Virtualize Your Disaster! Remove the Disaster from “Disaster Recovery”
Project proposal on...
Transcript of Project proposal on...
1
Project proposal on
CommunityBasedDisasterRiskReductionProject
Submission to Flagship-4 coordinator
Integrated community Based Disaster Risk Reduction,
Nepal Risk Reduction consortium(NRRC)
International Federation of Redcross And Consortium
Nepal Redcross Society,Kathmandu
Submitted By SocietyFor Community Development Nepal
(SOCOD NEPAL)
Author: Christine Nicholls Lowe(USA)Volunteer
Contact Person: Pashupati Nath Neupane
Tel: 9846437635 Email: [email protected]
Address: Lamjung, Besisahar
2
Date 21-3-2069 To the Becky- jay Harrington,
Flagship-4 coordinator,
Integrated community Based Disaster Risk Reduction,
Nepal Risk Reduction consortium(NRRC)
Internationan Federation of Redcross And Consortium,
Nepal Redcross Society,Kathmandu
Dear Sir/Madam
Subject: Submission of Community Based Disaster Risk Reduction Project
proposal.
Society for Community Development (SOCOD) Nepal is a non-profit NGO working in Lamjung
District, Nepal.It is only one member organization of DPNet Nepal from Lamjung District. SOCOD works
in poor rural communities with marginalised groups, with the aim of improving livelihoods through
empowerment and awareness.
We are seeking funding to run a project on Community Based Disaster Risk Reduction Project
proposal to rural communities. This intended aim is to increase awareness and effect, and the measures
that can be taken to reduce risk to them, thus reducing their direct impact on these communities including
death toll, injury, disease and long term recovery.
As an agency working in a similar field and holding the same beliefs and values as SOCOD Nepal, we
felt it appropriate to approach you for support towards this project. To ensure its successful delivery and
its aim to increase and improve awareness of and capacity to cope with community based disasters and
climate change. SOCOD Nepal requires support through funding to run this project.
We very much welcome the opportunity to discuss this further with you and hope to receive your support.
With kind regards
Pashupati Nath Neupane Chairman
SOCOD Nepal
3
Community Based Disaster Risk Reduction Project Author: Christine Nicholls Lowe(USA)Volunteer
Contact Person: Pashupati Nath Neupane
Tel: 9846437635 Email: [email protected]
Address: Lamjung, Besisahar
Contents
1. Executive Summary ......................................................................................... 4
2. Description ....................................................................................................... 4
2.1. Aim, Objectives and Scope ................................................................................ 4
2.2. Project Outline .................................................................................................. 5
2.3. Justification ........................................................................................................ 8
2.4. Location ............................................................................................................. 8
2.5. Target Group ...................................................................................................... 9
2.6. Beneficiaries ...................................................................................................... 9
3. Programme Management .............................................................................. 10
3.1. Steering committee .......................................................................................... 10
3.2. Project Initiation ............................................................................................... 10
3.3. Facilitators ....................................................................................................... 10
3.4. Time Frame...................................................................................................... 11
3.5. Resources ........................................................................................................ 11
4. Monitoring and Reporting ............................................................................. 12
4.1. Overall Programme .......................................................................................... 12
4.2. CDRMO ........................................................................................................... 12
5. Budget ............................................................................................................ 13
Appendix 1 Scope of activities .................................................................................. 14
Appendix 2 Organisations Structure ......................................................................... 16
Appendix 3 VDC Selection ....................................................................................... 17
Appendix 4 Time-frame of activities .......................................................................... 19
Appendix 5 Log-Frame ............................................................................................. 21
Appendix 6 Stakeholder Analysis ............................................................................. 24
Appendix 7 Proposed Budget ................................................................................... 27
4
1. Executive Summary
Community based disaster risk reduction management (DRRM) is the process by which
interventions, strategies and activities are defined by the community to reduce, mitigate or
prevent the negative impact of hazard events. It can be categorised as hazard mitigation,
vulnerability reduction and capacity building including reinforcing existing coping strategies.
It is support for the implementation, facilitation and monitoring of this process which this
proposal identifies, by explaining and identifying the steps, time frames and resources required
to ensure a successful programme.
2. Description
2.1. Aim, Objectives and Scope
2.1.1 Aim
The aim of the project is to reduce communities risk to disaster.
2.1.2 Objectives
Objectives to meet this aim are as follows:
> Empower communities to identify, manage and monitor their own community disaster risk
reductions measures in a sustained and continued way.
> Increase capacity and reduce vulnerability of communities to disaster.
> Reduce the likelihood and resulting consequences of disasters on communities.
2.1.3 Scope
The scope of the programme lies within 5 identified VDC's only and will consist of 6 stages:
1. Site selection.
2. Rapport building and understanding the community.
3. Community situational analysis.
4. Planning for solutions.
5. Establishing a community based organisation.
6. Implementing disaster risk management actions.
Disaster risk reduction measures to be covered within the programme will be based upon the
community situational assessment and community need, hence differing from between VDCs
and resulting in a wide and far reaching scope of work. Activity must however fall into one of the
following categories, see appendix 1 for expansion on these topics:
1. Health & hygiene.
2. Safe water supply.
5
3. Food security
4. Livelihoods
5. Mitigation
6. Disaster preparedness
7. Advocacy and networking
Activities will not include large construction or engineering projects, such as the building of
hospitals, roads or bridges, nor will it include the provision of technical specialist equipment,
such as that for medical use.
