1276
Sou
th 8
20 E
ast,
Suite
100
Amer
ican
Fork
, UT
840
03T
801
756-
0309
F
801
756-
0481
Gen
eral
s.dw
gP
:\U
T\N
orth
ern\
Log
an C
ity
Spe
cial
Ser
vice
s\L
ogan
Cit
y C
ente
r St
reet
Bri
dge\
Dra
win
gs\D
esig
n D
raw
ings
LA
YO
UT
: In
dex−
Not
esNU.0
064
Sep
tembe
r 13
, 2019
Issued For
Bidding
Plot Date: 9/13/2019
GENERAL NOTES
STANDARDS AND SPECIFICATIONS
1. ALL CONSTRUCTION SHALL MEET CITY OF LOGAN STANDARDS AND SPECIFICATIONS (APWA 2017, ASAMENDED BY LOGAN CITY AS OF DATE APPROVED FOR CONSTRUCTION BY ENGINEER). STANDARDSAND SPECIFICATIONS CAN BE VIEWED AND PRINTED AT:HTTP://WWW.LOGANUTAH.ORG/GOVERNMENT/DEPARTMENTS/PUBLIC_WORKS/ENGINEERING/ENGINEERING_DOCS.PHP
2. ANY AMBIGUITIES OR CONFLICTS IDENTIFIED BY THE CONTRACTOR, CONTRACTOR'S REPRESENTATIVE,ENGINEER, OR ENGINEER'S REPRESENTATIVE SHALL BE IDENTIFIED TO THE ENGINEER IMMEDIATELY.THESE SHALL BE RESOLVED AT NO ADDITIONAL COST TO THE CITY BASED ON THE FOLLOWING ORDEROF PRECEDENCE ( PER APWA 2007 SECTION 00 72 00, PART 3, SECTION 3.3) EXCEPT AS NOTED HEREIN:
2.1. CONTRACT FOR CONSTRUCTION (FROM BID DOCUMENTS)2.2. MODIFICATIONS, ADDENDUMS, OR CHANGE ORDERS SHALL TAKE PRECEDENCE OVER ALL
PREVIOUS MODIFICATIONS, ADDENDUMS, OR CHANGE ORDERS.2.3. APWA 2007 GENERAL CONDITIONS SECTION 00 72 00 AS AMENDED BY LOGAN CITY2.4. SPECIAL OR SUPPLEMENTAL SPECIFICATIONS2.5. PLANS (DRAWINGS)
2.5.1. WRITTEN DIMENSIONS OVER MEASURED DIMENSIONS2.5.2. SPECIAL DETAILS OVER PLANS AND PROFILES EXCEPT THAT LOGAN CITY STANDARD DETAILS
SHALL TAKE PRECEDENT OVER CONSTRUCTION DETAILS UNLESS STATED OTHERWISE BY CITYENGINEER.
2.6. STORM WATER POLLUTION PREVENTION PLAN AND OTHER PERMITS2.7. LOGAN CITY AMENDMENTS TO APWA 2007 STANDARD DRAWINGS2.9. LOGAN CITY AMENDMENTS TO APWA 2007 STANDARD SPECIFICATIONS2.10. APWA 2017 STANDARD DRAWINGS2.11. APWA 2017 STANDARD SPECIFICATIONS
3. CONTRACTOR IS SOLELY RESPONSIBLE TO REVIEW AND FULLY UNDERSTAND THE PLANS DURINGBIDDING. DEVIATIONS OR DISCREPANCIES ARE TO BE IDENTIFIED DURING BIDDING IF AND WHENIDENTIFIED.
SAFETY IN THE WORK ZONE
1. ALL PERSONNEL ARE REQUIRED TO WEAR HARD-HATS AND STEEL TOE BOOTS WITHIN THE WORK ZONE.ADDITIONAL SAFETY TO INCLUDE WORKING UNDER BRIDGE AND IN WATER.
2. ORANGE OR FLORESCENT YELLOW VESTS OR CLOTHING SHALL BE WORN WHILE WORKING ON THISPROJECT COMPLIANT WITH THE FOLLOWING:
2.1. CLASS 3 WHILE WORKING AT NIGHT WITHIN UDOT RIGHT-OF-WAY OR WHERE VEHICLE VELOCITIESMAY EXCEED 50 MPH.
2.2. CLASS 2 WHILE WORKING WITHIN LOGAN CITY RIGHT-OF-WAY AND WHERE VEHICLE VELOCITIESARE LESS THAN 50 MPH.
3. ALL EXCAVATION SHALL BE IN COMPLIANCE WITH OSHA 29 CFS, PART 1926. ALL SOILS SHALL BECONSIDERED TYPE C WHILE PREPARING TRENCH SHORING CALCULATIONS UNLESS GEOTECHNICALREPORT SPECIFIES A TYPE D.
4. CONFORM TO ALL OTHER APPLICABLE OSHA RULES AND REGULATIONS WHILE WORKING ON THISPROJECT.
EXISTING UTILITIES
1. UTILITY LOCATIONS SHOWN ON THE PLANS ARE APPROXIMATE ONLY.2. CONTRACTOR SHALL FIELD VERIFY ALL UTILITY LOCATIONS BY CONTACTING BLUE STAKES AT
1-800-662-4111 OR 811 AND OTHER APPLICABLE UTILITIES PRIOR TO EXCAVATION.3. UTILITY CONTACTS ARE AS FOLLOWS:
3.1. WATER AND SANITARY SEWER: CAMERON DRANEY (435) 716-9622 OR KASEY ERICKSON (435)994-0316.
3.2. STORM WATER: JED AL-IMARI (435) 881-4327 OR SHAWN HANSEN (435) 994-0526.3.3. LOGAN CITY LIGHT AND POWER: STEVE CROSBY (435) 716-9745 OR (435) 757-8530.3.4. COMCAST: ALEX VASQUEZ (801) 245-53143.5. CENTURY LINK: PAUL HIGBY (435) 232-39163.6. QUESTAR: NICK WHITE (435) 213-5662 OR (435) 755-2205
4. CONTRACTOR SHALL POT-HOLE AND LOCATE EXISTING UTILITIES WHEN NECESSARY TO ENSURECONSTRUCTION DOES NOT IMPACT EXISTING UTILITIES AND THAT THE LOCATION OF EXISTING UTILITIESDOES NOT AFFECT CONSTRUCTION. POT-HOLING SHALL BE DONE AT THE BEGINNING OF THE PROJECTIN ORDER TO PROVIDE UTILITY OWNERS ADEQUATE TIME TO RELOCATE SERVICES IF NECESSARY ORTO ALLOW ENGINEER TO REDESIGN PRIOR TO FABRICATION OF PRE-CAST STRUCTURES.
5. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR COSTS AND REPAIRS DUE TO DAMAGE OFEXISTING UTILITIES. ALL UTILITIES MAY NOT BE SHOWN ON PLANS.
6. ALL UTILITIES SHALL BE KEPT IN WORKING ORDER EXCEPT FOR THE MINIMUM TIME NEEDED FOREXCAVATION, TRENCHING, CONNECTIONS, ETC.
7. APPROVAL FROM THE CITY ENGINEER IS REQUIRED PRIOR TO WATER AND SEWER SHUT-DOWNS IFREQUIRED TO COMPLETE THIS PROJECT. ALL AFFECTED ENTITIES AND PROPERTY OWNERS SHALL BENOTIFIED 72 HOURS PRIOR TO APPROVED SHUTDOWNS.
PERMITS1. CONTRACTOR SHALL COMPLY WITH THE TERMS OF ALL PERMITS REQUIRED FOR THIS PROJECT.2. CONTRACTOR SHALL OBTAIN AND KEEP COPIES OF ALL REQUIRED PERMITS AT PROJECT LOCATION
DURING REASONABLE WORKING HOURS.3. CONTRACTOR SHALL OBTAIN A WORK IN THE RIGHT OF WAY PERMIT (CITY OF LOGAN) PRIOR TO
INITIATING ANY SITE DISTURBANCE OR CONSTRUCTION IN LOGAN CITY RIGHT OF WAY.4. IF DEWATERING IS REQUIRED, CONTRACTOR SHALL OBTAIN DEWATERING PERMITS FROM THE STATE
OF UTAH DIVISION OF WATER QUALITY AND COMPLY WITH ALL STATE REQUIREMENTS.5. CONTRACTOR SHALL OBTAIN A LOGAN CITY LAND DISTURBANCE PERMIT.6. LOGAN CITY IS OBTAINING A STREAM ALTERATION PERMIT IN ACCORDANCE WITH SECTION 404 OF THE
CLEAN WATER ACT. THE CONTRACTOR SHALL REVIEW AND COMPLY WITH ALL REQUIREMENTS OF THESTREAM ALTERATION PERMIT. A COPY OF THIS SUBMITTED PERMIT APPLICATION IS INCLUDED WITHTHE BID DOCUMENTS. THE FINAL PERMIT AND REQUIREMENTS WILL BE IN INCLUDED IN THE CONTRACT.
CONSTRUCTION NOTESSURVEY AND CONSTRUCTION STAKING
1. ALL CONSTRUCTION SURVEY ON THIS PROJECT WILL BE PROVIDED BY LOGAN CITY PUBLIC WORKS.2. CONTRACTOR SHALL SCHEDULE ALL SURVEY REQUESTS A MINIMUM OF 24 HOURS IN ADVANCE.
ACCESS RESTRICTIONS, ROAD AND LANE CLOSURES, PEDESTRIANACCESS AND TRAFFIC CONTROL PLAN
1. CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN, ADEQUATE TRAFFIC CONTROL, SIGNING,BARRICADING, AND PEDESTRIAN DIRECTION THROUGH AND AROUND THE CONSTRUCTION WORK ZONEIN COMPLIANCE WITH THE UDOT MUTCD AS REQUIRED BY UTAH STATE LAW ( R920-1).
2. THE TRAFFIC CONTROL PLANS SHALL BE PROVIDED TO THE ENGINEER A MINIMUM OF 48 HOURS PRIORTO THE PRE-CONSTRUCTION MEETING TO ALLOW REVIEW FOR APPROVAL. COMMENTS AND REQUIREDCHANGES SHALL BE PROVIDED AT THE PRE-CONSTRUCTION MEETING. ALL CORRECTIONS SHALL BEINCORPORATED INTO THE TRAFFIC CONTROL PLAN BEFORE A WORK IN THE RIGHT-OF-WAY PERMITWILL BE ISSUED.
3. CONTRACTOR SHALL INSTALL AND MAINTAIN ALL TRAFFIC CONTROL AS PART OF THIS PROJECT.4. CONTRACTOR SHALL INSPECT TRAFFIC CONTROL DAILY TO ENSURE A SAFE WORK ZONE.5. ANY SIGNIFICANT MODIFICATIONS TO THE TRAFFIC CONTROL PLAN DURING CONSTRUCTION SHALL BE
SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO IMPLEMENTATION.6. PROPERTY OWNERS, RESIDENTS, AND BUSINESSES SHALL BE GIVEN 48 HOURS NOTICE OF ANY
DRIVEWAY ACCESS RESTRICTIONS DURING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FORNOTIFYING HOMEOWNERS, RESIDENTS, AND BUSINESSES AS NEW PIPING AND CONCRETE AREINSTALLED.
7. ACCESS TO ALL RESIDENCES WITHIN THE PROJECT AREA SHALL BE COORDINATED WITH OWNERS ANDREASONABLY MAINTAINED DURING CONSTRUCTION.
8. CONTRACTOR SHALL PROVIDE NOTICE OF ROAD CLOSURE TO LOCAL AREA RESIDENTS, EMERGENCYSERVICES, CACHE COUNTY SCHOOL DISTRICT, LOGAN RIVER ENVIRONMENTAL DEPARTMENT, ANDCACHE VALLEY TRANSIT DISTRICT AT LEAST 48-HOURS IN ADVANCE OF CLOSURE. THROUGH TRAFFICMUST BE MAINTAINED TO THE GREATEST EXTENT REASONABLE AND SAFE.
