark new developments against a thorough set of criteria, specifically designed to reward best practice and innovative sustainable design approaches. The tool includes nine (9) different elements which cover all areas of building design and some ongoing operation. These are:
Management Transport Land Use and Ecology
Indoor Environment Quality Water Emissions Energy Materials Innovation
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy
Ref: 2064V2.doc Page 3 of 2B
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
The levels of achievement in this tool are defined as: 4 star Green Star being "Best Practice", 5 star being "Australian Excellence", and 6 star being "World Leader". This project is aiming to achieve a "potential 4 star Green Star rating". The Smith Street development is not presently pursuing a certified rating through the Green Building Council of Australia (GBCA), but regardless, practices and initiatives identified within this report will be monitored and followed through to construction to ensure the building is not only designed to the "Best Practice" standard but will also be constructed that way. The results of the Green Star preliminary assessment can be found in Appendix 1 of this report.
1.2.2 FirstRate 5
The energy efficiency of the development's thermal envelope has been assessed using FirstRate 5, which is an energy modelling software program to rate dwellings on a 10-Star scale. The tool uses the AccuRate engine (as a nationally recognised energy benchmarking) to rate dwellings based on climate zone, materials used in a structure, positioning, orientation and building sealing. Higher scores are achieved primarily through better material selection, improvements in glazing, and insulation. It is noted that the 2016 BCA (Building Code of Australia) will apply to this development. A representative sample has been modelled to predict the average heating and cooling energy use of the development. The results of the FirstRate assessments can be found in Appendix 1 of this report.
1.2.3 Melbourne Water STORM Tool
Melbourne Water has developed the Stormwater Treatment Objective — Relative Measure (STORM) Calculator to simplify the analysis of stormwater treatment methods. This calculator is designed for the general public to be able to assess simple Water Sensitive Urban Design (WSUD) measures on their property and has been developed specifically for small residential and industrial developments. The STORM Calculator displays the amount of treatment that is required to meet best practice targets, using WSUD treatment measures. The tool is capable of calculating the performance of a range of commonly implemented treatment measures including, rainwater tanks, ponds, wetlands. rain gardens, infiltration systems, buffers and swales'. The result of the STORM assessment is included as Appendix 3.
I The STORM tool provides only the most basic of options for a typical detached urban development. For more information visit http://library.melbournewater.com.au/content/wsud/ustng STORM.pdt
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy
Ref: 2064V2.doc Page 4 of 28
ate Library V gclo
to 8 .ft "*. Vonatovi'm elbo:urxte
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
1.3 Site and Development Description
The site is located at 411-421 Smith Street, Fitzroy and is currently occupied by some red brick heritage buildings which are proposed to be retained in part to form the base of the new development. The site is located 2.5km north east of the Melbourne CBD. Occupants will have convenient access to amenities, workplaces, entertainment, recreational and other facilities.
Figure 1 Site location — 411-421 Smith Street. Fitzroy (Soz, t
The Development Summary is as follows:
Area Type3
x Basement levels 9 x Commercial + Residential levels
Levels
'..Thnolo Earth)
Inclusions
Parking
Retail
Commercial
Dwellings
76 x Car parks
2 x Disabled car parks
100 x Bicycle parks
Total 827m2
Total 1,098m2
14 x One-bedroom apartments 44x Two-bedroom apartments 5 x Three-bedroom apartments 4 x Double-storey apartments 4 x Townhouse
Total: 71 dwellings
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy Ref: 2064V2.doc Page 5 of 28
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
2. Sustainability Initiatives The following sections outline the initiatives which will be included in the development and implemented throughout the design and construction process. Initiatives that go towards meeting the Green Star (GS) benchmark have a GS Design and As-Built reference number next to them e.g. (1.0, 16.2). Other initiatives do not have this coding. These sections, as well as nominating the sustainability initiatives, also identify the party/parties responsible for implementation of the initiative, and the stage at which implementation will be demonstrated. The following are the broad project stages:
Design Development
•
•
Consultants develop conceptual design drawing to a detailed stage suitable as a basis for preparing working drawings - Integration of architectural, services, structure and site attributes Checking compliance with all statutory requirements, codes and standards Arranging special surveys or reports as required
2 Construction • Architectural and services drawing sets completed Documentation • All specialist reports completed
• All necessary planning and building consents obtained as required by authorities
3 Construction • All work carried out onsite — site preparation, construction, alteration, extension. demolition
• Purchase of all materials / certification • Evidence gathering from subcontractors • Commissioning
4 Post Occupancy • Operation and Maintenance • Education — Buildino Users Guides
2.1 Building Management
Initiatives included in management promote adoption of environmental initiatives at different stages of the project — not just in the project design stage.
ject
Implementation
Green Star Accredited Professional (GSAP) (1.0)
VI IC UI LI IC pi ujk.t J LAJI IJUILal ILJ VVIII lJe Cl 170/-V- . I I Iey VVIII ClUVIJe
through the design and construction phases of the project. COL/
Consultant LJeJly1 I
Development
Erwiremental Performance Targets (2.0) ,,, -.....::.....;ki„si.i,i.,..
Documented targets are set for the environmental performance of the building.
ESD
Consultant Design
Development
Services and Maintainability Review (2.1)
The person responsible for maintenance has reviewed the design at all stages with respect to access, ongoing maintenance and ongoing cleaning of building services and external building features.
Owner / Services
Engineer / Builder
Design Development
Building Commissioning (2.2)
Comprehensive pre-commissioning, commissioning and quality monitoring is contractually required and building knowledge transferred from the design team and contractor to building manager and staff.