2.2. Programme Outline
The programme will be delivered by SOCOD Nepal and the community themselves who will
have overall responsibility for its success. The programme consists of six stages which it is
proposed will be completed over a three year time span, and is based on Nepal Red Cross
Society recommended good practice from their own Community Based Disaster Risk Reduction
programme. The target communities will be involved as a front player throughout this
programme, to transform their own vulnerabilities into capacities. The programme will enable
and facilitate the organization of communities to assess the risk, developing plans for turning
vulnerabilities into capacities and developing and strengthening organizational structure.
2.2.1 Site selection
To ensure resources are targeted at communities in most need, who are most vulnerable to
disaster and who have the least capacity to cope a thorough site selection process will be
completed. This will initially include the assessment of secondary data from the district profile
developed by the district development committee and additional data from the National Red
Cross Society chapter to identify hazard patterns and basic vulnerability and capacity factors.
This data will preliminary be used to select and rank VDCs based on those most disaster hit.
Following this initial sorting, the top 10 VDCs will be ranked and sorted against secondary
parameters including the number of Dalits (disadvantaged population), illiteracy, mortality and
morbidity, facilities and resources and the non-existence or low existence of other NGOs in the
VDC. A score will be assigned based on these parameters and the VDCs then ranked and
sorted to identify the top 5 VDCs targeted for support. Please see appendix 3 for the framework
of VDC selection and ranking system.
The top 5 VDCs will then be visited to confirm these parameters are accurate, and their
willingness to be involved in the community based DRR programme.
2.2.2 Rapport Building & Understanding the Community
Developing and building a rapport with the community is key to the success of the overall
programme. With a community based approach their buy in, support and involvement is
paramount.
The focus of this stage of the programme is to gain entry to the community, whilst building trust,
confidence and gaining acceptance. This will be achieved through both formal and informal
methods utilising the community’s social, political, economic and cultural structures. Field staff
may begin on an individual basis and grow to a community level including the undertaking of
6
home visits, living within the village, and meeting with leaders to build confidence with
community members. At all times discussions must be transparent and open, the involved
person will focus on listening, observing, participating in daily life, activities and cultural events.
By undertaking this process field staff will begin to understand the community in which they are
based, and will additionally undertake an element of programme orientation as part of this
interaction and a baseline survey to better understand the community, their needs and
priorities. This will include public awareness activities at festivals and events, which although
initiating at this stage of the programme, will run until the programmes conclusion over the three
year period.
2.2.3 Community Situational Analysis
The community situational analysis (CSA) is a participatory process, requiring engagement with
the community to identify their level of vulnerability and capacity. Volunteers from within the
community will be recruited and trained by field officers to undertake this assessment with the
community themselves ensuring the approach is truly community based.
To inform the CSA a number of assessments will first be completed. This includes:
- VCA (hazard, vulnerability & capacity assessment) to identify the status of hazards in
the area and its risk, the factors which put people at risk (vulnerability) and the existing
coping mechanisms and capacities in the community.
- Livelihood assessment to identify livelihood activities, associated assets and resource
and the hazards that threaten them.
- Hygiene and sanitation assessment using PHAST (Participatory hygiene and sanitation
transformation theories)
- And additional information gathered from baseline survey, transect walks, hazard
mapping, historical profile and secondary information.
A narrative report will be produced of the CSA which the community will all have access to and
can utilise for the next step. This will provide an overall view issues and concerns, vulnerability
and capacity, the results of which will be analysed with the community, not in isolation.
2.2.4 Planning for a solution
Based on the above assessment outcomes community disaster risk management (CDRM)
planning is facilities. Representatives from across the whole community, including women,
government, political, disabled groups etc, will be invited to take part in this process ensuring all
sectors are engaged and represented. This core group will then use the CSA to identify first the
problems, and then the solutions thus identifying their disaster risk management measures to
be taken. These solutions will be ranked and objectives, groupings and activities identified
along with associated indicators, timeframes and required resources. The required committees
will then be identified to facilitate their implementation. This will form the CDRM plan which will
be circulated to all of the community for agreement and approval and to wider stakeholders.
This process will be undertaken by the community themselves, with a SOCOD resource person
to facilitate the process and ensure the plan is based on need and will benefit the whole
community – not to influence the process and decisions.
7
2.2.5 Establishing a community based organisation
The core group which developed the CDRM plan will liaise and gain community consensus for
the formulation of a Community Disaster Risk Management Organisation (CDRMO). They will
see the recruitment of relevant members from a cross section of the whole community. The
organisation will be structured based on community requirements, but a proposed and
recommended structure can be seen in appendix 2. This consists of a General Assembly of
Members, an Executive committee and then associated committees dependent on the CDRM
plan. Upon its establishment members will receive orientation training on community based
disaster risk reduction principles and methodologies.
The CDRMO will operate against an agreed self written constitution, and will seek Nepal
government legal standard as identified in the Society Registration Act 2034, to gain legal
registration. This will give the organisation a legitimate profile to submit project proposals for
District Government funding as well as partnering with NGOs and INGOs. This approach will
provide continuity and sustainability to the CDRMO, which will be organised to implement
activities but also to be a catalyst for a safer and more resilient community.
