PRODUCTION CAPACITY : PLANNING AND CONTROL
Presented By:
Garima Punj [4131005]
Sonali Garwal [4131031]
![Page 2: Production capacity – planning and control](https://reader034.fdocuments.in/reader034/viewer/2022042607/55a9d7b91a28abf0788b476b/html5/thumbnails/2.jpg)
PRODUCTION CAPACITY
![Page 3: Production capacity – planning and control](https://reader034.fdocuments.in/reader034/viewer/2022042607/55a9d7b91a28abf0788b476b/html5/thumbnails/3.jpg)
Capacity Planning
Determining the long term capacity needs of an organization
Determining how these needs will be satisfied
![Page 4: Production capacity – planning and control](https://reader034.fdocuments.in/reader034/viewer/2022042607/55a9d7b91a28abf0788b476b/html5/thumbnails/4.jpg)
Determination of Plant Capacity
Ǐ Design Capacity – Rate of output of goods or services under full scale operating conditions
Ǐ System capacity – Maximum output of a specific product that the system of workers and equipments is capable of producing
![Page 5: Production capacity – planning and control](https://reader034.fdocuments.in/reader034/viewer/2022042607/55a9d7b91a28abf0788b476b/html5/thumbnails/5.jpg)
Strategies of Capacity Planning
![Page 6: Production capacity – planning and control](https://reader034.fdocuments.in/reader034/viewer/2022042607/55a9d7b91a28abf0788b476b/html5/thumbnails/6.jpg)
PLANNING AND CONTROL
![Page 7: Production capacity – planning and control](https://reader034.fdocuments.in/reader034/viewer/2022042607/55a9d7b91a28abf0788b476b/html5/thumbnails/7.jpg)
Planning Decisions
Strategic
Decisions
(Top – Level)
Tactical Decisions
(Middle – Level)
Operational Decisions
(Lower – Level)
![Page 8: Production capacity – planning and control](https://reader034.fdocuments.in/reader034/viewer/2022042607/55a9d7b91a28abf0788b476b/html5/thumbnails/8.jpg)
Strategic Decisions
Warehouse Location
Building a new plant
Mergers and Acquisitions
New Product Planning
Social Responsibility Planning
R & D Planning
![Page 9: Production capacity – planning and control](https://reader034.fdocuments.in/reader034/viewer/2022042607/55a9d7b91a28abf0788b476b/html5/thumbnails/9.jpg)
Tactical Decisions
Pricing a Product
Budget Analysis
Short-term Forecasting
Plant Layout
Reward System Design
Make or Buy Analysis
Negotiations
![Page 10: Production capacity – planning and control](https://reader034.fdocuments.in/reader034/viewer/2022042607/55a9d7b91a28abf0788b476b/html5/thumbnails/10.jpg)
Operational Decisions
Production Scheduling
Inventory Control
Daily Operator Scheduling
Order Entry
Machine Loading
![Page 11: Production capacity – planning and control](https://reader034.fdocuments.in/reader034/viewer/2022042607/55a9d7b91a28abf0788b476b/html5/thumbnails/11.jpg)
Phases of Planning and Control
Planning
Action
Control
![Page 12: Production capacity – planning and control](https://reader034.fdocuments.in/reader034/viewer/2022042607/55a9d7b91a28abf0788b476b/html5/thumbnails/12.jpg)
Planning Phase
Pre-Planning
• Product Development and Design
• Demand Forecasting
• Order Writing
• Master Scheduling
• MRP
Active Planning
• Process Planning and Routing
• Material Planning
• Tools Planning
• Loading
• Scheduling
![Page 13: Production capacity – planning and control](https://reader034.fdocuments.in/reader034/viewer/2022042607/55a9d7b91a28abf0788b476b/html5/thumbnails/13.jpg)
Action Phase
Dispatching includes:Job Order
Store Issue Order
Tool Order
Time Ticket
Inspection Order
Move Order
![Page 14: Production capacity – planning and control](https://reader034.fdocuments.in/reader034/viewer/2022042607/55a9d7b91a28abf0788b476b/html5/thumbnails/14.jpg)
Control Phase
Progress ReportingData regarding what is happening with the job collected
Corrective ActionIncludes creating schedule and capacity modifications
![Page 15: Production capacity – planning and control](https://reader034.fdocuments.in/reader034/viewer/2022042607/55a9d7b91a28abf0788b476b/html5/thumbnails/15.jpg)
![Page 16: Production capacity – planning and control](https://reader034.fdocuments.in/reader034/viewer/2022042607/55a9d7b91a28abf0788b476b/html5/thumbnails/16.jpg)
R & D Planning is a ______ decision.
‽ Strategic
‽ Operational
‽ Tactical
‽ None
![Page 17: Production capacity – planning and control](https://reader034.fdocuments.in/reader034/viewer/2022042607/55a9d7b91a28abf0788b476b/html5/thumbnails/17.jpg)
Production Planning and Control has ______ phases
‽ Two
‽ Three
‽ Four
‽ None
![Page 18: Production capacity – planning and control](https://reader034.fdocuments.in/reader034/viewer/2022042607/55a9d7b91a28abf0788b476b/html5/thumbnails/18.jpg)
Dispatching is a major step of ____ phase
‽ Planning
‽ Action
‽ Production Control
‽ None
![Page 19: Production capacity – planning and control](https://reader034.fdocuments.in/reader034/viewer/2022042607/55a9d7b91a28abf0788b476b/html5/thumbnails/19.jpg)
Planning phase has _____
‽ Pre – Planning, Active Planning and Post –Planning
‽ Pre – Planning and Active Planning
‽ Pre – Planning and Post – Planning
‽ None of the above
![Page 20: Production capacity – planning and control](https://reader034.fdocuments.in/reader034/viewer/2022042607/55a9d7b91a28abf0788b476b/html5/thumbnails/20.jpg)
_____ is the transition from planning phase to action phase
‽ Dispatching
‽ Scheduling
‽ Materials Planning
‽ None of the above