Professional Engineering and Project Management ADDENDUM #1

21
Page 1 of 2 835 NW 23 rd Street Corvallis, Oregon 97330 www.pillar-inc.com Telephone: (541) 752-9202 PILLAR CONSULTING GROUP, INC. Professional Engineering and Project Management ADDENDUM #1 TO BIDDERS FROM Jeff Schott, P.E. PROJECT Frontier Regional 911 Call Center Alteration 2014 SUBJECT Addendum- 1 Public Bid DATE 11/24/2014 PROJECT # 2014-007 MEMO # EM-03 THIS ADDENDUM DOES NOT CHANGE THE BID TIME OR THE BID LOCATION. Items addressed in addendum: 1. Bidders that attended mandatory pre-bid meeting and are therefore eligible to submit bids for the project: a. R.L. Reimers Company b. Griffin Construction, LLC. c. Rutherford Construction LLC d. Alegis Construction, Inc. See attached Plan-Holder list for contact information. 2. No NM cable is allowed for new wiring. MC, conduit, or other approved only for new wiring. 3. Added scope of work: a. In the area of the new equipment room 135, once the suspended ceiling is removed, there will be exposed plywood. This needs to be covered w/minimum 5/8” type X GWB, fire taped, and level 4 finish. Approximately 5’6” x 8’4” ceiling area. Concealed wall will also require repairs. 4. Questions: a. Do the remaining outlets above the access floor need to be raised? i. It does not appear that they do if the floor is raised 6”. The center of lower remaining outlet will be at about 15” which is the minimum reach clearance per current ADA rules. b. Supervision requirement? i. The general contractor is responsible for providing on-site supervision and coordination of subcontractors. At least daily on- site supervision is required for all work. Work in rooms in 134, 135, and 136 require full-time supervision. c. Clarify electrical LV work: i. Telephone and data communication wiring associated with the call center is not part of the scope of work. ii. Fire alarm modifications, if required, are part of the scope of work of this contract.

Transcript of Professional Engineering and Project Management ADDENDUM #1

Page 1: Professional Engineering and Project Management ADDENDUM #1

Page 1 of 2

8 3 5 N W 2 3 r d S t r e e t C o r v a l l i s , O r e g o n 9 7 3 3 0 w w w . p i l l a r - i n c . c o m

T e l e p h o n e : ( 5 4 1 ) 7 5 2 - 9 2 0 2

P I L L A R CONSULTING GROUP, INC.

Professional Engi neeri ng and Proj ec t Management

ADDENDUM #1

TO BIDDERS

FROM Jeff Schott, P.E.

PROJECT Frontier Regional 911 Call Center Alteration 2014

SUBJECT Addendum- 1 Public Bid

DATE 11/24/2014 PROJECT # 2014-007 MEMO # EM-03

THIS ADDENDUM DOES NOT CHANGE THE BID TIME OR THE BID LOCATION. Items addressed in addendum:

1. Bidders that attended mandatory pre-bid meeting and are therefore eligible to submit bids for the project:

a. R.L. Reimers Company b. Griffin Construction, LLC. c. Rutherford Construction LLC d. Alegis Construction, Inc. See attached Plan-Holder list for contact information.

2. No NM cable is allowed for new wiring. MC, conduit, or other approved only for new wiring.

3. Added scope of work: a. In the area of the new equipment room 135, once the suspended ceiling

is removed, there will be exposed plywood. This needs to be covered w/minimum 5/8” type X GWB, fire taped, and level 4 finish. Approximately 5’6” x 8’4” ceiling area. Concealed wall will also require repairs.

4. Questions: a. Do the remaining outlets above the access floor need to be raised?

i. It does not appear that they do if the floor is raised 6”. The center of lower remaining outlet will be at about 15” which is the minimum reach clearance per current ADA rules.

b. Supervision requirement? i. The general contractor is responsible for providing on-site

supervision and coordination of subcontractors. At least daily on-site supervision is required for all work. Work in rooms in 134, 135, and 136 require full-time supervision.

c. Clarify electrical LV work: i. Telephone and data communication wiring associated with the call

center is not part of the scope of work. ii. Fire alarm modifications, if required, are part of the scope of work

of this contract.