Builder Commissioning
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street. Kew 3101 Australia
Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy
Ref: 2064V2.doc
Page 6 of 28
engineeringsolutions
Design Requirernen
Building Tuning (2.3)
Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
ResponsibitinPlir Project Stag
Implementation
All common area and commercial area services (lighting, lifts, mechanical, pumps etc) will be required to be monitored and tuned over a 1 year period following practical completion to ensure they run as designed.
Builder Post Occupancy
Building Information (4.1) taaamakeiam..._ The design includes a Building Management Guide that will be developed, and made available to the facilities management team, which describes systems/actions for the operation and maintenance of both building services and building fabric.
Builder / Services
Contractors Post Occupancy
The design includes a user-friendly Building User Guide that will be produced and provided to the residents and commercial tenants. The guide will include descriptions of systems installed in the building, sustainable transport in the area as well as sustainable building operation suggestions relevant to building users. This involves the preparation of information that integrates with existing resident information resources.
Architect / ESD
Consultant / Services
Consultant
Owner
Services Engineers
Construction Documentation
End of Life
Design Development
End of Life Waste Performance (5.2)
At least 80% of the projects GFA (excluding carparks) will have a commitment to reduce demolition waste at the end of life for the base building component.
Metering and Monitoring (6.1) _ .
The design includes an electronic metering systems that will be integrated into the building to monitor and report on energy and water consumption, and control the building services. Energy and water consumption are monitored and reported against set performance targets for the building.
Construction Environmental Management (7.0)
Environmental Management (Req.)
Construction Documentation
As part of the construction process the contractor will implement a project specific Best Practise Environmental Management Plan — this must be in line with NSW EMS Guidelines. This will be in place before starting works and throughout the construction process.
Builder
Formalised Environmental Management System (7.1)
The EMS created for the site will be certified by a third party organisation that provides compliance to ISO14001 Standards.
Builder Construction
Documentation
High Quality Staff Support (7.2)
The main contractor will be required to provide a work environment on site that promotes sustainable practices and
Builder Construction
Documentation
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 531 1 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy
Ref: 2064V2.doc
Page 7 of 28
Design Requiremen
Implementation
ned,:niv,:resFyIe rile 1:aryj
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
2.2 Indoor Environment Quality
Indoor Environment Quality (1E0) credits address initiatives which help to create a healthy indoor environment free from toxins with ample supply of daylight and outside air.
Implementation
Indoor Air Quality (9.0)
Provision of Outdoor Air (9.2)
All apartments are to oe proviaea wan access to °moor air via operable windows and doors to each habitable room.
The commercial tenancies will be provided with 50% more outdoor air than the minimum requirement of AS1668.2 (or CO2 monitoring and control will be provided to ensure that the CO, level in the tenancies remains below 800ppm).
Services Consultant
Design Development
Exhaust Riser or Elimination of Pollutants (9.3)
All kitchen exhausts will be directly discharged from the building with no recirculation component. This applies to commercial kitchens as well as residential kitchens.
Services Consultant
Design
Development
Acoustic Comfort (10.0)
Reverberation (10.2)
Reverberation time in areas will be below the maximum stated 'Recommended Reverberation Time' provided in Table 1 of AS/NZ 2107:2000.
Architect/ Acoustic & Mechanical Engineer
Design Development
Acoustic Separation (10.3)
The project will address noise transmission in enclosed spaces. Partitions between spaces will be constructed to achieve a weighted sound reduction index (R„,) of at least 45.
Architect/ Acoustic Engineer
Design Development
Lighting Comfort (11.0)
High frequency ballasts are to be installed in all luminaires. All lighting is designed to have a minimum Colour Rendering Index of 80 and complies with levels specified in Table 7.2 of AS 1680.1-2006.
Lighting Engineer
Construction Documentation
General Illuminance and Glare Control (11.1)
Best Practise lighting levels will be met and will be in line with AS 1680.1:2006.
Internal lights are to be fitted with baffles, louvers or diffusers to
Architect / Lighting Engineer
Design
Development
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 531 1 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street. Fitzroy
Ref: 2064V2.doc
Page 8 of 28
engineeringsolutions Mechanical, Flectrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
Design Requirements quipmentrilEMIllifilltg
Implementation
UUJCUIC ally ulieut ilytit SuuFce SU dS LO UM UUL yleIW.
Illuminance levels for the different space types in the development comply with the requirements of AS 1680.1:2006.
Surface Illuminance (11.2)
At least one wall in each living space, kitchen and bedrooms are provided with specific wall-washing or a wall mounted fittings. This can also include a rail light that can pivot to a wall or downlight that could pivot to shine on the wall.
In commercial tenancies, lighting will be provided by combination up/down lighting or the design will include lighting that accentuates the building fabric and creates interest.
Architect / Lighting Engineer
Design
Development
Visual Comfort (12.0)
Glare Reduction (12.0)
Blinds, with a visual light transmittances (VLT) of less than 10%, will be provided to all apartments and commercial tenancies.
Architect Design
Development
Daylight (12.1)
It is expected that at least 40% of the usable floor area of commercial tenancies and dwellings (combined across the development) will be provided with over 2% daylight factor.
Additionally, it is expected that the daylight amenity provided to apartments will meet the minimum standards typically set by Council, with all bedrooms likely to be provided with high quality daylight and most living zones provided with over 1% daylight factor.
Please see Daylight Modelling report for further information.
Architect Development
Design
Views (12.2)
At least 60% of areas will have a clear line-of-sight to a high quality external view.
Architect Design
Development
Indoor Pollutants (13.0)
Volatile Organic Compounds (13.1)
All paints, adhesives and sealants, flooring, and wall and ceiling coverings do not exceed limits outlined in Appendix 1.0. Alternatively, products will be selected with no VOCs.
