ENGRO FOODS SUPPLY LTD
FABRICATION AND ERECTION OF TANKS
Rev - 00
Project Number - 0045
Prepared By
Project Planning and Control Department
PROJECT CONTROL SHEET
SR CONTENTS
1 ANNEXURE A1 - DAILY DAIRY
2 ANNEXURE A2 - PLANNED VS ACTUAL PROGRESS GRAPH
3 ANNEXURE A3 - DIRECT MANPOWER AND DAILY PRODUCTIVITY ANALYSIS
4 ANNEXURE A4 - DIRECT MANPOWER AND DAILY PRODUCTIVITY GRAPHS
5 ANNEXURE A5 - PROJECT PROJECTIONS
6 ANNEXURE A6 - MACHINE UTILIZATION
7 ANNEXURE A7 - SITE BOTTLENECKS
8 ANNEXURE A8 - INVOICING STATUS
9 ANNEXURE A9 - PROJECT DEPLOYMENTS
10 ANNEXUREA10 - PROJECT MONITORING SHEET
PROJECT PLANNING AND CONTROL DEPARTMENT
Project Title ENGRO FOODS SUPPLY LTDProject Manager NABEEL MIRZASite Supervisor MR SAEEDDated - SUBMISSION :
1) Weather ConditionsClear Max.Temp.Rainy Min. Temp.
2) Manpower
DescriptionYesterday Today
On Roll Present On Roll PresentDirect Manpower FauzIndirect Manpower FauzTotal Strength at site
3) Manhours
DescriptionTodate TODAY
Planned Actual Planned ActualNormal Direct ManhoursTotal Manhours
4) EquipmentDescription No. of Eqpt Working
Owned Rental Owned RentalCranesWelding MachinePower GeneratorOther Vehicles
5) Progress Percentage
DescriptionProject todate TODAY
Planned % Actual % Planned % Actual %###Tank A ###Tank B ###Tank CTank DTank E
###Total
6) Any critical information from site
7) NOTE
Daily DiaryDocument Level. VDocument Number. FR-PPC-05Document Version 1Effective Date. July 1st 2009
ANNEXURE A-2
ENGRO FOODS SUPPLY 12-Oct-10
10
98765432
SEPTEMBER
1
3130292827262524232221201918171615141312111098765432
AUGUST
1
31302928272625
JULY
24
0.00%20.00%40.00%60.00%80.00%
100.00%120.00%
Planned Percentage Vs Actual Percentage
Planned ProgressActual Progress
Cu
mu
lati
ve
P
erce
ntage
A
ch
ie
ve
d
ANNEXURE - A3
ENGRO FOODS SUPPLY
ACTUAL DAILY DIRECT MANPOWER STATUS
S/NO CRAFT 15-Oct 16-Oct 17-Oct 18-Oct 19-Oct 20-Oct 21-Oct 22-Oct 23-Oct 24-Oct 25-Oct 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov Man Days Man Hours
1 FABRICATOR 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 120 1,200
2 FITTER 1 2 3 4 5 6 7 8 9 10 11 12 13 14 105 1,050
3 RIGGERS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 105 1,050
4 SCAFFOLDERS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 120 1,200
5 WELDERS - -
6 HELPERS - -
TOTAL MANPOWER 0 0 0 0 0 0 0 1 2 4 7 11 15 19 23 27 31 35 39 43 47 51 39 27 14 15 0 0 0 0 0 0 450 4,500
TOTAL MANHOURS 0 0 0 0 0 0 0 10 20 40 70 110 150 190 230 270 310 350 390 430 470 510 390 270 140 150 0 0 0 0 0 0
ENGRO FOODS SUPPLYDAILY PRODUCTIVITY ANALYSISS/NO CRAFT 15-Oct 16-Oct 17-Oct 18-Oct 19-Oct 20-Oct 21-Oct 22-Oct 23-Oct 24-Oct 25-Oct 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov
1 QTY ACHIEVED 1 2 3 2 3 1 4 6 3 2 2 2 3 4 5 6 7 8 9 10
2 40 50 200 300 200 100 150 250 240 230 20 10 250 240 230 220 210 200 190 180
DAILY PRODUCTIVITY 40 25 66.667 150 66.667 100 37.5 41.667 80 115 10 5 83.333 60 46 36.667 30 25 21.111 18
MANHOURS CONSUMED
ANNEXURE A4
ENGRO FOODS SUPPLY 12-Oct-10
ENGRO FOODS SUPPLY 12-Oct-10
15-Oct
16-Oct
17-Oct
18-Oct
19-Oct
20-Oct
21-Oct
22-Oct
23-Oct
24-Oct
25-Oct
26-Oct
27-Oct
28-Oct
