Project Management Suite™ Project Management Suite™ Project ...
Project management
-
Upload
david-terry -
Category
Education
-
view
5.158 -
download
0
Transcript of Project management
![Page 1: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/1.jpg)
Information Processes & Technology
Project Management
St Joseph’s Catholic College
![Page 2: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/2.jpg)
Outline
Project ManagementSocial and Ethical Design
System Development CycleUseful Web Sites
Sample HSC Questions
![Page 3: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/3.jpg)
Project Management Project management focuses on a project.
- a beginning - an end
Meets established goals within cost, schedule, and quality objectives.
Coordination of a number of phases to successfully achieve identified goals.
Ref: 6, 7, 10
![Page 4: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/4.jpg)
Project Management These phases include –
o understanding the problem, o plan o designing solutions, o implementing and o testing, evaluating and maintaining.
Ref: 4
![Page 5: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/5.jpg)
Developing a Project Plan
Planning is crucial in project management. Planning means listing in detail what is required to
successfully complete the project along the three critical dimensions of -
quality, time, and cost.
Ref: 6, 7
![Page 6: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/6.jpg)
Developing a Project Plan
A project plan is a summary of a project that specifies who, what, how and when.
It clarifies what needs to be done and helps people to understand how they fit into the project.
Ref: 6, 7, 10
![Page 7: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/7.jpg)
Developing a Project Plan
A project plan usually breaks the project into major tasks called subprojects.
It must provide an overall schedule, the details of the subprojects and a schedule for each subproject.
It must also identify the people, information technology and data/information required by the system.
Ref: 6, 7, 10
![Page 8: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/8.jpg)
Developing a Project Plan
Project goal—the result of the project if it is successful. Goals may be broad or they may be very specific.
Deliverable—a tangible item expected from a task. It may be a diagram, report, data dictionary, program or training manual.
Schedule—shows the timing of major tasks and who will do the work. The success of a new system depends on accurate time estimates for each task.
Ref: 6, 7, 10
![Page 9: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/9.jpg)
Software
Project plans are constructed using InformationManagement Software or Project ManagementSoftware.
Information management software helps individuals conducting a project to manage information and schedule tasks.
Project management software contains most of the features of information management software.
Ref: 6, 7, 10
![Page 10: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/10.jpg)
Communication Skills
Active listening - involves restating, reflecting and summarising the speaker’s major ideas and feelings. - active listeners encourage the speaker and are non-committal.
Conflict resolution - solves arguments and disputes. - it involves listening to the other person’s views and looking at the conflict as a problem to be solved. - the aim is to create a “win-win” situation.
Ref: 4, 10
![Page 11: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/11.jpg)
Communication Skills
Negotiation skills - negotiation is a discussion between two parties with a goal of reaching agreement on issues.
Interview techniques - involve careful preparation, implementation and follow-up.
Team building - is the process of getting a group of people working together.
Ref: 4, 10
![Page 12: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/12.jpg)
![Page 13: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/13.jpg)
Ref: 9
![Page 14: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/14.jpg)
Social and Ethical Design
Machine-centred systems are designed to simplify what the computer must do at the expense of participants.
Human-centred systems are those which make participants’ work as effective and as satisfying as possible.
User-friendly describes a tool that people find easy to use.
System Design
Ref: 1, 4, 10
![Page 15: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/15.jpg)
Work Environment
Health and safety - eg. ergonomics - furniture, information technology, environmental factors.
Changing nature of work –This includes - deskilling, multi-skilling and in some cases redundancy. Will anyone lose their job or will new jobs be created?
Ref: 4, 10
![Page 16: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/16.jpg)
Work Environment
Ethics is a set of beliefs we hold about what is right and wrong.
There are a number of issues involving the use of information systems that many people are concerned about.
These include -
- environmental impact
- equity and access
Ref: 4, 10
![Page 17: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/17.jpg)
Work Environment
Equity concerns equal rights for all. It means that all people should have equal access to the benefits of information technology - this includes gender equity.