Architect Construction
documentation
Formaldehyde Minimisation (13.2)
All engineered wood products have 'low' formaldehyde, certified as E0 or better. Alternatively, products are specified with no
ocumentation
Architect Construction
documentation
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy
Ref: 2064V2.doc
Page 9 of 28
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
2.3 Energy Efficiency
Implementation
I Greenhouse Gas Emissions (15.0) Greenhouse gas emissions for the development are reduced through effective lighting, HVAC design and appropriate building
Architect
fabric.
Energy modelling will been carried out prior to building approval to ensure that the building exceeds minimum energy efficiency requirements, set through the National Construction Code BCA 2016 (the BCA).
The development achieves an average cooling load of <30MJ/m 2
and thus satisfies Standard D6, clause 58.03-1 of the Victoria Particular Provisions. See Appendix 2 for details on how the building fabric achieves this standard.
Development Design
ESD / Services
Consultant
HVAC Systems (15.0B)
Services Consultant
Design Development
HVAC systems will be sized within 10% of the cooling load and meet a minimum of 3 star energy rating for the dwellings. Each system will be dedicated to only serve the room they are installed in.
Hot Water (15.0B)
A highly efficient central condensing gas boiler system will be installed in the development to provide all domestic hot water.
Services Consultant
Construction Documentation 1
Lighting (15.0B)
Energy consumption from artificial lighting in the development will be reduced by using LED lighting or energy efficient compact fluorescent lighting and by optimising the daylight diffusion.
The following lighting power densities will not be exceeded:
• Apartments — 4.0 W/m2; • Retail — 14W/m2 • Office — 7W/m2 • Car park and storage area — 4.0 W/m2; • Entry foyers — 10W/m2; and • Hallways/Corridor — 6W/m2.
Common area lighting control will be automated to ensure that the lights are only operated when necessary.
Electrical Engineer
Design Development
Variable Speed Drives (15.0B)
Variable speed drives will be provided on all major pumps and fans (e.g. Car park ventilation) Services
Consultant Construction
Documentation
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy Ref: 2064V2.doc Page 10 of 28
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
IlerSign Requirements
Implementation
Energy Efficient Lift (15.0B)
Lifts will be specified that include:
• Suspension specifically designed to reduce friction;
• Adjustable speed motors;
• Gearless or planet drive gears to reduce drive losses;
• Measures to specifically reduce stand-by consumption such as:
o Switching off control devices when the lift is not in motion & using more efficient power supply units (e.g. Switched units, transformers); and
o LED lights and displays.
Services Consultant
Construction Documentation
Car Park Ventilation (15.0B)
Car Park Ventilation will be designed to best practice energy efficiency with all exhaust fans being installed with CO sensors and variable speed drives so as to make sure they only operate when necessary.
Mechanical Engineer
Construction Documentation
Unoccupied Areas (15.0B)
Lighting in common areas will be controlled by time clocks, daylight and/or motion sensors. This will reduce the time that common area lighting is on whilst not required, thus reducing the energy consumption of this service.
Electrical Engineer
Construction Documentation
Building Sealing
All windows, doors, exhaust fans and pipe penetrations will be constructed to minimise air leakage as required by the provisions outlined in Section J3 of the 2016 BCA. This will include the use of seals around operable windows and doors as well as caulking to pipe penetrations, and the addition of self-closing louvers or dampers to exhaust fans.
Architect Design
Development
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 531 1 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy
Ref: 2064V2.doc Page 11 of 28
Architect Design
Development
The proposed development is located close to a lot of shops, services and entertainment options. The development achieves a 'Walk Score' of 97/100. For more information see www.walkscore.com.au.
Inherent in Location
♦ 4
• a -a- rl ■
LI
Icebar Melbourne J., II
ti) u
RI 7 - YI - 71
" 11 .0, Ift TI .0, .0.- r1
es T'll
T r 6
I I
4 L U
0
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
2.4 Transport
The development is located on Smith Street, Fitzroy; which includes a variety of commercial and retail uses. Occupants of the development will have access to a number of coffee shops, grocery stores, restaurants, and schools, as well as easy access to local tram network.
Implementation
Access by Public Transport (17B.1)
The site is located on Smith Street with a tram stop on the 86 line which is a major line into the city and towards the north of Melbourne.
Inherent in Location
Low Emission Vehicle Infrastructure (17B.3)
At least 5% of parking will be supplied with a GPO for electric vehicles with charging capability. Architect
Design Development
Active Transport Facilities (17B.4)
One secure bicycle space per apartment has been provided for residents, which are located throughout the basement levels.
19 secure bicycle spaces have been provided for staff numbers of the commercial tenancies, along with a small change area that has lockers and showers suitable for the number of staff.
10 bicycle spaces that are located in a secure room on the ground level have been supplied for visitors.
Walkable Neighbourhoods (17B.5)
Figure 2: 411-421 Smith Street - Access to local amenities (Source: Walkscore) MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy
Ref: 2064V2.doc Page 12 of 28
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
2.5 Water Efficiency
Water will be used efficiently in the development through installation of efficient fixtures and fittings, and via collection and reuse of rainwater which helps to reduce mains water requirements and diverts stormwater from drains during rainfall events.
Respallinir
Implementation
Project S
Sanitary Fixture Efficiency (18A.1) AIM_
The development will include efficient fittings and fixtures to reduce the volume of mains water used in the dwelling. The following Water Efficiency Labelling Scheme (WELS) star ratings will be specified:
• Toilets — 4 Star;
• Taps (bathroom and kitchen) — 5 Star;
• Showerheads — 3 Star (less than 7.5 Umin); and
• Dishwashers — minimum 5 star.
