12
45 5000 45 Section A-A --- Section A-A --- Section B-B --- Section B-B --- 45 125 45 45 45 295 568 295 45 1302 1212 295 45 125 45 1082 2384 2838 4055 4910 295 205 295 45 295 45 45 45 45 45 A-A B-B 613 45 45 2055 45 295 5000 4 5 1 2 1 2 4 5 1 4 5 2 3 8 4 295 Tolerance Lenght/height Width Stud height Diagonal measurement Curvature +/- 6mm +/- 3mm +/- 1,5% +/- 5mm +/- 5mm Cutting list Symbol Quantity Dimensions (mm) S01 S02 S03 S04 S05 S06 S07 S08 S09 S10 S11 S12 BE01 S01 S02 S03 S04 S05 S06 S07 S08 S09 S10 S11 S12 BE01 2 1 1 1 1 2 1 1 2 2 2 4 1 693/295/45 1212/295/45 1302/295/45 1212/125/45 1302/125/45 1982/295/45 2384/205/45 2384/295/45 2838/295/45 4055/45/45 4910/70/45 4910/295/45 2384/168/90 S01 S03 S05 S02 S04 S06 S07 S08 S09 S09 S10 S10 Material information Wood type Strenght class Humidity level Screws Rope C18 S06 S01 Nordic wood 2384 BE01 90 205 205 90 1082 900 1857 4010 900 2384 90 168 S11 S11 496 449 449 449 496 168 125 250 45 125 125 693 1982 12% 45 7 0 4 5 4 5 4 5 4 5 4 5 1 4 5 7 0 4 5 45 205 45 45 4910 70 45 45 250 295 45 2384 295 45 RANDERS REBO nr. 11-0120-064B 12mm Class 3 Outdoor NKT nr.136676 M6,0x120mm screwing S06/07 to vertical studs; S02 to S04 and S03 to S05 27 stk. NKT nr.136674 M5,0x80mm screwing S11 to S12 C/C 200 S09/S12 to each other 132 stk. NKT nr.136675 M6,0x100mm screwing S10 to S11 48 stk. VBA TF POZI 6X200/64 Z.BLANC BE01 to S11 12 stk. STEP 1 - STUDS STEP 2 - DPM STEP 3 - SOLE PLATE STEP 4 - BATTENS STEP 5 - INSULATION B/W BATTENS STEP 6 - 1ST LAYER OF GYPSUM STEP 8 - FLIP THE ELEMENT STEP 7 - 2ND LAYER OF GYPSUM STEP 9 - INSULATION B/W STUDS STEP 10 - WIND BREAKER STEP 11 - DISTANCE STRIPS STEP 12 - CLADDING 125 1302 125 45 1212 295 45 S12 S12 S12 S12 --- AN-15(205)001 AN-15(205)001 --- AN-15(205)002 AN-15(205)002 AN-15(205)003 --- AN-15(205)003 PROJECT: SUBJECT: DRAWN BY: SCALE: CLASS: DATE: UNIVERSITY COLLEGE SCHOOL OF TECHNOLOGY AND BUSINESS - 1 : 20 Production drawing of WE6 - Skejby Step 1 - Studs Agnieszka Machalska 12/08/11 AN-15(205 01)037 CAHS31 Horsens AN-15(205 01)037 : 20 ep 1 - studs PRODUCED BY AN AUTODESK STUDENT PRODUCT PRODUCED BY AN AUTODESK STUDENT PRODUCT PRODUCED BY AN AUTODESK STUDENT PRODUCT PRODUCED BY AN AUTODESK STUDENT PRODUCT

description

Wooden wall element drawing - production phase

Transcript of Production drawing of WE 6 element

Page 1: Production drawing of WE 6 element

45

5000

45

Section A-A

---

Section A-A

---

Section B-B

---Section B-B

---45

125

45

45

45

295

568

295

45

1302

1212

295

45

125

45

1082

2384

2838

4055

4910

295

205

295

45

295

45

45

45

45

45

A-A

B-B

613

45

45

2055

45

295

5000

451212

45145

2384

295

Tolerance

Lenght/height

Width

Stud height

Diagonalmeasurement

Curvature

+/- 6mm

+/- 3mm

+/- 1,5%

+/- 5mm

+/- 5mm

Cutting list

Symbol Quantity Dimensions (mm)

