Project Reports Deal with plans for or results of a project Different from essays in that organized...

6
Project Reports Deal with plans for or results of a project Different from essays in that organized by headings Often preceded by letter of transmittal

Transcript of Project Reports Deal with plans for or results of a project Different from essays in that organized...

Page 1: Project Reports Deal with plans for or results of a project Different from essays in that organized by headings Often preceded by letter of transmittal.

Project Reports

Deal with plans for or results of a project

Different from essays in that organized by headings

Often preceded by letter of transmittal

Page 2: Project Reports Deal with plans for or results of a project Different from essays in that organized by headings Often preceded by letter of transmittal.

Oral Component

project report assignments will include oral-presentation component worth 25% of overall assignment

oral-component grade will be fixed grade in sense that each written project report, although graded individually, will receive same oral-presentation grade awarded to “team”

oral presentations will be max. of 15 mins.

Page 3: Project Reports Deal with plans for or results of a project Different from essays in that organized by headings Often preceded by letter of transmittal.

Teamwork next couple weeks will involve teamwork

approach to class material teams will consist of two to four people teamwork contribution to project-report

assignments should be acknowledged in transmittal letter

results of teamwork should be included in project report either as subcategory of “Discussion” or separate category preceding “Conclusions”

Page 4: Project Reports Deal with plans for or results of a project Different from essays in that organized by headings Often preceded by letter of transmittal.

Teamwork Preparation

upon initial meeting as team discuss individual strengths/weaknesses (e.g., who’s good writer, problem solver, public speaker)

designate one member as “team head” who’ll keep things organized and will assess team progress from time to time

team head is responsible for choosing team’s “note taker” and “speaker,” and keeping eyes open for slackers

Page 5: Project Reports Deal with plans for or results of a project Different from essays in that organized by headings Often preceded by letter of transmittal.

Teamwork Procedure

teams will deal with two classic tales over next couple of weeks by E.A. Poe (1809 - 1849): U.S. writer, poet, thinker, journalist, and eclectic man of genius interested in both artistic and scientific questions and problems

teams may also deal with topics relevant to engineering studies but should leave enough time to deal with Poe’s work too

Page 6: Project Reports Deal with plans for or results of a project Different from essays in that organized by headings Often preceded by letter of transmittal.

Quick Poe Biography

Earl Nightingale’s Summary of Poe’s Life

<http://www.youtube.com/watch?v=ypLLC-El5is>

Daguerréotype of Poe (c. 1849)