. Procedures, Programs and Manuals 5.6 * 5.6 Procedures, Programs and Manuals 5.6.2.10 OTSG Tube Surveillance Program (continued) 4. Acceptance criteria: a. Vocabulary as used in this Specification: 1. Tubing or Tube means that portion of the tube or sleeve which forms the primary system to secondary system pressure boundary. 2. Imperfection means an exception to the dimensions, finish or contour of a tube from that required by fabrication drawings or specifications. Eddy- current testing indications with signal to noise ratio > 5:1 and < 20% of the nominal tube wall thickness, if detectable, may be considered as imperfections. Indications with signal to noise ratio s 5:1 and voltage amplitude 12 volts will also be considered imperfections. 3. Degradation means a service-induced cracking, wastage, wear, or general corrosion occurring on either inside or outside of a-tube. 4. Degraded Tube means a tube containing imperfections 2 20% of the nominal wall thickness if signal to noise ratio > 5:1 or indications with signal to noise ratio 15:1, voltage amplitude > 2 volts, with axial extent of < 0.25 inch, and circumferential extent of < 120; caused by degradation except where all such degradation has been spanned by the installation of a sleeve. 5. % Degradation means the percentage of the tube wall thickness affected or removed by degradation. 6. Defect means an imperfection of such severity that it exceeds the repair limit except where the I imperfection has been spanned by the-installation of a sleeve. A tube containing a defect in its pressure boundary is defective. Any tube which does not permit the passage of the eddy-current inspection probe shall be deemed a defective tube. (continued) Crystal River Unit 3 5.0-16 Amendment No. ^ 940315olos 94o3o4 PDR ADDCK 05000302 P PDR "

Transcript of Procedures, Programs and Manuals 5

.

Procedures, Programs and Manuals5.6*

5.6 Procedures, Programs and Manuals

5.6.2.10 OTSG Tube Surveillance Program (continued)

4. Acceptance criteria:

a. Vocabulary as used in this Specification:

1. Tubing or Tube means that portion of the tube orsleeve which forms the primary system to secondarysystem pressure boundary.

2. Imperfection means an exception to the dimensions,finish or contour of a tube from that required byfabrication drawings or specifications. Eddy-current testing indications with signal to noiseratio > 5:1 and < 20% of the nominal tube wallthickness, if detectable, may be considered asimperfections. Indications with signal to noiseratio s 5:1 and voltage amplitude 12 volts willalso be considered imperfections.

3. Degradation means a service-induced cracking,wastage, wear, or general corrosion occurring oneither inside or outside of a-tube.

4. Degraded Tube means a tube containingimperfections 2 20% of the nominal wall thicknessif signal to noise ratio > 5:1 or indications withsignal to noise ratio 15:1, voltage amplitude > 2volts, with axial extent of < 0.25 inch, andcircumferential extent of < 120; caused bydegradation except where all such degradation hasbeen spanned by the installation of a sleeve.

5. % Degradation means the percentage of the tubewall thickness affected or removed by degradation.

6. Defect means an imperfection of such severity thatit exceeds the repair limit except where the I

imperfection has been spanned by the-installationof a sleeve. A tube containing a defect in itspressure boundary is defective. Any tube whichdoes not permit the passage of the eddy-currentinspection probe shall be deemed a defective tube.

(continued)

Crystal River Unit 3 5.0-16 Amendment No.

^

940315olos 94o3o4PDR ADDCK 05000302P PDR "

.

.

,

Procedures, Programs and Manuals5.6*

5.6 Procedures, Programs and Manuals

5.6.2.10 OTSG Tube Surveillance Program (continued)

7. Repair Limit means the imperfection at or beyondwhich the tube shall be restored to serviceabilityby the installation of a sleeve or removed fromservice because it may become unserviceable priorto the next inspection. The repair limit for eddycurrent indications with signal to noise ratios >5:1 is equal to 40% of the nominal tube wallthickness. 'The repair limit for eddy currentindications with signal to noise ratios s 5:1 is abobbin coil signal amplitude of > 2 volts, andaxial extent > 0.25 inches or circumferentialextent > 120 No more than five thousandsleeves my be installed in each OTSG.

8. Unserviceable describes the condition of a tube if *

it leaks or contains a defect large enough toaffect its structural integrity in the event of anOperating Basis Earthquake, a loss-of-coolantaccident, or a main steam line or feedwater linebreak, as specified in 5.6.2.10.3.c, above.

9. Tube Inspection means an inspection of the entireOTSG tube as far as possible.

b. The OTSG shall be determined OPERABLE after completingthe corresponding actions (plug or sleeve all tubesexceeding the plugging / sleeving limit and all tubescontaining through-wall cracks) required by Table5.6.2-2 (and Table 5.6.2-3 if the provisions ofSpecification 5.6.2.10.2.d are utilized). Defectivetubes may be repaired in accordance with the B&Wprocess (or method) equivalent to the method described I

.

in report BAW-2120P. |

5.6.2.11 Secondary Water Chemistry Program

This program provides controls for manitoring secondary water ,

chemistry to inhibit steam generator tube degradation and low |pressure turbine disc stress corrosion cracking. The program j

shall include:

a. Identification of a sampling schedule for the criticalvariables and control points for these variables,

1

(continued)

Crystal River Unit 3 5.0-17 Amendment No.