S01

S02

S03

S04

S05

S06

S07

S08

S09

S10

S11

S12

BE01

S01

S02

S03

S04

S05

S06

S07

S08

S09

S10

S11

S12

BE01

2

1

1

1

1

2

1

1

2

2

2

4

1

693/295/45

1212/295/45

1302/295/45

1212/125/45

1302/125/45

1982/295/45

2384/205/45

2384/295/45

2838/295/45

4055/45/45

4910/70/45

4910/295/45

2384/168/90

S01

S03

S05

S02

S04

S06

S07

S08

S09 S09

S10S10

Material information

Wood type

Strenght class

Humidity level

Screws

Rope

C18

S06

S01

Nordic wood

2384

BE01

90 205

205

90

1082 900

1857

4010 900

2384 90

168

S11S11

496 449 449 449 496

168

125

250

45

125

125

693

1982

12%

45

70

45 45

45 45

451 45

70

45

45

205

45

45

4910

70

45

45

250

295

45

2384

295

45

RANDERS REBO nr. 11-0120-064B 12mm

Class 3 Outdoor

NKT nr.136676 M6,0x120mm screwingS06/07 to vertical studs; S02 to S04 and S03 to S0527 stk.

NKT nr.136674 M5,0x80mm screwing S11 to S12 C/C 200S09/S12 to each other132 stk.

NKT nr.136675 M6,0x100mm screwingS10 to S1148 stk.

VBA TF POZI 6X200/64 Z.BLANCBE01 to S1112 stk.

STEP 1 - STUDS

STEP 2 - DPM

STEP 3 - SOLE PLATE

STEP 4 - BATTENS

STEP 5 - INSULATION B/W BATTENS

STEP 6 - 1ST LAYER OF GYPSUM

STEP 8 - FLIP THE ELEMENT

STEP 7 - 2ND LAYER OF GYPSUM

STEP 9 - INSULATION B/W STUDS

STEP 10 - WIND BREAKER

STEP 11 - DISTANCE STRIPS

STEP 12 - CLADDING

125

1302

125

45

1212

295

45

S12 S12 S12 S12

---AN-15(205)001

AN-15(205)001

---AN-15(205)002

AN-15(205)002

AN-15(205)003

---AN-15(205)003

PROJECT:

SUBJECT:

DRAWN BY:

SCALE:

CLASS:

DATE:

UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -

1 : 20

Production drawing of WE6 - Skejby

Step 1 - Studs

Agnieszka Machalska

12/08/11

AN-15(205 01)037

CAHS31

Horsens

AN-15(205 01)037

1 : 20

Step 1 - studs

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 2: Production drawing of WE 6 element

Section A-A

---

Section A-A

---

Section B-B

---Section B-B

---

A-A

B-B 45

DPM

Material

Quantity

Dimensions

1

150

150

150

150

Staples

Dimension/roll size

Quantity

Size

410 stk.