9. CONTRACTOR SHALL COORDINATE LANE CLOSURES AND PARTIAL AND COMPLETE ROAD CLOSURESWITH THE CITY ENGINEER.
10. ROAD CLOSURE IS ALLOWED ON CONDITION OF CONTINUAL WORK IN THE ROADWAY. THE ROADWAYSHALL BE OPENED TO THROUGH TRAFFIC AT EVERY OPPORTUNITY WHEN CONDITIONS ARE SAFE ANDWORK CREWS ARE NOT ACTIVELY WORKING IN THE ROADWAY.
QUALITY CONTROL TESTING
1. CONTRACTOR SHALL EMPLOY AN APPROVED QUALITY CONTROL TESTING AGENCY TO PROVIDETESTING FOR THE SITE IN ACCORDANCE WITH THE APPROPRIATE SECTIONS OF APWA MANUAL OFSTANDARDS AND SPECIFICATIONS AS AMENDED BY LOGAN CITY.
2. THE CONTRACTOR QUALITY CONTROL TESTING AGENCY SHALL PROVIDE PROCTOR, GRADATION, ANDCBR VALUES FOR PROPOSED GRANULAR BACKFILL BORROW AND UNTREATED BASE COURSE AT THEPRE-CONSTRUCTION MEETING. COMPACTION TESTS SHALL BE PROVIDED AT LEAST AT THE INTERVALSREQUIRED IN APWA 2017 STANDARD SPECIFICATIONS AS AMENDED BY LOGAN CITY.
3. CONTRACTOR QUALITY CONTROL TESTING AGENCY SHALL PROVIDE CONCRETE TESTING INCLUDINGAIR, SLUMP, 7 DAY BREAK TEST, AND 28 DAY BREAK TESTS AS REQUIRED BY APWA SECTION 03 30 05.
4. FIELD TEST RESULTS SHALL BE IMMEDIATELY SUBMITTED TO THE CITY ENGINEER, THE DESIGNATEDPUBLIC WORKS INSPECTOR FOR THE PROJECT, AND A COPY OF EACH REPORT KEPT ONSITE. EACHFAILED FIELD TEST AND ITS CORRESPONDING PASSING TEST SHALL BE CLEARLY IDENTIFIED IN EACHFIELD TEST REPORT.
5. LABORATORY TEST RESULTS SHALL BE SUBMITTED TO THE ENGINEER FOR THE CITY OF LOGAN WITHIN48 HOURS OF DETERMINATION.
6. A FINAL SUMMARY REPORT, IN TABULAR FORM, SHALL BE SUBMITTED TO THE ENGINEER FOR THE CITYOF LOGAN PRIOR TO FINAL ACCEPTANCE OF THE PROJECT. THE FINAL SUMMARY REPORT SHALLINCLUDE TABULAR RESULTS SHOWING EACH FAILED TEST AND ITS CORRESPONDING PASSING TEST.
A
A7
Refers to the View/Detail Designation Label (Top)Refers to the Sheet where the Detail is shown (Bottom)
A4
Refers to the Section Designation Label (Top)Refers to the Sheet where the View/Section is shown (Bottom)
View/Detail References
Section References
Section/View/Detail Title Labels
Legend
A4
Sheet Index
General Set
G1 Cover, Location MapsG2 Sheet Index, Legend, General NotesG3 Project Specific NotesG4 Storm Water Notes
Plan and Profiles
P1 Plan and ProfileP2 Sections 1P3 Sections 2P4 Staging − Grubbing
Details
D1 Details 1
A7
OF
SHEET
DA
TE
NO
.D
ESC
RIP
TIO
NIN
ITS.
REVIS
IONS
JOB
NO
.
DE
SIG
NE
R:
DR
AFT
SMA
N:
CH
EC
KE
D:
RE
VIE
WE
D:
PRO
JEC
T L
EA
DE
R:
PRIN
T D
AT
E:
1276
Sou
th 8
20 E
ast,
Suite
100
Amer
ican
Fork
, UT
840
03T
801
756-
0309
F
801
756-
0481
Gen
eral
s.dw
gP
:\U
T\N
orth
ern\
Log
an C
ity
Spe
cial
Ser
vice
s\L
ogan
Cit
y C
ente
r St
reet
Bri
dge\
Dra
win
gs\D
esig
n D
raw
ings
LA
YO
UT
: N
otes
(2)
NU.0
064
Sep
tembe
r 13
, 2019
Issued For
Bidding
Plot Date: 9/13/2019
PROJECT SPECIFIC NOTES
GRUBBING
1. GRUBBED MATERIALS WITH ORGANIC MATERIAL, CONCRETE OR STEEL, RUBBLE SHALL NOT BE REUSED ONTHIS PROJECT. ALL GRUBBING MATERIAL SHALL BE HAULED FROM THE SITE AND DISPOSED OF AT THE LOGANCITY LANDFILL AS PART OF REMOVAL PAY ITEMS.
EXCAVATION
1. EXCAVATED CLEAN MATERIALS SHALL BE REUSED ON THIS PROJECT.2. NATIVE SUBGRADE MATERIAL SHALL BE COMPACTED TO FIRM AND UNYIELDING PRIOR TO THE PLACEMENTOF ANY NEW MATERIAL UNLESS SPECIFIED OTHERWISE IN THESE PLANS.
GRANULAR BACKFILL BARROW (IF NEEDED)
1. GRANULAR BACKFILL BORROW SHALL BE IN ACCORDANCE WITH APWA SECTION 31 05 13 WITH A MAXIMUMPARTICLE SIZE OF 3 INCHES (RATHER THAN 2 INCHES). GRANULAR BACKFILL BORROW CONSIST OF AN A-1 (ASTMD3282) SOIL.2. GRANULAR BACKFILL BORROW SHALL HAVE A MINIMUM CBR VALUE OF 45.3. GRANULAR BACKFILL BORROW SHALL BE PLACED AS PER APWA 2017 STANDARDS AND SPECIFICATIONS.
