Project Brochure V03 - Avanta UK · 2018-12-12 · UK Installation Two Tier Fire Rated Mezzanine:...
Transcript of Project Brochure V03 - Avanta UK · 2018-12-12 · UK Installation Two Tier Fire Rated Mezzanine:...
Robust ergonomic workplace and storage
solutions for all work environments
www.avantauk.com
Project Brochure V03
Avanta UK Ltd | 3
Avanta UK Ltd is an independent company with over 20 years experience in designing and sourcing equipment. Long term partnership arrangements and rigorous appraisal of our portfolio of extensive manufacturing partners ensures that our clients have access to high quality and competitively priced standard and non-standard products.
and mobile shelving systems) and interior solutions (including
and on going support.
See more case studies atwww.avantauk.com
Call - 0800 975 4933Email: [email protected]
2 | Avanta UK Ltd
Mezzanine Floors page 4 Office Interiors page 12 Pallet Racking page 20
Shelving Systems page 28 Steel Partitions page 36 Workplace Equipment page 44
CONTENTS
Managing your workspace – you can
trust us.It is an investment in time and
money. We will work with you to maximise your workspace
and productivity.
From a single item to the full turnkey package For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
4 | Mezzanine Floors Mezzanine Floors | 5For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
Mezzanine FloorsUK, for a wide range of purposes. If it can be accommodated within the
USES OF MEZZANINE FLOORSStorage Mezzanines - Additional storage within a warehouse, specialist item storage, integration with racking systems.
Office Mezzanines - Additional workspace for staff, meeting areas or
Retail Mezzaninesstockroom space, storage for large or specialist items or office space.
Production Mezzanines - Increasing production capacity, adding capabilities to a facility, increasing product storage or adding control/office space.
Warehouse Mezzanines - Adding extra storage or specialist storage space, internal offices or picking/packing space.
Hospitality Mezzanines - Adding extra seating or serving areas, storage or stock rooms or kitchen areas for food preparation.
On-Site Survey
Design Service
Project Planning
Product Development
Aftercare
UK Installation
Two
Tier
Fire
Rat
ed M
ezza
nine
: Gal
vani
sed
faci
a an
d co
lum
ns.
Offic
e M
ezza
nine
: With
incl
ine
belt
conv
eyor
.Of
fice
Mez
zani
ne: O
ffice
s ab
ove
and
belo
w.Of
fice
Mez
zani
ne: S
teel
par
titio
ned
offic
e.
War
ehou
se S
tora
ge M
ezza
nine
:
6 | Mezzanine Floors Mezzanine Floors | 7For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
On-Site Survey
Design Service
Project Planning
Product Development
Aftercare
UK Installation
For more detailed information please visit:
War
ehou
se M
ezza
nine
Flo
or: F
ire ra
ted.
Reta
il M
ezza
nine
Flo
or: W
ith s
tain
less
ste
el h
andr
ail.
Stor
age
Mez
zani
ne F
loor
: Fire
rate
d.M
ezza
nine
Anc
illar
ies:
Stai
rcas
es.
Mez
zani
ne A
ncill
arie
s: Pa
llet G
ates
.
Larg
e Sc
ale
Two
Tier
Mez
zani
ne F
loor
: 14,
500m
2
8 | Case Study Case Study | 9For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
CASE STUDYCLIENT: Group Auto
PRODUCT: Multi-Tier & Shelving Project
LOCATION: Cleckheaton
INSTALLATION: 5 Weeks
REQUIREMENT:
To increase box storage capacity due to increased demand and the launch of numerous ranges to improve product choice and speed of delivery for customers. The undertaking by GROUPAUTO required considerable investment to future proof the capacity of the distribution centre.
Avanta had to design a suitable storage solution that could ‘tie in’ to an existing rack supported structure without compromising the amount of automotive parts that were to be stored.
10 | Case Study Case Study | 11For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
CASE STUDYCLIENT: Multi-channel Retailer
PRODUCT: Mezzanine & Shelving Project
LOCATION: Northern England
INSTALLATION: 36 Weeks
REQUIREMENT:
14,500m2
area is nearly the equivalent of 4 full size football
3900mm and 7500mm.
