Page 1: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

Project Updates

Page 2: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

Barangays are electrified usinggenerators that are owned andmanaged by the Barangay. Due tothe high cost of operating thediesel-powered gensets, power isdistributed from 6pm to 9pm only.Households are billed flat monthlyrates using the number ofconnected lighting loads as basis.

Self-employed

Employment

Fishing

Pension /RemittancesFarming

Source: 2015 Census*

Page 3: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

Current Electricity Sources 5 kVA Diesel Genset

• Fuel RatesP28/L mainland rateP38/L island rate

Solar Home System• 90% of households have solar for lighting• 100 Wp system sold by resident/distributors for

P15,000• Maintenance is limited to refilling batteries with

distilled water

Barangay bought new 3 kVA Yanmar Genset forP100,000 but output voltage was measured at110V

Streetlight Project Proposed installation

of 100 solarstreetlight by JGSummit

Logistics Household Clustering

• Concentration of household inthe school and barangay hallarea near the shore

Shallow Rocky Shore• Potential issue in hauling of

heavy equipment as there isno port structure

BARANGAY SAN ANDRES

Page 4: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

BARANGAY LIPON-PON

Current Electricity Sources Diesel Genset Solar Home System

• 90% of householdshave solar forlighting

Community Concerns Land Titles

• Many of the land titles have not beentransferred from their forebears

Budget for Electricity• Only 40% of the households can budget

P1,000 for electricity

Strong winds during typhoon seasons

Logistics Roads

• Parts of the concrete roadnetwork need maintenance

Distance from Shore• Barangay center is a good 30-

40 minute hike from the shore

Page 5: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

BARANGAY SAN AGAPITO

Current Electricity Sources 5 x 10 kVA and 1 x 5 kVA Diesel Genset

• Energized 6 out of 7 sitios• 90% of households connected to network

Solar Home System• 30% of households have solar for lighting

Informal Electric Cooperative Operation

• Started in 2010• Total daily fuel requirement for 6-10 PM operation is 7 liters• Commercial processes in place (e.g. disconnection, new

connection)• No formal Right of Way documents for facilities

Rates• Fixed Monthly Rates

o Lighting: P140 per bulbo TV: P200Limited Use: 6 to 10 PM

• Streetlights installed in certain areas are free of charge

Personnel• Each genset site is managed by an operator, collector and

electrician• Compensation is in the form of free lighting and allowance

Page 6: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

Installation of 1kWp PV system on the rooftop of 6 schools in Verde Island

Designs for the Installation of Facilities to Serve Brgys San Andres with costing

DOE-Meralco Rapid Rural Assessment (Generation Technology and Capacity to Pay)

Meralco Survey of Verde Island (Topography, Barangay Demographics, Load Profile);Designs for Installation of Facilities

Proposal for Installation of Generating System from First Gen Renewables

2000

2001

2007

2008

2012

2014 Initial Coordination with USAID / B-LEADERS on Proposed Microgrid Initiative

Page 7: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

Typical Household Load Year 1-5 Year 6-10 Unit

Lighting 50 50 Watts

Electric Fan 50 75 Watts

Audio / Video System 60 60 Watts

Mobile / Tablet / Laptop Charging 40 50 Watts

Major Appliances (Ref / Washing Machine) 0 150 Watts

Total Household Load 200 385 Watts

Survey of 686 residents yielded the typical household load as well as the barangay load profile

SanAndres

Lipon-ponSan

Agapito

Peak Demand (kW)

3.7 3.4 9.8

Monthly Consumption

(kWh)630 630 1,710

Biomass (kW) 60 60 80

Solar (kW) 20 20 40

Wind (kW) 3 3

Battery (kWh) 36 36 72

Scope of the Micro Grid Study was limited to 3 (out of 6 total) barangays. Currently exploring possible partnership with third parties in the electrification of

households in the remaining 3 barangays.

Prepared by the Building Low Emission Alternative to Develop Economic Resilience and Sustainability (B-LEADERS) Project for USAID Philippines

Page 8: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

LOADS

15 kW

SYSTEM INTEGRATION

SOLAR

40 kWENERGY STORAGE

72 kWhBIOMASS

80 kW

BATTERY INVERTERPV INVERTER

2015 PROPOSAL

- AC- DC

Page 9: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

LOADS

15 kW

SYSTEM INTEGRATION

SOLAR

195 kWENERGY STORAGE

600 kWhBIOMASS

0 kW

BATTERY INVERTERPV INVERTER

2016 PROPOSAL

- AC- DC

Originally

40Originally

72Originally

80

Page 10: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

GENERATION

DISTRIBUTION

Total Capacity:Panels:

Inverters:

STATUS:

