Production schedule

6
Production Schedule: Filming of shots: 5-7 Wednesday 14 th December Actors: Emily Morris, Matt Holley Time: P2 Location: Photography Studio. Equipment: Camera, Tripod, Projector. Props: Angles wings, Devil Horns, jewellery and flowers. Filming of shots: 1-4 and 9 Wednesday 15 th December Actors: Emily Morris, Matt Holley Time: 4:00pm Location: Equipment: Camera, Tripod, Dolly. Props: White angle wings, Devil horns. Filming of shots: 8 and 10. December Actors: Emily Morris, Matt Holley Time: 6:00 Location: Mudyford. Equipment: Camera, Tripod, Studio lights and dolly. Props: Angel Wings, Devil Horns. Filming of shots: 11, 12, 13, 15, 16, 17, 22, 23 and 24. January Actors: Emily Morris, Matt Holley. Time: 3:20+

Transcript of Production schedule

Page 1: Production schedule

Production Schedule:

Filming of shots: 5-7

Wednesday 14th December

Actors: Emily Morris, Matt Holley

Time: P2

Location: Photography Studio.

Equipment: Camera, Tripod, Projector.

Props: Angles wings, Devil Horns, jewellery and flowers.

Filming of shots: 1-4 and 9

Wednesday 15th December

Actors: Emily Morris, Matt Holley

Time: 4:00pm

Location:

Equipment: Camera, Tripod, Dolly.

Props: White angle wings, Devil horns.

Filming of shots: 8 and 10.

December

Actors: Emily Morris, Matt Holley

Time: 6:00

Location: Mudyford.

Equipment: Camera, Tripod, Studio lights and dolly.

Props: Angel Wings, Devil Horns.

Filming of shots: 11, 12, 13, 15, 16, 17, 22, 23 and 24.

January

Actors: Emily Morris, Matt Holley.

Time: 3:20+

Location:

Equipment: Camera, Tripod and Dolly.

Page 2: Production schedule

Props: Angle Wings, Devil Horn, Suit, Photo frame.

Filming of shots: 18, 19, 20, 21.

December

Actors: Emily Morris.

Time: 3:20

Location:

Equipment: Camera, Tripod, Dolly.

Props: Angel wings, dress.

Filming of shots: 14

January

Actors: Emily Morris.

Time: 12:00

Location: Ringwood.

Equipment: Camera, Tripod, Dolly.

Props: Angle wings.

Filming of shots: 25 and 26.

January

Actors: Emily Morris, Matt Holley, Georgia Stickley, Rowan Ellwell, Ellie Penfold, Matt Raybold.

Time: 4:00

Location: Somerly House

Equipment: Camera, Tripod, Dolly.

Props: Masks.

Filming of shots: 27,28,29,30,31 and 32.

Actors: Emily Morris, Matt Holley, Party Group.

Time: 3:20

Location: School Hall

Equipment: Camera, Tripod, Dolly.

Page 3: Production schedule

Props: Angle wings, Devil Horns, Masks.

Post Production:

14th January to 20th

Upload all footage onto computer and sort through clips.

Begin editing shots and add music to Premier Pro.

23rd January to 27th.

Finish editing all shots together and ensure music is in time with each shot.

Add transitions.

30th January to 3rd February

Add any finishing touches to the video using Premier Pro and After Effect.

Evaluation

13th Febuary

Design digipak and poster

27th Febuary

Final watching of music videos receiving peer feedback for evaluations Type peer feedback up in blog post/word.

28th Febuary

Upload final music videos to youtube then blogger

6th March

Complete digipak and poster and start evaluation question 1

Upload digipak and magazine ad (poster)

14th March

Complete evaluation question 2 x

Complete evaluation question 3 x

20th March

Complete evaluation question 3 x

Complete evaluation question 4 x

Page 4: Production schedule

23rd March

Complete evaluation question 4. Upload all evaluation questions to blogger.

Upload evaluation questions to blog

Equipment:

Canon 700-

This is the camera I will be using to film my music video. The camera shoots in 18-megapixel photos and Full-HD video. Giving my film a professional finish. The screen is adjustable and therefore will allow me to film freely. The camera films with low noise. Meaning if necessary to show a clip unmuted it will project clearly the recorded sound. With the use of Movie Servo AF (which keeps moving subjects in focus when shooting video) will help me in scenes where my character are dancing or I am tracking. With this camera I will also be able to capture the atmosphere in low-light conditions, which will be perfect for filming in the evenings. Overall this camera is multi-functional and perfect for my shoot.

Tripod-

Page 5: Production schedule

By using a tripod I will be able to keep the scene steady and easily pan. With the adjustable legs and handle I will be able to tilt and adjust the height in order to capture different shots to exactly how I need.

Dolly-

This piece of equipment will allow me to manoeuvre with the camera and tripod. This will be really importing whilst filming scenes where I am tracking the characters. It will keep the quality of the shot.

Studio Lights-

Studio lights are perfect for creating lighting in dark lighting without it being too harsh. I intend to use the lights to create a subtle effect on my characters whilst filming in darker atmospheres.

Projector-

The projector will be used for a total of 4 shots. It will create a different atmosphere to the rest of the film. I am excited to use this equipment and hope the final outcome will be good quality and easily distinctive.

Page 6: Production schedule