CAST IN PLACE CONCRETE
1. CONCRETE REINFORCEMENT SHALL BE IN COMPLIANCE WITH APWA 2017 SECTION 03 20 00. EPOXY ANDGALVANIZED COATINGS ARE NOT REQUIRED.2. CONCRETE ON THIS PROJECT SHALL COMPLY WITH APWA 2017 SECTION 03 30 04, CLASS 5000 (TABLE 5).3. SLUMP SHALL RANGE BETWEEN 4 AND 6 INCHES TO FACILITATE FILLING VOIDS UNDER THE FOUNDATION4. A MINIMUM OF ONE TEST FOR STRENGTH SHALL BE COMPLETED DAILY, ALL OTHER TESTS SHALL BE PERAPWA 2017 03 30 05, TABLE 1.5. AN ELECTRIC STINGER SHALL BE USED TO WORK CONCRETE INTO VOIDS UNDER THE FOUNDATION AND TOENSURE NO HONEY COMBS IN THE NEW FOUNDATIONS. DO NOT OVER WORK CONCRETE TO CAUSESEPARATION.6. DO NOT APPLY CONCRETE FINISHING CHEMICALS.7. SURFACE OF CONCRETE SHALL BE FINISHED ROUGH ON TOP. RUB FINISH UNDER FORMS.8. CONTRACTOR SHALL STRICTLY PROTECT LOGAN RIVER FROM CONTAMINATION BY ENSURINGSTORMWATER AND STREAM ALTERATION PERMIT B.M.P.S ARE STRICTLY ENFORCED.
LANDSCAPING AND ACCESS AREAS.1. CONTRACTOR SHALL REPAIR DISTURBED SURFACES TO EXISTING CONDITIONS, INCLUDING, BUT NOTLIMITED TO UTILITY LINES AND SERVICES, ASPHALT REPAIR, DRIVEWAYS, PLANTER STRIPS, SPRINKLER ANDIRRIGATION SYSTEMS, AND GENERAL CLEANUP EXCEPT WHERE INSTRUCTED OTHERWISE.2. CONTRACTOR SHALL MARK IRRIGATION HEADS AND SYSTEM ALONG EDGE OF SIDEWALK IDENTIFYINGLOCATION OF SPRINKLER HEADS, LINES, AND WIRES. ANY DAMAGE TO THE HEADS, LINES, AND WIRES SHALL BEREPAIRED AT CONTRACTORS EXPENSE.3. CONTRACTOR SHALL PROVIDE AND INSTALL TOP SOIL TO SHAPE AND CONTOUR LAWNS, LANDSCAPEDAREAS, AND OTHER LANDS TO MATCH NEW GRADES TO RESTORE AREAS TO PRE-CONSTRUCTION CONDITIONS.4. SOD GRASS, PURCHASED FROM A LOCAL VENDOR, SHALL BE PROVIDED AND INSTALLED AT DISTURBEDLANDSCAPED AREAS, RESTORING AREAS TO PRE-CONSTRUCTION CONDITION.5. TRIM NON-GRASS VEGETATION FLUSH WITH GROUND SURFACE WITH GRASS TRIMMER OR SAWS. DO NOTCUT GROUND SURFACE WITH SHOVELS OR EQUIPMENT6. SPECIAL CARE SHALL BE TAKEN TO PRESERVE AND PROTECT EXISTING MATURE TREES AND THEIR ROOTSYSTEMS UNLESS TREES ARE SPECIFIED FOR REMOVAL.7. TOPSOIL USED TO CONSTRUCT OR REPAIR DISTURBED OR NEW LANDSCAPING SHALL BE COMPLIANT WITHAPWA SECTION 31 05 13, PART 2.9. CONTRACTOR SHALL PROVIDE SOURCE, GRADATION, AND VERIFICATION OFCHEMICAL CHARACTERISTICS AND PHYSICAL CHARACTERISTICS AT PRE-CONSTRUCTION MEETING.8. NON-GRASS LANDSCAPE AREAS SHALL BE PROTECTED FROM HEAVY TRAFFIC BY THE USE OF DRAINAGEFABRIC AND ROADBASE. RESTORE NON-GRASS AREAS BY REMOVING ROADBASE AND FABRIC SO NATIVEVEGETATION CAN SELF RESTORE IN THE SPRING.
RIP RAP1. WHERE POSSIBLE, RECYCLE EXISTING ROCK IN CHANNEL.2. LOOSE-PLACED RIPRAP, HAND PLACED RIPRAP, AND GROUTED RIPRAP SHALL BE PLACED PER APWA 2017SECTION 31 37 00.3. ROCK SHALL BE DURABLE, ANGULAR, AND HARD STONE FREE OF SEAMS AND CRACKS PER APWA 2017SECTION 31 37 000.4. MINIMUM GRADATION SHALL BE AS FOLLOW FOR SPECIFIED RIPRAP.
4.1. LOOSE-PLACED RIPRAP4.1.1. 13" < D100 < 15"4.1.2. 10" < D85 < 9"4.1.3. 9" < D50 < 10"4.1.4. 3" < D15 < 5"
5. IF LARGER GRADATION IS PROVIDED, IT MUST BE APPROVED BY ENGINEER PRIOR TO PLACEMENT
DRAINAGE FABRIC
1. DRAINAGE FABRIC SHALL BE CLASS A PER APWA 2017 SECTION 31 05 19, TABLE 6.2. PLACEMENT SHALL BE AS DETAILED.
DEBRIS REMOVAL
1. REMOVE ALL STEEL AND IRON DEBRIS, CONCRETE RUBBLE, CONCRETE DUMP MATERIAL, AND FAILEDCONCRETE PATCHES UNDER THE BRIDGE AND IN AREAS OF DISTURBANCE PRIOR TO INSTALLING WATERMANAGEMENT AND ANY EXCAVATING.2. REMOVE TREES THAT ARE MARKED WITH ORANGE PAINT IN BRIDGE MAINTENANCE AREA AND BANKSTABILIZATION AREA. CUT TREES FLUSH WITH GROUND AND LEAVE TREE ROOTS IN PLACE.
