PROJECT EXPERIENCE SUMMARY - EJJVejjv.co.id/templates/akd_e/files/camellia-akd/uploads... ·  ·...

13
No Client Name Owner Project Name Specific Responsibilities/ Scope of Work Year Completed 1 4420001349 - BP Berau Ltd Technical Services Contract for Client Support Back Office Operation and Project Management (Bridging) On Going 2 EPPA-S14LL0096B-P23 Jasa Pembuatan As Built 3D Model Fasilitas Produksi Dengan Laser Scanning di Asset 5 On Going 3 4420000869 - BP Berau Ltd Provision of Oversight Skill Competencies of Discipline Capability Services 2014 4 4420000784 - BP Berau Ltd Oversight Supervision of Boeing PK-TVZ C-Check 2013 5 M500-027-001 BP UK / Rider Hunt International UK The Provision of Specilist Services On Going 6 212/DA/OPS/AUG-13 - West Madura Offshore Provision of Diving Supervisor for Under Water Services 2014 7 4420000566 - BP Berau Ltd Upstream IT&S Project Services 2013-2016 On Going 8 4420000431 - BP Berau Ltd Supply Chain Business Support Service On Going PROJECT MANAGEMENT CONSULTANT PROJECT EXPERIENCE SUMMARY PT EJJV Engineering Indonesia - Project Experience Summary Page 1 of 13

Transcript of PROJECT EXPERIENCE SUMMARY - EJJVejjv.co.id/templates/akd_e/files/camellia-akd/uploads... ·  ·...

Page 1: PROJECT EXPERIENCE SUMMARY - EJJVejjv.co.id/templates/akd_e/files/camellia-akd/uploads... ·  · 2015-03-2939 SO2435 - EPC-1 Banyu Urip Project Completion System for Banyu Urip EPC-1

No Client Name Owner Project Name Specific Responsibilities/ Scope of Work Year Completed

1 4420001349 - BP Berau LtdTechnical Services Contract for Client Support Back Office

Operation and Project Management (Bridging)On Going

2 EPPA-S14LL0096B-P23Jasa Pembuatan As Built 3D Model Fasilitas Produksi Dengan

Laser Scanning di Asset 5On Going

3 4420000869 - BP Berau LtdProvision of Oversight Skill Competencies of Discipline

Capability Services2014

4 4420000784 - BP Berau Ltd Oversight Supervision of Boeing PK-TVZ C-Check 2013

5M500-027-001

BP UK / Rider Hunt International UKThe Provision of Specilist Services On Going

6212/DA/OPS/AUG-13 - West Madura

OffshoreProvision of Diving Supervisor for Under Water Services 2014

7 4420000566 - BP Berau Ltd Upstream IT&S Project Services 2013-2016 On Going

8 4420000431 - BP Berau Ltd Supply Chain Business Support Service On Going

PROJECT MANAGEMENT CONSULTANT

PROJECT EXPERIENCE SUMMARY

PT EJJV Engineering Indonesia - Project Experience Summary Page 1 of 13

Page 2: PROJECT EXPERIENCE SUMMARY - EJJVejjv.co.id/templates/akd_e/files/camellia-akd/uploads... ·  · 2015-03-2939 SO2435 - EPC-1 Banyu Urip Project Completion System for Banyu Urip EPC-1

No Client Name Owner Project Name Specific Responsibilities/ Scope of Work Year Completed

PROJECT EXPERIENCE SUMMARY

9 4420000483 - BP Berau LtdProject Management Support Services for New Condensate &

Diesel Tanks, MATOA Mancamp & Aviation Risk StudyOn Going

10 4800022692 - BP Berau Ltd Fluid Database Project Consultation & Compliance 2014

11 4420000550 - BP Berau LtdProject Management Support for Tangguh Expansion Early

Works2014

12 CS-16318106 ConocoPhillips Indonesia IT Support Services Services On Going

13 4420000256-BP Berau LtdTechnical Services for Client Support Back Office Operation

and Project ManagementOn Going

14 STC-0768A Offshore North West JavaProvision of Client Site Representative to Support Diving and

ROV Compaign2014

15 4420000112 - BP Berau LtdProject Management Support for Tangguh Expansion Early