29-Oct
30-Oct
31-Oct1-N
ov2-N
ov3-N
ov4-N
ov5-N
ov6-N
ov7-N
ov8-N
ov9-N
ov
10-Nov
11-Nov
12-Nov
13-Nov
14-Nov
15-Nov
0
10
20
30
40
50
60
0 0 0 0 0 0 0 1 2 47
1115
1923
2731
3539
4347
51
39
27
14 15
0 0 0 0 0 0
DIRECT MANPOWER DEPLOYMENT
Actual Direct Manpower
15-Oct
16-Oct
17-Oct
18-Oct
19-Oct
20-Oct
21-Oct
22-Oct
23-Oct
24-Oct
25-Oct
26-Oct
27-Oct
28-Oct
29-Oct
30-Oct
31-Oct
1-Nov
2-Nov
3-Nov
4-Nov
5-Nov
6-Nov
7-Nov
8-Nov
9-Nov
10-Nov
11-Nov
12-Nov
13-Nov
14-Nov
15-Nov
0
20
40
60
80
100
120
140
160
4025
66.6666666666667
150
66.6666666666667
100
37.541.6666666666
667
80
115
10 5
83.3333333333333
6046 36.6666666666
66730 25 21.111111111111118
DAILY PRODUCTIVITY
MH/TON
ANNEXURE A-5
PROJECT PROJECTIONS BASED ON DAILY PRODUCTIVITY 18-Oct-10
Project Schedule
Sr.# CONTRACTUAL DATES PROJECTED COMPLETION Agreed with Client Variance
1 Start 8-Jul Duration Start 15-Oct Duration Start 8-Jul Duration Days2 Finish 15-Sep 69 Days Finish 23-Oct 8.01875 Days Finish 11-Nov 126 Days 38.01875
PROJECTIONS
Sr.# Description Unit Qty.Balance
Remarks
Qty Qty Qty/Day
1 Fabrication and Erection of Diesel Day Tank Ton 3.16 3 0 0.50 0.0 18-Oct-10 COMPLETED
2 Ton 11.95 12 0 0.80 0.0 18-Oct-10 COMPLETED
3 Fabrication and Erection of Condensate Tank Ton 8.01 8 0 0.30 0.0 18-Oct-10 COMPLETED
4 Fabrication and Erection of FW/RW Tank Ton 44 40 4 0.80 5 23-Oct-10
5 Ton 28.50 28 0 0.80 0.50 18-Oct-10
Achieved till date
Avg Productivity ( From last 3 days) Day Required to
CompleteProjected
Completion Date
Fabrication and Erection of Diesel Storage Tank
Fabrication and Erection of Treated Water Tank
ANNEXURE A-6
DAILY MACHINE UTLIZATION
TYP Item_Description QTYNO OF HOURS
15-Oct 16-Oct 17-Oct 18-Oct 19-Oct 20-Oct 21-Oct 22-Oct 23-Oct 24-Oct 25-Oct 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov Total M/C Hours
E&P
Crane 110 Ton 2
Crane 45 Ton 4
Fork Lifter 5Ton 1
Trolly 1
RENTAL E&P Crane 20 Ton 1
Shahzor 0
Haice 0
Carry (Rental) 2
Single Cabin (Rental) 1
TOOL AND PLANT
130KVa Generator
Wedling Machines 2
Chain Blocks 3
Flushing pump 1
Pressure Testing Pump 1
COMPANY TRANSPORT
RENTAL TRANSPORT
ANNEXURE A-7
ENGRO FOODS SUPPLY LTD 12-Oct-10
SITE BOTTLENECK LISTSR REMARKS
123456789
1011121314151617
ANNEXURE A-8PROJECT INVOICING STATUS
Description
Invoiced by FAUZ ENGINEERING DEDUCTION BY CLIENT
Ref. No. Date
1 1 26-11-2009 712,500 712,500 712,500 - - 712,500
2 1st Running Invoice 1 05-02-2010 1,000,000 1,000,000 - - - 1,000,000
3 2nd Running Invoice 1 16-02-2010 966,330 938,789 93,879 46,939 54,058 743,912
4 3rd Running Invoice 1 26-02-2010 2,001,852 1,507,104 - 75,355 - 1,431,749
6 4th Running Invoice 1 09-02-2010 165,800 85,800 80,652 - - 85,800
TOTAL 4,846,482 4,244,193 712,500 174,531 122,295
Sr No
Verified Amount By
Client
Advancesto be
adjusted Invoice Amount
Adjustmentagainst
advances @10%
Retention Amount@ 5%
BackCharges
GrossAmount
Mobilization Advance by Client
ANNEXURE A-8PROJECT INVOICING STATUS
DEDUCTION BY CLIENT Net Payment After Deduction
RemarksAmount Difference Cheque No Date
42,750 42,750 669,750 669,750 - 503263 22-12-2009 Deposit date 24/12/2009
60,000 60,000 940,000 ??? ??? ??? ???