Avanta supplied and built longspan shelving with mesh decks to create 40,000 BDC box locations.
a QC Area and garment section.
12 | Office Interiors Office Interiors | 13For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
On-Site Survey
Design Service
Project Planning
Product Development
Aftercare
UK Installation
Office InteriorsAvanta UK Ltd is one of the UK’s leading companies who design and install office partitions throughout the UK.
All Avanta interior equipment and office partitions are priced quickly and competitively backed with our free no obligation site surveys.
SOLID OR GLAZED OFFICE PARTITIONS?Avanta UK Ltd is an accredited contractor installing a comprehensive
partitions at highly competitive prices.
We recognise that our clients businesses are constantly evolving and, as such, so are the requirements for space distribution in their office.
Our complete service includes full project management with a free, no obligation on site survey where we can show you exactly what is possible using office partitions within the existing framework of your premises.
Solid
Offi
ce P
artit
ions
: With
gla
zing
and
blin
ds.
Glaz
ed O
ffice
Par
titio
ns: W
ith in
tegr
al b
linds
.Gl
azed
Offi
ce P
artit
ions
: With
bra
ndin
g.So
lid /
Gla
zed
Offic
e Pa
rtiti
ons:
With
bra
ndin
g.
Fram
eles
s Gl
ass
And
Solid
Offi
ce P
artit
ions
: To
crea
te o
ffice
s an
d bo
ardr
oom
.
14 | Office Interiors Office Interiors | 15For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
On-Site Survey
Design Service
Project Planning
Product Development
Aftercare
UK Installation
For more detailed information please visit:https://www.avantauk.com/office-partitions/
Susp
ende
d Ce
iling
: Of
fice
Stor
age
Wal
l: Ce
ntra
lised
sto
rage
sys
tem
.
Cant
een:
For
larg
e wa
reho
use
oper
atio
n.Ki
tche
n Fa
cilit
ies:
Desi
gned
for a
n SM
E bu
sine
ss.
Boar
droo
m M
eetin
g Fu
rnitu
re: T
o se
at 14
peo
ple.
Full
Offic
e Fi
t Out
, Fea
turin
g: B
ench
des
k sy
stem
.
16 | Case Study Case Study | 17For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
REQUIREMENT:
Avanta UK completed a turnkey project for Advanced Dynamics who are a market leading packaging solutions company.
Malcolm Little, Managing Director, Advanced Dynamics commented- “You know that feeling you get when a project exceeds all expectations? Well that is what Avanta achieved for me with this project. They have transformed our working environment to budget, on time, with a friendly, helpful and courteous team on site at all times.”
CASE STUDYCLIENT: Advanced Dynamics
PRODUCT: Turnkey Refurbishment Project
LOCATION: Bradford
INSTALLATION: 5 Weeks
18 | Case Study Case Study | 19For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
REQUIREMENT:
This project encompassed everything in termsof a Full Office Fit Out, from the installation of full height glazed & solid partitions to the supply,install & commissioning of all the AV Equipment.
Under the guidance of a dedicated site manager the works took 10 weeks to complete from start to
CASE STUDYCLIENT: Brenntag UK Ltd
PRODUCT: Installation of a Modern Office Interior
LOCATION: Leeds
INSTALLATION: 10 Weeks
20 | Pallet Racking Pallet Racking | 21For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
Pallet RackingAvanta UK Ltd is one of the UK’s leading specialists in the design, supply and installation of pallet racking for industrial and warehouse use. All Avanta storage racking systems are competitively priced and backed by our prompt service.
CLEVER INDUSTRIAL WAREHOUSE RACKING
needs of your operation to improve storage density, product throughput, accessibility and speed of pick. Options include Narrow Aisle Racking, Drive in Racking, Double Deep Racking and Dynamic Racking Systems.
Whatever the scope of the project, our team will ensure that you are able to maximise the potential of your storage space, and design a
the UK to provide a prompt installation of our pallet racking systems to ensure minimal disruption. All our storage racking installations are to SEMA standards.
