DET NORSKE VERITAS PROJECT REPORT Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry Prepared for: GAIL (India) Limited. DNV Ref. No.: PP027998 Rev 1, 13 th April, 2012

Transcript of PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit:...

Page 1: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

PROJECT REPORT

Emergency Response & Disaster

Management Plan for Cauvery Basin

Pipeline GAIL, Puducherry

Prepared for:

GAIL (India) Limited.

DNV Ref. No.: PP027998

Rev 1, 13th

April, 2012

Page 2: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin

Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page II

No distribution without permission from the client or responsible

organisational unit (however, free distribution for internal use within

DNV after 3 years) Indexing Terms

No distribution without permission from the client or responsible

organisational unit Key Words

ERDMP

Strictly confidential Service Area

SHE Risk Management

Unrestricted distribution Market Segment

Oil & Gas

Rev. No. / Date: Reason for Issue: Prepared by: Verified by Approved by:

Rev 0 /

2012-03-30

Draft report issued to GAIL for

comments AB SK SV

Rev 1 /

2012-04-13 Final Report issued to GAIL AB SK SV

All rights reserved. This publication or parts thereof may not be reproduced or transmitted in any form or by

any means, including photocopying or recording, without the prior written consent of Det Norske Veritas AS.

Emergency Response & Disaster Management Plan for cauvery

Pipeline GAIL, Puducherry

DET NORSKE VERITAS AS

DNV Maritime & Natural Gas

Flat. No. 202 & 203, Second Floor

Babu Khan Millenium Center,

RajBhavan Road, Somajuguda

500082 Hyderabad India

Tel: +91 40 23418186

Fax: +91 40 44745577 / 44745579

http://www.dnv.com

Org. No:PCGIN820

For:

GAIL (India) Limited

4th

Floor, Savitha Plaza,

Indira Gandhi Square,

Puducherry-605005

Account Ref.:

S.Arunachalam,

Sr. Manager (O&M),

GAIL (India) Limited,

Contact : 094878 44664

Email: [email protected]

Date of First Issue: 2012-04-13 Project No. PP027998

Report No.: 13WOASN-3 Organisation

Unit:

DNV Cleaner Energy & Natural Gas

Hyderabad

Revision No.: 1 Subject Group: SHE Risk Management

Summary:

This Emergency Response & Disaster Management Plan (ERDMP) to detail the action plan to be implemented

to minimise the losses through optimum utilisation of resources available in the organization as well as the

resources available with the external agencies in case of any disaster.

Prepared by: Name and Position

Avvari Anil Bhat, Consultant

Signature

Verified by Name and Position

Sandhya Kondaveety, Consultant

Signature

Approved by: Name and Position

Salian Varadharaja, Head of

Department

Signature

Page 3: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin

Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page III

Table of Contents

1 INTRODUCTION ................................................................................................................... 7

2 DEFINITION .......................................................................................................................... 7

3 OBJECTIVE ........................................................................................................................... 8

4 SCOPE ..................................................................................................................................... 8

5 GENERAL INFORMATION ABOUT PIPELINE ............................................................. 9

5.1 Description & Location ................................................................................................... 9

5.2 MAINTENANCE BASES ............................................................................................ 10

5.3 PIPELINE DESCRIPTION ........................................................................................... 10

5.4 DESPATCH TERMINAL ............................................................................................. 10

5.5 SECTIONALIZING VALVE STATIONS ................................................................... 10

6 TYPE OF EMERGENCIES: ............................................................................................... 13

7 CREDIBLE FAILURE SCENARIOS & HAZARD DISTANCES .................................. 14

8 SALIENT FEATURES ......................................................................................................... 35

8.1 Organizational Setup ..................................................................................................... 35

9 MAJOR CONTROLS AND INTER LOCKS .................................................................... 37

9.1 CONFIGURATION AND CONTROL FOR SV STATIONS ..................................... 37

9.2 CONFIGURATION AND CONTROL FOR RECEIVING TERMINALS ................. 37

9.3 SCADA SYSTEM AND FUNCTIONALITIES ........................................................... 37

10 SAFETY SYSTEMS WITHIN THE FACILITY .............................................................. 38

10.1 EMERGENCY VEHICLES .......................................................................................... 38

10.2 FIRE PROTECTION ARRANGEMENTS................................................................... 38

10.3 COMMUNICATION SYSTEMS ................................................................................. 38

10.4 REGIONAL GAS MANAGEMENT CENTRE ........................................................... 38

10.5 EMERGENCY CONTROL CENTRES (ECC) ............................................................ 38

10.6 Emergency Tools and Equipment ................................................................................. 39

11 ROLES AND RESPONSIBILITIES ................................................................................... 43

11.1 Organogram ................................................................................................................... 43

11.2 Action Plan for Coordinators and Key Personnel ......................................................... 46 11.2.1 Chief Incident Controller, DGM (O&M) / Officer In-charge: .......................... 46

11.2.2 Incident Controller, CM (O&M): ...................................................................... 47

11.2.3 Site Co-Ordinator, Base In charge: ................................................................... 47

11.2.4 Fire & Safety Co-Ordinator:.............................................................................. 47

Page 4: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin

Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page IV

11.2.5 Maintenance Co-Ordinator: ............................................................................... 47

11.2.6 Security Co-Ordinator: ...................................................................................... 48

11.2.7 Control Room Coordinator:............................................................................... 48

11.2.8 Material Co-Ordinator: ...................................................................................... 48

11.2.9 Finance Co-Ordinator: ....................................................................................... 48

11.2.10 Welfare, PR & Logistics Co-Ordinator: ........................................................ 48

11.2.11 Medical Co-Ordinator:................................................................................... 48

11.2.12 Communications Co-Ordinator: .................................................................... 49

12 SEQUENCE OF WORKS TO BE DONE DURING EMERGENCY ............................. 49

12.1 Approach Cautiously From Upwind: ............................................................................ 49

12.2 Secure The Scene: ......................................................................................................... 49

12.3 Identify The Hazards: .................................................................................................... 49

12.4 Assess The Situations: ................................................................................................... 49

12.5 General Precautions For Handling Emergencies........................................................... 50

12.6 Emergency Do's and Don’ts: ......................................................................................... 50

12.7 Action Plan to meet the Eventualities ........................................................................... 52

12.8 RESPONSIBILITIES ASSIGNED: .............................................................................. 53 12.8.1 Heavy Leakage: ................................................................................................. 53

12.8.2 Fire: ................................................................................................................... 54

12.8.3 Explosion: .......................................................................................................... 54

12.8.4 Failure of Critical Control System: ................................................................... 54

12.8.5 Design Deficiency: ............................................................................................ 54

12.8.6 Building/structure Collapse & other accidents: ................................................. 54

12.8.7 Riots/Civil Disorder/Mob attack ....................................................................... 55

12.8.8 Terrorism / Flood / Sabotage / Bomb Threat .................................................... 55

12.8.9 Outbreak of diseases / Food Poisoning / Water poisoning ................................ 55

13 PLAN OF COORDINATION .............................................................................................. 56

13.1 Communication Facilities.............................................................................................. 56 13.1.1 Telephones: ....................................................................................................... 56

13.2 Important Contact Numbers: ......................................................................................... 56

13.3 Telephone Directory at GAIL, Puducherry: .................................................................. 60

13.4 Mutual Aid Response Group ......................................................................................... 74

13.5 Co-ordination between the Local organisations/Mutual Aid Members: ....................... 74

13.6 Coordination with Outside Agencies: ........................................................................... 74

13.7 Role and Statutory Duties of Outside Agencies ............................................................ 75

Page 5: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin

Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page V

13.7.1 Role of police department ................................................................................. 75

13.7.2 Role of Tamil Nadu fire service ........................................................................ 75

13.7.3 Role of district authorities ................................................................................. 75

14 RESCUE AND RELIEF OPERATION PLAN .................................................................. 76

14.1 Assembly Points ............................................................................................................ 76

14.2 Emergency Evacuation .................................................................................................. 76

14.3 Rescue & Evacuation Procedure: .................................................................................. 76

15 MEDICAL FACILITIES ..................................................................................................... 77

15.1 First Aid Boxes:............................................................................................................. 77

15.2 Transportation Facilities: ............................................................................................... 78

16 RECOVERY PROCEDURES ............................................................................................. 78

17 REVISION & MOCK DRILLS ........................................................................................... 78

17.1 Revision: ........................................................................................................................ 78

17.2 Rehearsal / Mock Drill: ................................................................................................. 78

17.3 Training ......................................................................................................................... 79

17.4 Essential Employees ...................................................................................................... 79

17.5 Rehearsal / Mock Drill .................................................................................................. 79

17.6 Mock Drill Procedure .................................................................................................... 79

17.7 Updating the Plan .......................................................................................................... 82

Page 6: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin

Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page VI

List of Figures Figure 1 : Cauvery Basin Pipeline system ................................................................................ 12

Figure 2 : Individual Risk Contours for Narimanam Zone ....................................................... 19 Figure 3 : Individual Risk Contours for Kutthalam Zone ......................................................... 23 Figure 4 : Individual Risk Contours for Ramnad Zone ............................................................ 27 Figure 5 : Individual Risk Contours for Kovilkalappal Zone ................................................... 31 Figure 6 : Individual Risk Contours for Bhuvanagiri Zone ...................................................... 34

Figure 7 : Organisation Structure for Disaster Management Plan ............................................ 36 Figure 8: Lay-out of Narimanam zone ...................................................................................... 41

Figure 9: Lay-out of Kuthalam zone ......................................................................................... 41 Figure 10: Lay-out of Ramnad zone ......................................................................................... 42 Figure 11: Lay-out of Kovilkappal zone ................................................................................... 42 Figure 12: Lay-out of Bhuvanagiri zone ................................................................................... 43

Figure 13 : Emergency Line of command for Emergency Plan ............................................... 44 Figure 14 : Communication channel for Emergency Plan ........................................................ 45

List of Tables Table 1: Consequence Results for the Narimanam Zone’ Pipeline .......................................... 14 Table 2: Consequence Results for PRS at PPCL in the Narimanam Zone ............................... 16

Table 3: Consequence Results for AKM-NRM-Thirumarugal-Memathur Pipeline

and PRS at Memathur ............................................................................................................... 17

Table 4: Consequence Results for the Kutthalam Zone ............................................................ 20 Table 5: Consequence Results for the Ramnad Zone ............................................................... 24

Table 6: Consequence Results for the Kovilkalappal Zone ...................................................... 28 Table 7: Consequence Results for the Bhuvanagiri Zone ......................................................... 32 Table 8: Emergency Organisation Members ............................................................................ 46

Table 9: Do’s and Don’ts of Emergency .................................................................................. 50

Table 10: List of Important phone numbers of district authorities ........................................... 56 Table 11: Important Telephone Numbers of GAIL personnel .................................................. 60 Table 12: Mutual Aid Contact Details ...................................................................................... 61 Table 13: Police Station Contact Details .................................................................................. 65

Page 7: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin

Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 7

1 INTRODUCTION

With rapid industrialisation and the birth of large-scale plants using complex technologies, it

has become vital for industries to develop "Emergency Response & Disaster Management

Plans" to enable them to meet any undesired eventuality. Disaster management has assumed

added significance after the catastrophic happenings at Flixborough, Bhopal, Mexico, and

Chernobyl etc. Indeed some of the disasters in the recent past have brought out glaring

inadequacies in the management systems to respond to a disaster situation to effectively

control and minimise the loss of lives and property.

In view of the hazards associated with hydrocarbon processing industries, it is obligatory,

under the Factories Act, 1948(amended in 1987) and Manufacture, Storage and Import of

Hazardous Chemical (MSIHC) Rules, 1989 to develop our own ERDMP as per PNGRB

norms. Such a plan will ensure establishment of a system, which would make optimum use

of our available resources for speedy containment of the disaster protecting the health and

safety of people, nearby residences and workers as well as minimising damage to property

and environment. There are many agencies involved in the activities associated with disaster

situation e.g. Civil Administration, Fire services, Medical, Police, Army, Voluntary

organisations etc., which call for an organised multi-disciplinary approach to the problem.

DNV has been requested by GAIL to prepare and Emergency Response and Disaster

Management Plan (ERDMP) to satisfy both local regulatory and their internal HSE

requirements.

NAME AND ADDRESS OF THE PERSON FURNISHING THE INFORMATION

Name: Dinabandhu Soren,

Dy. Gen. Manager (O&M) & Officer In-charge,

Address:

Office: GAIL (India) Limited,

IV Floor, Savitha Plaza,

Puducherry - 605005.

Mobile: 9443242601

Landline: 0413 2200932, 2200933, 2201480

2 DEFINITION

Disaster is an incident or calamity caused by deficiencies in the system, accident, natural

causes, or deliberate intent and resulting in: serious damage or destruction to records and

facilities; a sudden threat to personal safety; or major disruption of operations. The aim of a

Page 8: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin

Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 8

disaster management plan is to detail the action plan to be implemented to minimise the

losses through optimum utilisation of resources available in the organization as well as the

resources available with the external agencies.

3 OBJECTIVE

The objective of the ERDMP is:

Identify potential hazards emergencies which has great threat to plant, property,

people & equipment

Initially contain and ultimately bring the incident under control

Minimize damage to property and environment

Effective rescue and treatment of casualties

Safeguard personnel in the premises

Provide authoritative information to news/media

Secure safe rehabilitation of affected areas

Preserve relevant records and equipment for subsequent inquiry into the cause and

circumstances of emergency

Make maximum use of the combined resources of the factory and the outside services

4 Scope

The scope of this ERDMP covers

Classifying the emergency

Pre emergency planning

Emergency mitigation measures

Emergency preparedness measures

Emergency response procedures and measures

Emergency organization and responsibilities

Infrastructure requirements

Declaration of Onsite and Offsite emergency

Resource for controlling emergencies

Demographic Information

Medical facilities

Page 9: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin

Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 9

Evacuation

Public relations and Information to Public

Reporting the incident

Emergency recovery Procedures

Integration of the ERDMP with National Disaster Management(NDMP)

Security threat plan

5 GENERAL INFORMATION ABOUT PIPELINE

5.1 Description & Location

Natural Gas pipeline network in Cauvery Basin has been designed to provide uninterrupted

service to both producers and consumers. The system has sufficient built-in redundancy to

meet breakdowns and planned withdrawal of units for routine maintenance. Normally,

pipeline is operated optimally to meet supply and demand forecast. The pipeline route has

been selected to avoid populated areas and has built in design factor commensurate with

degree of risk related to population index of that area.