To be Sorted Out44,635 239,511 699,278 ??? ??? ??? ???
85,905 161,260 1,345,844 1,490,746 - 144,902 887209 08-04-2010
5,148 5,148 80,652 ??? ??? ??? ??? Adjusted against advance
238,438 508,669 3,735,523 2,160,496
Tax onGross
Amount @ 6%
Total Deduction
ChequeAmount
ANNEXURE A-9PROJECT PERCENTAGE COMPLETION
MONTH JULY AUGUST SEPTEMBERDAYS 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
1 Water Storage Tank 0.12% 0.12% 0.48% 0.48% 0.72% 0.72% 0.96% 0.96% 0.96% 1.20% 1.20% 1.44% 1.20% 1.44% 1.44% 1.20% 1.44% 1.20% 1.20% 0.96% 0.96% 0.96% 0.72% 0.72% 0.48% 0.48% 0.12% 0.12%
2 Treated Water Tank 0.11% 0.11% 0.44% 0.44% 0.66% 0.66% 0.88% 0.88% 0.88% 1.10% 1.10% 1.32% 1.10% 1.32% 1.32% 1.10% 1.32% 1.10% 1.10% 0.88% 0.88% 0.88% 0.66% 0.66% 0.44% 0.44% 0.11% 0.11%
3 Diesel Tank 0.18% 0.18% 0.54% 0.72% 0.72% 1.08% 1.08% 1.26% 1.26% 1.26% 1.44% 1.26% 1.26% 1.26% 1.08% 1.08% 0.72% 0.72% 0.54% 0.18% 0.18%
4 Condensate Tank 0.19% 0.19% 0.57% 0.76% 0.76% 1.14% 1.14% 1.33% 1.33% 1.33% 1.52% 1.33% 1.33% 1.33% 1.14% 1.14% 0.76% 0.76% 0.57% 0.19% 0.19%
5 Diesel Day Tank 0.07% 0.21% 0.42% 0.49% 0.56% 0.70% 0.70% 0.77% 0.63% 0.70% 0.56% 0.49% 0.42% 0.21% 0.07%
6 Air Receival Vessel 0.09% 0.09% 0.27% 0.45% 0.45% 0.54% 0.54% 0.72% 0.63% 0.72% 0.72% 0.63% 0.72% 0.54% 0.63% 0.36% 0.45% 0.27% 0.09% 0.09%
PLANNED DAILY PROGRESS 0.18% 0.18% 0.54% 0.91% 1.00% 1.74% 2.18% 2.68% 3.27% 3.43% 3.87% 4.01% 3.92% 4.27% 3.76% 3.74% 3.33% 3.12% 2.96% 2.43% 2.38% 2.22% 1.66% 2.12% 1.84% 1.84% 2.30% 2.30% 2.76% 2.30% 2.76% 2.76% 2.30% 2.76% 2.30% 2.30% 1.84% 1.84% 1.84% 1.38% 1.38% 0.92% 0.92% 0.23% 0.23%
CUMULATIVE PROGRESS 0.18% 0.36% 1% 2% 3% 5% 7% 9% 13% 16% 20% 24% 28% 32% 36% 40% 43% 46% 49% 52% 54% 56% 58% 60% 62% 64% 66% 68% 71% 73% 76% 79% 81% 84% 86% 88% 90% 92% 94% 95% 97% 98% 99% 99% 99%
ACTUAL DAILY PROGRESS 0.02% 0.02% 0.02% 0.02% 1% 5% 8%
ACTUAL CUMULATIVE DAILY PROGRESS 0.02% 0.04% 0.06% 0.08% 1.28% 6.28% 14.28%
TANK MANHOURSMONTH JULY AUGUST SEPTEMBERDAYS MH 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
1 Water Storage Tank 6580 32.9 32.9 131.6 131.6 197.4 197.4 263.2 263.2 263.2 329 329 394.8 329 394.8 394.8 329 394.8 329 329 263.2 263.2 263.2 197.4 197.4 131.6 131.6 32.9 32.9
2 Treated Water Tank 5925 29.625 29.625 118.5 118.5 177.75 177.75 237 237 237 296.25 296.25 355.5 296.25 355.5 355.5 296.25 355.5 296.25 296.25 237 237 237 177.75 177.75 118.5 118.5 29.625 29.625
3 Diesel Tank 4860 48.6 48.6 145.8 194.4 194.4 291.6 291.6 340.2 340.2 340.2 388.8 340.2 340.2 340.2 291.6 291.6 194.4 194.4 145.8 48.6 48.6
4 Condensate Tank 5205 52.05 52.05 156.15 208.2 208.2 312.3 312.3 364.35 364.35 364.35 416.4 364.35 364.35 364.35 312.3 312.3 208.2 208.2 156.15 52.05 52.05
5 Diesel Day Tank 2025 20.25 60.75 121.5 141.75 162 202.5 202.5 222.75 182.25 202.5 162 141.75 121.5 60.75 20.25
