~ SAMSUNG ENGlNEERING
PROCEDURE MANUAL
SPQOO01EPN
General Procedure
Weld Map Marking Procedure
REY o DATE 2010620
SAMSUNG ENGINEERING eo LTO
SPQ0001EPNPROCEDURE MANUAL
REV o1- Weld Map Marking Procedure r DATE 2011 OO 21 PAGE 2 OF 5
2 1 2 Preparing (Weld Map Marking) Isometric drawings from SECL Engineering Department (HO) shaU be marked lor construction M1en iexclhe
document controller submits iexclhe isometriacutec drawings SECL piping department should review and register them as
per revisiOn status Alter Ihat SECL piping department (Construction) wi ll issue iexclhe ISO Drawings lo subcontractor
ler we ld map marking lor identificalion 01 field welds and lor spool control The we ~ding symbol and abbreviation are
used l er he identification 01 the jo int number spool number modifications cutling amp re-welding and addiUonal
welds The seqtlence 01 iexclhe weld map marking is given by Append ix I flowchart
For lsometric Drawings on reviSion lero (O) the Piping Engineer al head office sIlall issue an auto-generated weld
map For long straight pipe lines joinls are given alevery 12m (as per the slandard pipe labricalion length Ilthe
pipeatsi tedonotmatchwilhtherequired12mallsupplementaljointSshall be regarded as addilionaljoints
213 Distribulion M1en Ihe weld map marking on the drawing has been completed by the Subcontractor SECL piping depanment (Construction) and QAQC Depanment wil l review and check the draNIacuteng If there are no comments il slla ll be stamped asAFC [Approval lor Construction]
AFC stamped original isometric drawings shall be maintained by Piping Department (Construction) one (1) copy 01
isometric drawing shall be sent to subcontradors lor their action one (1) copy lor QNQC department lor input weld
plan dala in FMCS
214 Input olWeld Plan Data
When AFC Isomelric Drawing has been received from piping department QAQC Department shall ensure lo
correct weld plan dala in FMCS
22WeldMap
221 Marking 01 joinl numbers should be covered all weld joints thread joints bol joints aOO attac1ment
welds(spacesupportpadplug etc
222 Care should be taKen to avoid the duplication ofweld joint No on cont inuation drawing
223 AII rolary equipmenl nozzle connection point should be field weld (check with equipment)
224 In case 01 attachment jolnt no inm-dia will be considered as progress II is required only fo r NDT identificationsand records (consider counling factor as O)
225 Duringselectionoll ieldjointsfollowingaspectsshouldbeconsidered -Sizeolspool loreasy handling transportabonamp installat ion -Tominimize scaffolding - Installat ionareacondilions -Lengthofsuppliedpipes
SPQOOO1EPNPROCEDURE MANUAL
EfllGlNEERING REVO1- Weld Map Marking Procedure
[ DATE 2011 06 21 PAGE 3 OF S
23NeldJointDetail
8- 231 weiexclding No on ISO drawing will be gradually given in Une wtth the flow direction
) ltlo o~-c
0(5 o 2 32 Shop joint numbers should be marked by round
o 234 Fleld join number should be marked by hexagon
G 235 Reinforced pad Joint No is given as follows (Joint No 2 and 3 are reinforced pad joints)
CJX) 236 Long pipeline Join No should be marllt9d by
SPQOOO1EPNPROCEDURE MANUAL ___ ~~~~ING
REVO Weld Map Marldng Procedure
DATE 2011 06 21 PAGE 4 OF 5
iexcl-37 8pOQljOUld be numbered as SPQ01 SP-002 SP-003 aOO marked by rectangle
Spool
238 Attachmenl Joinl should be marked as following (For field atlachment joint 2 34 - hexagon is applied)
Suppor1Jointshallbe90Dsaries (ifrequired)
8 8011 Join shall be 800 series (ifrequired)
e OtherJointsshallbe700series (ifrequlred)
G 3 Rework Control
31 General Dunng Plpmg Fabncallon Work Al RewQI1laquos (Cuttlng amp Re-weldmQ and Addl~onal JOInl) shal be controlled and
recorded
32 ReworkAbbreviation
ReworkTag
Due lo SECL Construction Faul CC1CC2
Cuttmgamp Re-welding Dua to SECL Englneering Faul EC1EC2
DuetoSubcontractorFaul1 SC1SC2 middotmiddot
Oua lo SECL Construction Fault CA1CA2 middotmiddot
Addilional W9ldlngJOlnt Due lo SECL Engineering Fault EA1 EA2