To prevent damage due to corrosion, three layer PE coated pipes have been used for most of

the lines. Besides, a permanent CP system has been installed for additional protection, the

health of which is routinely monitored.

GAIL, Cauvery Basin consists of a network of around 267 Kms of pipeline of various sizes

and lengths supplying NATURAL GAS to 52 consumers in the region distributed

geographically in different districts. There are 9 gas collecting stations of ONGCL

(Narimanam, Kamalapuram, Nannilam, Tiruvarur EPS, Adiyakkamangalam, Bhuvanagiri,

Kovilkalappal, Ramnad, Kuthalam) divided into Five zones being utilized for supplying gas

to the consumers.

The Five zones are:

Narimanam zone catering to 38 consumers.

Kovilkalappal (Thirumakkotai) zone catering to 2 consumers.

Bhuvanagiri zone catering to 1 consumer.

Kuthalam Zone catering to 6 consumers

Ramnad Zone catering to 5 consumers

Page 10: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin

Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 10

5.2 MAINTENANCE BASES

The pipeline network has been divided into the following five Zones of operation with the

Base stations as given below

i) PPCL (Narimanam Zone)

ii) Tirumakottai TNEB (Kovilkalappal Zone)

iii) Kuthalam TNEB (Kuthalam & Bhuvanagiri Zones)

iv) Ramnad TNEB (Ramnad Zone)

Each of the above base station is headed by a Base-In-charge who is responsible for safe

operation and maintenance as well as management of any emergency involving the pipeline

arising in the area.

5.3 PIPELINE DESCRIPTION

The following facilities have been provided (as well as proposed) along the Pipeline network:

1. Despatch Terminal

2. Receiving Terminals

3. Sectionalizing valve stations

4. Tap-ins / tap-offs

Natural gas in the pipeline network of Cauvery Basin is supplied through the production

installations of ONGC. The Natural gas from the pipeline grid is supplied to the downstream

consumers.

5.4 DESPATCH TERMINAL

The pipeline network has six Dispatch terminals in total covering all the Zones. The gas is

received from ONGCL and is transported to the downstream consumers through the Pipeline

network at an average operating pressure of 10-15 Kg / cm2.

5.5 SECTIONALIZING VALVE STATIONS

The SV stations are installed on the main trunk line, for the purpose of isolating the sections

of pipeline system in case of any maintenance or emergency or accident.

Page 11: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin

Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 11

These stations apart from main line isolation valve do have the provision for safe venting off

the gas from the pipeline to the atmosphere. Most of the SVs along the entire pipeline

network are guarded round the clock by security guards, who work in shifts. The security

guards have been provided with Emergency Telephone numbers and have been directed to

provide information as and when necessary.

Each SV station is located inside chain-link fencing and its gate is kept locked.

Page 12: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 12

Figure 1 : Cauvery Basin Pipeline system

Page 13: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin

Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 13

6 TYPE OF EMERGENCIES:

The emergencies are mainly classified into three levels

Level 1 : This is an emergency or an incident which

can be effectively and safely managed, and contained within the site, location or

installation by the available resources

has no impact outside the site, location or installation

is unlikely to be danger to life, the environment or to company assets or reputation

All the lelvel1 emergencies will be handled by the GAIL Personnel

Level 2 : This is an emergency or an incident which

cannot be effectively and safely managed or contained at the site, location or

installation by available resource and additional support is required

is having, or has the potential to have an effect beyond the site, location or installation

and where external support of mutual aid partner may be involved

is likely to be danger to life, to the environment, to company assets or reputation

level 2 emergencies will be handled by the GAIL personnel and members under

Mutual Aid Scheme

Level 3 : This is an emergency or an incident which

is catastrophic and is likely to affect the population, property and environment inside

and outside the installation, and management & control is done by District

Administration. Although the level 3 emergency falls under the purview of District

Authority but till this will be taken care till the District administration comes into

force.

Level 1 & Level 2 shall normally be grouped as onsite emergency and Level 3 as off-site

emergency.

Page 14: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 14

7 CREDIBLE FAILURE SCENARIOS & HAZARD DISTANCES

The credible failure scenarios are given in below table

Table 1: Consequence Results for the Narimanam Zone’ Pipeline

No. Node Description Scenario Release Rate &

Duration Event Impact criteria

Consequence

Distance(m)

D

11m/s

B

2m/s

F

2m/s

1

Pipeline from CPCL to

PPCL

(High Flow Rate Line)

Pipeline

Medium 3.98E+00 kg/s & 711.77s

Flash Fire LFL (41766 ppm) 60.7 73.26 32.33

Jet Fire

37.5Kw/m2 11.34 8.77 8.77

12.5Kw/m2 13.17 11.83 11.83

4Kw/m2 19.41 20.86 20.86

Explosion

0.3bar 36.6 41.6 21.6

0.1bar 56.17 61.17 41.17

0.03bar 111.33 116.33 96.33

Large 1.594E+01kg/s & 177.94s

Flash Fire LFL (41766 ppm) 118.94 57.51 131.24

Jet Fire

37.5Kw/m2 21.98 16.34 16.34

12.5Kw/m2 26.43 24.84 24.84

4Kw/m2 44.21 44.77 44.77

Explosion

0.3bar 61.6 71.6 31.6

0.1bar 81.17 91.17 51.17

0.03bar 136.33 146.33 106.33

Rupture NA

Flash Fire LFL (41766 ppm) 51.76 48.32 21.04

Jet Fire

37.5Kw/m2 8.65 8.65 13.71

12.5Kw/m2 12.14 12.14 14.73

4Kw/m2 21.56 21.56 16.41

Explosion

0.3bar 0 26.6 0

0.1bar 0 46.17 0

0.03bar 0 101.33 0

2 Pipeline from ISRM Pipeline Medium 2.18E+00 kg/s & 66.9s Flash Fire LFL (39302.1 ppm) 47.66 64.46 57.09

Page 15: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 15

No. Node Description Scenario Release Rate &

Duration Event Impact criteria

Consequence

Distance(m)

D

11m/s

B

2m/s

F

2m/s

consumers to Jayadevi

(Low Flow Rate) Jet Fire

37.5Kw/m2 5.68 6.72 6.72

12.5Kw/m2 5.83 8.6 8.6

4Kw/m2 12.72 14.32 14.32

Explosion

0.3bar NH 36.62 31.62

0.1bar NH 56.24 51.24

0.03bar NH 111.56 106.56

Large 8.73E+00kg/s & 16.72s

Flash Fire LFL (39302.1 ppm) 93.62 120.19 51.23

Jet Fire

37.5Kw/m2 16.49 12.46 12.46

12.5Kw/m2 19.54 17.89 17.89

4Kw/m2 31.48 32.5 32.5

Explosion

0.3bar 51.62 103.11 31.62

0.1bar 71.24 122.74 51.24

0.03bar 126.56 178.05 106.56

Rupture NA

Flash Fire LFL (39302.1 ppm) 50.91 57.1 27.1

Jet Fire

37.5Kw/m2 11.33 8.06 8.06

12.5Kw/m2 12.54 10.67 17.87

4Kw/m2 15.65 10.67 17.87

Explosion

0.3bar 31.62 NH NH

0.1bar 51.24 NH NH

0.03bar 106.55 NH NH

Page 16: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 16

Based the dynamic inventory, PRS at PPCL has considered as the representative for all the PRS station in Narimanam Zone. Table 2 below

summarises representative failure cases with the consequence results.

Table 2: Consequence Results for PRS at PPCL in the Narimanam Zone

No. Node Description Scenario Release Rate &

Duration Event Impact criteria

Consequence

Distance(m)

D

11m/s

B

2m/s

F

2m/s

1 PRS AT CPCL

(High Flow Rate) PRS

Small 1.17E-02kg/s & 900s

Flash Fire LFL (41766 ppm) 0.745 0.913 0.931

Jet Fire

37.5Kw/m2 NR NR NR

12.5Kw/m2 NR NR NR

4Kw/m2 1.74 1.74 1.74

Medium 2.94E-01kg/s & 900s

Flash Fire LFL (41766 ppm) 3.45 4.41 4.59

Jet Fire

37.5Kw/m2 NR NR NR

12.5Kw/m2 NR 6.19 6.19

4Kw/m2 7.6 8.47 8.47

Large 4.69E+00kg/s & 585.29s

Flash Fire LFL (41766 ppm) 14.89 20.2 19.16

Jet Fire

37.5Kw/m2 29.14 24.06 24.06

12.5Kw/m2 33.39 30.03 30.03

4Kw/m2 38.35 37.83 37.83

Rupture NA

Flash Fire LFL (41766 ppm) 4.39 5.77 6.13

Jet Fire

37.5Kw/m2 8.59 8.59 8.59

12.5Kw/m2 9.5 9.5 9.5

4Kw/m2 11.66 11.66 11.11

Page 17: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 17

below summarises the failure cases with the consequence results of AKM-NRM-Thirumarugal-Memathur Pipeline and PRS at Memathur

Table 3: Consequence Results for AKM-NRM-Thirumarugal-Memathur Pipeline and PRS at Memathur

No Node Description Accident

Scenario

Release Rate &

Duration Event Impact criteria

Consequence

Distance(m)

D

11m/s

B

2m/s

F

2m/s

1

Pipeline from AKM-NRM-

THIRUMARUGAL-

MEMATHUR

Pipeline

Medium 4.11E+00 kg/s & 900s

Flash Fire LFL (39302.1 ppm) 63.83 87.16 77.44

Jet Fire

37.5Kw/m2 11.39 8.84 8.84

12.5Kw/m2 13.26 11.94 11.94

4Kw/m2 19.72 21.16 21.16

Explosion

0.3bar 36.62 46.62 41.62

0.1bar 56.24 66.24 61.24

0.03bar 111.56 121.56 116.56

Large 1.64E+01kg/s & 432.76s

Flash Fire LFL (39302.1 ppm) 125.66 162.91 67.63

Jet Fire

37.5Kw/m2 22.12 16.48 16.48

12.5Kw/m2 26.64 25.2 25.2

4Kw/m2 44.85 45.38 45.38

Explosion

0.3bar 66.62 86.62 36.62

0.1bar 86.24 106.24 56.24

0.03bar 141.56 161.56 111.56

Rupture NA

Flash Fire LFL (39302.1 ppm) 198.12 77.19 87.19

Fireball

37.5Kw/m2 136.63 136.63 136.63

12.5Kw/m2 385.73 385.73 385.73

4Kw/m2 717.6 717.6 717.6

Explosion

0.3bar 106.99 9.69 17.7

0.1bar 126.62 29.31 37.32

0.03bar 181.93 84.63 92.64

2 PRS at SV3 Memathur Pipeline Small 1.21E-02kg/s & 900s Flash Fire LFL (39302.1 ppm) 0.754 0.919 0.937

Page 18: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 18

No Node Description Accident

Scenario

Release Rate &

Duration Event Impact criteria

Consequence

Distance(m)

D

11m/s

B

2m/s

F

2m/s

Medium 3.03E-1kg/s & 900s

Flash Fire LFL (39302.1 ppm) 3.48 4.46 4.63

Jet Fire

37.5Kw/m2 NR NR NR

12.5Kw/m2 NR 6.36 6.36

4Kw/m2 7.69 8.57 8.57

Large 4.84E+00kg/s & 774.79s

Flash Fire LFL (39302.1 ppm) 15.16 19.32 20.33

Jet Fire

37.5Kw/m2 29.34 24.32 24.32

12.5Kw/m2 33.65 30.35 30.35

4Kw/m2 38.69 38.23 38.23

Rupture NA

Flash Fire LFL (39302.1 ppm) 183.16 55.52 61.04

Fireball

37.5Kw/m2 NR NR NR

12.5Kw/m2 196.13 196.13 196.13

4Kw/m2 396.28 396.28 396.28

Explosion

0.3bar NR NR NR

0.1bar 183.39 17.77 30.04

0.03bar 216.39 50.76 63.03

Page 19: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 19

Individual Risk

Figure 2 : Individual Risk Contours for Narimanam Zone

Page 20: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 20

Table 4: Consequence Results for the Kutthalam Zone

S.No Description Accident

Scenario

Release Rate, Release

Duration Event

Impact criteria

Consequence Distance(m)

Day Night

B 2m/s D 11m/s F 2m/s

1

Receiving and Distribution

Terminal Kutthalam (KUT

DT)

Small 0.01kg/s, 900s

Flash Fire LFL (39302.1) 0.91 0.75 0.9

Jet Fire

37.5kW/m2 1.76 1.76 1.76

12.5kW/m2 1.76 1.76 1.76

4 kW/m2 1.76 1.76 1.76

Medium 0.3kg/s, 900s

Flash Fire LFL (39302.1) 4.39 3.48 4..41

Jet Fire

37.5kW/m2 6.24 6.24 6.24

12.5kW/m2 7.24 7.24 7.24

4 kW/m2 8.5 7.69 8.5

Large 4.84kg/s, 900s

Flash Fire LFL 18.9 15.16 19.2

Jet Fire

37.5kW/m2 24.86 29.33 24.86

12.5kW/m2 30.75 33.65 30.75

4 kW/m2 38.32 38.69 38.32

Rupture 37.07kg/s, 834s

Flash Fire LFL (39302.1) 72.26 81.44 77.97

Jet Fire

37.5kW/m2 61.02 76.22 61.02

12.5kW/m2 78.31 86.07 78.21

4 kW/m2 102.31 101.59 102.31

Explosion

0.3bar - - -

0.1bar 48.25 53.25 48.25

0.03bar 81.24 86.24 81.24

2 KUT DT to SV Memathur Medium 4.11kg/s, 900s

Flash Fire LFL (39302.1) 87.33 63.83 76.38

Jet Fire

37.5kW/m2 9.07 11.39 9.07

12.5kW/m2 12.09 13.24 12.09

4 kW/m2 21.07 19.72 21.07

Explosion

0.3bar 46.62 36.62 41.62

0.1bar 66.24 56.24 61.24

0.03bar 121/559 111.55 61.24

Page 21: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 21

S.No Description Accident

Scenario

Release Rate, Release

Duration Event

Impact criteria

Consequence Distance(m)

