Flood-CBA#2 Training Seminars
Proforma B
Évros River Case Study
Évros River Case Study
A B C D E F
Collecting information regarding
the site that is to be assessed.
Collecting details about
(a) the current flood risk situation and (b) the key features at risk today and in the future from flooding at
the site.
Overview of the impacts
that are expected under the do-nothing
or the baseline scenario.
An assessment
of the possible future
changes and/or
interventions that may affect the
site
the potential of a range of
flood risk prevention measures and assess
their efficacy based on
CBA and/or MCA
methods
To be determined
1-4 5-11 12-15 16-18 19-23 24-27
5% 20% 25% 25% 10% 20%
Proforma
The rationale
Approx. % of the total
effort
Number of steps/tasks
Évros River Case Study
B
Collecting details about
(a) the current flood risk situation and (b) the key features at risk today and in the future from flooding at
the site.
5-11
20%
Proforma
The rationale
Approx. % of the total
effort
Number of steps/tasks
Task 5: For the site (in the past): Collect information on flood extent/history in the past (maps of flooding; numbers of properties
affected, and their types [e.g. residential; non-residential etc]; photos; etc)
Task 6: For the site (in the past): Collect information on any flood
damages and/or disruption to economic activities (i.e. traffic; railways; agriculture) in the past
Task 7: For the site (in the past): Collect details any injuries and loss
of life in floods in the past here.
Task 8: For the site (now and in the future): Collect data on Flood hydrology (flows; flood return periods; flood extents, etc) for the site.
Task 9: For the site (now and in the future): Collect data on modelled
or estimated future flood extents (geographical areas) by return period (e.g. for the 2; 5; 20; 50; 100 year floods).
Task 10: For the site (now and in the future): Collect data on property
numbers and types [e.g. residential; non-residential etc] in each of those areas identified above.
Task 11: For the site (now and in the future): Collect data on population numbers (estimated) in each of those areas.
Évros River Case Study
Proforma B Collecting details about (a) the current flood risk situation and (b) the key features at risk today and in the future from flooding at the site.
Task 5 For the site (in the past): Collect information on flood extent/history in the past (maps of flooding; numbers of properties affected, and their types [e.g. residential; non-residential etc]; photos; etc)
It will be useful to know the extent to which the study location has a history of flooding, to inform both our assessment of damages and our elaboration of potential risk reducing measures. For example, it will be useful to know whether the area is affected very rarely by major events or
regularly by minor floods.
Tasks 5-11
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Évros River Case Study
Task 5 For the site (in the past): Collect information on flood extent/history in the past (maps of flooding; numbers of properties affected, and their types [e.g. residential; non-residential etc]; photos; etc)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Évros River Case Study
Task 5 For the site (in the past): Collect information on flood extent/history in the past (maps of flooding; numbers of properties affected, and their types [e.g. residential; non-residential etc]; photos; etc)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
km2
Évros River Case Study
Task 5 For the site (in the past): Collect information on flood extent/history in the past (maps of flooding; numbers of properties affected, and their types [e.g. residential; non-residential etc]; photos; etc)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Évros River Case Study
Proforma B Collecting details about (a) the current flood risk situation and (b) the key features at risk today and in the future from flooding at the site.
Task 6 For the site (in the past): Collect information on any flood damages and/or disruption to economic activities (i.e. traffic; railways; agriculture) in the past
It will be useful to have an idea of the kind of damages that are caused in this location, not least so we can concentrate on those areas where damage is greatest.
Tasks 5-11
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Évros River Case Study
Task 6 For the site (in the past): Collect information on any flood damages and/or disruption to economic activities (i.e. traffic; railways; agriculture) in the past
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Primary sectors affected by flood events: • Agriculture. • Livestock. • Trade and Business. • Transport Infrastructure. • Properties (Public and Private). • Damaged pump station Flooded area
No archeological sites & monuments in Case Study Area.
Damaged pump station Flooded area
Évros River Case Study
Proforma B Collecting details about (a) the current flood risk situation and(b) the key features at risk today and in the future from flooding at the site.
Task 7 For the site (in the past): Collect details any injuries and loss of life in floods in the past here.
It is important to stress within the case studies that economics using money values is not the whole story. Many intangible impacts from floods, and injury and loss of life are two of these.
Tasks 5-11
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Évros River Case Study
Task 7 For the site (in the past): Collect details any injuries and loss of life in floods in the past here.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Évros River Case Study
Proforma B Collecting details about (a) the current flood risk situation and(b) the key features at risk today and in the future from flooding at the site.