Invasion of privacy Privacy - computer technology allows personal information to be distributed faster and further than previously before.
Control (rights and privileges) Control is the level of direct involvement that people have in decision making.
Ref: 4, 10
![Page 18: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/18.jpg)
Work Environment
Freedom of information Individuals have the right to access information
regarding themselves.
Computer crimeComputer crime can be broadly defined as any illegal or immoral activity that could not work without the use of a computer.
CopyrightCopyright laws protect the rights of an author against cases of piracy.
Ref: 4, 10
![Page 19: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/19.jpg)
Understanding the Problem
Plan
Designing SolutionsImplementing the Solution
Testing, evaluating & maintaining
Change in purpose
Change type of system
Change system
Change use of system
Problem with system
U P D I T
System Development
Cycle
SDC
Ref: 4, 10
![Page 20: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/20.jpg)
Understanding the Problem
![Page 21: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/21.jpg)
Preliminary Investigation
A preliminary investigation, or requirement definition, determines whether a quick fix of the existing system will solve the problem or a new system is necessary.
The project plan is created in this stage. Participants. Participants play an important
part in developing a workable system. Participants are people involved in the
planning, design and implementation. Ref: 4, 10
![Page 22: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/22.jpg)
Preliminary Investigation
Data collection methods
Data is collected tounderstand theproblem andto develop anappropriate solution.
o interviews, o surveys, o observations and o measurements.
Ref: 4, 10
![Page 23: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/23.jpg)
Problem Definition
Provides a clear definition of the problem, which needs to be solved.
Ref: 4
![Page 24: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/24.jpg)
Ref: 9
![Page 25: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/25.jpg)
Requirements Report
The requirements report is a statement about the need for a new system.
It outlines the aims and objectives of the new system and how it will help the organisation.
The requirement report is based on data collected from the participants.
Ref: 4, 8, 10
![Page 26: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/26.jpg)
Negotiating specifications with the client
If there is a client involved who must accept the project upon completion, the specifications that define a successful outcome must be negotiated and agreed to by the client, and included as part of the contract.
A client may be either internal or external. There may also be more than one client.
Ref: 4, 8, 10
![Page 27: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/27.jpg)
Prototype
A prototype is a working model of an information system, built in order to understand the requirements of the system.
Used when the problem is not easily understood.
Involves a repetitive process of prototype modification and participants' feedback, until the process is understood.
Can be the basis for further system development.
Ref: 4, 8, 10
![Page 28: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/28.jpg)
Ref: 9
![Page 29: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/29.jpg)
Prototype
Prototypes can be created from application packages that provide screen generators and report generators.
There are advantages and disadvantages in using a prototype.
Ref: 4, 8, 10
![Page 30: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/30.jpg)
Prototype - Advantages
The requirements of the system more accurately reflect the needs of the participants.
Participants earlier involvement - this may reduce the number of changes required by the participants in the testing, evaluating and maintaining stage.
The new system is easier to create from a prototype.
Ref: 4, 8, 10
![Page 31: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/31.jpg)
Prototype - Disadvantages
The greater involvement of the participants could impact on their work with the old system.
The repetitive process of the prototype can be frustrating if the succeeding versions do not provide a better solution.
Successful prototypes can produce software that is difficult to maintain, unreliable or inadequate. This may occur if any design restrictions are not taken into account when creating the prototype.
Ref: 4, 8, 10
![Page 32: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/32.jpg)
Questions
Name the system you investigated
What was the problem with the system you investigated?
Who are the participants?
What data gathering methods did you use?
Describe your development of the prototype.
What was the outcome of the prototype you developed?
![Page 33: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/33.jpg)
Planning
![Page 34: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/34.jpg)
This stage involves making decisions using the data gathered in the preliminary investigation
A constraint is a factor that affects the system and prevents it from achieving the desired objectives.
There are different types of constraints, such as -
financial environmental
technical personal
Planning
Ref: 4, 8, 10
![Page 35: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/35.jpg)
Feasibility Study
A feasibility study is a short report that analyses potential solutions in terms of the known constraints and makes a recommendation.