Polyethylene

4568/2384/0.2 mm

Galvanized, Würth

10/10/3 mm

STEP 1 - STUDS

STEP 2 - DPM

STEP 3 - SOLE PLATE

STEP 4 - BATTENS

STEP 5 - INSULATION B/W BATTENS

STEP 6 - 1ST LAYER OF GYPSUM

STEP 8 - FLIP THE ELEMENT

STEP 7 - 2ND LAYER OF GYPSUM

STEP 9 - INSULATION B/W STUDS

STEP 10 - WIND BREAKER

STEP 11 - DISTANCE STRIPS

STEP 12 - CLADDING

Tæt

Quantity

Dimension

1 roll

Isover

95x20 mm

150

150

Data

Producer

soft ISOVER strips of plastic film with big airand diffusion resistance for sealing b/wconstructuion element

PROJECT:

SUBJECT:

DRAWN BY:

SCALE:

CLASS:

DATE:

UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -

1 : 20

Production drawing of WE6 - Skejby

Step 2 - DPM

Agnieszka Machalska

12/08/11

AN-15(205 01)038

CAHS31

Horsens

AN-15(205 01)038

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 3: Production drawing of WE 6 element

Section A-A

---

Section A-A

---

Section B-B

---Section B-B

---

Tolerance

Lenght

Width

Thickness

+/- 3mm

+/- 2mm

+/- 5mm

Cutting list

Symbol Quantity Dimensions (mm)

SP 01 2434/90/45

Material information

Sole plate

Strenght class

Humidity level

Screws

C18

45

90

90

2384

Nordic wood

SP 01

A-A

B-B

90

STEP 1 - STUDS

STEP 2 - DPM

STEP 3 - SOLE PLATE

STEP 4 - BATTENS

STEP 5 - INSULATION B/W BATTENS

STEP 6 - 1ST LAYER OF GYPSUM

STEP 8 - FLIP THE ELEMENT

STEP 7 - 2ND LAYER OF GYPSUM

STEP 9 - INSULATION B/W STUDS

STEP 10 - WIND BREAKER

STEP 11 - DISTANCE STRIPS

12%

NKT nr.119294 5,0x90mm screwing tovertical studs with a distance of 200 mm6 stk.

SP 01

1

STEP 12 - CLADDING

45

90

Class 3 Outdoor

2384

---AN-15(205)001

AN-15(205)001

---AN-15(205)002

AN-15(205)002

AN-15(205)003

---AN-15(205)003

PROJECT:

SUBJECT:

DRAWN BY:

SCALE:

CLASS:

DATE:

UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -

1 : 20

Production drawing of WE6 - Skejby

Step 3 - Sole plate

Author

12/08/11

AN-15(205 01)039

Horsens

AN-15(205 01)039

1 : 20

Step 3 - sole plate

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 4: Production drawing of WE 6 element

Section A-A

---

Section A-A

---

Section B-B

---Section B-B

---

45

732

300

300

300

300

300

300

300

300

300

300

300

300

300

368

5045

Tolerance

Lenght

Width

Thickness

+/- 3mm

+/- 2mm

+/- 5mm

Cutting list

Symbol Quantity Dimensions (mm)

B01

B02

B03

B04

B05

B06

B07

B08

B09

13

1

7

7

1

2

2

8

1

255/45/45

278/45/45

496/45/45

541/45/45

687/45/45

1302/45/45

2055/45/45

2339/45/45

2384/90/45

Material information

Wood type

Strenght class

Humidity level

Screws

C18, T1

45

45

541

45

45

45

45

1302

2055

45

45

45

45

45

45

45

95

95

4910

2339

B01

B02

B03

B04

B05

B06

B07

B08

B09

B05

B01

B04B05

45

45

255

45

B02

45

45

45

278Nordic wood

B06

B07

A-A

B-B

45

2055

45

45

45

45

45

45

591 1302 541

95 45 45

45

45

687

45

B08

12%

STEP 1 - STUDS

STEP 2 - DPM

STEP 3 - SOLE PLATE

STEP 4 - BATTENS

STEP 5 - INSULATION B/W BATTENS

STEP 6 - 1ST LAYER OF GYPSUM

STEP 8 - FLIP THE ELEMENT

STEP 7 - 2ND LAYER OF GYPSUM

STEP 9 - INSULATION B/W STUDS

STEP 10 - WIND BREAKER

STEP 11 - DISTANCE STRIPS

STEP 12 - CLADDING

2433.69

NKT nr.119294 5,0x80mm screwing tostuds with a distance of 200 mm150 stk.