On-Site Survey
Design Service
Project Planning
Product Development
Aftercare
UK Installation
Very
Nar
row
Aisl
e Ra
ckin
g: W
ith m
an ri
ser V
NA tr
uck.
Adju
stab
le P
alle
t Rac
king
: Bes
poke
col
our b
eam
s.Ad
just
able
Pal
let R
acki
ng:
Adju
stab
le P
alle
t Rac
king
: Sho
wing
brid
ge b
ay.
Adju
stab
le P
alle
t Rac
king
:
22 | Pallet Racking Pallet Racking | 23For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
On-Site Survey
Design Service
Project Planning
Product Development
Aftercare
UK Installation
For more detailed information please visit:https://www.avantauk.com/pallet-racking/
Driv
e-in
Rac
king
: Hig
h de
nsity
sto
rage
sys
tem
.Pu
sh B
ack
Rack
ing:
Pal
lets
are
retr
ieve
d on
a ‘F
i-Lo’
bas
is.
Doub
le D
eep
Rack
ing:
Mor
e st
orag
e le
ss a
isle
s.Pa
llet L
ive
Rack
ing:
Wor
king
on
a ‘F
i-Lo’
bas
is.
Shut
tle R
acki
ng: D
eep
lane
sto
rage
sys
tem
.
Narr
ow A
isle
Rac
king
:
24 | Case Study Case Study | 25For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
CASE STUDYCLIENT: Sweet Squared
PRODUCT: Pallet Racking Installation
LOCATION: Leeds
INSTALLATION: 2 Weeks
REQUIREMENT:
expansion there was a requirement for Pallet Racking to store over 1100 pallet locations.
The racking system is designed to store products on pallets 1200mm wide x 1000mm deep x up to 1500mm high x 1000 kgs maximum load. Organised into 1 x single sided runs @ 13 bays long. c/w
double sided runs @ 7 bays long.
26 | Case Study Case Study | 27For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
REQUIREMENT:
Avanta UK successfully tendered for the pallet racking project, including the sprinklers and an advanced smoke detection system.
The project had a strict 6 week build programme
project on time. There is now over 5700 palletpositions available including low level storage foranything from a mattress to a tumble dryer.
CASE STUDYCLIENT: Large Home Delivery Specialist
PRODUCT: Pallet Racking Installation
LOCATION: Midlands
INSTALLATION: 6 Weeks
28 | Shelving Systems Shelving Systems | 29For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
On-Site Survey
Design Service
Project Planning
Product Development
Aftercare
UK Installation
Shelving SystemsSophisticated shelving systems allow direct access to merchandise, stock, parts, supplies, documents, and more.
THE RIGHT SHELVING FOR YOU?Avanta UK can help you select and design the most appropriate shelving systems for your storage situation – from industrial shelving and warehouse shelving including longspan shelving to commercial office
shelving & roller racking systems. In most cases there is a choice of
requirements.
Avanta shelving systems are perfect for the storage, picking and replenishment of boxes, packets, containers, documents and loose items.
Certain shelving systems can be accessed from both sides and utilise the full area of the shelf.
Med
ium
Dut
y Ri
vet S
helv
ing:
With
chi
pboa
rd d
ecks
.
Long
span
She
lvin
g: W
ith c
arto
n liv
e ro
ller b
eds.
Long
span
She
lvin
g: W
ith o
pen
boar
ded
deck
s.Lo
ngsp
an S
helv
ing:
With
ste
el d
rop
over
dec
ks.
Long
span
She
lvin
g: W
ith m
esh
deck
s an
d di
vide
rs.
30 | Shelving Systems Shelving Systems | 31For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
On-Site Survey
Design Service
Project Planning
Product Development
Aftercare
UK Installation
For more detailed information please visit:https://www.avantauk.com/shelving-systems/ Sh
orts
pan
Stee
l She
lvin
g: F
orm
ing
a m
ulti-
tier s
helv
ing
stru
ctur
e.
Shor
tspa
n St
eel S
helv
ing:
To s
tore
pac
kets
, bag
s an
d bo
xes.
