REVISION: 3
ExecCo
SysSe
Direct
3.3
O
PR
cutive Spoommissio
stem Manecretary; torate of
Ton
ONGAR
ONGAR
ROJEC
onsors – Dner of Pu
nagemenRichard PInformat
ny Hoffma
Project M
Origi
Rev
RD REPLACEME
RD REP
CT MA
(
Demesia ublic Land
nt Team (SPreston, Ption Man
Inform
an, Direct
Manager
nal Plan
vision Da
Rev
NT PROJECT MA
PLACEM
ANAGE
(PMP)
Padilla, Tds; David
SMT) – JoPh.D., Assagementation Off
tor ONGA
– Cathy P
Date: Jun
te: March
vision: 3.3
ANAGEMENT PL
ENT PR
EMENT
)
TRD SecreMartin, E
ohn Monfsistant SLt; Joe Monficer
ARD Servi
Plummer,
ne 11, 201
h 4, 2016
3
LAN
ROJECT
T PLA
etary; AubEMNRD S
forte, TRDO Commntano, EM
ce Cente
, PMP
12
6
N
brey Dunecretary
D Deputyissioner, MNRD Ch
r
i OF vi
n,
hief
REVISION: 3.3 ONGARD REPLACEMENT PROJECT MANAGEMENT PLAN ii OF vi
Contents
REVISION HISTORY ............................................................................................................................................ IV
1.0 PROJECT OVERVIEW ..................................................................................................................................... 1
EXECUTIVE SUMMARY‐ RATIONALE FOR THE PROJECT ............................................................................................................ 1 1.1 FUNDING AND SOURCES ............................................................................................................................................. 3 1.2 CONSTRAINTS .......................................................................................................................................................... 5 1.3 DEPENDENCIES ......................................................................................................................................................... 6 1.4 ASSUMPTIONS ..................................................................................................................................................... 6 1.5 PROJECT RISKS IDENTIFIED ........................................................................................................................................ 7
2.0 PROJECT AUTHORITY AND ORGANIZATIONAL STRUCTURE ............................................................................ 8
2.1 STAKEHOLDERS ........................................................................................................................................................ 8 2.2 PROJECT GOVERNANCE STRUCTURE ........................................................................................................................... 10
2.2.1 Describe the organizational structure – Org Chart ................................................................................... 10 2.2.2 Describe the role and members of the project steering committee .......................................................... 11
2.3 EXECUTIVE REPORTING ............................................................................................................................................ 12
3.0 SCOPE ......................................................................................................................................................... 14
3.1 PROJECT OBJECTIVES .............................................................................................................................................. 14 3.1.1 BUSINESS OBJECTIVES .......................................................................................................................................... 15 3.1.2 TECHNICAL OBJECTIVES ........................................................................................................................................ 15 3.2 CRITICAL SUCCESS FACTORS ..................................................................................................................................... 15
4.0 PROJECT DELIVERABLES AND METHODOLOGY ............................................................................................. 16
4.1 PROJECT MANAGEMENT LIFE CYCLE .......................................................................................................................... 16 4.1.1 Project Management Deliverables ............................................................................................................ 16 4.1.2 Product Deliverables ................................................................................................................................. 17 4.1.3 Deliverable Approval Authority Designations ........................................................................................... 18 4.1.4 Deliverable Acceptance Procedure ............................................................................................................ 18
4.2 PRODUCT LIFE CYCLE ......................................................................................................................................... 18 4.2.1 Major Deliverables and Performance Measures ....................................................................................... 18 Major Project Deliverable and Performance Measure ....................................................................................... 18 Due Date ............................................................................................................................................................ 18 Project Phase ...................................................................................................................................................... 18 4.2.2 Product and Product Development Deliverables ....................................................................................... 20
5.0 PROJECT WORK ........................................................................................................................................... 20
5.1 WORK BREAKDOWN STRUCTURE (WBS) .................................................................................................................... 20 5.2 SCHEDULE ALLOCATION ‐ PROJECT TIMELINE ............................................................................................................... 23 5.3 PROJECT TEAM ...................................................................................................................................................... 24
5.3.1 Project Team Organizational Structure ..................................................................................................... 24 5.3.2 Project Team Roles and Responsibilities ................................................................................................... 24
5.4 STAFF PLANNING AND RESOURCE ACQUISITION .................................................................................................. 26 5.4.1 Project Team ............................................................................................................................................. 26 5.4.2 Non‐Personnel resources ........................................................................................................................... 27
5.5 PROJECT LOGISTICS ........................................................................................................................................... 27 5.5.1 Project Team Training ............................................................................................................................... 27
6.0 PROJECT MANAGEMENT AND CONTROLS .................................................................................................... 27
6.1 RISK AND ISSUE MANAGEMENT ................................................................................................................................. 27 6.1.1 Risk Reporting and Escalation Strategy ..................................................................................................... 27
REVISION: 3.3 ONGARD REPLACEMENT PROJECT MANAGEMENT PLAN iii OF vi
6.1.2 Project Risk Tracking Approach ................................................................................................................ 28 6.1.3 ISSUE MANAGEMENT ................................................................................................................................ 28
6.2 INDEPENDENT VERIFICATION AND VALIDATION ‐ IV&V ............................................................................................. 28 6.3 SCOPE MANAGEMENT PLAN .................................................................................................................................... 29
6.3.1 Change Control .......................................................................................................................................... 29 6.4 PROJECT BUDGET MANAGEMENT .............................................................................................................................. 30
6.4.1 Communication Matrix ............................................................................................................................. 30 6.4.2 Project Status Reports ............................................................................................................................... 31
6.5 PERFORMANCE MEASUREMENT (PROJECT METRICS) ...................................................................................... 31 6.5.1 Baselines .................................................................................................................................................... 31
6.6 QUALITY OBJECTIVES AND CONTROL ................................................................................................................ 32 6.6.1 Quality Standards ...................................................................................................................................... 33 6.6.2 Agency/Customer Satisfaction .................................................................................................................. 33 6.6.3 Product Deliverable Acceptance Process ................................................................................................... 33
6.7 CONFIGURATION MANAGEMENT ..................................................................................................................... 33 6.7.1 Version Control .......................................................................................................................................... 34 6.7.2 Project Repository (Project Library) ........................................................................................................... 34
6.8 PROCUREMENT MANAGEMENT PLAN .............................................................................................................. 34
7. 0 PROJECT CLOSE ........................................................................................................................................... 34
7.1 Administrative Close ..................................................................................................................................... 34 7.2 Contract Close .............................................................................................................................................. 34
REVISION: 3
REVISI
REVISION
1.0
2.0
2.1
2.2
2.3
2.4
3.0
3.1
3.2
3.3
3.3
ON HISTO
N NUMBER
ONGAR
ORY
DATE
June 11
Octobe
Novemb2013
May 28
Septem2014
Februar
Octobe
January
January
March 4
RD REPLACEME
1, 2012
r 1st, 2013
ber 18th,
thth, 2014
mber 24thth,
ry 24th, 2015
r 20, 2015
y 3, 2016
y 28, 2016
4, 2016
NT PROJECT MA
COMMEN
Origina
Revision
Directo
Change
Changebeing cl
5 Change
Revisionand add
Revisionwith Hy
Revision
Revision
ANAGEMENT PL
NT
l Version
n
r review and
es to Plannin
es to Planninlosed
es due to dep
ns to suppordition of new
ns to reflectybrid Archite
ns to update
ns to confor
LAN
d change do
g Budget
g budget du
parture of Pr
rt FY17 Fundw Project Ma
ONGARD Reecture
e schedule a
rm to SMT d
iv
c
ue to BPA RF
roject Mana
ding Requestanager
eplacement
nd risk regis
irectives
v OF vi
FP
ager
t
ster
1
REVISION: 3
1.0 PROJE
The NM Owas estaNew MexaggregatgovernmRevenue(EMNRD)Tri‐Agenc
The Tri‐AagenciesPreston,
ONGARDrevenuesillustrate
Regrettasystem thfrequentproduct, of life plathan tweTRD, SLO
The ONGleverage collects r
EXECUT
The ONGcollectionas revenuInformatinfrastrumoderniz$1M wasproducedimplemeturned oproviding
3.3
ECT OVER
Oil and Natublished by Sxico Legislation of oil an
ment agencie Departmen) Oil Conservcies governa
Agencies Syst. Currently sAssistant Co
D supports ths to State bee that ONGA
bly, the Tri‐Ahat is aged atly require dafrom all thraces the critenty‐two yeaO, EMNRD, a
GARD Replactechnology revenue from
TIVE SUMM
GARD Servicen of taxes anues from` ottion Technolcture and przation, the Os reverted dud a Strategicntation thatut to be fortg new and b
ONGAR
RVIEW
ural Gas Admenate Bill SBive Session. d gas produs: (1) the Nent (TRD), andvation Divisiance, unique
tem Manageserving on thommissioner
he collectioneneficiaries, RD accounts
Agencies facand increasinata correctioee agencies,ical collectioars, the currend the State
ement (f/k/advancemem its natural
MARY‐ RAT
e Center (OSnd royalties ther SLO busogy (DoIT) srocesses. In ONGARD prouring the 20c Roadmap at had been atuitous, as teetter option
RD REPLACEME
ministrationB339, the ON The bill proction and reew Mexico Sd (3) the Eneon. The ONe to the State
ement Teamhe SMT are Jr, SLO, and J
n of 25% of tincluding uns for annual
ce a serious sngly challengons and/or r, is often squon of state reent ONGARDe.
a Modernizants and to rel resources,
TIONALE F
SC) supports paid on the siness activithare a commthe initial p
oject receive09 Legislativand implemeanticipated technology hns for system
NT PROJECT MA
and RevenuNGARD Systeovided a Joinevenue relattate Land Ofrgy MineralsGARD Systee of New Me
m (SMT) assuJohn Monfooe Montano
he State’s reniversities, prevenue col
situation todged to addrerestorations uandered. Devenue at risD system mu
ation) Projeceengineer thin order to b
FOR THE PR
Tri‐Agency extraction oties. The Trimon vision tlanning phaed $1.5M ($5ve Session. Tentation plano follow plaas advanced
m integration
ANAGEMENT PL
e Database em Developnt Powers Aged informatffice (SLO), (s and Naturam Developmexico.
ures represeorte, Deputy o, Chief Info
evenues andublic schoollection of ap
day, having tess businessfrom backuDepending osk. Having bust be replac
ct will enablehe way that benefit its Be
ROJECT
business proof oil and nat‐Agencies ano improve tse authorize500K in FY08The expendin, however tnning. This d significantln that weren
LAN
(ONGARD) Sment Act, dgreement totion from thr(2) the Taxatal Resourcesment Act also
ntation fromSecretary, Trmation Off
d the distribus, and hospipproximatel
to rely on a s demands. ps, so that eon a system wbeen in serviced to meet
e the Tri‐AgeNew Mexicoeneficiaries
ocesses assotural gas resnd the Depahe current Oed to addres8, $1M in FYiture of the the funding situation maly in the pastn’t mature in
Service Centuring the 19o support theree state tion and s Departmeno establishe
m each of theTRD, Rich icer, EMNRD
ution of thesitals. FY15 dy $1.8 Billion
computer System issueemployee wowell past its ice for morethe needs o
encies to o tracks andand citizens
ociated with sources, as wartment of ONGARD ss 09), howeveinitial $500Kloss deferreay actually ht seven yearn 2009.