Day Night

B 2m/s D 11m/s F 2m/s

Large 16.4kg/s, 900s

Flash Fire LFL (39302.1) 167.21 125.65 149.34

Jet Fire

37.5kW/m2 16.94 22.12 16.94

12.5kW/m2 25.17 26.64 25.17

4 kW/m2 45.36 44.84 45.36

Explosion

0.3bar 86.6 66.5 76.62

0.1bar 106.24 86.24 96.24

0.03bar 161.55 141.55 151.55

Rupture 28.1kg/s, 900s

Flash Fire LFL (39302.1) 9.83 0 14.01

Jet Fire

37.5kW/m2 24.99 38.03 24.99

12.5kW/m2 38.24 43.12 38.24

4 kW/m2 68.97 65.82 68.97

Explosion

0.3bar 36.6 76.6 31.6

0.1bar 56.24 96.24 51.24

0.03bar 111.55 151.55 106.55

3 KUT TNEB to Kaveri Gas

Medium 4.1kg/s, 900s

Flash Fire LFL (39302.1) 88.17 63.97 77.57

Jet Fire

37.5kW/m2 9.07 11.4 9.07

12.5kW/m2 12.104 13.27 12.104

4 kW/m2 21.1 19.75 21.1

Explosion

0.3bar 46.62 36.62 41.62

0.1bar 66.24 56.24 61.24

0.03bar 121.55 111.55 116.55

Large 16.48kg/s, 781s

Flash Fire LFL (39302.1) 169.7 126.04 150.68

Jet Fire

37.5kW/m2 16.95 22.14 16.95

12.5kW/m2 25.19 26.66 25.19

4 kW/m2 45.4 44.89 45.4

Explosion

0.3bar 86.62 66.62 81.62

0.1bar 106.24 86.24 101.24

0.03bar 161.55 141.55 156.55

Page 22: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 22

S.No Description Accident

Scenario

Release Rate, Release

Duration Event

Impact criteria

Consequence Distance(m)

Day Night

B 2m/s D 11m/s F 2m/s

Rupture 16.62kg/s, 775.3s

Flash Fire LFL (39302.1) 166.18 125.94 149.44

Jet Fire

37.5kW/m2 17.02 22.22 17.02

12.5kW/m2 25.36 26.77 25.36

4 kW/m2 45.6 45.09 45.6

Explosion

0.3bar 86.62 66.62 76.62

0.1bar 106.24 86.24 96.24

0.03bar 161.55 141.55 151.55

Page 23: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 23

Individual Risk

Figure 3 : Individual Risk Contours for Kutthalam Zone

Page 24: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 24

Table 5: Consequence Results for the Ramnad Zone

S.No Description Accident

Scenario

Release Rate,

Release Duration Event Impact criteria

Consequence Distance(m)

Day Night

B 2m/s D 11m/s F 2m/s

1

Receiving and

Distribution terminal

Ramnad (RMD GCS)

Small 0.01kg/s, 900s Flash Fire LFL (39302.1) 0.91 0.75 0.9

Medium 0.29kg/s, 900s

Flash Fire LFL (39302.1) 4.37 3.46 4.39

Jet Fire

37.5kW/m2 6.02 6.02 6.02

12.5kW/m2 7.4 7.4 7.4

4 kW/m2 8.39 7.57 8.39

Large 4.67kg/s, 900s

Flash Fire LFL (39302.1) 18.98 15.04 19.9

Jet Fire

37.5kW/m2 24.58 29.07 24.58

12.5kW/m2 30.38 33.32 30.38

4 kW/m2 37.87 38.27 37.87

Rupture 35.67kg/s, 900s

Flash Fire LFL (39302.1) 71.09 74.9 78.68

Jet Fire

37.5kW/m2 60.35 75.24 60.35

12.5kW/m2 77.33 84.97 77.33

4 kW/m2 100.85 100.32 100.85

Explosion

0.3bar - - -

0.1bar 48.22 48.22 48.22

0.03bar 81.13 81.13 81.13

2 RMD GCS to TNEB Medium 3.96kg/s, 900s

Flash Fire LFL (39302.1) 74.2 59.71 61.75

Jet Fire

37.5kW/m2 8.98 11.31 8.98

12.5kW/m2 11.95 13.13 11.95

4 kW/m2 20.76 19.39 20.76

Explosion

0.3bar 41.6 0 36.6

0.1bar 61.17 0 56.17

0.03bar 116.35 0 111.35

Large 15.8kg/s, 900s Flash Fire LFL (39302.1) 135.33 118.25 56.69

Page 25: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 25

S.No Description Accident

Scenario

Release Rate,

Release Duration Event Impact criteria

Consequence Distance(m)

Day Night

B 2m/s D 11m/s F 2m/s

Jet Fire

37.5kW/m2 16.78 21.95 16.78

12.5kW/m2 24.81 26.38 24.81

4 kW/m2 44.75 44.21 44.75

Explosion

0.3bar 71.63 61.63 31.63

0.1bar 91.17 91.17 51.17

0.03bar 146.35 136.35 106.35

Rupture 24.5kg/s, 900s

Flash Fire LFL 139.36 141.91 58.97

Jet Fire

37.5kW/m2 20.76 28.57 20.76

12.5kW/m2 32.31 34.08 32.31

4 kW/m2 58.06 57.57 58.06

Explosion

0.3bar 71.63 76.63 31.63

0.1bar 91.17 96.17 51.17

0.03bar 146.35 151.35 106.35

3 RMD TNEB to

Coromandel

Medium 4.0kg/s, 900s

Flash Fire LFL (39302.1) 76.97 61.32 64.85

Jet Fire

37.5kW/m2 9.03 11.37 9.03

12.5kW/m2 12.02 13.21 12.02

4 kW/m2 20.9 19.54 20.9

Explosion

0.3bar 41.6 36.6 36.6

0.1bar 61.17 56.17 56.17

0.03bar 116.35 111.35 111.35

Large 16.01kg/s, 900s

Flash Fire LFL 141.43 120.45 58.61

Jet Fire

37.5kW/m2 16.86 22.06 16.86

12.5kW/m2 24.96 26.52 24.96

4 kW/m2 45.01 44.48 45.01

Explosion 0.3bar 76.6 66.6 31.6

Page 26: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 26

S.No Description Accident

Scenario

Release Rate,

Release Duration Event Impact criteria

Consequence Distance(m)

Day Night

B 2m/s D 11m/s F 2m/s

0.1bar 96.17 86.17 51.17

0.03bar 151.35 141.35 106.35

Rupture 10.11kg/s, 900s

Flash Fire LFL (39302.1) 118.16 96.82 96.46

Jet Fire

37.5kW/m2 13.79 17.87 13.79

12.5kW/m2 19.49 21.24 19.49

4 kW/m2 35.38 34.51 35.38

Explosion

0.3bar 61.6 51.6 51.6

0.1bar 81.17 71.11 71.11

0.03bar 136.35 126.35 126.35

Page 27: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 27

Individual Risk

Figure 4 : Individual Risk Contours for Ramnad Zone

Page 28: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 28

Table 6: Consequence Results for the Kovilkalappal Zone

S.No Description Accident

Scenario

Release Rate, Release

Duration Event Impact criteria

Consequence Distance(m)

Day Night

B 2m/s D 11m/s F 2m/s

1 Receiving and Distribution

Terminal (Nallur DT)

Small 0.01kg/s, 900s Flash Fire LFL (39302.1) 0.91 0.75 0.9

Medium 0.3kg/s, 900s

Flash Fire LFL (39302.1) 4.39 3.48 4.41

Jet Fire

37.5kW/m2 6.24 6.24 6.24

12.5kW/m2 7.8 7.8 7.8

4 kW/m2 8.54 7.69 8.5

Large 4.84kg/s, 900s

Flash Fire LFL (39302.1) 18.99 15.16 19.92

Jet Fire

37.5kW/m2 24.86 29.33 24.86

12.5kW/m2 30.85 33.65 30.75

4 kW/m2 38.32 38.69 38.32

Rupture 37kg/s, 521s

Flash Fire LFL (39302.1) 72.26 81.44 77.97

Jet Fire

37.5kW/m2 61.02 76.22 61.02

12.5kW/m2 78.31 86.07 78.31

4 kW/m2 102.31 101.59 102.31

Explosion

0.3bar 0 0 0

0.1bar 48.25 53.25 48.25

0.03bar 81.14 86.24 81.24

2 Nallur DT to TNEB TMK

Medium 4.11kg/s, 900s

Flash Fire LFL (39302.1) 87.33 63.83 76.38

Jet Fire

37.5kW/m2 9.07 11.39 9.07

12.5kW/m2 12.09 13.25 12.09

4 kW/m2 21.07 19.72 21.07

Explosion

0.3bar 46.62 36.62 41.62

0.1bar 66.24 56.24 61.24

0.03bar 121.55 111.55 116.55

Large 16.4kg/s, 900s

Flash Fire LFL (39302.1) 167.21 125.65 149.34

Jet Fire 37.5kW/m2 16.94 22.12 16.94

12.5kW/m2 25.17 26.64 25.17

Page 29: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 29

S.No Description Accident

Scenario

Release Rate, Release

Duration Event Impact criteria

Consequence Distance(m)

Day Night

B 2m/s D 11m/s F 2m/s

4 kW/m2 45.36 44.84 45.36

Explosion

0.3bar 86.62 66.62 76.62

0.1bar 106.24 86.26 96.24

0.03bar 161.55 141.55 151.55

Rupture 13.11kg/s, 900s

Flash Fire LFL (39302.1) 97.88 104.26 40.21

Jet Fire

37.5kW/m2 17.59 26.83 17.59

12.5kW/m2 25.86 29.85 25.86

4 kW/m2 46.86 41.48 46.86

Explosion

0.3bar 51.62 56.62 26.62

0.1bar 71.24 76.24 46.24

0.03bar 126.55 131.55 101.55

3 Nallur DT to Premi

Chemco

Medium 2.82kg/s, 129s

Flash Fire LFL (39302.1) 72.56 53.14 64.77

Jet Fire

37.5kW/m2 7.66 9.48 7.66

12.5kW/m2 9.96 10.85 9.96

4 kW/m2 16.75 15.31 16.75

Explosion

0.3bar 41.62 0 36.62

0.1bar 61.24 0 56.25

0.03bar 116.55 0 111.55

Large 11.3kg/s, 32.2s

Flash Fire LFL (39302.1) 140.62 105.05 125.4

Jet Fire

37.5kW/m2 14.38 18.64 14.38

12.5kW/m2 20.59 22.24 20.59

4 kW/m2 37.32 36.52 37.32

Explosion

0.3bar 76.62 56.62 87.87

0.1bar 96.24 76.24 107.49

0.03bar 151.55 131.55 162.81

Rupture 3.5kg/s, 104s Flash Fire LFL (39302.1) 73.34 55.18 62.78

Jet Fire 37.5kW/m2 8.88 11.56 8.88

Page 30: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 30

S.No Description Accident

Scenario

Release Rate, Release

Duration Event Impact criteria

Consequence Distance(m)

Day Night

B 2m/s D 11m/s F 2m/s

12.5kW/m2 11.72 13.23 11.72

4 kW/m2 19.89 18.34 19.89

Explosion

0.3bar 41.62 0 36.62

0.1bar 61.24 0 56.25

0.03bar 116.55 0 111.55

Page 31: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 31

Individual Risk

Figure 5 : Individual Risk Contours for Kovilkalappal Zone

Page 32: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 32

Table 7: Consequence Results for the Bhuvanagiri Zone

S.No Description Accident Scenario Release Rate,

Release Duration Event Impact criteria

Consequence Distance(m)

Day/Night

B 2m/s D 11m/s F 2m/s

1 Neycer (India) Ltd

Small 0.11kg/s, 900s Flash Fire LFL (39302.1) 0.91 0.75 0.9

Medium 0.3kg/s, 900s

Flash Fire LFL (39302.1) 4.39 3.48 4.41

Jet Fire

37.5kW/m2 6.24 6.24 6.24

12.5kW/m2 7.6 7.6 7.6

4 kW/m2 8.5 7.69 8.5

Large 4.84kg/s, 239s

Flash Fire LFL (39302.1) 18.99 15.16 19.92

Jet Fire

37.5kW/m2 24.86 29.33 24.86

12.5kW/m2 30.75 33.65 30.75

4 kW/m2 38.32 38.69 38.32

Rupture 2.68kg/s, 431s

Flash Fire LFL (39302.1) 14.85 10.25 15.47

Jet Fire

37.5kW/m2 19.27 25.44 19.27

12.5kW/m2 24.36 27.78 24.36

4 kW/m2 30.53 31.01 30.53

2 Bhuvanagiri to Neycer (India) Ltd

Medium 3.45kg/s, 900s

Flash Fire LFL (39302.1) 78.88 58.01 67.41

Jet Fire

37.5kW/m2 8.36 10.43 8.36

12.5kW/m2 11.05 12.08 11.05

4 kW/m2 18.97 17.56 18.97

Explosion

0.3bar 41.62 0 36.62

0.1bar 61.24 0 56.24

0.03bar 116.55 0 111.55

Large 13.8kg/s, 316s

Flash Fire LFL (39302.1) 150.44 113.377 133.63

Jet Fire 37.5kW/m2 15.72 20.46 15.72

12.5kW/m2 22.96 24.53 22.96

Page 33: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 33

S.No Description Accident Scenario Release Rate,

Release Duration Event Impact criteria

Consequence Distance(m)

Day/Night

B 2m/s D 11m/s F 2m/s

4 kW/m2 41.47 40.82 41.47

Explosion

0.3bar 81.62 61.62 71.62

0.1bar 101.24 81.24 91.24

0.03bar 156.55 136.55 149.55

Rupture 0.48kg/s, 900s

Flash Fire LFL (39302.1) 24.9 23.11 18.02

Jet Fire

37.5kW/m2 7.16 8.25 7.16

12.5kW/m2 7.16 8.25 7.16

4 kW/m2 7.17 8.25 7.17

Page 34: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 34

Individual Risk

Figure 6 : Individual Risk Contours for Bhuvanagiri Zone

Page 35: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin

Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 35

In these scenarios most of them can be treated as onsite emergencies and come under level 1

and level 2 emergencies. The level 3 emergencies mostly consist of

Riots/Civil Disorder/Mob attack

Terrorism

Sabotage

Bomb threat

War / hit by missiles

Abduction

Food poisoning / water poisoning.

Flood

Earth quake

Cyclone

Outbreak of disease

Excessive rains

Tsunami

All the scenarios will be acted by the combined resources of the GAIL and the outside

services based on their level.

