PROJECT FACT SHEET Mears Group, Inc. HDD Division 2800 Post Oak Blvd., Ste. 3010 Houston, TX 77056 U.S.A. Phone: 800-632-7727 281-448-2488 Copyright © 2014 Certified in Safety, Quality, and Environmental: OHSAS 18001:2007, ISO 9001:2008 and ISO 14001:2004 Project Fact Sheet - 1 #2005 Greenland Lateral. St. John's River Design Build Location Jacksonville, FL Date Completed March 2010 Project Type Gas Equipment Mears’ 140,000 lb. rig and 500,000 lb. rig Owner/Client TECO / Peoples Gas Engineer JR Giese Operations Length, Pipe Diameter, Pipe Material 16-inch Steel, 7,390-feet Type of Crossing River Project Summary Mears Group, Inc. completed in March a 7,400-foot Horizontal Directional Drilling bore in Jacksonville, Florida, a design-build project that allows a regional energy producer to expand its natural gas pipeline to serve new facilities. To complete the project, Mears drilled a 7,390-foot pilot hole beneath the St. Johns River at a depth of 130 feet below river bottom to install the 16-inch steel pipe. It is an essential link in a 50-mile pipeline that ends at the Jacksonville Electric Authority (JEA’s) Greenland Energy Center. Though just 1.4 miles of the 50 mile pipeline, this portion of the project was the most difficult. HDD was the best option for installing pipe. The crew drilled from both sides of the St. Johns River and intersected the two holes under the river -- a waterway lined with stately homes and used mostly for recreational purposes.

Transcript of PROJECT FACT SHEET - Horizontal Directional...

PROJECT FACT SHEET

Mears Group, Inc. HDD Division 2800 Post Oak Blvd., Ste. 3010 Houston, TX 77056 U.S.A. Phone: 800-632-7727 ▪ 281-448-2488 www.mears.net

Copyright © 2014

Certified in Safety, Quality, and Environmental: OHSAS 18001:2007, ISO 9001:2008 and ISO 14001:2004

Project Fact Sheet - 1 #2005

Greenland Lateral. St. John's River Design Build

Location Jacksonville, FL

Date Completed March 2010

Project Type Gas

Equipment Mears’ 140,000 lb. rig and 500,000 lb. rig

Owner/Client TECO / Peoples Gas

Engineer JR Giese Operations

Length, Pipe Diameter,

Pipe Material 16-inch Steel, 7,390-feet

Type of Crossing River

Project Summary

Mears Group, Inc. completed in March a 7,400-foot Horizontal Directional Drilling bore in Jacksonville, Florida, a design-build project that allows a regional energy producer to expand its natural gas pipeline to serve new facilities. To complete the project, Mears drilled a 7,390-foot pilot hole beneath the St. Johns River at a depth of 130 feet below river bottom to install the 16-inch steel pipe. It is an essential link in a 50-mile pipeline that ends at the Jacksonville Electric Authority (JEA’s) Greenland Energy Center. Though just 1.4 miles of the 50 mile pipeline, this portion of the project was the most difficult. HDD was the best option for installing pipe. The crew drilled from both sides of the St. Johns River and intersected the two holes under the river -- a waterway lined with stately homes and used mostly for recreational purposes.