Shor
tspa
n St
eel S
helv
ing:
Fre
e st
andi
ng b
ays.
Shor
tspa
n St
eel S
helv
ing:
Use
d fo
r onl
ine
retu
rns.
Mob
ile S
helv
ing:
Mul
ti-tie
r She
lvin
g:
32 | Case Study Case Study | 33For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
REQUIREMENT:
A recent installation of this type of warehouse shelving was carried out for a prominent Internet fashion retailer providing 145,920 returns locations within 1920 bays.
The all steel shelving is a bolt free system that provides a sturdy and robust storage solution that will
CASE STUDYCLIENT: Internet Retailer
PRODUCT: Shortspan Shelving
LOCATION: Northern England
INSTALLATION: 6 Weeks
34 | Case Study Case Study | 35For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
REQUIREMENT:
With the available space in the warehouse Avanta UK successfully designed, delivered and installed a 3 Tier Shelving Structure. This created in the region of 10,000 pick levels of various sized products condensed into
to create marshalling and despatch areas. Access for pallets is via goods lift and multiple pallet gates. Access for employees is via staircases.
CASE STUDYCLIENT: Hallmark Consumer Services
PRODUCT: Multi-Tier Shelving Installation
LOCATION: Midlands
INSTALLATION: 7 Weeks
36 | Steel Partitions Steel Partitions | 37For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
Steel Partitionsfor use in a variety of work environments throughout the UK.
USES OF STEEL PARTITIONSFactories - Warehouses - Clean Rooms - Offices - Laboratories
We provide high quality steel partitioning systems at a competitive price in a quick lead-time. For a free no obligation quotation and / or site survey please contact us.
Steel partitions are an excellent tool in redesigning your existing space and can provide additional security to businesses dealing with high risk stock. Our range offers single and double skin steel partitions and a host of other options including cleanroom partitions, machine cages, mesh partitioning and security cages.
Whitewall partitioning is economic and quick to build panel system that can be laid vertically or horizontally.
It is suitable for use within temperature controlled and hygiene safe environments, typically laboratories, cold stores and food factories.
On-Site Survey
Design Service
Project Planning
Product Development
Aftercare
UK Installation
Mac
hine
Gua
rdin
g: W
ith s
wipe
car
d ac
cess
.
Mes
h Pa
rtiti
onin
g: To
div
ide
the
ware
hous
e.M
esh
Cage
s: To
sto
re h
igh
valu
e ite
ms.
Mes
h Pa
rtiti
onin
g: W
ith s
ingl
e lo
ckab
le d
oor.
Sing
le S
kin
Stee
l Par
titio
ning
: Use
d to
hou
se m
achi
nes.
38 | Steel Partitions Steel Partitions | 39For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
On-Site Survey
Design Service
Project Planning
Product Development
Aftercare
UK Installation
For more detailed information please visit:https://www.avantauk.com/steel-partitions/
Whi
tewa
ll Pa
rtiti
ons:
Subd
ivid
e ar
eas
with
in w
areh
ouse
s.Cl
eanr
oom
Ste
el P
artit
ioni
ng: U
sed
in h
ospi
tal e
nviro
nmen
t.
Doub
le S
kin
Stee
l Par
titio
ns: W
ith g
lazin
g de
tail.
Sing
le S
kin
Stee
l Par
titio
ns: T
o ho
use
mac
hine
ry.
Doub
le S
kin
Stee
l Par
titio
ns: T
o cr
eate
test
room
.
Clea
nroo
m P
artit
ioni
ng: T
o cr
eate
labo
rato
ry e
nviro
nmen
t.
40 | Case Study Case Study | 41For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
REQUIREMENT:
The purpose of the project was to create enclosures to house a number of production machines to reduce equipment and material exposure to potential airborne contaminants. After initial discussions Avanta invited market leading steel partitioning manufacturer Troax Lee to work in partnership on the project.
After a handful of design meetings and a client visit to
agreed.
