    Bar or Gantt Charts

    Disadvantages

    Difficult to show the interrelationships between activities. The representation of the construction sequence may give too simple

    picture.

    Networks

    Advantages

    Shows the interrelationships of activities.

    Requires the planner to think logically.

    Critical activities are identified.

    Non-critical activities are identified, this allows the planner to balance

    resources requirements. The effect on future activities of a delay on a previous activities can be easily

    analyzed.

    Effects of delays can be identified and claims by contractor for extension of

    time can be substantiated more easily.

    Suitable for complex and difficult projects

  • 7/28/2019 Project Management Lecture Note 8A1 - Project Scheduling

    3/16

    Networks

    Disadvantages

    Not easily understood by all participants to the contract.

    Updating and redrafting can be time consuming and difficult. Requires the planner and users to have an expert knowledge of the

    construction processes and methods used in the project.

    Line of Balance or Linier Scheduling Method

    Advantages

    Rate of working is clearly shown.

    Information is easily understood.

    Provides good pictorial representation of construction sequences.

    Effect of delays are clearly shown.

    Progress can be recorded easily as an aid to monitoring and control.

    Requirement dates for materials can be easily identified.

    Different rates of output are evident

    Effect of accelerating the activities are clearly shown.

  • 7/28/2019 Project Management Lecture Note 8A1 - Project Scheduling

    4/16

    Line of Balance or Linier Scheduling Method

    Disadvantages

    Suitable only for repetitive works

    May give too simple a picture of the construction process as a lot ofinformation is summarized on the chart.

  • 7/28/2019 Project Management Lecture Note 8A1 - Project Scheduling

    5/16

  • 7/28/2019 Project Management Lecture Note 8A1 - Project Scheduling

    6/16

    15900

  • 7/28/2019 Project Management Lecture Note 8A1 - Project Scheduling

    7/16

    Draw the planned S curve

  • 7/28/2019 Project Management Lecture Note 8A1 - Project Scheduling

    8/16

  • 7/28/2019 Project Management Lecture Note 8A1 - Project Scheduling

    9/16

  • 7/28/2019 Project Management Lecture Note 8A1 - Project Scheduling

    10/16

  • 7/28/2019 Project Management Lecture Note 8A1 - Project Scheduling

    11/16

  • 7/28/2019 Project Management Lecture Note 8A1 - Project Scheduling

    12/16

    ES : Early Start

    EF : (ES + Duration)

    LS : Late Start (LF Duration)

    LF : Late Finish

    TF : Total Float (LS-ES)Milestone : Activity with zero duration

    SS

    FS SF

    FF

  • 7/28/2019 Project Management Lecture Note 8A1 - Project Scheduling

    13/16

  • 7/28/2019 Project Management Lecture Note 8A1 - Project Scheduling

    14/16

  • 7/28/2019 Project Management Lecture Note 8A1 - Project Scheduling

    15/16

  • 7/28/2019 Project Management Lecture Note 8A1 - Project Scheduling

    16/16

    A : The amount of work carried out at a given time

    B : Time taken to complete a given amount of work

    C : Lag time between one activity to another