Project Brief Pasir Besi_yogya

download Project Brief Pasir Besi_yogya

of 18

Transcript of Project Brief Pasir Besi_yogya

  • 8/14/2019 Project Brief Pasir Besi_yogya

    1/18

    Project Information Brief May 2006

    Yogyakarta

    Ironsands- Pig IronProject

  • 8/14/2019 Project Brief Pasir Besi_yogya

    2/18

    Project Information Brief May 2006

    IntroductionIndo Mines Ltd emerged from the former company Australian Kimberley Diamonds ( AK D ). AKD has be en listed on the Australian Stock Exchangesince December 1993 and has been involved in the exploration anddevelopment of mineral projects, in particular diamonds, sinceincorporation.

    AK D has a por tfolio of high qua lity exploration pro spects both in Australiaand Peru.

    In Australia, AKD's assets include the King George and Seppelt Rangediamond projects located in the North Kimberley of Western Australia, theBird in Hand gold project located in the South Australia and the W onarahphosph ate project located in the Northern Ter ritory.In Peru , AKD has 100% of the Chinguela gold project and 30% of the Nangaligold project. It also retains a 0.5% NSR in the El Molino coppe r gold project.

    Following a change of direction towards the development of mineralresource projects in Indonesia, in part icular the development of the Yogyakarta Ironsands / Pig Iron Project, AKD Ltd was renamed IndoMines Limited in March 2006.

  • 8/14/2019 Project Brief Pasir Besi_yogya

    3/18

    Project Information Brief May 2006

    Project BriefRecently Indo Mines Ltd acquired the rights to earn a 70% interest in the Yogyakarta Ironsands - Pig Iron pr oject in Indonesia, following the relevantappr ovals and due diligence.The Iron sands depo sit was initially drilled by PT Aneka Tamb ang in the 1970'sand early 1980's. On the basis of this drilling and subsequent test-work,feasibility studies com pleted by Lurgi and Davy McK ee in 1985 repor ted a largeironsand deposit containing titano-ferrous magnetite over a 22 km by 1.5 km wide strip o f coastal plain.The ironsands deposit at Yogyakarta will be used as the basis for theestablishment of a pig iron making facility at Yogyakarta to provide feedstock for regional steel producers.The location of the beneficiation and pig iron plant at Kulon Progo will be inthe Yogyakarta Province. This location is nominated due to its strategicposition - close to raw material sources, the availabili ty of infrastructure andother required util it ies power, water, rail and harbourProposed initial capacity is 300,000 Tonne / year of Pig Iron. During thefeasibil ity study options will be evaluated to increase pig iron production

    capacity produce and to produce additional ironsand concentrate for directexpor t sale. Apart from ironsand as i ts raw material , the project requires other supportingma terials such as coal and lime stone, all of which are available within closeproximity in Indonesia.

  • 8/14/2019 Project Brief Pasir Besi_yogya

    4/18

    Project Information Brief May 2006

  • 8/14/2019 Project Brief Pasir Besi_yogya

    5/18

    Project Information Brief May 2006

  • 8/14/2019 Project Brief Pasir Besi_yogya

    6/18

    Project Information Brief May 2006

  • 8/14/2019 Project Brief Pasir Besi_yogya

    7/18

    Project Information Brief May 2006

    Historical and Potential Ironsand Deposit DataDeposit: Titaniferrous magnetite sand deposit over22km x 1.8km area; Historical data indicates an average

    10m depth from surface; grading up to13 % Fe

    Exploration Target: + 300 Mt ironsand based ongeological due diligence completed by McKay &Schnellman(a substantial non JORC Compliant resource was defined by Lurgi/ DavyMcKee in 1985 based on +13,000 drill holes by Aneka Tambang in 1970s)

    Potential Mine Life: The potential size of the deposit isexpected to be well in excess of a 15 year mine lifeproducing 300,000 tpa pig iron

  • 8/14/2019 Project Brief Pasir Besi_yogya

    8/18

    Project Information Brief May 2006

    Resource Definition Program

    CurrentlyCompleted geological due diligenceTopogaphical Survey using Differential GPS beingcompleted by Gajah Mada UniversityManagement of exploration program by expatriatesMackay & SchnellmannDrilling using 2 track mounted air core rigs is being

    completed by PT RB Drilling JakartaLaboratory XRF analysis underway with ALS in Perth

  • 8/14/2019 Project Brief Pasir Besi_yogya

    9/18

    Project Information Brief May 2006

    Resource Definition Program ( cont )April to June 2006

    Resource definition drilling programTopographical SurveyUp to 16,000m of air core drilling

    Up to 1000 holes at 16 m average depthInitial drilling on a wide spaced 800m x 100m grid

    Infill drilling to follow in order to define deposit to a measured / indicated JORC standard