2.2.6 Implementing disaster risk management actions
The CDRMO will be responsible for ensuring and for delivering the agreed activities within the
CDRM plan, mobilising the community to achieve its objectives and targets. These activities are
as yet unknown as will be based upon community need, however it is likely some of these
activities will include:
> Developing and printing resource, vulnerability and hazard maps
> Running a health awareness camp
> Conducting a livelihoods activity support scheme – funding support to those in greatest
need
> PHAST training and implementation within the community
> First Aid training
> Light Search and Rescue (LSAR) Training
> CDRMO finance training – to manage budgets, emergency and livelihood funds
> Annual community disaster risk management exercise
The CDRMO will also be responsible for development of the organisation itself, through
monitoring and evaluation, regulations, functioning committees, partnership opportunities and
capacity building. This work will include fund management and generation activities, advocacy
from the community to the VDC, DDC or for referral services to other organisations, and
networking developing stakeholder relationships, coordination and partnerships.
The CDRMO is necessary to ensure sustained continuity of the CDRM plan and future plans,
and is a necessary channel for NGOs and Government bodies etc.
8
2.3. Justification
2.3.1 Programme Justification
The 5 VDCs selected for the programme will have been clearly and transparently identified as
significantly vulnerable to disaster, with limited facilities, opportunities and resources and high
levels of deprivation resulting in reduced capacity to prepare for and respond to a disaster when
it occurs. These will be identified through recognised parameters based on health statistics,
literacy levels, marginalised communities, available facilities and previous disaster occurrence
which reflect the level of vulnerability within the community.
As both rural and isolated communities, these people will be the first to respond when a
disaster happens. Outside assistance will take a long time to come, and as such they must be
prepared and able to help themselves in a disaster situation. If left in this current situation
communities will remain vulnerable to their occurrence and consequences. They will not
understand the causes of such hazards and thus be in a position to reduce their likelihood
through mitigation techniques, respond in a structured and efficient way, nor will they have the
resources pre-prepared and organised to manage a response to and recover from these
disasters. As a result the impacts of these disasters will be much greater, affecting more
members of the community for longer periods of time which will inevitably result in greater
suffering, illness and death. With the knowledge, capabilities and resource we have available in
the world today this can not be allowed to happen.
Previous experience within SOCOD, the Nepalese Red Cross and other NGOs has shown that
a community based approach is necessary for the success of any long term and sustainable
programme to result in meaningful change. By providing the knowledge and support necessary
the community will be empowered to make change themselves, identifying their own problems
and prioritised solutions to improve their own resources and capabilities. This is vital to ensuring
change. This must come directly from the communities themselves not enforced upon them by
external influences. Only this way will change be manageable and sustainable.
2.3.2 SOCOD Nepal Justification
This project is complimented by the additional projects to be undertaken by SOCOD, including
the delivery of training to reduce disaster risk and its impacts of disaster to those with
disabilities, and the construction of sanitation facilities in schools improving hygiene and
sanitation practice to reduce disease.
This project helps to achieve SOCODs mission ‘to improve the livelihood of the people through
empowerment by helping the local people to manage their resources’. In turn this project
supports SOCODs organisational objectives to build capacity within the community, to raise
awareness in the community and to build networks with other NGOs.
2.4. Location
The identified communities to receive the awareness training will be across the Lamjung
District. Lamjung District is a part of Gandaki Zone and one of the seventy five districts of
Nepal, a landlocked country of South Asia. The district, with Besisahar as its district
headquarters, covers an area of 119 km² and has a population (2001) of 225,461. The district of
Lamjung lies in round Annapurna range close to the second city of the Country, Pokhara. Many
9
of the areas are still semi-urban or rural and 64.45% of people are still traditional farmers. The
literacy rate is low at 64.79%, which drops significantly to 54.04% for women.
Lamjung is an area also vulnerable to disaster. With major rivers running through it, and steep
heavily farmed hillsides the whole district is vulnerable to landslides and flooding primarily. In
addition the majority of the population living in rural areas, reside in clusters of thatched housing
which are vulnerable to house fire and spreading. Hygiene and sanitation practices are also
poor, resulting in poor health and high risk of disease outbreak and spreading.
2.5. Target Group
Five VDCs will be targeted for this community based disaster risk reduction programme. These
communities are selected against a number of parameters which were applied to all VDCs in
the Lamjung District see appendix 3. These parameters are:
> Most disaster hit
> Greatest percentage of Dalits within the community
> Highest illiteracy levels
> Least physical facilities and services
> Highest levels of morbidity and mortality
> Least number of NGOs working there
The programme will target the whole community regardless of age, sex, caste or religion.
Ethnic Groups
The main ethnicity of the Lamjung communities include: Gurung, Magar, Kami, Damai, Sarki,
Bhujel and to a limited extent Brahmin and Chettries. These areas are highly disadvantaged in
terms of their education and literacy. In fact, the literacy rate for women and other
disadvantaged groups is less than 30% in some areas. Primary school enrolment rate is low in
general and lowest among girls, Janajati and other lower casts. More then 35% of children are
out of school in some areas. The adult literacy rate is also low.
2.6. Beneficiaries
Direct Beneficiaries
The direct beneficiaries include the whole community from the targeted VDC. The whole
community will be engaged throughout the process and will benefit from a community based
disaster risk reduction programme. All will result with reduced vulnerability to disaster and
increased capacity to cope through greater knowledge, awareness and understanding and
activities put in to place to mitigate, adapt and prepare for hazards. This will in the long term
save lives, livelihoods and communities.