Task 8 For the site (now and in the future): Collect data on Flood hydrology (flows; flood return periods; flood extents, etc) for the site
Any assessment of the benefits of flood risk reduction requires the assessment of the impact in the future of a range of events of different return periods. Taking a single event is likely to lead to
gross errors. See Annex B4
Tasks 5-11
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Évros River Case Study
Proforma B Collecting details about (a) the current flood risk situation and(b) the key features at risk today and in the future from flooding at the site.
Task 8 For the site (now and in the future): Collect data on Flood hydrology (flows; flood return periods; flood extents, etc) for the site
Any assessment of the benefits of flood risk reduction requires the assessment of the impact in the future of a range of events of different return periods. Taking a single event is likely to lead to
gross errors. See Annex B4
Tasks 5-11
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Évros River Case Study
Task 8 For the site (now and in the future): Collect data on Flood hydrology (flows; flood return periods; flood extents, etc) for the site
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Basin Area: 53,000 km2 • 66.2% in Bulgaria • 27.5% in Turkey • 6.3% in Greece
River Length: 528 km Estimated flow (annual average): 103 m3/s
EVROS RIVER
Évros River Case Study
Task 8 For the site (now and in the future): Collect data on Flood hydrology (flows; flood return periods; flood extents, etc) for the site
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Évros River Case Study
Task 8 For the site (now and in the future): Collect data on Flood hydrology (flows; flood return periods; flood extents, etc) for the site
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Main causes of flooding in Case Study Area: • Evros River
flooding.
• Stormwater flooding from streams vertical to Evros River.
Évros River Case Study
Task 8 For the site (now and in the future): Collect data on Flood hydrology (flows; flood return periods; flood extents, etc) for the site
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Évros River Case Study
Proforma B Collecting details about (a) the current flood risk situation and(b) the key features at risk today and in the future from flooding at the site.
Task 9 For the site (now and in the future): Collect data on modelled or estimated future flood extents (geographical areas) by return period (e.g. for the 2; 5; 20; 50; 100 year floods)
Each of the floods of different severities in the future, the return periods of which are estimated, needs to have a map showing the properties affected. The rare floods (e.g. 1:100 years) will affect more properties than the more common floods (e.g. 1:10 years). If this is not the case, the data is
likely to be flawed.
Tasks 5-11
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Évros River Case Study
Task 9 For the site (now and in the future): Collect data on modelled or estimated future flood extents (geographical areas) by return period (e.g. for the 2; 5; 20; 50; 100 year floods)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Évros River Case Study
Task 9 For the site (now and in the future): Collect data on modelled or estimated future flood extents (geographical areas) by return period (e.g. for the 2; 5; 20; 50; 100 year floods)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Évros River Case Study
Task 9 For the site (now and in the future): Collect data on modelled or estimated future flood extents (geographical areas) by return period (e.g. for the 2; 5; 20; 50; 100 year floods)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Évros River Case Study
Task 9 For the site (now and in the future): Collect data on modelled or estimated future flood extents (geographical areas) by return period (e.g. for the 2; 5; 20; 50; 100 year floods)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Évros River Case Study
Task 9 For the site (now and in the future): Collect data on modelled or estimated future flood extents (geographical areas) by return period (e.g. for the 2; 5; 20; 50; 100 year floods)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Évros River Case Study
Proforma B Collecting details about (a) the current flood risk situation and(b) the key features at risk today and in the future from flooding at the site.
Task 10 For the site (now and in the future): Collect data on property numbers and types [e.g. residential; non-residential etc] in each of those areas identified above
This is a crucial ingredient, identifying properties and potential damage from events of different return periods. This is what will be used to calibrate the loss-probability curve (see Annex B4).
Tasks 5-11
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Évros River Case Study
Task 10 For the site (now and in the future): Collect data on property numbers and types [e.g. residential; non-residential etc] in each of those areas identified above
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Damage in buildings
Damage in cultivated areas
Évros River Case Study
Proforma B Collecting details about (a) the current flood risk situation and(b) the key features at risk today and in the future from flooding at the site.
Task 11 For the site (now and in the future): Collect data on population numbers (estimated) in each of those areas.
It may be possible to assess the number of properties in the area from the population that lives there, in the absence of better information (i.e. divide population by c. 2.3 to identify the number of households/houses). In any case this information may be useful for assessing the potential loss
of life or injury during floods, related to the population living there.
Tasks 5-11
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Évros River Case Study
Task 11 For the site (now and in the future): Collect data on population numbers (estimated) in each of those areas.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Population affected by the flood incidents
Population of Lavara: 1093 residents
Flood-CBA#2 Training Seminars
End of Proforma B