NKT nr.136676 M6,0x120mm screwingbatten B09 to horizontal battens14 stk.

Class 3 Outdoor

45

45

496

45

B03

---AN-15(205)001

AN-15(205)001

---

AN-15(205)002

AN-15(205)002AN-15(205)003

---AN-15(205)003

PROJECT:

SUBJECT:

DRAWN BY:

SCALE:

CLASS:

DATE:

UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -

1 : 20

Production drawing of WE6 - Skejby

Step 4 - Battens

Agnieszka Machalska

01/06/12

AN-15(205 01)040

Horsens

AN-15(205 01)040

1 : 20

Step 4 - battens

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 5: Production drawing of WE 6 element

Section A-A

---

Section A-A

---

Section B-B

---Section B-B

---

Cutting list

Symbol Quantity Dimensions (mm)

IN01

IN02

IN03

IN04

IN05

IN06

IN07

5

1

16

10

2

1

1

255/249/45

275/249/45

255/451/45

255/1000/45

275/1000/45

95/1302/45

115/1302/45

Material information

Thermal conductivity

Heat resistance

Fire class

0.04 in temperature of 25 degrees

IN01

IN02

IN03

IN04

IN05

IN06

IN07

lambda = 0,037 W/mK

255

278

255

278

95

255

115

1302

1000

1302

1000

451

249

249 45

045

45

45

45

45

Euro class 1

IN04 IN01

IN03

IN05 IN02

IN06

IN07

A-A

B-B

B08

IN04

IN05

STEP 1 - STUDS

STEP 2 - DPM

STEP 3 - SOLE PLATE

STEP 4 - BATTENS

STEP 5 - INSULATION B/W BATTENS

STEP 6 - 1ST LAYER OF GYPSUM

STEP 8 - FLIP THE ELEMENT

STEP 7 - 2ND LAYER OF GYPSUM

STEP 9 - INSULATION B/W STUDS

STEP 10 - WIND BREAKER

STEP 11 - DISTANCE STRIPS

STEP 12 - CLADDING

255

95

115

255

278

1000 1000

1302 45149645

249

---AN-15(205)001

AN-15(205)001

---

AN-15(205)002

AN-15(205)002

AN-15(205)003

---

AN-15(205)003

PROJECT:

SUBJECT:

DRAWN BY:

SCALE:

CLASS:

DATE:

UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -

1 : 20

Production drawing of WE6 - Skejby

Step 5 - Insulation between battens

Agnieszka Machalska

01/06/12

AN-15(205 01)041

CAHS31

Horsens

AN-15(205 01)041

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 6: Production drawing of WE 6 element

Section A-A

---

Section A-A

---

Section B-B

---Section B-B

---

Cutting list

Symbol Quantity Dimensions (mm)

P01

P02

P03

P04

P05

2

1

1

1

1

2055/542/12.5

2055/611/12.5

2364/185/12.5

2364/828/12.5

2364/1200/12.5

Material information

Thermal conductivity

Density

Fire class

Screws

1150 +/- 50kg/m3

P01

P02

P03

P04

P05

lambda = 0,034 W/mK

2055

542

828

1200

185

2364

2364

2364

Euro class A2

12.5

828

12.5

1200

12.5

12.5

185

Tolerance

Lenght

Width

+/- 1mm

+/- 1mm

P01

P04

P05

P03

A-A

B-B

B08

12.5

1200

185

2055

828

12.5

611

P02

3,9x 25 mm, distance 300 mm, 100 stk.