Indirect beneficiaries
Indirect beneficiaries include the generations to come from within the community who will
benefit from a long standing, sustained and continued CDRMO committed to reducing disaster
10
risk. In addition other indirect beneficiaries may include neighbouring VDCs, who may well
benefit from activities put in place and from shared knowledge, learning and engagement.
3. Programme Management
Management of the overall programme will be undertaken by SOCOD Nepal, through the
Programme Manager. The Programme Manager will report to a purposely created steering
committee, consisting of the chairman of SOCOD Nepal, the programme manager, field staff
and representatives from the Nepalese Red Cross. As required, additional representatives will
attend this committee from donor and partner organisations.
3.1. Steering committee
The role of the steering committee is to
> Ensure adherence to the aim, objectives and scope of programme
> Approve and sign off the overall programme plan
> Monitor progress and provide strategic decision making
> Approve programme and decision making process throughout
> Represent the CBDRM programme as appropriate
3.2. Programme Initiation
To initially establish the programme recruitment of a programme manager, training officer and
technical field supervisor must take place. These posts must all be filled from the outset of the
programme to ensure rapport and relationships are established with the relevant VDCs from the
outset.
Upon recruitment they will engage and liaise with stakeholders and partners regarding the
programme, establishing and identifying any additional good practice guidelines being utilised
elsewhere. This consistent and ongoing engaging and sharing of information and practices is
crucial to ensure the success and sustainability of the programme, allowing learning from others
and also promotion of the programme itself.
Part of the programme initiation will include orientation of the programme at the district level for
the District Development Committee and other involved and interested stakeholders working in
the area including government departments and other NGOs. This orientation will take place
annually, providing updates and briefing for all within the district, again allowing for shared
knowledge and learning and identification of areas of support and cross over.
3.3. Facilitators
To run this programme over a three year period staff structure is required to ensure continuity,
delivery of services and a consistent knowledge base and experience to initiate and facilitate
the activities.
11
SOCOD Nepal would recruit:
> One Programme Manager to initiate and oversee the running of the whole programme,
including stakeholder management, budget, planning and resourcing.
> One community trainer to develop training programmes, deliver training to community
volunteers and to engage with external partners to deliver specialist training
> One technical / field supervisor to engage directly and regularly with the involved
communities, facilitate workshops and programme development and provide a direct link in
for the communities to SOCOD.
In addition to this staff base, community workers would be recruited from within each of the five
VDCs. These workers would be volunteers from within the community who would be trained by
SOCOD Nepal, to ensure a continual presence from the programme, and a point of contact for
support and assistance to the rest of the community. The number of community workers
required will be dependent upon the outcome of analysis and needs identified.
3.4. Time Frame
The programme will take place over a three year timeframe in three phases.
> Inception phase – 6 months: Community selection, rapport building, baseline survey and
CSA
> Implementation phase – 18 months: CDRM plan produced, CDRMO established,
implementation of plan and activities underway
> Phase out – 12 months: Stepped and controlled hand over of whole programme to the
CDRMO, ensuring it will operate independently and sustainably.
See appendix 4 for detailed activities within time frames.
3.5. Resources
Resources will be required for the initial start up of the programme and its longer term running.
These include computers, office furniture, stationary and training materials. Additional costs for
accommodation, food and transport are also significant given the wide geographic area to be
covered and the variety of locations to be visited for long time frames.
Resources required for following years will be dependent upon the needs and solutions
identified in the community disaster risk management plan. At this point donors will be
requested to support additional the requisition of additional funds for the next phase of the
programme.
12
4. Monitoring and Reporting
4.1. Overall Programme
4.1.1 Monitoring & evaluation
Overall progress and success of the programme will be monitored against programme
indicators as identified in the Log frame in appendix 5. Based on these findings progress
against indicators and timeframes will be monitored and adjustments to achieve targets made.
In addition an evaluation will be made as to the success to date of achieving objectives, and
decisions for the future to ensure this success. This will form the basis of the bi-annual report
produced for donors. Information for this monitoring will be taken from the results of the
baseline survey, CSA, DRM plan, observations, and feedback and report forms.
At the end of the programme an additional survey will be undertaken to assess progress
against base line findings and indicators to assess overall success of the programme.
4.1.2 Reporting
Reporting will take place through a variety of structures during the course of the programme.
> The SOCOD programme manager will report to the steering committee on a monthly basis
> The SOCOD programme manager will report to donors on a bi-annual basis, including
budget plans and forecasts.
> Training and technical field supervisors will formally report to the programme manager on a
monthly basis.
> Reports will be distributed to stakeholders and partners on an annual basis.
> Following completion of the programme, a final programme evaluation report will be
produced and disseminated to donors and other stakeholders.
4.2. CDRMO
4.2.1 Monitoring & evaluation
The CDRMO will monitor and evaluate progress against their DRM plan and its identified
indicators and timeframes. This will ensure feedback is obtained during the implementation of
the plan to enable adjustments to be made to keep plans on track with objectives. Evaluation
will also take place with SOCOD Nepal and other relevant stakeholders, to reflect on activities
to date, to make future decisions, and to determine progress and whether original objectives
have been met.
4.2.2 CDRMO reporting
The CDRMO will have its own reporting structure.