1
ter 990 e
nt d a
e
D.
se data n.
es ork end
e of
d .
well
er, K ed have rs,
REVISION: 3.3 ONGARD REPLACEMENT PROJECT MANAGEMENT PLAN 2
During the FY12 budget planning process, ONGARD was awarded C‐2 funding totaling $6M. The C‐2 submission was a multi‐million dollar request to support platform migration, with the objective of moving the mainframe COBOL base code to a server‐based environment. Since the FY12 appropriation, however, the SMT has engaged in an in‐depth exploration of modern technology options, and its FY17 request for total system replacement supplanted the FY12 platform migration request. The SMT’s change in approach was driven by its aspiration to develop a system that would be sustainable for the long term, to support the State’s and Tri‐Agencies’ mission well into the future.
Accomplishments and System Improvements: FY12 funding has supported several important system improvements and research efforts by the SMT, including, but not limited to, the following:
First, the EMNRD Oil Conservation Division (OCD) Online System has been completed and currently interfaces with ONGARD. This system is responsible for e‐Permitting, including the Application for Permit to Drill; Acreage Plat and Dedication; Operator Change; Operators' Monthly Report; and Hydraulic Fracturing Fluid Disclosure (HFFD) forms. OCD Online also provides well locations, including unit letters, sections, townships and ranges.
Second, the SLO Land Information System (LIMS), which provides land‐lease geospatial location integration with ONGARD, is nearing completion. Deployment is expected in May, 2016.
Third, critical ONGARD Stabilization activity has been completed, including the creation of test, QA and staging environments and a test/release process, the removal of 2.5 Million lines of unused/redundant code, security and audit improvements, and the upgrade to enterprise COBOL.
Fourth, the SMT engaged in Research and Benchmarking other oil and gas producing states’ solutions and best practices, including travel to Colorado, Wyoming, Texas and Louisiana to look at systems and solutions, as well as conversations with additional states, including Alaska.
Fifth, a Request for Information was submitted to industry leaders to produce estimates of implementation costs, timeframe and Total Cost of Ownership. The results of the RFI were reviewed and summarized, leading to the estimate for system replacement identified in the initial FY17 C‐2 Funding Request.
Sixth, the ONGARD Business Process Analysis, Phase 1 was completed in November, 2015. The BPA provides a comprehensive analysis of all systems and sub‐systems that comprise the ONGARD ecosystem. This effort incorporated strong participation by Tri‐Agencies Subject Matter Experts (SME’s), resulted in Functional and Technical Requirements, and produced a preliminary data exchange analysis to support a Service Oriented Architecture (SOA)/ distributed system approach.
Finally, the SMT has engaged in additional Research including sessions with Gartner, discussions with academia and industry, and review of technical literature, resulting in a decision point to embrace a Hybrid Architecture, leveraging commercial, off the shelf applications which have been optimized and deployed successfully in production. The Hybrid Architecture will support data exchange among severance tax, royalty, land information
REVISION: 3
managemcurrentlyArchitectexchangefor ONGA
1.1 FUNDI
SOURCE
House BiAct of 20
Laws of 2Item 5
3.3
ment and wey in the procture, a Reque requiremeARD Replace
ING AND S
ll 2 General 012
2012, Chapte
ONGAR
ell permittiness of evaluuirements Phnts to suppoement.
SOURCES
Appropriati
er 19, Sectio
RD REPLACEME
g systems viating severahase 2 effortort technolo
AMO
on
on 7,
$6,00
NT PROJECT MA
ia message oal tools and pt is underwaogy decisions
OUNT A
00,000 TbGDfo
BaMDPthammthcoowminthetoththadincoshPreA
ANAGEMENT PL
oriented midplatforms. Tay to provides, procureme
ASSOCIATED
To stabilize thbegin moderGas AdministDatabase, incor Proposal.
Before implend RevenueMinerals andDepartment aublic Lands he Oil and Nnd Revenuemigrated to tmigration wilheir day‐to‐dollection of of Informatiowith the thremigration andncludes estimhe system. Txecuted befo the new plhe stabilizathe ONGARDpproval of tevelop a fivencludes distiosts for the hall jointly proposals to eplacement Administratio
LAN
ddleware anTo support te a more detent and corr
RESTRICTIO
he existing snizing the Otration and Rcluding issui
mentation, te Departmend Natural Resand the Comshall certify
Natural Gas Ae Database cthe new platll not negativday operatiorevenue. Thon Technologee agencies od testing plamated costs The plan shafore migratinlatform. On ion of the ex Service Cenhe three agee‐year actionct phases areplacemenproduce a Recommence of the Oil anon and Reve
nd the SMT ishe Hybrid tailed set of related prici
ONS
system and il and NaturRevenue ng a Reques
the Taxationnt, the Energsources mmissioner oin writing thAdministratioan be tform, and thvely impair ons or he Departmegy will work on a detailedan that for stabilizinll be fully ng the systemcompletion xisting systenter, with encies, shall n plan that and estimatent system anequest for the nd Natural Gnue Databa
3
s
data ng
ral
st
n gy,
of hat on
he
ent
d
ng
m of m,
ed d
Gas se.
REVISION: 3
SOURCE
In AugustFY16 C‐2Million fo
In AugustFY17 C‐2Million foreflectingresponseoil and ga
In NovemRevision of $12 M
Replacem
This reduHybrid Aselected cost and Off‐the‐Ssuccessfugas prod
3.3
t 2014, TRD Funding Reor ONGARD
t 2015, TRD Funding Reor ONGARD g evaluationes and feedbas producing
mber 2015, T1 to its FY 1
Million for ON
ment.
uced amounrchitecture adue to anticrisk utilizingShelf (COTS) ully implemeucing states
ONGAR
submitted aquest of $33Modernizat
submitted aquest of $18Modernizat of RFI back from otg states.
TRD submitt7 C‐2 RequeNGARD
t supported approach, cipated redug Commerciaapplicationsented in oil a.
RD REPLACEME
AMO
a 3 ion.
$33,0
a 8 ion,
her
$18,0
ed est,
the
uced al s, and
$12,0
NT PROJECT MA
OUNT A
TthMstvethAFmaao
$th
000,000 N
000,000 TN
000,000 TrepMrere
TLe2
ANAGEMENT PL
ASSOCIATED
The approprihe ONGARDManager protatus and inerification rehe DepartmeAdministratioinance Commigration andnd written vgencies thatof the approp
2M of the $he Lands Ma
Not funded
The initial C‐2November 20
The Computeecommendapublished by Modernizatioecommendeequest of $1
This funding wegislature to016 legislati
LAN
RESTRICTIO
ations are co Service Cenoviding timeldependent veports to thent of Finanon and the Lmittee on thd replacemeverification ft the need fopriation exis
6M appropraintenance F
2 Request w015
er Enhancemations for FYDoIT. ONGAon (Replacemed for the fu12 Million.
was reducedo $10 Millionive session.
ONS
ontingent onnter Project y monthly validation ane Governor,ce and Legislative he platform ent system, from the thror the releassts.
riation is froFund.
was revised in
ment Fund C‐Y17 were ARD ment) was ll current C‐
d by the n during the
4
n
nd
ree se
m
n
‐2
2
REVISION: 3
SOURCE
House BiAct of 20
1.2 CONST
Constrain
NUMBER
1
2
3.3
ll 2 General 016
TRAINTS
nts are facto
DESCRIPTIO
This projecpersonnel objectives,developmeacceptance
This projecGeneral Ap2016.
ONGAR
Appropriati
ors that restr
ON
ct is constraiand Subject, including bent, design, e testing.
ct is constraippropriation
RD REPLACEME
AMO
on $10,0
rict the proje
ined by the at Matter Expbut not limitemigration an
ined by budgn Act of 2012
NT PROJECT MA
OUNT A
000,000 SeAasyasUayeotbyesyasafrodincop
(DToadsythth
ect by scope
availability, perts to supped to, Requind conversio
getary consi2 and House
ANAGEMENT PL
ASSOCIATED
ection 7. DATAPPROPRIATIOre appropriatystems enhans indicated, foUnless otherwppropriation ears 2016, 20therwise indialances remaear 2018 shaystems enhans indicated. Tnd administrarom the fundsn receiving ceocumentationformation ofompliance wirocess.
5) TAXATIONDEPARTMENT o replace thedministrationystem. Five mhe other statehe state lands
e, resource, o
as defined bport and comrements Phaon efforts, q
iderations dee Bill 2 Gener
LAN
RESTRICTIO
TA PROCESSINONS.‐‐The folted from the ncement fundor the purpos
wise indicatedmay be expe017 and 2018icated, any unaining at the ell revert to thncement fundThe departmeation shall alls for the purpertification ann from the stfficer that indith the projec
AND REVENUT 10,000,000 e oil and natun and revenuemillion dollarse funds appros maintenanc
or schedule.
by the SMT, mplete near ase 2 complquality assura
efined in Horal Appropri
ONS
NG lowing amoucomputer d, or other fuses specified.d, the ended in fisca8. Unless nexpended end of fiscal he computer d or other funent of financeocate amounposes specifiend supportingtate chief dicates ct certification
UE
ral gas e database s ($5,000,000)opriation is frce fund.
.
of Tri‐Agencterm etion, ance, and us
ouse Bill 2 ation Act of
5
nts
nds .
l
nds e nts ed g
n
) of rom
cy
ser
f
REVISION: 3
1.3 DEPEN
Types inc
M
Dalm
E‐pr
NUMBER
1
2
1.4 ASSUM
Assumptio
NUMBER
1
3
3.3
NDENCIES
clude the fol
Mandatory dep
‐ Discretionaryso encompass
mandatory in th
‐External deperoject activitie
DESCRIPT
This projeAgencies,Sponsors
The decisfunding isreplace OPoint Anaand a RFI its originareplacemNovembedeploy a H(COTS) apthe FY17 $10M, ap
MPTIONS
ons are plannin
R DESCR
The SMdeployand dis
The necurrentAdminmay be
ONGAR
llowing and
endencies are
y dependencies particular apphe project life c
ndencies are ds such as purch
TION
ect is depend, this extend.
sion to replas required toONGARD wasalysis producsubmitted tal estimate tent. The SMer 2015, reacHybrid Archipplications, rfunding reqppropriated f
g factors that,
IPTION
MT will suppoy the future sstribution.
ed, and subt ONGARD sistrations, Tre encountere
RD REPLACEME
should be as
dependencies
s are dependeproaches becaucycle.
dependencies thasing/procure
dent on collads from SME’
ce the ONGAo complete ts $33M, whiced by IBM. to industry leto $18M to sMT continuedched a decisitecture, leverealizing an auest to $12Mfor FY17.
for planning p
ort the ongostate of NM
sequently thystem with ri‐Agency peed.