Works2014

16 STC-0765 Offshore North West Java Consulting Contract for Project Engineering & Construction

Management Services (Package 2)2014

17 CS-15924767 ConocoPhillips Indonesia Application Development and Maintenance Services On Going

PT EJJV Engineering Indonesia - Project Experience Summary Page 2 of 13

Page 3: PROJECT EXPERIENCE SUMMARY - EJJVejjv.co.id/templates/akd_e/files/camellia-akd/uploads... ·  · 2015-03-2939 SO2435 - EPC-1 Banyu Urip Project Completion System for Banyu Urip EPC-1

No Client Name Owner Project Name Specific Responsibilities/ Scope of Work Year Completed

PROJECT EXPERIENCE SUMMARY

18 4420000201 BP Tangguh Oversight Supervision of Boeing PK-TVZ C-Check 2012

19 SO 9420003527 - West Madura Offshore Provision of ROV and Diving Specialist 2012

20 4420000206 BP Tangguh Project management Support and Sevices for Onshore Project 2013

21 STC-0720 Offshore North West Java Consulting Contract for Project Engineering & Construction

Management Services (Package 1)2014

22 STC-0609 Offshore North West Java

Provision of Project Management & Construction Engineering

- Project Management Team

- Project Delivery Procedure

2012

23 STC-0587 Offshore North West JavaTechnical Services for Provision of Client Site Representative to

Support Diving and ROV Campaigns2012

244400000157 - BP Tangguh Gas Processing

Facilities

Provision of Technical Support Services for Tangguh Gas

Processing Facilities. General Scope of work are:

- Quality Management Services

- HSE Management Services

- Logistic Requirement Services

- Constructability Study

- Contracting & Project Control Services

- Specialized Study

2012

PT EJJV Engineering Indonesia - Project Experience Summary Page 3 of 13

Page 4: PROJECT EXPERIENCE SUMMARY - EJJVejjv.co.id/templates/akd_e/files/camellia-akd/uploads... ·  · 2015-03-2939 SO2435 - EPC-1 Banyu Urip Project Completion System for Banyu Urip EPC-1

No Client Name Owner Project Name Specific Responsibilities/ Scope of Work Year Completed

PROJECT EXPERIENCE SUMMARY

25STC-0429 - Offshore West Java

Rehabilitation Project

Project Management Services

The services are:

- Project Management Services

- Provide personnel for Construction

- Review Piping Validation

- Engineering Works for TAR 2009

- Project HSE Reviews

- Engineering Quality Plan

- Capital Value Process (CVP) Review

- Construction Engineering

2011

26 West Java Rehabilitation Project Provision of Piping Design Engineer / Construction Engineer 2007

27 West Java Rehabilitation Project Provision of Workpack Development Specialist Services 2008

28 West Java Rehabilitation Project Provision of As-Built Specialist Consultancy 2008

29 West Java Rehabilitation Project Provision of Workpack Development Specialist Consultancy 2007

30 West Java Rehabilitation Project Provision of Workpack Development Specialist Consultancy 2007

31 Shell Sarawak Berhad (B11LQ) Project Provision of Manpower Services - Indirect Personnel 2008

32Mafumeira KWIP Offshore Development

ProjectProvision of Manpower Services - Direct Personnel 2009

PT EJJV Engineering Indonesia - Project Experience Summary Page 4 of 13

Page 5: PROJECT EXPERIENCE SUMMARY - EJJVejjv.co.id/templates/akd_e/files/camellia-akd/uploads... ·  · 2015-03-2939 SO2435 - EPC-1 Banyu Urip Project Completion System for Banyu Urip EPC-1

No Client Name Owner Project Name Specific Responsibilities/ Scope of Work Year Completed

PROJECT EXPERIENCE SUMMARY

33 Takula Gas Processing Platform Project Provision of Manpower Services - Direct Personnel 2009

34 Takula Gas Processing Platform Project Provision of Manpower Services - Direct Personnel 2009

35 Takula Gas Processing Platform Project Provision of Manpower Services - Direct Personnel 2009

36 TOTAL TUNU 11 Direct Hire of Lead Electrical Engineer 2007

37 TOTAL TUNU 11 Seconded Lead Piping Engineer 2007

383900214656

Cleaning Tanki and Processing SOR

Cleaning Tanki T-2 / T-9 & Processing Sludge Oil Recovery

(SOR) - Pertamina EP Jatibarang Field2013

39 SO2435 - EPC-1 Banyu Urip Project Completion System for Banyu Urip EPC-1 2014

PROJECT CONSTRUCTION

PT EJJV Engineering Indonesia - Project Experience Summary Page 5 of 13

Page 6: PROJECT EXPERIENCE SUMMARY - EJJVejjv.co.id/templates/akd_e/files/camellia-akd/uploads... ·  · 2015-03-2939 SO2435 - EPC-1 Banyu Urip Project Completion System for Banyu Urip EPC-1

No Client Name Owner Project Name Specific Responsibilities/ Scope of Work Year Completed

PROJECT EXPERIENCE SUMMARY

40 P14-049Provision to Supply for Tehcnical Safety Engineer for CP2

ProjectOn Going

41 MSOCL/CON-HSE/DEC/13/218 Provision of HAZID Workshop & Report Service 2014

42 SCA No : 2778-EN-SC-014 HAZOP & QRA Studies of Chevron AIP Project 2014

43Safetec Malaysia Provision of Process Safety Engineer in Foorozan FZ-A project

at NGL Tech office in Kuala Lumpur2013

44P00036 - Safetec Malaysia

Murphy Permas Topsides EPCC - RAM & AIV Studies 2013

45380/CA/2013 Pertamina (persero) RU III

PlajuUpdate P&ID Menggunakan 3D Scanning Kilang Utilities Plaju 2013

46

PS-102/EJJV/VI/2013

GSWP Project of Petronas Carigali SDN

Bhd

Hazid & Hazop Studies for Development of Generic Satelite

Wellhead Platform (GSWP) Project 2013

47SO No. PA03780613

PT Atamora Tehnik MakmurUmbilical Project for Hazid Study 2013

ENGINEERING & PROCESS SAFETY STUDIES

PT EJJV Engineering Indonesia - Project Experience Summary Page 6 of 13

Page 7: PROJECT EXPERIENCE SUMMARY - EJJVejjv.co.id/templates/akd_e/files/camellia-akd/uploads... ·  · 2015-03-2939 SO2435 - EPC-1 Banyu Urip Project Completion System for Banyu Urip EPC-1

No Client Name Owner Project Name Specific Responsibilities/ Scope of Work Year Completed

PROJECT EXPERIENCE SUMMARY

48 PS-095A/EJJV/II/2013 Pertamina RFCC Cilacap QRA & BRA Studies 2013

49 PS-095/EJJV/II/2013 Pertamina RFCC Cilacap QRA & BRA Studies 2013

50RFCC-A-PR-AG-008A Cilacap Resid Fluid

Catalityc Cracking (RFCC)Provision Hazop and SIL Study 2013

51 PPGJ-PS-TSA-079 Gundih Project Dispersion Study for Thermal Oxidaton Package (PE-0401) 2012

52 Naga Pelikan Project Provision of Hazid, Hazop & SIL Chairman & Scriber Services 2013

53 KF Booster Gas Compressor Project Hazid and Hazop Engineering Study 2012

54 FEED GG Field Development ProjectPerform Safety Case Study i.e Fire and Explosion Analysis,

Pipeline Risk Assessment, QRA Study and FERA Study.2012

PT EJJV Engineering Indonesia - Project Experience Summary Page 7 of 13

Page 8: PROJECT EXPERIENCE SUMMARY - EJJVejjv.co.id/templates/akd_e/files/camellia-akd/uploads... ·  · 2015-03-2939 SO2435 - EPC-1 Banyu Urip Project Completion System for Banyu Urip EPC-1

No Client Name Owner Project Name Specific Responsibilities/ Scope of Work Year Completed

PROJECT EXPERIENCE SUMMARY

55Proyek Pengembangan Gas Jawa Area

GundihPerform QRA Study 2012

56 EPC for LTRO Project Perform HAZOP and HAZID Study for LTRO Project 2012

57EPCI OF AGX COMPRESSOR

RECONFIGURATION

Provision of Safety Studies i.e HAZID, HAZOP, QRA, NHHA, ESSA,

EERA, SIL, ALARP, Safety Case, What if analysis, Safety critical

elements and performance standard, Noise Study, Chemical

handling and Hazard Register.

2012

58 Subsea Project SSIV QRA Study 2012

59 Ujung pangkah Development WHP B Perform HAZID for Ujung pangkah Development WHP B

Upgrade and Inspection2011

60 CO-11-138 PremierOil Natuna Written Scheme of Examination Development & Safety Safety

Critical Element Verification2012

61 Bakrie Sumatera Plantations (BSP) Project ATEX 137 Hazardous Area Classification (HAC) Study 2011

62Salamander Existing Gas Plant Pangkalan

Brandan North Sumatra

Performed Hazard Identification (HAZID) study for Installation

VRU Compressor Package 2011

63 Block A Gas Development ProjectPerformed Quantitative Risk Assessment (QRA) study for

Medco Block A Gas Development Project2011

PT EJJV Engineering Indonesia - Project Experience Summary Page 8 of 13

Page 9: PROJECT EXPERIENCE SUMMARY - EJJVejjv.co.id/templates/akd_e/files/camellia-akd/uploads... ·  · 2015-03-2939 SO2435 - EPC-1 Banyu Urip Project Completion System for Banyu Urip EPC-1

No Client Name Owner Project Name Specific Responsibilities/ Scope of Work Year Completed

PROJECT EXPERIENCE SUMMARY

64 LIMA Subsidence Remediation ProjectPerformed Hazard Identification (HAZID) study for PHE LIMA

Subsidence Remediation Project2011

65 EHMR Water (reinjection) FEL-3 Project

Facilitating HAZID, SIL and HAZID/ENVID Session of CESC

Eastern Hub Mercury Removal - Water (Reinjection) FEL-3

project

2011

66 Ammonia Plant Project Performed QRA Study for Ammonia Gas Plant project 2011

67 CESC Bungin Develeopment FEL-2 ProjectFacilitating HAZID, HAZOP and SIL of CESC Bungin

Development FEL-2 Project2011

68 CESC LTRO FEL3 project Facilitating HAZID, HAZOP and SIL of CESC LTRO FEL3 Project 2010

69 CO-09-098 PremierOil Natuna

Independent Verification Services In Accordance With the

Offshore Safety case Requirements

- Development of Written Scheme Examination (WSE)

2010

70 CO-09-101 PremierOil Natuna

Provision of Enhancement of Scheme of Verification for Static

Equipment Elements.

- Identification of Static SCEs

- SCE/MAE Matrix

- Development Operational Performance Standards for

approved Static SCEs

- Electrical Ex-Register Review

- Inputs for Update of Scheme of Verification Document

- SCE ID and First Pass Performance Standards

- Provide advice on in corporatation of Static SCE's in TSS

matrix

2010

PT EJJV Engineering Indonesia - Project Experience Summary Page 9 of 13

Page 10: PROJECT EXPERIENCE SUMMARY - EJJVejjv.co.id/templates/akd_e/files/camellia-akd/uploads... ·  · 2015-03-2939 SO2435 - EPC-1 Banyu Urip Project Completion System for Banyu Urip EPC-1

No Client Name Owner Project Name Specific Responsibilities/ Scope of Work Year Completed

PROJECT EXPERIENCE SUMMARY

71SC-0063 - HSE Management System

Services

HSE Audit Support, Contractor Safety, Health and Environt

management System Implementation Support Services,

SIMOP Procedure, HSE Acceptance List, HSE Online

2012

72 Anoa Safety Case

Performed Offshore Quantitative Risk Assessment (QRA), Base

Case Definition, Supporting Studies, Safety Case, Offshore

Handbook and Rollout, Training, Management Updates,

Safety Critical Element (SCE) studies for Anoa Safety Case

2009

73 Update QRA & HAZOP Study Update QRA & HAZOP Study 2009

74 Specialist Safety Study ProjectSpecialist Study for Quantitive Risk Assessment (QRA) and

Safety Integrity Level (SIL) Assessment2009

75Pangkah Liquid Development Oil

Treating & LPG Facilities ProjectPerform Detailed Surge Analysis Study 2009

76Singa Gas Development Project

Lematang - South SumatraQuantitative Risk Assessment Study 2010

77Ujung Pangkah Liquid Development

ProjectFireproofing Requirement Review 2009

78Cnooc Mila A Wellhead Platform and

Pipeline ProjectPerformed HAZOP, HAZID and ALARP Studies 2010

PT EJJV Engineering Indonesia - Project Experience Summary Page 10 of 13

Page 11: PROJECT EXPERIENCE SUMMARY - EJJVejjv.co.id/templates/akd_e/files/camellia-akd/uploads... ·  · 2015-03-2939 SO2435 - EPC-1 Banyu Urip Project Completion System for Banyu Urip EPC-1

No Client Name Owner Project Name Specific Responsibilities/ Scope of Work Year Completed

PROJECT EXPERIENCE SUMMARY

79 Ujung Pangkah CPP & AUP EPCC Project LQ Sprinkler System Requirement Review 2009

80Ujung Pangkah Liquid Development

ProjectOTF & LPG Detailed Surge Analysis 2009

81 OTF & LPG recovey Plant Additional HAZOP study for LPG product Segregation &

produced water system package2009

82 Ujung Pangkah Development Project Pipeline Transient Analysis Revisit 2009

83EPC Gas Production Facilities Jambi

Merang Development ProjectSafety Engineering - Review of Critical 2009

84 LPG-FSO Petrostar Failure Analysis Matering of LPG-FSO Petrostar 2008

85Oyong Phase 2 Onshore Processing Plant

(OPF) Project

Performed Hazard Identification (HAZID) study for Santos

Oyong Phase 2 OPF Project2009

86Ujung Pangkah Liquid Development

ProjectWater Hammer Analysis & Surge Analaysis 2009

87 Gelagah Kambuna Development Project SPECIALIST HAZOP, HAZID & SIL STUDY 2009

PT EJJV Engineering Indonesia - Project Experience Summary Page 11 of 13

Page 12: PROJECT EXPERIENCE SUMMARY - EJJVejjv.co.id/templates/akd_e/files/camellia-akd/uploads... ·  · 2015-03-2939 SO2435 - EPC-1 Banyu Urip Project Completion System for Banyu Urip EPC-1

No Client Name Owner Project Name Specific Responsibilities/ Scope of Work Year Completed

PROJECT EXPERIENCE SUMMARY

88Singa Gas Development Project

Lematang - South Sumatra

Performed HAZOP and HAZID studies for Singa Gas Plant

Development Project2009

89Gas Production Facility Jambi Merang

Project

Performed HAZOP and HAZID Studies for Jambi Merang

Project2008

90 West Java Rehabilitation Project Preparation of Material Take Off 2008

91 North Duri Development Project - Area 13Performed HAZOP study for North Duri Development Project -

Area 132008

92LPG FSO (Petrostar), FPU and Oil FSO

(Federal-I) Jabung Offshore

Undertake Safety Review to identify all the potential hazards

associated with the LPG FSO (Petrostar), FPU and Oil FSO

(Federal-I).

2008

93 ` Export hose rupture case, Effect of pump seal failure at MD3 2008

94

Ujung Pangkah Liquids Development

Projects –Oil Treating Facility and LPG

Recovery Plant Project

Performed SIL, HAZOP, HAZID and QRA Studies for Ujung

Pangkah Liquids Development Projects –Oil Treating Facility

and LPG Recovery Plant Project

2007

95 Wellhead Platform Performed SIL and Noise studies for ENI Blacktip Gas Project 2007

PT EJJV Engineering Indonesia - Project Experience Summary Page 12 of 13

Page 13: PROJECT EXPERIENCE SUMMARY - EJJVejjv.co.id/templates/akd_e/files/camellia-akd/uploads... ·  · 2015-03-2939 SO2435 - EPC-1 Banyu Urip Project Completion System for Banyu Urip EPC-1

No Client Name Owner Project Name Specific Responsibilities/ Scope of Work Year Completed

PROJECT EXPERIENCE SUMMARY

96Cilamaya Onshore Receiving Facility and

Offshore Platform

Performed SIL Verification for Cilamaya ORF and NGLB

Dehydration as part of the project2007

97 KG Platform Modification ProjectPerformed FERA and EERA Studies for the KG Platform

Modification Project2007

98Offshore LPG/Oil Terminal, Offshore

JabungHAZOPS, HAZID, and Safety Review 2007

PT EJJV Engineering Indonesia - Project Experience Summary Page 13 of 13