> The Executive committee will report to the General Assembly of Members twice a year
> The activity based committees will report to the Executive Committee monthly
> The Executive Committee will produce monthly reports for all CDRMO members and
SOCOD Nepal
13
5. Budget
Funding for the whole programme is required including staff costs, office set up, programme
management and delivery of activities. Full costs for phases 2 and 3 of the programme, and
hence years 2 and 3 are currently estimated, as they will be widely dependent on the outcome
from each VDCs DRRM plan, which will be based on need.
The requested budget however for each year is as follows
Year 1 Year 2 Year 3
Budget (Rps) 1,523,900 1,913,300 1,339,800
Budget (US$) 21,770 27,333 19,140
A full budget breakdown can be seen in appendix 7.
Appendix 1 Scope of activities
Scope of DRRM activities could include,
Health and hygiene > First aid & PHAST approaches
> Latrine construction and hand washing
> Bed net use and provision
> Health awareness, nutrition and health camps
> Training on health, hygiene and nutrition
Safe water supply > Awareness of water borne diseases
> Management of safe water supply
> Transportation and storage
> Existing water source protection - animal separation, pump seals collection tanks etc
> New water source development
> Supporting water filters to most vulnerable families
Food Security > Awareness and support for better crop production and animal husbandry
> Inputs of seeds and tools - possible new varieties and alternatives
> Small scale irrigation - surface pump provision
> Crop storage and food preparation
> Cropdiversificationpilotprojects
Livelihoods > Savings and credit schemes
> Technical advice and referrals
Mitigation > Housing construction awareness
> Repair and/or maintenance to footpaths
> Landslide and water erosion control through bio-engineering
> Reforestation
15
> Garbage and waste management
> Fire prevention and control - e.g. improved cooking stove (ICS)
Disaster Preparedness > Training and equipment
> DRM plan and emergency response plan
> Establish food grain and emergency fund stores
> Search and rescue training
> First aid training
> Early warning system establishment and dissemination
> Evacuation route and must point identification
> Exercises and drills
> Communications equipment
Advocacy and networking > VDC, DDC, NGOs
This list is not exhaustive. The scope of the work however will be based on community need
and the findings of the community situational analyses.
16
Appendix 2 Organisations Structure
Community Based Organisation Structure
General Assembly of Members
(Elected members of the
committees)
Executive Committee
(Chairpersons of the committees)
Relief
committee
Fund
Generation
Committee
Mitigation
Committee
Training &
Awareness
Committee
17
Appendix 3 VDC Selection
Pre selection of VDC S. No.
Name of the VDC Disaster/effects General vulnerability General Ranking
1 Gaunda Landslide effects every year (35 family)
Landslide 1
2 Pyarjung Landslide effects every year(30)
Landslides 2
3 kolki landslide effects every year (28)families
landsliedes 3
4 Illampokhary landslide effects every year (25) families
landslide 4
5 Bichour landslide effects every year(20)families
landslied 5
6 Dudhpokhari landslide effects every year(18)families
landslied 6
7 Bhalayakharka landslide effects every year(17)families
landslied 7
8 Mohoriyakot landslide effects every year(16)families
landslied 8
9 Chakratirtha landslide effects every year(16)families
landslied 9
10 Bharte landslide effects every year(15)families
landslied 10
VDC selection parameters
VDC VDC
Criteria Weighted given (a)
Scale (1-10) ( b)
Weighted scores (c)=a X b
Weighted given (a)
Scale (1-10) ( b)
Weighted scores (c)=a X b
The most disaster hit VDC 10 4 40 10 0
Dalits/disadvantaged and other socially excluded and marginalized population 7
3 21
7
0
Illiteracy 5 4 20 5 0
Morbidity and mortality due to disaster and water and sanitation related diseases 5
5 25
5
0
Non or low existence of other development agencies/NGOs 4
6 24
4
0
Willingness to participate in the project 5
7 35
5
0
Total 36 165 36 0
18
VDC Ranking
S. No (General Ranking) VDC Score Ranking
1 Gauda 20 1
2 Pyargunj 18 2
3 Kolki 16 3
4 Illampokhari
15 4
5 Bichour 14 5
6 Dudhpokhari 13 6
7 Bhalayakharka 12 7
8 Mohoriyakot 11 8
9 Chakratirtha 11 8
10 Bharte 10 9
19
Appendix 4 Time-frame of activities
Programme activities and timeframe
Previously Year 1 Year 2 Year 3
Activity Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Ph
ase
1:
Incep
tion
0.1 Assess secondary data and identify preliminary selected VDCs
0.2 Submit proposal for funding
0.3 Confirmation of funding
1.1 Steering Committee established and meets
1.2 Determine disaster risk management planning - good practice guidelines / engagement with partners
1.3 District level programme orientation
1.4 Recruit personnel
1.5 Establish Office
1.6 Site visit to VDCs to confirm selection parameters and discuss involvement
1.7 Formal engagement with community following selection
1.8 Conduct baseline survey
1.9 Immerse into the community - build rapport through formal & informal networks
1.10 Public awareness activities - presence at festivals & community events
1.11 Recruit community volunteers
1.12 Train community volunteers in conducting Vulnerability Capacity Assessment / Livelihood & other assessment techniques inc. hazard assessment, transect walk etc
1.13 Conduct assessments
1.14 Construction of narrative report forming CSA (based on previous assessments)
Ph
ase
