Project Updates
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
Barangays are electrified usinggenerators that are owned andmanaged by the Barangay. Due tothe high cost of operating thediesel-powered gensets, power isdistributed from 6pm to 9pm only.Households are billed flat monthlyrates using the number ofconnected lighting loads as basis.
Self-employed
Employment
Fishing
Pension /RemittancesFarming
Source: 2015 Census*
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
Current Electricity Sources 5 kVA Diesel Genset
• Fuel RatesP28/L mainland rateP38/L island rate
Solar Home System• 90% of households have solar for lighting• 100 Wp system sold by resident/distributors for
P15,000• Maintenance is limited to refilling batteries with
distilled water
Barangay bought new 3 kVA Yanmar Genset forP100,000 but output voltage was measured at110V
Streetlight Project Proposed installation
of 100 solarstreetlight by JGSummit
Logistics Household Clustering
• Concentration of household inthe school and barangay hallarea near the shore
Shallow Rocky Shore• Potential issue in hauling of
heavy equipment as there isno port structure
BARANGAY SAN ANDRES
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
BARANGAY LIPON-PON
Current Electricity Sources Diesel Genset Solar Home System
• 90% of householdshave solar forlighting
Community Concerns Land Titles
• Many of the land titles have not beentransferred from their forebears
Budget for Electricity• Only 40% of the households can budget
P1,000 for electricity
Strong winds during typhoon seasons
Logistics Roads
• Parts of the concrete roadnetwork need maintenance
Distance from Shore• Barangay center is a good 30-
40 minute hike from the shore
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
BARANGAY SAN AGAPITO
Current Electricity Sources 5 x 10 kVA and 1 x 5 kVA Diesel Genset
• Energized 6 out of 7 sitios• 90% of households connected to network
Solar Home System• 30% of households have solar for lighting
Informal Electric Cooperative Operation
• Started in 2010• Total daily fuel requirement for 6-10 PM operation is 7 liters• Commercial processes in place (e.g. disconnection, new
connection)• No formal Right of Way documents for facilities
Rates• Fixed Monthly Rates
o Lighting: P140 per bulbo TV: P200Limited Use: 6 to 10 PM
• Streetlights installed in certain areas are free of charge
Personnel• Each genset site is managed by an operator, collector and
electrician• Compensation is in the form of free lighting and allowance
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
Installation of 1kWp PV system on the rooftop of 6 schools in Verde Island
Designs for the Installation of Facilities to Serve Brgys San Andres with costing
DOE-Meralco Rapid Rural Assessment (Generation Technology and Capacity to Pay)
Meralco Survey of Verde Island (Topography, Barangay Demographics, Load Profile);Designs for Installation of Facilities
Proposal for Installation of Generating System from First Gen Renewables
2000
2001
2007
2008
2012
2014 Initial Coordination with USAID / B-LEADERS on Proposed Microgrid Initiative
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
Typical Household Load Year 1-5 Year 6-10 Unit
Lighting 50 50 Watts
Electric Fan 50 75 Watts
Audio / Video System 60 60 Watts
Mobile / Tablet / Laptop Charging 40 50 Watts
Major Appliances (Ref / Washing Machine) 0 150 Watts
Total Household Load 200 385 Watts
Survey of 686 residents yielded the typical household load as well as the barangay load profile
SanAndres
Lipon-ponSan
Agapito
Peak Demand (kW)
3.7 3.4 9.8
Monthly Consumption
(kWh)630 630 1,710
Biomass (kW) 60 60 80
Solar (kW) 20 20 40
Wind (kW) 3 3
Battery (kWh) 36 36 72
Scope of the Micro Grid Study was limited to 3 (out of 6 total) barangays. Currently exploring possible partnership with third parties in the electrification of
households in the remaining 3 barangays.