Page 2: Professional Engineering and Project Management ADDENDUM #1

p:\projects (thorin)\2014\2014007\pm\templates\em-03 addendum 1b.docx Page 2 of 2

8 3 5 N W 2 3 r d S T C o r v a l l i s , O r e g o n 9 7 3 3 0 w w w . p i l l a r - i n c . c o m

T e l e p h o n e : ( 5 4 1 ) 7 5 2 - 9 2 0 2

iii. Wiring of transformers associated with electric strikes is part of the scope of work.

iv. Low voltage wiring associated with HVAC is part of the scope of work.

v. Low voltage raceways shown on plans are part of the scope of work for the project.

d. Routing to roof for electrical & HVAC? i. See Plans. The approximate routing for HVAC and electrical is

shown. Roofing details from the manufacturer are included in this addendum.

e. Floor topping in room 135 equipment room and room 2nd floor server rooms?

i. The existing plans indicated that there is a 1” gypcrete topping on the floors of the server rooms, and that this is part of a 1 hour fire rated assembly. Penetrations of these floors should be assumed to be fire a 1hour fire rated penetration. No penetrations of the 2nd floor equipment/server room are anticipated.

ii. The second floor equipment room walls are fire rated. Penetration of this wall, if required, will need to be a 1 hour fire rated penetration.

f. Temporary barriers: i. Temporary partitions are required around work areas. These are

anticipated to include wood framing, visqueen, plywood and/or GWB. Barriers are to be dust tight. Barriers need to be provided specifically:

1. Between the existing equipment room, and the expansion area.

2. In room 134 between the expansion of 135 and the rest of the room.

3. Between room 129 and room 102. 4. Near door 131A

ii. Access needs to be provided to all time to: 1. Room 132 from entry 130 through the existing door. If

required, access through room 136 may be allowed later in the project.

2. Room 135 from either 134 or room 137. Attachments:

Plan-holder distribution list Genco roofing details. Approved lighting alternate.

Page 3: Professional Engineering and Project Management ADDENDUM #1

Pillar Consulting Group, Inc. Project # 2014-007

835 SW 23rd ST Description FR 911Corvallis, Oregon 97330 Manager JTSphone: (541) 752-9202 Date 11/24/2014

Company Name Type Address City State ZIP Phone Fax e-mail

General Attending

Pre-Bid

Abbott Construction Matt Paine contractor307 SE Hawthorne Blvd, Suite 150 Portland OR 97214 503-213-4033 [email protected]

Alegis ConstructionGlyn Jones/Dave Brookings contractor Portland OR 503-970-8312 503-427-6066 [email protected] Yes

BidClerk Andrew Cutler plan holder 28 N. Clark St., Suite 450 Chicago IL 60602 312-380-4807 x791 [email protected]

Blue Mountain Electric, LLC Shane Blagg contractor 70870 SW Douglas Dr. Pendleton OR 97801 541-379-2918 [email protected]

Central Oregon Builders Exchange plan holder 1902 NE 4th Street Bend OR 97701 541-389-0123 [email protected]

Central Oregon Electric Gary Thrasher contractor Redmond OR 541-408-7560 541-548-4020 [email protected]

(subcont)

Contractor Plan Center Inc. Brie Kidwell plan holder5468 SE International Way Milwaukie OR 97222 503-650-0148 [email protected]

DJC Plan Center plan holder 921 SW Washington St #210 Portland OR 97205 503-274-0624 [email protected]

Dodge Data & Analytics Donetta Brooks contractor 3315 Central Avenue Hot Springs AR 71913 425-505-2874 [email protected]

Douglas Plan Center Diane J. Chartier plan holder 3076 NE Diamond Lake Blvd Roseburg OR  97470 541-440-9030 [email protected]

Dry Canyon Construction Jim Larsen contractor 541-276-6451 [email protected]

Eugene Builders Exchange Debbie Johnson plan holder 2460 W 11th Ave. Eugene OR 97402 541-484-5331 [email protected]

Griffin Construction Samuel Griffin contractor Prineville OR 541-447-7237 541-447-2244 [email protected] Yes

Hermiston Plan Center Stacy McQuain plan holder 1565 North 1st Street Hermiston OR 97838 541-564-0420 [email protected]

Hire Electric Taner Elliott contractor2700 West Second Street The Dalles OR 97058 541-296-5574 [email protected]

Mission Construction and Building Services William Kirwan contractor

40800 SE Gordon Creek Road Corbett OR 97019 503-577-1749 [email protected]

R. L. Reimers Jake Wagner contractor Albany OR 541-926-7766 [email protected] Yes

Rutherford Construction Rusty Rutherford contractor Fossil OR 541-256-0401 [email protected] Yes

Salem Contractors Exchange Jaysa Nesbitt plan holder 2256 Judson SE Salem OR 97302 503-362-7957 [email protected]

Tri-City Construction Council Beverly Crane plan holder 20 E. Kennewick Ave Kennewick WA 99336 509-582-7424 [email protected]

Frontier Regional 911 Alteration Plan Holder/Bidder List

Page 4: Professional Engineering and Project Management ADDENDUM #1

10/06

Detail #: T-3.13Sleeper Support Assembly TPO Systems

GenFlex TPO Membrane

GenFlex TPO or EPDM Membrane Slip-Sheet Extending3" (76.20 mm) Beyond Sleeper in all Directions

GenFlex ISO

Wood Nailer Exceeding the Size of the Supported Sleeper by at least 1/2" (12.70 mm) on All Sides

Approved Substrate

* For use when the roof supported load exceeds 5 lb/in (3.52 g/mm ). For loads less than 5 lb/in (3.52 g/mm ), the sleeper may be set on a slip-sheet directly on the cleaned roof surface.

