PROJECT EXPERIENCE: BIOPHARMACEUTICALS /BIOTECHNOLOGY€¦ · Name: Location: Owner: Project...

1
Name: Location: Owner: Project Services www.kinetics.net – KINETICS 2016 – All rights reserved PROJECT EXPERIENCE: BIOPHARMACEUTICALS /BIOTECHNOLOGY Amgen AFR-BMX Manufacturing Fremont, CA USA Amgen This project was an extreme renovation to an existing 100,000 sq. ft. facility. Kinetics performed the install of all process piping, pressure testing and supervised the passivation. Fluor provided the P&IDs, routing and drawing while Kinetics utilized 3D CAD modeling and was the coordination lead for the entire project. Kinetics performed over 200 shutdown tie-ins to all process systems in two separate shutdowns in order to keep the facility running. Kinetics also installed a new clean steam generator, centrifuge, transfer panels and numerous large tanks. Our safety record for the project included over 39,000 man hours with no lost time injuries.

Transcript of PROJECT EXPERIENCE: BIOPHARMACEUTICALS /BIOTECHNOLOGY€¦ · Name: Location: Owner: Project...

Page 1: PROJECT EXPERIENCE: BIOPHARMACEUTICALS /BIOTECHNOLOGY€¦ · Name: Location: Owner: Project Services t – – d PROJECT EXPERIENCE: BIOPHARMACEUTICALS /BIOTECHNOLOGY Amgen AFR-BMX

Name:

Location:

Owner:

Project Services

ww

w.kinetics.net–

KINETIC

S 2016 –All rights reserved

PROJECT EXPERIENCE: BIOPHARMACEUTICALS/BIOTECHNOLOGY

Amgen AFR-BMX Manufacturing

Fremont, CA USA

Amgen

This project was an extreme renovation to an existing 100,000 sq. ft. facility. Kinetics performed the install of all process piping, pressure testing and supervised the passivation. Fluor provided the P&IDs, routing and drawing while Kinetics utilized 3D CAD modeling and was the coordination lead for the entire project. Kinetics performed over 200 shutdown tie-ins to all process systems in two separate shutdowns in order to keep the facility running. Kinetics also installed a new clean steam generator, centrifuge, transfer panels and numerous large tanks. Our safety record for the project included over 39,000 man hours with no lost time injuries.