Awaiting TechnicalSpecifications fromIntegrator to finalizeInterconnection Design

STATUS: Pending Survey by Integrator

STATUS: Deed of Donation Already Signed

PV Facility

SITE

192 kWacSPR-435 (480 modules)SPR27601p (4 units)SPR12001f (8 units)

Page 11: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

LOADS

15 kW

SYSTEM INTEGRATION

SOLAR

32 kWENERGY STORAGE

185 kWhBIOMASS

0 kW

BATTERY INVERTERPV INVERTER

2017 PROPOSAL

- AC- DC

Previously

195Previously

600

Page 12: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

SOLAR DISTRIBUTION

HOUSE

STEP-UP480V 7.62KV

DIESELGENERATOR

SET(FUTURE)

STEP-UP

230V

EXTENDED SECONDARY

Page 13: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

Lines to start from site of Solar/battery facility

Meralco already completed design for all four sites

Construction completed for Site 1 and portion of Site 2

Description SOLAR PLANT SITE 1 SITE 2 SITE 3 SITE 4 TOTAL

Circuit Length (km) - 2.246 1.401 1.413 1.773 6.833

No. of Customers - 44 77 138 61 320

Breakdown of Major Materials

No. of distribution transformer 3 1 1 2 1 8

Disconnect Switch 1 - - - - 1

Primary: #3/0 Covered Conductor (m) - 2,370 1,468 1,277 335 5,450

Secondary: #3/0 Ins. Al. Triplex (m) - 2,348 1,359 1,680 1,655 7,042

No. of Poles - 57 37 45 43 182

Page 14: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

2014 2015 2016

JULY SEPTEMBER JUNE SEPTEMBER NOVEMBER JULY AUGUST

Release of USAID Feasibility Study

Release of Initial Survey Data to Meralco

Survey by USAID to Assess Residential Energy

Requirement

Survey of Proposed Sites and Meeting with City

Government

Project Briefing: Batangas Provincial Government

Initial Project Coordination between Meralco, USAID and Batangas City LGU

Initial Network Design and Project

Cost Estimates

Page 15: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

2017

JANUARY FEBRUARY MARCH MAY JULY

Preliminary Survey of Brgy San Agapito

Donation of Lot for Generation Facility

Groundbreaking Ceremony

Donation of 615 Solar Panels by SUNPOWER

Discussion on MOU with City Government; Update with Barangay Officials;

Discussion on ROW, permits, and shipping of materials

Page 16: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

2017

AUG NOV DEC FEB APR

2018

Erc Project Briefing

Finalization of Usufruct and O&M Proposal

Options for Gen-Side

Committee Hearing on Ordinance to Accept Usufruct and O&M Proposal

Reclassification from Usufruct to Lease

Page 17: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

Solar Panels Installed

Page 18: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

Solar Panels Installed

Page 19: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

Powerhouse

Page 20: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

Battery Arrays inside Powerhouse

Page 21: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

MERALCO Facilities Hauling

MSERV’s hauling and boat transport of 34 steel poles started on Nov. 13, 2017, together with the other materials and construction equipment now stored at Brgy hall.

Page 22: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

Pole Staking

Pole staking for the proposed 34 poles has been completed together with Brgy. Officials & Batangas BC Representative last Nov. 14, 2017. Materials used are bamboo stakes with red caution tape.

Page 23: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

Secondary Line - Cable Stringing

Page 24: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

20 EMC Modules have been installed as of Feb. 9, 2018

Page 25: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

• Initial testing and energization• Batangas City Mayor Beverly Dimacuha expressed no objection in proceeding with

the test interface/connection of the solar plant and the Meralco line. (c/o USAID/B-LEADERS)

• Next step is for LGU and Meralco to conduct a community meeting to explain test phase and that billing will start once the system is fully operational.

• 39 customers have already completed the Meralco application process.

• Finalization of Lease Agreement between Batangas City LGU and Meralco• Lease proposal submitted to Batangas City LGU for evaluation and conduct of Swiss

Challenge.

• As instructed by the Commission, Meralco to submit to ERC electrification scheme for Isla Verde.

Page 26: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site

M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t

• Challenges to DU Operations• Customer Service: Service Applications, Metering Reading, Billing,

Payments, etc.• System loss• Outage management and restoration performance (SAIFI, SAIDI)

• Additional capacity and scaling up off-grid operations• Need for assistance with local government concerns on right-if-way, official

road network, etc.• Installation of remaining donated solar panels• Conduct of Competitive Selection Process for additional off-grid capacity

Page 27: Project Updatesstorage.googleapis.com/request-attachments... · Limited Use: 6 to 10 PM • Streetlights installed in certain areas are free of charge Personnel • Each genset site