The feasibility study briefly examines the available options, estimates costs and identifies any constraints to be considered.
Ref: 4, 8, 10
![Page 36: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/36.jpg)
Economic Feasibility
Economic feasibility compares the costs of developing the new system with the expected benefits.
A financial analyst is often asked to assess economic feasibility. Economic feasibility is also called cost/benefit feasibility.
Ref: 4, 8, 10
![Page 37: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/37.jpg)
Technical Feasibility
Technical feasibility determines the information technology requirements of the new system and the technical demands that will be placed on the new system.
Ref: 4, 10
![Page 38: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/38.jpg)
Schedule Feasibility
Schedule feasibility determines whether time is available to implement the new system.
Ref: 4, 10
![Page 39: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/39.jpg)
Organisational Feasibility
Organisational feasibility determines whether the new system will fit into the organisation and meet the current goals and objectives.
It also determines whether the new system will have enough support from participants to be successfully implemented and whether participants can operate the system.
Ref: 4, 10
![Page 40: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/40.jpg)
Recommendation Options
A feasibility study has three recommendation options
no change
develop a new system
investigate other solutions
Ref: 4, 10
![Page 41: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/41.jpg)
Analysis Report The details of the new system are presented, along with recommendations for design, implementation and maintenance.
The analysis report contains -
design specifications a more detailed project plan
Ref: 4, 10
![Page 42: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/42.jpg)
Risks involved
Risk is the exposure to potential threats to the project.
They differ from constraints in that they are not definite but possess some likelihood of occurrence.
Risks are identified and classified as Low Risk Medium Risk High Risk
Ref: 4, 6, 7, 10
![Page 43: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/43.jpg)
Questions
Describe any constraints involved in the Making Decisions stage you encountered.
What recommendation was advised after your submission of your Feasibility Study?
Describe the most appropriate tools used in this stage of the System Development Cycle. Give reasons why.
![Page 44: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/44.jpg)
Designing Solutions
![Page 45: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/45.jpg)
Designing a Solution
Designing a solution is the transformation of the specifications into appropriate hardware, software and information processes.
Involves purchasing hardware, writing or purchasing software, and specifying information processes to make the system operational.
Ref: 4, 10
![Page 46: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/46.jpg)
Designing a Solution
Systems analysts and programmers often use –
Top-down - divides a large, complicated problem into a series of smaller, easier to solve problems.
Step-wise refinement - then takes each sub-problem and breaks it down even further.
Solutions based on prototypes are created in this stage.
Ref: 4, 5, 10
![Page 47: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/47.jpg)
Participant development
Participant development occurs when people within the information system develop the solution.
Participants produce their own information system using readily available information technology.
Tools for participant development - eg. guided processes in application packages
Ref: 4, 10
![Page 48: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/48.jpg)
Information Technology
Acquisition of hardware and software and the process of making it operational
Ref: 4, 10
![Page 49: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/49.jpg)
Design Tools
Design tools are used to better understand the system and document the new system.
The tools are used to assist in explaining the operation of the new system.
Ref: 4, 10
![Page 50: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/50.jpg)
Types of Design Tools
The design tools used in the Designing Solutions stage of the System Development Cycle include -
o Context diagrams
o Data flow diagram
o Decision trees
o Decision tables
o Data dictionaries
![Page 51: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/51.jpg)
Context Diagrams
Context diagrams are used to represent entire information systems. Process Single process - a circle is used to represent the entire system.
Data Flow An arrow is used to show the flow of data between the process and the external entities.
External Entity Any person or organisation that provides data to the system or receives data from the system.
Ref:1, 2, 3, 4, 10
![Page 52: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/52.jpg)
Data Flow Diagram
Data flow diagrams represent the information system as a number of processes that together form the single process of a context diagram.
The source of data, its flow between processes and its destination along with data generated by the system is represented.
Ref:1, 2, 3, 4, 10
![Page 53: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/53.jpg)
Data Flow Diagrams
Process
Process Processes are an action taking place transforming inputs to outputs.