NT PROJECT MA
ssociated wi
s that are inher
ncies defined use a specific s
that involve a rement
aboration ac’s, to the SM
ARD system the project. Tch was base Following readers durinsupport a mod research aion point to eraging Comadditional 3M. This fund
purposes, will b
oing, multiyeoil and natu
he institutiona Hybrid Arcersonnel cha
ANAGEMENT PL
ith each dep
rent to the wo
by the projectsequence of ac
relationship be
cross all leveMT, to the Ex
means that The FY16 esed on the 20esearch, benng FY16, theonolithic sysand discover design, dev
mmercial Off3% savings ading was red
be considered
ear effort requral gas acco
nal commitmchitecture wanges, and b
LAN
pendency list
rk being done.
management ctivities is prefe
etween project
els of the Trixecutive
additional stimate to 14 Functionnchmarking,e SMT revisestem ry and in velop and f the Shelf and reducingduced to
true, real, or c
quired to deounting, reve
ment, to repwill remain inbudgetary lan
ted.
.
team. This maerred, but not
t activities and
TYPE M
‐ M
, d
g
M, E
certain.
efine and enue collect
place the ntact across ndscapes th
6
ay
d non‐
,D,E
ion
at
REVISION: 3
1.5 PROJ
In this sebe taken
Risk 1
DescripReplacerisk if alfully engdecisionyear desdeploym
Risk 2
DescripReplacerisk if fumaintaidevelopthe repl
3.3
ECT RISKS
ection identif to maximize
tion: The Oement Projecl stakeholdegaged at all n points durisign, develoment proces
tion: The ONement Projecunding is notned to comppment and dlacement sy
ONGAR
IDENTIFIE
fy and descre activity tha
NGARD ct will be at ers are not of the ing the multpment, and ses.
NGARD ct will be at t secured anplete designeployment ostem.
RD REPLACEME
ED
ribe how eacat will result
ti‐
ProbabilLow
Mitigati
stakehosuccess
Hold recurrentlong raposition
Conting
planninplace thAgreemaddress
d , of
ProbabilLow
Mitigati
collaboFY17 ap
Conting
Agencycritical during implemas outli
NT PROJECT MA
ch risk will bet in minimizi
ity
ion Strategy:
olders and bsful project.
egular SMT mt directions ange ONGARns.
gency Plan: Tng phase so throughout tment (JPA) des any issue t
ity
ion Strategy:
oratively to sppropriation
gency Plan: Ry CIOs and Dproject objethe planning
mentation wiined in the a
ANAGEMENT PL
e managed. ng probabili
Impa
High
Emphasizebe sure all un
meetings to and challengD Roadmap
This risk will that necessahe project. Tetails a stronthat may aris
Impa
High
The SMT wsupport the on.
Review the soIT to align tectives. Thisg process asill include deappropriatio
LAN
Include theity and impa
act
h
e communicanderstand th
keep all partges as they r. Back‐fill cri
be addresseary communThe Joint Pong escalatiose.
act
h
will work togeobjectives fu
chedule regthe funding s risk will be moving intoelivering then.
e steps that wact of each r
ation to all he benefits o
ties abreast relate to theitical SME
ed during thenication takeowers n path to
ether unded by the
gularly with Tto support mitigated o e Five year pl
7
will isk.
of a
of e
e es
e
Tri‐
lan
2
REVISION: 3
Risk 3
DescripInformaSystem completmanagethe newthe currmust bereplace
Risk 4
Descripsystem dedicateowners personnRetiremimpact sand the
2.0 PROJE
2.1 STAKE
Stakeholpositively
NAME
Demesia
Aubrey D
3.3
tion: The SLation Manag(LIMS) projetion. LIMS mement functiw system. Inrent ONGARe maintainedment system
tion: The Ohas been maed staff of band technonel over the ment and tursome of this system kno
ECT AUTH
EHOLDERS
ders should y or negative
ST
Padilla Ex
Dunn Ex
ONGAR
LO Land gement ect is nearingmigrates landionality and terfaces to D system d until the m is deploye
NGARD aintained byusiness logy years. nover may s workforce owledge base
HORITY A
be a mix of ely by the pr
TAKE IN PRO
xecutive Spo
xecutive Spo
RD REPLACEME
g d to
d.
ProbabilLow
Mitigati
prioritizrobust assuransystem
Conting
the OSCto the S
y a
e.
ProbabilHigh
Mitigati
collabomembefuture s
Conting
methodtransfethat doand sys
ND ORGA
agency manroject.
OJECT ORG
onsor TaxDep
onsor Stat
NT PROJECT MA
ity
ion Strategy:
ze teamworbusiness anance to maint, to mitigate
gency Plan: OC Director anSMT if neces
ity
ion Strategy:
oratively to eers; this will systems as t
gency Plan: Eds, includingr during planocumentatiostem capabil
ANIZATIO
nagement an
GANIZATION
xation and Repartment
te Land Offic
ANAGEMENT PL
Impa
Med
Continue tok and commalysis, documtain interface any defects
Outstanding nd SLO Chiefssary.
Impa
High
Work with ensure crossensure sustthey are dep
Employ agileg regular scrunning and imn supports alities.
ONAL STR
nd end users
N
evenue
ce
LAN
act
dium
o work withmunication. Pmentation, aes with currs and to sup
issues will bf Informatio
act
h
Tri‐Agency functionalitainability ofployed
e project manums, to assumplementatall aspects o
RUCTURE
s who are im
TITLE
Cabinet Se
CommissiLands
SLO IT to Participate inand quality rent ONGARDpport end us
be escalated on Officer, an
participantsty among teaf current and
nagement ure knowledion. Ensure f the project
mpacted
ecretary
oner of Pub
8
n
D ers.
to nd
am d
ge
t
lic
REVISION: 3
NAME
F. David
John Mo
Rich Pres
Joe Mont
Jim Wast
Martin D
Tony Hof
Cathy Plu
Jeff Bjark
Danny M
Ed Marti
Cynthia M
James W
EMNRD
SLO
TRD Oil &Bureau
TRD ASD
3.3
ST
Martin Ex
nforte (SM
ston (SM
tano (SMEM
tvedt TR
Davis SL
ffman ONCe
ummer TR
ke SM
Martinez SM
n SM
Melton SM
Whitaker SM
Us
Us
& Gas Us
Us
ONGAR
TAKE IN PRO
xecutive Spo
MT) Systemanagement
MT) Systemanagement
MT) Systemanagement MNRD CIO
RD CIO
LO CIO
NGARD Serventer
RD IT
ME contribut
ME contribut
ME Contribu
ME Contribut
ME Contribu
sers of syste
sers of syste
sers of syste
sers of syste
RD REPLACEME
OJECT ORG
onsor EneNatDep
Team
TaxDep
Team
Stat
Team
EM
TRD
SLO
vice OSC
OSC
tor TRDComBur
tor SLO
tor SLO
tor SLO
tor EM
em
em
em
em
NT PROJECT MA
GANIZATION
ergy, Mineratural Resourpartment
xation and Repartment
te Land Offic
NRD IT
D IT
O IT
C
C
D Audit and mpliance Oilreau
O Royalty Bu
O
O Royalty Bu
NRD IT
ANAGEMENT PL
N
als and rces
evenue
ce
& Gas
reau
reau
LAN
TITLE
Cabinet Se
Deputy Se
Deputy Co
Chief InforOfficer
Chief InfoOfficer
Chief InforOfficer
Director
ONGARD Manager
Bureau Ch
Bureau Ch
Senior Eng
Deputy Di
ITO ApplicManager
ecretary
ecretary
ommissioner
rmation
rmation
rmation
Project
hief
hief
gineer
rector
cations
9
r
REVISION: 3
NAME
TRD Tax
TRD RPDEntry Bu
DFA
LFC
DoIT
2.2 PROJE
2.2.1 DES
3.3
ST
Policy Us
Data reau
Us
Us
Us
Sem
CT GOVER
SCRIBE THE ORG
ONGAR
TAKE IN PRO
sers of syste
sers of syste
sers of syste
sers of syste
ervice providainframe
RNANCE ST
GANIZATIONAL
RD REPLACEME
OJECT ORG
em TRDSec
em TRDDiv
em DFA
em LFC
der for DepInfoOpe
TRUCTURE
L STRUCTURE –
NT PROJECT MA
GANIZATION
D Office of thcretary
D Returns Prision
A revenue fo
C revenue fo
partment of ormation Teerations
E
– ORG CHART
ANAGEMENT PL
N
he
rocessing
orecast
recast
chnology
LAN
TITLE
10
REVISION: 3
2.2.2 DES
ROLE
Executive
System ManagemTeam
Project M
SME Tea
3.3
SCRIBE THE ROL
e Sponsor
ment
Manager
m
ONGAR
LE AND MEMBE
RESPONSIBILI
Attend
Approv
Commu
Champi
Review,
Review architec
Ensure
Review delivera
Support
Ensure
Particip
Commu
Champi
Contrib
Recomm
Commu
Develop
Provideexpecta
Manage
Facilitatissues lo
Manage
Report
Promot
Facilitat
Develop
Value te
Recomm
Champi
The Pro
RD REPLACEME
ERS OF THE PRO
ITY
executive re
e project pla
unicate with
ion the Proje
, approve an
and approvcture recom
project staff
and provideables
t the Project
user particip
pate in plann
unicate with
ion the Proje
ute to Lesso
mend go/no
unicate with
p initial man
e leadership ations
e contractua
te meetings,og
e schedules
on project s
te and practi
te requireme
p and chroni
eamwork, co
mend go/no
ion the Proje
oject Team m
NT PROJECT MA
OJECT STEERIN
eviews as sch
ans progress
other agenc
ect!
nd execute p
e recommenmendations
f availability
e input to pr
t Manager
pation
ning
respective a
ect!
ons Learned
go based on
the Executiv
nagement pla
for a coordi
al services
, assign task
tatus
ice change m
ents develop
icle Lessons
ooperation a
go based on
ect!
member is an
ANAGEMENT PL
G COMMITTEE
heduled by t
s
cies’ Executi
project docu
ndation to ms of SMT me
y, funding an
roject artifac
agency rega
n status
ve Sponsors
an and proje
nated proje
ks, track actio
managemen
pment; med
Learned
and planning
n status
n important
LAN
E
the SMT me
ive Sponsors
ments as re
move to newmbers and S
nd contract m
cts, including
rding status
s and SMT
ect plan
ct effort; ma
on items, an
t
diate dispute
g
role in that
embers
s as needed
quired
w system SMEs
managemen
g contractor
and progres
anage
nd maintain
es
it is the link
11
t
r
ss
k
REVISION: 3
ROLE
Member
2.3 EXECU
At the reand the prequesteadditionarequired
The mee
SMT
addre
Full S
mont
agen
includ
depe
meet
agen
meet
mana
SMT
hoste
CIO o
to tec
3.3
UTIVE REPO
quest of theproject maned. The SMTal participan.
ting times a
working ses
essed by the
SMT meeting
th @ 1330 M
da, supporti
ding a recor
nding on the
ting time and
da or may re
ting minutes
ager, and po
Technical Su
ed at EMNRD
of each Tri‐A
chnical decis
ONGAR
RESPONSIBILI
betwee
membe
Attend
capacity
respect
Particip
Accomp
Assist o
Represe
Report
Recomm
Contrib
ORTING
e SMT, most ager only, anT has designants from the
nd distributi
sions may in
e SMT.
gs will be he
Mountain Tim
ng documen
d of attenda
e depth of is
d accepted t
equire a spe
s in a timely
osted to the
ubcommitte
D in its IT Co
Agency and a
sion points.
