Project book Xavier Nieto Pascual

9
Project Book / Xavier Nieto Pascual MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES Budget: 100.000 EUR. Location: UOC, Barcelona, Spain. Figures: Update the web-site “Information to the Student” Prepare all the web sites in the Internet portal. Choose and design the web style with CSS. Management the content of the web with the software OPENCMS. Perform all the links to the other UOC web sites. Provide support, as requested, to all the teachers in the university. Program the teacher academy request with HTML, JAVASCRIPT and PHP. MAIN PROJECTS / 2010

Transcript of Project book Xavier Nieto Pascual

Page 1: Project book Xavier Nieto Pascual

Project Book / Xavier Nieto Pascual

MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES

Budget: 100.000 EUR. Location: UOC, Barcelona, Spain. Figures: Update the web-site “Information

to the Student”

Prepare all the web sites in the Internet portal.

Choose and design the web style with CSS.

Management the content of the web with the software OPENCMS.

Perform all the links to the other UOC web sites.

Provide support, as requested, to all the teachers in the university.

Program the teacher academy request with HTML, JAVASCRIPT and PHP.

MAIN PROJECTS / 2010

Page 2: Project book Xavier Nieto Pascual

Project Book / Xavier Nieto Pascual

MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES

Budget: 100.000 EUR. Location: Schneider Electric, Barcelona,

Spain. Figures: Homologation of Automation

Servers as a official BACnet IP controller in Gas Natural

Prepare technical documents (Tested Documented Validated Architecture, presentation).

Perform a demo to test the BACnet connectivity.

Coordinate and verify with the client all the specifications to the test.

Supervise the execution of the demo test. Analyse and solve pending issues in the

demo. Represent the company to the customer

during the different tests.

MAIN PROJECTS / 2012

Page 3: Project book Xavier Nieto Pascual

Project Book / Xavier Nieto Pascual

MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES

Budget: 200.000 EUR. Location: Schneider Electric, Spain,

Barcelona. Figures: Launch control platform,

SmartStruxure Lite.

MAIN PROJECTS / 2012 Perform the first communication test with all the

platform products. Test all the communication protocols of the

control solution (BACnet, Zigbee PRO, Enocean, Modbus, Web Services).

Prepare technical documentation and trainings (specs, costs, estimates, operation manuals, TDVA).

Coordinate and verify the range with the wireless protocols Zigbee PRO and Enocean.

Supervise the execution of works related to this platform.

Analyse and resolve pending issues imposed by the final client at the installations.

Represent the company as a country technical leader.

Page 4: Project book Xavier Nieto Pascual

Project Book / Xavier Nieto Pascual

MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES

Budget: 500.000 €. Location: Gran Canaria Airport. Figures: Lightning, HVAC and metering

control with SmartStruxure to Wonderware software.

Communication performance test with BACnet and Modbus protocol.

Propose and analyse different control scenarios.

Communication and performance test to Wonderware software.

Define IT architecture to connect Automation Server to Wonderware.

Analyse and solve pending issues requiere by the final client at the airport installation.

MAIN PROJECTS / 2013

Lore
inclui punto faltante
Page 5: Project book Xavier Nieto Pascual

Project Book / Xavier Nieto Pascual

MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES

Budget: 50.000 EUR. Location: Hotel Marriot, Mallorca, Spain. Figures: HVAC control with SmartStruxure

Lite with SmartStruxure platform.

Review customer specifications ensuring quote is technically compatible and competitive.

Coordinate with Sales Representative to determine and/or clarify project requirements to ensure quality output.

Understand, analyze, document, and communicate contractual, technical and commercial terms and conditions relative to the company standard.

Incorporate use of technological capabilities to improve processes and efficiency.

Assist outside sales representatives in the preparation of customer presentations related to the quote, including comments on exceptions and built in value.

Analyze the signal range because is a wireless solution technology in the room part.

Supervise the control installation done by the system integrator.

MAIN PROJECTS / 2014

Page 6: Project book Xavier Nieto Pascual

Project Book / Xavier Nieto Pascual

MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES

Budget: 10.000 EUR. Location: Cepsa, Getafe, Spain. Figures: Lighting, HVAC and metering of

the gas station.

MAIN PROJECTS / 2014 Assist outside sales representatives in the

preparation of customer presentations related to the quote, including comments on exceptions and built in value.

Match products to customer specifications by demonstrating knowledge of products.

Review customer specifications to ensure quote is technically compatible and competitive.

Coordinate with Sales Representative to determine and/or clarify project requirements to ensure quality output.

Understand, analyze, document, and communicate contractual, technical and commercial terms and conditions relative to the company standard.

Incorporate use of technological capabilities to improve processes and efficiency.

Supervise the system installation in Getafe, Madrid and perform test with an IP public connection.

Page 7: Project book Xavier Nieto Pascual

Project Book / Xavier Nieto Pascual

MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES

Budget: 100.000 €. Location: Parador de León, León, Spain. Figures: Lightning, HVAC and metering

control with SmartStruxure and SmartStruxure Lite control.

Communication performance test with Zigbee PRO protocol in the rooms.

Propose and analyse different control scenarios.

Communication test to SmartStruxure Solution

Analyse and solve pending issues required by the final client at the installations.

Technical documentation about the control installation.

MAIN PROJECTS / 2014

Page 8: Project book Xavier Nieto Pascual

Project Book / Xavier Nieto Pascual

MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES

Budget: 100.000 EUR. Location: Mutua Intercomarcal,

Barcelona, Spain. Figures: Lighting, HVAC and metering of

the offices in Mutua Intercomarcal.

MAIN PROJECTS / 2015 Match products to customer specifications by demonstrating knowledge of products.

Review customer specifications to ensure quote is technically compatible and competitive.

Coordinate with Sales Representative to determine and/or clarify project requirements to ensure quality output.

Understand, analyze, document, and communicate contractual, technical and commercial terms and conditions relative to the company standard.

Incorporate use of technological capabilities to improve processes and efficiency.

Perform all the graphical part including all the customer request.

Assist outside sales representatives in the preparation of customer presentations related to the quote, including comments on exceptions and built in value.

Supervise the system installation in all the offices.

Page 9: Project book Xavier Nieto Pascual

Project Book / Xavier Nieto Pascual

MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES

Budget: 350.000 EUR. Location: Olympic Channel, Madrid,

Spain. Figures: BMS to supervise all the electric

installation of the Olympic Broadcasting System.

MAIN PROJECTS / 2016 Design all the IT System Program all the devices to transform the Modbus

serial protocol to Modbus/TCP Coordinate with Sales Representative to

determine and/or clarify project requirements to ensure quality output.

Understand, analyze, document, and communicate contractual, technical and commercial terms and conditions relative to the company standard.

Incorporate use of technological capabilities to improve processes and efficiency.

Perform all the graphical part including all the customer request.

Supervise the system installation in all the offices.