CASE STUDYCLIENT: Kodak
PRODUCT: Steel Partitioning Enclosure Project
LOCATION: Leeds
INSTALLATION: 4 Weeks
42 | Case Study Case Study | 43For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
REQUIREMENT:
The Police Authority had the space and the requirement within the stores warehouse to create a secure segregated storage area.
The preferred option was to utilise a secure cage system that is free standing, demountable and can be relocated as the storage needs evolve over the years.
CASE STUDYCLIENT: A Regional Police Authority
PRODUCT: Secure Mesh Cage Project
LOCATION: Northern England
INSTALLATION: 5 Days
44 | Workplace Equipment Workplace Equipment | 45For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
On-Site Survey
Design Service
Project Planning
Product Development
Aftercare
UK Installation
Workplace EquipmentAvanta UK Ltd offer a comprehensive range of standard and bespoke workplace equipment.
INNOVATIVE WORKPLACE SOLUTIONSLockers
and stainless steel to suit a multitude of storage applications we have a locker to suit. We also manufacture heavy duty security lockers.
WorkbenchesStandard and bespoke workbenches are available on a built to order basis to suit the application. There are a variety of worktop options and storage options to personalise your workbenches.
CabinetsHigh quality British made metal workshop storage cabinets arranged in runs to optimise storage space. Available in 4 colours with special colours also available. Avanta cabinets are modular in 1000mm and 500mm widths.
TrolleysExtensive range of standard and bespoke trolleys.
Wor
ksho
p St
orag
e Sy
stem
: Dom
estic
app
licat
ion.
Besp
oke
Wor
kben
ches
:La
bora
tory
Sto
rage
Uni
ts: D
oubl
e de
ep d
rawe
rs.
Wor
ksho
p St
orag
e Sy
stem
: Ful
l hei
ght s
tora
ge.
Wor
ksho
p St
orag
e Sy
stem
: For
boa
t wor
ksho
p.
46 | Workplace Equipment Workplace Equipment | 47For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
On-Site Survey
Design Service
Project Planning
Product Development
Aftercare
UK Installation
For more detailed information please visit:https://www.avantauk.com/workplace-equipment/
Lock
er R
oom
Inst
alla
tion:
With
isla
nd s
eatin
g.Lo
cker
Roo
m In
stal
latio
n: B
espo
ke lo
cker
s.
Wor
kben
ches
: ESD
can
tilev
er w
orks
tatio
ns.
Stee
l Cab
inet
s: Ha
zard
ous
and
gene
ral s
tora
ge.
Truc
ks &
Trol
leys
: Bes
poke
med
ical
trol
ley.
Wor
ksho
p St
orag
e Sy
stem
: For
veh
icle
re-s
tylin
g wo
rksh
op.
48 | Case Study Case Study | 49For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
CASE STUDYCLIENT: Academy Workshop
PRODUCT: Workshop Fit Out
LOCATION: Northern England
INSTALLATION: 5 Days
REQUIREMENT:
Mobile and static shelving.
Workbenches including electrical, storage, welding and personal workbenches.
Multi-drawer units and crew lockers. Storage cabinets including workshop, general, hazardous & key cabinets.
Workshop equipment including vices, drill press, arc
50 | Case Study Case Study | 51For a free, no obligation quote call: 0800 975 4933 or email: [email protected]
REQUIREMENT:
There is circa 40 individual storage units within this installation with a 10.6m seamless biscuit jointed industrial lino worktop on the main run. There are multiple storage cabinets for bulk storage, bins for consumables and drawers for tooling.
Bespoke depth units were utilised and a mobile drawer unit was included in the package so that tools could be taken to the job if required.
CASE STUDYCLIENT: UK Boating Team
PRODUCT: Boat Maintenance Workshop Fit Out
LOCATION: Essex
INSTALLATION: 2 Days
Avanta UK Ltd • Unit B1 • Astra Park • Parkside Lane • Leeds • West Yorkshire • LS11 5SZ
Tel: 0800 975 4933 / 0113 384 8777 Fax: 0113 384 8778Email: [email protected] Web: www.avantauk.com
Mezzanine Floors
Office Interiors
Pallet Racking
Shelving Systems
Steel Partitions
Workplace Equipment