RD REPLACEME
ITY
en the vision
ers’ responsi
and particip
y of a techni
tive agency
pate in the p
plish and pro
or support sy
ent specific a
progress, iss
mend go/no
ute to lesso
of its meetind will incluated a montTri‐Agencies
ions of meet
nclude a form
ld on a regu
me) through
ntation if ne
ance. The tim
ssues to be c
to be postpo
cial meeting
fashion, and
project Shar
e meetings w
onference Ro
additional IT
The commit
NT PROJECT MA
and the rea
bilities inclu
pate in meet
ical or busin
lanning proc
ovide input t
ystem testing
area(s) for th
sues, etc.
based on st
ns learned
ngs will be wde the Tri‐aghly session as, DoIT, IV&V
ting minutes
mal agenda,
lar schedule
out the proj
cessary, and
me allocated
covered. Ite
oned may be
g. Every atte
d the minute
rePoint site.
will be held
oom. The Te
participants
ttee will rev
ANAGEMENT PL
ality of the p
ude:
tings, review
ess represen
cess
to deliverab
g activities a
he overall pr
tatus
working sessgency CIO’s as a Full SMTV, and addit
s for the pro
depending
e (currently,
ject. Full SM
d will result i
d to each ag
ems not able
e added to th
empt will be
es will be dis
weekly, on F
echnical Sub
s to review,
view researc
LAN
project. The
w all docume
ntative for h
les
as required
roject as ass
sions amongand/or specT meeting thtional partici
oject are as f
on the topic
the fourth T
MT meetings
in meeting m
genda topic w
e to be cover
he next stan
made to pu
stributed by
Friday morn
committee w
evaluate an
h, documen
Project Team
nts in the
his/her
signed
g SMT membcific SME’s ahat will incluipants as
follows:
c(s) being
Tuesday of t
will include
minutes,
will vary
red within th
nding meetin
ublish the
the project
ings, 9:00 a.
will include
d provide in
tation, cont
12
m
bers s ude
he
an
he
ng’s
.m.
the
put
ract
REVISION: 3.3 ONGARD REPLACEMENT PROJECT MANAGEMENT PLAN 13
deliverables and SOWs, participate in Q&A sessions with consultants, and provide
recommendations to the SMT as needed on contracts and decisions that impact the Tri‐
Agency enterprise. Individual agency technology choices may not require the committee’s
involvement or feedback.
Project Team and Contractor/Vendor Meetings will be scheduled as needed, and during the
DEFINE (requirements), DESIGN, DEVELOP, and DEPLOY project phases may be managed as
daily scrums at the discretion of the project manager. Action items, issues and risk logs will
be tracked in the project status report, and distributed by the project manager as needed.
The project manager will approve deliverables with the sign‐off of the SMT, and will provide written acceptance, including but not limited to email, and archive the documentation.
Issues and/or risks should be reported at the earliest possible time so that corrective action or risk mitigation can be explored immediately. The project manager will maintain an issue tracking log, will work with the project team for corrective action, to facilitate timely review, and report to the SMT. The SMT will coordinate review, approval and execution of critical project documents with the Executive Sponsors as required.
3
REVISION: 3
3.0 SCOPE
3.1 PROJE
Governpriori
ONGA
Replac
t supp
the
Govern
priorit
“Balan
the Bu
since t
system
collect
approx
ely 25%
all Stat
revenu
3.3
E
CT OBJECT
or’s ty
RD
cemen
orts
nor’s
y of
ncing
udget”
the
m
ts
ximat
% of
te
ue
In
te
m
e
d
q
g
s
w
c
a
e
d
Im
o
in
th
e
m
im
st
e
b
in
te
sy
C
im
in
te
re
o
ONGAR
TIVES
Alignment o
DoIT
nformation
echnology
must drive
efficient
delivery of hig
quality
government
ervices that
will benefit
onstituents
nd support
economic
development
mprove value
of the IT
nvestment
hrough
enterprise
models that
mprove and
treamline the
executive
branch’s
nformation
echnology
ystems
Continuous
mprovement
nformation
echnology an
esource
optimization
RD REPLACEME
of Tri‐Agency
EM
gh
e
e
in
nd
Utiliz
explo
enha
of te
or bu
proc
inclu
imple
n of
softw
solut
incre
agen
to im
oper
work
Integ
mod
adm
syste
Cons
redu
syste
singl
meth
Auto
outd
syste
NT PROJECT MA
y and State St
MNRD
ze and
ore new or
anced uses
echnology
usiness
esses
uding the
ementatio
integrated
ware
tions to
ease the
ncy’s ability
mprove
rations and
k flow
grate and
ernize
inistrative
ems
solidate
ndant
ems into
e delivery
hods
omate
ated
ems
ANAGEMENT PL
trategic Obje
SLO
Informat
Technolo
a corner
of the St
Land Off
Blending
ONGARD
Geograp
Informat
System (
data will
enable th
State Lan
Office an
public to
online m
of well
locations
lease
locations
areas of
explorat
and
developm
This form
will help
State Lan
Office m
decisions
natural
resource
managem
LAN
ectives
tion
ogy is
stone
tate
fice
g
D and
phical
tion
(GIS)
l
he
nd
nd the
o view
maps
s,
s, and
ion
ment.
mat
the
nd
make
s on
e
ment
TRD
Improve
support for a
TRD
information
technology
systems,
collaborating
with business
divisions for
lower level
technical and
business
support
Minimize
systemic
infrastructur
risks. (Busine
Continuity,
Disaster
Recovery,
Security)
Plan acquisit
implement,
maintain and
refresh the
technologica
infrastructur
necessary to
support
excellent
delivery of IT
services
14
all
g
s
d
e
ess
ion,
d
l
e
T
REVISION: 3
3.1.1 BUSINE
NUMBER
BUSINESS
BUSINESS
BUSINESS
BUSINESS
3.1.2 TECHNI
NUMBER
TECHNICA
TECHNICA
TECHNICA
TECHNICA
3.2 CRITIC
Identify tunderstaBusiness See also
3.3
ESS OBJECTIVES
R
S OBJECTIVE 1
S OBJECTIVE 2
S OBJECTIVE 3
S OBJECTIVE 4
CAL OBJECTIVE
R
AL OBJECTIVE
AL OBJECTIVE
AL OBJECTIVE
AL OBJECTIVE
CAL SUCCES
the critical sanding the abOwner, as wsection 6.7 Q
ONGAR
S
DESCRI
1 Accuratof New
2 Supporaccoun
3 Enable Fund an
4 Deploy sustainthe Sta
ES
DESCRI
E 1 Captureto supproyaltietracking
E 2 Deploy agile anprocess
E 3 Improvamong exchan
E 4 Implemcomply
SS FACTOR
uccess factobility of the well as the aQuality Obje
RD REPLACEME
IPTION
tely and conw Mexico.
rt state and fting, collect
accurate annd to severa
an ONGARDable to suppte.
IPTION
e and managport the collees. Improve g system tra
an ONGARDnd flexible toses among t
ve processes Tri‐Agency sge specificat
ment a replacy with agency
RS
ors for achievproject to mbility of the ectives and C
NT PROJECT MA
nsistently col
federal reguion and dist
d timely distance tax and
D Replacemeport the evo
ge the right ection and dthe ability t
ansactions.
D Replacemeo support chhe Tri‐Agenc
and operatisystems, viation.
cement systey security di
ving successmeet the endproject teamControls.
ANAGEMENT PL
llect oil and
latory changribution.
tribution of royalty Ben
ent system tlving needs
data at an adistribution oto capture cu
ent system thanges or encies.
ing efficienca a common,
em that maiirectives.
s in this projed goals of them to stay wi
LAN
gas revenue
ges that imp
revenue to neficiaries.
that is scalabof the Tri‐ A
appropriate lof severanceurrent and h
that is well anhanced bus
cy by data ex, standardize
intains audit
ect. Metricse Executive thin schedu
e for the Stat
pact revenue
the General
ble and Agencies and
level of detae taxes and historical dat
architected, iness
xchange ed data
t logs to
s are key to Sponsor andle and budg
15
te
e
d
ail
ta
d the et.
4
REVISION: 3
NUMBER
QUALITY
QUALITY
QUALITY
QUALITY
4.0 PROJE
4.1 PROJE
4.1.1 PRO
Project Dmethodoproduct r
Project C
Certifica
3.3
R
METRIC 1
METRIC 2
METRIC 3
METRIC 4
ECT DELIV
CT MANAG
OJECT MANAG
Deliverables ology requirerequirement
Charter
tion Form
ONGAR
DESCRI
Functiofuture sdistribu
ProcureONGARpropos
Currentworkflo
Uninter
VERABLES
GEMENT L
EMENT DELIVE
are work proements and ts of the pro
The PprojepermCertiComplann
The submIt detopicprojeprep
RD REPLACEME
IPTION
onal and datastate of Oil aution.
ement instruRD Replacemals are recei
t documentaow and valid
rrupted trac
S AND ME
LIFE CYCLE
ERABLES
oducts or arstandard project.
Project Charect, the govemission to prification is umittee with ning to certi
Request fomitted wheneals with thecs that indicect. Many oparation of th
NT PROJECT MA
a exchange and Natural
uments, inclment systemsived.
ation is matcdated by all S
king and dis
ETHODOL
rtifacts that aoject manag
rter for Certiernance struroceed with sed to proviadequate kfy the initiat
or Certificat a project goe financial ascate the leveof the questhe project ch
ANAGEMENT PL
requiremenGas revenue
uding, but ns, are posted
ched againstSME’s.
stribution of
LOGY
are driven bgement prac
ification setsucture, and wthe project.de the Projenowledge oftion phase o
tion and Roes for any spects of thel of plannitions have bharter
LAN
ts accuratelye collection
not limited tod and respo
t business p
oil and gas
by the projecctices regard
s the overallwhen signed The Projecect Certificatf the projectof the projec
elease of Fof the certife project, ang that hasbeen incorpo
y define theand
o RFP(s), fornsive
rocess
revenue.
ct managemdless of the
l scope for thd is consideret Charter fortion t and its ct
Funds formfication phass well as ots gone into orated into
16
r
ent
he ed r
m is ses. her the the
REVISION: 3
Project MPlan
IT Servic
Project S
Project C
4.1.2 PRO
RequiremDocume
Design D
Systems
Systems
3.3
Managemen
e Contracts
Schedule
Closeout Rep
ODUCT DELIVER
ments nts
Documents
Specificatio
Architectur
ONGAR
nt The Pthe eplannprojedocucommscopadditcommacqu
The DPurctemp
A tooassigmiles
port DoITcloseproc
RABLES
The r“DEFand RReturequsyste
Requspec
ons Systeconf
re An oexchphas
RD REPLACEME
Project Manexecutive spning phase uect close. Thument plannmunication e, cost and stional plans municationsuisition, and
Departmenthasing Divisplate for all I
ol used to ingned resourcstones. The
T’s template,ed. Project ess.
requirementFINE” phase.Royalty applrns Manageirements foems, e.g., DF
uirements wifications du
em and exchiguration du
verall architange, maintse.