8 SALIENT FEATURES

8.1 Organizational Setup

The organization chart is given in Figure 7

Page 36: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 36

Figure 7 : Organisation Structure for Disaster Management Plan

Page 37: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin

Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 37

9 MAJOR CONTROLS AND INTER LOCKS

In view of the hazards (fire / leakage) associated with the highly flammable natural gas and

the fact that the cross country pipe lines passing through a number of populated areas, GAIL

has recognized the paramount importance in ensuring safety during transportation through

the pipe line. A number of SV stations have been provided at different locations along the

pipe line to make it safe.

9.1 CONFIGURATION AND CONTROL FOR SV STATIONS

SV stations are provided along the pipe line at every 20 to 25 Kms approximately. These SV

stations consist of main isolating ball valves QOEC System for evacuating gas. In case of

emergency in any particular section the up / down stream of SV stations can be isolated and

the gas can be vent out in order to facilitate repair jobs in that particular section.

All SV stations are guarded round the clock by security guards. Communication facility is

available for communicating with the RGMC, Pondicherry.

9.2 CONFIGURATION AND CONTROL FOR RECEIVING

TERMINALS

The Receiving terminals are provided with filtration system which consists of slug catcher,

scrubber and filter separators, pressure reduction system and metering system. The pressure

reduction system consists of pressure controllers and shutdown valves. Normally all the

major receiving terminals have two loops of pressure reduction system and one loop will be

online and the second loop will be in hot standby. If the online loop fails immediately the

stand by loop will come into line and by this way it is ensured that required pressure is

always maintained to the consumer. The receiving terminals also have safety valves in order

to take care of any excessive pressure to ensure safety of the terminal.

9.3 SCADA SYSTEM AND FUNCTIONALITIES

Monitoring

The pipe line parameters of various stations like Pressure, Temperature, and Gas flow can be

monitored from RGMC, Pondicherry by SCADA.

Page 38: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin

Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 38

10 SAFETY SYSTEMS WITHIN THE FACILITY

In view of possible emergencies involving natural gas along the pipeline GAIL has provided

the following resources for controlling emergencies and necessary mitigate actions. These are

described in this section.

10.1 EMERGENCY VEHICLES

Each base station has been equipped with a round-the-clock vehicle. This vehicle would be

available with the pipeline O&M department in the respective Base Station and would be

used for reaching the scene of any accident along the pipeline and controlling the

emergencies.

10.2 FIRE PROTECTION ARRANGEMENTS

All major terminals are provided with fire water hydrant systems and portable fire

extinguishers and all other terminals and pipeline installations are provided with portable fire

extinguishers. Minimum 2 numbers of 10 kg Dry Chemical Powder type fire extinguishers

are kept at small installation & additional 25 kg Dry Chemical Powder type fire extinguisher

is kept at major installation

10.3 COMMUNICATION SYSTEMS

The main mode of communication between the base stations and RGMC Pondicherry is

Landline Phones/Mobile phones.

10.4 REGIONAL GAS MANAGEMENT CENTRE

Regional Gas Management Centre established at Pondicherry Office WILL ACT AS

REGIONAL CONTROL CENTRE. In RGMC all the data regarding operational requirement

can be collected through GSM Modem based SCADA communication.

10.5 EMERGENCY CONTROL CENTRES (ECC)

The control room shall be designated as the Emergency Control Centre for controlling any

emergency arising in their respective regions. The Chief Incident Controller shall be present

at the Emergency Control Centers along with the Engineers & Technicians, as required.

Depending upon the situation and decision of the Chief Incident Controller(s) the Emergency

Control Centre may also be temporarily shifted to the location of leak along the Natural Gas

pipeline.

The following facilities shall be available at each of the Emergency Control Centers (ECC):

Page 39: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin

Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 39

a) Master plan of the whole pipeline network including associated facilities and surrounding

areas.

b) Layout plan of the relevant installations.

c) Maps indicating location of pipeline and associated facilities vis-à-vis populated areas in

the neighborhood

d) Communication arrangements ( Mobile phones, phones, etc.)

e) A copy of the Disaster Management Plan

f) List of telephone numbers of all key personnel of GAIL

g) List of telephone numbers of external agencies (District authorities, police, hospitals,

contractors, neighbouring industries, consumers, etc.)

h) Telephone directory both local as well as other districts in the region

i) Transport facility (in addition to the emergency vehicle)

j) General stationery like paper, pencils, pens etc.

The control room staff shall never leave the control room (ECC) in any case, except in the

following situations:

a) Fire inside the control room

b) Natural Gas ingress inside the control room

10.6 Emergency Tools and Equipment

1. LEL detector.

2. PPEs – (Minimum 3 sets)

- Safety helmets

- Ear muff

- Cotton hand gloves

3. First aid box.

4. Safety torch.

5. Valve sealant gun and sufficient cartridges.

Page 40: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin

Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 40

6. Measuring tape.

7. S.W. Gaskets- 2”, 4”, 6”, 8”, 10”, 12”, 14”, 18”.

8. Grease.

9. Rustoline.

10. Marking cloth.

11. Teflon tape.

12. Insulation tape.

13. DCP fire extinguisher.

14. SS fittings.

15. O-Ring kit.

16. Tool box containing following Non-Sparking Tools

- Set of ring spanners 6-32 mm

- Set of open end spanner 6-32mm

- Pipe wrench

- Adjustable wrench

- Set of screw drivers

- Allen key set

- Location Maps for the Terminals

The location maps for the terminals are given below so that they can be used during

emergency situations.

Page 41: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin

Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 41

Figure 8: Lay-out of Narimanam zone

Figure 9: Lay-out of Kuthalam zone

Page 42: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin

Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 42

Figure 10: Lay-out of Ramnad zone

Figure 11: Lay-out of Kovilkappal zone

Page 43: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin

Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 43

Figure 12: Lay-out of Bhuvanagiri zone

11 ROLES AND RESPONSIBILITIES

11.1 Organogram

The details (designation) and duties of the staff are given below in the “organisation structure

for emergency plan” is given in Figure 13

Page 44: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 44

Figure 13 : Emergency Line of command for Emergency Plan

Page 45: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 45

Figure 14 : Communication channel for Emergency Plan

Page 46: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan

for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 46

The role of key personnel is clearly defined to avoid confusion and to meet the emergency

effectively. The Chief Incident Controller are the personnel for effective control of an

emergency at site.

Chief Incident Controller - DGM/OFFICER IN-CHARGE

Incident Controller -MR (O&M)

Site Coordinator -Base Incharge

The various coordinators shall act upon depending on the situation for running/shutdown of

the plant in consultation with the site main controller. They shall take in to account the safety

of personnel, plant property. Safe operating procedures which are already in practice shall be

followed:

Table 8: Emergency Organisation Members

CO-ORDINATOR DESIGNATION

1 Chief Incident Controller DGM / OFFICER IN-CHARGE

2 Incident Controller MR (O&M)

3 Site Coordinator Base In charge

4 Fire & Safety Coordinator HOD (F&S)

5 Maintenance Coordinator HOD (Maintenance)

6 Security Coordinator HOD (Security)

7 Control Room Coordinator RGM-In-charge

8 Material Coordinator HOD (C&P)

9 Communication Coordinator HOD (GAIL TEL)

10 Welfare and Medical Coordinator HOD (HR)

11 Finance Coordinator HOD (F&A)

11.2 Action Plan for Coordinators and Key Personnel

Action Plan for Coordinators and Key Personnel in Case of Fire / Explosion / Flammable

Gas/Liquid Leakage / Toxic Gas/ Liquid Leakage Emergencies

11.2.1 Chief Incident Controller, DGM (O&M) / Officer In-charge:

He shall,

Rush to RGMC control room (emergency control center)

Take overall charge of situation

Inform the higher authorities at corporate office and outside agencies, if required

Page 47: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan

for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 47

Keep in touch with all coordinators & give necessary instructions to control the

emergency

Accord final approval for all action plans and overall co-ordination.

11.2.2 Incident Controller, CM (O&M):

He shall,

Rush to site with the emergency response team from Puducherry

Keep in touch with chief incident controller & all coordinators

Take overall charge of site operations from base in charge

Take suitable action in consultation with chief incident controller to control the

emergency

11.2.3 Site Co-Ordinator, Base In charge:

Rush to site with his team from base

Take charge of situation till arrival of incident controller

Co-ordinate with incident controller & RGMC control room for requirement of

resources

Assist incident controller in formulating remedial measures to control the emergency

11.2.4 Fire & Safety Co-Ordinator:

Rush to site along with emergency response team from Puducherry

Take charge of firefighting & rescue operations at site

Assist incident controller in mitigating the emergency & liaison with other fire

services

11.2.5 Maintenance Co-Ordinator:

Rush to site along with emergency response team from Puducherry

Take charge of maintenance operations at site

Assist incident controller in mitigating the emergency

Page 48: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan

for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 48

11.2.6 Security Co-Ordinator:

Rush to site along with emergency response team from Puducherry

Take charge of security operations at site

Assist incident controller in rescue operations & liaison with police authorities

11.2.7 Control Room Coordinator:

Rush to RGMC control room

Assist chief incident controller with managing flow of gas through the pipeline

network

11.2.8 Material Co-Ordinator:

Rush to RGMC control room

Assist chief incident controller

Manage stores functions, issue/ procurement of materials required in emergency

11.2.9 Finance Co-Ordinator:

Rush to RGMC control room

Assist chief incident controller

Arrange funds for emergency purposes

11.2.10 Welfare, PR & Logistics Co-Ordinator:

Rush to RGMC control room

With due approval of CIC control information flow to external parties

Action for arranging welfare/ transportation of men & material

11.2.11 Medical Co-Ordinator:

Rush to RGMC control room

Page 49: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan

for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 49

Assist chief incident controller by liaising with concerned authorities to provide

medical & other related facilities at site

11.2.12 Communications Co-Ordinator:

Rush to RGMC control room

Assist chief incident controller by establishing communication link with site &

keeping him posted with updated information.

12 SEQUENCE OF WORKS TO BE DONE DURING EMERGENCY

The following sequence of works is to be done for different emergency situations.

12.1 Approach Cautiously From Upwind:

Resist the urge to rush in; others cannot be helped until the situation has been fully assessed.

12.2 Secure The Scene:

Without entering the immediate hazard area, isolate the area and assure the safety of people

and the environment, keep people away from the scene and outside the safety perimeter.

Allow enough room to move your own equipment.

12.3 Identify The Hazards:

Placards, container labels, shipping documents and / or expert persons on the scene are

valuable information sources. Evaluate all available information and consult the

recommended MSDS to reduce immediate risks.

12.4 Assess The Situations:

Consider the following:

Is there a fire, a spill or a leak?

What are the weather conditions?

What is the terrain like?

Who/what is at risk: people, property or the environment?

What actions should be taken: Is an evacuation necessary?

Page 50: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan

for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 50

What resources (human and equipment) are required and are readily available?

What can be done immediately?

12.5 General Precautions For Handling Emergencies

Decide On Site Entry:

Any efforts made to rescue persons, protect property or the environment must be weighed

against the possibility that you could become part of the problem. Enter the area only when

wearing appropriate protective gear (see the MSDS on protective clothing and equipment).

Respond:

Respond in an appropriate manner. Establish a command post and lines of communication.

Rescue casualties where possible & evacuate if necessary. Maintain control of the site.

Continually re-assess the situation & modify the response accordingly. The first duty is to

consider the safety of the people in the immediate area, including your own.

Above All:

Don’t walk into or touch spilled materials. Avoid inhalation of fumes, smoke & vapours,

even if no dangerous chemicals are known to the involved. Don’t assume that the gases or

vapours are harmless because of lack of smell – odourless gases or vapours may be harmful.

12.6 Emergency Do's and Don’ts:

Table 9: Do’s and Don’ts of Emergency

DO'S DON'TS

ANY ONE NOTICING AN EMERGENCY:

Will inform control room and / or fire station and

provide assistance for the crew where ever possible.

Then report to the assembly point and await further

instructions.

DO NOT take unnecessary risk.

DO NOT run in panic.

DO NOT argue or discuss in the scene of fire.

DO NOT try to operate the firefighting

equipment if you do not know the operation.

DO NOT over crowd the scene of fire

unnecessarily.

DO NOT get too excited, because fire is faster

Page 51: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan

for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 51

DO'S DON'TS

than you.

DO NOT linger with firefighting equipment,

when there is fire, every moment counts.

DO NOT order or signal unless required to

do.

CONTRACTOR PERSONNEL

Stop work on hearing alarm. Assemble at the

ASSEMBLY POINT and be ready to evacuate.

DO NOT enters the site, till it is cleared for the

normal work by Chief Incident Controller.

SECURITY :

Keep the gate manned

Keep the road clear for movement of fire tenders.

Control traffic.

DO NOT allow unauthorized visitors free to

enter.

VISITORS :

Leave the place and assemble at assembly point.

DO NOT enter the site if emergency alarm is

heard.

ALL OTHER EMPLOYEES ON SITE :

On hearing FIRE alarm, go to assembly point and

wait for further instruction.

DO NOT panic

DO NOT go to the site of emergency unless

specifically instructed by site main/incident

controller.

Page 52: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan

for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 52

12.7 Action Plan to meet the Eventualities

Procedure for Handling Fire

Case-1 Fire at Terminal area

Locate the fire affected area

Evaluate the Magnitude of fire

Isolate the affected section from the remaining area

Extinguish the fire by suitable fire extinguisher if required seek the assistance of

customer tender and fire men

Inform the Base In-charges / GAIL officers and the customer control room & Fire

station

Inform the MCR/OIC GAIL, Puducherry according to the nature of fire

Case-2 Fire at Pipeline area

As the message comes confirm about the identity of P/L location particulars and

quantum of fire

Immediately inform BIC / GAIL officers and customer control room

BIC shall rush to the site with necessary fire extinguishers, retaining one

coordinator at the terminal and extinguish the fire.

Ensure that P/L section is isolated if required

BIC shall asses the nature of fire and accordingly inform the MCR/OIC GAIL

Puducherry & Tamil Nadu State Govt. authorities.

Once the fire is extinguished a detailed report on the incident shall be submitted to

OIC, GAIL, Puducherry.

Procedure for handling Accidents

Incase of any accident occurred in the installation provide the first aid to the

injured person immediately.