DuatoSubcontractorFault SA1SA2 middotmiddot
(Englneering Fault indudesnolonlyengineelingfaullsbulalsoprocuremenlfaulls)
Ex) If Joinl No 1 is cut and re-weldad dua lo SECL Engineering Fault JOlnt No 1 will be deleted and Joint No
1EC1will be added
Appendlx I
Appendix I Welding Map Flow Chart SPQ0001EPN
REV 0
PAGE 1 OF 1
Welding Map Flow Chart
SECL Document Control Distrlbule ISO Draving lo Subcontractors
Subcontractor Subcontraclor shall draw up W9ldlng Map
bull SECL Piping I SECL QAlQC
Relliews and comments the related INelding Map from Subcontractor (if any comments Subcontractor shall re1Iact lhe comments) then retum to Subcontractor with Approved
bull SECL QAlQC (Control ofWeld Plan Data) I SECL Piping (Control of Welding Result)
SECl QAJQC shall inpul weking plan according ISO DWG in FMCS
Then after corniucting welding SECL Piping input welding data in FMC dally base then
bull SECLQAQC
QACe shall Wfify welding data according to OC inspectian reporto bull
SECLPlplngbullSECl Piping leam refers FMCS welding input status for monlhly progress payment
measurlng end final adjustment
![Page 2: Procedure Manual SPQ0001EPN.pdf](https://reader036.fdocuments.in/reader036/viewer/2022081703/5695d1131a28ab9b02950c38/html5/thumbnails/2.jpg)
SPQ0001EPNPROCEDURE MANUAL
REV o1- Weld Map Marking Procedure r DATE 2011 OO 21 PAGE 2 OF 5
2 1 2 Preparing (Weld Map Marking) Isometric drawings from SECL Engineering Department (HO) shaU be marked lor construction M1en iexclhe
document controller submits iexclhe isometriacutec drawings SECL piping department should review and register them as
per revisiOn status Alter Ihat SECL piping department (Construction) wi ll issue iexclhe ISO Drawings lo subcontractor
ler we ld map marking lor identificalion 01 field welds and lor spool control The we ~ding symbol and abbreviation are
used l er he identification 01 the jo int number spool number modifications cutling amp re-welding and addiUonal
welds The seqtlence 01 iexclhe weld map marking is given by Append ix I flowchart
For lsometric Drawings on reviSion lero (O) the Piping Engineer al head office sIlall issue an auto-generated weld
map For long straight pipe lines joinls are given alevery 12m (as per the slandard pipe labricalion length Ilthe
pipeatsi tedonotmatchwilhtherequired12mallsupplementaljointSshall be regarded as addilionaljoints
213 Distribulion M1en Ihe weld map marking on the drawing has been completed by the Subcontractor SECL piping depanment (Construction) and QAQC Depanment wil l review and check the draNIacuteng If there are no comments il slla ll be stamped asAFC [Approval lor Construction]
AFC stamped original isometric drawings shall be maintained by Piping Department (Construction) one (1) copy 01
isometric drawing shall be sent to subcontradors lor their action one (1) copy lor QNQC department lor input weld
plan dala in FMCS
214 Input olWeld Plan Data
When AFC Isomelric Drawing has been received from piping department QAQC Department shall ensure lo
correct weld plan dala in FMCS
22WeldMap
221 Marking 01 joinl numbers should be covered all weld joints thread joints bol joints aOO attac1ment
welds(spacesupportpadplug etc
222 Care should be taKen to avoid the duplication ofweld joint No on cont inuation drawing
223 AII rolary equipmenl nozzle connection point should be field weld (check with equipment)
224 In case 01 attachment jolnt no inm-dia will be considered as progress II is required only fo r NDT identificationsand records (consider counling factor as O)
225 Duringselectionoll ieldjointsfollowingaspectsshouldbeconsidered -Sizeolspool loreasy handling transportabonamp installat ion -Tominimize scaffolding - Installat ionareacondilions -Lengthofsuppliedpipes
SPQOOO1EPNPROCEDURE MANUAL
EfllGlNEERING REVO1- Weld Map Marking Procedure
[ DATE 2011 06 21 PAGE 3 OF S
23NeldJointDetail
8- 231 weiexclding No on ISO drawing will be gradually given in Une wtth the flow direction
