Production of construction materials in...
Transcript of Production of construction materials in...
01.10.2009
ddProduction of construction Production of construction materials in Uzbekistanmaterials in Uzbekistan ––materials in Uzbekistan materials in Uzbekistan
cooperation prospectscooperation prospects
E.Akramov
Chairman of the Board
JSC “U b ild i l ”JSC “Uzbuildmaterials”
Foundation and structure
Company was established in 1997N b f i 100Number of enterprises – over 100Annual volume of production– 616 mln. USD
“UZBUILDMATERIALS”
Enterprises ofcement industry Enterprises of special Enterprises of non Wall material
producingcement industry building materials ore materials producing enterprises
Trade enterprisesScientific research
Institute Mining and geological expedition
Volume of a commodity output (million USD)
615,9700,0
419 4472,2
548,5600,0
293 3 321,2349,0
390,1
419,4
400,0
500,0
293,3 ,
300,0
100,0
200,0
0,02001 2002 2003 2004 2005 2006 2007 2008
Structure of productionStructure of production86 3%86.3%
cement - 6640 thous. tonncement 6640 thous. tonn
glass - 10,0 mln.m2 ( 2-х mm)
wall materials - 1,4 bill.items
bl it 370 th 2
цц
12%
0 8%
marble, granite - 370 thous m2
others0.4%
0.5%
0.8%
Export dynamics for 2001-2008. (million USD)
117,1 117,3120
140
100
120
8053,6
60
14,0 21,131,5 33,940
14,0
0
20
02001 2002 2003 2004 2005 2006 2007 2008
Geography of ExportGeography of Export
Investment offer (1)Proposed projects for glass production !
The project of creation of the enterprise on production of glassenterprise on production of glass
Capacity– 600 tones/ per day (10 million sq.m, 4 mm calc)Project Cost Project Cost -- 885 million US dollars5 million US dollarsDemand for glass in 2010-2015 - till 125 000 tonesThere are raw materials components and external mainThere are raw materials components and external main communications
Market: Domestic market - Republic of UzbekistanExport - Central Asia Republics and
Af h i tAfghanistan
Production and consumption of glassProduction and consumption of glass
in Central Asia (thousand tones)
№ CountryProduction
(annual capacity)
Consumption Gapcapacity)
1 Kazakhstan - 100 - 100
2 Kyrgyzstan 93 10 + 83
3 U b ki 65 150 853 Uzbekistan 65 150 - 85Total 158 260 - 102
Provision of raw material
Raw material type Deposit nameApproved deposits
( illi t )Provision
( )yp p (million tones) (years)
Quartz sand Mayskoe 7 50
Limestone Urgazskoe 96.6 over 100
Dolomite Dehkanabad 2.6 over 50
/Calcium soda Kungrad soda plant 0.1/year
Feldspar Karichsay 24,3 over 50
Investment offer (2)
j f i f iThe project of creation of the enterprise on production of ceramic tile
The capacity of the project - 3,0 million sq. mProject Cost Project Cost -- -- 27,027,0 million US dollarsmillion US dollarsMarket demands - 4,0 million sq. mImport (2008) - 3,7 million sq. mThere are raw materials components and external main communicationsMarket– Uzbekistan, Central Asia, Russia
d Af h i tand Afghanistan
Investment offer (3)
j f i f iThe project of creation of the enterprise on production of sanitary ware
Capacity - 200 thousand item per year Project CostProject Cost -- 17 617 6 million US dollarsmillion US dollarsProject CostProject Cost 17,617,6 million US dollarsmillion US dollarsAssortment of product – ceramic washstands, lavatories, sinks, bowls, etc., ,Import (2008) - 150 thousand itemsThere are raw materials components and external main pcommunicationsMarket – Uzbekistan, Central Asia, Russia and Afghanistan
Production and consumption Production and consumption ceramic tile and sanitary ware in Uzbekistanceramic tile and sanitary ware in Uzbekistan
ProductMeas. unit
Production Consumption Gap
Ceramic tilesmillion
sq. 1 5 - 4qmetres
S ithousand
25 150 125Sanitary ware pieces 25 150 - 125
Provision of raw materialProvision of raw material
The authorizedThe name of raw material Deposit name
The authorized stocks
(million tons)
Provision(Years)
Kaolin Altin tay 5,4 over 50
Quartz sand Djeroy 205,0 over 100
Feldspar Lyangar 27.8 over 50
D l i D hk b d 2 6 50Dolomite Dehkanabad 2.6 over 50
The offer for investments (4)The offer for investments (4)
The design on taking and manufacture of products from a marble and granite.products from a marble and granite.
Cost of a production line on:Cost of a production line on:- to taking a marble and granite - 1,5 million USD;
hi i bl 1 0 illi USD- to machining a marble - 1,0 million USD;- to machining granite - 2,0 million USD.
The organization of manufacture of a continuous basalt fibre and basalt-plastic pipes (5)
Manufacture of a continuous basalt fibre by power of 1,5 thousand tons and basalt-plasticpipes of 90 kms one year in diameter from 50 up to 500 mm.
C f d k S dCost of the design makes 14,5-17,1 million US dollars (without taking into account buildings, constructions, engineering lines).
Pay-back period of expenses of 36-40 months.
Contacts:Contacts:Contacts:Contacts:
[email protected]Теl: +99871 2522063/5F 998 1 255 0Fax: +99871 2557707
Th k f tt ti !Th k f tt ti !Thank you for your attention!Thank you for your attention!