    REINFORCED CONCRETE DESIGN IISEMESTER I 2013/2014

    BFC32802 / BFC 3172 : REINFORCED CONCRETE DESIGN 2Project instruction:This project must be carried out by group of maximum four or five (4 or 5) members.This project will contribute 20 of coursework mark.1.0IntroductionYour consultant company wins bid to build a multi-story commercial building in Batu Pahat

    City Center. An area of 30 m x 20 m has been allocated for the development purpose. As a

    team of designer and structural engineer, your group have been appointed to prepare the

    design and detail of the building, including a complete report of the following scopes:

    a) Description of proposed building and details of project.b) Layout of building for each floor, side and elevation views complete with

    location of columns, beams and footings.

    c) Analysis of design actions subjected to all probable combinations of loads.d) Design of staircase, frame analysis, columns and foundations.e) Detailingf) Discussion and a clear recommendation of the design.

    2.0Details of the projecta) Site

    The proposed building will be constructed in Batu Pahat City Center. The

    location can be considered as urban area with flat topography, slope < 0.05 and

    dense terrain. Other information is shown in the figure below.

    30 m

    Land for development 20m

    30 m

    Main winddirection

  • 8/13/2019 Project Reinforced Concrete Design 2

    2/3

    REINFORCED CONCRETE DESIGN IISEMESTER I 2013/2014

    b) Design consideration:i. All variable and permanent actions must follow the recommendation of

    Eurocode. However, any relevant assumptions can be made to calculate the

    wind action.

    ii. The number of story is 5 with height of floor is 3.6 m.iii. The dimension of beam and thickness of slab must be designed based on

    relevant requirement for the multi-story building.

    iv. The distance between two columns must not more than 4m, or 7m ifsupported by secondary beam.

    v. Foundation to ground floor has height of 2 m.vi. Any relevant assumptions can be employed, whatever necessary.

    3.0Reporta) Report should include the information/parameters, analysis, design and drawing

    of structure and structure plan arrangement.

    b) Computer drawings using a CAD system are highly encouraged.c) Analysis and design of specific structure should be conducted as scheduled,

    which is at 8.0 Schedule.d) A compile report must be submitted upon completing the course.

    4.0Assessment- Structural system and idealization, concepts and assumptions 10%- Analysis and design 35%- Detailing 25%- Report and Organization of report 20%- Professionalism and creativity 10%

    5.0Important dateDateline of report submission : 20thDecember 2013

    If the project is submitted late without sufficient cause, a penalty shall be applied. A

    deduction of 15% of the maximum mark available from the actual mark achieved by the

    group shall be imposed upon expiry of the deadline. A further deduction of 5% of the

    maximum mark available from the actual achieved by the group shall then be imposed

    of the next subsequence days.

  • 8/13/2019 Project Reinforced Concrete Design 2

    3/3

    REINFORCED CONCRETE DESIGN IISEMESTER I 2013/2014

    6.0WarningPlagiarism and academic dishonesty can have some severe penalties and repercussions.

    7.0Example of layout

    8.0Schedule- 18 October 2013 : Layout of building and staircase design- 15 November 2013 : Analysis of frame structure- 06 December 2013 : Column Design- 20 December 2013 : Footing design- 20 December 2013 : Complete report and submission