) ltlo o~-c
0(5 o 2 32 Shop joint numbers should be marked by round
o 234 Fleld join number should be marked by hexagon
G 235 Reinforced pad Joint No is given as follows (Joint No 2 and 3 are reinforced pad joints)
CJX) 236 Long pipeline Join No should be marllt9d by
SPQOOO1EPNPROCEDURE MANUAL ___ ~~~~ING
REVO Weld Map Marldng Procedure
DATE 2011 06 21 PAGE 4 OF 5
iexcl-37 8pOQljOUld be numbered as SPQ01 SP-002 SP-003 aOO marked by rectangle
Spool
238 Attachmenl Joinl should be marked as following (For field atlachment joint 2 34 - hexagon is applied)
Suppor1Jointshallbe90Dsaries (ifrequired)
8 8011 Join shall be 800 series (ifrequired)
e OtherJointsshallbe700series (ifrequlred)
G 3 Rework Control
31 General Dunng Plpmg Fabncallon Work Al RewQI1laquos (Cuttlng amp Re-weldmQ and Addl~onal JOInl) shal be controlled and
recorded
32 ReworkAbbreviation
ReworkTag
Due lo SECL Construction Faul CC1CC2
Cuttmgamp Re-welding Dua to SECL Englneering Faul EC1EC2
DuetoSubcontractorFaul1 SC1SC2 middotmiddot
Oua lo SECL Construction Fault CA1CA2 middotmiddot
Addilional W9ldlngJOlnt Due lo SECL Engineering Fault EA1 EA2
DuatoSubcontractorFault SA1SA2 middotmiddot
(Englneering Fault indudesnolonlyengineelingfaullsbulalsoprocuremenlfaulls)
Ex) If Joinl No 1 is cut and re-weldad dua lo SECL Engineering Fault JOlnt No 1 will be deleted and Joint No
1EC1will be added
Appendlx I
Appendix I Welding Map Flow Chart SPQ0001EPN
REV 0
PAGE 1 OF 1
Welding Map Flow Chart
SECL Document Control Distrlbule ISO Draving lo Subcontractors
Subcontractor Subcontraclor shall draw up W9ldlng Map
bull SECL Piping I SECL QAlQC
Relliews and comments the related INelding Map from Subcontractor (if any comments Subcontractor shall re1Iact lhe comments) then retum to Subcontractor with Approved
bull SECL QAlQC (Control ofWeld Plan Data) I SECL Piping (Control of Welding Result)
SECl QAJQC shall inpul weking plan according ISO DWG in FMCS
Then after corniucting welding SECL Piping input welding data in FMC dally base then
bull SECLQAQC
QACe shall Wfify welding data according to OC inspectian reporto bull
SECLPlplngbullSECl Piping leam refers FMCS welding input status for monlhly progress payment
measurlng end final adjustment
![Page 3: Procedure Manual SPQ0001EPN.pdf](https://reader036.fdocuments.in/reader036/viewer/2022081703/5695d1131a28ab9b02950c38/html5/thumbnails/3.jpg)
SPQOOO1EPNPROCEDURE MANUAL
EfllGlNEERING REVO1- Weld Map Marking Procedure
[ DATE 2011 06 21 PAGE 3 OF S
23NeldJointDetail
8- 231 weiexclding No on ISO drawing will be gradually given in Une wtth the flow direction
) ltlo o~-c
0(5 o 2 32 Shop joint numbers should be marked by round
o 234 Fleld join number should be marked by hexagon
G 235 Reinforced pad Joint No is given as follows (Joint No 2 and 3 are reinforced pad joints)
CJX) 236 Long pipeline Join No should be marllt9d by
SPQOOO1EPNPROCEDURE MANUAL ___ ~~~~ING
REVO Weld Map Marldng Procedure
DATE 2011 06 21 PAGE 4 OF 5
iexcl-37 8pOQljOUld be numbered as SPQ01 SP-002 SP-003 aOO marked by rectangle
Spool
238 Attachmenl Joinl should be marked as following (For field atlachment joint 2 34 - hexagon is applied)
Suppor1Jointshallbe90Dsaries (ifrequired)
8 8011 Join shall be 800 series (ifrequired)
e OtherJointsshallbe700series (ifrequlred)
G 3 Rework Control
31 General Dunng Plpmg Fabncallon Work Al RewQI1laquos (Cuttlng amp Re-weldmQ and Addl~onal JOInl) shal be controlled and
recorded
32 ReworkAbbreviation
ReworkTag
Due lo SECL Construction Faul CC1CC2
Cuttmgamp Re-welding Dua to SECL Englneering Faul EC1EC2
DuetoSubcontractorFaul1 SC1SC2 middotmiddot
Oua lo SECL Construction Fault CA1CA2 middotmiddot
Addilional W9ldlngJOlnt Due lo SECL Engineering Fault EA1 EA2
DuatoSubcontractorFault SA1SA2 middotmiddot
(Englneering Fault indudesnolonlyengineelingfaullsbulalsoprocuremenlfaulls)
Ex) If Joinl No 1 is cut and re-weldad dua lo SECL Engineering Fault JOlnt No 1 will be deleted and Joint No
1EC1will be added