2:
Imp
lem
en
tatio
n
2.1 Invite representatives from across the community to form core group
2.2a Group to use CSA to identify problems then solutions - disaster risk management measures
2.2b Rank solutions and group
2.2c Identify associated indicators, timeframes and resources including committees needed to solutions
2.3 Produce report and disseminate to community
2.4a Gain community agreement of content and approach
20
2.4b Gain community agreement to establish CDRMO
2.5 Disseminate DRRM plan to stakeholders
2.6a Elect CRDRMO members
2.6b Review and agree constitution
2.7 CBDRR orientation for CDRMO
2.8 CBDRMO to gain legal registration
2.9 CDRMO operational: Committees to meet and undertake agreed activities
2.10 Conduct awareness Health Camps
2.11 Printing of resource, vulnerability and hazard maps
2.12 Conduct livelihood activity support
2.13 PHAST Training for volunteers
2.14 PHAST Implementation in community
2.15 Community FA Training
2.16 Community LSAR Training
2.17 CBDRMO Finance Management Training
2.18 Community DRM exercise
Ph
ase
3:
Pha
se o
ut Phased handover to community
(activities dependent on DRRM plan)
Mo
nito
rin
g a
nd
eva
lua
tio
n
4.1 Field reports to Programme Manager
4.2 Bi-annual reporting to donors
4.3 Annual reporting to partners
4.4 Committee reports to Executive Committee
4.5 Executive committee reports to General Assembly of Members
4.6 Formal bi-annual programme report against project indicators
4.7 Final programme report against project indicators
Appendix 5 Log-Frame
Logical framework provided for Community Based Disaster Risk Reduction Management programme.
Narrative Summary Impact Indicators Means of Verification Assumptions / Risks
Goal Reduce the communities risk to
disaster
Increase awareness of
disaster management and
disaster risk reduction
techniques
Reduce the impact a disaster
will have on the community
Survey
Assessment
Whole community is engaged
in DRRM process
Preparation for disaster
mitigation practices are
undertaken by whole
community
Outcomes To increase the capacity of
communities to disaster
To reduce the likelihood of
disasters on communities
By 2013 to see changes in the
practice of hygiene and
sanitation
Implemented mitigation
methods in place
Implemented disaster
preparedness methods in
place
Exercise of response
arrangements
Monitoring reports
Survey
Visual observation survey
Post exercise report
Training courses attended
Knowledge is used
Community take ownership of
plan production
Committee membership is
upheld and sustained
Cultural practice/beliefs can be
overcome
Alternative resource can be
brought into the area
No change to transport or
22
communications infrastructure
Outputs Increase awareness of DRM
Produce community based DRM
plan
Establish CDRMO
Improve hygiene and sanitation
practices
Training delivered to relevant
members of the community
Disaster preparedness and
mitigation practices in place
Prepared CBDRR plan
Committee meetings
Reduce incidence of disease
Evidence of good hygiene
practices
Training records
Survey
Hazard maps
Document
Minutes
Agendas
Survey
Observations
Health statistics
Community welcomes
programme
No significant change to
disaster hazard in location /
area
No significant change to
existing resource levels,
economy, environment and
resultant resources
Baseline survey can be
completed with community
involvement
CSA can be completed by
community
Activities Site selection of VDCs and site
visit
Rapport building - meet and
explain
Attend community events,
meetings, immerse into
community
Conduct baseline survey with
VDCs involved in research
Baseline survey
Activities calendar
Report documentation
23
community
Identify and train volunteers to
undertake VCA, PHAST,
Livelihoods assessments
Produce narrative report on CSA
Invite representatives from
across the community to identify
DRRM measures
Community reps to develop
DRRM plan and agree with
community
Agreement to establish CDMO
Election of members and
constitution agreement
Form committees to deliver
DRRM activities
Training need assessed
Training content developed
Target individuals selected
CSA
Cross section of community
DRM plan
Community agreement
Agreement of constitution and
approval of DRRM plan
Committees selected and
meeting
Training plans
Training
content/programme
CSA report documentation
VCA documentation etc
Analyses of community
groups and
representatives
DRRM plan
documentation
Meeting notes
Meeting notes
Signed constitution
documents
Agendas, minutes
24
Appendix 6 Stakeholder Analysis
Stakeholder Stake in the
Programme
Potential impact on
Programme
What does the
Programme expect
the Stakeholder to
provide?
Perceived attitudes
and/or risks
Stakeholder
Management
Strategy
Responsibility
Community To develop and
enhance own
capacity and reduce
own vulnerability
Crucial to success of
the programme.
Community will
deliver and continue
DRR activities.
Engage and buy in
to the overall
programme and its
approach.
Attend training
sessions as
appropriate.
Deliver activities
and utilise agreed
risk reduction
measures.
Cultural beliefs or
practices that may
hinder progression.
Economic pressures
and priorities.
CDRMO structure
to motivate
community, ensure
their engagement
and delivery of
agreed activities.
Committees
Committees To develop and
enhance own
capacity and reduce
own vulnerability
Successful
completed delivery of
programme activities
within their sector
Delivery of
programme
activities.
Local knowledge.
Awareness raising
and community
engagement.
Economic pressures.
Time constraints.
