Project first prototype (1)
Transcript of Project first prototype (1)
![Page 1: Project first prototype (1)](https://reader033.fdocuments.in/reader033/viewer/2022052910/559b5f401a28ab1f448b468c/html5/thumbnails/1.jpg)
![Page 2: Project first prototype (1)](https://reader033.fdocuments.in/reader033/viewer/2022052910/559b5f401a28ab1f448b468c/html5/thumbnails/2.jpg)
![Page 3: Project first prototype (1)](https://reader033.fdocuments.in/reader033/viewer/2022052910/559b5f401a28ab1f448b468c/html5/thumbnails/3.jpg)
![Page 4: Project first prototype (1)](https://reader033.fdocuments.in/reader033/viewer/2022052910/559b5f401a28ab1f448b468c/html5/thumbnails/4.jpg)
![Page 5: Project first prototype (1)](https://reader033.fdocuments.in/reader033/viewer/2022052910/559b5f401a28ab1f448b468c/html5/thumbnails/5.jpg)
![Page 6: Project first prototype (1)](https://reader033.fdocuments.in/reader033/viewer/2022052910/559b5f401a28ab1f448b468c/html5/thumbnails/6.jpg)
PartName
Part descrip
tionMaterial
Manufacturing
Process
Quantity
Unit Cost
Total Cost
Structures
This part deal with product because structures have an effect on strength in any part of product.
-Wood-Nail
-Drilling-Cutting-Hammering
2 40 80
Chair
This part made from wood and hold by nail . In this part
-Wood-Nail
-Drilling-Cutting-Hammering
1 300 300
![Page 7: Project first prototype (1)](https://reader033.fdocuments.in/reader033/viewer/2022052910/559b5f401a28ab1f448b468c/html5/thumbnails/7.jpg)
PartName
Part descrip
tion
Material
Manufacturing
Process
Quantity
Unit Cost
Total Cost
Table
This part made from wood and hold by nail. In this part you can put a book , Laptop or Tablet and can do work in document type.
-Wood
-Nail
-Drilling-Cutting-Hammering-Dubbing-Painting
1 200 200
Inside of
![Page 8: Project first prototype (1)](https://reader033.fdocuments.in/reader033/viewer/2022052910/559b5f401a28ab1f448b468c/html5/thumbnails/8.jpg)
Total Cost
80+300+200+500 = 1080 Baht
![Page 9: Project first prototype (1)](https://reader033.fdocuments.in/reader033/viewer/2022052910/559b5f401a28ab1f448b468c/html5/thumbnails/9.jpg)
![Page 10: Project first prototype (1)](https://reader033.fdocuments.in/reader033/viewer/2022052910/559b5f401a28ab1f448b468c/html5/thumbnails/10.jpg)
![Page 11: Project first prototype (1)](https://reader033.fdocuments.in/reader033/viewer/2022052910/559b5f401a28ab1f448b468c/html5/thumbnails/11.jpg)
Record the number of hours spent in each
manufacturing process.
-Cutting= 3 hrs.
-Drilling= 2hr.
-Hammering= 1.30 hrs.
-Dubbing= 1.30hrs.
-Painting =2hrs.
Total = 10 hrs.
![Page 12: Project first prototype (1)](https://reader033.fdocuments.in/reader033/viewer/2022052910/559b5f401a28ab1f448b468c/html5/thumbnails/12.jpg)
Provide difficulties and problems encountered during the prototype development.
- It’s hard to move because product didn’t have rollers.
- Material have a high cost.
- Use time to make too much.
![Page 13: Project first prototype (1)](https://reader033.fdocuments.in/reader033/viewer/2022052910/559b5f401a28ab1f448b468c/html5/thumbnails/13.jpg)
Provide the solutions for your second prototype.
- Find rollers and shaft . And assembly it with product (First prototype)
- Find a material that people didn’t use it.
- Manage a time and prepare manufacturing processes that my product use.