If the accident is of major in nature provide first aid to the person and then refer

him I the customer dispensary or to the hospital.

All minor/Major accidents shall be reported to the safety officer and BIC.

Procedure for Handling Flange Leakage

In case of Flange leakage

Evaluate the magnitude of the leak

Inform the BIC/ GAIL officials

Page 53: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan

for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 53

Plan for the Material , Manpower and Tools & Tackles

Necessary work permit may be obtained from the authorities before carrying out

the job.

Place fire extinguisher, arrange necessary non sparking tools

Minor Leak

Before carrying out the job wear personnel protective equipment like safety

helmet, gloves and safety goggles.

Try to control the leak by further tightening of bolts.

Use standard Engineering practice while tightening the nuts & bolts, check for

any leakage

If leak does not stop arrange for shut down of the equipment, if necessary.

Major Leak

Inform the BIC and the customer

Prepare for the shutdown of the equipment if necessary

Close the upstream and downstream valve of the leaking flange. Allow the gas

flow to the customer through by pass line if possible.

Vent the Entrapped gas to depressurize the equipment/line

Remove the nuts & bolts by standard practice if necessary use flange-separators.

Replace the old gasket with the new one after cleaning the flange surface

Tighten the nuts & bolts by standard practice and arrest leakage if any before

resuming gas supply to the customer.

Open the upstream valve slowly and then open the downstream valve when the

customer is ready to draw.

12.8 RESPONSIBILITIES ASSIGNED:

Responsibilities have been assigned to key persons for handling of emergencies at site.

General actions required to be taken by key persons are given below. They shall take

appropriate action to control emergencies. If required, help from mutual aid response group

shall be taken to control the on-site emergencies.

12.8.1 Heavy Leakage:

For containment of Heavy Leakages, HOD (Ops) & HOD (Mech) shall take action in

coordination with HOD (F&S) and other HOD’s. HOD (F&S) shall ensure that all hot jobs

Page 54: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan

for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 54

are stopped and if required and take action to blanket flammable liquid with foam. For heavy

gas leakage take help of mutual aid members for leak arresting and containment.

12.8.2 Fire:

HOD (F&S)/Designated safety officer shall take action for the control/extinguishment of

particular type of fire. However, HOD (Ops) shall guide him about the process parameters of

the equipments / vessels involved in fire. For large fire take help of mutual aid member.

12.8.3 Explosion:

HOD (F&S)/Designated safety officer shall take action in case of the explosion of particular

type of equipment / vessel, however, HOD (Ops) shall guide him about the process

parameters of the equipments / vessels involving in the explosion. Take help from mutual aid

members for a large scale search and rescue operation.

12.8.4 Failure of Critical Control System:

HOD (Ops) and HOD (Mech) shall work in coordination for the situation such as failure of

critical control system. In such situations HOD (F&S) shall guide the working personnel

about the safe handling of the situation. Evacuation and barricading of area shall be done as

per requirement by HOD (F&S) in consultation with Site Main Controller and with the help

of Security Coordinator. For large scale damage take help of mutual aid members for getting

the situation into control.

12.8.5 Design Deficiency:

HOD (Ops) and HOD (Mech) shall work in coordination for doing the HAZOP for different

units, identify the design deficiency as and when required and address the same in

coordination with HOD (F&S), HOD (Civil) etc.

12.8.6 Building/structure Collapse & other accidents:

Building/structure collapse may be due to earthquack, other causes/hazards & secondary

effects of above emergencies. Accidents such as electrocution, cold/hot burn, suffocation etc.

may happened during plant operation. HOD (F&S)/Designated safety officer shall take action

Page 55: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan

for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 55

for search and rescue. HOD (Operation) will take action for clearing of collapsed

building/structure. HOD (Mech) will assist HOD (Operation). HOD (HR) will arrange for

medical help as per requirement. Take help from mutual aid members for a large scale search

and rescue operation.

12.8.7 Riots/Civil Disorder/Mob attack

The most effective way to deal with riots, Civil disorders, Mob attacks is to identify and

report potentially dangerous situations prior to an incident. All employees are therefore

expected to exercise good judgment and to immediately inform Human Resources if any

such behaviour or situations are found. Based on the intensity of the situation the HOD (HR)

will take action by calling police or by declaring suspension of works. After calm up of the

situation the employees shall be informed by the HOD (HR) and HOD (F&S) to attend their

normal duties.

12.8.8 Terrorism / Flood / Sabotage / Bomb Threat

Any prior information of the terrorism or flood or sabotage or bomb threat is known to the

HOD (F&S) will coordinate with the NDMA authorities, assess the situation and based on

the emergency they will coordinate with the Mutual Aid group and the district authorities.

Will shut down the operations in coordination with the other HOD’s and if any emergency

situation occurs the Emergency Medical Technician team will start rescue operations.

12.8.9 Outbreak of diseases / Food Poisoning / Water poisoning

If there is an outbreak of diseases in the district the site coordinator will be informed by the

health department about this. Then the Site coordinator, HOD (HR) should coordinate with

the local government hospitals and get the possible medication for all the employees and

educate them about that pandemic disseises to make them aware of the situation.

In case of food poisoning / water poisoning the concerned employees are to be taken to the

nearby hospital by the Site coordinator, HOD (HR) or the HOD (F&S). After proper

treatment, the cause for this to be evaluated by them and proof to be preserved for further

investigation. The food or water should be discarded so that no one else will consume the

same.

Page 56: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan

for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 56

13 PLAN OF COORDINATION

The plan of co-ordination includes the procedures for the following:

13.1 Communication Facilities

communication at GAIL Puducherry.

13.1.1 Telephones:

DOT Telephone (Landline & WLL)

Inter com Telephone

Satellite Phone

Telephones are provided at strategic location in plant and in various departments for internal

as well as external communication (selected locations). Telephone facility is also provided at

the residence of key person, coordinators.

13.2 Important Contact Numbers:

List of District and State Authorities:

Table 10: List of Important phone numbers of district authorities

NAGAPATTINAM DISTRICT CIVIL AUTHORITIES

1 DISTRICT COLLECTOR

04365 – 247000/253083 (O) 04365 – 247800

(R)

2 DIVISIONAL FIRE OFFICER 04365 – 249409

3 HOSPITAL COORDINATOR 04365 – 242459

4 DY. DIRECTOR HEALTH SERVICES 04365 – 248734

5 REGIONAL TRANSPORT OFFICER 04365 – 249477

6 SUPENTENDENT OF POLICE 04365 – 242888 (O) 04365 – 248777 (R)

7 SR. REG. MANAGER, CIVIL SUPPLY 04365 – 251843 / 251393

8 EXECUTIVE ENGINEER (PWD) 04365 – 220082

9 INSPECTOR OF FACTORIES 04366 - 242327

10

DISTRICT TELEPHONE AUTHORITY

(DE) 04365 – 225600

11

RAILWAY STATION

NAGAPATTINAM 04365 – 242131

THIRUVARUR DISTRICT CIVIL AUTHORITIES

1 DISTRICT COLLECTOR 04366 – 221001 / 02 / 03 / 04 04366 – 223344

Page 57: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan

for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 57

(DIRECT) 04366 – 243242

2 SENIOR FIRE OFFICER 04366 – 222101

3 HOSPITAL COORDINATOR 04366 – 242354

4 DY. DIRECTOR HEALTH SERVICES 04366 – 250879

5 REGIONAL TRANSPORT OFFICER 04366 – 240357 / 221261

6 SUPENTENDENT OF POLICE 04366 – 222377 (O) 04366 – 222029 (R)

7 DISTRICT OFFICER CIVIL SUPPLY 04366 – 220510

8 EXECUTIVE ENGINEER (PWD) 04366 – 241347

9 INSPECTOR OF FACTORIES 04366 – 242327

10

DISTRICT TELEPHONE AUTHORITY

(DE) 04366 – 224800

11 RAILWAY STATION THIRVARUR 04366 – 222551

KARAIKAL DISTRICT CIVIL AUTHORITIES

1 DISTRICT COLLECTOR 04368 – 222444 / 221760

2 DIVISIONAL FIRE OFFICER 04368 – 230112

3 HOSPITAL COORDINATOR 04368 – 222593 / 223917

4 RES. MEDICAL OFFICER 04368 – 222450

5 REGIONAL TRANSPORT OFFICER 04368 – 222729

6 SUPENTENDENT OF POLICE 04368 – 228007

7 SR. SUPENTENDENT OF POLICE 04368 – 223238

8 DY. DIRECTOR CIVIL SUPPLY 04368 – 227718

9 EXECUTIVE ENGINEER (PWD) 04368 – 222592

10 INSPECTOR OF FACTORIES 04368 – 221740 / 222562

11

DISTRICT TELEPHONE AUTHORITY

(DE) 04368 – 222500

RAMNAD DISTRICT CIVIL AUTHORITIES

1 DISTRICT COLLECTOR 04567 – 231220 / 230060 04567 – 222079 (R)

2 REHABITATION OFFICER 04567 – 231410

3 DIVISIONAL FIRE OFFICER 04567 – 232118 / 230094

4 HOSPITAL COORDINATOR 04567 – 220102 / 340 / 341

5 DY. DIRECTOR HEALTH SERVICES 04567 – 222454

6 REGIONAL TRANSPORT OFFICER 04567 – 220622 / 722 04567 – 232120 / 231373

7 SUPENTENDENT OF POLICE

04567 – 232243 / 232114 04567 – 231350 /

230770

8 DISTRICT OFFICER CIVIL SUPPLY 04567 – 230056 / 57 / 58

9 EXECUTIVE ENGINEER (PWD) 04567 – 220239 / 230728

10 INSPECTOR OF FACTORIES 04575 – 224326 0452 – 2530729 (MADURAI)

11

DISTRICT TELEPHONE AUTHORITY

(DE) 04567 – 222400 / 222222

12 RAILWAY STATION RAMNAD 04567 – 220810

Page 58: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan

for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 58

TANJORE DISTRICT CIVIL AUTHORITIES

1 DISTRICT COLLECTOR 04362 – 230121 04362 – 230201 (R)

2 DIVISIONAL FIRE OFFICER 04362 – 238932

3 HOSPITAL COORDINATOR 04362 – 231221,231023

4 DY. DIRECTOR HEALTH SERVICES 04362 – 273503

5 REGIONAL TRANSPORT OFFICER 04362 – 227358

6 SUPENTENDENT OF POLICE 04362 – 277220

7 DISTRICT OFFICER CIVIL SUPPLY 04362 – 231336

8 EXECUTIVE ENGINEER (PWD) 04362 – 271250

9 INSPECTOR OF FACTORIES 04362 – 235469

10

DISTRICT TELEPHONE AUTHORITY,

GM -KUMHBAKONAM 0435 – 2430000

11

RAILWAY STATION

KUMBHAKONAM 0435 – 2433131

CUDDALORE DISTRICT CIVIL AUTHORITIES

1 DISTRICT COLLECTOR 04142 – 230668 (O) 04142 – 230777 (R)

2 DIVISIONAL FIRE OFFICER 04142 – 295101 / 293301

3 HOSPITAL COORDINATOR 04142 – 231590

4 DY. DIRECTOR HEALTH SERVICES 04142 – 295134

5 REGIONAL TRANSPORT OFFICER 04142 – 290035

6 SUPENTENDENT OF POLICE 04142 – 214477 (O) 04142 – 251161 (R)

7 DISTRICT OFFICER CIVIL SUPPLY 04142 – 230223

8 EXECUTIVE ENGINEER (PWD) 04142 – 230274

9 INSPECTOR OF FACTORIES 04142 – 231864

10

DISTRICT TELEPHONE AUTHORITY

( SDE ) 04142 – 285050 / 217000

11 RAILWAY STATION CUDDALORE 04142 – 237642

OTHER IMPORTANT TELEPHONE NUMBERS

1 FIRE STATION CHIDAMBARAM 04144 – 238099 / 244366

2 GOVT. HOSPITAL MAILADUTHURAI 04364 – 222459

3 GOVT. HOSPITAL BHUVANAGIRI 04144 – 241001

4 POLICE STATION NAGORE 04365 – 250100

5 POLICE STATION KEELVELUR 04365 – 275450

6 POLICE STATION THITTACHERRY 04365 – 234100

7 POLICE STATION NERAVI 04368 – 238376

8 POLICE STATION THIRUNALLAR 04368 – 236465

9 POLICE STATION KORADACHERRY 04366 – 232450

10 POLICE STATION MANNARGUDI 04367 – 222244

11

POLICE STATION THIRUVARUR

TOWN 04366 – 222203

Page 59: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan

for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 59

12 TAHASILDAR RAMNAD 04567 – 220352

13 TAHASILDAR NAGAPATTINAM 04365 – 242456

14 TAHASILDAR KEELVELUR 04365 – 275493

15 TAHASILDAR KARAIKAL 04368 – 222637

16 TAHASILDAR NANNILAM 04367 – 230456

17 TAHASILDAR KODAVASAL 04365 – 262056

18 TAHASILDAR MANNARGUDI 04367 – 222291

19

EXECUTIVE ENGINEER

MAILADUTHURAI PWD 04364 – 225904

20

RAILWAY STATION

MAILADUTHURAI 04364 - 222131

21

RAILWAY STATION

CHIDAMBARAM 04144 – 238298,238759

22 RAILWAY STATION VADALURE 04142 - 260090

Page 60: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan

for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 60

13.3 Telephone Directory at GAIL, Puducherry:

Table 11: Important Telephone Numbers of GAIL personnel

Contact Person Extensio

n Landline Mobile Residence

Gail-Puducherry

D.Soren, DGM (O&M) 500 0413-2200982 9443242601 2240588

L.Arumugam, CM (O&M) 300 0413-2200981 9443242605 2203228

D Baskaran, CM (HR) 340 0413-2200927 9845626696

Scaria Mathew, SM (O&M) 450 0413-2200729 9486852610 2276628

R. Rajagopalan, SM (F&A) 360 0413-2205285 9435525257

T.S.Viswanathan, SM (O&M) 460 0413-2200930 9445182895 24983711

S.Arunachalam, SM (O&M) 470 0413-2200977 9487844664

Mukalesh Biswas, SM (Mech.) 471 0413-2200935 9047027022 2200720

S.Krishnan, SM (C&P) 380 0413-2200980 9443347934 2242293

M.Monsingh, DM (F&S) 440 0413-2200932 9442244187

RGMC – Puducherry 330/ 331 0413-2200729

Gail-Narimanam zone 04365-320999

P.Nandagopal, Sr. Mgr(O&M) 04368-234460/61 9442527780

D Selva Kumar Mgr.(O&M) 04368-234460/ 61

Surya Prasad, DM (Mech.) 04368-234460/61

Narimanam GAIL-GCS 04365-235101/326777

Adaiyakkamangalam GAIL-GCS 04366-204885

Kamalapuram GAIL-GCS 04366-204453

Gail- Kuthalam zone

P.Lakshmi, Sr Mgr. (NG P/L,O&M) 04364-237058 9442292274

Kathiresan, Mgr.(O&M) 04364-237258 9442237081

PPN Gas Receiving Terminal 04364-204570

Disp.term.,Kshethrapalapuram 04364-234058

Gail-Tirumakottai zone

M.I.A.Jabbar, SM (Elect.) 04367-292392/272033 9442104704

Nallur Gas Dispatch Terminal 04367-277204

P Maruthu Pandian SE (O&M) 04367-272033 9442276512

GAIL-Ramnad zone

Sivabalan, Sr Mgr.(NG P/L,O&M) 04567-255007/291386 9442257055

D Jegannathan

04567-255007/

291386

Page 61: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan

for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 61

Contact Person Extensio

n Landline Mobile Residence

D.Sakthivel,DM(Inst.)