    July to August 2006

    Complete JORC compliant Resource for minimumproject life ( + 15 years )Ore Resource calculationGeostatiscal analysisMine Plan and Costing

  • 8/14/2019 Project Brief Pasir Besi_yogya

    10/18

    Project Information Brief May 2006

    Current as of May 20 5,000 m drilled

  • 8/14/2019 Project Brief Pasir Besi_yogya

    11/18

    Project Information Brief May 2006

    Anticipated Product Grades

    Ore % Concentrate % Pig Iron %

    Fe up to13 58 to 60 C 1.5 to 2.5TiO2 7 to 9 Si 0.5 max

    V2O5 0.5 to 0.6 P 0.1 maxSiO2 1.2 to 1.4 S 0.05 maxAl2O3 3.3 to 3.5 Ti 0.05 maxS 0.03 to 0.05 V 0.02 maxP2O5 0.24 to 0.26 Fe 94 min

  • 8/14/2019 Project Brief Pasir Besi_yogya

    12/18

    Project Information Brief May 2006

    Proposed Schedule* 2006 *

    MarchCommence resource definition drilling program including Topographical

    Survey and up to 16,000 m of air core drillingInitial drilling on a w ide spaced 800m x 100m gr id with Infill drilling to follow to define deposit to a m easur ed/indicated JORC standa rd Appro x. 10,000 sam ples for ana lysis

    July

    Complete JORC compliant Resource for minimum project life (+ 15 years )including Ore Resource Calculation and Geostatistical AnalysisMine Plan and CostingConcentration, reduction and smelting testwork based on representativedrilling sample by Outokumpu

    AugustCommence Bankable Feasibility

    SeptemberFinalisation of Offtake arrangements

  • 8/14/2019 Project Brief Pasir Besi_yogya

    13/18

    Project Information Brief May 2006

    Proposed Schedule ( cont ) 2007

    January Continue Bankable Feasibility Study

    Commence project finance arrangementsPerformance Guarantee Testwork

    JuneCompletion Bankable Feasibility Study

    If BFS is positive the follow ing schedu le is anticipated for pr oject executionJuly

    Commence Project Design 2008

    AugustCommence Concentrate Production

    2009 December

    Commence Pig Iron Production

  • 8/14/2019 Project Brief Pasir Besi_yogya

    14/18

    Project Information Brief May 2006

    Proposed Study Development Schedule

    1 2 3 4 5 6 7 8 9 10 11 12

    Technical Study

    Exploration Program

    Testwork

    Drilling

    Resource Estimate

    Mine Plan

    DesignEstimation

    Infrastructure

    Report

    Design

    Performance

    Month

    XRF Analysis

  • 8/14/2019 Project Brief Pasir Besi_yogya

    15/18

    Project Information Brief May 2006

    Feasibility Study - Managed by Outokumpu

    Technical StudyResource DefinitionMining DevelopmentTestworkProcess Plant including Beneficiation / Multiple Hearth Furnace / KilnReduction and Ti & V slag removalLocal infrastructure / fabrication / constructionEnvironmental

    CommercialProject Capital and Operating CostsDevelop financial model and project debt / equity arrangement

    Offtake ArrangementsNegotiate product offtake with Indonesian Steel Producers and Others

  • 8/14/2019 Project Brief Pasir Besi_yogya

    16/18

    Project Information Brief May 2006

    Project Development Alternatives Subject toStudy

    Current base project 300,000 tpa pig iron

    AlternativesIncrease total pig iron production up to 0.5 to 1 MtpaIncrease Concentrator Size ~ 1.5 Mtpa plus 300 to 500,000 tpa pigiron for pig iron and concentrate saleDownstream expansion to Specialty Steels from liquid pig iron

  • 8/14/2019 Project Brief Pasir Besi_yogya

    17/18

    Project Information Brief May 2006

    Testwork Program - Managed by Outokumpu

    CurrentlyPreliminary concentration testwork on winnowed surfacesample completed by Outokumpu Technology Florida

    Confirms historical mineralogy and metallurgical propertiesConcentrate can be produced by Gravity and Low IntensityMagnetic Separation

    July 2006Testwork based on representative drilling sample

    Concentration, reduction and smelting

    January 2007Bulk sample testing for performance guarantees

  • 8/14/2019 Project Brief Pasir Besi_yogya

    18/18

    Project Information Brief May 2006

    Anticipated Process Flowsheet

    Mining

    5.5 Mtpa

    Beneficiation0.7 Mtpa

    MHF / SLRNReduction 0.51 MtpaIronmaking

    0.3 Mtpa

    0.33 Mtpa of Coal

    131 GwHPower

    The technology proposed is

    similar to that successfullyemployed for 20 + years on anironsands to steel operation inNew Zealand

    ~3.0 Mtpa