REVEGETATION
ALL REVEGETATION SHALL CONSIST OF POLE PLANTINGS AND NATIVE SEEDS AS FOLLOWS
1. POLE PLANTINGS HARVESTED FROM LOCAL SOURCES APPROVED BY ENGINEER1.1. COYOTE WILLOWS1.2. RED OZIER DOGWOODS
2. NATIVE GRASS SEED FROM WHEATLAND OR GRANITE SEED. SEED MIX TO BE APPROVED BY ENGINEERPRIOR TO INSTALLATION
DEWATERING
1. CONTRACTOR IS RESPONSIBLE FOR ALL DEWATERING NECESSARY TO CONSTRUCT MITIGATIONMEASURES.2. TO PROTECT SITE, CONTRACTOR SHALL COORDINATE U.S.U. WATERLAB RELEASES TO ENSURE A SAFEWORK ZONE.3. LOGAN RIVER SHALL BE SHIFTED WITHIN THE EXISTING CHANNEL BY USING COFFER DAMS OR TEMPORARYBYPASS CULVERTS. HEIGHT OF COFFER DAMS OR PIPE DIVERSION SHALL BE HIGH ENOUGH TO PROTECT FROMUPSTREAM RAIN EVENTS OF UP TO DOUBLE STREAM FLOWS.
UNTREATED BASE COURSE
1. UNTREATED BASE COURSE MATERIAL USED FOR DRIVEWAYS, ROADWAY, CURB AND GUTTER, ANDSIDEWALKS SHALL BE CLASS A, GRADE 34 OR GRADE 1, WITH A MINIMUM CBR VALUE OF 70 IN COMPLIANCE WITHAPWA SECTION 32 11 23.
HOT MIX ASPHALT
1. PROVIDE CONSTRUCTION MANAGER WITH SPECIFIED AND SELECTED ASPHALT MIX DESIGNS, ANDSELECTED PRIME COAT AND TACK COAT AT PRE-CONSTRUCTION MEETING.2. ALL HOT MIX ASPHALT SHALL BE PG 58-28, DM-1/2, MARSHALL MIX PER APWA 32 12 05.3. APPLY TACK COAT, COMPLIANT WITH APWA SECTION 32 12 14, BETWEEN LAYERS OR LIFTS IF THEPREVIOUS PAVEMENT LAYER IS DIRTY OR OLDER THAN 24 HOURS PER APWA SECTION 32 12 16.
OF
SHEET
DA
TE
NO
.D
ESC
RIP
TIO
NIN
ITS.
REVIS
IONS
JOB
NO
.
DE
SIG
NE
R:
DR
AFT
SMA
N:
CH
EC
KE
D:
RE
VIE
WE
D:
PRO
JEC
T L
EA
DE
R:
PRIN
T D
AT
E:
1276
Sou
th 8
20 E
ast,
Suite
100
Amer
ican
Fork
, UT
840
03T
801
756-
0309
F
801
756-
0481
Gen
eral
s.dw
gP
:\U
T\N
orth
ern\
Log
an C
ity
Spe
cial
Ser
vice
s\L
ogan
Cit
y C
ente
r St
reet
Bri
dge\
Dra
win
gs\D
esig
n D
raw
ings
LA
YO
UT
: S
D N
otes
NU.0
064
Sep
tembe
r 13
, 2019
Issued For
Bidding
Plot Date: 9/13/2019
STORM WATER POLLUTION PREVENTIONINFORMATIONSITE EVALUATION, ASSESSMENT, AND PLANNINGPROJECT SITE/NAME: CENTER STREET BRIDGE REPAIRPROJECT LOCATION: SEE COVER SHEETCITY: LOGAN, UTAH 84321COUNTY: CACHELATITUDE/LONGITUDE (GOOGLE EARTH)LAT: 41°43'51.85" NORTH LONG: 111°48' 54.49" WEST
CONTACT INFORMATION AND RESPONSIBLE PARTIES:OWNER: LOGAN CITY
290 NORTH 100 WESTLOGAN, UT 84321(435) 716-9152 (PUBLIC WORKS)
PROJECT MANAGER:BILL YOUNG.LOGAN CITY ENGINEER290 NORTH 100 WESTLOGAN, UT 84321(435) [email protected]
STORMWATER MANAGER AND SWPPP CONTACTTBD-THIS IS TO BE FILLED IN BY THE CONTRACTOR
LOGAN CITY REGULATORY STORMWATER INSPECTORLYNN MAYSLOGAN CITY STREETS AND STORMWATER FOREMAN290 NORTH 100 WESTLOGAN, UT 84321(435) 716-9167 (DAY)(435) 716-9090 (AFTER HOURS EMERGENCY)[email protected]
NATURE AND SEQUENCE OF CONSTRUCTIONTHE CITY IS STABILIZING THE CRITICAL BRIDGE ON CENTER STREET CROSSING THE LOGAN RIVER.THIS BRIDGE IS THE ONLY CROSSING OF THE LOGAN RIVER SERVING THE CLIFF SIDE AREA OFLOGAN. WATER SHALL BE DIVERTED TO ONE SIDE OF THE RIVER, THEN CONCRETE RUBBLE ANDDEBRIS REMOVED, THE FOUNDATION VOIDS EXCAVATED, CONCRETE FORMED AND PLACED, ANDHAND PLACED RIP RAP INSTALLED. THE LOGAN RIVER SHALL THEN BE DIVERTED TO THE OTHERSIDE OF THE RIVER AND REPEAT THE PROCESS. AT THIS POINT, THE BANKS SHALL BE STABILIZED,ROCK WALLS INSTALLED, AND THE CHANNEL REPAIRED AS THE EQUIPMENT WORKS BACK OUTTHROUGH THE ACCESS. THE BANKS SHALL BE RESTORED.
THE FUNCTION OF THIS ACTIVITY IS PUBLIC.ESTIMATED START DATE: JULY 2019ESTIMATED COMPLETION: SEPTEMBER 2019
SOILS, SLOPES, VEGETATION, AND CURRENT DRAINAGE PATTERNSTHE SOILS ON THIS SITE ARE STEED GRAVELY LOAM AS OBTAINED BY THE NRCS SOILS SURVEYWEBSITE. INFILTRATION RATES AVERAGE 9.9 INCHES PER HOUR ACCORDING TO THE NRCS.
