1 Project 11 Culver Boulevard Reconstruction Culver City, California

description

Case Study #11 for UTCM Report #08-14-03 "Making Mobility Improvements a Community Asset: Transportation Improvements Using Context-Sensitive Solutions"

Transcript of Project 11 culver blvd 092710

Page 1: Project 11   culver blvd 092710

1

Project 11Culver Boulevard Reconstruction

Culver City, California

Page 2: Project 11   culver blvd 092710

2

Culver Boulevard

Main street of L.A. enclave city

Home to movie studios

“Heart of Screenland”

New SONY headquarters

Formerly state highway, interurban route

Very wide, variable ROW

Deteriorated street, businesses

Source: http://www.culvercity.org/info/harry_culver.asp?sec=arts

Page 3: Project 11   culver blvd 092710

Project

Support/encourage redevelopment

Incorporate new city hall and fire station

Revitalize area

Make street walkable

3

Culver Blvd. with interurban tracks 9above) and after tracks removed (below). Source: http://www.culvercity.org/Information/Gallery/ThenAndNow/ThenAndNow3.aspx

Page 4: Project 11   culver blvd 092710

CSS From Start City wanted community to help develop theme, concept

Stakeholders

Businesses

Residents

Elected officials

Others

Multidisciplinary project teams

Wide range of objectives

Workshops and charrettes

Designs went through workshop process4

Range of Objectives• Placemaking• City• Business• Aesthetics• Traffic operations• Theme• Multimodal

Page 5: Project 11   culver blvd 092710

Design Features

Movie-related theme

Wide sidewalks (up to 30 feet)

More pedestrian friendly environment

Sidewalk dining

Raised medians

Street trees

Special street/signal hardware

5

Source: Kimley-Horn & Associates

Page 6: Project 11   culver blvd 092710

Design Features

6

City hall given movie façade

Reconstructed bridge has theme railing

Geometrics improved at problem intersection

“Walk of Fame”

Source: http://www.culvercity.org/info/harry_culver.asp?sec=arts

Page 7: Project 11   culver blvd 092710

Results

Area became active restaurant center

Citizens requested extensions

2 subsequent phases

Different character adapted to local contexts

7

Source: Kimley-Horn & Associates

Page 8: Project 11   culver blvd 092710

Results

8

Before and after example. Source: http://www.culvercity.org/Information/Gallery/ThenAndNow/ThenAndNow3.aspx