Project No. 15-015K
September 20, 2016
TO ALL POTENTIAL BIDDERS
Subject: Addendum No. 2 for Drainage Improvements For Nueces River Fishing Area
Ladies/Gentlemen:
This addendum is considered part of the Contract Documents and is issued to change,
amplify, add to, delete from, or otherwise explain the Contract Documents. Where provisions of
this addendum differ from those of the original Contract Documents, this addendum will take
precedence and govern.
Bidders are hereby notified that they must incorporate this addendum into their bids, and
it will be construed that the contractor’s bid reflects with full knowledge all items, changes, and
modifications to the Contract Documents herein specified. Bidders will acknowledge receipt of
this addendum in the space provided on the Bid form.
BID DOCUMENTS
1. Reissued “Revised BID BREAKDOWN” sheets (pages 1 – 3).
TECHNICAL SPECIFICATIONS
Table of Contents
1. Remove and replace with “Revised TABLE OF CONTENTS” sheet.
Division 01
1. Remove Section 01 57 13 “TEMPORARY EROSION AND SEDIMENT CONTROL”
dated 9/2/2016, pages 1 – 9.
Division 32
1. Remove Section 32 91 00 “SEEDING” dated 9/2/2016, pages 1 – 6.
2. Insert Section 32 91 00 “TOPSOIL AND SEEDING” dated 08/15, pages 1 – 4.
To All Potential Bidders Project No. 15-015K
Page 2 Addendum No. 2
September 20, 2016
09/15
DRAWINGS
1. Reissued DWG 15-015K-05
2. Reissued DWG 15-015K-07
Sincerely,
Louis Donato, E.I.T.
Associate Project Engineer
LD/clh
Enclosures
cc: Sean Strawbridge
David L. Krams
Sarah Garza
David L. Michaelsen
Sonya Lopez-Sosa
Revised Bid Breakdown Sheet
05/14 1/3
___________________________________
(Company Name)
BID BREAKDOWN SHEET
DRAINAGE IMPROVEMENTS FOR NUECES RIVER FISHING AREA
PORT OF CORPUS CHRISTI AUTHORITY
BREAKDOWN OF BID PRICES
This breakdown is a part of the Contract Documents and is designed to help the PCCA evaluate the
bids to detect possible errors or omissions and to establish values for the individual items of work so
that modifications to the contract can be more easily resolved. Please fill out the items listed below
so that the total matches the prices shown on the bid. The bidder is invited to include his own
estimates if he so chooses.
Design Bidder’s Unit Total
Quantity Quantity Amount Amount
BASE BID
1. Mobilization/
Demobilization
1 LS
$
$
2. Bonds &
Insurance
1 LS
$
$
3. Construct Drainage
Channel
502 CY
$
$
4. Fill Depression 145 CY $ $
5. Culvert Pipe (24” RCP) 24 LF $ $
6. Precast Concrete
Headwall
1 EA
$
$
7. Precast Concrete Safety
End Treatment (SET)
1 EA
$
$
8. Culvert Rip Rap
Protection
8 CY
$
$
9. Geogrid- River
Access Road
3,566 SY
$
$
10. Roadbase- River
Access Road
304 CY
$
$
11. Roadbase- Service
Road
371 CY
$
$
12. Topsoil & Reseeding 1 ACRE $ $
13. SW3P Items 1 LS $ $
14. Miscellaneous 1 LS $ $
15. Roadbase-maintenance 35 CY $ $
Total Amount – Base Bid
$
BID BREAKDOWN SHEET
(Continued)
Revised Bid Breakdown Sheet
05/14 2/3
ADDITIVE BID ITEM 1: DOUBLE BARRELED RCP CULVERT (List additional costs additive to the Base Bid.)
1. Culvert Pipe (24” RCP) 24 LF $ $
2. Precast Concrete
Headwall
1 EA
$
$
3. Precast Concrete Safety
End Treatment (SET)
1 EA
$
$
4. Culvert Rip Rap
Protection
1 CY
$
$
Miscellaneous 1 LS
Total Amount – Additive Bid Item 1 $
The preceding design quantities are approximate and are not guaranteed. Bidders will prepare their
own estimate of work and bid accordingly. Bidders will indicate their own estimate of work under
the column labeled “Bidder’s Quantity” and calculate the “Total Amount” based on same. If this
column is left blank, the bidder will be deemed to be in agreement with the design quantities and no
adjustment in contract price will be made for variance.
LIST OF SUBCONTRACTORS & SUPPLIERS
Please list all intended subcontractors and major suppliers below. The bidder awarded the contract
will be required to notify the Engineer of any changes in the actual suppliers and subcontractors.
Material Item Name of Supplier
BID BREAKDOWN SHEET
(Continued)
Revised Bid Breakdown Sheet
05/14 3/3
Subcontractors (if any):
Revised TABLE OF CONTENTS
TECHNICAL SPECIFICATIONS
DRAINAGE IMPROVEMENTS FOR NUECES RIVER
FISHING AREA
PORT OF CORPUS CHRISTI AUTHORITY
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 73 10 PCCA POLICIES & PROCEDURES
DIVISION 01 - GENERAL REQUIREMENTS
01 14 13 ACCESS TO PORT AUTHORITY PROPERTY
01 31 13 PROJECT COORDINATION
01 31 19 PROJECT MEETINGS
01 33 00 SUBMITTALS
01 35 21 POLLUTION PREVENTION
01 40 00 QUALITY REQUIREMENTS
01 42 16 DEFINITIONS AND STANDARDS
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 57 13 TEMPORARY EROSION AND SEDIMENT CONTROL
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 23.11 TEMPORARY STORM WATER
(POLLUTION CONTROLS CONSTRUCTION SITE 1-5 ACRES)
01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS
DIVISION 31 - EARTHWORK
31 10 00 SITE CLEARING
31 22 00 GRADING
31 23 16 EXCAVATION
31 23 23 FILL
31 37 00 RIPRAP
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 19.20 GEOGRID & GEOTEXTILES
32 11 23 AGGREGATE BASE COURSES
32 91 00 TOPSOIL AND SEEDING
DIVISION 33 - UTILITIES
33 42 13 PIPE CULVERTS
08/15
32 91 00 - 1/4
SECTION 32 91 00
TOPSOIL AND SEEDING
PART 1 – GENERAL
1.01 SECTION INCLUDES
This specification shall govern all work necessary for placing topsoil, fertilizing, planting
seeds, laying sod, placing mattings or blankets, and maintaining vegetation in the areas
designated on the plans.
PART 2 – PRODUCTS
2.01 MATERIALS
A. Topsoil
Provide easily cultivated, fertile topsoil that is free from objectionable material, has a
high resistance to erosion, and is able to support plant growth. Topsoil is subject to
testing by engineer.
B. Seeding
Provide seed from the previous season’s crop meeting the requirements of Texas Seed
Law, including the testing and labeling for pure live seed (PLS). Furnish seed of the
designated species and use within 12 months from the date of analysis. When
Buffalo grass is specified, use seed that is treated with potassium nitrate (KNO3) to
overcome dormancy. Use the below tables to determine appropriate seed mix and
rates as specified on the plans.
Table 1: Permanent Rural Seed Mix (January 1st – May 1st)
Clay Soils Sandy Soils
Species and Rates
(lbs PLS/acre)
Species and Rates
(lbs PLS/acre)
Green Sprangletop 0.3 Green Sprangletop 0.3
Sideoats Grama (Haskell) 2.7 Bermudagrass 1.8
Bremudagrass 1.8 Buffelgrass (Common) 0.4
Buffalograss (Texoka) 1.6 Sand Lovegrass 0.6
Plains Bristlegrass 1.2 Lehmanns Lovegrass 0.6
Illinois Bundleflower 1.0 Purple Prairieclover 0.5
Table 2: Temporary Cool Season Seeding (September 1st – November 30th)
Seed Mix and Rates (lb/acre)
Oats 72
08/15
32 91 00 - 2/4
Table 3: Temporary Warm Season Seeding (May 1st – August 31st)
Seed Mix and Rates (lb/acre)
Foxtail Millet 34
C. Sod
Sod shall be appropriate for the soil it will be placed atop and shall be from a vendor
in south Texas.
D. Mattings and Blankets
Mattings and blankets refer to sheets of erosion-control materials (straw, jute, wood
fiber, coconut fiber, plastic netting, or other materials approved by the engineer)
placed on the surface of disturbed soil. They are commonly used to stabilize slopes
or used as flexible channel liners, where they protect the soils until vegetation
becomes established. Contractor shall suggest mattings and blankets for use at the
site and seek approval, prior to purchase, from PCCA Director of Environmental
Planning & Compliance.
E. Compost
Furnish compost that has been produced by aerobic (biological) decomposition of
organic matter and meets the requirements of “U.S. Department of Agriculture Test
Methods for the Examination of Composting and Compost”. Do not use materials
that have been treated with chemical preservatives as a compost feedstock or as wood
chips. The compost shall be stockpiled onsite and maintained until approved by the
engineer. Engineer reserves the right to sample compost at the jobsite.
F. Fertilizer
All fertilizer shall be delivered in bags or clearly marked containers showing the
analysis, name, trademark, and warranty. The fertilizer is subject to testing by the
State chemist in accordance with the Texas fertilizer law. Fertilizer shall have an
analysis of 12-12-12 (% nitrogen, phosphoric acid, and potash) as determined by the
Association of Official Agricultural Chemists. At least 50% of the nitrogen
component must be of a slow-release formulation. Fertilizer shall be free flowing and
uniform in composition.
PART 3 – EXECUTION
3.01 INSTALLATION OF TOPSOIL
Before placing topsoil, cultivate the area to a depth of 4 inches. Spread the topsoil to
a uniform loose cover of 2 to 4 inches or at the thickness specified and shape the
topsoil as directed. Water and roll the topsoil with a light roller or other suitable
equipment.
08/15
32 91 00 - 3/4
3.02 INSTALLATION OF SEEDING
Cultivate the area to a depth of 4-inches before placing the seed unless otherwise
directed by the engineer. When performing permanent seeding after an established
temporary seeding, cultivate the seedbed to a depth of 4-inches or mow the area
before placement of the permanent seed. Distribute the seed or seed mixture
uniformly over the areas shown on the plans using hand or mechanical distribution or
hydro-seeding on top of the soil. When seed and water are to be distributed as a
slurry during hydro-seeding, apply mixture to the area to be seeded within 30 minutes
of placement of components in the equipment. Roll the planted area with a light
roller or other suitable equipment. Seeds may also be drill seeded at a depth of 0.25
to 0.33 inches. If seeding is to be applied on slopes greater than 3:1, then matting
and/or other stabilization methods shall be used.
3.03 INSTALLATION OF SOD
Sod is composed of living vegetation and is placed on disturbed soil that requires an
immediate and permanent vegetative cover. Grading activities are to be completed
prior to sod installation. Soils of poor quality may require fertilization or the
application of compost or topsoil prior to sod installation. Sod shall have at least a
one inch root system and be free of noxious weeds, other grasses, or any matter
deleterious to the growth of the sod. Only sod that has been harvested, delivered, and
installed within a period no greater than 36 hours shall be used. Cultivate the area to
a depth of 4-inches before laying sod, unless otherwise directed by the engineer. The
sod is to be installed in a staggered pattern with the long side perpendicular to the
slope. If a single row or spot sodding is to occur, the sod is to be planted where the
top of the sod’s soil is level with the surrounding ground. All exposed sides of the
sod shall be firmed with soil without covering the sod with soil. Sod is to be rolled
immediately to achieve firm contact with the soil. For slopes greater than 3:1, the sod
shall be anchored to the ground.
3.04 INSTALLATION OF MATTINGS AND BLANKETS
Complete grading of the soils, fertilize as needed, and seed area prior to installation of
mattings or blankets. Install and anchor the mattings and blankets, previously
approved for use by the PCCA Environmental Compliance Manager, in accordance
with the manufacturer’s specifications.
3.05 INSTALLATION OF COMPOST
Compost is appropriate on slopes of 3:1 or less. After excavation and embankment
work is complete, remove and dispose of objectionable material from the topsoil
before placing compost. Apply compost uniformly 2 to 4 inches deep. Compost may
be blended with topsoil. Water and roll the compost with a light roller or other
suitable equipment.
08/15
32 91 00 - 4/4
3.06 APPLICATION OF FERTILIZER
Deliver and apply the fertilizer uniformly at a rate equal to 100 pounds of nitrogen
per acre or at the analysis and rate specified on the plans.
3.07 APPLICATION OF WATERING
Use water that is clean and free of industrial wastes and other substances harmful to
the growth of vegetation. Apply water with equipment appropriate to distribute water
at a uniform and controllable rate. Ensure that watering does not erode soil or
plantings. For seeded areas, grass seed make take 5-30 days to germinate depending
on the seed type and temperature. Seeded areas should be watered daily at a
frequency to ensure stabilization of mature vegetation to 70% of the background
vegetation. The sodded areas are to be watered daily to where one inch of the soil
below the sod has be permeated. Watering shall continue until the roots of the sod
are affixed into the soil and as dry conditions require.
PART 4 – MEASUREMENT & PAYMENT
(Not Used)
END OF SECTION