SLOPES ON THIS PROJECT ARE FROM 0 TO 2 PERCENT OUTSIDE OF THE RIVER CHANNEL. HOWEVER,SOME OF THE RIVER CHANNEL BANKS APPROACH VERTICAL.
DRAINAGE PATTERNS: DRAINAGE PATTERNS ARE FROM EAST TO WEST
VEGETATION: VEGETATION RANGES FROM WILLOWS AND DOGWOOD TO LANDSCAPED.
CONSTRUCTION SITE ESTIMATESCONSTRUCTION SITE AREA TO BE DISTURBED: 0.44 ACRESTOTAL PROJECT AREA: 0.44 ACRESPERCENT IMPERVIOUS AREA BEFORE CONSTRUCTION: 0%PERCENT IMPERVIOUS AREA AFTER CONSTRUCTION: 0%RUNOFF CN NUMBER AFTER CONSTRUCTION: 20 SAME AS BEFORE CONSTRUCTION100-YEAR PEAK RUNOFF BEFORE CONSTRUCTION: N/A100-YEAR PEAK RUNOFF AFTER CONSTRUCTION: N/ADETENTION REQUIREMENTS: 0 ACRE-FEET
RECEIVING WATERSTHE RECEIVING WATER FOR THIS PROJECT IS THE LOGAN RIVER.
SITE FEATURES AND SITE SENSITIVE AREAS TO BE PROTECTEDTHE LOGAN RIVER BOTH UPSTREAM AND DOWNSTREAM ARE PROTECTED BY THE STREAMALTERATION PERMIT.
ENDANGERED SPECIESTHERE ARE NO ENDANGERED SPECIES ASSOCIATED WITH THIS SITE. IT IS ALLDEVELOPED ROADWAY.
HISTORIC PRESERVATIONTHERE ARE NO HISTORIC SITES LISTED ON THIS PROJECT
GENERAL LOCATION MAPFOR THE GENERAL LOCATION MAP, SEE COVER SHEET.
BMP EVALUATION FOR 90TH PERCENTILE STORMTHE GENERAL STORMWATER PERMIT DOES NOT APPLY. THIS PROJECT IS GOVERNED BY THESECTION 404 STREAM ALTERATION PERMIT.
PERMITS REQUIREMENTS AND BMPS1. THE CONTRACTOR SHALL COMPLY WITH THE STREAM ALTERATION PERMIT.2. THE CONTRACTOR SHALL ENSURE THAT NO POLLUTION LEAVES THE DESIGNATED WORK ZONE
BY IMPLEMENTING STANDARD BMP'S AND COMMON PRACTICES APPROVED BY THE ENGINEERAND DOCUMENTED.
3. CONTRACTOR SHALL NOT DISTURB ANY PORTION OF THE SITE UNTIL THE DEWATERING PLAN ISAPPROVED BY THE LOGAN CITY STORM WATER INSPECTOR, CITY ENGINEER, AND CONTRACTOROBTAINS A LOGAN CITY LAND DISTURBANCE PERMIT.
4. BMPS SHALL BE INSTALLED PRIOR TO ANY OTHER CONSTRUCTION ACTIVITIES.5. THE CONTRACTOR SHALL INCLUDE THE ASSOCIATED BMPS FOR EACH OF THE POSSIBLE
CONTAMINANT SOURCES INCLUDED IN THE ASSOCIATED POTENTIAL POLLUTANTS INCLUDED ONTHIS SHEET. THE POTENTIAL SOURCES IN BOLD TYPE ARE EXPECTED BY THE ENGINEER TO BETHE MOST LIKELY TO CAUSE CONTAMINATION.
6. THE CONTRACTOR IS RESPONSIBLE FOR ALL SITE INSPECTIONS BY A CERTIFIED RSI, OREQUIVALENT, INSPECTOR WHILE WORK IS OCCURRING ON THIS PROJECT.
7. ALL INSPECTIONS AND LOGS SHALL BE RECORDED ON A UTAH DWQ APPROVED INSPECTIONFORM.
8. INSPECTIONS SHALL BE CONTINUED UNTIL SITE OBTAINS PERMANENT STABILIZATION WHICHSHALL BE DEFINED AS 70 PERCENT OF VEGETATIVE RESTORATION OR NON-EROSIVECONDITIONS ESTABLISHED OVER 100 PERCENT OF THE SITE.
9. FINAL PAYMENT SHALL NOT BE PROCESSED UNTIL STABILIZATION IS APPROVED BY ENGINEER.
BEST MANAGEMENT PRACTICESSPECIFIC BMPS WILL BE SPECIFIED IN THE DE-WATERING PLAN
POTENTIAL SOURCES OF POLLUTION
POTENTIAL POLLUTANTMATERIAL
ACTUAL POLLUTANT POLLUTANT SOURCE MANAGEMENT PRACTICE
SEDIMENT/TOTALSUSPENDED SOLIDS
SEDIMENT EROSION OFDISTURBED SOILS
PAUSE DISTURBANCES UNTILWATER CLEARS. INSTALL BMPSALONG THE BANKS.
SOILS STABILIZATIONMATERIAL
VARIOUS MATERIALSBOTH FLOATABLEAND SOLUBLE
DISTURBED AREASWHERE SLOPES ORSUSCEPTIBLE SOILTYPES ARE EXPOSED
INSTALL SEDIMENT CONTROLBMPS
CONCRETE-WHITE/GREY
LIMESTONE, SAND,pH, CHROMIUM
EXTRA CONCRETEWHEN POURINGCONCRETE
CLEAN UP EXCESS AND EXTRACONCRETE AND DISPOSE OF ATSPECIFIED LOCATION. SEE ALSOCONCRETE WASHOUT
OILS-BROWN OILYPETROLEUM ANDHYDROCARBONS
MINERAL OIL,HYDRAULIC FLUID,MOTOR OIL, ETC.
VEHICLES ANDEQUIPMENT USED INCONSTRUCTION
NO OILS WILL BE CHANGED ONSITE. LEAKS WILL BE REPAIREDIMMEDIATELY.