Report monthly to
CDRMO
Executive
committee
25
Executive
committee
To develop and
enhance own
capacity and reduce
own vulnerability
Coordination of
programme
Delivery of
programme
Monitoring and
reporting
Coordinated
response
Monthly reports
Economic pressures
Time constraints.
Ability to manage
committees.
Report monthly to
General Assembly
of Members and
stakeholders
General
Assembly of
Members
General
Assembly of
Members
To develop and
enhance own
capacity and reduce
own vulnerability
Potential to steer
direction of the
programme and
identify priorities
Decide on policy
and strategy of
DRRM programme.
Sign off plan.
Appoint committee
members
Economic pressures
Time constraints
2 annual meetings
with SOCOD
attendance
SOCOD
Donors
SOCOD
Nepal
Interested in
reducing disaster
risk, empowering
communities and
enhancing capacity
sustainably.
Facilitate programme
- crucial for inception.
Engagement with
community
Training and
awareness raising
Facilitation
Documentation
production
Monitoring and
evaluation
Financial resource
available
Ability to make long
term improvement
2 annual meetings
with AGM
Report to donors
Regular meeting
(formal & informal)
in community
Donors
Nepal Red
Cross
Interested in
reducing disaster
risk, empowering
communities and
enhancing capacity
sustainably.
Provision of training Training courses
Knowledge and
information
Availability of time
and resource
Resource withdrawal
from Lamjung
following completion
of alternative
programmes
Regular meetings
Joint planning and
training delivery
SOCOD
26
Local
Government
Departments
Interested to improve
community disaster
resilience and
capacity
Progression of
programmes
Development of
specific activities
Technical advise
Support
Input and resource
Support
identification of
target communities
Limited resource
Limited time
Political stability
Competing priorities
Buy in
Meetings
Engagement
Information
provision
Advocacy
CDRMO
Local police
authority
Interested to improve
community disaster
resilience and
capacity
Provision of training Technical advise
Support
Training courses
Limited resource
Limited time
Internal security
stability
Competing priorities
Buy in
Meetings
Engagement
Information
provision
CDRMO
Donor agency Interested in
reducing disaster
risk, empowering
communities and
enhancing capacity
sustainably.
Implementation of
programme
Programme quality
(resource
dependent) and
parameters
Financial support
Parameters within
which programme
must operate
Input and
engagement
Ability to support
long term
improvement
Economic situation
Competing priorities
Annual meeting with
SOCOD
Review of
monitoring reports
Attendance of
ceremonies / events
as appropriate
SOCOD
27
Appendix 7 Proposed Budget
Proposed budget for CBDRM Programme. Please note years 2 and 3 are estimates only as dependent upon
outcome of each VDCs DRRM plan which is based upon need.
Activity No. Description of the activity Times Units Rates Initial Budget Q1 Q2 Q3 Q4 Yr 2 Yr 3
Phase 1 Total 1558450 415762.5 380512.5 284375 283203.1 1243750 1243750
1.1 District level programme orientation 12500 12500 0 0 0 12500 12500
Stationeries and other supplies 1 30 100 3000 3000 0 0 0 3000 3000
Tea and snacks 1 30 300 9000 9000 0 0 0 9000 9000
Banner 1 1 500 500 500 0 0 0 500 500
1.2 Steering committee established and meets 72000 18000 18000 18000 18000 72000 72000
Conduct regular meeting of steering committee - tea & printing 12 10 100 12000 3000 3000 3000 3000 12000 12000
Steering committee representative & CDRMO meeting 60 10 100 60000 15000 15000 15000 15000 60000 60000
1.3 Determine disaster risk management planning - good practice guidelines / engagement with partners
36250 9062.5 9062.5 9062.5 9062.5 36250 36250
Stationeries and supplies 1 10 100 1000 250 250 250 250 1000 1000
Food & accommodation 2.5 10 850 21250 5312.5 5312.5 5312.5 5312.5 21250 21250
Travel cost 2 10 200 4000 1000 1000 1000 1000 4000 4000
Daily allowances 2 10 500 10000 2500 2500 2500 2500 10000 10000
1.4 Salary Costs 903000 97950 225750 225750 225750 903000 903000
Programme Manager 12 1 32,650 391800 97950 97950 97950 97950 391800 391800
Community Trainer 12 1 20000 240000 0 60000 60000 60000 240000 240000
Technical field supervisor 12 1 22600 271200 0 67800 67800 67800 271200 271200
28
1.5 Office costs 282000 192000 30000 30000 30000 120000 120000
Office utilities 12 1 3000 36000 9000 9000 9000 9000 36000 36000
Laptop computers 1 3 45000 135000 135000 0 0 0 0 0
Office furniture 1 1 5000 5000 5000
Printer 1 1 22000 22000 22000 0 0 0 0 0
Maintenance office equipment 12 1 1000 12000 3000 3000 3000 3000 12000 12000
Communication 12 1 3000 36000 9000 9000 9000 9000 36000 36000
Stationary 12 1 3000 36000 9000 9000 9000 9000 36000 36000 1.6 Site visit to VDCs to confirm