Data flow An arrow is used to show the flow of data between the process and the external entities.
External Entity Any person or organisation that provides data to the system or receives data from the system.
Data store A location where data is stored. It can be in computer format, such as a diskette, or in non-computer format, such as a filing cabinet or an answering machine.
Ref:1, 2, 3, 4, 10
![Page 54: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/54.jpg)
Data Flow Diagram Example
![Page 55: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/55.jpg)
Decision Trees
A decision tree is a diagrammatic way of representing all possible combinations of decisions and their resulting actions.
It represents the decisions made within a system as the branches of a tree. Each branch ends with a particular action.
Ref: 3, 4, 10
![Page 56: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/56.jpg)
Decision Trees Example
Ref: 10
![Page 57: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/57.jpg)
Data Dictionaries
Data dictionaries contain a comprehensive description of each field in the database.
This commonly includes:
field name, number of characters (field width), data type, number of decimal places (if applicable) and a description of the purpose of each field.
Ref: 3, 4, 10
![Page 58: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/58.jpg)
Data Dictionary Example
![Page 59: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/59.jpg)
Data Dictionary Example
![Page 60: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/60.jpg)
System Flow Charts
System flowcharts are a diagrammatic way of representing both the flow of data and logic through an information system.
Ref: 3, 4, 10
![Page 61: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/61.jpg)
System Flow Charts
Ref: 3, 4, 10
![Page 62: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/62.jpg)
System Flow Chart Example
Ref: Meriden, 2001, Andrews
![Page 63: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/63.jpg)
Screen Design
Screen design for input and output of data are created.
These are created using good principles of design, eg. ease of navigation, and use of consistent style.
Ref: 3, 4, 10
![Page 64: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/64.jpg)
Documentation
Technical specifications must be identified and documented prior to purchase of hardware.
Documentation is an essential part of any system, as it communicates information to the developers, users and others on how the system operates and how to use it.
Ref: 3, 4, 10
![Page 65: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/65.jpg)
Technical and user documentation User documentation – used to
assist people to use the computer system.
Technical documentation – describes the construction of the computer system.
Ref: 3, 4, 10
![Page 66: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/66.jpg)
Questions
Describe the role of the Systems Analyst in Stage 3 of the System Development Cycle – Designing Solutions.
Various tools can be used at this stage. Explain the difference between using a data flow diagram and a system flowchart. Outline the tools you have used in your project.
![Page 67: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/67.jpg)
Implementing
![Page 68: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/68.jpg)
Implementation Plan
The project manager coordinates all the elements of a project.
The implementation stage delivers the new system to the participants.
Ref: 3, 4, 10
![Page 69: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/69.jpg)
Implementation Plan
Responsibilities of the Project Manager controlling work in progress to see that it is carried out according to plan; providing feedback to those working on the project; negotiating for materials, supplies, and services; and resolving differences among those involved with the project. Ref: 3, 4, 10
![Page 70: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/70.jpg)
Conversion Methods
Direct involves the immediate change to the new system on a chosen date.
Old System
New System
Ref: 3, 4, 5, 10
![Page 71: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/71.jpg)
Conversion Methods
Parallel conversion involves the old and new systems both working together at the same time.
Old System
New System
Ref: 3, 4, 5, 10
![Page 72: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/72.jpg)
Conversion Methods
Phased conversion involves the gradual implementation of the new system.
Old System
New System
Ref: 3, 4, 5, 10
![Page 73: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/73.jpg)
Conversion Methods
Pilot conversion involves trialling the new system in a small portion of the
organisation. The old system is still available if the new system fails or experiences problems.
Pilot conversion is usually started by a keen group of participants who appreciate the benefits of the new system.
Ref: 3, 4, 5, 10
![Page 74: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/74.jpg)
Conversion Methods
Pilot Conversion
Old System
Old System
Old System
New System
New System
New System
Ref: 3, 4, 5, 10
![Page 75: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/75.jpg)
Implementation of the chosen conversion process Information processes are continually
tested during the implementation of the system over a period of time.
Minor changes to procedures are immediately implemented.
