Group HIS HIS Project report in Qatar www.his-lj.si www.his.hr

Transcript of Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of...

Page 1: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Group HIS HIS Project report

in Qatar

www.his-lj.si www.his.hr

Page 2: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Construction of a 4 - level intersection in Doha - Qatar

Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLITMain subcontractor: HIDROSERVICE TRADING & CONTRACTING CO.

Subcontractor for Waterworks and Sewerage: HIS d.o.o. Ljubljana

Industrial Interchange

Page 3: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Projection of a new roundabout

Page 4: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Industrial Interchange -project in AutoCAD

Page 5: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Industrial Interchange

Campus and the concrete plant with precast concrete elements

Page 6: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Industrial Interchange

Construction of a 4 - level intersection in Doha - Qatar

Waterworks and Sewerage Department:

HIS d.o.o. Ljubljana (subcontractor)

Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT

• SWDSWD – Surface Water Drainage 13.953 m13.953 m

• TSETSE – Treated Sewage Effluent 7.488 m7.488 m

• FSRMFSRM – Foul Sewerage Rising Main 1.850 m1.850 m

• FS GRAVFS GRAV – Foul Sewerage Gravity 261 m261 m

• WWWW – Waterworks 8.8.309309 mm

Main subcontractor: HIDROSERVICE TRADING & CONTRACTING CO.

Page 7: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Industrial Interchange -project in AutoCAD

SWD – Surface Water Drainage (odvodnja)

TSE – Treated Sewage Effluent (tehnološka - prečiščena voda)

FSRM – Foul Severage Rising Main (kanalizacija tlačna)

FS GRAV – Foul Severage Gravity (kanalizacija gravitacijska)

WW – Water Works (vodovod)

Page 8: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Industrial Interchange

• SWD – Surface Water Drainage

TOTAL 13.953 m of vitrified clay drainage pipes

6.033 m – ø 150 mm1.834 m – ø 300 mm1.372 m – ø 400 mm1.902 m – ø 500 mm1.508 m – ø 600 mm640 m – ø 800 mm664 m – ø 900 mm

Page 9: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Surface Water Drainage

Casting of concrete bed, vitrified clay pipe laying and built-in vitrified clay pipe with concrete surround

Page 10: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Surface Water Drainage

Initial air test for vitrified clay pipeline

Page 11: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Surface Water Drainage

Formwork for inlet pipes and bench

making on manhole junction

Page 12: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Steel panelling for elevation of the manhole, concrete pouring and protected manhole with bituboard

Surface Water Drainage

Page 13: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Industrial Interchange

• TSE – Treated Sewage Effluent

TOTAL 7.488 m of HDPE pipes

442 m – ø 355 mm7.046 m – ø 450 mm

Heating element butt welding of OD 450 HDPE pipes

Page 14: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

HDPE pipe ø 450 mm SDR11 PN16 (pressure rate 16 bar)

Treated Sewage Effluent

Page 15: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Welded HDPE pipeline ready for installation into trench

Finished joint Installed HDPE pipeline

Treated Sewage Effluent

Page 16: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Treated Sewage Effluent

Water inlet valve and a pressure gauge

Sealing of the water inlet valve for the time of pressure test

Page 17: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

• FSRM - Foul Severage Rising Main • FS GRAV - Foul Severage Gravity

TOTAL 2.111 m of HDPE pipes

1.850 m – ø 150 mm (FSRM)261 m – ø 200 mm (FS GRAV)

Industrial Interchange

Page 18: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Pipeline installation and paneling for concrete surround of the pipes

Secured electrical cables with wooden boxin excavated trench

Foul Severage Rising Main

Page 19: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

• WW – Water Works

TOTAL 8.309 m of ductile iron pipes

1.800 m – DN 150 mm 1.281 m – DN 200 mm 302 m – DN 300 mm 3.320 m – DN 400 mm 390 m – DN 500 mm 831 m – DN 600 mm 260 m – DN 700 mm 125 m – DN 900 mm

Industrial Interchange

Page 20: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Secured trench wall with send bed ready for pipe laying

A full bunch of el. cables and water pipes make difficulties in trench excavation

Wrapping machine for rolling up protection on pipes

Water Works

Page 21: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Water Works

Pipe laying DN 900 on Salwa RoadPreparation of bedding for the pipes Sand surround after joint wrapping

Page 22: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Water Works

Pipeline backfilling

DN 600 pipeline preparation for connection on the water supply

network

Concrete surround and concrete slab under carriageway

Page 23: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Water Works

Pipeline ready for connection

on water supply network

Page 24: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Water Works

Preparatory works for concrete pouring of manhole walls with reinforcement

Page 25: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Water Works

All flanged tee DN 900 × 400 mm

Thrust blocks on the end of pipeline

All flanged tee DN 900 × 600 mm

200 mm air release and gate valve

Page 26: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Water Works

Preparatory works for shutdown – change of an existing water supply with new

Page 27: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Water Works

Shutdown in progress (Al Furousiya street)

Page 28: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Construction of a 4 - level intersection in Doha - Qatar

Construction of the Microtunnel

Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLITMain subcontractor: HIDROSERVICE TRADING & CONTRACTING CO.Subcontractor for waterworks and sewerage: HIS d.o.o. Ljubljana

Industrial Interchange

Page 29: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Pipes for the construction of a microtunnel Shaft entrance

Microtunnel

Trench dug up and ready for connection of a storm water

extraction pipeline in the microtunnel

Page 30: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

External - crank drive of the machine for construction of a microtunnel

Microtunnel

Machine for construction of a microtunnel “mole”- body

Machine for construction of a microtunnel

Machine for construction of a microtunnel“mole” - head

Page 31: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

MicrotunnelM

icro

tunn

elsh

aft

Page 32: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Construction of a 4 - level intersection in Doha - Qatar

A few pictures from the site

Industrial Interchange

Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLITMain subcontractor: HIDROSERVICE TRADING & CONTRACTING CO.Subcontractor for waterworks and sewerage: HIS d.o.o. Ljubljana

Page 33: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

From Abu Samra towards Doha

Rest day on site

On the site

Page 34: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Underpass

Steel bars for the road fence

On the site

Page 35: Project report in Qatar - his-lj.si · PDF fileFormwork for inlet ... Qatar Construction of the Microtunnel Main contractor: KONSTRUKTOR - ENGINEERING D.D. SPLIT ... Overpass (flyover)

Overpass (flyover) is coming towards final stage Panels for the overpass (flyover)

On the site