Appendlx I
Appendix I Welding Map Flow Chart SPQ0001EPN
REV 0
PAGE 1 OF 1
Welding Map Flow Chart
SECL Document Control Distrlbule ISO Draving lo Subcontractors
Subcontractor Subcontraclor shall draw up W9ldlng Map
bull SECL Piping I SECL QAlQC
Relliews and comments the related INelding Map from Subcontractor (if any comments Subcontractor shall re1Iact lhe comments) then retum to Subcontractor with Approved
bull SECL QAlQC (Control ofWeld Plan Data) I SECL Piping (Control of Welding Result)
SECl QAJQC shall inpul weking plan according ISO DWG in FMCS
Then after corniucting welding SECL Piping input welding data in FMC dally base then
bull SECLQAQC
QACe shall Wfify welding data according to OC inspectian reporto bull
SECLPlplngbullSECl Piping leam refers FMCS welding input status for monlhly progress payment
measurlng end final adjustment
![Page 4: Procedure Manual SPQ0001EPN.pdf](https://reader036.fdocuments.in/reader036/viewer/2022081703/5695d1131a28ab9b02950c38/html5/thumbnails/4.jpg)
SPQOOO1EPNPROCEDURE MANUAL ___ ~~~~ING
REVO Weld Map Marldng Procedure
DATE 2011 06 21 PAGE 4 OF 5
iexcl-37 8pOQljOUld be numbered as SPQ01 SP-002 SP-003 aOO marked by rectangle
Spool
238 Attachmenl Joinl should be marked as following (For field atlachment joint 2 34 - hexagon is applied)
Suppor1Jointshallbe90Dsaries (ifrequired)
8 8011 Join shall be 800 series (ifrequired)
e OtherJointsshallbe700series (ifrequlred)
G 3 Rework Control
31 General Dunng Plpmg Fabncallon Work Al RewQI1laquos (Cuttlng amp Re-weldmQ and Addl~onal JOInl) shal be controlled and
recorded
32 ReworkAbbreviation
ReworkTag
Due lo SECL Construction Faul CC1CC2
Cuttmgamp Re-welding Dua to SECL Englneering Faul EC1EC2
DuetoSubcontractorFaul1 SC1SC2 middotmiddot
Oua lo SECL Construction Fault CA1CA2 middotmiddot
Addilional W9ldlngJOlnt Due lo SECL Engineering Fault EA1 EA2
DuatoSubcontractorFault SA1SA2 middotmiddot
(Englneering Fault indudesnolonlyengineelingfaullsbulalsoprocuremenlfaulls)
Ex) If Joinl No 1 is cut and re-weldad dua lo SECL Engineering Fault JOlnt No 1 will be deleted and Joint No
1EC1will be added
Appendlx I
Appendix I Welding Map Flow Chart SPQ0001EPN
REV 0
PAGE 1 OF 1
Welding Map Flow Chart
SECL Document Control Distrlbule ISO Draving lo Subcontractors
Subcontractor Subcontraclor shall draw up W9ldlng Map
bull SECL Piping I SECL QAlQC
Relliews and comments the related INelding Map from Subcontractor (if any comments Subcontractor shall re1Iact lhe comments) then retum to Subcontractor with Approved
bull SECL QAlQC (Control ofWeld Plan Data) I SECL Piping (Control of Welding Result)
SECl QAJQC shall inpul weking plan according ISO DWG in FMCS
Then after corniucting welding SECL Piping input welding data in FMC dally base then
bull SECLQAQC
QACe shall Wfify welding data according to OC inspectian reporto bull
SECLPlplngbullSECl Piping leam refers FMCS welding input status for monlhly progress payment
measurlng end final adjustment
![Page 5: Procedure Manual SPQ0001EPN.pdf](https://reader036.fdocuments.in/reader036/viewer/2022081703/5695d1131a28ab9b02950c38/html5/thumbnails/5.jpg)
Appendlx I
Appendix I Welding Map Flow Chart SPQ0001EPN
REV 0
PAGE 1 OF 1
Welding Map Flow Chart
SECL Document Control Distrlbule ISO Draving lo Subcontractors
Subcontractor Subcontraclor shall draw up W9ldlng Map
bull SECL Piping I SECL QAlQC
Relliews and comments the related INelding Map from Subcontractor (if any comments Subcontractor shall re1Iact lhe comments) then retum to Subcontractor with Approved
bull SECL QAlQC (Control ofWeld Plan Data) I SECL Piping (Control of Welding Result)
SECl QAJQC shall inpul weking plan according ISO DWG in FMCS
Then after corniucting welding SECL Piping input welding data in FMC dally base then
bull SECLQAQC
QACe shall Wfify welding data according to OC inspectian reporto bull
SECLPlplngbullSECl Piping leam refers FMCS welding input status for monlhly progress payment
measurlng end final adjustment