2 2

2 2

Roof in g Sys t semGenFlex

Page 5: Professional Engineering and Project Management ADDENDUM #1

10/06

Detail #: T-7.01 TPO SystemsPre-Fabricated Pipe Boot

Membrane securement at 12" (304.80 mm) out from penetration and 12" o.c. (304.80 mm) required for Mechanically Attached Roof Systems. This can be accomplished with seam plates and fasteners overlaid with either TPO Cover Tape, a target patch of TPO field membrane for the boot flange to be welded to, or with 6" (152.40 mm) TPO Reinforced Flashing. When installation of the pipe boot would overlap a field seam, install a minimum 24" x 24" (609.60 mm x 609.60 mm) target patch centered on the penetration before installing the pipe boot. Membrane securement may also be installed close to the penetration and flashed with the pipe boot as shown here.

GenFlex TPO Membrane

GenFlex ISO

Approved Substrate

GenFlex Pre-Molded Pipe Boot - Hot Air Weld standard boot flange to deck membrane, or apply the Peel & stick boot flange to the primed membrane, and roll into place with a 2" (50.80 mm) silicone roller.

Stainless Steel Clamping Ring GenFlex Water Stop Under

Pipe Boot Lip

GenFlex Termination Caulk

Pipe

Water StopTerminationCaulk

Stainless SteelClamp

Pre-Molded Pipe Boot

Cut View

For MAS Systems, Read Note.

Roof in g Sys t semGenFlex

Page 6: Professional Engineering and Project Management ADDENDUM #1

10/06

Detail #: T-7.02 TPO SystemsField Fabricated Pipe Wrap

See membrane securement note on Detail T-7.01. Securement must occur outside of boot flashing area for this condition.

GenFlex TPO Membrane

Upper wrap to extend 1½" (38.10 mm) onto base wrap and 8" Min. (203.20 mm) up pipe and sealed into a bead of GenFlex Water Stop with a stainless steel compression band.

Base wrap to extend 1" Min. (25.40 mm) up vertical surface of pipe and 2" Min. (50.80 mm) onto field membrane with a solid hot air weld to the deck membrane.

GenFlex ISO

Approved Substrate

GenFlex Water Stop

GenFlex Termination Caulk

Stainless Steel Clamping Ring

GenFlex TPO Non-reinforced Flashing

Side View of Field Wrapped Pipe

1"(25.40 mm)

1½"(38.10 mm)

2" Min.(50.80 mm)

8" Min.(203.20 mm)

Roof in g Sys t semGenFlex

Page 7: Professional Engineering and Project Management ADDENDUM #1

10/06

Detail #: T-16.03

When running gas line supports on a Mechanically Attached Roof System, caremust be taken to run the supports on the lines of membrane securement in order to prevent movement caused by sheet flutter. The support area may be isolated from the main portion of the roof by installing a row of membrane securement on each side of the supports and then stripping them in with TPO Cover Tape installed to GenFlex specification.

TPO SystemsPipe Support

GenFlex TPO Membrane

Membrane or Walkway Pad Slip-SheetWood Block Support -

Secure supported object to blocking to prevent dislodging. If supported load per block exceeds 25 lb (11.34 kg), see Detail T-3.13.

1/4" Min. (6.35 mm)

3" Min.(76.20 mm)

GenFlex ISO

Pipe or Conduit

Approved Substrate

Clamps & Fasteners (by Others)

Roof in g Sys t semGenFlex

Page 8: Professional Engineering and Project Management ADDENDUM #1
Page 9: Professional Engineering and Project Management ADDENDUM #1
Page 10: Professional Engineering and Project Management ADDENDUM #1
Page 11: Professional Engineering and Project Management ADDENDUM #1
Page 12: Professional Engineering and Project Management ADDENDUM #1
Page 13: Professional Engineering and Project Management ADDENDUM #1
Page 14: Professional Engineering and Project Management ADDENDUM #1
Page 15: Professional Engineering and Project Management ADDENDUM #1
Page 16: Professional Engineering and Project Management ADDENDUM #1
Page 17: Professional Engineering and Project Management ADDENDUM #1
Page 18: Professional Engineering and Project Management ADDENDUM #1
Page 19: Professional Engineering and Project Management ADDENDUM #1
Page 20: Professional Engineering and Project Management ADDENDUM #1
Page 21: Professional Engineering and Project Management ADDENDUM #1