ASPHALT AND PAVING -BLACK SOLIDS
OIL AND PETROLEUMDISTILLAGES
ASPHALT PAVINGOPERATIONS
PAVING OPERATIONS WILL NOTBE PERFORMED WITHIN 8 HOURSOF EXPECTED STORMSEXCEEDING 0.5 INCH.
GREASE GREASE AND LUBEOIL
VEHICLES ANDEQUIPMENT USED INCONSTRUCTION
KEEP EQUIPMENT CLEAN ANDWIPED DOWN
ANTIFREEZE ETHYLENE GLYCOL ENGINE COLLUANT FIX LEAKS IMMEDIATELY.REPAIRS WILL NOT BE MADE ONSITE
TSS/SEDIMENTS DEWATERINGACTIVITIES
CONTRACTOR TO OBTAIN PERMITIF DEWATERING IS REQUIRED.
FUELS BENZENE, ETHYLBENZENE, TOULENE,XYLENE, MTBE,PETROLEUMDISTALLATE,OILS/GREASES,NAPHTHALEN, COALOIL
USED IN VEHICLESAND POWEREQUIPMENT
FUELING WILL NOT BE ALLOWEDON SITE UNLESS OVER ANIMPERMEABLE SURFACE WITH ANEMERGENCY CLEANUP KIT ATTHE LOCATION
PESTICIDES ANDINSECTICIDES,FUNGICIDES,HERBICIDES, ANDRODENTICIDES
CHLORINATEDHYDROCARBONS,ORANOPHOSPHATES,CARBAMATES,ARSENIC
USED FOR CONTROLOF PESTS DURINGREVEGETATION
APPLICATION WILL BE PERMANUFACTURER INSTRUCTIONS.EXCESS OR LEFT OVER PESTICIDESWILL BE IMMEDIATELY REMOVEDFROM SITE
CONCRETE CURINGCOMPOUNDS - CREAMYWHITE LIQUID
WHITE PIGMENTED LIQUID TYPE 2.(VARIES BYMANUFACTURER
CONCRETE WASHOUTWATER
pH CONCRETE TRUCKSAND PUMP TRUCKS
WASH WATER FROM CONCRETETRUCKS WILL BE CONTAINED IN ALEAK PROOF LOCATIONDESIGNATED BY THE CONTRACTOR
TRASH SOLID WASTES TRASH LEFT OVERFROM CONSTRUCTIONACTIVITES
REMOVE ALL TRASH FROM SITEDAILY. DO NOT DISPOSE OFTRASH IN HOLES OR TRENCHES
SANITARY WASTEMANAGEMENT
BACTERIA,PARASITES, VIRUSES
FECAL COLIFORM,BACTERIAASSOCIATED WITHHUMAN OR ANIMALWASTES
NO PUBLIC RESTROOMSAVAILABLE. CONTRACTOR SHALLPROVIDE PORTABLE FACILITIESAND ENSURE THEY ARE SECUREDFROM TIPPING AND AREMAINTAINED
FERTILIZERS - LIQUIDAND SOLID GRAIN
NITROGEN,PHOSPHORUS
FERILIZERS USED INRESTORINGVEGETATION
APPLICATION WILL BE PERMANUFACTURER INSTRUCTIONS.EXCESS WILL BE PROMPTLYREMOVED FROM SITE
CONSTRUCTIONDEWATERING
USED FOR CONTROLOF CONCRETECURING
APPLICATION WILL BE PERMANUFACTURER INSTRUCTIONS.EXCESS OR LEFT OVER WILL BEREMOVED FROM SITE
4548
4550
4552
4554
4556
4558
4560
4562
4548
4550
4552
4554
4556
4558
4560
4562
1+00 1+50 2+00 2+50 3+00 3+50
Bottom of Bridge 4562.65
Loose Riprap
D 50 = 10"
Loose RiprapLoose Riprap
Tie Into UpstreamRock Bottom
12" Min
30"
CD1
Riprap Keyed into Toe or BedCD1
Riprap Keyed into Toe or Bed
BP2
CP3
DP3
OHW
OF
SHEET
DA
TE
NO
.D
ESC
RIP
TIO
NIN
ITS.
REVIS
IONS
JOB
NO
.
DE
SIG
NE
R:
DR
AFT
SMA
N:
CH
EC
KE
D:
RE
VIE
WE
D:
PRO
JEC
T L
EA
DE
R:
PRIN
T D
AT
E:
1276
Sou
th 8
20 E
ast,
Suite
100
Amer
ican
Fork
, UT
840
03T
801
756-
0309
F
801
756-
0481
Pla
n an
d P
rofi
les.
dwg
P:\
UT
\Nor
ther
n\L
ogan
Cit
y S
peci
al S
ervi
ces\
Log
an C
ity
Cen
ter
Stre
etB
ridg
e\D
raw
ings
\Des
ign
Dra
win
gsL
AY
OU
T:
PP
NU.0
064
Sep
tembe
r 13
, 2019
Issued For
Bidding
Plot Date: 9/13/2019A 0 5’ 10’ 20’
0 1’ 2’ 4’
Horizontal Scale
Vertical Scale
Plan and Profile
4540
4550
4560
4570
4580
4540
4550
4560
4570
4580
0 10 20 30 40 50 600−10−20−30−40
Existing Surfaceelev. = 4551.60
D 50 = 10"
Finished Surface
OHW
elev = 4554.01 elev = 4553.99
OF
SHEET
DA
TE
NO
.D
ESC
RIP
TIO
NIN
ITS.
REVIS
IONS
JOB
NO
.