25

STEP 1 - STUDS

STEP 2 - DPM

STEP 3 - SOLE PLATE

STEP 4 - BATTENS

STEP 5 - INSULATION B/W BATTENS

STEP 6 - 1ST LAYER OF GYPSUM

STEP 8 - FLIP THE ELEMENT

STEP 7 - 2ND LAYER OF GYPSUM

STEP 9 - INSULATION B/W STUDS

STEP 10 - WIND BREAKER

STEP 11 - DISTANCE STRIPS

STEP 12 - CLADDING

542

2055 12.5

611

2364

542

---AN-15(205)001

AN-15(205)001

---AN-15(205)002

AN-15(205)002

AN-15(205)003

---AN-15(205)003

PROJECT:

SUBJECT:

DRAWN BY:

SCALE:

CLASS:

DATE:

UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -

1 : 20

Production drawing of WE6 - Skejby

Step 6 - 1st layer of gypsum

Agnieszka Machalska

01/06/12

AN-15(205 01)042

CAHS31

Horsens

AN-15(205 01)042

Step 6 - gypsum board

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 7: Production drawing of WE 6 element

Cutting list

Symbol Quantity Dimensions (mm)

P01

P02

P03

P04

P05

2

1

1

1

1

586/1755/12.5

611/1755/12.5

435/2364/12.5

1015/2364/12.5

1100/2364/12.5

Material information

Thermal conductivity

Density

Fire class

Screws

1150 +/- 50kg/m3

P01

P02

P03

P04

lambda = 0,034 W/mK

1755

541

1100

435

2364

2364

Euro class A2

12.5

541

1100

12.5

435

12.5

Tolerance

Lenght

Width

+/- 1mm

+/- 1mm

P05

P01

P04

P03

P05

A-A

B-B

95

P02

12.5

12.5

611 1212 541

978

2364

978

12.5

611 1212 541

3,9x 35 mm, distance 100 mm onright from first layer, 3rd layer onsite (45mm)85 stk.

STEP 1 - STUDS

STEP 2 - DPM

STEP 3 - SOLE PLATE

STEP 4 - BATTENS

STEP 5 - INSULATION B/W BATTENS

STEP 6 - 1ST LAYER OF GYPSUM

STEP 8 - FLIP THE ELEMENT

STEP 7 - 2ND LAYER OF GYPSUM

STEP 9 - INSULATION B/W STUDS

STEP 10 - WIND BREAKER

STEP 11 - DISTANCE STRIPS

STEP 12 - CLADDING

25

150

150

2364

435

1100

1755

978

611 541

1755

611

12.5

611

2364

---AN-15(205)001

AN-15(205)001

---AN-15(205)002

AN-15(205)002

AN-15(205)003

---AN-15(205)003

PROJECT:

SUBJECT:

DRAWN BY:

SCALE:

CLASS:

DATE:

UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -

1 : 20

Production drawing of WE6 - Skejby

Step 7 - 2nd layer of gypsum

Author

01/06/12

AN-15(205 01)043

Horsens

AN-15(205 01)043

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 8: Production drawing of WE 6 element

Section A-A

---

Section A-A

---

Section B-B

---Section B-B

---

A-A

B-B

STEP 1 - STUDS

STEP 2 - DPM

STEP 3 - SOLE PLATE

STEP 4 - BATTENS

STEP 5 - INSULATION B/W BATTENS

STEP 6 - 1ST LAYER OF GYPSUM

STEP 8 - FLIP THE ELEMENT

STEP 7 - 2ND LAYER OF GYPSUM

STEP 9 - INSULATION B/W STUDS

STEP 10 - WIND BREAKER

STEP 11 - DISTANCE STRIPS

STEP 12 - CLADDING

FLIP

PROJECT:

SUBJECT:

DRAWN BY:

SCALE:

CLASS:

DATE:

UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -

1 : 20

Production drawing of WE6 - Skejby

Step 8 - Flip the element

Agnieszka Machalska

01/06/12

AN-15(205 01)044

CAHS31

Horsens

AN-15(205 01)044

1 : 20

Step 8 - flip the element

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 9: Production drawing of WE 6 element