Architect / Services
Consultant
Construction Documentation
Rainwater Collection & Reuse (18A.1, STORM requirement)
A minimum of 1,100m2 of roof/terrace area of the development will be designed to collect rainwater for re-use in toilet flushing and irrigation (see Appendix 3). The development will be provided with rainwater tank(s) with an effective storage of 33,000L connected to all commercial tenancy toilets (as a minimum) as well as the irrigation network and bin wash down. Harvested rainwater will be directed through a filtration system prior to being stored, given the capture off some trafficable surfaces.
Services Consultant
Design
Development
Heat Rejection Water (18A.1)
No water based heat rejection systems will be provided for the apartments or commercial tenancies in the development.
Services Consultant
Design Development
Landscape Irrigation (18A.1)
Drought tolerant landscaping is to be installed in accordance with Xeriscape principles and coarse mulch is to be used to improve infiltration and reduce water requirements. Irrigation (if provided) will be via a subsurface drip irrigation system with moisture sensor.
Landscape Contractor
Construction Documentation
Fire System Water (18A.1)
The fire system either does not expel water for testing or the fire system includes temporary storage for 80% of the routine fire protection system test water and maintenance drain-downs for reuse on site (irrigation or other). Installed sprinkler systems are fitted with isolation valves for floor-by-floor testing. This will save thousands of litres of potable water each year.
Fire Consultant
Design Development
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy
Ref: 2064V2.doc
Page 13 of 28
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
2.6 Building Materials and Waste Management
Materials initiatives help to reduce the use of virgin materials, reduce waste, and promote the use of materials with lower embodied energy and environmental impacts.
Operational Waste (8.0) Recycling Waste Facilities (8B) The development will be provided with a dedicated space for bulk waste storage of minimum 2m3 on site. The space will store both recycling and general waste and there will be a clear distinction between the two streams as indicated by signage and colour coding. The space will be located on the basement floor in proximity to the lift to be easily accessed by all building occupants.
Commercial waste and recycling will also be adequately serviced by separate waste rooms (or a clear delineation between residential and commercial waste will be made in the waste room).
A separate Waste Management Plan will be prepared for the project in line with City of Yarra's current guidelines.
Architect Design
Development
Life Cycle Impacts (19.0)
Concrete (19B.1.3)
A minimum of 50% of the concrete mix will contain recycled water (rainwater or purchased recycled water) and at least 40% of coarse aggregate is crushed slag or another alternative material, or 25% of fine aggregate (sand) is recycled or manufactured sand (not virgin sand from a quarry).
Structural Engineer/
Builder Construction
Steel (19B.2B)
The project team will be required to demonstrate a 5% reduction in the mass of reinforcing steel used in the building when compared to standard practice.
Builder Construction
Building Reuse (19B.3.1)
Approximately 42-45% of the existing façade for the building on site will be retained within the proposed building. This is deemed to be the largest amount that can logistically be retained and will result in a significant reduction of new building materials.
Architect Design
Development
Responsible Building Materials (20.0)
Structure and Reinforcing Steel (20.1)
At least 95% of all steel used in the building's structure is sourced from an environmentally Responsible Steel Maker (with IS014001 Certification and WSO CAP Certification).
Builder Construction
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 531 1 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street. Fitzroy Ref: 2064V2.doc Page 14 of 28
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
ign ReMments
ementation Additionally, at least 60% of the steel reinforcing (by mass) will be produced by energy reducing processes (such as PIT). This applies to all reinforcing bar and mesh.
Timber (20.2)
All timber used in the development is Forest Stewardship Council (FSC) or Program for the Endorsement of Forest Certification (PEFC) certified, or recycled / reused.
Builder Construction
Cables, Pipes, Floors and Blinds (20.3)
At least 90% of all cable, pipe, floor and blind products installed in the building (by cost) does not contain PVC or complies with the Best Practice Guidelines for PVC in the Built Environment by being procured from a manufacturer with an IS014001 certified EMS for manufacturing processes.
Builder Construction
Construction and Demolition Waste (22B)
90% of the waste generated during construction and demolition will be diverted from landfill.
Architect Construction
Documentation
2.7 Land Use and Ecology
1111111lPIIIIIIIIIMImplementation
Re-use of Land (24.1) The land has been previously built on; therefore there is no degradation of environmental attributes due to the development of the site.
Inherent in Location
2.8 Emissions and Innovation
Stormwater Discharge Reduction (26.1, 26.2) Stormwater discharged from the site does not exceed the pre-development peak event discharge through the inclusion of a 33,000L rainwater tank for use in the flushing of toilets, irrigation and bin wash down (previously all stormwater was discharged directly off site with no treatment).
The stormwater management initiatives also allow the development to achieve pollution reduction targets as set out in the Best Practice Environmental Management Guidelines. Please refer to Appendix 2 for details of how the development meets the Melbourne Water STORM tool, which aligns with a minimum 45% reduction in total nitrogen leaving the site.
Hydraulics / Civil
Consultant
Design Development
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy Ref: 2064V2.doc Page 15 of 28
Legionella (28.0)
There are no water-based heat rejection systems serving the Smith Street development.
Services Construction Consultants Documentation
Insolent ODP
All thermal insulants in the development will be specified to avoid the use of ozone-depleting substances in both their manufacture and composition.
Architect / Services
Consultants
Construction Documentation
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
Design ReqtAnffitrits
Implementation
Light Pollution (27.0, 27.1)
External luminaires will be specified to have an upwara light output ratio lower than 5%. The lighting design will comply with AS 4282 'Control of the Obtrusive Effect of Outdoor Lighting'.