04567-

255007/291386 9442150003

Valantharavai Dispatch Terminal 04567-253808

Table 12: Mutual Aid Contact Details

S.

No Name Address Phone number

NARIMANAM ZONE

1

CHENNAI

PETROLEUM CORP

LTD

Panangudi, Nagapattinam-611 002.

04365 – 256412, 256416

Fax No. 0435 – 256415 /

414

2 EZHIL CHEMICALS

(P) LTD

No.123, Uttamacholapuram, Narimanam,

Nagapattinam-611 002. 04365 – 256478

3 KIRAN SILICATES

PVT LTD

No. 123, Uthamacholapuram,

Serunangai, Narimanam P.O.

Nagapattinam-611 002.

04365 – 256478

4 MADRAS

CHEMICALS

66/2-A, 123, Uthamacholapuram,

Boothangudi, Nannilam Taluk,

Nagapattinam-611 002.

04365 – 291118

5 MMS STEEL &

POWER PVT LTD

No.17/20, ONGC Road,

Naranamangalam, Narimanam, Nagore,

Nagapattinam-611 002.

04365 - 256343 & 344

Fax No. 04365 - 221202

6 NANNILAM

SILICATES (P) LTD.,

No.151/C, Uttamacholapuram,

Serunangai, Narimanam P.O.

Nagapattinam-611 002.

04365 – 256478

7 PREM CHEMICAL

INDUSTRIES

No.123, Uttamacholapuram, Narimanam

P.O. Nannilam Taluk, Nagapattinam -

611 002.

04365 – 256590

8 REENA SILICATES

PVT LTD

No.123-C, Uthamacholapuram,

Narimanam Post, Nagapattinam District-

611 002.

04365 – 256217

9 SUNRISE

SILICATES PVT LTD

No.123, Uttamacholapuram, Serunangai,

Narimanam P.O. Nagapattinam-611 002. 04365 – 256478

10 ADITYA FERRO

ALLOYS PVT LTD

SF No.242/1, Sorakkudy Village,

Peralam Main Road, Thirunallar,

Karaikal-609 607.

04368 – 236721

Mobile: 9842468322

11 BOSS PROFILES

LTD

No.24, Sorakkudy Village, Thirunallar

Commune, Karaikal-609607.

04368 - 236401/402/404

Mobile: 9842468302

12 CHEMPLAST

SANMAR LTD.

Melavanjore, T. R. Pattinam. Karaikal -

611 002 04365 - 256475 / 476

Mobile: 9894091715

Fax No. 04365 – 256473

13 CHEMPLAST

SANMAR LTD.

Nitro Aromatics Unit, Melavanjore, T. R.

Pattinam, Karaikal. 611 002

Page 62: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan

for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 62

S.

No Name Address Phone number

(PHASE-II)

14 GODREJ SARA LEE

LTD

Kurumbakulam, Nedungadu, Karaikal,

Pondicherry. 04368 - 262147 / 148

15 GODREJ SARA LEE

LTD- (T)

Sethur Village, Thirunallar Commune,

Karaikal -609601

04368 – 236697

Fax No. 04368 - 236697

16

H & R

JOHNSON(INDIA)

LTD

Thennangudi, Karaikal, Pondicherry.

609601

04368 - 236731 / 733 /

734 / 735 / 729

17 HENKEL INDIA LTD No.131, Peralam Main Road,

Thirunallar, Karaikal-609 607.

04368 - 236494-98

Mobile: 9443121271

18

KAMAKSHI

CHEMICALS

(Eshwerie-old)

57/3, Nainikattai Road, Polagam village,

T. R.Pattinam, Karaikal-609 606.

04368 – 233312

Mobile: 9443133317

19 KARAIKAL

CHLORATES

Melakarakudy Village, Nedungadu,

Karaikal -609603

04368 - 292976

Mobile: 9362920233

20 MURUDESWAR

CERAMICS LTD

No.143, Illayancudy road, Devamapuram

village,Karaikal-609 607.

04368 - 236899

Mobile: 9842446508

21 PONDICHERRY

POWER CORP LTD

Polagam, T. R. Pattinam, Melavanjore,

Karaikal.609606 04368 – 233988, 233193

22

KIRAN PONDY

CHEM LTD (Kiran

Pondichem Group)

No.37, Nagore Main Road, Melavanjore,

Karaikal-611 002 04365 – 256478

23 R J CHEMICALS No.17/3, Ambagarathur Road,

Thirunallar, Karaikal-609 607. 04368 – 236448

24 REGMA CERAMICS

LTD

Sellur Village, Agalaukannu Road,

Karaikal-609 607.

04368 - 268271 & 273 &

274 Fax No. 04368-

268272

25 SILICATE INDIA General Manager, No.37, Nagore Road,

Melavanjore,Karaikal -611 002. 04365 – 256210

26 SOUNDARAJA

MILLS LIMITED- (N) Nedungadu-609 603, Karaikal.

04368 – 261293 / 284

Fax No. 04398 - 261519

27

VAIGAI

INDUSTRIES PVT.

LIMITED

No.32/1&2, Melakarakudy village,

Nedungadu Commune, Karaikal-609

603.

04368 - 261375

28 VANJORE

SILICATES LTD

R.S.No.92/1, Keeliyur South, T. R.

Pattinam,Karaikal-609 606. 04368 – 234143/ 44

29

SOUTH INDIA

EDIBLE OIL PVT

LTD

Karuppur village, Semangalam,

Tiruvarur District.

04366 - 220911

Mobile: 9842433515

30 SOUTHERN

REFRACTORY

No.121/1-A, Pulivalam Road, Meppalam

village, Thiruvarur.

04366 - 204688

Mobile: 98422504066

31 SREE

RAGHAVENDRA

No.206/A, Pulivalam Road, Vellakudy

village, Peruntharakudi Taluk, Kulikarai Mobile: 9600095564

Page 63: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan

for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 63

S.

No Name Address Phone number

ALKALIES P.O, Tiruvarur-610001

32 TAMILNADU CIVIL

SUPPLIES CORP.

Modern Rice Mill, Tiruvarur Main Road,

Tiruvarur-610 001. 04366 - 222575

33 JAYADEVI

INDUSTRIES

No.117/1B/1, Kuthalam Village,

Gopurajapuram Post-via Thittachery,

Kuttalam, Nagapattinam District.

04365 - 234326

Mobile: 9443134327

34 DIAMOND

SILICATES

3/207, K. K. Nagar, Vilamal,

Ammaiyappan, Tiruvarur. 610001 04366 - 205001

35 NARIMANAM

SILICATE

Plot No.91, K. T. R. Estate, Near Bye-

Pass Road, Tiruvarur-610 001. 04366 – 250009

36 NARIMANAM

SILICATE - II

R.S No.11 -7/C, Karuppur road,

Adiyakkamangalam village, Tiruvarur

Dist. - 611 101.

04366 – 356684

Mobile: 9443156646,

9366680471

KUTHALAM / BHUVANAGIRI ZONE

1 KAVERI GAS

POWER LTD.

Muruthur Village, Therizhandur-609808,

Mailaduthurai, Nagai District. mobile 9790996410

2 OPG ENERGY

PRIVATE LTD

Muruthur Village, Therizhandur-609808,

Mailaduthurai

04364 - 237099

Mobile: 9344303671

3 PPN POWER

GENERATING LTD

Pillai Perumal Nallur, Thirumeighanam

Post, Thirukkadaiyur Via Tharangambadi

Taluk, Nagai Dist. -609311.

04364 - 287050

Fax No. 04364 - 287039

4 SAHELI EXPORTS

PVT. LTD.

Kothangudi Road, Komal West,

Mayiladuthurai-609805 04364 - 237237 & 239

5

TAMILNADU

ELECTRICITY

BOARD

KGTPS, Muruthur Village,

Therizhandur, Mailaduthurai. 609808 04364 - 237084

6 ABAN POWER

COMPANY LIMITED

No.9, Karuppur, Thiruvidaimaruthur

Taluk, Tanjore District. - 609 807.

0435 - 2451199 & 232

Mobile: 9443251199,

9443321232 Fax No.

0435 - 2451288

7 NEYCER INDIA LTD Sanitaryware Division, Vadalur,

Cuddalore District -607 303. 04142 - 259181 & 253

RAMNAD ZONE

1

ARKAY ENERGY

LTD -II

(Rameswaram)

Near ONGC-GCS, Therukkukattoor,

Valantharavai Post, Ramnad

District.623536

04567 - 253516

2

COROMANDEL

ELECTRIC

COMPANY LTD

Near TNEB-VGTPP Power Station,

Valuthur,Valantharavai Post, Ramnad

District. 623536

04567 - 255248

Fax. No.: 04567 - 255241

3

PENNA

ELECTRICITY

LIMITED

Near ONGC-GCS, Therukkukattoor,

Valantharavai Post, Ramnad District

623536

04567 – 253792, 293561

4 04 SAI REGENCY

POWER LT

Kalugurani Village, Ramnad District

623536

04567 - 293228

Mr. Y. Paradesi:

Page 64: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan

for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 64

S.

No Name Address Phone number

9443135794

5

TAMIL NADU

ELECTRICITY

BOARD

VGTPPS, Valuthur, Valantharavai

Branch Post,Ramnad. 623536

04567 - 255025 / 255030

& 255385

KOVILKALAPPAL ZONE

1 PREMI CHEMCO No.1/73, 74, Nallur, Adichapuram (via),

Mannargudi Taluk, Tiruvarur. 04367 - 277295

2

TAMILNADU

ELECTRICITY

BOAD - TMK

T (K) GTPS, Tirumakottai. Tiruvarur

District. -614017

04367 - 272766 & 034

Fax No. 04367- 272390

Page 65: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 65

Table 13: Police Station Contact Details

PIPELINES JURISDICTION

SI NO

NAME OF THE INSTALLATION

LOCATION JURISDICTION MANDALAM POLICE STATION PHONE NO

A KARAIKAL AREA PIPELINES

1 NRM GCS TO SFCL KUTHALAM KUTHALAM ERAVANCHERI GOPURAJAPURAM THITTACHERI AGARAKONDAGAI KOTHAMANGALAM ALATHUR ARULMOZHITHEVAN KEEZHAMANAI PETTAI

NAGAI TK & DIST KARAIKAL TK PONDY STATE

THITTACHERI THIRUNALLAR

04366 234100 04368 236465

2 MARAIKANCHAVADI SV STATION TO KSCL

THITTACHERI THITTACHERI AGARAKONDAGAI PANANGUDI POLAGAM VANJORE

NAGAI TK & DIST KARAIKAL TK PONDY STATE

THITTACHERI T R PATTINAM

04366 234100 04368 233480

3 KSCL TAP OFF TO PONDY CHEM

VANJORE VANJORE KARAIKAL TK PONDY STATE

T R PATTINAM 04366 233480

4 KSCL TAP OFF TO MEENAKSHI SILICATE

POLAGAM POLAGAM KARAIKAL TK PONDY STATE

T R PATTINAM 04368 233480

5 HENKEL SPIC TO BOSS PROFILES

THIRUNALLAR THIRUNALLAR SORAKKODI

KARAIKAL TK PONDY STATE

THIRUNALLAR 04368 233480

6 HENKEL SPIC TO H&R JOHNSON

THIRUNALLAR PETTAI SELLUR

KARAIKAL TK PONDY STATE

THIRUNALLAR 04368 233480

7 HENKEL SPIC- RCL THIRUNALLAR PETTAI SELLUR THENNANGUDI

KARAIKAL TK PONDY STATE

THIRUNALLAR 04368 233480

8 HENKEL SPIC- SRCM

THIRUNALLAR PETTAI SELLUR

KARAIKAL TK PONDY STATE

THIRUNALLAR 04368 233480

Page 66: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 66

THENNANGUDI DEVAMAPURAM SORAKUDY NEDUNGADU

9 PPCL TO VANJORE SILICATE

KELAIYUR SOUTH

KELAIYUR SOUTH KARAIKKAL TK KARAIKKAL DT

TR PATTINAM 04368 233274

10 CPCL TO PPCL TAP OFF TO CHEMPLAST

PANANGUDY & VAJORE

PANANGUDY VANJORE

KARAIKKAL TK KARAIKKAL DT

TR PATTINAM 04368 270357

11 SPIC TO EID PARRY TAP OFF TO RJ CHEMICALS

SELLUR SELLUR KARAIKKAL TK KARAIKKAL DT

THIRUNALLAR 04368 232465

12 SPIC TO JOHNSON TAP OFF TO MURUDEESWAR P LTD

DEVANAMPURAM

DEVAMAPURAM KARAIKKAL TK KARAIKKAL DT

THIRUNALLAR 04368 232465

13 SPIC TO SRCM THENNAMKUDY

THENNAMKUDY DEVAMAPURAM SORAKKUDY SELLUR NEDUNKADU

KARAIKKAL TK KARAIKKAL DT

THIRUNALLAR 04368 232465

14 SRCM TO GODREJ SARA LEE

NEDUNKADU NEDUNKADU KURUMBAKULAM

KARAIKKAL TK KARAIKKAL DT

NEDUNKADU 04368 232465

15 SPIC TO BOSS PROFILES TAP OFF TO ADITYA

SORAKKUDY SORAKKUDY KARAIKKAL TK KARAIKKAL DT

THIRUNALLAR 04368 232465

16 SPIC TO VAIGAI KK CHOLORIDE

SORAKKUDY SORAKKUDY SULERAPURAM MELAKARAKUDY

KARAIKKAL TK & PONDY STATE

THIRUNALLAR 04368 232465

17 H& R JOHNSON TILES TO GRSLS, SETHUR

SETHUR SETHUR THIRUNALLAR TK KARAIKKAL DT

THIRUNALLAR 04368 232465

Page 67: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 67

B NARIMANAM AREA PIPELINES

1 NARIMANM-ISRM THITTACHERI 04366 234100

2 NARIMANAM-TNEB THITTACHERI 04366 234100

3 NRM GCT TO MM STEEL POWER

KUTHALAM KUTHALAM NARIMANAM

NAGAI TALUK & DIST

THITTACHERY 04365 234217

4 NRM GCS TO KIRAN SILICATE

KUTHALAM KUTHALAM NARIMANAM

NAGAI TALUK & DIST

THITTACHERY 04365 234100

5 NRM TO MRL TAP OFF TO JAYADEVI

KUTHALAM KUTHALAM NARIMANAM

NAGAI TALUK & DIST

THITTACHERY 04365 234100

6 MARAIKANCHAVADY TAP IN POINT TO ESHWARI INDUST.

AGARAKONDARGUR AGARAKONDARGUR THITTACHERI

POLAGRAM

NAGAI TK & DT.