Section A-A

---

Section A-A

---

Section B-B

---Section B-B

---

Cutting list

Symbol Quantity Dimensions (mm)

I01

I02

I03

I04

I05

I06

I07

2

2

1

3

2

3

6

455/451/295

738/359/295

738/404/205

404/168/205

451/168/205

1200/404/295

1200/451/295

Material information

Thermal conductivity

Heat resistance

Fire class

0,04 in temperature of 25 degrees

I01

I02

I03

I04

I05

I06

lambda = 0,037 W/mK

Euro class 1

455

451

738

404

168

404

451

168

1200404

295

295

404

205

404

205

449.5

295

738

359

295

359

451

1200 295

451I07

A-A

B-B

451

404

STEP 1 - STUDS

STEP 2 - DPM

STEP 3 - SOLE PLATE

STEP 4 - BATTENS

STEP 5 - INSULATION B/W BATTENS

STEP 6 - 1ST LAYER OF GYPSUM

STEP 8 - FLIP THE ELEMENT

STEP 7 - 2ND LAYER OF GYPSUM

STEP 9 - INSULATION B/W STUDS

STEP 10 - WIND BREAKER

STEP 11 - DISTANCE STRIPS

STEP 12 - CLADDING

I05 I05I04I04I04

I07 I07I06I06I06

I07 I07

I07 I07

I01 I01I01 I01 I01

---AN-15(205)001

AN-15(205)001

---AN-15(205)002

AN-15(205)002AN-15(205)003

---AN-15(205)003

PROJECT:

SUBJECT:

DRAWN BY:

SCALE:

CLASS:

DATE:

UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -

1 : 20

Production drawing of WE6 - Skejby

Step 9 - Insulation between studs

Agnieszka Machalska

01/06/12

AN-15(205 01)045

CAHS31

Horsens

AN-15(205 01)045

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 10: Production drawing of WE 6 element

Section A-A

---

Section A-A

---

Section B-B

---Section B-B

---

B-B

Cutting list

Symbol Quantity Dimensions (mm)

WB01

WB02

WB03

WB04

1

1

1

2

1212/805.5/10

2384/917/10

2384/468/10

2860.5/586/10

Material information

Thermal conductivity

Density

Fire class

Screws

1150 +/- 50kg/m3, wind proof gypsum

WB 01

WB 02

WB03

WB 04

lambda = 0,034 W/mK

Euro class A2

1212

805.5

2384468

2860.5

586

A-AA-AA-AA-A

2384

917

STEP 1 - STUDS

STEP 2 - DPM

STEP 3 - SOLE PLATE

STEP 4 - BATTENS

STEP 5 - INSULATION B/W BATTENS

STEP 6 - 1ST LAYER OF GYPSUM

STEP 8 - FLIP THE ELEMENT

STEP 7 - 2ND LAYER OF GYPSUM

STEP 9 - INSULATION B/W STUDS

STEP 10 - WIND BREAKER

STEP 11 - DISTANCE STRIPS

STEP 12 - CLADDING

10

10

4245.5

2384

10

10

10

586 1212 586

805.5

2860.5

4245.5

468

917

10

3,5 x 35 mm, 76 stk.

WB 03

WB 02

WB 01

WB 04 WB 04

---AN-15(205)001

AN-15(205)001

---AN-15(205)002

AN-15(205)002AN-15(205)003

---AN-15(205)003

PROJECT:

SUBJECT:

DRAWN BY:

SCALE:

CLASS:

DATE:

UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -

1 : 20

Production drawing of WE6 - Skejby

Step 10 - Wind breaker

Agnieszka Machalska

01/06/12

AN-15(205 01)046

CAHS31

Horsens

AN-15(205 01)046

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 11: Production drawing of WE 6 element

Section A-A

---

Section A-A

---

Section B-B

---Section B-B

---

B-B

Cutting list

Symbol Quantity Dimensions (mm)

D01

D02

D03

D04

DPC 01

2

2

2

2

2

805.5/45/25

1385/45/25

4245.5/45/25

4245.5/70/25

4245.5/70/25

Pressurized wooden list

Wooden class

Screws Class 3 Outdoor

NKT nr.119274 4,0x60 mmevery 300 mm82 stk.