DAILY MANHOURS 48.6 48.6 145.8 246.45 246.45 447.75 520.05 609.15 774 794.25 915.15 907.05 907.05 979.35 838.2 858.45 720.75 710.975 642.125 567.65 527.15 531.3 427.2 552.25 500.2 500.2 625.25 625.25 750.3 625.25 750.3 750.3 625.25 750.3 625.25 625.25 500.2 500.2 500.2 375.15 375.15 250.1 250.1 62.525 62.525
CUMULATIVE MANHOURS 48.6 97.2 243 489.45 735.9 1183.65 1703.7 2312.85 3086.85 3881.1 4796.25 5703.3 6610.35 7589.7 8427.9 9286.35 10007.1 10718.075 11360.2 11927.85 12455 12986.3 13413.5 13965.75 14465.95 14966.15 15591.4 16216.65 16966.95 17592.2 18342.5 19092.8 19718.05 20468.35 21093.6 21718.85 22219.05 22719.25 23219.45 23594.6 23969.75 24219.85 24469.95 24532.475 24595
TANKS QUANTITIESMONTH
QTYJULY AUGUST SEPTEMBER
DAYS 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
1 Water Storage Tank 43087 215.44 215.44 861.74 861.74 1292.61 1292.61 1723.48 1723.48 1723.48 2154.35 2154.35 2585.22 2154.35 2585.22 2585.22 2154.35 2585.22 2154.35 2154.35 1723.48 1723.48 1723.48 1292.61 1292.61 861.74 861.74 215.44 215.44
2 Treated Water Tank 27803 139.02 139.02 556.06 556.06 834.09 834.09 1112.12 1112.12 1112.12 1390.15 1390.15 1668.18 1390.15 1668.18 1668.18 1390.15 1668.18 1390.15 1390.15 1112.12 1112.12 1112.12 834.09 834.09 556.06 556.06 139.02 139.02
3 Diesel Tank 11953 119.53 119.53 358.59 478.12 478.12 717.18 717.18 836.71 836.71 836.71 956.24 836.71 836.71 836.71 717.18 717.18 478.12 478.12 358.59 119.53 119.53
4 Condensate Tank 7706 77.06 77.06 231.18 308.24 308.24 462.36 462.36 539.42 539.42 539.42 616.48 539.42 539.42 539.42 462.36 462.36 308.24 308.24 231.18 77.06 77.06
5 Diesel Day Tank 3161 31.61 94.83 189.66 221.27 252.88 316.10 316.10 347.71 284.49 316.10 252.88 221.27 189.66 94.83 31.61
6 Air Receival VesselDAILY QTY TO BE ACHIEVED 93710 119.5 119.5 358.6 555.2 555.2 948.4 1057.0 1239.8 1488.7 1520.3 1748.5 1692.2 1692.2 1800.9 1541.1 1572.7 1270.4 1516.2 1365.1 1940.4 1877.2 2357.9 2203.8 2912.7 2835.6 2835.6 3544.5 3544.5 4253.4 3544.5 4253.4 4253.4 3544.5 4253.4 3544.5 3544.5 2835.6 2835.6 2835.6 2126.7 2126.7 1417.8 1417.8 354.5 354.5
CUMULATIVE QTY 119.5 239.1 597.6 1152.8 1708.0 2656.4 3713.4 4953.2 6441.9 7962.3 9710.8 11403.0 13095.3 14896.2 16437.2 18009.9 19280.4 20796.6 22161.6 24102.0 25979.2 28337.1 30540.8 33453.5 36289.1 39124.7 42669.2 46213.7 50467.1 54011.6 58265.0 62518.4 66062.9 70316.3 73860.8 77405.3 80240.9 83076.5 85912.1 88038.8 90165.5 91583.3 93001.1 93355.6 93710.0
TANKS PERCENTAGESMONTH JULY AUGUST SEPTEMBERDAYS 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
1 Water Storage Tank 1% 1% 2% 2% 3% 3% 4% 4% 4% 5% 5% 6% 5% 6% 6% 5% 6% 5% 5% 4% 4% 4% 3% 3% 2% 2% 1% 1%
2 Treated Water Tank 1% 1% 2% 2% 3% 3% 4% 4% 4% 5% 5% 6% 5% 6% 6% 5% 6% 5% 5% 4% 4% 4% 3% 3% 2% 2% 1% 1%
3 Diesel Tank 1% 1% 3% 4% 4% 6% 6% 7% 7% 7% 8% 7% 7% 7% 6% 6% 4% 4% 3% 1% 1%
4 Condensate Tank 1% 1% 3% 4% 4% 6% 6% 7% 7% 7% 8% 7% 7% 7% 6% 6% 4% 4% 3% 1% 1%
5 Diesel Day Tank 1% 3% 6% 7% 8% 10% 10% 11% 9% 10% 8% 7% 6% 3% 1%
6 Air Receival Vessel 1% 1% 3% 5% 5% 6% 6% 8% 7% 8% 8% 7% 8% 6% 7% 4% 5% 3% 1% 1%