KARAIKAL TK & DT

THITTACHERI

TR PATTINAM

234217 233274

C ONGCL FEEDER LINES

1 NRM GCS TO CPCL PANANGUDI & RETURN LINE TO NRMGCS

KUTHALAM KUTHALAM NARIMANAM

NAGAI TK & DIST THITTACHERI 04366 234100

2 AKM GGS(ONGCL)-AMK GCS TWIN LINES

ALIVALAM ALIVALAM TVR TK & DIST

ALIVALAM 04366 247233

3 AKM GCS TO MRL ALIVALAM ALIVALAM KARUPPUR ADIYAKAMANGALAM SEMANGALAM KALLIKUDI KURUMANANGUDI ERAVANCHERI VADAKKUVELI AGARAKADAMBANUR

TVR TK & DIST KEEVALUR TK NAGAI DIST

ALIVALAM KEEVALUR

04366 247233 04366 275450

Page 68: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 68

KOGUR VADAGARI UTHAMACHOLAPURAM NARIMANAM

NAGAI TK & DIST

NAGORE

250100

4 AKM GCS TO KPM EPS

ALIVALAM ALIVALAM VENKATESWARAPURAM PULIVALAM PERUNGUDI PERUNTHARAKUDI

TVR TK & DIST KODAVASAL TK TIRUVARUR DIST

ALIVALAM KODAVASAL

04366 247233 04366 262050

5 KMP EPS TO NLM EPS

PERUNTHARAKUDI PERUNTHARAKUDI KULIKARAI THIAGARAJAPURAM MELATHIRUMATHI- KUNNAM PARUTHIYUR KANKODUTHAVANITHAM ATHICHOLAMANGALAM KRISHNAKOTTAGAM

KODAVASAL TK TIRUVARUR DIST

KORADACHERI KORADACHERI

04366 232450 04366 232450

6 TVR EPS TO NRM GCS

OKKUR OKKUR VENGADANGAL NARIMANAM KUTHALAM

KEEVALUR TK NAGAI TK & DIST

KEEVALUR NAGORE

04366 275450 250100

7 KUTHALAM TO PPN

KUTHALAM KUTHALAM KSHETRA BALAPURAM THOLUTHA LANGUDY ANAI MELAGARAM SIKADU MARAIYUR KOVANKUDY AGARAKEERANKUDY KODANGUDY ANNAVASAL MEMATHUR

MAYILADUTHURAI TALUK NAGAI DT. THARANGAMPADI

KUTHALAM MAYILADUTHURAI

SEMBANARKOIL

04364 234100

1 Annexure – 6.

Page -1

Page 69: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 69

KELMATHUR KILIYUR J. MANALMEDU THIRUKKADAIYUR PILLAI PERUMAL NALLUR

TALUK NAGAI DT.

THARANGAMBADI

8 AKM TO MEMATHUR (VIA) NARIMANAM GCS

ALIVALAM ALIVALAM KALAPPUR SEMANGALAM ADIYAKKAMANGALAM KALLIKUDY KURUMBANANGUDY AGARAKADAMABANUR VADAKANVELI IRAVANCHERRY ANNAIMANGALAM OKKUR VENGIDANGAL NARIMANAM KUTHALAM ERAVANCHERY THIRAIYUR SEGAL SEEYATHAMANGAI THIRUMARUGAL PONDARAVADAI THENPELAGAI SHESHAMOOLAI EDAYANTHENGUDY EAVADI THIRUKOTTARAM VELANGUDY MUGANDANUR

THIRUVARUR TK & DIST KELVELUR TK NAGAI DT. NAGAI TK & DT

THIRUVARUR KELVELUR NAGORE NAGAI

222595 04366 275450 04365 250100

Page 70: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 70

NALLADAI KOTHANGUDY THIRUVILAYATHAM EACHANGUDY NARASINGANATTAM MEMATHUR

THARANGAMBADI TALUK NAGAI DIST.

THARANGAMBADI

D PPCL LINE

1 CPCL TO PPCL PANANGUDI PANANGUDI POLAGAM

NAGAI TK & DIST KARAIKAL TK PONDY STATE

NAGORE T R PATTINAM

250100 04368 233480

E OTHER CONSUMERS DEDICATED LINES

KAMALAPURAM AREA(NRM ZONE)

1 KAMALAPURAM-NRM SILICATE

PERUNTHARAKUDY PERUNTHARAKUDY KODAVASAL TK TIRUVARUR DIST

KODAVASAL 04366 262050

2 NRM SILICATE TAP OFF- RAGVENDRA

PERUNTHARAKUDY PERUNTHARAKUDY KODAVASAL TK TIRUVARUR DIST

KODAVASAL 04366 262050

3 KMP-TNCSE TIRUVARUR

TIRUVARUR PERANTHARAKKUDI THEVARKANDANALLUR PERUNGUDI THANDALAI VIJAYAPURAM

TIRUVARUR TK & DIST

KODAVASAL 04366 262050

4 KAMALAPURAM-DIAMOND SILICATE

PERUNTHARAKUDY PERUNTHARAKUDY KODAVASAL TK TIRUVARUR DIST

KODAVASAL 04366 262050

F BHUVANAGIRI ZONE

Page 71: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 71

1 BHUVANAGIRI WELL NO 2 TO SUMANGALA STEEL LTD

ATHIVARAGANATHAM CHIDAMBARAM TK

CHIDAMBARAM TK CUDDALORE DIST

BHUVANAGIRI BHUVANAGIRI 04144 241244

2 BVG-NEYCER VADALUR ADIVARAGANATHAM VADAKARAYANPATTU ALAMBADI VADYIUR THALAIKULAM SOUTH THALAIKULAM NORTH KOLAKKUDI MARUVAI SERAKUPPAM

CHIDAMBARAM TK CUDALORE TK CUDALORE DIST

VADALUR BHUVANAGIRI

04142 259233

G KOVIL KALAPPAL ZONE

1 NALLUR-PREMI CHEMCO

NALLUR NALLUR MANNARGUDY TK TIRUVARUR DIST

KOTTUR 04367 279450

2 NALLUR EPS TO TNEB(TMK)

NALLUR NALLUR ORATHUR KALUVATHUR THENGARAI VALLUR RATHANARASIMMA- PURAM THIRUMAKKOTTAI

MANNARGUDI TK TIRUVARUR DIST

PARAVAKKOTTAI

04367 270437

H RAMNAD ZONE

1 RAMNAD-VALUTHUR(TNEB)

VALANTHARAVAI VALANTHARAVAI RAMANATHAPURAM TK & DIST

RAMANATHAPURAM 04567 230100 230770

2 VALANTHARAVAI TO PERUNGULAM TNEB

VALANTHARAVAI VALANTHARAVAI RAMNAD TALUK & DIST

RAMNAD 04567 230100 230770

2 Annexure – 6.

Page -8

Page 72: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 72

3 VALANTHARAVAI TO TNEB TAP OFF TO RK ENERGY

VALANTHARAVAI VALANTHARAVAI RAMNAD TALUK & DIST

RAMNAD 04567 230100 230770

4 VALANTHARAVAI TO TNEB TAP OFF TO CORAMANDAL CO.

VALANTHARAVAI VALANTHARAVAI RAMNAD TALUK & DIST

RAMNAD 04567 230100 230770

5 RAMNAD GAIL DESPATCH TO SRPCPL

VALANTHARAVAI VALANTHARAVAI RAMNAD TALUK & DIST

RAMNAD 04567 230100 230770

I KUTHALAM ZONE

1 KUTHALAM-PPN(THIRUKKADAYIYUR)

KSHTERABALAPURAM KSHETRABALAPURAM KUTTALAM THOLUTHALAKKUDY ANNAI MELAGARAM ASIKKADU MARAIYUR KOVANGUDY AGARAKEERANKUDY ANNAVASAL MEMATHUR KEELAMATHUR KILLIYUR MANAMODU THIRUKKADAIYUR PILLAIPERUMALNALLUR

MAYILADUTHRAI TK & NAGAI DIST THARAGAMBDI TK & NAGAI DIST

KUTTALAM

MAYILADUTHRAI SEMBANARKOIL

04364 234100 04364 222450, 222010 04364 282100

2 KUTHALAM TO MARUTHUR TNEB

KSHETRABALAPURAM KSHETRABALAPURAM UMAYAMBALPURAM KUTHALAM SENNIYANALLUR MELAIYUR PERUMALKOIL MARUTHUR

MAYILADUTHURAI TALUK NAGAI DIST.

KUTHALAM 04364 234100

Page 73: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 73

3 MARUTHUR TNEB TO OPG

MARUTHUR MARUTHUR PERUMAL KOIL

MAYILADUTHURAI TALUK NAGAI DIST.

KUTHALAM 04364 234100

4 KUTHALAM TO SAHELI MARUTHUR MARUTHUR PERUMALKOIL

MAYILADUTHURAI TALUK NAGAI DIST.

KUTHALAM 04364 234100

5 MARUTHUR TNEB TO KAVERI GAS POWER

MARUTHUR MARUTHUR PERUMALKOIL

MAYILADUTHURAI TALUK NAGAI DIST.

KUTHALAM 04364 234100

J GAS SOURCE INSTALLATIONS

1 NARIMANAM GCS KUTHALAM NAGAI TK

NAGAI TK & DIST THITTACHERI 04366 234100

2 MARAIKKAN CHAVADI S V STATION

THITTACHERI NAGAI TK & DIST THITTACHERI 04366 234100

3 ADIYAKAMANGALAM GCS

ALIVALAM TIRUVARUR TK & DIST TIRUVARUR 04365 222595

4 KAMALAPURAM EPS TERMINAL

PERUNTHARAKKUDI KODAVASAL TK TIRUVARUR DIST

TIRUVARUR 04365 222595

5 NANNILAM EPS TERMINAL

KRISHNAKOTTAGAM KODAVASAL TK TIRUVARUR DIST

KORADACHERI 04366 232450

6 TIRUVARUR EPS TERMINAL

OKKUR KEEVALUR TK NAGAI DIST

KEEVALUR 04366 275450

7 BISMI ALKALIES TO KIRAN SILICATE TERMINAL

NARIMANAM NAGAI TK & DIST NAGORE/ TITTACHERI

250100/ 04366 234100

8 NALLUR DISPATCH TERMINAL

NALLUR NALLUR MANNARGUDY TK TIRUVARUR DIST

KOTTUR 04367 279450

Page 74: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery

Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 74

13.4 Mutual Aid Response Group

There is a formal arrangement towards Mutual Aid response in the area with all the

industries where ever the terminals are located; however following emergency

facilities are available with neighboring industries on understanding.

Ambulance Service.

Occupational Health Center.

Doctor and Para Medical Staff.

Technical Staff to assist in Emergency.

First-Aid equipment, Safety equipment, Self breathing apparatus.

Firefighting equipment.

13.5 Co-ordination between the Local organisations/Mutual Aid

Members:

Communications facilities have been provided in control rooms of all mutual aid response

group. Each member will coordinate with each other for mitigating damage to the extent

possible in case of emergencies.

13.6 Coordination with Outside Agencies:

Responsibility of information on necessary measures in the event of damage and warning to

the nearby population rests with the civic authorities and other government agencies.

Intimation/warning about the likely scenarios of disaster which may affect nearby population

is to be given to civic authorities (district collector) by OIC. The decision as to when the

population to be warned/evacuated in the event of possible damage lies with the civic

authorities.

Outside agencies support is required for the on-site emergency responses like:

Augmentation of the firefighting service and fire water.

Emergency medical help for the injured personnel of the plant.

Evacuation of the personnel.

Law enforcement and traffic control and crime protection.

Co-ordination with the other industrial establishment.

Special purpose equipment for rescue of the trapped persons in the plant.

Procuring firefighting consumable like foam compound, DCP, fire hoses etc.

Page 75: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery

Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 75

13.7 Role and Statutory Duties of Outside Agencies

Traffic control, provision of alternate traffic, regulation of traffic within the area of

responsibility

Assisting the medical and evacuation team to work without any hindrance and further

help to the medical department in evacuation the casualties’ victim

Helping in evacuation of persons and domestic animals in the affected area

Preventing unauthorized entry of personnel in to the affected area.

The role of outside agencies as planned in advance is given below:

13.7.1 Role of police department

Police control room on receiving the emergency message shall communicate to district, civil

and police official on wireless network. On arriving at terminal they shall help in following

manner:

They shall help in traffic control, provisions of alternate traffic within the area of

responsibility

Helping in evacuation of person in the affected area

Preventing unauthorized entry of the personnel in the affected area

Controlling bystanders, identifying the dead and dealing with casualties and

informing to the relative of death or injury

13.7.2 Role of Tamil Nadu fire service

It is the responsibility of chief fire in-charge (work main controller) to call for external help

like fire brigade, police and help from “neighbouring industries” in case of a probability of a

major hazard. The chief fire in-charge will supervise the rescue and fire fighting operation,

till the arrival of the chief fire officer of the area. However, after the arrival of the CFO, the

CFO shall take command. Chief fire in-charge shall help him in the fire fighting work. Tamil

Nadu fire service on advice of GAIL chief fire in-charge shall also contact agencies to render

assistance for fighting fire, arranging for rescue, evacuation and medical aid.

