HDFC BANK Case :-
Date and Day Before Lunch After Lunch
01-10 150-160 60-80
10-20 100-110 50-60
20-30 80-90 40-50
![Page 2: Project](https://reader038.fdocuments.in/reader038/viewer/2022100607/55a249641a28ab932b8b475f/html5/thumbnails/2.jpg)
CASE SOLAVE:-
Arrival rate (λ) Before Lunch = 120-140 Total= 300-350
Service Rate (µ)= min = 20
(1) proportion of time that the system will be idle
= = no idle time
Note:- according to bank manager their have hardly any possibility of being idle in the
Branch till that date. Provide no server failure take place
(2) average waiting time of a costumer is queue before reaching the server is given by
Wq =
Since, it has a rush, and server is continuous, according to bank manager average
waiting time in the queue is 5-7 mins.
(3) average number of customer waiting for the service is given by :-
Lq =
According to bank manager average costumer waiting for queue are 30 person.
AFTER LUNCH
(1) λ= 60-80
µ= =20
(2) no idle time
(3) Wq = 5-7 min.
(4) Lq = 20 persons.
10-20 (Before lunch)
λ= 80 – 100
µ= = 20
No idle time
Average waiting time = 3 mins
Lq = 18 persons.
![Page 3: Project](https://reader038.fdocuments.in/reader038/viewer/2022100607/55a249641a28ab932b8b475f/html5/thumbnails/3.jpg)
(After Lunch)
λ= 30 mins.
µ= 20 mins
NO idle time
Wq = 2-3 mins.
Lq = 12 persons.
( 20-30 ) Before Lunch
λ= 70-90
µ= = 20
no idle time
___ = 3-5 mins.
Lq = 25 persons.
(After Lunch)
λ= 30-50 persons.
µ= 20 mins.
No idle time
Wq = 3-4 mins.
Lq = persons.
![Page 4: Project](https://reader038.fdocuments.in/reader038/viewer/2022100607/55a249641a28ab932b8b475f/html5/thumbnails/4.jpg)
According to bank manager
01-10 pension holder
10-20 account opening, loan and deposit.
20-30 money withdrawal