    Product Design & ProcessSelection-Manufacturing

  • 8/3/2019 Product Design Process Selection Manufacturing 1212049492424889 8

    2/20

    2

    The McGraw-Hill Companies, Inc., 2004

    Typ ical Phases of Product DesignDevelo pm ent

    Designing for the Custo m er

    Design for Manufacturabilit y

    Typ es of ProcessesProcess Flow Structures

    Process Flow DesignGlobal Product Design and Manufacturing

    OBJEC TIV ES

  • 8/3/2019 Product Design Process Selection Manufacturing 1212049492424889 8

    3/20

    3

    The McGraw-Hill Companies, Inc., 2004

    Typ ical Phases of Product Design

    Develo pm ent

    Conce p t Develo pm ent

    Product Planning

    Product/Process Engineering

    Pilot Production/Ra mp -Up

  • 8/3/2019 Product Design Process Selection Manufacturing 1212049492424889 8

    4/20

    4

    The McGraw-Hill Companies, Inc., 2004

    Concurrent Engineering

    Defined

    Concurrent engineering can be defined asthe si m ultaneous develo pm ent of p rojectdesign functions, with o pen andinteractive co mm unication existingam ong all tea m m em bers for the

    p ur p oses of reducing ti m e to m arket,decreasing cost, and i mp roving qualit y and reliabilit y

  • 8/3/2019 Product Design Process Selection Manufacturing 1212049492424889 8

    5/20

    5

    The McGraw-Hill Companies, Inc., 2004

    Concurrent Engineering(Continued)

    T ea m s p rovide the p ri m ar y integrationm echanis m in CE p rogra m sT here are three t yp es of tea m s Program Management Team Technical Team

    Design-Build TeamsT im e savings of CE p rogra m s are createdby perfor m ing activities in parallel

  • 8/3/2019 Product Design Process Selection Manufacturing 1212049492424889 8

    6/20

    6

    The McGraw-Hill Companies, Inc., 2004

    Designing for the Custo m er

    Quality FunctionDeployment

    Value Analysis/Value Engineering

    IdealCustomer Product

    House of Quality

  • 8/3/2019 Product Design Process Selection Manufacturing 1212049492424889 8

    7/20

    7

    The McGraw-Hill Companies, Inc., 2004

    Designing for the Custo m er:

    Qualit y Function De p loym ent

    Interfunctional tea m s fro m m arketing, designengineering, and m anufacturing

    Voice of the custo m er

    House of Qualit y

  • 8/3/2019 Product Design Process Selection Manufacturing 1212049492424889 8

    8/20

    8

    The McGraw-Hill Companies, Inc., 2004

    QF DTECHNICAL ATTRIBUTES

    CUSTOMER REQUIREMENT I M P O R T A N C E

    C A S E

    M A T E R I A L

    B A T T E R Y S I Z E

    S C R E E N T Y P E

    R A M C A P

    H A R D

    D R I V E S I Z E

    K E Y B O A R D S I Z E

    LIGHT WEIGHT 4.5 3 9 3 3 3 3SMALL SIZE 3.0 9 3 3 9LONG OPERATION BETW EEN RECHARGING 3.5 9LARGE KEYS ON KEYBOARD 2.0 9SHORT TIME TO RECHARGE 1.5 9

    READABLE SCREEN 3.0 9DURABLE ( UNBREAKABLE) 2.0 9 3 3 3FAST PROCESSING /LARGE MEMORY CAP 4.0 9 9

    ATTRIBUTE IMPORTANCE 31.5 118.5 49.5 52.5 64.5 64.5 381.0% IMPORTANCE 8.27 31.10 12.99 13.78 16.93 16.93 100.0LEGEND 9= STRONG , 3= MEDIUM ,1= WEAK

    QFD FOR A LAP TOP COMPUTER

  • 8/3/2019 Product Design Process Selection Manufacturing 1212049492424889 8

    9/20

    9

    The McGraw-Hill Companies, Inc., 2004

    Designing for the Custo m er:

    Value Anal ysis/ Value Engineering ( VA/VE)Achieve equivalent or better perfor m ance at a lowercost while m aintaining all functional require m ents

    defined b y the custo m er Does the ite m have an y design features that are

    not necessar y? Can two or m ore parts be co m bined into one ? How can we cut down the weight ? Are there nonstandard parts that can be

    elim inated ?