DE
SIG
NE
R:
DR
AFT
SMA
N:
CH
EC
KE
D:
RE
VIE
WE
D:
PRO
JEC
T L
EA
DE
R:
PRIN
T D
AT
E:
1276
Sou
th 8
20 E
ast,
Suite
100
Amer
ican
Fork
, UT
840
03T
801
756-
0309
F
801
756-
0481
Pla
n an
d P
rofi
les.
dwg
P:\
UT
\Nor
ther
n\L
ogan
Cit
y S
peci
al S
ervi
ces\
Log
an C
ity
Cen
ter
Stre
etB
ridg
e\D
raw
ings
\Des
ign
Dra
win
gsL
AY
OU
T:
Sec
tion
sNU.0
064
Sep
tembe
r 13
, 2019
Issued For
Bidding
Plot Date: 9/13/2019
B 0 2.5’ 5’ 10’
Scale
Section 1
4540
4550
4560
4570
4580
4540
4550
4560
4570
4580
0 10 20 300−10−20−30
Existing Surfaceelev. = 4552.35
D 50 = 10"
OHW
elev = 4554.96elev = 4554.50
4540
4550
4560
4570
4540
4550
4560
4570
0 10 20 30 400−10−20−30
Existing Surfaceelev. = 4553.20
D 50 = 10"
OHW
elev = 4556.02 elev = 4555.88
OF
SHEET
DA
TE
NO
.D
ESC
RIP
TIO
NIN
ITS.
REVIS
IONS
JOB
NO
.
DE
SIG
NE
R:
DR
AFT
SMA
N:
CH
EC
KE
D:
RE
VIE
WE
D:
PRO
JEC
T L
EA
DE
R:
PRIN
T D
AT
E:
1276
Sou
th 8
20 E
ast,
Suite
100
Amer
ican
Fork
, UT
840
03T
801
756-
0309
F
801
756-
0481
Pla
n an
d P
rofi
les.
dwg
P:\
UT
\Nor
ther
n\L
ogan
Cit
y S
peci
al S
ervi
ces\
Log
an C
ity
Cen
ter
Stre
etB
ridg
e\D
raw
ings
\Des
ign
Dra
win
gsL
AY
OU
T:
Sec
tion
s (2
)NU.0
064
Sep
tembe
r 13
, 2019
Issued For
Bidding
Plot Date: 9/13/2019
C 0 2.5’ 5’ 10’
Scale
Section 2
D 0 2.5’ 5’ 10’
Scale
Section 3
City OwnedPossible Staging Area
Center Street
100 North
Riverside Dr
ive
Rive
r Po
int Dr
ive
Remove Trees
Trim Existing Vegetation andCover With Drainage Fabric
and Roadbase to Protect
Protect Existing Entry
Relocate Mailbox to East of River
Protect Sidewalk, Curb and Gutter
Establish Material Access Point Here
Remove Loose Concrete DumpDebris Along Bank andChannel From 10’ Below Bridgeto Upstream of Bridge
Break up and Remove DumpedConcrete From Existing WoodRetaining Wall 22’ South WestEstimated 22’ x 3’ x 10’Remove and Dispose of anyAdditional Debris in Access
Protect Curbing
Remove Tree
Install River AccessRestore to Similar Condition as Before Construction
Protect Concrete
Remove Existing AsphaltFurnish and Install Road Base
and new Asphalt
Mailbox to go Here
Armor Bank to HighWater Warm with Riprap
OF
SHEET
DA
TE
NO
.D
ESC
RIP
TIO
NIN
ITS.
REVIS
IONS
JOB
NO
.
DE
SIG
NE
R:
DR
AFT
SMA
N:
CH
EC
KE
D:
RE
VIE
WE
D:
PRO
JEC
T L
EA
DE
R:
PRIN
T D
AT
E:
1276
Sou
th 8
20 E
ast,
Suite
100
Amer
ican
Fork
, UT
840
03T
801
756-
0309
F
801
756-
0481
Pla
n an
d P
rofi
les.
dwg
P:\
UT
\Nor
ther
n\L
ogan
Cit
y S
peci
al S
ervi
ces\
Log
an C
ity
Cen
ter
Stre
etB
ridg
e\D
raw
ings
\Des
ign
Dra
win
gsL
AY
OU
T:
Sta
ging
NU.0
064
Sep
tembe
r 13
, 2019
Issued For
Bidding
Plot Date: 9/13/2019
E 0 50’ 100’ 200’
Scale
Staging Area
F 0 10’ 20’ 40’
Scale
Clearing and Grubbing
N
1’−6"
3’8" Min.
Varies by Amount of Scour
3’ ±
45’ ±
Bottom of Bridge Girder
D ^50 = 10" Riprap12" Thick Min.
Fill Voids in Riprap WithRiver Cobble and Sands
8" Min.
BD1
Footing DetailBD1
Footing Detail
10’±
1’
3’
Install Drainage Fabric 12" UnderFooting and 3’ Under Rock. KeyFabric into Riverbed if Possible
1’
Hand Excavate 8"Back Face for
Concrete BetweenFooting and Earth
1’−6"
3’ Min.
3"
3"
3"
Varies
Hand Excavate UnderFooting Back to WhereUnder Mining Has Occurred
Excavate Toe ofNew Footing a Min.of 6" Below Existing
Grade AfterConcrete is Removed
Overlap Rebar 18" Min.
Dowel Rebar Into Existing Footing 4"and Grout With Epoxy Grout or GlueEvery 12" Along Length of Footing
Install ExpandableWater Seal
Seal Joint With SikaFlex or Equivalent
18"
6" Min.
T = 12" Min.
Greater of3x D
50 or 2x D 100
2’ Min.
OF
SHEET
DA
TE
NO
.D
ESC
RIP
TIO
NIN
ITS.
REVIS
IONS
JOB
NO
.
DE
SIG
NE
R:
DR
AFT
SMA
N:
CH
EC
KE
D:
RE
VIE
WE
D:
PRO
JEC
T L
EA
DE
R:
PRIN
T D
AT
E:
1276
Sou
th 8
20 E
ast,
Suite
100
Amer
ican
Fork
, UT
840
03T
801
756-
0309
F
801
756-
0481
Det
ails
.dw
gP
:\U
T\N
orth
ern\
Log
an C
ity
Spe
cial
Ser
vice
s\L
ogan
Cit
y C
ente
r St
reet
Bri
dge\
Dra
win
gs\D
esig
n D
raw
ings
LA
YO
UT
: D
1NU.0
064
Sep
tembe
r 13
, 2019
Issued For
Bidding
Plot Date: 9/13/2019
ANot To Scale
Channel Section
BNot To Scale
Footing Detail
CNot To Scale
Riprap Keyed into Toe or Bed
Note: All Rebar Shall be #5 Bars on 12"Centers Unless Called Out Otherwise.