.

Procedures, Programs and Manuals5.6*

5.6 Procedures, Programs and Manuals

i

5.6.2.11 Secondary Water Chemistry Program (continued)

b. Identification of the procedures used to measure the valuesof the critical variables;

c. Identification of process sampling points, which shallinclude monitoring the discharge of the condensate pumps forevidence of condenser in leakage;

d. Procedures for the recording and management of data;

Procedures defining corrective actions for all off controle.point chemistry conditions; and |

f. A procedure identifying the authority responsible for theinterpretation of the data and the sequence and timing ofadministrative events, which is required to initiatecorrective action.

5.6.2.12 Ventilation Filter Testing Program (VFTP)

A program shall be established to implement the following requiredtesting of the Control Room Emergency Ventilation System (CREVS)per the requirements specified in Regulatory Guide 1.52,Revision 2, 1978, and in accordance with ASME N510-1975 and ASMEN509-1976.

a. Demonstrate for each train of the CREVS that an inplace testof the high efficiency particulate air (HEPA) filters shows ;

a penetration and system bypass < 0.05% when tested in i

accordance with Regulatory Guide 1.52, Revision 2, 1978, and .

Iin accordance with ASME N510-1975 at a flowrate of 43,500cfm i 10%. j

b. Demonstrate for each train of the CREVS that an inplace testof the charcoal adsorber shows a penetration and systembypass < 0.05% when tested in accordance with RegulatoryGuide 1.52, Revision 2, and ASME N510-1989 at the systemflowrate of 43,500 cfm i 10L

(continued)

Crystal River Unit 3 5.0-18 Amendment No.

l

-- __ _ __ _ _ _ _ _ _i

e

. . -

Procedures, Programs and Manuals5.6''

5.6 Procedures, Programs and Manuals,

5.6.2.12 VFTP (continued)

c. Demonstrate for each train of the CREVS that a laboratorytest of a sample of the charcoal adsorber, when obtained asdescribed in Regulatory Guide 1.52, Revision 2,1978, showsthe methyl iodide penetration less than 1% when tested inaccordance with Table 2 of Regulatory Guide 1.52, Revision 2and ASME N509-1976 at a temperature of 80aC and 70% relativehumidity.

d. Demonstrate for each train of the CREVS that the pressuredrop across the combined HEPA filters and the charcoaladsorbers is 1 AP-6" water when tested in accordance withRegulatory Guide 1.52, Revision 2,1978, and ASME N510-1975at the system flowrate of 43,500 cfm i 10%.

The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the VFTPtest frequencies.

5.6.2.13 Explosive Gas and Storage Tank Radioactivity Monitoring Program

This program provides controls for potentially explosive gasmixtures contained in the Radioactive Waste Disposal (WD) System,the quantity of radioactivity contained in gas storage tanks orfed into the offgas treatment system. The gaseous radioactivityquantities shall be determined following the methodology in BranchTechnical Position (BTP) ETSB 11-5, " Postulated RadioactiveRelease due to Waste Gas System Leak or Failure". The-liquidradwaste quantities shall be determined in accordance withStandard Review Plan, Section 15.7.3, " Postulated RadioactiveRelease due to Tank Failures".

The program shall include:

a. The limits for concentrations of hydrogen and oxygen in theRadioactive Waste Disposal (WD) System and a surveillanceprogram to ensure the limits are maintained. Such limitsshall be appropriate to the system's design criteria, (i.e.,whether or not the system is designed to withstand ahydrogen explosion),

i

||

(continued) |1

Crystal River Unit 3 5.0-19 Amendment No.

|1

.-

.

Procedures, Programs and Manuals'- 5.6

5.6 Procedures, Programs and Manuals

5.6.2.13 Explosive Gas and Storage Tank Radioactivity Monitoring Program(continued)

b. A surveillance program to ensure that the quantity ofradioactivity contained in each gas storage tank and fedinto the offgas treatment system is less than the amountthat would result in a whole body exposure of it 0.5 rem toany individual in an unrestricted area, in the event of anuncontrolled release of the tanks' contents.

The provisions of SR 3.0.2 and SR 3.0.3 are applicable to theExplosive Gas and Storage Tank Radioactivity Monitoring Piogramsurveillance frequencies.

5.6.2.14 Diesel Fuel Oil Testing Program

A diesel fuel oil testing program to implement required testing'ofboth new fuel oil and stored fuel oil shall be established. Theprogram shall include sampling and testing requirements, andacceptance criteria, in accordance with applicable ASTM Standards.The purpose of the program is to establish the following:

a. Acceptability of new fuel oil for use prior to addition tostorage tanks by determining that the fuel oil has thefollowing properties within limits of ASTM D 975 for GradeNo. 2-D fuel oil:

1. Kinematic Viscosity,

2. Water and Sediment,

3. Flash Point,

4. Specific Gravity API;

b. Other properties of ASTM D 975 for Grade No. 2-D fuel oilare within limits within 92 days following sampling andaddition of new fuel to storage tanks.

c. Total particulate contamination of stored fuel oil is <.10mg/L when tested once per 92 days in accordance with ASTM D2276-91 (gravimetric method).

5.6.2.15 Not Used