NT PROJECT MA
nagement Plaonsors and Tused to manhe primary uing assumptamong stakeschedule bafor issue escs, deliverablerisk manage
t of Information of GenerIT related co
dicate the pces for perfo standard is
, used to reqclosure is th
ts will be co Functionallication will ement, Auditr data exchaFA SHARE.
will be transfouring the “DE
hange specifuring the “DE
tecture will btenance and
ANAGEMENT PL
an is a formaTri‐Agenciesnage project uses of the ptions and deeholders, anselines. A pcalation, chae review andement.
tion Technolral Services ontracts.
planned dateorming activiMicrosoft P
quest that thhe last phase
nfirmed and requiremeninclude all st and Complange among
ormed into aESIGN” phas
fications willEVELOP” pha
be develope preservatio
LAN
al documents SMT, develexecution, c
project plan ecisions, facind to documroject plan iange controld acceptance
logy and thehave establi
es, dependeities and forProject.
he project bee of the certi
d refined durnts for the Seystem moduiance, and aTri‐Agency
application ase.
drive codinase
d to facilitaton during the
t approved bloped in thecontrol, and are to litate ent approveincludes l, e, staff
e State ished a
ncies, and r meeting
e officially ification
ring the everance Taules, e.g., also include and externa
and exchang
g and
te informatioe “DESIGN”
17
by
ed
ax
al
ge
on
REVISION: 3
System aTesting
4.1.3 DEL
Delivera
All Deliv
System aTesting R
4.1.4 DEL
Delivera
System aTesting
4.2 PRODU
During thdevelopm
4.2.1 MA
PROPOSED M
MAJOR PR
MEASURE
Function Po
Develop spnumber ex
Printing Propoint of fai
Industry Ou
RFI develop
3.3
and Accepta
LIVERABLE APP
ble
erables
and AcceptaResults
LIVERABLE ACC
bles
and Accepta
UCT LIFE C
he project mment lifecycl
AJOR DELIVERA
MAJOR DELIVER
ROJECT DELIVER
oint Analysis
pecifications anpansion and h
ocess analysis lure in ONGAR
utreach
pment
ONGAR
ance Testiand wrequ
PROVAL AUTHO
Appr
PM,
ance PM,
CEPTANCE PRO
Afterthe pwriti
ance Afterforwman
CYCLE
management le methodol
ABLES AND PER
RABLE SCHEDULE
RABLE AND PE
nd design docuorizontal drillin
and removal oRD notice gene
RD REPLACEME
ing will take will include ired, as well
ORITY DESIGNA
roval Autho
SMT
Subject mat
CEDURE
r deliverableproject manang to the co
r any testingwarded and ragement ap
lifecycle, agogy approve
RFORMANCE M
E AND PERFORM
RFORMANCE
mentation forng requiremen
of windows 95 ration workflo
NT PROJECT MA
place duringunit testing,l as user acc
ATIONS
rity
tter experts,
es are submiager and SMontractor.
g conducted eviewed witproval prior
gencies shalled by the De
MEASURES
ANCE MEASURE
API nts.
single ow
ANAGEMENT PL
g deployme, parallel andeptance tes
Tri‐Agency
itted, and reMT, the appro
on the systeth the projecr to deploym
select and iepartment o
E
BUDGET
$ 36,768.00
$ 89,514.00
$ 129,828.43
$ 6,567.63
$ 48,684.38
LAN
nt (the “DEPd regressionting.
IT Managem
eviewed andoval will be
em, test resuct team, for
ment.
implement aof Informatio
DUE DATE
0 Complete
0 Complete
3 Complete
3 Complete
8 Complete
PLOY” phase testing as
ment
accepted byprovided in
ults will be Tri‐Agency I
a phased proon Technolog
PROJECT P
Planning
Planning
MainframeStabilizatio
Planning
Planning
18
e)
y
IT
oduct gy.
PHASE
e on
REVISION: 3
PROPOSED M
MAJOR PR
MEASURE
Supplemenon Businesupdate of O
COBOL devarchiving, wcorrections
DBA Mode
Contractor Process An
Business PrRequiremePartitioningexchanges,requiremen
IV&V
Business Im
SharePoint
ProfessionaRoyalty Sys
Exchange sSeverance
Environmeimplement
Severance contract
Total Plann
Develop an
Develop an
Develop anPhase 2
Develop anexchange a
Project Clo
3.3
MAJOR DELIVER
ROJECT DELIVER
ntal staffing sups Process AnalONGARD funct
velopers to supweb presentatis, database and
rnization and L
to assist in dealysis
rocess Analysisents 2 added Deg, Data Archite, Definition of Mnts and ShareP
mpact Analysis
t Migration to O
al Services Prostem)
specification anand Royalty sy
ntal provisioniation
Tax licenses, m
ning and Main
nd Deploy Seve
nd Deploy Roya
nd Deploy Land
nd Deploy middamong Tri‐Agen
se‐out
ONGAR
RABLE SCHEDULE
RABLE AND PE
pport for Tri‐Aysis; ONGARD tion point analy
pport LIMS inteion of forms, sd system suppo
LIMS Support
velopment of
s (BPA). Suppleecember 2015ecture definitioMaster Data MPoint migration
and Disaster R
OSC site
curement Sup
nd conversion/ystems
ng at TRD to s
maintenance, a
frame Stabiliza
erance Tax Syst
alty System
d Information M
dleware to supncy systems
RD REPLACEME
E AND PERFORM
RFORMANCE
Agencies to allodatabase suppysis.
erface, printingervice requestort
RFP for Busine
emental SOW f: Requirementon, To‐Be inforManagement n.
Recovery
port (RFP Proc
/migration sup
upport Severa
and planning se
ation
tem
Management S
pport informati
NT PROJECT MA
ANCE MEASURE
ow work port;
g and ts, data
ess
for ts mation $
$
$
$
cess for $
port, $
nce Tax $
ervices $
$
System
ion
ANAGEMENT PL
E
BUDGET
$ 161,070.26
$ 643,765.61
$ 206,743.90
$ 17,344.00
$ 1,107,695.74
$ 71,854.64
$ 60,000.00
$ 48,025.75
$ 53,029.80
$ 54,156.25
$ 719,327.00
2,661,624.61
6,116,000.00
TBD
TBD
TBD
TBD
TBD
LAN
DUE DATE
6 6/30/16
1 6/30/16
0 12/31/16
0 Complete
4 Complete
4 6/30/16
0 Complete
5 6/30/16
0 6/30/16
5 6/30/16
0 6/30/16
1 6/30/16
0 6/30/16
D TBD
D TBD
D TBD
D TBD
D TBD
PROJECT P
Planning
MainframeStabilizatio
MainframeStabilizatio
Planning
Planning
Planning
MainframeStabilizatio
Planning
Planning
Planning
Planning
Planning
Planning
Implement
Implement
Implement
Implement
Close‐out
19
PHASE
e on
e on
e on
tation
tation
tation
tation
5
REVISION: 3
4.2.2 PRO
Product Dmethodoproduct r
Requirem
Design D
Systems
Systems
System a
Operatio
5.0 PROJE
5.1 WORK
Task Na
DEFINE
DecisH
Presto
3.3
ODUCT AND PR
Deliverablesology requirerequirement
ments Docu
Documents
Specificatio
Architectur
and Accepta
ons requirem
ECT WORK
K BREAKDO
me and De
E
ion Point onHybrid Appro
sent Technoo PCC
ONGAR
RODUCT DEVEL
s are work prements and ts of the pro
ments
ons
re
ance Testing
ments
K
OWN STRU
escription
n Technologyoach
ology Recom
RD REPLACEME
LOPMENT DELI
roducts or astandard project.
The requi“DEFINE” Severancesystem mComplianexchangeDFA SHAR
Requiremexchange
System anconfigura
An overalinformatiduring the
g Testing wphase) antesting as
Standard for the TrManagemmanagem
UCTURE (W
y:
mendation
NT PROJECT MA
VERABLES
rtifacts thatoject manag
rements wilphase. Fune Tax and Ro
modules, e.g.,ce, and also among Tri‐ARE.
ments will be specificatio
nd exchangetion during t
l architecturon exchangee “DESIGN”
will take placend will includs required, a
Operating Pri‐Agency Enment Plan to ment among
WBS)
Deliver
PowerP
ANAGEMENT PL
t are driven bgement prac
ll be confirmnctional requoyalty applic, Returns Mao include reqAgency and
e transformeons during th
e specificatiothe “DEVELO
re will be dee, maintenaphase.
e during depde unit testins well as use
Procedures (terprise, alosupport datthe particip
rable
oint Present
LAN
by the productices regard
med and refinuirements focation will inanagement,quirements fexternal sys
ed into appliche “DESIGN”
ons will driveOP” phase
eveloped to fnce and pre
ployment (thng, parallel aer acceptanc
SOP’s) will bong with a Mta exchangepating system
tation
uct managemdless of the
ned during tor the nclude all , Audit and for data stems, e.g.,
cation and ” phase.
e coding and
facilitate servation
he “DEPLOY”and regressice testing.
be developeMaster Data and changems.