Date #REF! EFSL TANKS: PLANNING MONITORING SHEET
SR TANK NAME TANK NO PORTION TagTHICK/MMWIDTH/MM LENGTH/MM QTY
PROGRESS PHYLUMS5% 5% 8% 8% 20% 15% 25% 4% 10%
PRIMER MARKING CUTTING FITUP WELDING INSPECTION PERC %
1 Diesel Day Tank T-6702 S P2 6 1000 5194 2 489 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 489.27 100%2 Diesel Day Tank T-6702 S P1 6 1500 5194 4 1,468 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 1,467.82 100%3 Diesel Day Tank T-6702 R P6 6 1807 260 2 44 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 44.26 100%4 Diesel Day Tank T-6702 R P5 6 1500 3400 2 480 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 480.42 100%5 Diesel Day Tank T-6702 B P4 6 1830 266 2 46 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 45.85 100%6 Diesel Day Tank T-6702 B P3 6 1500 3412 2 482 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 482.12 100%7 Diesel Day Tank T-6702 Nozzles NPS 8 Sch 80 All 68 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 68.00 100%8 Diesel Day Tank T-6702 Flanges NPS 8 Sch 80 All 36 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 36.10 100%9 Diesel Day Tank T-6702 Curb L All 47 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 47.00 100%
Sub Total 3,161 3,160.85 100%1 Diesel Storage Tank T-6701 S P2 6 1500 4010 4 1,133 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 1,133.23 100%2 Diesel Storage Tank T-6701 S P1 6 1500 6000 12 5,087 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 5,086.80 100%3 Diesel Storage Tank T-6701 R P6 6 1220 5294 2 608 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 608.41 100%4 Diesel Storage Tank T-6701 R P7 6 1220 6674 2 767 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 767.00 100%5 Diesel Storage Tank T-6701 R P8 6 1220 7066 2 812 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 812.05 100%6 Diesel Storage Tank T-6701 B P3 6 1220 5275 2 606 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 606.22 100%7 Diesel Storage Tank T-6701 B P4 6 1220 6660 2 765 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 765.39 100%8 Diesel Storage Tank T-6701 B P5 6 1220 7052 2 810 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 810.44 100%9 Diesel Storage Tank T-6701 Nozzles All 474 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 474.00 100%
10 Diesel Storage Tank T-6701 Flanges All 46 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 45.50 100%11 Diesel Storage Tank T-6701 Rafters All 482 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 482.00 100%12 Diesel Storage Tank T-6701 Curb L All 98 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 98.00 100%13 Diesel Storage Tank T-6701 Columns All 257 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 257.00 100%14 Diesel Storage Tank T-6701 Guides All 7 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 6.60 100%
Sub Total 11,953 11,952.65 100%
Total Weight/ KG SAND
BLASTINGROLLING/ERECTION
FINSH COAT
WEIGHT ACHIEVED