Services Consultants
Construction Documentation
3. Implementation of Initiatives The proposed development will have the preliminary design potential to meet the City of Yarra's 'Best Practice' requirements through a number of initiatives such as the superior performance of the building's thermal envelope, reductions in greenhouse gas emissions through the use of efficient air conditioners and lighting, as well as reduced environmental impact during the construction stage through the specification of environmentally preferred materials and a construction team that works in accordance with a construction EMP that is tailored to the site and the project.
The initiatives that have been included within this ESD statement are all initiatives that have a proven track record to serve their individual purpose and can be easily maintained with any failures obvious to the occupants of the development. This helps to ensure the ongoing sustainability of the development as the systems installed in the beginning are maintained for purpose throughout the life of the dwellings.
With appropriate implementation, management, monitoring and maintenance the initiatives outlined within this ESD statement will serve to provide the residents with lower running costs, as well as benefit the environment.
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor. 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy Ref: 2064V2.doc Page 16 of 28
100 45.1
Sustainability Management Plan 411-421 Smith Street, Fitzroy Ref: 2064V2.doc Page 17 of 28
Operational Waste Prescriptive Pathway
8B Prescriptive Pathway - Facilities
Total 14 10
Core Points Total Snore Mailable Targeted
anagement
To recognise the appointment and active involvement of a Green Star Accredited Professional in order to ensure that the rating tool is applied effectively and as intended
Commissioning and To encourage and recognise commissioning. handover
Tuning and tuning initiatives that ensure all building services operate to their full potential
To encourage and recognise projects that are resilient to Adaptation and Resilience
the impacts of a changing climate and natural disasters.
To recognise the development and provision of building information that facilitates understanding of a building's
Building Information systems. operation and maintenance requirements, and environmental targets to enable the optimised performance
To recognise practices that encourage building owners, Commitment to building occupants and facilities management teams to set Performance targets and monitor environmental performance in a
collaborative way.
Metering and Monitoring To recognise the implementation of effective energy and water metering and monitoring systems
To reward projects that use best practice formal environmental management procedures during construction.
14
1.0 Accredited Professional
20 Environmental Performance Targets Complies
2.1 Services and Maintainability Review
2.2 Building Commissioning
2.3 Building Systems Tuning
2 4 Independent Commissioning Agent
3.1 Implementation of a Climate Adaptation Plan 2
4 1 Building Information
5.1 Environmental Building Performance
5.2 End of Life Waste Performance
60 Metering Compiles
6.1 Monitoring Systems
7 0 Environmental Management Plan Compiles
7 1 Formalised Environmental Management System
7 2 High Quality Staff Support
Responsible Building Practices
Green Star Accredited rItJ1Wbbill11,11
Project: 411-421 Smith Street, Fitzroy
Targeted Rating: 4 Star - Best Practice
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
Appendix 1 - Green Star Design and As-Builtv1.2
Green Star - Design & As Built Scorecard
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
Indoor Environment Quality
9 1 Ventilation System Attributes
Indoor Air Quality To recognise projects that provide high air quality to occupants 9.2 Provision of Outdoor Air 2
9.3 Exhaust or Elimination of Pollutants
10.1 Internal Noise Levels
To reward projects that provide appropriate and comfortable acoustic conditions for occupants.
Acoustic Comfort 10.2 Reverberation
10.3 Acoustic Separation
11.0 Minimum Lighting Comfort Complies
11.1 General Illuminance and Glare Reduction
Lighting Comfort To encourage and recognise well-lit spaces that provide a high degree of comfort to users.
Potable Water Performance Pathway
11.2 Surface Illuminance
11 3 Localised Lighting Control
12 0 Glare Reduction - Complies
Visual Comfort To recognise the delivery of well-lit spaces that provide high levels of visual comfort to building occupants.
12.1 Daylight 2
12.2 Views
13.1 Paints, Adhesives. Sealants and Carpets
;Indoor Pollutants To recognise projects that safeguard occupant health through the reduction in internal air pollutant levels
13.2 Engineered Wood Products H 14.1 Thermal Comfort
Thermal Comfort To encourage and recognise projects that achieve high levels of thermal comfort
14.2 Advanced Thermal Comfort
Total
17 10
Water 12
113A 1 Potable Water - Performance Pathway 12
Total
12 5
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy Ref: 2064V2.doc Page 18 of 28
•
16A Presentative Pathway - On-see Energy Generation Peak Electricity Demand Reduction
Prescnptive Pathway
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
:nergy 22
Greenhouse Gas
Emissions B NatHERS Pathway 1513 0 Conditional Requirement NatHERS Pathway Complies
158.1 NatHERS Pathway 16
olal 17 41
10
17B 1 Access by Public Transport 3 1
178.2 Reduced Car Parking PProvision 1
178 3 Low Emission Vehicle Infrastructure 1 1
178 4 Aces,* Transport Eaukhes 1
178.5 Walkable Neighbourhoods 1 1
4
Sustainable Transport
Irescnpbve Pathway
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected],au www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy
Ref: 2064V2.doc Page 19 of 28
engineering solutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
Materials
3 1981 Concrete
Lute Cycle Impacts Prescriptive Pathway . Life Cycle Impacts
198.2 Steel 1
198.3 Building Reuse 4
198.4 Structural Timber 4
20.1 Structural and Reinforcing Steel
Responsible Building To reward projects that include materials Mal are Materials responsibly sourced or have a sustainable supply chain.