20
ment
the
d
” on
d
e
REVISION: 3.3 ONGARD REPLACEMENT PROJECT MANAGEMENT PLAN 21
Task Name and Description Deliverable
Present C‐2 and technology recommendation to LFC
PowerPoint Presentation
Requirements Phase 1: BPA Analysis & AS‐IS Exchange Model
Functional Requirements and Exchange Model
Requirements Phase 2: Parse Requirements and Data Architecture
Partition Requirements by System MS Access Database with System, Subsystem,
Process, Business Rules
Data Architecture for Data to be Exchanged
TO‐BE Analysis and Data Model Activity Diagrams illustrating exchanges and
objects exchanged among systems
TO‐BE Information Exchanges
UML diagram illustrating objects exchanged among systems, associations, cardinality, min/max occurs, data structure spreadsheet ordered by namespace, data element dictionary, XML schema
Refine Data Model following mapping and data conversion
Final Data Model, including all artifacts identified above
Master Data Management Requirements
Master Data Management Plan
Tri‐Agency SharePoint Collaboration Site State‐Owned SharePoint Site
Knowledge Transfer Documentation for site provisioning and site
collections
DESIGN
Sub Project A: Data Warehouse/Middleware
Research Options for Integration Architecture
Research documentation
Acquire Garter Magic Quadrant/resource session
Gartner Reports
Support from System Architect/Integrator Contractual Instrument
Site assessment and Produce Report On‐site meetings and Integration Assessment
Present architectural recommendations, Q&A
Q&A session
Create Architecture Design Design Artifact
Procure Hardware, Tools and Licenses Contractual instruments, Purchase Orders
Deploy Integration Architecture Deployment Plan
REVISION: 3
Task Na
Te
Sub P
DrafSe
NegSe
Publish S
Proj
Prod
Map
Sub P
Iden
Req
ReR
Dr
Re
Pu
Prod
Q&A
Revsp
Rev
Awa
Proj
Prod
Map
DEVELOP
D
D
D
3.3
me and De
est Integratio
Project B: Sev
ft Sole Sourceverance Ta
gotiate and Feverance Ta
Sole Source J
ject Kickoff
duce Project
pping and Da
Project C: Ro
ntify potenti
uest for Pro
eview and Fioyalty Syste
raft RFP
efine and fin
ublish RFP
duce Respon
A with Respo
ise/clarify repecification
iew and sco
ard Contract
ject Kickoff
duce Project
pping and Da
P/DEPLOY
Develop/Dep
Develop/Dep
Develop/Dep
ONGAR
escription
on Architect
verance Tax
ce Justificatix Module
Finalize Contx Vendor
Justification
t Schedule
ata Convers
yalty Modul
al Royalty V
oposal
nalize Requiem
alize RFP
nse to RFP
ondents
equirementsas required
re response
t for Royalty
t Schedule
ata Convers
ploy Severan
ploy Severan
ploy Royalty
RD REPLACEME
ure
Module
on for
tract with
ion
e
Vendors
irements for
s
(s)
System
ion
ce Phase 1
ce Phase 2
NT PROJECT MA
Deliver
Test Pla
Sole Sou
Contrac
SPD Sole
Kickoff M
Severan
Mappin
r Function
Draft RF
Final RF
RFP and
Respons
TCs andq
TCs andq
Scoring
Contrac
Kickoff M
Royalty
Mappin
Source
Source c
Source c
ANAGEMENT PL
rable
an
urce Justifica
ctual Instrum
e Source Jus
Meeting
nce Tax Syste
g artifact, re
nal and Data
FP
FP
d contacts fo
se(s) to RFP
/or correspoquestions on
/or correspoquestions on
sheet
ctual instrum
Meeting
System Proj
g artifact, re
code, Deplo
code, Deplo
code, Deplo
LAN
ation
ment
stification
em Project S
evised data m
a Exchange R
or each vend
ondence to an requireme
ondence to an requireme
ment(s)
ject Schedul
evised data m
oyment and
yment and T
yment and T
Schedule
model
Requiremen
dor
address ents
address ents
le
model
Test Plans
Test Plans
Test Plans
22
ts
REVISION: 3
5.2 SCHED
Task Name
Decisio
RequireModel
RequireExchange A
Partit
Data A
TO‐
TO‐
Mas
ONGA
Sub Pro
Sub Pro
Draft
Negot
Publis
Projec
Produ
Confi
Sub Pro
Devel
Produ
Q&A
Revise
Revie
Award
Projec
Produ
Confi
DEVELOP/
DEVELOP/
DEVELOP/
3.3
DULE ALLO
e
n Point on Tec
ements Phase
ements Phase Architecture
tion Requireme
Architecture fo
BE Analysis an
BE Information
ster Data Mana
ARD SharePoin
oject A: Data W
oject B: Severa
Sole Source Ju
tiate and Final
sh Sole Source
ct Kickoff
uce Project Sch
rm Requireme
oject C: Royalty
lop and publish
uce Response t
with Responde
e/clarify requir
w and score re
d Contract for
ct Kickoff
uce Project Sch
rm Requireme
DEPLOY Severa
DEPLOY Royalt
DEPLOY Severa
ONGAR
CATION ‐
chnology: Hybr
1: BPA Analysi
2: Parse Requi
ents by System
or Data to be E
d Data Model
n Exchanges
agement Requ
nt Collaboration
Warehouse/Mid
nce Tax Modu
ustification for
ize Contract w
with SPD
hedule
nts, Mapping,
y Module
h Request for P
to RFP
ents
rements specif
esponse(s)
Royalty System
hedule
nts, Mapping,
ance Phase 1
ty
ance Phase 2
RD REPLACEME
PROJECT T
rid Approach
s, AS‐IS Exchan
rements, Data
m
Exchanged
uirements
n Site
ddleware
le
Severance Tax
w Severance Tax
Data Conversi
Proposal
fication as requ
m
Data Conversi
NT PROJECT MA
TIMELINE
Dura
15 da
nge 60 da
a85 da
10 da
60 da
35 da
64 da
110 d
85 da
145 d
94 da
x Module 10 da
x Vendor 4 day
22 da
5 day
9 day
on 30 da
141 d
30 da
22 da
10 da
uired 10 da
10 da
5 day
5 day
9 day
on 35 da
150 d
160 d
90 da
ANAGEMENT PL
tion Start
ays Thu 1
ays Thu 1
ays Mon 1
ays Mon 1
ays Mon 1
ays? Fri 2/
ays? Mon 1
days Mon 1
ays Mon 1
days? Mon 1
ays Mon 2
ays Mon 2
ys Mon 3
ays Fri 3/
ys Mon 5
ys Mon 5
ays Fri 5/2
days Mon 3
ays Mon 3
ays Mon 5
ays Wed 6
ays Wed 6
ays Wed 6
ys Wed 7
ys Wed 7
ys Wed 7
ays Tue 8
days Wed 7
days Tue 9
ays Tue 5
LAN
Fi
10/15/15 W
10/1/15 W
1/4/16 Fr
1/4/16 Fr
1/4/16 Fr
12/16 Th
1/4/16 Th
1/4/16 Fr
12/7/15 Fr
11/30/15 Fr
2/22/16 Th
2/22/16 Fr
3/7/16 Th
11/16 M
5/2/16 Fr
5/9/16 Th
20/16 Th
3/7/16 M
3/21/16 Fr
5/2/16 Tu
6/1/16 Tu
6/8/16 Tu
6/22/16 Tu
7/6/16 Tu
7/13/16 Tu
7/20/16 M
/2/16 M
7/6/16 Tu
/20/16 M
/2/17 M
nish
Wed 11/4/15
Wed 12/23/15
ri 4/29/16
ri 1/15/16
ri 3/25/16
hu 3/31/16
hu 3/31/16
ri 6/3/16
ri 4/1/16
ri 6/17/16
hu 6/30/16
ri 3/4/16
hu 3/10/16
Mon 4/11/16
ri 5/6/16
hu 5/19/16
hu 6/30/16
Mon 9/19/16
ri 4/29/16
ue 5/31/16
ue 6/14/16
ue 6/21/16
ue 7/5/16
ue 7/12/16
ue 7/19/16
Mon 8/1/16
Mon 9/19/16
ue 1/31/17
Mon 5/1/17
Mon 9/4/17
23
REVISION: 3
5.3 PROJE
5.3.1 PRO
5.3.2 PRO
ROLE
Executive
System Managem
3.3
CT TEAM
OJECT TEAM O
OJECT TEAM RO
e Sponsor
ment
ONGAR
RGANIZATIONA
OLES AND RESP
RESPONSIBILI
Attend
Approv
Commu
Champi
Review,
Review architec
Ensure
Review
RD REPLACEME
AL STRUCTURE
PONSIBILITIES
ITY
executive re
e project pla
unicate with
ion the Proje
, approve an
and approvcture recom
project staff
and provide
NT PROJECT MA
E
eviews as sch
ans progress
other agenc
ect!
nd execute p
e recommenmendations
f availability
e input to pr
ANAGEMENT PL
heduled by t
s
cies’ Executi
project docu
ndation to ms of SMT me
y, funding an
roject artifac
LAN
the SMT me
ive Sponsors
ments as re
move to newmbers and S
nd contract m
cts, including
embers
s as needed
quired
w system SMEs
managemen
g contractor
24
t
r
REVISION: 3
ROLE
Team
Project M
SME TeaMember
3.3
Manager
m
ONGAR
RESPONSIBILI
delivera
Support
Ensure
Particip
Commu
Champi
Contrib
Recomm
Commu
Develop
Provideexpecta
Manage
Facilitatissues lo
Manage
Report
Promot
Facilitat
Develop
Value te
Recomm
Champi
The Pro
betwee
membe
Attend
capacity
respect
Particip
Accomp
Assist o
Represe
Report
RD REPLACEME
ITY
ables
t the Project
user particip
pate in plann
unicate with
ion the Proje
ute to Lesso
mend go/no
unicate with
p initial man
e leadership ations
e contractua
te meetings,og
e schedules
on project s
te and practi
te requireme
p and chroni
eamwork, co
mend go/no
ion the Proje
oject Team m
en the vision
ers’ responsi
and particip
y of a techni
tive agency
pate in the p
plish and pro
or support sy
ent specific a
progress, iss
NT PROJECT MA
t Manager
pation
ning
respective a
ect!
ons Learned
go based on
the Executiv
nagement pla
for a coordi
al services
, assign task
tatus
ice change m
ents develop
icle Lessons
ooperation a
go based on
ect!
member is an
and the rea
bilities inclu
pate in meet
ical or busin
lanning proc
ovide input t
ystem testing
area(s) for th
sues, etc.
ANAGEMENT PL
agency rega
n status
ve Sponsors
an and proje
nated proje
ks, track actio
managemen
pment; med
Learned
and planning
n status
n important
ality of the p
ude:
tings, review
ess represen
cess
to deliverab
g activities a
he overall pr
LAN
rding status
s and SMT
ect plan
ct effort; ma
on items, an
t
diate dispute
g
role in that
project. The
w all docume
ntative for h
les
as required
roject as ass
and progres
anage
nd maintain
es
it is the link
Project Team
nts in the
his/her
signed
25
ss
k
m
REVISION: 3
ROLE
5.4 STAFF
5.4.1 PRO
Entity
System Ma
State Land
Energy, MNatural Re
DepartmeRevenue
ONGARD
DoIT
3.3
PLANNING
OJECT TEAM
anagement Te
d Office
inerals and esources Divisi
nt of Taxation
ONGAR
RESPONSIBILI
Recomm
Contrib
G AND RES
eam Rich Pr
Joe Mo
John M
Martin
Danny
ion James
Scott D
and Jim Wa
Jeff Bja
Natalie
Aysha
Elizabe
Ron Ga
Muthu
Tony H
Cathy P
Robin J
Mike B
Darsha
RD REPLACEME
ITY
mend go/no
ute to lesso
SOURCE AC
Name
reston
ontano
Monforte
n Davis
Martinez
Whitaker
Dawson
astvedt
arke
e Smith
Mora
eth Sanchez
allegos
u Bala
Hoffman
Plummer
Jacobs
Baca
ana Kanabar
NT PROJECT MA
based on st
ns learned
CQUISITIO
rpre
joe.m
John.M
md
dmar
james
Scott
Jim.W
Jeffre
nata
aysh
Elizabet
ron.g
mut
tony.
