Project Description RAIL PROJECT - DOHA METRO RED ...QATAR INTEGRATED RAIL PROJECT - DOHA METRO RED...

7
Page 1 of 7 www.valveit.com COUNTRY: QATAR CLIENT: QATAR RAIL CONTRACTOR: ISG JV SALINI- IMPREGILO CONSULTANT: JACOBS TYPE: WATER TREATMENT & WASTE WATER TREATMENT QATAR INTEGRATED RAIL PROJECT - DOHA METRO RED LINE NORTH UNDERGROUND The Doha metro consists of four lines serving the Greater Doha area. The lines are both underground and elevated rail sections as well as several bridges and over passes. It includes connections to town centers and commercial and residential areas throughout the city. The new Red Line Underground aims to connect the northern part of Doha to the new and existing metropolitan network. The project was handled via a Design & Build Contractor, result of a Joint Venture led by Italian Salini Impregilo, South Korea’s SK Engineering and Construction and Qatar Galfar Al Misnad. Seven new stations have been designed and delivered to the client (Qatar Rail) by the end of 2017 for this purpose, representing one of the largest infrastructure projects the city of Doha has seen for a while. The Red Line North Underground connects Msheireb Station, located in the center of Doha, to Al Khor in the northern area of the city, through two 13 kilometers long parallel tunnels. Project Description

Transcript of Project Description RAIL PROJECT - DOHA METRO RED ...QATAR INTEGRATED RAIL PROJECT - DOHA METRO RED...

Page 1: Project Description RAIL PROJECT - DOHA METRO RED ...QATAR INTEGRATED RAIL PROJECT - DOHA METRO RED LINE NORTH UNDERGROUND Engineering and Construction and The Doha metro consists

Page 1 of 7

www.valveit.com

COUNTRY: QATAR

CLIENT: QATAR RAIL

CONTRACTOR: ISG JV SALINI-IMPREGILO

CONSULTANT: JACOBS

TYPE: WATER TREATMENT & WASTE WATER

TREATMENT

QATAR INTEGRATED RAIL PROJECT - DOHA

METRO RED LINE NORTH UNDERGROUND

The Doha metro consists of four lines serving the Greater Doha area. The lines are both underground and elevated rail sections as well as several bridges and over passes. It includes connections to town centers and commercial and residential areas throughout the city.

The new Red Line Underground aims to connect the northern part of Doha to the new and existing metropolitan network. The project was handled via a Design & Build Contractor, result of a Joint Venture led by Italian Salini Impregilo, South Korea’s SK Engineering and Construction and Qatar Galfar Al Misnad. Seven new stations have been designed and delivered to the client (Qatar Rail) by the end of 2017 for this purpose, representing one of the largest infrastructure projects the city of Doha has seen for a while. The Red Line North Underground connects Msheireb Station, located in the center of Doha, to Al Khor in the northern area of the city, through two 13 kilometers long parallel tunnels.

Project Description

Page 2: Project Description RAIL PROJECT - DOHA METRO RED ...QATAR INTEGRATED RAIL PROJECT - DOHA METRO RED LINE NORTH UNDERGROUND Engineering and Construction and The Doha metro consists

Page 2 of 7

www.valveit.com

Product Description Quantity

THREADED RUBBER BELLOWS PN 16 Rubber expansion joint Reinforced EPDM rubber Threaded end connections to BS 21 (with unions) 20,00

THREADED RUBBER BELLOWS PN 16

Rubber expansion joint Reinforced EPDM rubber Threaded end connections to BS 21 (with unions) 10,00

THREADED RUBBER BELLOWS PN 16

Rubber expansion joint Reinforced EPDM rubber Threaded end connections to BS 21 (with unions) 14,00

CAST IRON SWING CHECK VALVE PN 16

Body, bonnet and disc material: cast iron EN-JL 1040 Suitable for mounting in Horizontal and Vertical Pipe (with flow upwards)

Raised face, bronze trim, bolted cover. 2,00

RUBBER EXPANSION JOINT FLANGED, PN 16 Flanged rubber bellow, PN 16 rated, EPDM rubber, floating type flanges, flange material in

carbon steel ST37.2 with electro-galvanized. 28,00

RUBBER EXPANSION JOINT FLANGED, PN 16 Flanged rubber bellow, PN 16 rated, EPDM rubber, floating type flanges, flange material in

carbon steel ST37.2 with electro-galvanized. 16,00

PRODUCT SUPPLIED

Page 3: Project Description RAIL PROJECT - DOHA METRO RED ...QATAR INTEGRATED RAIL PROJECT - DOHA METRO RED LINE NORTH UNDERGROUND Engineering and Construction and The Doha metro consists

Page 3 of 7

www.valveit.com

PRODUCT SAMPLES

Page 4: Project Description RAIL PROJECT - DOHA METRO RED ...QATAR INTEGRATED RAIL PROJECT - DOHA METRO RED LINE NORTH UNDERGROUND Engineering and Construction and The Doha metro consists

Page 4 of 7

www.valveit.com

PROJECT APPROVALS

Page 5: Project Description RAIL PROJECT - DOHA METRO RED ...QATAR INTEGRATED RAIL PROJECT - DOHA METRO RED LINE NORTH UNDERGROUND Engineering and Construction and The Doha metro consists

Page 5 of 7

www.valveit.com

Page 6: Project Description RAIL PROJECT - DOHA METRO RED ...QATAR INTEGRATED RAIL PROJECT - DOHA METRO RED LINE NORTH UNDERGROUND Engineering and Construction and The Doha metro consists

Page 6 of 7

www.valveit.com

Page 7: Project Description RAIL PROJECT - DOHA METRO RED ...QATAR INTEGRATED RAIL PROJECT - DOHA METRO RED LINE NORTH UNDERGROUND Engineering and Construction and The Doha metro consists

Page 7 of 7

www.valveit.com