  • 8/3/2019 Product Design Process Selection Manufacturing 1212049492424889 8

    10/20

    10

    The McGraw-Hill Companies, Inc., 2004

    Design for Manufacturabilit y

    T raditional A pp roach We design it, you build it or Over the

    wall

    Concurrent Engineering Lets work together si m ultaneousl y

  • 8/3/2019 Product Design Process Selection Manufacturing 1212049492424889 8

    11/20

  • 8/3/2019 Product Design Process Selection Manufacturing 1212049492424889 8

    12/20

    12

    The McGraw-Hill Companies, Inc., 2004

    V irtual Factor y

    Defined

    A virtual factor y can be defined as am anufacturing o p eration where activities arecarried out not in one central p lant, but inm ulti p le locations b y su pp liers and partnerfir m s as p art of a strategic alliance

  • 8/3/2019 Product Design Process Selection Manufacturing 1212049492424889 8

    13/20

    13

    The McGraw-Hill Companies, Inc., 2004

    Break-Even Anal ysis

    A standard a pp roach to choosing a m ongalternative p rocesses or equi pm ent

    Model seeks to deter m ine the p oint in units

    p roduced (and sold) where we will startm aking p rofit on the p rocess or equi pm ent

    Model seeks to deter m ine the p oint in unitsp roduced (and sold) where total revenue andtotal cost are equal

  • 8/3/2019 Product Design Process Selection Manufacturing 1212049492424889 8

    14/20

    14

    The McGraw-Hill Companies, Inc., 2004

    Break-Even Anal ysis (Continued)

    This formula can be used to find any of its

    components algebraically if the other parametersare known

    Break-even Demand=

    Purchase cost of process or equipmentPrice per unit - Cost per unit

    or

    Total fixed costs of process or equipmentUnit price to customer - Variable costs per unit

  • 8/3/2019 Product Design Process Selection Manufacturing 1212049492424889 8

    15/20

    15

    The McGraw-Hill Companies, Inc., 2004

    Break-Even Anal ysis (Continued) Exa mp le: Su pp ose you want to purchase a new co mp uter

    that will cost $5,000. I t will be used to process written ordersfro m custo m ers who will pay $25 each for the service. T hecost of labor, electricit y and the for m used to p lace the orderis $5 per custo m er. How m an y custo m ers will we need to

    serve to per m it the total revenue to break-even with ourcosts ?

    Break-even Demand:= Total fixed costs of process or equip.

    Unit price to customer Variable costs=5,000/(25-5)=250 customers

  • 8/3/2019 Product Design Process Selection Manufacturing 1212049492424889 8

    16/20

    16

    The McGraw-Hill Companies, Inc., 2004

    Process Flow Design

    Defined A process flow design can be defined as am app ing of the s pecific p rocesses that raw

    m aterials, parts, and subasse m blies follow asthe y m ove through a p lant

    T he m ost co mm on tools to conduct a p rocessflow design include asse m bl y drawings,asse m bl y charts, and o peration and routesheets

  • 8/3/2019 Product Design Process Selection Manufacturing 1212049492424889 8

    17/20

    17

    The McGraw-Hill Companies, Inc., 2004

    Exa mp le: Asse m bl y Chart (Gozinto)

    A -2SA -2

    4

    5

    6

    7

    Lockring

    Spacer, detent spring

    Rivets (2)

    Spring-detent

    A -5Component/ A ssy Operation

    Inspection

    From Exhibit 5.14

  • 8/3/2019 Product Design Process Selection Manufacturing 1212049492424889 8

    18/20

    18

    The McGraw-Hill Companies, Inc., 2004

    Exa mp le: Process Flow Chart

    MaterialReceivedfromSupplier

    InspectMaterial for Defects Defects

    found?

    Return toSupplier for Credit

    Yes

    No ,Continue

  • 8/3/2019 Product Design Process Selection Manufacturing 1212049492424889 8

    19/20

    19

    The McGraw-Hill Companies, Inc., 2004

    Global Product Design and ManufacturingStrategies

    Joint Ventures

    Global Product Design Strateg y

  • 8/3/2019 Product Design Process Selection Manufacturing 1212049492424889 8

    20/20

    20

    The McGraw-Hill Companies, Inc., 2004

    Measuring Product Develo pm entPerfor m ance

    Measures Freq. Of new products introduced

    Time to market introductionNumber stated and number completed

    A ctual versus planPercentage of sales from new products

    Time-to-market

    Productivity

    Quality

    Engineering hours per projectCost of materials and tooling per project

    A ctual versus plan

    Conformance-reliability in useDesign-performance and customer satisfaction

    Yield-factory and field

    PerformanceDimension