PRODUCTION FACILITY HIGHLIGHTS

Page 2: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

FAST FACTS:

• 550,000 Square Feet

• $40 Million Investment

• ISO9001 Certification

Page 3: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

This very large machine cuts steel coil sheets into blanks and also does roll forming.

Yes, that is an 8’ ladder.

Page 4: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

Inventory of steel blanks

This is one day’s work --- thanks to a JIT program

Page 5: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

A programmable automatic CNC punch press ensures the one millionth part is identical to the first.

Note the detailed cuts

Price: $1.2 Million

Two more units

are on order!

Page 6: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

A programmable state-of-the-art CNC shearing machine to make desk parts and drawer fronts.

Price: $1.5 Million

Page 7: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

A row of precisely-tooled press brakes used to form parts for files, desks and pedestals.

Clean!

Bright!Neat!

Look at that reflection!

A couple of other items worth noting……..

Page 8: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

This is the beginning of the file line……… The robot selects

the correct size blank for the file size that has been programmed ...

Then feeds it to the automated rollers…..

An automated material storage and retrieval system…..the latest technology available today.

Page 9: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

ALL of the bends required to create a file case are performed by this machine…….

The next stop is spot welding the braces and O-frame members.

Price: $2 Million

This is the high-rise storage for the steel sheets picked by the robotic retrieval system

Page 10: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

The next stop is where the Multi-O-Frames and top cap assemblies are spot welded.

And take note…..

This is the first time human labor touches

the product!

Page 11: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

The case is fitted with the top, bottom and Multi-O-Frame in this fixture

All welding operations are done simultaneously

Customers marvel at this machine!

Page 12: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

The finished file case.

Elapsed time from when robot sent

blank down the line: 7 minutes

Humans involved in the process: 2

Chance for error: 0%

Presto !

Page 13: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

Finished cases waiting (patiently) to be painted

Overhead paint line carrier system

Page 14: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

New powder coating line

Price: $800,000

Page 15: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

3,500 feet of paint line, handling objects of all sizes to be painted in 30 different colors, requires skilled management.

Paint line “air traffic controller”

Paint line computer monitoring equipment

Page 16: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

The computer-controlled power and free paint line carriers are bar coded to tell the robotic paint arm what color is to be painted.

If a color change is required, the next batch is held to permit purging the old color from the feed lines.

If the line is not ready for the next batch, it is sent to a “siding” to wait.

Page 17: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

The product is run through a completely contained chemical cleaning line to ensure the finish coat adheres properly.

Page 18: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

Once the components have been cleaned, they are ready for the paint application process.

The mechanism for this four-head sprayer is computer-programmed with the size and shape of each piece that comes through the line….

The paint is applied by discs rotating at 10,000 rpm.

Computer-controlled robotic painting arm.

This system uses less air…

….which means less wasted paint

….which makes it a very “GREEN”“GREEN” process.

….thus ensuring that each piece is fully and evenly coated.

Page 19: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

With a uniform coat of paint applied, it is then time to bake the finish in a computer programmable oven.

Can you believe how clean?!

Even the carts are spotless!

Page 20: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

Once the paint has cooled, the products are then readied for final assembly and packaging.

Page 21: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

Pre-painted coiled steel is used to create lateral file and pedestal drawer bodies.

It takes a gentle machine and perfect tooling to bend pre-painted steel.

This machine makes all the bends necessary to create a finished drawer body.

Price: $750,000

Page 22: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

Once formed, the drawer bodies are moved by air suction cups to the automatic welding fixture.

Page 23: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

The entire drawer producing line can be seen here.

It starts here…

And ends here…

Page 24: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

All desk and file tops are laid up in this section

Page 25: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

All edge banding is applied automatically.

Page 26: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

When manufacturing is complete, all products are then staged for loading on our private carrier’s trailers.

Page 27: PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.

There is not a facility in the industry that is the equal of ours in all aspects of manufacturing.

It was designed and built this way for a single purpose.

We want to be certain that your customer receives their product

and CORRECT

ON-TIMECOMPLETE