D 01

D 02

D03

D 04

C18

805.5

45

4245.5

45

4245.5

70

A-AA-AA-AA-A

1385

45

STEP 1 - STUDS

STEP 2 - DPM

STEP 3 - SOLE PLATE

STEP 4 - BATTENS

STEP 5 - INSULATION B/W BATTENS

STEP 6 - 1ST LAYER OF GYPSUM

STEP 8 - FLIP THE ELEMENT

STEP 7 - 2ND LAYER OF GYPSUM

STEP 9 - INSULATION B/W STUDS

STEP 10 - WIND BREAKER

STEP 11 - DISTANCE STRIPS

STEP 12 - CLADDING10

25

25

805.5

1340

4245.5

70 7045454545

45

25

45

25

45

25

70

D01

D02D03D04 D03 D04

---AN-15(205)001

AN-15(205)001

---AN-15(205)002

AN-15(205)002AN-15(205)003

---AN-15(205)003

PROJECT:

SUBJECT:

DRAWN BY:

SCALE:

CLASS:

DATE:

UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -

1 : 20

Production drawing of WE6 - Skejby

Step 11 - Distance laths

Agnieszka Machalska

01/06/12

AN-15(205 01)047

CAHS31

Horsens

AN-15(205 01)047

Step 11 - distance laths

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 12: Production drawing of WE 6 element

Section A-A

---

Section A-A

---

Section B-B

---Section B-B

---

B-B

Cutting list

Symbol Quantity Dimensions (mm)

C01

C02

C03

32

14

1

503/135/25

2218/135/25

2218/135/25

Pressurized wooden list

Cladding

Screws Stainless steel, class 3 Outdoor

NKT nr.119272 4,0x45 mmevery cladding160 stk.

NKT nr.136675 M6,0x100mmscrewing6 stk.

C 01

C02

C04

SUPER WOOD ™:SW1 AART, moisture content : 12-20%,suitable for outdoor use

503

135

A-AA-AA-AA-A

2218

135

STEP 1 - STUDS

STEP 2 - DPM

STEP 3 - SOLE PLATE

STEP 4 - BATTENS

STEP 5 - INSULATION B/W BATTENS

STEP 6 - 1ST LAYER OF GYPSUM

STEP 8 - FLIP THE ELEMENT

STEP 7 - 2ND LAYER OF GYPSUM

STEP 9 - INSULATION B/W STUDS

STEP 10 - WIND BREAKER

STEP 11 - DISTANCE STRIPS

STEP 12 - CLADDING

C01

C02

C01

503 503

25

135

135

C03

2218

135

25

25

135

135

25

2218

---AN-15(205)001

AN-15(205)001

---AN-15(205)002

AN-15(205)002

AN-15(205)003

---AN-15(205)003

- 2 layers of gypsum board (2*12,5 mm)- battens with mineral wool b/w 45x45mm- DPM 0,2 mm- vertical studs with mineral wool b/w295x45 mm- horizontal studs and battens: 295x45mm and 45x45 mm as a framing for thewindow- wooden batten acting as a drip edgewith flashing on top of it- windproof gypsum 10 mm- vertical pressurized wooden lists 25x50mm- horizontal cladding 25x135 mm

10 mm space is left for better ventilationand snow catch is placed betweencladding and windproof gypsum

PROJECT:

SUBJECT:

DRAWN BY:

SCALE:

CLASS:

DATE:

UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -

1 : 20

Production drawing of WE6 - Skejby

Step 12 - Cladding

Agnieszka Machalska

01/06/12

AN-15(205 01)048

CAHS31

Horsens

AN-15(205 01)048

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT