PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of...

38
REVISION: 3 Exec Co Sys Se Direct 3.3 O PR cutive Spo ommissio stem Man ecretary; torate of Ton ONGAR ONGAR ROJEC onsors – D ner of Pu nagemen Richard P Informat ny Hoffma Project M Origi Rev RDREPLACEME RDREP CTMA ( Demesia ublic Land nt Team (S Preston, P tion Man Inform an, Direct Manager nal Plan vision Da Rev NT PROJECT MA PLACEM ANAGE (PMP) Padilla, T ds; David SMT) – Jo Ph.D., Ass agement ation Off tor ONGA – Cathy P Date: Jun te: March vision: 3.3 ANAGEMENT PL ENT PR EMENT ) TRD Secre Martin, E ohn Monf sistant SL t; Joe Mon ficer ARD Servi Plummer, ne 11, 201 h 4, 2016 3 LAN ROJECT T PLA etary; Aub EMNRD S forte, TRD O Comm ntano, EM ce Cente , PMP 12 6 N brey Dun ecretary D Deputy issioner, MNRD Ch r i OF vi n, hief

Transcript of PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of...

Page 1: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

 

REVISION: 3

ExecCo

SysSe

Direct

 

 

 

 

 

 

 

3.3 

O

PR

cutive Spoommissio

stem Manecretary; torate of 

Ton

ONGAR

ONGAR

ROJEC

onsors – Dner of Pu

nagemenRichard PInformat

ny Hoffma

Project M

Origi

Rev

RD REPLACEME

RD REP

CT MA

(

Demesia ublic Land

nt Team (SPreston, Ption Man

Inform

an, Direct

Manager 

nal Plan 

vision Da

Rev

NT PROJECT MA

PLACEM

ANAGE

(PMP)

 

 

Padilla, Tds; David 

SMT) – JoPh.D., Assagementation Off

tor ONGA

– Cathy P

Date: Jun

te: March

vision: 3.3

ANAGEMENT PL

ENT PR

EMENT

TRD SecreMartin, E

ohn Monfsistant SLt; Joe Monficer 

ARD Servi

Plummer,

ne 11, 201

h 4, 2016

 

LAN

ROJECT 

T PLA

etary; AubEMNRD S

forte, TRDO Commntano, EM

ce Cente

, PMP 

12 

N  

brey Dunecretary 

D Deputyissioner, MNRD Ch

i OF vi    

n,  

 

hief 

Page 2: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

 

REVISION: 3.3  ONGARD REPLACEMENT PROJECT MANAGEMENT PLAN  ii OF vi    

Contents 

REVISION HISTORY ............................................................................................................................................ IV 

1.0 PROJECT OVERVIEW ..................................................................................................................................... 1 

EXECUTIVE SUMMARY‐ RATIONALE FOR THE PROJECT ............................................................................................................ 1 1.1 FUNDING AND SOURCES ............................................................................................................................................. 3 1.2 CONSTRAINTS .......................................................................................................................................................... 5 1.3 DEPENDENCIES ......................................................................................................................................................... 6 1.4 ASSUMPTIONS ..................................................................................................................................................... 6 1.5   PROJECT RISKS IDENTIFIED ........................................................................................................................................ 7 

2.0 PROJECT AUTHORITY AND ORGANIZATIONAL STRUCTURE ............................................................................ 8 

2.1 STAKEHOLDERS ........................................................................................................................................................ 8 2.2 PROJECT GOVERNANCE STRUCTURE ........................................................................................................................... 10 

2.2.1 Describe the organizational structure – Org Chart ................................................................................... 10 2.2.2 Describe the role and members of the project steering committee .......................................................... 11 

2.3 EXECUTIVE REPORTING ............................................................................................................................................ 12 

3.0 SCOPE ......................................................................................................................................................... 14 

3.1 PROJECT OBJECTIVES .............................................................................................................................................. 14 3.1.1 BUSINESS OBJECTIVES .......................................................................................................................................... 15 3.1.2 TECHNICAL OBJECTIVES ........................................................................................................................................ 15 3.2 CRITICAL SUCCESS FACTORS ..................................................................................................................................... 15 

4.0 PROJECT DELIVERABLES AND METHODOLOGY ............................................................................................. 16 

4.1 PROJECT MANAGEMENT LIFE CYCLE .......................................................................................................................... 16 4.1.1 Project Management Deliverables ............................................................................................................ 16 4.1.2 Product Deliverables ................................................................................................................................. 17 4.1.3 Deliverable Approval Authority Designations ........................................................................................... 18 4.1.4 Deliverable Acceptance Procedure ............................................................................................................ 18 

4.2 PRODUCT LIFE CYCLE ......................................................................................................................................... 18 4.2.1 Major Deliverables and Performance Measures ....................................................................................... 18 Major Project Deliverable and Performance Measure ....................................................................................... 18 Due Date ............................................................................................................................................................ 18 Project Phase ...................................................................................................................................................... 18 4.2.2 Product and Product Development Deliverables ....................................................................................... 20 

5.0 PROJECT WORK ........................................................................................................................................... 20 

5.1 WORK BREAKDOWN STRUCTURE (WBS) .................................................................................................................... 20 5.2 SCHEDULE ALLOCATION ‐ PROJECT TIMELINE ............................................................................................................... 23 5.3 PROJECT TEAM ...................................................................................................................................................... 24 

5.3.1 Project Team Organizational Structure ..................................................................................................... 24 5.3.2 Project Team Roles and Responsibilities ................................................................................................... 24 

5.4 STAFF PLANNING AND RESOURCE ACQUISITION .................................................................................................. 26 5.4.1 Project Team ............................................................................................................................................. 26 5.4.2 Non‐Personnel resources ........................................................................................................................... 27 

5.5 PROJECT LOGISTICS ........................................................................................................................................... 27 5.5.1 Project Team Training ............................................................................................................................... 27 

6.0 PROJECT MANAGEMENT AND CONTROLS .................................................................................................... 27 

6.1 RISK AND ISSUE MANAGEMENT ................................................................................................................................. 27 6.1.1 Risk Reporting and Escalation Strategy ..................................................................................................... 27 

Page 3: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

 

REVISION: 3.3  ONGARD REPLACEMENT PROJECT MANAGEMENT PLAN  iii OF vi    

6.1.2  Project Risk Tracking Approach ................................................................................................................ 28 6.1.3 ISSUE MANAGEMENT ................................................................................................................................ 28 

6.2 INDEPENDENT VERIFICATION AND VALIDATION ‐ IV&V ............................................................................................. 28 6.3 SCOPE MANAGEMENT PLAN .................................................................................................................................... 29 

6.3.1 Change Control .......................................................................................................................................... 29 6.4 PROJECT BUDGET MANAGEMENT .............................................................................................................................. 30 

6.4.1 Communication Matrix ............................................................................................................................. 30 6.4.2 Project Status Reports ............................................................................................................................... 31 

6.5 PERFORMANCE MEASUREMENT (PROJECT METRICS) ...................................................................................... 31 6.5.1 Baselines .................................................................................................................................................... 31 

6.6 QUALITY OBJECTIVES AND CONTROL ................................................................................................................ 32 6.6.1 Quality Standards ...................................................................................................................................... 33 6.6.2 Agency/Customer Satisfaction .................................................................................................................. 33 6.6.3 Product Deliverable Acceptance Process ................................................................................................... 33 

6.7 CONFIGURATION MANAGEMENT ..................................................................................................................... 33 6.7.1 Version Control .......................................................................................................................................... 34 6.7.2 Project Repository (Project Library) ........................................................................................................... 34 

6.8 PROCUREMENT MANAGEMENT PLAN .............................................................................................................. 34 

7. 0 PROJECT CLOSE ........................................................................................................................................... 34 

7.1 Administrative Close ..................................................................................................................................... 34 7.2 Contract Close .............................................................................................................................................. 34 

 

 

 

   

Page 4: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

 

REVISION: 3

REVISI

REVISION

1.0 

2.0 

2.1 

2.2 

2.3 

2.4 

3.0 

3.1 

3.2 

3.3 

 

3.3 

ON HISTO

N NUMBER 

ONGAR

ORY 

DATE 

June 11

Octobe

Novemb2013 

May 28

Septem2014 

Februar

Octobe

January

January

March 4

RD REPLACEME

1, 2012 

r 1st, 2013 

ber 18th, 

thth, 2014 

mber 24thth, 

ry 24th, 2015

r 20, 2015 

y 3, 2016 

y 28, 2016 

4, 2016 

NT PROJECT MA

COMMEN

Origina

Revision

Directo

Change

Changebeing cl

5  Change

Revisionand add

Revisionwith Hy

Revision

Revision

ANAGEMENT PL

NT 

l Version 

n  

r review and

es to Plannin

es to Planninlosed 

es due to dep

ns to suppordition of new

ns to reflectybrid Archite

ns to update

ns to confor

LAN

d change do

g Budget 

g budget du

parture of Pr

rt FY17 Fundw Project Ma

 ONGARD Reecture  

e schedule a

rm to SMT d

iv

ue to BPA RF

roject Mana

ding Requestanager 

eplacement 

nd risk regis

irectives 

v OF vi    

FP 

ager 

ster 

Page 5: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

1

REVISION: 3

 

 

1.0 PROJE

 

The NM Owas estaNew MexaggregatgovernmRevenue(EMNRD)Tri‐Agenc

The Tri‐AagenciesPreston, 

ONGARDrevenuesillustrate

Regrettasystem thfrequentproduct, of life plathan tweTRD, SLO

The ONGleverage collects r

EXECUT

The ONGcollectionas revenuInformatinfrastrumoderniz$1M wasproducedimplemeturned oproviding

3.3 

ECT OVER

Oil and Natublished by Sxico Legislation of oil an

ment agencie Departmen) Oil Conservcies governa

Agencies Syst.  Currently sAssistant Co

D supports ths to State bee that ONGA

bly, the Tri‐Ahat is aged atly require dafrom all thraces the critenty‐two yeaO, EMNRD, a

GARD Replactechnology revenue from

TIVE SUMM

GARD Servicen of taxes anues from` ottion Technolcture and przation, the Os reverted dud a Strategicntation thatut to be fortg new and b

ONGAR

RVIEW  

ural Gas Admenate Bill SBive Session. d gas produs: (1) the Nent (TRD), andvation Divisiance, unique

tem Manageserving on thommissioner

he collectioneneficiaries, RD accounts

Agencies facand increasinata correctioee agencies,ical collectioars, the currend the State

ement (f/k/advancemem its natural

MARY‐ RAT

e Center (OSnd royalties ther SLO busogy (DoIT) srocesses.  In ONGARD prouring the 20c Roadmap at had been atuitous, as teetter option

RD REPLACEME

ministrationB339, the ON The bill proction and reew Mexico Sd (3) the Eneon.  The ONe to the State

ement Teamhe SMT are Jr, SLO, and J

n of 25% of tincluding uns for annual 

ce a serious sngly challengons and/or r, is often squon of state reent ONGARDe.   

a Modernizants and to rel resources, 

TIONALE F

SC) supports paid on the siness activithare a commthe initial p

oject receive09 Legislativand implemeanticipated technology hns for system

NT PROJECT MA

and RevenuNGARD Systeovided a Joinevenue relattate Land Ofrgy MineralsGARD Systee of New Me

m (SMT) assuJohn Monfooe Montano

he State’s reniversities, prevenue col

situation todged to addrerestorations uandered.  Devenue at risD system mu

ation) Projeceengineer thin order to b

FOR THE PR

Tri‐Agency extraction oties.  The Trimon vision tlanning phaed $1.5M ($5ve Session.  Tentation plano follow plaas advanced

m integration

ANAGEMENT PL

e Database em Developnt Powers Aged informatffice (SLO), (s and Naturam Developmexico.    

ures represeorte, Deputy o, Chief Info

evenues andublic schoollection of ap

day, having tess businessfrom backuDepending osk.  Having bust be replac

ct will enablehe way that benefit its Be

ROJECT  

business proof oil and nat‐Agencies ano improve tse authorize500K in FY08The expendin, however tnning.  This d significantln that weren

LAN

(ONGARD) Sment Act, dgreement totion from thr(2) the Taxatal Resourcesment Act also

ntation fromSecretary, Trmation Off

d the distribus, and hospipproximatel

to rely on a s demands.  ps, so that eon a system wbeen in serviced to meet 

e the Tri‐AgeNew Mexicoeneficiaries 

ocesses assotural gas resnd the Depahe current Oed to addres8, $1M in FYiture of the the funding situation maly in the pastn’t mature in

Service Centuring the 19o support theree state tion and s Departmeno establishe

m each of theTRD, Rich icer, EMNRD

ution of thesitals.  FY15 dy $1.8 Billion

computer System issueemployee wowell past its ice for morethe needs o

encies to o tracks andand citizens

ociated with sources, as wartment of ONGARD ss 09), howeveinitial $500Kloss deferreay actually ht seven yearn 2009. 

1  

 

ter 990 e 

nt d a 

D. 

se data n. 

es ork end 

e of 

d .   

well 

er, K ed have rs, 

Page 6: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3.3  ONGARD REPLACEMENT PROJECT MANAGEMENT PLAN  2  

     

 

During the FY12 budget planning process, ONGARD was awarded C‐2 funding totaling $6M. The C‐2 submission was a multi‐million dollar request to support platform migration, with the objective of moving the mainframe COBOL base code to a server‐based environment.  Since the FY12 appropriation, however, the SMT has engaged in an in‐depth exploration of modern technology options, and its FY17 request for total system replacement supplanted the FY12 platform migration request.  The SMT’s change in approach was driven by its aspiration to develop a system that would be sustainable for the long term, to support the State’s and Tri‐Agencies’ mission well into the future.   

Accomplishments and System Improvements:  FY12 funding has supported several important system improvements and research efforts by the SMT, including, but not limited to, the following:  

First, the EMNRD Oil Conservation Division (OCD) Online System has been completed and currently interfaces with ONGARD.  This system is responsible for e‐Permitting, including the Application for Permit to Drill; Acreage Plat and Dedication; Operator Change; Operators' Monthly Report; and Hydraulic Fracturing Fluid Disclosure (HFFD) forms.  OCD Online also provides well locations, including unit letters, sections, townships and ranges.   

Second, the SLO Land Information System (LIMS), which provides land‐lease geospatial location integration with ONGARD, is nearing completion.  Deployment is expected in May, 2016.   

Third, critical ONGARD Stabilization activity has been completed, including the creation of test, QA and staging environments and a test/release process, the removal of 2.5 Million lines of unused/redundant code, security and audit improvements, and the upgrade to enterprise COBOL. 

Fourth, the SMT engaged in Research and Benchmarking other oil and gas producing states’ solutions and best practices, including travel to Colorado, Wyoming, Texas and Louisiana to look at systems and solutions, as well as conversations with additional states, including Alaska. 

Fifth, a Request for Information was submitted to industry leaders to produce estimates of implementation costs, timeframe and Total Cost of Ownership.  The results of the RFI were reviewed and summarized, leading to the estimate for system replacement identified in the initial FY17 C‐2 Funding Request.   

Sixth, the ONGARD Business Process Analysis, Phase 1 was completed in November, 2015.  The BPA provides a comprehensive analysis of all systems and sub‐systems that comprise the ONGARD ecosystem.  This effort incorporated strong participation by Tri‐Agencies Subject Matter Experts (SME’s), resulted in Functional and Technical Requirements, and produced a preliminary data exchange analysis to support a Service Oriented Architecture (SOA)/ distributed system approach.   

Finally, the SMT has engaged in additional Research including sessions with Gartner, discussions with academia and industry, and review of technical literature, resulting in a decision point to embrace a Hybrid Architecture, leveraging commercial, off the shelf applications which have been optimized and deployed successfully in production.  The Hybrid Architecture will support data exchange among severance tax, royalty, land information 

Page 7: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

managemcurrentlyArchitectexchangefor ONGA

1.1 FUNDI

SOURCE 

House BiAct of 20

Laws of 2Item 5 

 

 

3.3 

ment and wey in the procture, a Reque requiremeARD Replace

ING AND S

ll 2 General 012 

2012, Chapte

ONGAR

ell permittiness of evaluuirements Phnts to suppoement. 

SOURCES 

Appropriati

er 19, Sectio

RD REPLACEME

g systems viating severahase 2 effortort technolo

AMO

on 

on 7, 

$6,00

NT PROJECT MA

ia message oal tools and pt is underwaogy decisions

OUNT  A

00,000  TbGDfo

BaMDPthammthcoowminthetoththadincoshPreA

ANAGEMENT PL

oriented midplatforms.  Tay to provides, procureme

ASSOCIATED 

To stabilize thbegin moderGas AdministDatabase, incor Proposal. 

Before implend RevenueMinerals andDepartment aublic Lands he Oil and Nnd Revenuemigrated to tmigration wilheir day‐to‐dollection of of Informatiowith the thremigration andncludes estimhe system. Txecuted befo the new plhe stabilizathe ONGARDpproval of tevelop a fivencludes distiosts for the hall jointly proposals to eplacement Administratio

LAN

ddleware anTo support te a more detent and corr

 RESTRICTIO

he existing snizing the Otration and Rcluding issui 

mentation, te Departmend Natural Resand the Comshall certify 

Natural Gas Ae Database cthe new platll not negativday operatiorevenue. Thon Technologee agencies od testing plamated costs The plan shafore migratinlatform. On ion of the ex Service Cenhe three agee‐year actionct phases areplacemenproduce a Recommence of the Oil anon and Reve

nd the SMT ishe Hybrid tailed set of related prici

ONS 

system and il and NaturRevenue ng a Reques

the Taxationnt, the Energsources mmissioner oin writing thAdministratioan be tform, and thvely impair ons or he Departmegy will work on a detailedan that for stabilizinll be fully ng the systemcompletion xisting systenter, with encies, shall n plan that and estimatent system anequest for the nd Natural Gnue Databa

3  

 

data ng 

ral 

st 

n gy, 

of hat on 

he 

ent 

ng 

m of m, 

ed d 

Gas se. 

Page 8: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

SOURCE 

In AugustFY16 C‐2Million fo

 

In AugustFY17 C‐2Million foreflectingresponseoil and ga

In NovemRevision of $12 M

Replacem

This reduHybrid Aselected cost and Off‐the‐Ssuccessfugas prod

 

3.3 

t 2014, TRD  Funding Reor ONGARD 

t 2015, TRD  Funding Reor ONGARD g evaluationes and feedbas producing

mber 2015, T1 to its FY 1

Million for ON

ment.   

uced amounrchitecture adue to anticrisk utilizingShelf (COTS) ully implemeucing states

ONGAR

submitted aquest of $33Modernizat

submitted aquest of $18Modernizat of RFI back from otg states. 

TRD submitt7 C‐2 RequeNGARD 

t supported approach, cipated redug Commerciaapplicationsented in oil a. 

RD REPLACEME

AMO

a 3 ion. 

$33,0

a 8 ion, 

her 

$18,0

ed est, 

the 

uced al s, and 

$12,0

NT PROJECT MA

OUNT  A

TthMstvethAFmaao

$th

000,000  N

000,000  TN

000,000  TrepMrere

TLe2

ANAGEMENT PL

ASSOCIATED 

The approprihe ONGARDManager protatus and inerification rehe DepartmeAdministratioinance Commigration andnd written vgencies thatof the approp

2M of the $he Lands Ma

Not funded 

The initial C‐2November 20

The Computeecommendapublished by Modernizatioecommendeequest of $1

This funding wegislature to016 legislati

LAN

 RESTRICTIO

ations are co Service Cenoviding timeldependent veports to thent of Finanon and the Lmittee on thd replacemeverification ft the need fopriation exis

6M appropraintenance F

2 Request w015 

er Enhancemations for FYDoIT.  ONGAon (Replacemed for the fu12 Million.  

was reducedo $10 Millionive session. 

ONS 

ontingent onnter Project y monthly validation ane Governor,ce and Legislative he platform ent system, from the thror the releassts.  

riation is froFund. 

was revised in

ment Fund C‐Y17 were ARD ment) was ll current C‐

d by the n during the 

4  

 

nd  

ree se 

‐2 

 

Page 9: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

SOURCE 

House BiAct of 20

 

1.2 CONST

Constrain

NUMBER 

3.3 

ll 2 General 016 

TRAINTS 

nts are facto

DESCRIPTIO

This projecpersonnel objectives,developmeacceptance

This projecGeneral Ap2016. 

ONGAR

Appropriati

ors that restr

ON 

ct is constraiand Subject, including bent, design, e testing. 

ct is constraippropriation

RD REPLACEME

AMO

on  $10,0

rict the proje

ined by the at Matter Expbut not limitemigration an

ined by budgn Act of 2012

NT PROJECT MA

OUNT  A

000,000  SeAasyasUayeotbyesyasafrodincop

 (DToadsythth

ect by scope

availability, perts to supped to, Requind conversio

getary consi2 and House

ANAGEMENT PL

ASSOCIATED 

ection 7. DATAPPROPRIATIOre appropriatystems enhans indicated, foUnless otherwppropriation ears 2016, 20therwise indialances remaear 2018 shaystems enhans indicated.  Tnd administrarom the fundsn receiving ceocumentationformation ofompliance wirocess.  

5) TAXATIONDEPARTMENT o replace thedministrationystem. Five mhe other statehe state lands

e, resource, o

as defined bport and comrements Phaon efforts, q

iderations dee Bill 2 Gener

LAN

 RESTRICTIO

TA PROCESSINONS.‐‐The folted from the ncement fundor the purpos

wise indicatedmay be expe017 and 2018icated, any unaining at the ell revert to thncement fundThe departmeation shall alls for the purpertification ann from the stfficer that indith the projec

 AND REVENUT 10,000,000  e oil and natun and revenuemillion dollarse funds appros maintenanc

or schedule.

by the SMT, mplete near ase 2 complquality assura

efined in Horal Appropri

ONS 

NG lowing amoucomputer d, or other fuses specified.d, the ended in fisca8. Unless nexpended end of fiscal he computer d or other funent of financeocate amounposes specifiend supportingtate chief dicates ct certification

UE 

ral gas e database s ($5,000,000)opriation is frce fund. 

.   

of Tri‐Agencterm etion, ance, and us

ouse Bill 2 ation Act of 

5  

 

nts 

nds . 

nds e nts ed g 

) of rom 

cy 

ser 

f

Page 10: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

1.3 DEPEN

Types inc

M

Dalm

E‐pr

 

NUMBER 

1.4 ASSUM

Assumptio

NUMBER

3.3 

NDENCIES 

clude the fol

Mandatory dep

‐ Discretionaryso encompass

mandatory in th

‐External deperoject activitie

DESCRIPT

This projeAgencies,Sponsors

The decisfunding isreplace OPoint Anaand a RFI its originareplacemNovembedeploy a H(COTS) apthe FY17 $10M, ap

MPTIONS 

ons are plannin

R  DESCR

The SMdeployand dis

The necurrentAdminmay be

ONGAR

llowing and 

endencies are 

y dependencies particular apphe project life c

ndencies are ds such as purch

TION 

ect is depend, this extend. 

sion to replas required toONGARD wasalysis producsubmitted tal estimate tent.  The SMer 2015, reacHybrid Archipplications, rfunding reqppropriated f

g factors that,

IPTION 

MT will suppoy the future sstribution. 

ed, and subt ONGARD sistrations, Tre encountere

RD REPLACEME

should be as

dependencies

s are dependeproaches becaucycle. 

dependencies thasing/procure

dent on collads from SME’

ce the ONGAo complete ts $33M, whiced by IBM. to industry leto $18M to sMT continuedched a decisitecture, leverealizing an auest to $12Mfor FY17. 

 for planning p

ort the ongostate of NM 

sequently thystem with ri‐Agency peed. 

NT PROJECT MA

ssociated wi

s that are inher

ncies defined use a specific s

that involve a rement 

aboration ac’s, to the SM

ARD system the project. Tch was base Following readers durinsupport a mod research aion point to eraging Comadditional 3M.  This fund

purposes, will b

oing, multiyeoil and natu

he institutiona Hybrid Arcersonnel cha

ANAGEMENT PL

ith each dep

rent to the wo

by the projectsequence of ac

relationship be

cross all leveMT, to the Ex

means that The FY16 esed on the 20esearch, benng FY16, theonolithic sysand discover design, dev

mmercial Off3% savings ading was red

be considered 

ear effort requral gas acco

nal commitmchitecture wanges, and b

LAN

pendency list

rk being done.

management ctivities is prefe

etween project

els of the Trixecutive 

 additional stimate to 14 Functionnchmarking,e SMT revisestem ry and in velop and f the Shelf and reducingduced to 

true, real, or c

quired to deounting, reve

ment, to repwill remain inbudgetary lan

ted. 

.   

team.  This maerred, but not 

t activities and

TYPE M

‐ M 

 , d 

M, E 

certain.   

efine and enue collect

place the ntact across ndscapes th

6  

 

ay 

d non‐

,D,E 

ion 

at 

Page 11: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

1.5   PROJ

In this sebe taken

Risk 1 

DescripReplacerisk if alfully engdecisionyear desdeploym

Risk 2 

DescripReplacerisk if fumaintaidevelopthe repl

 

 

3.3 

ECT RISKS 

ection identif to maximize

tion:  The Oement Projecl stakeholdegaged at all n points durisign, develoment proces

tion: The ONement Projecunding is notned to comppment and dlacement sy

ONGAR

IDENTIFIE

fy and descre activity tha

NGARD ct will be at ers are not of the ing the multpment, and ses. 

NGARD ct will be at t secured anplete designeployment ostem.   

 

RD REPLACEME

ED 

ribe how eacat will result

ti‐

ProbabilLow 

Mitigati

stakehosuccess

Hold recurrentlong raposition

Conting

planninplace thAgreemaddress

d , of 

ProbabilLow 

Mitigati

collaboFY17 ap

Conting

Agencycritical during implemas outli

NT PROJECT MA

ch risk will bet in minimizi

ity

ion Strategy:

olders and bsful project.

egular SMT mt directions ange ONGARns.  

gency Plan:  Tng phase so throughout tment (JPA) des any issue t

ity 

ion Strategy: 

oratively to sppropriation

gency Plan:  Ry CIOs and Dproject objethe planning

mentation wiined in the a

ANAGEMENT PL

e managed. ng probabili

Impa

High

   Emphasizebe sure all un 

meetings to and challengD Roadmap

This risk will that necessahe project. Tetails a stronthat may aris

Impa

High

  The SMT wsupport the on. 

Review the soIT to align tectives.  Thisg process asill include deappropriatio

LAN

 Include theity and impa

act 

e communicanderstand th

keep all partges as they r. Back‐fill cri

be addresseary communThe Joint Pong escalatiose. 

act 

will work togeobjectives fu

chedule regthe funding s risk will be  moving intoelivering then. 

e steps that wact of each r

ation to all he benefits o

ties abreast relate to theitical SME 

ed during thenication takeowers n path to 

ether unded by the

gularly with Tto support mitigated o e Five year pl

7  

 

will isk.  

of a 

of e 

e es 

Tri‐

lan 

Page 12: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

2

REVISION: 3

 

 

Risk 3 

DescripInformaSystem completmanagethe newthe currmust bereplace

 

Risk 4 

Descripsystem dedicateowners personnRetiremimpact sand the

 

2.0 PROJE

2.1 STAKE

Stakeholpositively

NAME 

Demesia 

Aubrey D

3.3 

tion:  The SLation Manag(LIMS) projetion.  LIMS mement functiw system.  Inrent ONGARe maintainedment system

tion:  The Ohas been maed staff of band technonel over the ment and tursome of this system kno

ECT AUTH

EHOLDERS 

ders should y or negative

ST

Padilla  Ex

Dunn  Ex

ONGAR

LO Land gement ect is nearingmigrates landionality and terfaces to D system d until the m is deploye

NGARD aintained byusiness logy years.  nover may s workforce owledge base

HORITY A

be a mix of ely by the pr

TAKE IN PRO

xecutive Spo

xecutive Spo

RD REPLACEME

g d to 

d. 

ProbabilLow 

Mitigati

prioritizrobust assuransystem

Conting

the OSCto the S

y a 

e.   

ProbabilHigh 

Mitigati

collabomembefuture s

Conting

methodtransfethat doand sys

ND ORGA

agency manroject.   

OJECT  ORG

onsor  TaxDep

onsor  Stat

NT PROJECT MA

ity 

ion Strategy: 

ze teamworbusiness anance to maint, to mitigate

gency Plan:  OC Director anSMT if neces

ity 

ion Strategy: 

oratively to eers; this will systems as t

gency Plan:  Eds, includingr during planocumentatiostem capabil

ANIZATIO

nagement an

GANIZATION

xation and Repartment 

te Land Offic

ANAGEMENT PL

Impa

Med

  Continue tok and commalysis, documtain interface any defects

Outstanding nd SLO Chiefssary. 

Impa

High

  Work with ensure crossensure sustthey are dep

Employ agileg regular scrunning and imn supports alities. 

ONAL STR

nd end users

evenue 

ce 

LAN

act 

dium 

o work withmunication. Pmentation, aes with currs and to sup

issues will bf Informatio

act 

Tri‐Agency  functionalitainability ofployed  

e project manums, to assumplementatall aspects o

RUCTURE 

s who are im

TITLE 

Cabinet Se

CommissiLands 

 SLO IT to Participate inand quality rent ONGARDpport end us

be escalated on Officer, an

participantsty among teaf current and

nagement ure knowledion. Ensure f the project

mpacted 

ecretary 

oner of Pub

8  

 

D ers. 

to nd 

 am d 

ge 

lic 

Page 13: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

NAME 

F. David 

 

John Mo

Rich Pres

Joe Mont

Jim Wast

Martin D

Tony Hof

Cathy Plu

Jeff Bjark

Danny M

Ed Marti

Cynthia M

James W

EMNRD 

SLO 

TRD Oil &Bureau 

TRD ASD

3.3 

ST

Martin  Ex

nforte  (SM

ston  (SM

tano  (SMEM

tvedt  TR

Davis  SL

ffman  ONCe

ummer  TR

ke  SM

Martinez  SM

n  SM

Melton  SM

Whitaker  SM

Us

Us

& Gas  Us

Us

ONGAR

TAKE IN PRO

xecutive Spo

MT) Systemanagement 

MT) Systemanagement 

MT) Systemanagement MNRD CIO 

RD CIO 

LO CIO 

NGARD Serventer 

RD IT 

ME contribut

ME contribut

ME Contribu

ME Contribut

ME Contribu

sers of syste

sers of syste

sers of syste

sers of syste

RD REPLACEME

OJECT  ORG

onsor  EneNatDep

 Team 

TaxDep

 Team 

Stat

 Team 

EM

TRD

SLO

vice  OSC

OSC

tor  TRDComBur

tor  SLO

tor  SLO

tor  SLO

tor  EM

em   

em   

em   

em   

NT PROJECT MA

GANIZATION

ergy, Mineratural Resourpartment 

xation and Repartment 

te Land Offic

NRD IT 

D IT 

O IT 

D Audit and mpliance Oilreau 

O Royalty Bu

O Royalty Bu

NRD IT 

ANAGEMENT PL

als and rces 

evenue 

ce  

 & Gas 

reau 

reau 

LAN

TITLE 

Cabinet Se

Deputy Se

Deputy Co

Chief InforOfficer 

Chief InfoOfficer 

Chief InforOfficer 

Director 

ONGARD Manager 

Bureau Ch

Bureau Ch

Senior Eng

Deputy Di

ITO ApplicManager 

 

 

 

 

ecretary 

ecretary 

ommissioner

rmation 

rmation 

rmation 

Project 

hief 

hief 

gineer 

rector 

cations 

9  

 

r  

Page 14: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

NAME 

TRD Tax 

TRD RPDEntry Bu

DFA  

LFC  

DoIT 

2.2 PROJE

2.2.1 DES

 

 

3.3 

ST

Policy  Us

 Data reau 

Us

Us

Us

Sem

CT GOVER

SCRIBE THE ORG

ONGAR

TAKE IN PRO

sers of syste

sers of syste

sers of syste

sers of syste

ervice providainframe 

RNANCE ST

GANIZATIONAL

 

RD REPLACEME

OJECT  ORG

em  TRDSec

em  TRDDiv

em  DFA

em  LFC

der for  DepInfoOpe

TRUCTURE

L STRUCTURE –

NT PROJECT MA

GANIZATION

D Office of thcretary 

D Returns Prision 

A revenue fo

C revenue fo

partment of ormation Teerations 

– ORG CHART

ANAGEMENT PL

he 

rocessing 

orecast 

recast 

chnology 

LAN

TITLE 

 

 

 

 

 

10  

 

Page 15: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

2.2.2 DES

ROLE 

Executive

System ManagemTeam  

Project M

SME Tea

3.3 

SCRIBE THE ROL

e Sponsor 

ment 

Manager 

ONGAR

LE AND MEMBE

RESPONSIBILI

Attend 

Approv

Commu

Champi

Review,

Review architec

Ensure 

Review delivera

Support

Ensure 

Particip

Commu

Champi

Contrib

Recomm

Commu

Develop

Provideexpecta

Manage

Facilitatissues lo

Manage

Report 

Promot

Facilitat

Develop

Value te

Recomm

Champi

The Pro

RD REPLACEME

ERS OF THE PRO

ITY 

executive re

e project pla

unicate with 

ion the Proje

, approve an

and approvcture recom

project staff

and provideables 

t the Project

user particip

pate in plann

unicate with

ion the Proje

ute to Lesso

mend go/no

unicate with 

p initial man

e leadership ations 

e contractua

te meetings,og 

e schedules

on project s

te and practi

te requireme

p and chroni

eamwork, co

mend go/no

ion the Proje

oject Team m

NT PROJECT MA

OJECT STEERIN

eviews as sch

ans progress

other agenc

ect! 

nd execute p

e recommenmendations

f availability

e input to pr

t Manager 

pation 

ning  

respective a

ect! 

ons Learned

 go based on

the Executiv

nagement pla

for a coordi

al services 

, assign task

tatus 

ice change m

ents develop

icle Lessons 

ooperation a

 go based on

ect! 

member is an

ANAGEMENT PL

G COMMITTEE

heduled by t

s  

cies’ Executi

project docu

ndation to ms of SMT me

y, funding an

roject artifac

agency rega

n status 

ve Sponsors

an and proje

nated proje

ks, track actio

managemen

pment; med

Learned 

and planning

n status 

n important 

LAN

the SMT me

ive Sponsors

ments as re

move to newmbers and S

nd contract m

cts, including

rding status 

s and SMT 

ect plan 

ct effort; ma

on items, an

diate dispute

role in that 

embers 

s as needed

quired 

w system SMEs 

managemen

g contractor

 and progres

anage 

nd maintain 

es  

it is the link

11  

 

ss  

Page 16: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

ROLE 

Member

2.3 EXECU

At the reand the prequesteadditionarequired

The mee

SMT 

addre

Full S

mont

agen

includ

depe

meet

agen

meet

mana

SMT 

hoste

CIO o

to tec

3.3 

UTIVE REPO

quest of theproject maned.  The SMTal participan. 

ting times a

working ses

essed by the

SMT meeting

th @ 1330 M

da, supporti

ding a recor

nding on the

ting time and

da or may re

ting minutes

ager, and po

Technical Su

ed at EMNRD

of each Tri‐A

chnical decis

ONGAR

RESPONSIBILI

betwee

membe

Attend 

capacity

respect

Particip

Accomp

Assist o

Represe

Report 

Recomm

Contrib

ORTING 

e SMT, most ager only, anT has designants from the 

nd distributi

sions may in

e SMT.   

gs will be he

Mountain Tim

ng documen

d of attenda

e depth of is

d accepted t

equire a spe

s in a timely 

osted to the 

ubcommitte

D in its IT Co

Agency and a

sion points.  

RD REPLACEME

ITY 

en the vision

ers’ responsi

and particip

y of a techni

tive agency 

pate in the p

plish and pro

or support sy

ent specific a

progress, iss

mend go/no

ute to lesso

of its meetind will incluated a montTri‐Agencies

ions of meet

nclude a form

ld on a regu

me) through

ntation if ne

ance.  The tim

ssues to be c

to be postpo

cial meeting

fashion, and

project Shar

e meetings w

onference Ro

additional IT 

The commit

NT PROJECT MA

 and the rea

bilities inclu

pate in meet

ical or busin

lanning proc

ovide input t

ystem testing

area(s) for th

sues, etc. 

 based on st

ns learned 

ngs will be wde the Tri‐aghly session as, DoIT, IV&V

ting minutes

mal agenda, 

lar schedule

out the proj

cessary, and

me allocated

covered.  Ite

oned may be

g.  Every atte

d the minute

rePoint site.

will be held 

oom.  The Te

participants

ttee will rev

ANAGEMENT PL

ality of the p

ude: 

tings, review

ess represen

cess 

to deliverab

g activities a

he overall pr

tatus 

working sessgency CIO’s as a Full SMTV, and addit

s for the pro

 depending 

e (currently, 

ject.  Full SM

d will result i

d to each ag

ems not able

e added to th

empt will be

es will be dis

weekly, on F

echnical Sub

s to review, 

view researc

LAN

project.  The 

w all docume

ntative for h

les 

as required 

roject as ass

sions amongand/or specT meeting thtional partici

oject are as f

on the topic

the fourth T

MT meetings 

in meeting m

genda topic w

e to be cover

he next stan

 made to pu

stributed by 

Friday morn

committee w

evaluate an

h, documen

Project Team

nts in the 

his/her 

signed 

g SMT membcific SME’s ahat will incluipants as 

follows:   

c(s) being 

Tuesday of t

will include

minutes, 

will vary 

red within th

nding meetin

ublish the 

the project 

ings, 9:00 a.

will include 

d provide in

tation, cont

12  

 

bers s ude 

he 

 an 

he 

ng’s 

.m. 

the 

put 

ract 

Page 17: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3.3  ONGARD REPLACEMENT PROJECT MANAGEMENT PLAN  13  

     

 

deliverables and SOWs, participate in Q&A sessions with consultants, and provide 

recommendations to the SMT as needed on contracts and decisions that impact the Tri‐

Agency enterprise.   Individual agency technology choices may not require the committee’s 

involvement or feedback. 

Project Team and Contractor/Vendor Meetings will be scheduled as needed, and during the 

DEFINE (requirements), DESIGN, DEVELOP, and DEPLOY project phases may be managed as 

daily scrums at the discretion of the project manager.  Action items, issues and risk logs will 

be tracked in the project status report, and distributed by the project manager as needed.   

The project manager will approve deliverables with the sign‐off of the SMT, and will provide written acceptance, including but not limited to email, and archive the documentation.  

Issues and/or risks should be reported at the earliest possible time so that corrective action or risk mitigation can be explored immediately.  The project manager will maintain an issue tracking log, will work with the project team for corrective action, to facilitate timely review, and report to the SMT.  The SMT will coordinate review, approval and execution of critical project documents with the Executive Sponsors as required.   

   

Page 18: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

3

REVISION: 3

 

 

3.0 SCOPE

3.1 PROJE

Governpriori

ONGA

Replac

t supp

the 

Govern

priorit

“Balan

the Bu

since t

system

collect

approx

ely 25%

all Stat

revenu

  

 

 

3.3 

E  

CT OBJECT

or’s ty 

RD 

cemen

orts 

nor’s 

y of 

ncing 

udget” 

the 

ts 

ximat

% of 

te 

ue 

In

te

m

e

d

q

g

s

w

c

a

e

d

Im

o

in

th

e

m

im

st

e

b

in

te

sy

C

im

in

te

re

o

 

ONGAR

TIVES 

Alignment o

DoIT 

nformation 

echnology 

must drive 

efficient 

delivery of hig

quality 

government 

ervices that 

will benefit 

onstituents 

nd support 

economic 

development 

mprove value

of the IT 

nvestment 

hrough 

enterprise 

models that 

mprove and 

treamline the

executive 

branch’s 

nformation 

echnology 

ystems 

Continuous 

mprovement 

nformation 

echnology an

esource 

optimization 

 

RD REPLACEME

of Tri‐Agency

EM

gh 

in 

nd 

Utiliz

explo

enha

of te

or bu

proc

inclu

imple

n of 

softw

solut

incre

agen

to im

oper

work

Integ

mod

adm

syste

Cons

redu

syste

singl

meth

Auto

outd

syste

NT PROJECT MA

y and State St

MNRD 

ze and 

ore new or 

anced uses 

echnology 

usiness 

esses 

uding the 

ementatio

integrated 

ware 

tions to 

ease the 

ncy’s ability 

mprove 

rations and 

k flow 

grate and 

ernize 

inistrative 

ems 

solidate 

ndant 

ems into 

e delivery 

hods  

omate 

ated 

ems 

ANAGEMENT PL

trategic Obje

SLO

Informat

Technolo

a corner

of the St

Land Off

Blending

ONGARD

Geograp

Informat

System (

data will

enable th

State Lan

Office an

public to

online m

of well 

locations

lease 

locations

areas of 

explorat

and 

developm

This form

will help

State Lan

Office m

decisions

natural 

resource

managem

 

LAN

ectives 

tion 

ogy is 

stone 

tate 

fice  

D and 

phical 

tion 

(GIS) 

he 

nd 

nd the 

o view 

maps 

s, 

s, and 

ion 

ment.    

mat 

 the 

nd 

make 

s on 

ment 

TRD 

Improve 

support for a

TRD 

information 

technology 

systems, 

collaborating

with business

divisions for 

lower level 

technical and

business 

support 

Minimize 

systemic 

infrastructur

risks. (Busine

Continuity, 

Disaster 

Recovery, 

Security)  

Plan acquisit

implement, 

maintain and

refresh the 

technologica

infrastructur

necessary to 

support 

excellent 

delivery of IT

services  

14  

 

all 

ess 

ion, 

Page 19: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

3.1.1 BUSINE

 

NUMBER

BUSINESS

BUSINESS

BUSINESS

BUSINESS

3.1.2 TECHNI

 

NUMBER

TECHNICA

TECHNICA

TECHNICA

TECHNICA

3.2 CRITIC

Identify tunderstaBusiness See also 

3.3 

ESS OBJECTIVES

S OBJECTIVE 1

S OBJECTIVE 2

S OBJECTIVE 3

S OBJECTIVE 4

CAL OBJECTIVE

AL OBJECTIVE

AL OBJECTIVE

AL OBJECTIVE

AL OBJECTIVE

CAL SUCCES

the critical sanding the abOwner, as wsection 6.7 Q

ONGAR

DESCRI

1  Accuratof New

2  Supporaccoun

3  Enable Fund an

4  Deploy sustainthe Sta

ES 

DESCRI

E 1  Captureto supproyaltietracking

E 2  Deploy agile anprocess

E 3  Improvamong exchan

E 4  Implemcomply

SS FACTOR

uccess factobility of the well as the aQuality Obje

RD REPLACEME

IPTION 

tely and conw Mexico. 

rt state and fting, collect

accurate annd to severa

an ONGARDable to suppte. 

IPTION 

e and managport the collees.  Improve g system tra

an ONGARDnd flexible toses among t

ve processes Tri‐Agency sge specificat

ment a replacy with agency

RS 

ors for achievproject to mbility of the ectives and C

NT PROJECT MA

nsistently col

federal reguion and dist

d timely distance tax and

D Replacemeport the evo

ge the right ection and dthe ability t

ansactions. 

D Replacemeo support chhe Tri‐Agenc

and operatisystems, viation.  

cement systey security di

ving successmeet the endproject teamControls. 

ANAGEMENT PL

llect oil and 

latory changribution. 

tribution of  royalty Ben

ent system tlving needs

data at an adistribution oto capture cu

ent system thanges or encies. 

ing efficienca a common,

em that maiirectives. 

s in this projed goals of them to stay wi

LAN

gas revenue

ges that imp

revenue to neficiaries. 

that is scalabof the Tri‐ A

appropriate lof severanceurrent and h

that is well anhanced bus

cy by data ex, standardize

intains audit

ect.  Metricse Executive thin schedu

e for the Stat

pact revenue

the General

ble and Agencies and

level of detae taxes and historical dat

architected, iness 

xchange ed data 

t logs to 

s are key to Sponsor andle and budg

15  

 

te 

 

ail 

ta 

d the et. 

Page 20: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

4

REVISION: 3

 

 

 

NUMBER

QUALITY 

QUALITY 

QUALITY 

QUALITY 

 

4.0 PROJE

4.1 PROJE

4.1.1 PRO

Project Dmethodoproduct r

Project C

Certifica

3.3 

METRIC 1 

METRIC 2 

METRIC 3 

METRIC 4 

ECT DELIV

CT MANAG

OJECT MANAG

Deliverables ology requirerequirement

Charter  

tion Form 

ONGAR

DESCRI

Functiofuture sdistribu

ProcureONGARpropos

Currentworkflo

Uninter

VERABLES

GEMENT L

EMENT DELIVE

are work proements and ts of the pro

The PprojepermCertiComplann

The submIt detopicprojeprep

RD REPLACEME

IPTION 

onal and datastate of Oil aution.  

ement instruRD Replacemals are recei

t documentaow and valid

rrupted trac

S AND ME

LIFE CYCLE

ERABLES 

oducts or arstandard project.   

Project Charect, the govemission to prification is umittee with ning to certi

Request  fomitted wheneals with thecs  that  indicect.   Many oparation of th

NT PROJECT MA

a exchange and Natural 

uments, inclment systemsived. 

ation is matcdated by all S

king and dis

ETHODOL

rtifacts that aoject manag

rter for Certiernance struroceed with sed to proviadequate kfy the initiat

or  Certificat a project goe financial ascate  the  leveof the questhe project ch

ANAGEMENT PL

requiremenGas revenue

uding, but ns, are posted

ched againstSME’s. 

stribution of 

LOGY 

are driven bgement prac

ification setsucture, and wthe project.de the Projenowledge oftion phase o

tion  and  Roes for any spects of thel of plannitions have bharter 

LAN

ts accuratelye collection 

not limited tod and respo

t business p

oil and gas 

by the projecctices regard

s the overallwhen signed  The Projecect Certificatf the projectof the projec

elease  of  Fof the certife project, ang  that hasbeen  incorpo

y define theand 

o RFP(s), fornsive 

rocess 

revenue. 

ct managemdless of the 

l scope for thd is consideret Charter fortion t and its ct 

Funds  formfication phass well as ots gone  into orated  into 

16  

 

 

ent 

he ed r 

m  is ses. her the the 

Page 21: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

Project MPlan 

IT Servic

Project S

Project C

 

4.1.2 PRO

RequiremDocume

Design D

Systems 

Systems 

3.3 

Managemen

e Contracts 

Schedule 

Closeout Rep

ODUCT DELIVER

ments nts 

Documents 

Specificatio

Architectur

ONGAR

nt  The Pthe eplannprojedocucommscopadditcommacqu

The DPurctemp

A tooassigmiles

port  DoITcloseproc

RABLES 

The r“DEFand RReturequsyste

Requspec

ons  Systeconf

re  An oexchphas

RD REPLACEME

Project Manexecutive spning phase uect close.  Thument plannmunication e, cost and stional plans municationsuisition, and 

Departmenthasing Divisplate for all I

ol used to ingned resourcstones.  The

T’s template,ed.   Project ess. 

requirementFINE” phase.Royalty applrns Manageirements foems, e.g., DF

uirements wifications du

em and exchiguration du

verall architange, maintse. 

NT PROJECT MA

nagement Plaonsors and Tused to manhe primary uing assumptamong stakeschedule bafor issue escs, deliverablerisk manage

t of Information of GenerIT related co

dicate the pces for perfo standard is 

, used to reqclosure is th

ts will be co  Functionallication will ement, Auditr data exchaFA SHARE. 

will be transfouring the “DE

hange specifuring the “DE

tecture will btenance and

ANAGEMENT PL

an is a formaTri‐Agenciesnage project uses of the ptions and deeholders, anselines.  A pcalation, chae review andement. 

tion Technolral Services ontracts. 

planned dateorming activiMicrosoft P

quest that thhe last phase

nfirmed and requiremeninclude all st and Complange among 

ormed into aESIGN” phas

fications willEVELOP” pha

be develope preservatio

LAN

al documents SMT, develexecution, c

project plan ecisions, facind to documroject plan iange controld acceptance

logy and thehave establi

es, dependeities and forProject. 

he project bee of the certi

d refined durnts for the Seystem moduiance, and aTri‐Agency 

application ase.  

 drive codinase 

d to facilitaton during the

t approved bloped in thecontrol, and are to litate ent approveincludes l, e, staff 

e State ished a 

ncies, and r meeting 

e officially ification 

ring the everance Taules, e.g., also include and externa

and exchang

g and 

te informatioe “DESIGN” 

17  

 

by   

ed 

ax 

al 

ge 

on 

Page 22: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

System aTesting 

4.1.3 DEL

Delivera

All Deliv

System aTesting R

4.1.4 DEL

 

Delivera

System aTesting 

4.2 PRODU

During thdevelopm

4.2.1 MA

PROPOSED M

MAJOR PR

MEASURE 

Function Po

Develop spnumber ex

Printing Propoint of fai

Industry Ou

RFI develop

3.3 

and Accepta

LIVERABLE APP

ble 

erables 

and AcceptaResults 

LIVERABLE ACC

bles 

and Accepta

UCT LIFE C

he project mment lifecycl

AJOR DELIVERA

MAJOR DELIVER

ROJECT DELIVER

oint Analysis 

pecifications anpansion and h

ocess analysis lure in ONGAR

utreach 

pment 

ONGAR

ance  Testiand wrequ

PROVAL AUTHO

Appr

PM, 

ance  PM, 

CEPTANCE PRO

Afterthe pwriti

ance  Afterforwman

CYCLE  

management le methodol

ABLES AND PER

RABLE SCHEDULE

RABLE AND PE

nd design docuorizontal drillin

and removal oRD notice gene

RD REPLACEME

ing will take will include ired, as well

ORITY DESIGNA

roval Autho

SMT 

Subject mat

CEDURE 

r deliverableproject manang to the co

r any testingwarded and ragement ap

lifecycle, agogy approve

RFORMANCE M

E AND PERFORM

RFORMANCE 

mentation forng requiremen

of windows 95 ration workflo

NT PROJECT MA

place duringunit testing,l as user acc

ATIONS 

rity 

tter experts, 

es are submiager and SMontractor. 

g conducted eviewed witproval prior

gencies shalled by the De

MEASURES 

ANCE MEASURE

 API nts. 

single ow 

ANAGEMENT PL

g deployme, parallel andeptance tes

 Tri‐Agency 

itted, and reMT, the appro

on the systeth the projecr to deploym

 select and iepartment o

BUDGET  

$   36,768.00

$   89,514.00

$  129,828.43

$    6,567.63

$   48,684.38

LAN

nt (the “DEPd regressionting.   

IT Managem

eviewed andoval will be 

em, test resuct team, for 

ment. 

implement aof Informatio

DUE DATE 

0  Complete 

0  Complete 

3  Complete 

3  Complete 

8  Complete 

PLOY” phase testing as 

ment  

 accepted byprovided in 

ults will be Tri‐Agency I

a phased proon Technolog

PROJECT P

Planning 

Planning 

MainframeStabilizatio

Planning 

Planning 

18  

 

e) 

IT 

oduct gy.  

PHASE 

e on 

Page 23: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

PROPOSED M

MAJOR PR

MEASURE 

Supplemenon Businesupdate of O

COBOL devarchiving, wcorrections

DBA Mode

Contractor Process An

Business PrRequiremePartitioningexchanges,requiremen

IV&V  

Business Im

SharePoint

ProfessionaRoyalty Sys

Exchange sSeverance 

Environmeimplement

Severance contract 

Total Plann

Develop an

Develop an

Develop anPhase 2 

Develop anexchange a

Project Clo

3.3 

MAJOR DELIVER

ROJECT DELIVER

ntal staffing sups Process AnalONGARD funct

velopers to supweb presentatis, database and

rnization and L

to assist in dealysis 

rocess Analysisents 2 added Deg, Data Archite, Definition of Mnts and ShareP

mpact Analysis 

t Migration to O

al Services Prostem) 

specification anand Royalty sy

ntal provisioniation 

Tax licenses, m

ning and Main

nd Deploy Seve

nd Deploy Roya

nd Deploy Land

nd Deploy middamong Tri‐Agen

se‐out 

ONGAR

RABLE SCHEDULE

RABLE AND PE

pport for Tri‐Aysis; ONGARD tion point analy

pport LIMS inteion of forms, sd system suppo

LIMS Support 

velopment of 

s (BPA). Suppleecember 2015ecture definitioMaster Data MPoint migration

and Disaster R

OSC site 

curement Sup

nd conversion/ystems 

ng at TRD to s

maintenance, a

frame Stabiliza

erance Tax Syst

alty System 

d Information M

dleware to supncy systems 

RD REPLACEME

E AND PERFORM

RFORMANCE 

Agencies to allodatabase suppysis. 

erface, printingervice requestort 

RFP for Busine

emental SOW f: Requirementon, To‐Be inforManagement n. 

Recovery  

port (RFP Proc

/migration sup

upport Severa

and planning se

ation 

tem 

Management S

pport informati

NT PROJECT MA

ANCE MEASURE

ow work port; 

g and ts, data 

ess 

for ts mation  $

$

$

$

cess for $

port, $

nce Tax  $

ervices $ 

$  

System 

ion 

ANAGEMENT PL

BUDGET  

$  161,070.26

$  643,765.61

$  206,743.90

$     17,344.00

$ 1,107,695.74

$      71,854.64

$      60,000.00

$      48,025.75

$      53,029.80

$      54,156.25

$     719,327.00

  2,661,624.61

  6,116,000.00

TBD

TBD

TBD

TBD

TBD

LAN

DUE DATE 

6  6/30/16 

1  6/30/16 

0  12/31/16 

0  Complete 

4  Complete 

4  6/30/16 

0  Complete 

5  6/30/16 

0  6/30/16 

5  6/30/16 

0   6/30/16 

1  6/30/16 

0 6/30/16 

D  TBD 

D  TBD 

D  TBD 

D  TBD 

D  TBD 

PROJECT P

Planning 

MainframeStabilizatio

MainframeStabilizatio

Planning 

Planning 

Planning 

MainframeStabilizatio

Planning 

Planning  

Planning 

Planning 

Planning 

Planning 

Implement

Implement

Implement

Implement

Close‐out

19  

 

PHASE 

e on 

e on  

e on  

tation

tation

tation

tation

Page 24: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

5

REVISION: 3

 

 

4.2.2 PRO

Product Dmethodoproduct r

Requirem

Design D

Systems 

Systems 

System a

Operatio

 

5.0 PROJE

5.1 WORK

Task Na

   DEFINE

      DecisH

         Presto

3.3 

ODUCT AND PR

Deliverablesology requirerequirement

ments Docu

Documents 

Specificatio

Architectur

and Accepta

ons requirem

ECT WORK

K BREAKDO

me and De

ion Point onHybrid Appro

sent Technoo PCC 

ONGAR

RODUCT DEVEL

s are work prements and ts of the pro

ments 

ons 

re 

ance Testing

ments 

OWN STRU

escription 

n Technologyoach 

ology Recom

RD REPLACEME

LOPMENT DELI

roducts or astandard project.   

The requi“DEFINE” Severancesystem mComplianexchangeDFA SHAR

Requiremexchange

System anconfigura

An overalinformatiduring the

g  Testing wphase) antesting as

Standard for the TrManagemmanagem

UCTURE (W

y:                   

mendation 

NT PROJECT MA

VERABLES 

rtifacts thatoject manag

rements wilphase.  Fune Tax and Ro

modules, e.g.,ce, and also among Tri‐ARE. 

ments will be specificatio

nd exchangetion during t

l architecturon exchangee “DESIGN” 

will take placend will includs required, a

Operating Pri‐Agency Enment Plan to ment among 

WBS) 

Deliver

  

       

PowerP

ANAGEMENT PL

t are driven bgement prac

ll be confirmnctional requoyalty applic, Returns Mao include reqAgency and 

e transformeons during th

e specificatiothe “DEVELO

re will be dee, maintenaphase. 

e during depde unit testins well as use

Procedures (terprise, alosupport datthe particip

rable 

oint Present

LAN

by the productices regard

med and refinuirements focation will inanagement,quirements fexternal sys

ed into appliche “DESIGN”

ons will driveOP” phase 

eveloped to fnce and pre

ployment (thng, parallel aer acceptanc

SOP’s) will bong with a Mta exchangepating system

tation 

uct managemdless of the 

ned during tor the nclude all , Audit and for data stems, e.g., 

cation and ” phase.  

e coding and

facilitate servation 

he “DEPLOY”and regressice testing.  

be developeMaster Data  and changems. 

20  

 

ment 

the 

” on 

Page 25: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3.3  ONGARD REPLACEMENT PROJECT MANAGEMENT PLAN  21  

     

 

Task Name and Description  Deliverable 

         Present C‐2 and technology recommendation to LFC 

PowerPoint Presentation 

      Requirements Phase 1: BPA Analysis & AS‐IS Exchange Model 

Functional Requirements and Exchange Model 

      Requirements Phase 2: Parse Requirements and Data Architecture 

  

         Partition Requirements by System MS Access Database with System, Subsystem, 

Process, Business Rules 

         Data Architecture for Data to be Exchanged 

  

            TO‐BE Analysis and Data Model Activity Diagrams illustrating exchanges and 

objects exchanged among systems 

            TO‐BE Information Exchanges 

UML diagram illustrating objects exchanged among systems, associations, cardinality, min/max occurs, data structure spreadsheet ordered by namespace, data element dictionary, XML schema  

            Refine Data Model following mapping and data conversion  

Final Data Model, including all artifacts identified above 

            Master Data Management Requirements 

Master Data Management Plan 

        Tri‐Agency SharePoint Collaboration Site  State‐Owned SharePoint Site 

            Knowledge Transfer Documentation for site provisioning and site 

collections 

   DESIGN    

      Sub Project A: Data Warehouse/Middleware 

  

         Research Options for Integration Architecture 

Research documentation 

            Acquire Garter Magic Quadrant/resource session 

Gartner Reports 

   Support from System Architect/Integrator  Contractual Instrument 

            Site assessment and Produce Report  On‐site meetings and Integration Assessment 

            Present architectural recommendations, Q&A 

Q&A session 

            Create Architecture Design  Design Artifact 

            Procure Hardware, Tools and Licenses  Contractual instruments, Purchase Orders 

            Deploy Integration Architecture   Deployment Plan 

Page 26: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

Task Na

            Te

      Sub P

         DrafSe

         NegSe

Publish S

         Proj

         Prod

         Map

      Sub P

         Iden

         Req

            ReR

            Dr

            Re

            Pu

         Prod

         Q&A

         Revsp

         Rev

         Awa

         Proj

         Prod

         Map

DEVELOP

D

D

D

 

3.3 

me and De

est Integratio

Project B: Sev

ft Sole Sourceverance Ta

gotiate and Feverance Ta

Sole Source J

ject Kickoff 

duce Project

pping and Da

Project C: Ro

ntify potenti

uest for Pro

eview and Fioyalty Syste

raft RFP 

efine and fin

ublish RFP 

duce Respon

A with Respo

ise/clarify repecification 

iew and sco

ard Contract

ject Kickoff 

duce Project

pping and Da

P/DEPLOY 

Develop/Dep

Develop/Dep

Develop/Dep

ONGAR

escription 

on Architect

verance Tax 

ce Justificatix Module 

Finalize Contx Vendor 

Justification 

t Schedule 

ata Convers

yalty Modul

al Royalty V

oposal 

nalize Requiem 

alize RFP 

nse to RFP 

ondents 

equirementsas required 

re response

t for Royalty

t Schedule 

ata Convers

ploy Severan

ploy Severan

ploy Royalty 

RD REPLACEME

ure 

Module 

on for 

tract with 

ion 

Vendors 

irements for

(s) 

System 

ion 

ce Phase 1

ce Phase 2

NT PROJECT MA

Deliver

 Test Pla

  

Sole Sou

Contrac

SPD Sole

Kickoff M

Severan

Mappin

  

  

  

r Function

Draft RF

Final RF

RFP and

Respons

TCs andq

TCs andq

Scoring 

Contrac

Kickoff M

Royalty 

Mappin

  

 Source 

Source c

Source c

ANAGEMENT PL

rable 

an 

urce Justifica

ctual Instrum

e Source Jus

Meeting 

nce Tax Syste

g artifact, re

nal and Data

FP 

FP 

d contacts fo

se(s) to RFP

/or correspoquestions on

/or correspoquestions on

sheet 

ctual instrum

Meeting 

System Proj

g artifact, re

code, Deplo

code, Deplo

code, Deplo

LAN

ation 

ment  

stification 

em Project S

evised data m

a Exchange R

or each vend

ondence to an requireme

ondence to an requireme

ment(s) 

ject Schedul

evised data m

oyment and 

yment and T

yment and T

Schedule 

model 

Requiremen

dor 

address ents 

address ents 

le 

model 

Test Plans 

Test Plans

Test Plans

22  

 

ts 

Page 27: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

5.2 SCHED

  

Task Name

      Decisio

      RequireModel 

      RequireExchange A

         Partit

         Data A

            TO‐

            TO‐

            Mas

         ONGA

      Sub Pro

      Sub Pro

         Draft 

         Negot

         Publis

         Projec

         Produ

         Confi

      Sub Pro

         Devel

         Produ

         Q&A 

         Revise

         Revie

         Award

         Projec

         Produ

         Confi

DEVELOP/

DEVELOP/

DEVELOP/

3.3 

DULE ALLO

n Point on Tec

ements Phase 

ements Phase Architecture 

tion Requireme

Architecture fo

BE Analysis an

BE Information

ster Data Mana

ARD SharePoin

oject A: Data W

oject B: Severa

Sole Source Ju

tiate and Final

sh Sole Source 

ct Kickoff 

uce Project Sch

rm Requireme

oject C: Royalty

lop and publish

uce Response t

with Responde

e/clarify requir

w and score re

d Contract for 

ct Kickoff 

uce Project Sch

rm Requireme

DEPLOY Severa

DEPLOY Royalt

DEPLOY Severa

ONGAR

CATION ‐ 

chnology: Hybr

1: BPA Analysi

2: Parse Requi

ents by System

or Data to be E

d Data Model 

n Exchanges 

agement Requ

nt Collaboration

Warehouse/Mid

nce Tax Modu

ustification for 

ize Contract w

with SPD 

hedule 

nts, Mapping, 

y Module 

h Request for P

to RFP 

ents 

rements specif

esponse(s) 

Royalty System

hedule 

nts, Mapping, 

ance Phase 1 

ty 

ance Phase 2 

RD REPLACEME

PROJECT T

rid Approach

s, AS‐IS Exchan

rements, Data

Exchanged

uirements

n Site

ddleware

le 

Severance Tax

w Severance Tax

Data Conversi

Proposal

fication as requ

Data Conversi

NT PROJECT MA

TIMELINE

Dura

15 da

nge 60 da

a85 da

10 da

60 da

35 da

64 da

110 d

85 da

145 d

94 da

x Module 10 da

x Vendor 4 day

22 da

5 day

9 day

on 30 da

141 d

30 da

22 da

10 da

uired 10 da

10 da

5 day

5 day

9 day

on 35 da

150 d

160 d

90 da

ANAGEMENT PL

tion Start

ays Thu 1

ays  Thu 1

ays  Mon 1

ays Mon 1

ays Mon 1

ays? Fri 2/

ays? Mon 1

days Mon 1

ays Mon 1

days? Mon 1

ays Mon 2

ays Mon 2

ys Mon 3

ays Fri 3/

ys Mon 5

ys Mon 5

ays Fri 5/2

days Mon 3

ays Mon 3

ays Mon 5

ays Wed 6

ays Wed 6

ays Wed 6

ys Wed 7

ys Wed 7

ys Wed 7

ays Tue 8

days Wed 7

days Tue 9

ays Tue 5

LAN

Fi

10/15/15  W

10/1/15  W

1/4/16  Fr

1/4/16 Fr

1/4/16 Fr

12/16 Th

1/4/16 Th

1/4/16 Fr

12/7/15  Fr

11/30/15  Fr

2/22/16  Th

2/22/16  Fr

3/7/16 Th

11/16 M

5/2/16 Fr

5/9/16 Th

20/16 Th

3/7/16 M

3/21/16  Fr

5/2/16 Tu

6/1/16 Tu

6/8/16 Tu

6/22/16  Tu

7/6/16 Tu

7/13/16  Tu

7/20/16  M

/2/16 M

7/6/16 Tu

/20/16 M

/2/17 M

nish 

Wed 11/4/15

Wed 12/23/15

ri 4/29/16 

ri 1/15/16

ri 3/25/16

hu 3/31/16

hu 3/31/16

ri 6/3/16 

ri 4/1/16 

ri 6/17/16

hu 6/30/16

ri 3/4/16 

hu 3/10/16

Mon 4/11/16

ri 5/6/16 

hu 5/19/16

hu 6/30/16

Mon 9/19/16

ri 4/29/16

ue 5/31/16

ue 6/14/16

ue 6/21/16

ue 7/5/16

ue 7/12/16

ue 7/19/16

Mon 8/1/16

Mon 9/19/16

ue 1/31/17

Mon 5/1/17

Mon 9/4/17

23  

 

Page 28: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

5.3 PROJE

5.3.1 PRO

5.3.2 PRO

ROLE 

Executive

System Managem

3.3 

CT TEAM 

OJECT TEAM O

OJECT TEAM RO

e Sponsor 

ment 

ONGAR

RGANIZATIONA

OLES AND RESP

RESPONSIBILI

Attend 

Approv

Commu

Champi

Review,

Review architec

Ensure 

Review 

RD REPLACEME

AL STRUCTURE

PONSIBILITIES

ITY 

executive re

e project pla

unicate with 

ion the Proje

, approve an

and approvcture recom

project staff

and provide

NT PROJECT MA

eviews as sch

ans progress

other agenc

ect! 

nd execute p

e recommenmendations

f availability

e input to pr

ANAGEMENT PL

heduled by t

s  

cies’ Executi

project docu

ndation to ms of SMT me

y, funding an

roject artifac

LAN

the SMT me

ive Sponsors

ments as re

move to newmbers and S

nd contract m

cts, including

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

embers 

s as needed

quired 

w system SMEs 

managemen

g contractor

24  

 

Page 29: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

ROLE 

Team  

Project M

SME TeaMember

3.3 

Manager 

ONGAR

RESPONSIBILI

delivera

Support

Ensure 

Particip

Commu

Champi

Contrib

Recomm

Commu

Develop

Provideexpecta

Manage

Facilitatissues lo

Manage

Report 

Promot

Facilitat

Develop

Value te

Recomm

Champi

The Pro

betwee

membe

Attend 

capacity

respect

Particip

Accomp

Assist o

Represe

Report 

RD REPLACEME

ITY 

ables 

t the Project

user particip

pate in plann

unicate with

ion the Proje

ute to Lesso

mend go/no

unicate with 

p initial man

e leadership ations 

e contractua

te meetings,og 

e schedules

on project s

te and practi

te requireme

p and chroni

eamwork, co

mend go/no

ion the Proje

oject Team m

en the vision

ers’ responsi

and particip

y of a techni

tive agency 

pate in the p

plish and pro

or support sy

ent specific a

progress, iss

NT PROJECT MA

t Manager 

pation 

ning  

respective a

ect! 

ons Learned

 go based on

the Executiv

nagement pla

for a coordi

al services 

, assign task

tatus 

ice change m

ents develop

icle Lessons 

ooperation a

 go based on

ect! 

member is an

 and the rea

bilities inclu

pate in meet

ical or busin

lanning proc

ovide input t

ystem testing

area(s) for th

sues, etc. 

ANAGEMENT PL

agency rega

n status 

ve Sponsors

an and proje

nated proje

ks, track actio

managemen

pment; med

Learned 

and planning

n status 

n important 

ality of the p

ude: 

tings, review

ess represen

cess 

to deliverab

g activities a

he overall pr

LAN

rding status 

s and SMT 

ect plan 

ct effort; ma

on items, an

diate dispute

role in that 

project.  The 

w all docume

ntative for h

les 

as required 

roject as ass

 and progres

anage 

nd maintain 

es  

it is the link

Project Team

nts in the 

his/her 

signed 

25  

 

ss  

Page 30: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

ROLE 

5.4 STAFF 

5.4.1 PRO

Entity 

System Ma

  

  

  

State Land

  

  

Energy, MNatural Re

  

  

DepartmeRevenue 

  

  

  

  

  

  

  

ONGARD 

  

  

  

DoIT 

  

  

3.3 

PLANNING

OJECT TEAM 

anagement Te

d Office 

inerals and esources Divisi

nt of Taxation

ONGAR

RESPONSIBILI

Recomm

Contrib

G AND RES

eam  Rich Pr

Joe Mo

John M

  

Martin

Danny 

  

ion  James 

Scott D

  

 and Jim Wa

Jeff Bja

Natalie

Aysha 

Elizabe

Ron Ga

Muthu

  

Tony H

Cathy P

Robin J

  

Mike B

Darsha

  

RD REPLACEME

ITY 

mend go/no

ute to lesso

SOURCE AC

Name 

reston 

ontano 

Monforte 

n Davis 

Martinez 

Whitaker 

Dawson 

astvedt 

arke 

e Smith 

Mora 

eth Sanchez 

allegos 

u Bala 

Hoffman 

Plummer 

Jacobs 

Baca 

ana Kanabar 

NT PROJECT MA

 based on st

ns learned 

CQUISITIO

 rpre

joe.m

John.M

md

dmar

james

Scott

Jim.W

Jeffre

nata

aysh

Elizabet

ron.g

mut

tony.

Cathy

Robin

Mik

Darshan

ANAGEMENT PL

tatus 

ON 

Email 

[email protected]

montano@state

Monforte@state

  

[email protected]

[email protected]

  

s.whitaker@stat

t.Dawson@state

  

Wastvedt@state

ey.Bjarke@state

lie.smith@state

ha.mora@state.

thT.Sanchez@sta

gallegos@state.

thu.bala@state.

  

.hoffman@state

.Plummer@stat

nL.Jacobs@state

  

[email protected]

na.Kanabar@sta

  

LAN

.nm.us 

.nm.us 

e.nm.us 

nm.us 

e.nm.us 

te.nm.us 

e.nm.us 

e.nm.us 

e.nm.us 

e.nm.us 

nm.us 

ate.nm.us 

.nm.us 

nm.us 

e.nm.us 

te.nm.us 

e.nm.us 

nm.us  

ate.nm.us 

Phone

(505) 827‐5

(505) 476‐3

(505) 827‐0

  

(505) 827‐1

(505) 827‐5

  

(505) 476‐3

  

  

(505) 827‐2

(505) 827‐0

(505) 383‐0

(505) 841‐6

(505) 469‐2

(505) 469‐4

(505) 476‐3

  

(505) 827‐5

(505) 827‐6

(505) 827‐4

  

  

  

  

26  

 

5764 

3280 

0322 

1218 

5757 

3300 

2289 

0954 

0169 

6659 

2806 

4296 

3172 

5816 

6115 

4484 

Page 31: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

6

REVISION: 3

 

 

Entity 

IV&V (POD

5.4.2 NON

DOIT ma

5.5 PROJE

The projeTRD’s Albroom and

5.5.1 PRO

Project teadditionaand main

 

6.0 PROJE

6.1 RISK A

PMBOK©

Risk: “Anproject’s

Issue: “Aunder dis

Both Risksimilar w

6.1.1 RISK

Issues anduring plcorrectivcorrectivissue or r

 

SMT Mem

3.3 

D Associates) 

N‐PERSONNEL 

nages the ha

CT LOGIST

ect team is dbuquerque od via confere

OJECT TEAM TR

eam membeal training asntenance, XM

ECT MANA

AND ISSUE 

©: 

n uncertain e objectives.”

A point or mascussion or o

ks and Issuesways. 

K REPORTING A

nd risk manaanning procve action andve action shorisk.   

mber 

ONGAR

Dan Do

RESOURCES 

ardware and

TICS 

distributed boffice at the ence call to 

RAINING 

ers will attens needed.  TML, and agile

AGEMEN

MANAGEM

event or con” 

atter in quesover which t

s can signific

AND ESCALATIO

gement andcess.  Issues d risk mitigatould address

RD REPLACEME

Name 

onoghue 

d software re

between 310Bank of the ensure team

nd training phe team is ce project ma

NT AND CO

MENT 

dition that, 

stion or dispthere are op

cant impact 

ON STRATEGY

d resolution or risks shoution can be ds both the im

Review andplan, projec

NT PROJECT MA

Dan.Donogh

esources for

0 Old Santa FWest. Meet

m involveme

provided by tconsidering aanagement.

ONTROLS

if it occurs, h

ute, or a poiposing view

a project’s s

help to resould be repordeveloped tmmediate ne

d accept the ct plan and b

ANAGEMENT PL

Email 

hue@poddataso

r the ONGAR

Fe Trail, othetings are helnt througho

the Severanadditional tr 

has a positiv

int or mattews or disagre

success, and 

olve those issrted at the eo address weed and the 

initial risk asbudget 

LAN

olutions.com> 

RD Mainfram

er Santa Fe ld in applicaout the proce

ce Tax vendraining in Sha

ve or negativ

r that is not ements.” 

d both should

sues or risksarliest possi

with the issueunderlying c

ssessment, m

Phone

(505) 243‐2

me.   

locations, anble confereness.  

or and arePoint des

ve effect on 

settled and

d be handled

s not anticipaible time so e or risk.  Thcause of the

managemen

27  

 

2287  

nd nce 

sign 

 is 

d in 

ated that e  

nt 

Page 32: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

Project M

 

6.1.2  PRO

The ProjeTeam forlog with tissue and

 

6.1.3 ISSU

6

 Issues anduring plcorrectivcorrectivrisk.  TheTeam forlog with t

6

The extemethodoguidance

6.2 INDEP

 IV&V focdeliverab

The folloInformataccounta

Project/P

Project S

Managem

3.3 

Manager 

OJECT RISK TRA

ect Managerr corrective athe SMT as rd risk log rev

UE MANAGE

.1.3.1 Intern

nd risk manaanning procve action andve action wile Project Mar corrective athe SMT as r

.1.3.2 Extern

rnal processology that cae and resolut

ENDENT V

cus dependsbles.  

wing check tion technoloability the pr

Product Are

Sponsorship 

ment Assess

ONGAR

ACKING APPRO

r will keep aaction. The Prequired. Thview at SMT 

EMENT 

nal Issue Esc

agement andcess.  Issues d risk mitigatl address bonager will keaction. The Prequired.  

nal Issue Esc

s for an issueannot be restion. 

VERIFICATI

s upon the ty

list is based ogy templatroject envisio

ment 

RD REPLACEME

Conduct iniDevelop plaKeep an issProject TeaProvide an 

OACH 

n issue and Project Manhe Project Mmeetings. 

calation and

d resolution or risks will tion can be dth the immeeep an issueProject Man

calation and

e that involvolved ONGA

ON AND V

ype of projec

on Exhibit Ae.  It is incluons: 

NT PROJECT MA

tial risk asseans with proue and risk tm for correcissue and ris

risk trackingager will hoanager will a

 Resolution 

help to resobe reporteddeveloped tediate need e and risk traager will ho

d Resolution

es project reARD will inclu

VALIDATIO

ct, with vario

A of the OCIOded here to 

ANAGEMENT PL

essment oject team fotracking log ctive actionsk log review

g log and willd regular realso be resp

Process 

olve those isd at the earlio address wand the undacking log anld regular re

n Process 

esources, prude the SMT

ON ‐ IV&V

ous emphas

O IV&V Contprovide a h

Includ

Yes 

Yes 

LAN

or risk and will wor

w at SMT me

l work with eviews of theponsible for p

ssues or risksest possible

with the issuederlying causnd will work eviews of the

rocesses, proT which will 

ses on projec

tract Templaigh level of t

de –Yes/No 

rk with the 

eetings  

the Project e issue and rproviding an

s not anticip time so thae or risk.  Thse of the issuwith the Proe issue and r

ocedures, orprovide 

ct and produ

ate, and the the type of I

28  

 

risk n 

pated t e ue or oject risk 

uct 

V&V 

Page 33: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

Project/P

Project M

Risk Man

Change M

Commun

Project E

Subcontr

Quality M

Requirem

6.3 SCOPE

Describeaddress m

6.3.1 Cha

6

A.  CdS

B.  Cab

1

2

3.3 

Product Are

Management

nagement 

Managemen

nication Man

Estimating an

ractors and E

Managemen

ments Mana

E MANAGE

 the processmanaging st

ange Contro

.3.1.1 Chang

hanges.  Anyeveloped byMT.   

hange Requccomplish the submitted

.  The Pappro

(a) 

(b) 

(c) 

(d) 

(e) 

(f) 

.  The SMMana

ONGAR

nt 

nagement 

nd Schedulin

External Staf

gement 

EMENT PLA

s that is goinakeholder e

ge Control P

y changes ory the project

est Process.he Charter od that meets 

roject Manaoval by the S

The name 

A summar

The start d

The reason

The eleme

The impac

MT shall proge within a 

RD REPLACEME

ng 

ff 

AN 

ng to be usedxpectations

Process 

r revisions tot will only ta

  In the evenor Scopes of the followin

ager shall draMT to includ

of the perso

ry of the req

date for the 

n and neces

ents to be alt

ct of the cha

ovide a writtmaximum o

NT PROJECT MA

d to manage. 

o the Projectke place afte

nt that circuWork as desng criteria: 

aft a writtende:   

on requestin

uired chang

change;  

sity for chan

tered; and 

nge.  

en decision f ten (10) Bu

ANAGEMENT PL

Includ

Yes 

Yes 

Yes 

Yes 

Yes 

Yes 

Yes 

Yes 

e the scope o

t Charter or er receipt of

mstances wscribed abov

n Change Req

ng the chang

ge;  

nge;  

on the Chanusiness Days

LAN

de –Yes/No 

of the projec

any Scopes f written app

warrant a chave, a Change

quest for rev

ge;  

nge Requests of receipt o

ct.  Make sur

of Work proval by the

ange to e Request sh

view and 

 to the Projeof the Chang

29  

 

re to 

hall 

ect ge 

Page 34: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

6

 SMT 

Project M

6.4 PROJE

Project boften as 

6.4.1 COM

Meeting softwarewill be mto the neto start adepth of accepteda special 

ROLE 

Executive

SMT  

Project M

The mee

At the reand the prequesteadditionarequired

The mee

3.3 

Requeapproorigin

.3.1.2 Chang

Manager 

CT BUDGE

budget will brequired. 

MMUNICATION

agendas, me packages:  made to publext regularly and finish onissues to bed to be postpmeeting. 

e Sponsors 

Manager 

ting times a

quest of theproject maned.  The SMTal participan. 

ting times a

ONGAR

est.  All decisoved, becomal Agreemen

ge Control B

Providecontrac

Practice

ET MANAG

be presented

N MATRIX 

inutes, and sMicrosoft Wish the meescheduled m

n time.  The te covered.  Itponed may b

RESPONS

Comnee

Rec

Comesca

Rec

Comsub

nd distributi

e SMT, most ager only, anT has designants from the 

nd distributi

RD REPLACEME

sions made e a part of tnt. 

Board (CCB)

e managemects or deliver

e change ma

GEMENT 

d and finalize

supporting dWord, Excel, Pting minutesmeeting.  Antime allocatetems not abbe added to 

SIBILITY 

mmunicate weded commendati

mmunicate walations commendati

mmunicate wbcommittee,

ions of the m

of its meetind will incluated a montTri‐Agencies

ions of meet

NT PROJECT MA

by the SMT he Agreeme

ent review arables 

anagement p

ed through t

documentatPowerPoint,s in a timely ny meeting ced to each ale to be covethe next sta

with other ag

ons of SMT 

with the resp

ons SMEs 

with SMT, wproject team

meeting min

ngs will be wde the Tri‐aghly session as, DoIT, IV&V

ting minutes

ANAGEMENT PL

are final.  Chent and beco

nd accept ch

process as d

the SMT at le

tion will be p, Outlook an fashion andcalled shouldagenda topicered within anding meet

gencies’ Exe

members an

pective agen

working groupms 

nutes for the

working sessgency CIO’s as a Full SMTV, and addit

s for the pro

LAN

hange Requeome binding

hanges to pr

described in 

east monthl

provided usinnd/or Projectd no later thad have an agc will vary dethe meetingting’s agenda

ecutive Spon

nd SMEs 

ncy regardin

ps, technica

e project are

sions amongand/or specT meeting thtional partici

oject are as f

ests, once g as a part of

roject plan, 

document 

y, and more

ng the followt.  Every attean 2 days prgenda, attemepending ong time and a or may req

nsors as 

g progress a

 as follows:

g SMT membcific SME’s ahat will incluipants as 

follows:   

30  

 

f the 

wing empt rior mpt  the 

quire 

and 

 

bers s ude 

Page 35: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

SMT 

addre

Full S

mont

agen

includ

depe

meet

agen

meet

mana

SMT 

hoste

CIO o

to tec

delive

recom

Agen

involv

Proje

DEFIN

daily 

be tra

6.4.2 PRO

Status  restatus rereports p

6.5 PERFO

Metrics ascheduleaid in platime (sch

6.5.1 BAS

P

Busines

3.3 

working ses

essed by the

SMT meeting

th @ 1330 M

da, supporti

ding a recor

nding on the

ting time and

da or may re

ting minutes

ager, and po

Technical Su

ed at EMNRD

of each Tri‐A

chnical decis

erables and 

mmendation

cy enterpris

vement or fe

ect Team and

NE (requirem

scrums at th

acked in the

OJECT STATUS R

eports will beports as reqprepared upo

ORMANCE 

are collectede, resource uanning and fohedule), cost

SELINES 

roject Area 

s Process An

ONGAR

sions may in

e SMT.   

gs will be he

Mountain Tim

ng documen

d of attenda

e depth of is

d accepted t

equire a spe

s in a timely 

osted to the 

ubcommitte

D in its IT Co

Agency and a

sion points.  

SOWs, parti

ns to the SM

se.   Individu

eedback. 

d Contractor

ments), DESI

he discretion

e project stat

REPORTS 

be used  to  tquested by ton request a

MEASURE

d for measurusage, and erorecasting fut (budget) an

nalysis   S

RD REPLACEME

nclude a form

ld on a regu

me) through

ntation if ne

ance.  The tim

ssues to be c

to be postpo

cial meeting

fashion, and

project Shar

e meetings w

onference Ro

additional IT 

The commit

icipate in Q&

T as needed

al agency te

r/Vendor Me

GN, DEVELO

n of the proj

tus report, a

rack progrethe Project and by other

EMENT (PR

ring the progrror rates, auture projecnd quality.  

Categ

Schedule, Co

NT PROJECT MA

mal agenda, 

lar schedule

out the proj

cessary, and

me allocated

covered.  Ite

oned may be

g.  Every atte

d the minute

rePoint site.

will be held 

oom.  The Te

participants

ttee will rev

&A sessions 

d on contract

echnology ch

eetings will b

OP, and DEPL

ect manage

and distribut

ss and  issueManager.   Tr contractors

ROJECT ME

gress of a prnd of establcts.  At a min

gory 

ost, Quality 

ANAGEMENT PL

 depending 

e (currently, 

ject.  Full SM

d will result i

d to each ag

ems not able

e added to th

empt will be

es will be dis

weekly, on F

echnical Sub

s to review, 

view researc

with consult

ts and decis

hoices may n

be schedule

LOY project 

er.  Action ite

ted by the pr

es.   Project These reports.  

ETRICS) 

roject againsishing a histnimum metr

Measure

Deviation

LAN

on the topic

the fourth T

MT meetings 

in meeting m

genda topic w

e to be cover

he next stan

 made to pu

stributed by 

Friday morn

committee w

evaluate an

h, documen

tants, and p

ions that im

not require t

d as needed

phases may

ems, issues a

roject mana

Team memts will be  in 

st its plannedorical databrics must be 

n from initial

c(s) being 

Tuesday of t

will include

minutes, 

will vary 

red within th

nding meetin

ublish the 

the project 

ings, 9:00 a.

will include 

d provide in

tation, cont

rovide 

mpact the Tri

the committ

d, and during

y be manage

and risk logs

ger as neede

bers will proaddition to 

d budget, base, which westablished 

l schedule, 

31  

 

he 

 an 

he 

ng’s 

.m. 

the 

put 

ract 

ee’s 

g the 

d as 

s will 

ed.   

ovide such 

will for 

Page 36: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

P

Req

Integra

Data E

Severad

Rod

Middlew

Front end

Data migratio

6.6 QUALI

Quality Mneeds fothat deteimprovemsummary

3.3 

roject Area 

quirements 

ation Assessm

Exchange Mo

ance Tax sysdeployment 

oyalty systemdeployment  

ware deploy

nd/User Intedeployment 

conversion aon from main

ITY OBJECT

Managemenr which it waermine the qment, withiny in this docu

ONGAR

2   S

ment  S

odel   S

stem S

m S

yment  S

erface S

and nframe 

S

TIVES AND

t includes thas undertakequality policyn the qualityument and r

RD REPLACEME

Categ

Schedule, Co

Schedule, Co

Schedule, Co

Schedule, Co

Schedule, Co

Schedule, Co

Schedule, Co

Schedule, Co

D CONTROL

he processesen.  It includy, objectivesy system.  If arefer to the a

NT PROJECT MA

gory 

ost, Quality 

ost, Quality 

ost, Quality 

ost, Quality 

ost, Quality 

ost, Quality 

ost, Quality 

ost, Quality 

s required todes all activits, quality assa separate Qappropriate 

ANAGEMENT PL

Measure

deviationadequacy

Deviationdeviationadequacy

Deviationdeviationadequacy

Deviationdeviationadequacy

Deviationdeviationadequacy

Deviationdeviationadequacy

Deviationdeviationadequacy

Deviationdeviationadequacy

Deviationdeviationadequacy

o ensure thaties of the ovsurance, quaQuality Plan appendix.

LAN

n from estimy of artifacts

n from initialn from estimy of artifacts

n from initialn from estimy of artifacts

n from initialn from estimy of artifacts

n from initialn from estimy of artifacts

n from initialn from estimy of artifacts

n from initialn from estimy of artifacts

n from initialn from estimy of artifacts

n from initialn from estimy of artifacts

t the projecverall managality control,is used, incl

ated cost,  

l schedule, ated cost,  

l schedule, ated cost,  

l schedule, ated cost,  

l schedule, ated cost,  

l schedule, ated cost,  

l schedule, ated cost,  

l schedule, ated cost,  

l schedule, ated cost,  

t will satisfygement func and qualityude a high le

32  

 

 the ction y evel 

Page 37: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

REVISION: 3

 

 

6.6.1 QUA

Describeand asseobjective

Identify ethe perfotracking t

NUMBER

QUALITY 

QUALITY 

QUALITY 

6.6.2 AGE

The projeexperts hproject, t

ONGARDimportanthe resulimplemeparticipa

6.6.3 PRO

The projewritten a

6.7 CONFI

Configuramemos, version cStandard

3.3 

ALITY STANDA

 the agency,ssed by the es were achi

each of the pormance of ttool or meas

METRIC 1 

METRIC 2 

METRIC 3 

ENCY/CUSTOM

ect managerhave participthe SMT gro

D also has a mnt that all mating directiontation.  Thents. 

ODUCT DELIVER

ect manageracceptance, 

GURATION

ation Managdocuments, control, etc.)ds and team 

ONGAR

RDS 

, industry orproject. Theeved. 

project qualthe actual prsure such as

DESCRI

Uninter

Verificadefinedfollowe

Verificaother, wimpact 

MER SATISFACT

r is continuopated in requup has been

major stakehajor system on be comme SMT will c

RABLE ACCEPT

r will approvincluding bu

N MANAG

gement deteetc.) will be) and ownedawareness a

RD REPLACEME

r regulatory pese quality st

ity standardroduct and/os number of 

IPTION 

rrupted trac

ation that alld and that thed during the

ation that prwith system the legacy m

TION 

ously requestuirements dn fully engag

holder in thelevel changeunicated to reate an adv

TANCE PROCESS

ve deliverablut not limited

EMENT 

ermines howe managed (td by (e.g., Agare critical.

NT PROJECT MA

project perftandards wil

s that are dior service. Fproject revie

king and dis

l major desighe approvede design and

rocesses andmigration mmainframe s

ting feedbacevelopmentged. 

e oil and gas es and impacthe producevisory group

es with the d to email, a

w project infotracked, appgency manag

ANAGEMENT PL

ormance stall be used to

irectly relateFor each quaews or Proje

stribution of 

gn and deved processes ad developme

d standards amethodologisystem. 

ck from the Tt and confirm

 producers acts be deciders far in advp including in

oversight ofand archive t

ormation (fiproved, storeging the proj

LAN

andards thato assess whe

ed to the proality standardect Status. 

 oil and gas 

elopment proand standardent project p

are compaties, and do n

Tri‐ Agenciemation. Thro

across the sted upon by vance of anyndustry and 

f the SMT, athe docume

les, reports,ed, secured,ject or the C

t will be folloether the qua

oject and nod, identify th

revenue 

ocesses are ds are phases. 

ble with eacnot negative

s and busineoughout the 

tate.  It is the SMT, any academic 

nd will provntation.  

, designs, , accessed, Customer).  

33  

 

owed ality 

ot to he 

ch ly 

ess 

nd 

ide 

Page 38: PROJECT MANAGEMENT PLA N PMP)€¦ · 23/03/2016  · utive Spo mmissio tem Man cretary; orate of Ton ONGAR NGAR OJEC nsors – D ner of Pu agemen Richard P Informat y Hoffma Project

7

REVISION: 3

 

 

6.7.1 VER

The projeSharePoiprocess i

6.7.2 PRO

The new all projecRequiremsystem, sThis Shar

6.8 PROCU

Procuremthe SMT defined i

7. 0 PROJE

Project Cproject amandatofor the Arecordingassignmeprocurem

7.1 ADMIN

Administof verificactivitiesin accordburden ogiven prowork witcomplim

ONGARDfrom pro

7.2 CONTR

Contract verificatihand ove

3.3 

RSION CONTRO

ect team wilnt site.  Docn SharePoin

OJECT REPOSIT

SharePoint ct artifacts, iments 2 and service requrePoint site i

UREMENT 

ments will beto define alln this Projec

ECT CLOS

Close will alwctivities andory step in thAgency/Unit g the last hoents.  Contrament audit a

NISTRATIVE CL

trative Closeation that os are adminisdance with tof closing is toject are conh the projecent the proj

D will compleoject, budget

RACT CLOSE 

close is simon for contrer process of

ONGAR

OL 

l utilize verscument revisnt.    

ORY (PROJECT

ONGARD Rencluding butData Exchanests and bugis currently u

MANAGEM

e agreed to al expectationct Managem

SE 

ways consist d an externahe project lifthat is respoours against tactual activitnd formal a

LOSE 

e occurs at bobjectives anstratively clohe WBS andtoo great anntingent on tct’s project mect’s object

ete a projectt, schedule r

ilar to adminract close. Cof artifacts wi

RD REPLACEME

sion control sions will be 

T LIBRARY) 

eplacement t not limitednge artifactsg tracking, punder devel

MENT PLA

and approvens and timel

ment Plan. 

of administrl vendor is efe cycle.  Admonsible for mthe project, ties meet thecceptance o

oth the end d deliverablosed out.  Ad should not d audits inacthe project’smanagemenives. 

t closure docresults, lesso

nistrative cloontracts for ill be comple

NT PROJECT MA

for all projecaccomplishe

site collectiod to, historics, SMT restriproject manaopment.  

AN 

ed by the SMlines relative

rative projecemployed.  Cministrative managing theand providie contractuaof the projec

of phase anes were metdministrativebe delayed tccurate.  Thes complexityt consultant

cument whicons learned,

ose in that itthis phase oete.  

ANAGEMENT PL

ct artifacts oed by the ch

on will provical requiremcted area, seagement, mi

MT.  The Proje to each ma

ct activities aCompleting bactivities coe project, sung transitional needs, suct work prod

nd end of prot. Acceptance closure octo project ee specific pry and size.  Pt to tailored 

ch summarizand follow u

t involves prof the projec

LAN

on the collabheck out and

ide several sents, BPA reeparate foldilestones an

ject Manageajor procure

and possiblyboth sets of omplete the uch as lessonn for the stach as executucts.   

oject.  This cce is formalicurs on a “bnd.  At that roject close aProject manaProject Clos

zes deliverabup recomme

oduct and pct will be fina

borative d check in 

separate siteequirementsders for eachd schedules

er will work wement activit

y contractuaactivities is internal neens learned, aff to other ting a 

closure consized and phaby‐phase” bapoint, the activities foragers shouldse procedure

bles, conclusendations. 

process alized and a 

34  

 

es for s, h .  

with ty as 

l a eds 

ists ase asis 

r a d es to 

sions