Ref: 3, 4, 5, 10
![Page 76: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/76.jpg)
Questions
Describe the role of the Project Manager in Stage 4 of the System
Development Cycle – Implementing.
Discuss the importance of training staff during this stage. Which of the conversion methods was the most appropriate for your system? Explain why.
![Page 77: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/77.jpg)
Testing, Evaluating and Maintaining
![Page 78: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/78.jpg)
System Testing
Testing is a way of verify the quality of the project.
Testing a system is a very important part of the implementation of a system.
Without rigorous testing, the system cannot be guaranteed to work as expected.
Tests must be designed to examine the system operation under all possible events.
Ref: 3, 4, 10
![Page 79: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/79.jpg)
Ref: 9
![Page 80: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/80.jpg)
Hardware
Tested using - diagnostic software and
- through general operation
Backup systems should be tested by selecting files to be restored.
Ref: 3, 4, 5, 10
![Page 81: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/81.jpg)
Software
Software is tested using data that has been structured to test all decisions made within the system.
Test data must cover all possible combinations of data that may be encountered.
It should be based on the original design specifications.
Ref: 3, 4, 5, 10
![Page 82: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/82.jpg)
Testing and Evaluating
Testing a solution ensures that it works. Testing is carried out throughout the system development cycle.
Evaluation determines whether the system is working as expected or whether changes are required.
Ref: 3, 4, 5, 10
![Page 83: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/83.jpg)
Ref: 9
![Page 84: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/84.jpg)
Maintenance
Maintenance is the modification of the system by making minor improvements.
Participants may discover deficiencies in the system and suggest improvements during the operation of the system.
Ref: 3, 4, 5, 10
![Page 85: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/85.jpg)
Operation Manual
An operation manual details procedures participants follow when using a new system.
Participants need to be instructed about and assisted with the major features and functions of the system.
Ref: 3, 4, 5, 10
![Page 86: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/86.jpg)
Operation Manual
Some of the factors for creating an easy-to-use operation manual include:
user-friendly format and structure clear and concise instructions steps listed in point form tasks completed in the simplest way appropriate instructions for file management and security screen dumps included where possible. Ref: 10
![Page 87: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/87.jpg)
Questions
Explain the importance of testing a new system. Who is involved in this stage? Describe the methods you have used in creating an operation manual.
![Page 88: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/88.jpg)
Useful Web Sites Board of Studies http://www.boardofstudies.nsw.edu.au/
HSC Online http://www.hsc.csu.edu.au/
![Page 89: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/89.jpg)
References1. Board of Studies. (1999). IPT Examination Assessment & Reporting Supplement.
http://www.boardofstudies.nsw.edu.au/syllabus99/syllabus2000_listi.html#i 2. Board of Studies. (1999). IPT Software and Course Specifications.
http://www.boardofstudies.nsw.edu.au/syllabus99/syllabus2000_listi.html#i 3. Board of Studies. (1999). IPT Support Document
http://www.boardofstudies.nsw.edu.au/syllabus99/syllabus2000_listi.html#i 4. Board of Studies. (1999). IPT Syllabus.
http://www.boardofstudies.nsw.edu.au/syllabus99/syllabus2000_listi.html#i 5. Chivers, B. et. al. (1994). Computing Studies - Preliminary Course. The
Jacaranda Press: Australia.
![Page 90: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/90.jpg)
References6. Cotterell, M & Hughes, B (1999). Software Project Management,
International Thomson Computer Press, United Kingdom. 7. Haynes, M.E. (1989). Project Management. Crisp Publications, California. 8. Johnstone, G. et al. (2001). Excel HSC Information Processes and
Technology – Your Step by Step Guide to HSC Success. Pascal Press: Sydney.
9. www.offthemark.com
10. Powers, G. (2000). HSC Information Processes & Technology. Heinemann, Australia
![Page 91: Project management](https://reader036.fdocuments.in/reader036/viewer/2022070604/545045acaf79597e078ba473/html5/thumbnails/91.jpg)
Best wishes for the HSC