20.2 Timber Products
203 Permanent Formwork. Pipes. Flooring. Blinds and
• Cables
Sustainable Products To encourage sustainability and transparency in product specification
21.1 Product Transparency and Sustainabarty 3
Construction and Demolition Waste
Percentage Benchmark
228 Percentage Benchmark
Total
Land Use & Ecology
23.0 Endangered. Threatened or Vulnerable Species
Ecological Value To reward projects that improve the ecological value of then site
211 Ecological Value 3
24.0 Conditional Requirement
To reward projects that choose to develop sites that have Sustainable Sites limited ecological value. re-use previously developed land
and remedate contaminate land 24.1 Reuse of Land
24.2 Contamination and Hazardous Materials
Heat Island Effect To encourage and recognise projects that reduce the contribution of the project site to the heat island effect
25.0 Heat island Effect Reduction
Total
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy
Ref: 2064V2.doc Page 20 of 28
Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
Sustainability Management Plan 411-421 Smith Street, Fitzroy Ref: 2064V2.doc Page 21 of 28
Total 10 0
Light Pollution To reward projects that minimise light pollution.
Refrigerant Impacts To encourage operational practices that minimise the environmental impacts of refrigeration equipment.
Global SustainabIllty
Project leans may adopt an approved credit from a Global Green Building Rating tool that addresses a sustainability issue that is currently outside the scope of this Green Star
26.1 Stormwater Peak Discharge
26.2 Stormwater Pollution Targets 1 1
27.0 Light Pollution to Neighbouring Bodies Complies
27.1 Light Pollution to Night Sky
28.0 Legionella Impacts from Cooling Systems
29.0 Refrigerants Impacts
5
10
30A Innovative Technology or Process
308 Market Transformation
30C Improving on Green Star Benchmarks 10
300 Innovation Challenge
30E Global Sustainability
Stormwater
To recognise projects that implement systems to minimise Microbial Control the impacts associated with harmful nicrobes in building
systems.
Total
Innovation
The project meets the aims of an existing credit using a Innovative Technology or technology or process that is considered innovative in Process Australia or the world.
The project has undertaken a sustainability initiative that
Market Transformation substantially contributes to the broader market transformation towards sustainable development in
The project has achieved full points in a Green Star credit Improving on Green Star and demonstrates a substantial improvement on the Benchmarks benchmark required to achieve full points.
Where the project addresses an sustainability issue not Innovation Challenge included within any of the Credits in the vesting Green Star
rating tools.
To reward projects that minimise peak stormwater flows and reduce pollutants entering public sewer infrastructure.
Emissions
TOTALS
CORE POINTS
CATEGORY PERCENTAGE SCORE
INNOVATION POINTS
TOTAL SCORE TARGETED
AVAILABLE TARGETED
100
10
45.1
45.1
0.0
45.1
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
•
•
engineeringsolutions
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
Appendix 2 - FirstRate 5 Assessment The FirstRate energy rating program is the primary modelling method used in Victoria to indicate the required energy for heating and cooling based on the building's thermal envelope. It does not take into account any heating or cooling systems installed; it only assesses walls, roof and floor materials; levels of insulation, building orientation, glazing and the area layout. The proposed development at 411-421 Smith Street, Fitzroy is located in Climate Zone 21 (Melbourne) and is required by the Building Code of Australia (BCA) to achieve an average rating of 6 Stars (114MJ/m2), with no dwelling rating lower than 5 stars. In addition an average score of 6.5 stars is required meet the minimum performance requirements of the Green Star tool. Additionally, Clause 58.03-1 Energy Efficiency requires that apartments have a cooling load of below 30MJ/m2 in this climate zone.
Table 1: The following are the scores achieved by the sample units in the development.
Apt
Star Rating
No. Thermally
similar Accrued Rating
Energy Use (MJ/m2)
Heating Energy (MJ/m2)
Cooling Energy (MJ/m2)
T4 7.3 4 29.2 73.9 61.1 12.9
T5 5.6 4 22.4 126.5 97.1 29.4
307 6.1 6 36.6 111 83.4 27.6
404 6.6 7 46.2 95.3 77.6 17.7
509 5.6 7 39.2 129.2 104.2 25.0
511 5.8 6 34.8 121.2 91.7 29.5
602 7.5 7 53.2 65.3 46.8 18.4
606 6 46.8 60.8 52.9 7.9
701 6.4. 6 38.4 102.4 74.2 28.2
704 6.2 6 37.2 106.8 79.0 27.8
804 7.4 6 44.4 70.9 52.8 18.1
902 7.5 2 15.0 67.3 45.7 21.6
903 6.5 2 13.0 97.8 72.1 25.7
1003 6.3 2 12.6 104.8 78.1 26.7
Weighted Average 6.6 94.6 72.6 22.0
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy Ref: 2064V2.doc Page 22 of 28
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
The sample ratin•s have been com•leted with the followin inputs:
Building Fabric Element Description External Walls All external walls require an additional R1.7 insulation to be added.
Some options include:
• Bradford Acoustigard Partition Rolls (75mm)
• Fletcher Pink Partition Insulation (75mm)
Insulation material with minimum 20% (up to 80%) recycled material content will be selected. The options recommended above go beyond this requirement.
Party walls are assumed as double stud walls with R3.4 acoustic insulation (R1.7 acoustic insulation to each side) or concrete walls with R1.7 acoustic insulation
Party Walls
Internal walls will not require additional insulation. Internal Walls
Floor Coverings Floor coverings are assumed as carpet for bedrooms and tiles for bathrooms / ensuite. Tiles have been assumed for the living room and kitchen areas for the western apartments and floating timber for all remaining apartments.
Sustainability Management Plan 411-421 Smith Street, Fitzroy Ref: 2064V2.doc Page 23 of 28
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
Floors Floors are assumed as suspended concrete slab. An additional R1.2 insulation is to be added when the floor is located above car park or open space.