Prepared by the Building Low Emission Alternative to Develop Economic Resilience and Sustainability (B-LEADERS) Project for USAID Philippines
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
LOADS
15 kW
SYSTEM INTEGRATION
SOLAR
40 kWENERGY STORAGE
72 kWhBIOMASS
80 kW
BATTERY INVERTERPV INVERTER
2015 PROPOSAL
- AC- DC
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
LOADS
15 kW
SYSTEM INTEGRATION
SOLAR
195 kWENERGY STORAGE
600 kWhBIOMASS
0 kW
BATTERY INVERTERPV INVERTER
2016 PROPOSAL
- AC- DC
Originally
40Originally
72Originally
80
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
GENERATION
DISTRIBUTION
Total Capacity:Panels:
Inverters:
STATUS:
Awaiting TechnicalSpecifications fromIntegrator to finalizeInterconnection Design
STATUS: Pending Survey by Integrator
STATUS: Deed of Donation Already Signed
PV Facility
SITE
192 kWacSPR-435 (480 modules)SPR27601p (4 units)SPR12001f (8 units)
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
LOADS
15 kW
SYSTEM INTEGRATION
SOLAR
32 kWENERGY STORAGE
185 kWhBIOMASS
0 kW
BATTERY INVERTERPV INVERTER
2017 PROPOSAL
- AC- DC
Previously
195Previously
600
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
SOLAR DISTRIBUTION
HOUSE
STEP-UP480V 7.62KV
DIESELGENERATOR
SET(FUTURE)
STEP-UP
230V
EXTENDED SECONDARY
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
Lines to start from site of Solar/battery facility
Meralco already completed design for all four sites
Construction completed for Site 1 and portion of Site 2
Description SOLAR PLANT SITE 1 SITE 2 SITE 3 SITE 4 TOTAL
Circuit Length (km) - 2.246 1.401 1.413 1.773 6.833
No. of Customers - 44 77 138 61 320
Breakdown of Major Materials
No. of distribution transformer 3 1 1 2 1 8
Disconnect Switch 1 - - - - 1
Primary: #3/0 Covered Conductor (m) - 2,370 1,468 1,277 335 5,450
Secondary: #3/0 Ins. Al. Triplex (m) - 2,348 1,359 1,680 1,655 7,042
No. of Poles - 57 37 45 43 182
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
2014 2015 2016
JULY SEPTEMBER JUNE SEPTEMBER NOVEMBER JULY AUGUST
Release of USAID Feasibility Study
Release of Initial Survey Data to Meralco
Survey by USAID to Assess Residential Energy
Requirement
Survey of Proposed Sites and Meeting with City
Government
Project Briefing: Batangas Provincial Government
Initial Project Coordination between Meralco, USAID and Batangas City LGU
Initial Network Design and Project
Cost Estimates
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
2017
JANUARY FEBRUARY MARCH MAY JULY
Preliminary Survey of Brgy San Agapito
Donation of Lot for Generation Facility
Groundbreaking Ceremony
Donation of 615 Solar Panels by SUNPOWER
Discussion on MOU with City Government; Update with Barangay Officials;
Discussion on ROW, permits, and shipping of materials
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
2017
AUG NOV DEC FEB APR
2018
Erc Project Briefing
Finalization of Usufruct and O&M Proposal
Options for Gen-Side
Committee Hearing on Ordinance to Accept Usufruct and O&M Proposal
Reclassification from Usufruct to Lease
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
Solar Panels Installed
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
Solar Panels Installed
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
Powerhouse
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
Battery Arrays inside Powerhouse
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
MERALCO Facilities Hauling
MSERV’s hauling and boat transport of 34 steel poles started on Nov. 13, 2017, together with the other materials and construction equipment now stored at Brgy hall.
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
Pole Staking
Pole staking for the proposed 34 poles has been completed together with Brgy. Officials & Batangas BC Representative last Nov. 14, 2017. Materials used are bamboo stakes with red caution tape.
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
Secondary Line - Cable Stringing
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
20 EMC Modules have been installed as of Feb. 9, 2018
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
• Initial testing and energization• Batangas City Mayor Beverly Dimacuha expressed no objection in proceeding with
the test interface/connection of the solar plant and the Meralco line. (c/o USAID/B-LEADERS)
• Next step is for LGU and Meralco to conduct a community meeting to explain test phase and that billing will start once the system is fully operational.
• 39 customers have already completed the Meralco application process.
• Finalization of Lease Agreement between Batangas City LGU and Meralco• Lease proposal submitted to Batangas City LGU for evaluation and conduct of Swiss
Challenge.
• As instructed by the Commission, Meralco to submit to ERC electrification scheme for Isla Verde.
M a n i l a E l e c t r i c C o m p a n y V e r d e I s l a n d P r o j e c t
• Challenges to DU Operations• Customer Service: Service Applications, Metering Reading, Billing,
Payments, etc.• System loss• Outage management and restoration performance (SAIFI, SAIDI)
• Additional capacity and scaling up off-grid operations• Need for assistance with local government concerns on right-if-way, official
road network, etc.• Installation of remaining donated solar panels• Conduct of Competitive Selection Process for additional off-grid capacity