selection parameters and discuss involvement 12000 12000
Food & accommodation 10 2 400 8000 8000 Travel cost 10 2 200 4000 4000 1.7 Formal engagement with
community following selection 24000 24000 Food & accommodation 10 2 400 8000 8000 Travel cost 10 2 200 4000 4000 Tea and snacks 5 30 80 12000 12000 1.8 Conduct baseline survey 4000 2500 1500 Template printing 1 1000 1 1000 1000 Food & accommodation 5 1 400 2000 1000 1000 Travel cost 5 1 200 1000 500 500 1.9 Immerse into the community -
build rapport through formal & informal networks 42000 21000 21000
Food & accommodation 5 14 400 28000 14000 14000 Travel cost 5 2 200 2000 1000 1000 Tea and snacks 5 30 80 12000 6000 6000 1.10 Public awareness activities -
presence at festivals & community events 5 4 5000 100000 25000 6250 1562.5 390.625 100000 100000
1.11 Recruit community volunteers
29
1.12 Train community volunteers in conducting Vulnerability Capacity Assessment / Livelihood Assessment & other assessment techniques hazard assessment, transect walk etc (3 days)
54700 54700 Stationeries and supplies 1 3 200 600 600 Food & accommodation 3 20 400 24000 24000 Travel allowance 2 20 200 8000 8000 Daily allowances 2 20 500 20000 20000 Facilitator allowance 3 1 700 2100 2100 1.13 Conduct Assessments 3500 1750 1750 Template printing 1 1000 1 1000 500 500 Stationeries 5 1 500 2500 1250 1250 1.14 Construction of narrative
report forming CSA (based on previous assessments) 12500 12500
Printing of report and dissemination 5 100 25 12500 12500
Phase 2 Total 802000 0 0 103500 52500 661000 85000 2.1 Invite representatives from
across the community to form core group - - -
2.2 Core Group to use CSA to identify problems then solutions - disaster risk management measures
51000 51000 Stationeries and supplies 5 30 100 15000 15000 Tea and snacks 15 30 80 36000 36000 2.3 Produce DRRM plan and
disseminate to community 12500 12500 Printing of DRRM plan 5 100 25 12500 12500 2.4 Gain community agreement 40000 40000 Tea and snacks 5 100 80 40000 40000
30
2.5 Disseminate DRRM plan to stakeholders 5000 5000
Printing of DRRM plan and distribution 5 20 50 5000 5000
2.6 Establish CDRMO 500 500 Elect members Review and agree constitution
stationary / tea 5 1 100 500 500
2.7 CBDRR orientation for CDRMO 32000 32000
Stationeries and supplies 5 10 300 15000 15000
Food 5 12 100 6000 6000
Facilitator Travel allowance 5 2 200 2000 2000
Facilitator allowance 5 2 700 7000 7000
Accommodation 5 2 200 2000 2000 2.8 CDRMO to gain legal
registration 5 1 3000 15000 15000
2.9 CDRMO operations 60000 15000 60000 60000
Monthly meeting - tea and snacks 60 10 50 30000 7500 30000 30000
Stationeries / supplies 60 10 50 30000 7500 30000 30000
2.10 Awareness Health Camps 47500 47500
Tea and snacks 5 100 80 40000 40000
Supplies and materials 5 1 500 2500 2500
Incentive for technical resource persons 5 1 1000 5000 5000
2.11 Printing of resource, vulnerability and hazard maps 5 1 500 2500 2500
2.12 Livelihood activity support 5 1 1 70000 70000
2.13 PHAST Training for volunteers (5 days) 144500 144500
Stationeries and supplies 1 20 300 6000 6000
PHAST picture set 1 12 5000 60000 60000
Food & accommodation 5 20 400 40000 40000
Travel allowance 2 20 200 8000 8000
31
Daily allowances 2 20 500 20000 20000
Facilitator allowance 3 5 700 10500 10500 2.14 PHAST Implementation in
community 13000 13000 Tea and snacks 5 30 80 12000 12000 Stationeries and supplies 5 1 200 1000 1000
2.15 Community FA Training 124500 124500 Stationeries and supplies 5 20 500 50000 50000 Food 25 20 100 50000 50000 Facilitator Travel allowance 5 2 200 2000 2000 Facilitator allowance 25 1 700 17500 17500 Accommodation 25 1 200 5000 5000
2.16 Community LSAR Training 149000 149000
Stationeries and supplies 5 20 500 50000 50000
Food 25 20 100 50000 50000
Facilitator Travel allowance 5 4 200 4000 4000
Facilitator allowance 25 2 700 35000 35000
Accommodation 25 2 200 10000 10000
2.17 CBDRMO Finance Management Training 10000 10000
Stationeries and supplies 5 10 100 5000 5000
Tea & snacks 5 10 100 5000 5000
Facilitators allowance 5 1 700 3500 3500
2.18 Community DRM exercise 25000 25000 25000 Annual simulation of plans -
materials & stationary 5 1 3000 15000 15000 15000 Tea & snacks 5 200 10 10000 10000 10000 Monitoring and reporting total 11050 0 0 2025 2025 8550 11050 4.2 Bi-annual reporting to donors 4050 2025 2025 4050 4050 Designing and editing 2 1 2000 4000 2000 2000 4000 4000 Printing 2 1 25 50 25 25 50 50 4.3 Annual reporting to partners 4500 4500 4500 Designing and editing 1 1 2000 2000 1000 1000 2000 2000 Printing 1 100 25 2500 1250 1250 2500 2500
32
4.7 Final programme report against project indicators 2500 2500
Printing 1 100 25 2500 2500
Total First Year Quarters 415762.5 380512.5 389900 337728.1
Total per year 1523903.13 1913300 1339800