Cathy
Robin
Mik
Darshan
ANAGEMENT PL
tatus
ON
montano@state
Monforte@state
s.whitaker@stat
t.Dawson@state
Wastvedt@state
ey.Bjarke@state
lie.smith@state
ha.mora@state.
thT.Sanchez@sta
gallegos@state.
thu.bala@state.
.hoffman@state
.Plummer@stat
nL.Jacobs@state
na.Kanabar@sta
LAN
.nm.us
.nm.us
e.nm.us
nm.us
e.nm.us
te.nm.us
e.nm.us
e.nm.us
e.nm.us
e.nm.us
nm.us
ate.nm.us
.nm.us
nm.us
e.nm.us
te.nm.us
e.nm.us
nm.us
ate.nm.us
Phone
(505) 827‐5
(505) 476‐3
(505) 827‐0
(505) 827‐1
(505) 827‐5
(505) 476‐3
(505) 827‐2
(505) 827‐0
(505) 383‐0
(505) 841‐6
(505) 469‐2
(505) 469‐4
(505) 476‐3
(505) 827‐5
(505) 827‐6
(505) 827‐4
26
e
5764
3280
0322
1218
5757
3300
2289
0954
0169
6659
2806
4296
3172
5816
6115
4484
6
REVISION: 3
Entity
IV&V (POD
5.4.2 NON
DOIT ma
5.5 PROJE
The projeTRD’s Albroom and
5.5.1 PRO
Project teadditionaand main
6.0 PROJE
6.1 RISK A
PMBOK©
Risk: “Anproject’s
Issue: “Aunder dis
Both Risksimilar w
6.1.1 RISK
Issues anduring plcorrectivcorrectivissue or r
SMT Mem
3.3
D Associates)
N‐PERSONNEL
nages the ha
CT LOGIST
ect team is dbuquerque od via confere
OJECT TEAM TR
eam membeal training asntenance, XM
ECT MANA
AND ISSUE
©:
n uncertain e objectives.”
A point or mascussion or o
ks and Issuesways.
K REPORTING A
nd risk manaanning procve action andve action shorisk.
mber
ONGAR
Dan Do
RESOURCES
ardware and
TICS
distributed boffice at the ence call to
RAINING
ers will attens needed. TML, and agile
AGEMEN
MANAGEM
event or con”
atter in quesover which t
s can signific
AND ESCALATIO
gement andcess. Issues d risk mitigatould address
RD REPLACEME
Name
onoghue
d software re
between 310Bank of the ensure team
nd training phe team is ce project ma
NT AND CO
MENT
dition that,
stion or dispthere are op
cant impact
ON STRATEGY
d resolution or risks shoution can be ds both the im
Review andplan, projec
NT PROJECT MA
Dan.Donogh
esources for
0 Old Santa FWest. Meet
m involveme
provided by tconsidering aanagement.
ONTROLS
if it occurs, h
ute, or a poiposing view
a project’s s
help to resould be repordeveloped tmmediate ne
d accept the ct plan and b
ANAGEMENT PL
hue@poddataso
r the ONGAR
Fe Trail, othetings are helnt througho
the Severanadditional tr
S
has a positiv
int or mattews or disagre
success, and
olve those issrted at the eo address weed and the
initial risk asbudget
LAN
olutions.com>
RD Mainfram
er Santa Fe ld in applicaout the proce
ce Tax vendraining in Sha
ve or negativ
r that is not ements.”
d both should
sues or risksarliest possi
with the issueunderlying c
ssessment, m
Phone
(505) 243‐2
me.
locations, anble confereness.
or and arePoint des
ve effect on
settled and
d be handled
s not anticipaible time so e or risk. Thcause of the
managemen
27
e
2287
nd nce
sign
a
is
d in
ated that e
nt
REVISION: 3
Project M
6.1.2 PRO
The ProjeTeam forlog with tissue and
6.1.3 ISSU
6
Issues anduring plcorrectivcorrectivrisk. TheTeam forlog with t
6
The extemethodoguidance
6.2 INDEP
IV&V focdeliverab
The folloInformataccounta
Project/P
Project S
Managem
3.3
Manager
OJECT RISK TRA
ect Managerr corrective athe SMT as rd risk log rev
UE MANAGE
.1.3.1 Intern
nd risk manaanning procve action andve action wile Project Mar corrective athe SMT as r
.1.3.2 Extern
rnal processology that cae and resolut
ENDENT V
cus dependsbles.
wing check tion technoloability the pr
Product Are
Sponsorship
ment Assess
ONGAR
ACKING APPRO
r will keep aaction. The Prequired. Thview at SMT
EMENT
nal Issue Esc
agement andcess. Issues d risk mitigatl address bonager will keaction. The Prequired.
nal Issue Esc
s for an issueannot be restion.
VERIFICATI
s upon the ty
list is based ogy templatroject envisio
a
ment
RD REPLACEME
Conduct iniDevelop plaKeep an issProject TeaProvide an
OACH
n issue and Project Manhe Project Mmeetings.
calation and
d resolution or risks will tion can be dth the immeeep an issueProject Man
calation and
e that involvolved ONGA
ON AND V
ype of projec
on Exhibit Ae. It is incluons:
NT PROJECT MA
tial risk asseans with proue and risk tm for correcissue and ris
risk trackingager will hoanager will a
Resolution
help to resobe reporteddeveloped tediate need e and risk traager will ho
d Resolution
es project reARD will inclu
VALIDATIO
ct, with vario
A of the OCIOded here to
ANAGEMENT PL
essment oject team fotracking log ctive actionsk log review
g log and willd regular realso be resp
Process
olve those isd at the earlio address wand the undacking log anld regular re
n Process
esources, prude the SMT
ON ‐ IV&V
ous emphas
O IV&V Contprovide a h
Includ
Yes
Yes
LAN
or risk and will wor
w at SMT me
l work with eviews of theponsible for p
ssues or risksest possible
with the issuederlying causnd will work eviews of the
rocesses, proT which will
ses on projec
tract Templaigh level of t
de –Yes/No
rk with the
eetings
the Project e issue and rproviding an
s not anticip time so thae or risk. Thse of the issuwith the Proe issue and r
ocedures, orprovide
ct and produ
ate, and the the type of I
28
risk n
pated t e ue or oject risk
r
uct
V&V
REVISION: 3
Project/P
Project M
Risk Man
Change M
Commun
Project E
Subcontr
Quality M
Requirem
6.3 SCOPE
Describeaddress m
6.3.1 Cha
6
A. CdS
B. Cab
1
2
3.3
Product Are
Management
nagement
Managemen
nication Man
Estimating an
ractors and E
Managemen
ments Mana
E MANAGE
the processmanaging st
ange Contro
.3.1.1 Chang
hanges. Anyeveloped byMT.
hange Requccomplish the submitted
. The Pappro
(a)
(b)
(c)
(d)
(e)
(f)
. The SMMana
ONGAR
a
t
nt
nagement
nd Schedulin
External Staf
t
gement
EMENT PLA
s that is goinakeholder e
l
ge Control P
y changes ory the project
est Process.he Charter od that meets
roject Manaoval by the S
The name
A summar
The start d
The reason
The eleme
The impac
MT shall proge within a
RD REPLACEME
ng
ff
AN
ng to be usedxpectations
Process
r revisions tot will only ta
In the evenor Scopes of the followin
ager shall draMT to includ
of the perso
ry of the req
date for the
n and neces
ents to be alt
ct of the cha
ovide a writtmaximum o
NT PROJECT MA
d to manage.
o the Projectke place afte
nt that circuWork as desng criteria:
aft a writtende:
on requestin
uired chang
change;
sity for chan
tered; and
nge.
en decision f ten (10) Bu
ANAGEMENT PL
Includ
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
e the scope o
t Charter or er receipt of
mstances wscribed abov
n Change Req
ng the chang
ge;
nge;
on the Chanusiness Days
LAN
de –Yes/No
of the projec
any Scopes f written app
warrant a chave, a Change
quest for rev
ge;
nge Requests of receipt o
ct. Make sur
of Work proval by the
ange to e Request sh
view and
to the Projeof the Chang
29
re to
e
hall
ect ge
REVISION: 3
6
SMT
Project M
6.4 PROJE
Project boften as
6.4.1 COM
Meeting softwarewill be mto the neto start adepth of accepteda special
ROLE
Executive
SMT
Project M
The mee
At the reand the prequesteadditionarequired
The mee
3.3
Requeapproorigin
.3.1.2 Chang
Manager
CT BUDGE
budget will brequired.
MMUNICATION
agendas, me packages: made to publext regularly and finish onissues to bed to be postpmeeting.
e Sponsors
Manager
ting times a
quest of theproject maned. The SMTal participan.
ting times a
ONGAR
est. All decisoved, becomal Agreemen
ge Control B
Providecontrac
Practice
ET MANAG
be presented
N MATRIX
inutes, and sMicrosoft Wish the meescheduled m
n time. The te covered. Itponed may b
RESPONS
Comnee
Rec
Comesca
Rec
Comsub
nd distributi
e SMT, most ager only, anT has designants from the
nd distributi
RD REPLACEME
sions made e a part of tnt.
Board (CCB)
e managemects or deliver
e change ma
GEMENT
d and finalize
supporting dWord, Excel, Pting minutesmeeting. Antime allocatetems not abbe added to
SIBILITY
mmunicate weded commendati
mmunicate walations commendati
mmunicate wbcommittee,
ions of the m
of its meetind will incluated a montTri‐Agencies
ions of meet
NT PROJECT MA
by the SMT he Agreeme
ent review arables
anagement p
ed through t
documentatPowerPoint,s in a timely ny meeting ced to each ale to be covethe next sta
with other ag
ons of SMT
with the resp
ons SMEs
with SMT, wproject team
meeting min
ngs will be wde the Tri‐aghly session as, DoIT, IV&V
ting minutes
ANAGEMENT PL
are final. Chent and beco
nd accept ch
process as d
the SMT at le
tion will be p, Outlook an fashion andcalled shouldagenda topicered within anding meet
gencies’ Exe
members an
pective agen
working groupms
nutes for the
working sessgency CIO’s as a Full SMTV, and addit
s for the pro
LAN
hange Requeome binding
hanges to pr
described in
east monthl
provided usinnd/or Projectd no later thad have an agc will vary dethe meetingting’s agenda
ecutive Spon
nd SMEs
ncy regardin
ps, technica
e project are
sions amongand/or specT meeting thtional partici
oject are as f
ests, once g as a part of
roject plan,
document
y, and more
ng the followt. Every attean 2 days prgenda, attemepending ong time and a or may req
nsors as
g progress a
l
as follows:
g SMT membcific SME’s ahat will incluipants as
follows:
30
f the
e
wing empt rior mpt the
quire
and
bers s ude
REVISION: 3
SMT
addre
Full S
mont
agen
includ
depe
meet
agen
meet
mana
SMT
hoste
CIO o
to tec
delive
recom
Agen
involv
Proje
DEFIN
daily
be tra
6.4.2 PRO
Status restatus rereports p
6.5 PERFO
Metrics ascheduleaid in platime (sch
6.5.1 BAS
P
Busines
3.3
working ses
essed by the
SMT meeting
th @ 1330 M
da, supporti
ding a recor
nding on the
ting time and
da or may re
ting minutes
ager, and po
Technical Su
ed at EMNRD
of each Tri‐A
chnical decis
erables and
mmendation
cy enterpris
vement or fe
ect Team and
NE (requirem
scrums at th
acked in the
OJECT STATUS R
eports will beports as reqprepared upo
ORMANCE
are collectede, resource uanning and fohedule), cost
SELINES
roject Area
s Process An
ONGAR
sions may in
e SMT.
gs will be he
Mountain Tim
ng documen
d of attenda
e depth of is
d accepted t
equire a spe
s in a timely
osted to the
ubcommitte
D in its IT Co
Agency and a
sion points.