Keeping the above in view, Tamil Nadu fire service shall familiarize themselves with the

location of onsite stores of flammable materials, water and other fire fighting equipment.

13.7.3 Role of district authorities

Following action shall be taken by the district authorities:

Page 76: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery

Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 76

Evacuation of nearby population when required

Arranging for transportation of victims to hospitals and coordinating with hospitals

for admitting the victims

Arranging for education of the people nearby, regarding the possibilities

To nominate the persons to be contacted during disasters for coordinating of various

activities

14 RESCUE AND RELIEF OPERATION PLAN

14.1 Assembly Points

Assembly points marked in the consumer terminals will be the assembly point during any

emergency.

14.2 Emergency Evacuation

The incident is likely to affect people in the other plant area or environment outside the site.

The site main controller will intimate evacuation. Evacuation of the personnel to assempbly

point &/or away from site ensuring proper head count.

Accounting for site personnel, visitors and contractors, particularly those know to have been

in the affected area will be done.

All HOD’s will provide the exact head count details to HOD (F&S) during the emergency.

The evacuation is along the escape route leading to assembly point. People must be

evacuated at right angle to wind or opposite the wind direction.

14.3 Rescue & Evacuation Procedure:

Rescue operation will be carried out by the fire & safety personnel immediately attending to

the emergency. The above rescue operations generally refer to the rescue at incident site.

However a large scale rescue operations shall be carried by the fire & safety personnel if a

large scale emergency is perceived. The above operations will be lead by the second in

command of Fire & Safety dept. The list of casualties etc shall be reported to the HOD(F&S)

who in turn will be reporting to the site main controller at site. Casualties will be shifted to

hospital, if required by HR in consultation with Chief Incident Controller/OIC. Evacuation of

undesired personnel will be carried out in consultation with site main controller. Generally all

personnel required to be assembled at ASSEMBLY POINT and will be evacuated by

vehicles arranged by HOD(HR) / HR dept.

Page 77: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery

Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 77

15 MEDICAL FACILITIES

Hospitals in the proximity of the site locations will be providing the medical facilities in case

of requirement. contact details of the hospitals are displayed prominently.

15.1 First Aid Boxes:

First Aid boxes are Provided at all the terminals

In first aid equipment are sustituted by other type medicines or are ommited from the

standard list, as decided by company doctor.

Content of First aid box (standard list):

Twenty four small sterilized dressings.

Twelve medium size sterilized dressings.

Twelve large size sterilized dressings.

Twelve large size sterilized burn dressings.

Twelve (15gm.) packets of sterilized cotton wool.

One (200 ml.) bottle of cetrimide solution (1 per cent ) or a suitable antiseptic

solution.

One (200 ml.) bottle of mercurochrome solution (2 percent ) in water.

One (120 ml) bottle containing sal-volatile having the doses and mode of

administration indicate on the label.

One pair of scissors.

One roll of adhesive plaster (6 cms. x 1 metre.)

Two rolls of adhesive plaster (2 cms x 1 metre.)

Twelve pieces of sterilized eye pads in separate sealed packets.

A bottle containing 100 tablets (each of 05grains ) of aspirin or any other analgesic.

One polythene wash bottle (500 cc.) for washing eyes.

Twelve roller bandages 10cms wide.

Twelve roller bandages 5 cms wide.

Six triangular bandages.

One tourniquet.

A supply of suitable splints.

Two packets of safety pins.

Page 78: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery

Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 78

Kidney tray.

A snake-bite lancet.

One (30 ml.) bottle containing potassium permanganate crystals.

Ointment for burns.

15.2 Transportation Facilities:

Adequate transport vehicles are provided for medical treatment, evacuation and the

movement of key persons. If required help from outside transport agencies will be taken for

mass evacuation of persons.

16 RECOVERY PROCEDURES

After the emergency, the following activities will be carried out in detail.

Information to Statutory Authorities.

Incident Investigation.

Damage Assessment.

Salvage of products, de-contamination, clean-up and Restoration.

A detailed report shall be prepared based on the entire experience of the incident,

including restorations, limitations and Lessons learnt.

17 REVISION & MOCK DRILLS

17.1 Revision:

"The ERDMP" will be reviewed/modified on yearly basis or after occurrence of emergency

listed in this document or whenever any major changes in operations are carried out or if

deemed by issuing authority.

17.2 Rehearsal / Mock Drill:

In emergency management time is very important, the initial few minutes are critical and

timely action may contain the emergency. For persons to perform quickly their assigned

roles, it is essential that each individual should be made aware of emergency rehearsals

which will impart procedures and their individual roles through proper training. It is

necessary to test through necessary expertise to individuals to act quickly in case of a real

emergency situation. This will help in identifying the deficiencies in the procedures and the

likely difficulties, that may be encountered during implementation. Rehearsal of the plan will

be undertaken on quarterly basis.

Page 79: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery

Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 79

17.3 Training

The employees will be informed about “On Site Emergency Plan” in details with the help of

training programmes. For the success of this plan not only training will be organized but for

mock drill will be organized periodically. Mock drill will help to understand the role to be

played by everyone during the emergency.

17.4 Essential Employees

In each shift there will be available some trained workers in fire fighting, use of gas masks,

first aid. It will be a task force to assist and execute the instructions of The Site Controller

and The Incident Controller.

Number of persons trained for firefighting : all

Number of persons trained for first aid firefighting : all

Number of persons trained for plant operations : all operators

17.5 Rehearsal / Mock Drill

In disaster, Management time is very important, the initial few minutes are critical and timely

action may control the emergency. For persons to perform quickly their assigned roles, it is

essential that each individual should be made aware of emergency rehearsals, which will

impart procedures and their individual roles through proper training. It is necessary to test

through necessary expertise to individuals to act quickly in case of a real emergency. This

will help in identifying the deficiencies in the procedures and the likely difficulties, that may

be encountered during implementation hence rehearsal of the plan will be undertaken at an

interval of three months of work or when any new substance is introduced in the process or

in the event of a serious accident taking place it will be reviewed and modified to the extent

necessary.

17.6 Mock Drill Procedure

Inform all the employees about mock drill.

Fix the date for mock drill.

Mock drill will be monitored by observer/s not involved in the exercise.

Emergency alarm will be raised.

After hearing the alarm Emergency Procedure will be followed.

All clear signs will be studied carefully.

Records of drill are maintained.

Page 80: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery

Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 80

Emergency drills and integrated exercises have the following objectives:

These constitute another important component of emergency preparedness. They refer to the

re-enactment, under the assumption of a mock scenario, of the implementation of response

actions to be taken during an emergency.

a. To test the adequacy of the effectiveness, timing, and content of the DMP and

implementing procedures.

b. To ensure that the emergency organization personnel are familiar with their duties and

responsibilities by demonstration.

c. Provide hands-on experience with the procedures to be implemented during emergency.

d. Maintain emergency preparedness.

The frequency of the drills would vary depending on the severity of the hazard. However,

drills should be conducted once in a year. Scenarios may be developed in such a manner as to

accomplish more than one even objective. It may be ensured that the external agencies are

also made to participate in the mock drill at least once a year in order to familiarize them of

the emergency procedures/actions.

Drill and exercises shall be conducted as realistically as is reasonably practicable.

Planning for drills and exercises shall include:

a. The basic objectives

b. The dates, times and places

c. The participating organizations

d. The events to be simulated

e. An approximate schedule of events

f. Arrangements for qualified observers

g. An appropriate critique of drills/exercises with participants.

Evaluation of drills and exercises should be carried out which should include comments from

the participants and observers (internal as well as external). Discrepancies noted by the drill

observers during the drill shall be pointed out. The individual responsible for conducting the

drill or exercise should prepare a written evaluation of the drill or exercise. The evaluation

team should include assessments and recommendations on:

Page 81: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery

Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 81

a. Areas that require immediate correction.

b. Areas where additional training is needed.

c. Suggested modifications to the DMP or procedure.

d. Deficiencies in equipment, training, and facilities.

The evaluation of a drill or exercise may be submitted to OIC Pondicherry for review and

acceptance who shall then determine the corrective actions to be taken and assign the

responsibility to appropriate personnel.

The Fire & Safety Coordinator may track all approved drill and exercise corrective actions as

a means of assuring that corrections are made in a reasonable amount of time, and shall

appraise OIC regarding status of implementation of corrective actions.

Records of drills, exercises, evaluations, and corrective actions should be scrupulously

maintained. The committee shall supervise the following activities:

a) Functioning of Emergency Control Centre very specifically availability of all facilities etc.

as mentioned in the plan and its functional healthiness.

b) To evaluate communication of the Disaster Management Plan (DMP) among all segments

of employees for familiarizing them on their likely responsibilities in case of any disaster

including evaluation of behavior of employees and others.

c) To ensure that all facilities as required under the plan from within or from nearby

industries/aid centers under mutual assistance scheme or otherwise are available.

d) To ensure that the necessities under material assistance scheme is properly documented

and the concerned employees are fully aware in this regard.

e) To ensure that employees are fully aware to fight any emergency like firefighting.

f) The mock drill operation should be timed and each timing should be reviewed with respect

to the previous one and long lead-time should be identified. The committee may invite any

other official/expert to assist its functioning.

Following activities shall be necessarily supervised to ensure effectiveness of the DMP.

a) All employees are trained about their responsibilities/duties. They all are aware about the

approach routes to various facilities from Pondicherry, direction of evaluation the

equipment’s to be used during evacuation or the method of evacuation.

Page 82: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

DET NORSKE VERITAS

MANAGING RISK

Emergency Response & Disaster Management Plan for Cauvery

Basin Pipeline GAIL, Puducherry

PP027998/GAIL//2012-04-13 Page 82

b) All employees are fully trained to rescue their colleagues who are affected due to cause of

disaster in case they are unable to get out of the affected area. They should know to who they

are to inform about such persons.

c) All warning alarms are functional and public address system is in healthy condition.

d) All telephone lines/communication systems are provided in control rooms and there is no

removal of the facilities (as prescribed for the control rooms.

e) It is clear that who shall inform the District authorities, state authorities and corporate

office.

17.7 Updating the Plan

As and when required this “On Site Emergency Plan” will be updated and informed to all. If

necessary, after each drill the plan will be thoroughly reviewed to take account of

shortcomings.

As a commitment towards safe working environment, the Management has

formulated a safety policy and the same is displayed at prominent places.

Page 83: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

ANNEXURE 1

MATERIAL SAFETY DATA SHEET

Page 84: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

MSDS

________________________________________________________________________________________________________________Disclaimer: information contained in this material data sheet is believed to be reliable but not representation, guarantee or warranties of any

kind are made as to its accuracy, suitability for a particular application or results to be obtained for them. It is upto the user to ensure that the

information contained in the material safety data sheet is relevant to the product manufactured / handled or sold by him as the case may be.

We make no warranties expressed or implied in respect of the adequacy of this document for any particular purpose.

A. SAFETY DATA SHEET OF NATURAL GAS

MATERIAL SAFETY DATA SHEET (MSDS)

1. CHEMICAL IDENTITY

Trade Name : Natural Gas CAS No. : 8006-14-2

Synonyms : NG UN No. : 1972

Formula : Cn H2n+2, n=1,2

2. PHYSICAL PROPERTIES:

Boiling Point : -1610C Physical State : Gas

Melting/ Freezing Point : -1830 C Appearance : Colourless

Vapor Density : 0.6 Odour : Odourless

Can be Compressed to liquid at very low Temperature

3.FIRE/EXPLOSION HAZARD DATA

Explosive Limits : 5.3 to 14.8

% Vol. in air (LEL - HEL)

Auto ignition Temperature : 5370 C

HAZARDS PRECAUTIONS EXTINGUISHING AGENT

Fire: Highly inflammable.

(Flash Point: 187.80C)

Explosion: Gas forms an

explosive mixture with air.

No open fire, sparks, no

smoking.

Explosion proof electrical

equipment. Gag tests with

explosive meter suitable

for methane.

Shut off supply or let it burn

if there is no danger to

surroundings. Otherwise

extinguish with Carbon

dioxide, dry chemical powder

and water spray to cool it.

4. REACTIVITY DATA

Chemical Stability : Stable

Incompatibility with other Materials : Contact with strong oxidizing agents and

halogen

compound increase risk of the fire and explosion.

Reactivity : Stable

5. HEALTH HAZARD DATA

SYMPTOMS PRECAUTIONS FIRST AID

Inhalation: Dullness,

breathlessness, fatigue,

nausea, Vomiting, disturbs

muscle Co-ordination.

Ventilation, local air

extraction, air mask.

Remove the person to fresh

air and resort to artificial

respiration if necessary.

Report for medical

attention.

Page 85: PROJECT REPORT - gailcorintra.gail.co.in Basin/Final... · Report No.: 13WOASN-3 Organisation Unit: DNV Cleaner Energy & Natural Gas Hyderabad Revision No.: 1 Subject Group: SHE Risk

MSDS

________________________________________________________________________________________________________________Disclaimer: information contained in this material data sheet is believed to be reliable but not representation, guarantee or warranties of any

kind are made as to its accuracy, suitability for a particular application or results to be obtained for them. It is upto the user to ensure that the

information contained in the material safety data sheet is relevant to the product manufactured / handled or sold by him as the case may be.

We make no warranties expressed or implied in respect of the adequacy of this document for any particular purpose.

ADDITIONAL INFORMATION:

High concentrations in air cause Oxygen deficiency leading to unconsciousness.

Under atmospheric pressure and at low concentrations, hydrocarbon gases are not toxic for

humans. The presence of hydrocarbons (at a total concentration not exceeding 3 mg / m3)

has no long-term harmful effects on man. However, at high concentrations hydrocarbon

gases displace oxygen thus causing asphyxia.

The degree of fire and explosion hazards of Natural gas is high, mainly for the following

reasons:

a. Poor visibility of the ignitable mixture and high burning velocity that can injure

instantly anyone coming into contact with it, on account of high calorific value of

Natural Gas (~ 9500 K.Cal /m3).

b. Ability to ignite and burn.