Roofs are assumed as concrete slab. Where located below a terrace/unconditioned space and additional R2.5 insulation will be required. The top roof will require an additional R5.0 insulation to be added.
Some options include:
• CSR Bradford Gold Ceiling Batts (R5.0)
• Knauff Earthwool Ceiling Batts (R5.0)
All windows and glazed doors are required to meet the following glazing specifications (glass and frame combined). The SHGCs of the selected glazing system must be within ±5% of the modelled values. The U-values of the selected glazing must not exceed the modelled values.
Apartments T4, 404, 509, 606, 804, 902, 903 and all similar designs
Window Type Specifications
Example Glass Type U Value SHGC
Fixed windows & Sliding Doors
3.1 0.49 Double Glazed
Thermally broken frames Low-e Clear
65% VLT Awning Windows & Hinged Doors
3.1 0.39
Roof Insulation
Windows and Glazing
**Assumed to be full height
•
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
Building Fabric Element
Description
Apartments 307, 704, 1003 and all similar designs
Window Type Specifications
Example Glass Type U Value SHGC
Fixed windows &
Sliding Doors 3.4 0.40 Saint-Gobain
Cool-Lite SKN 176 II
Double glazing (6/16/6)
70% VLT
Awning Windows &
Hinged Doors 3.4 0.32
Apartments T5, 511, 701 and all similar designs
Window Type Specifications
Example Glass Type U Value SHGC
Fixed windows 2.62 0.23 Saint-Gobain
Cool-Lite SKN 154/154 II
Double Glazing (6/16/6)
52% VLT
Sliding Doors 3.11 0.22
Awning Windows 4.61 0.24
Building Sealing All doors, windows, exhaust fans and openings will be sealed so as to not allow for air infiltration into the units.
Downlights All recessed down light fittings that have openings allowing air to pass through to a ceiling cavity (e.g. Adjustable down lights) shall be fitted with a cover that allows for ceiling insulation to closely enclose the sides and top of the down light.
Note: The above building elements may vary as the plans are refined for building approval, however the overall building energy rating performance will not be less than 6.6 Stars (average) in order meet the Green Star requirement.
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy Ref: 2064V2.doc Page 24 of 28
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
Appendix 3 — STORM Assessment & WSUD Report
Objectives
Part of this SMP includes addressing how the proposed development responds to the principles and requirements of Water Sensitive Urban Design (WSUD). The main objectives for WSUD aim to:
• Promote the use of water sensitive urban design, including stormwater re-use. • Mitigate the detrimental effect of development on downstream waterways, by the application
of best practice stormwater management through water sensitive urban design for new development.
• Minimise peak stormwater flows and stormwater pollutants to improve the health of water bodies, including creeks, rivers and bays.
• Reintegrate urban water into the landscape.
To achieve these objectives, new developments must comply with the best practice performance targets for suspended solids, total phosphorous and total nitrogen, as set out in the Urban Stormwater Best Practice Environmental Management Guidelines, Victoria Stormwater Committee 1999. Currently, these water quality performance targets require:
• Suspended Solids - 80% retention of typical urban annual load. • Total Nitrogen - 45% retention of typical urban annual load. • Total Phosphorus - 45% retention of typical urban annual load. • Litter - 70% reduction of typical urban annual load.
New developments must also incorporate treatment measures that improve the quality of water and reduce flow of water discharged into waterways (such as collection and reuse of rainwater/stormwater on site), and encourage the use of measures to prevent litter being carried off-site in stormwater flows. The proposed development has addressed these requirements by identifying the impervious surfaces within the site and implementing treatments to mitigate the impacts of stormwater leaving the site. To assess these initiatives, the STORM tool — which is an industry accepted tool — was used to score these initiatives.
The above requirements align with the Yarra City Council planning policy 22.16 Stormwater Management.
Site Characteristics
For the purposes of the stormwater assessment, the building has been delineated into basic surface types listed below:
• Site area of 1,820m2; • Minimum of 1,100m2 of roof/terrace area comprised of the roof top area and terraces
below will be designed to divert rainwater runoff to rainwater tank(s) on site; • 720m2 of the Remaining site is untreated; • A rainwater tank for the development, with a total effective capacity of 33,000L. The
stored rainwater will be connected to all commercial tenancy toilets on lower levels as a minimum. The stored rainwater will also be used for any irrigation and bin wash-down.
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy
Ref: 2064V2.doc Page 25 of 28
engineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
Stormwater Management Initiatives
Stormwater treatment initiatives will need to be implemented within the development as a means of achieving best practice performance objectives set by the City of Yarra. The following section presents the impervious surfaces that have been identified for treatment, and the required treatment. The initiatives to manage stormwater flows for the building area will underpin the overall performance of the building and its ability to meet stormwater management objectives.
Table 2: List of impervious areas and their stormwater treatment measures.
Impervious Surface Topographic Area m2
Required Treatment
e 1,100m2 Runoff to be diverted to rainwater tank(s) with an
effective storage capacity of 33,000L. The stored rainwater will be connected to all toilets serving the commercial tenancies (as a minimum). The stored rainwater will also be used for any irrigation and bin wash-down. The harvested rainwater will be diverted through a filtration system prior to being stored in the tank(s) given some of the capture area is trafficable.
720m2 Runoff is discharged directly into stormwater drainage system.
Results:
The impervious surfaces and recommended treatments have been applied to the STORM tool and as a result, the proposed development has achieved a score of 103%. With the proposed stormwater treatment measures incorporated into the development at 411-421 Smith Street, Fitzroy; the design will meet the minimum performance standards required by the City of Yarra.