SOWs, parti
ns to the SM
se. Individu
eedback.
d Contractor
ments), DESI
he discretion
e project stat
REPORTS
be used to tquested by ton request a
MEASURE
d for measurusage, and erorecasting fut (budget) an
nalysis S
RD REPLACEME
nclude a form
ld on a regu
me) through
ntation if ne
ance. The tim
ssues to be c
to be postpo
cial meeting
fashion, and
project Shar
e meetings w
onference Ro
additional IT
The commit
icipate in Q&
T as needed
al agency te
r/Vendor Me
GN, DEVELO
n of the proj
tus report, a
rack progrethe Project and by other
EMENT (PR
ring the progrror rates, auture projecnd quality.
Categ
Schedule, Co
NT PROJECT MA
mal agenda,
lar schedule
out the proj
cessary, and
me allocated
covered. Ite
oned may be
g. Every atte
d the minute
rePoint site.
will be held
oom. The Te
participants
ttee will rev
&A sessions
d on contract
echnology ch
eetings will b
OP, and DEPL
ect manage
and distribut
ss and issueManager. Tr contractors
ROJECT ME
gress of a prnd of establcts. At a min
gory
ost, Quality
ANAGEMENT PL
depending
e (currently,
ject. Full SM
d will result i
d to each ag
ems not able
e added to th
empt will be
es will be dis
weekly, on F
echnical Sub
s to review,
view researc
with consult
ts and decis
hoices may n
be schedule
LOY project
er. Action ite
ted by the pr
es. Project These reports.
ETRICS)
roject againsishing a histnimum metr
Measure
Deviation
LAN
on the topic
the fourth T
MT meetings
in meeting m
genda topic w
e to be cover
he next stan
made to pu
stributed by
Friday morn
committee w
evaluate an
h, documen
tants, and p
ions that im
not require t
d as needed
phases may
ems, issues a
roject mana
Team memts will be in
st its plannedorical databrics must be
n from initial
c(s) being
Tuesday of t
will include
minutes,
will vary
red within th
nding meetin
ublish the
the project
ings, 9:00 a.
will include
d provide in
tation, cont
rovide
mpact the Tri
the committ
d, and during
y be manage
and risk logs
ger as neede
bers will proaddition to
d budget, base, which westablished
l schedule,
31
he
an
he
ng’s
.m.
the
put
ract
‐
ee’s
g the
d as
s will
ed.
ovide such
will for
REVISION: 3
P
Req
Integra
Data E
Severad
Rod
Middlew
Front end
Data migratio
6.6 QUALI
Quality Mneeds fothat deteimprovemsummary
3.3
roject Area
quirements
ation Assessm
Exchange Mo
ance Tax sysdeployment
oyalty systemdeployment
ware deploy
nd/User Intedeployment
conversion aon from main
ITY OBJECT
Managemenr which it waermine the qment, withiny in this docu
ONGAR
2 S
ment S
odel S
stem S
m S
yment S
erface S
and nframe
S
TIVES AND
t includes thas undertakequality policyn the qualityument and r
RD REPLACEME
Categ
Schedule, Co
Schedule, Co
Schedule, Co
Schedule, Co
Schedule, Co
Schedule, Co
Schedule, Co
Schedule, Co
D CONTROL
he processesen. It includy, objectivesy system. If arefer to the a
NT PROJECT MA
gory
ost, Quality
ost, Quality
ost, Quality
ost, Quality
ost, Quality
ost, Quality
ost, Quality
ost, Quality
L
s required todes all activits, quality assa separate Qappropriate
ANAGEMENT PL
Measure
deviationadequacy
Deviationdeviationadequacy
Deviationdeviationadequacy
Deviationdeviationadequacy
Deviationdeviationadequacy
Deviationdeviationadequacy
Deviationdeviationadequacy
Deviationdeviationadequacy
Deviationdeviationadequacy
o ensure thaties of the ovsurance, quaQuality Plan appendix.
LAN
n from estimy of artifacts
n from initialn from estimy of artifacts
n from initialn from estimy of artifacts
n from initialn from estimy of artifacts
n from initialn from estimy of artifacts
n from initialn from estimy of artifacts
n from initialn from estimy of artifacts
n from initialn from estimy of artifacts
n from initialn from estimy of artifacts
t the projecverall managality control,is used, incl
ated cost,
l schedule, ated cost,
l schedule, ated cost,
l schedule, ated cost,
l schedule, ated cost,
l schedule, ated cost,
l schedule, ated cost,
l schedule, ated cost,
l schedule, ated cost,
t will satisfygement func and qualityude a high le
32
the ction y evel
REVISION: 3
6.6.1 QUA
Describeand asseobjective
Identify ethe perfotracking t
NUMBER
QUALITY
QUALITY
QUALITY
6.6.2 AGE
The projeexperts hproject, t
ONGARDimportanthe resulimplemeparticipa
6.6.3 PRO
The projewritten a
6.7 CONFI
Configuramemos, version cStandard
3.3
ALITY STANDA
the agency,ssed by the es were achi
each of the pormance of ttool or meas
R
METRIC 1
METRIC 2
METRIC 3
ENCY/CUSTOM
ect managerhave participthe SMT gro
D also has a mnt that all mating directiontation. Thents.
ODUCT DELIVER
ect manageracceptance,
GURATION
ation Managdocuments, control, etc.)ds and team
ONGAR
RDS
, industry orproject. Theeved.
project qualthe actual prsure such as
DESCRI
Uninter
Verificadefinedfollowe
Verificaother, wimpact
MER SATISFACT
r is continuopated in requup has been
major stakehajor system on be comme SMT will c
RABLE ACCEPT
r will approvincluding bu
N MANAG
gement deteetc.) will be) and ownedawareness a
RD REPLACEME
r regulatory pese quality st
ity standardroduct and/os number of
IPTION
rrupted trac
ation that alld and that thed during the
ation that prwith system the legacy m
TION
ously requestuirements dn fully engag
holder in thelevel changeunicated to reate an adv
TANCE PROCESS
ve deliverablut not limited
EMENT
ermines howe managed (td by (e.g., Agare critical.
NT PROJECT MA
project perftandards wil
s that are dior service. Fproject revie
king and dis
l major desighe approvede design and
rocesses andmigration mmainframe s
ting feedbacevelopmentged.
e oil and gas es and impacthe producevisory group
S
es with the d to email, a
w project infotracked, appgency manag
ANAGEMENT PL
ormance stall be used to
irectly relateFor each quaews or Proje
stribution of
gn and deved processes ad developme
d standards amethodologisystem.
ck from the Tt and confirm
producers acts be deciders far in advp including in
oversight ofand archive t
ormation (fiproved, storeging the proj
LAN
andards thato assess whe
ed to the proality standardect Status.
oil and gas
elopment proand standardent project p
are compaties, and do n
Tri‐ Agenciemation. Thro
across the sted upon by vance of anyndustry and
f the SMT, athe docume
les, reports,ed, secured,ject or the C
t will be folloether the qua
oject and nod, identify th
revenue
ocesses are ds are phases.
ble with eacnot negative
s and busineoughout the
tate. It is the SMT, any academic
nd will provntation.
, designs, , accessed, Customer).
33
owed ality
ot to he
ch ly
ess
nd
ide
7
REVISION: 3
6.7.1 VER
The projeSharePoiprocess i
6.7.2 PRO
The new all projecRequiremsystem, sThis Shar
6.8 PROCU
Procuremthe SMT defined i
7. 0 PROJE
Project Cproject amandatofor the Arecordingassignmeprocurem
7.1 ADMIN
Administof verificactivitiesin accordburden ogiven prowork witcomplim
ONGARDfrom pro
7.2 CONTR
Contract verificatihand ove
3.3
RSION CONTRO
ect team wilnt site. Docn SharePoin
OJECT REPOSIT
SharePoint ct artifacts, iments 2 and service requrePoint site i
UREMENT
ments will beto define alln this Projec
ECT CLOS
Close will alwctivities andory step in thAgency/Unit g the last hoents. Contrament audit a
NISTRATIVE CL
trative Closeation that os are adminisdance with tof closing is toject are conh the projecent the proj
D will compleoject, budget
RACT CLOSE
close is simon for contrer process of
ONGAR
OL
l utilize verscument revisnt.
ORY (PROJECT
ONGARD Rencluding butData Exchanests and bugis currently u
MANAGEM
e agreed to al expectationct Managem
SE
ways consist d an externahe project lifthat is respoours against tactual activitnd formal a
LOSE
e occurs at bobjectives anstratively clohe WBS andtoo great anntingent on tct’s project mect’s object
ete a projectt, schedule r
ilar to adminract close. Cof artifacts wi
RD REPLACEME
sion control sions will be
T LIBRARY)
eplacement t not limitednge artifactsg tracking, punder devel
MENT PLA
and approvens and timel
ment Plan.
of administrl vendor is efe cycle. Admonsible for mthe project, ties meet thecceptance o
oth the end d deliverablosed out. Ad should not d audits inacthe project’smanagemenives.
t closure docresults, lesso
nistrative cloontracts for ill be comple
NT PROJECT MA
for all projecaccomplishe
site collectiod to, historics, SMT restriproject manaopment.
AN
ed by the SMlines relative
rative projecemployed. Cministrative managing theand providie contractuaof the projec
of phase anes were metdministrativebe delayed tccurate. Thes complexityt consultant
cument whicons learned,
ose in that itthis phase oete.
ANAGEMENT PL
ct artifacts oed by the ch
on will provical requiremcted area, seagement, mi
MT. The Proje to each ma
ct activities aCompleting bactivities coe project, sung transitional needs, suct work prod
nd end of prot. Acceptance closure octo project ee specific pry and size. Pt to tailored
ch summarizand follow u
t involves prof the projec
LAN
on the collabheck out and
ide several sents, BPA reeparate foldilestones an
ject Manageajor procure
and possiblyboth sets of omplete the uch as lessonn for the stach as executucts.
oject. This cce is formalicurs on a “bnd. At that roject close aProject manaProject Clos
zes deliverabup recomme
oduct and pct will be fina
borative d check in
separate siteequirementsders for eachd schedules
er will work wement activit
y contractuaactivities is internal neens learned, aff to other ting a
closure consized and phaby‐phase” bapoint, the activities foragers shouldse procedure
bles, conclusendations.
process alized and a
34
es for s, h .
with ty as
l a eds
ists ase asis
r a d es to
sions