Project of Zonda New Energy Bus. Yancheng Zhongwei Nanjing Jinling Beijing Yanjing Shanghai Guanghui...
-
Upload
summer-june -
Category
Documents
-
view
215 -
download
0
Transcript of Project of Zonda New Energy Bus. Yancheng Zhongwei Nanjing Jinling Beijing Yanjing Shanghai Guanghui...
Project of Zonda New Energy BusProject of Zonda New Energy Bus
YanchengZhongwei
NanjingJinling
BeijingYanjing
ShanghaiGuanghui
Zonda Bus
Hybrid BusCNG BusDiesel Bus Electric Bus
Zonda Bus
4
Zonda New Energy Bus
Industrialization
5
Core Advantages of Zonda Electric Bus • Qualification Zonda Group has been checked and accepted by the nation and is qualified to manufacture ele
ctric buses and chassises
• Strong support form state government Approved by China Ministry of Industry and Information and headed by Zonda Group, leading in
dustrialization demonstration base of power system integration of Chinese electric buses are going to be set up.
• Adoption of special technology & high reliability Zonda electric bus has adopted such special technology as electric-magnetic management syst
em, control system and energy recycling system,etc.The test by China Identification and Test Center of Automotive Vehicles and Test Center of Zonda Special Power Battery of National 863 Electric Vehicles shows all performance indicators are stable and reliable. Charging device can effectively ensure the balance and safety of charging. The battery keeps its temperature constant in operation without heating.
• Effective balance of peak-valley of city grid The parking lot is equipped with charging device.The way buses run in the day time and are ch
arged in the night is taken to balance the peak-valley of city grid and save energy consumption.
• Being provided with good marketability conditions The electric buses are characterized by long mileage, low energy consumption, safe and reliab
le operation, low cost of complete buses,light weight of batteries, short time of charging, long service life of batteries, zero emission without pollution, which make good marketability conditions.
Core Advantages of Zonda Electric Bus
The Project of Electric Bus(electric bus power-train and chassis)
Zonda Bus took over Qingshan New Energy Co.,Lt
d.
The three core technologies of pure electric bus (battery, motor and controller) have got China National Patents.The bus can run more than 500 kilometers on one time charge while the national standard is only about 200km. The battery can charge and discharge more than 1,000 times with energy consumption lower than 5kW.h/100km.t. The maximum speed is not less than 110km/h and the maximum grade ability is larger than 20 degrees.All technical indicators are superior to national standards.The bus has its own patented motor development technology and can recycle energy.
Zonda Electric Bus Co., Ltd.
total investment of 1 billion
Project land 600 mu (40 acres)
●power trains of 5000 units of electrical vehicles
●chassises of 5000 units of electrical vehicles
●production base of 5000 units of electrical vehicles
annual production capacity : 5000 units of electric vehicles and power trains annual sales revenue : 12 billion total profits : 1.16 billion
Project Plan of Electric Bus and Power Battery
In 2009 October, Nanjing Zonda Electric Bus Co., Ltd. was founded.It constructed the first modernized iron vanadium & lithium phosphite batteries and power train production line in China, which represents an important step towards the industrialization of pure electric vehicles . Recently we have obtained approval from authorities. Zonda is honored to become the third demonstration operation manufacturer of new energy vehicles in China and first in Jiangsu.
President Mr.Xu Liankuan, on hehalf of Beijing Zonda Yanjing Bus Co.,Ltd. under Zonda Group, signed a cooperation agreement on New Energy Bus Project. During this project 10,000 units of buses shall be researched and developed.
Tianjing Transportation Group signed a contract with Zonda Group to order 50 units of pure electric buses which will serve the 2010 Davos Economic Forum.
Production Line of Zonda New Energy Batteries
Key task-1: enlarge auto parts industry of the new energy bus and promote the development of key parts and localization of production
04/10/23 13
Heavy current slow pulse charger
Inverter
Power-train and controller of pure electric bus
Electric power steering control
DC converter Car Chargers
Motor controller
Key task-2: speed up construction of new energy vehicle industrial parkThe main functions of the new energy vehicle industrial park:
04/10/23 14
knowledge park
Research and Development park
parts park
complete bus park
logistics park
trading and service park
Key task - 3 : vigorously carry out demonstration and popularization of new energy vehicle and optimize the operation environment of new energy vehicle
• Under the premise of corresponding to the related national policy, laws, standards and guiding principles, preferential treatment in policy is given to the usage and consumption of new energy vehicle.In the aspects of tax levy, licence issuing, driver training, management of operating buses,price of electricity and way of traffic management, etc.we should explore the mode of management that is required by consumer and in conformity with conditions of state, province and city in order to encourage the germination and development.
04/10/23 15
State laws & regulations
Conditions of state & province & city
Tax for new energy
License issuing
Management of the operating vehicle
Market demand
Trial operation
Key task-4: do the basic work well for the development of new energy bus industry
04/10/23 16
Raise the level of thelogistics industry
enhance the strategic brand management of
Yancheng new energy automotive industry
solve the problem of financing
of SMEs and innovative enterprises
Expand overseas market
Create a high level of producer services
environment
Security measure: actively preparing for building the testing ground for new energy vehicles and testing center for vehicle batteries
04/10/23 17
Market prediction of global new energy vehicle
Pure electricity Plug-in hybrid
Common hybrid
USA Japan Europe China 1 China 2
CAAM :The next decade will be the golden time for the development of new energy vehicle ,t he sales quantity will be substantially increased . If our policies are proper, including restrictions on fuel consumption, the concessions and subsidies of new energy vehicles, also think about the rapidly rising oil prices,the number of hybrid vehicles is expected to be more than 2.5 million by 2015 (including the BSG, ISG and kinds of hybrid vehicles) and the number of pure electric vehicles will be over 750,000 units (including small electric bus).
Investment Estimation and Financial Appraisal of the Project of 10,000 Units of Pure Electric Buses
Produced per Year of Zonda Automobile Group
• Estimation of total investment (unit:million USD)
Total investment of
604.8
Fixed asset investment of
321
Construction investment
312.2
Interests in construction
period8.7
Liquidity of
283.8
283.8
• Funding plan (unit:million USD)
Total investment of
604.8
Fixed asset investment of
321
Capital funded by Zonda
48.3
Long-term bank loan
151.5
Funds from society
121.2
Liquidity of 283.8
Capital funded by Zonda
85.2
Circulating funds loan
198.6
• Sales revenue (unit: USD)
• Cost analysis (unit: USD) The total cost of the project is 1562 million per year,including raw materials
purchased,fuel and power purchased,wages and welfare fund,depreciation cost and repair cost,etc.
• Profitability analysis(unit: USD)
Average unit price Sales revenue per year(including tax)
0.3 million 3 billion
Overall profits per year
Overall profits after tax per year
Repayment period of fixed asset investment
IRR of project investment
Investment return period
227 million 170 million 3.59 years 40.13% 3.57 years
Development & Planning of Zonda Automobile Group
Wish our cooperation a complete success!