EN Melbourne STORM Rating Report Eli Water TransactionlD:
Municipality:
Rainfall Station:
Address:
Assessor
Development Type.
Allotment Site (m2):
STORM Rating %:
Description
661760
YARRA
YARRA
421 Smith St
Fitzroy
VIC
MAC
Residential - Mixed Use
1.820.00
103
Impervious Area Treatment Type (m2)
Treatment Area/Volume
(m2 or L)
Occupants , Number Of Bedrooms
Treatment % Tank Water Supply
Reliability (%)
Roof and Balconies 1.100.00 Rainwater Tank 33.000.00 100 170.00 82.00
Remainder of Site 720.00 None 0.00 0 0.00 0.00
Figure 3: Results of the STORM assessment for the project.
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street. Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy
Ref: 2064V2.doc Page 26 of 28
engineering solutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
Stormwater Management Initiatives
Treatment - Various
Stormwater management in the construction stage will include measures which will be put in place to minimise the likelihood of contaminating stormwater discharge from the site as well as reduce the velocity of the flows generated from the building as it is being constructed. This will mean ensuring buffer strips are in place, and the site will be kept clean from any loose rubbish. More information is available from "Keeping Our Stormwater Clean — A Builder's Guide" by Melbourne Water2. The diagram below is an illustration of the various objectives which assist in minimising the impacts of stormwater runoff typical during the construction phase. Typical pollutants that are generated from a construction site during a rainfall event include:
• Dust • Silt • Mud • Gravel • Stockpiled materials • Spills/oils • Debris/litter
To reduce the impacts and minimise the generation of these pollutants the following measures are proposed. The symbols embedded within each image are typically used for Construction Environmental Management Plans.
Gravel Sausage filters — to be placed at the entrance of pits/side stormwater inlets. These permeable sacks will filter the suspended soils and sediments and any other litter carried by the stormwater to prevent the pollutants entering the system.
Silt Fences Under Grates - Silt fence material may be placed under the grate of surface-entry inlets to prevent sediment from entering the stormwater system
Temporary Rumble Grids — these are designed to open the tread on tires and vibrate mud and dirt off the vehicle (in particular the chassis). This will heavily minimise the amount of soil/dirt deposited on local streets where it can be washed (by rainfall or other means) into the stormwater drains.
= For copies please contact Melbourne Water on 131 722. MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street, Fitzroy
Ref: 2064V2.doc Page 27 of 28
enqineeringsolutions Mechanical, Electrical, Hydraulic, Fire Sprinkler, Lift, Sustainability
Appendix 4 — Green Star VOC and Formaldehyde Limits
Table 3 - Maximum Volatile Organic Compound Levels for construction materials. (Source: Green Building Council Australia — Green Star Design and AS Building v1.2 2017 Manual)
Product Type/Sub Category Max TVOC Content (g/L of ready-to-use-
product) Paints, Adhesives and Sealants
General purpose adhesives and sealants 50
Interior wall and ceiling paint, all sheen levels 16
Trim, varnishes and wood stains 75
Primers, sealers and prep coats 65
One and two pack performance coatings for floors 140
Acoustic sealants. architectural sealant, waterproofing 250
membranes and sealant, fire retardant sealants and adhesives Structural glazing adhesive. wood flooring and laminate
100 adhesives and sealants
Carpets
Total VOC limit
4- PC (4- Phenylcyclohexene)
ISO 16000 / EN 13419 - TVOC at three days
ISO 10580 / ISO/TC 219 (Document N238) - TVOC at 24 hours
0.5 mg/m2 per hour
0.05mg/m2 per hour
0.5 mg/m2 per hour
0.5 mg/m2 per hour
Table 4 - Maximum Formaldehyde levels for processed wood products. (Source: Green Building Council Australia — Green Star Design and As Built v1.2 2017 Manual)
Formaldehyde emission limit values for different testing methods
Test Method
ASINZS 2269:2004, testing procedure AS/NZS 2098.11:2005 method 10 for Plywood
ASINZS 1859.1:2004 - Particle Board, with use of testing procedure AS/NZS 4266.16:2004 method 16 ASINZS 1859.2:2004 - MDF. with use of testing procedure ASINZS 4266.16:2004 method 16 AS/NZS 4357.4 - Laminated Veneer Lumber (LVL)
Japanese Agricultural Standard MAFF Notification No.701 Appendix Clause 3 (11) -LVL JIS A 5908:2003- Particle Board and Plywood. with use of testing procedure JIS A 1460 JIS A 5905:2003 - MDF. with use of testing procedure JIS A 1460
Emission Limit/ Unit of Measurement
51mg/ L
51.5 mg/L
51mg/ L
51mg/ L
51mg/ L
51mg/ L
51mg/ L
JIS A1901 (not applicable to Plywood, applicable to high pressure laminates and compact laminates)
ASTM D5116 (applicable to high pressure laminates and compact laminates)
ISO 16000 part 9. 10 and 11 (also known as EN 13419). applicable to high pressure laminates and compact laminates ASTM D6007
ASTM E1333
EN 717-1 (also known as DIN EN 717-1)
EN 717-2 (also known as DIN EN 717-2)
50.1 mg/m2hr
50.1 mg/m2hr (at 3 days)
50.12mg/m'
50.12mg/m'
50.12mg/m'
53.5mg/mThr
MacCormack Associates Consultants Pty. Ltd. ABN 79 978 772 380 1st Floor, 276 High Street, Kew 3101 Australia Telephone +61 3 9853 5311 Email [email protected] www.maccormack.com.au
Sustainability Management Plan 411-421 Smith Street. Fitzroy
Ref: 2064V2.doc Page 28 of 28