Page 1: Procedure Management PTN V1_3

PROCEDUREMPLS Aggregation Network

PTN

CONFIGURATION MANAGEMENT CSG&MASG

Page 2: Procedure Management PTN V1_3

1 Document Control

Version History

This table shows a record of significant changes to the document.

Version Date Who Description of ChangeV1.0 2010-04-13 OUDDANI MustaphaV1.2 2010-06-23 DEVOS Marc LSR ID declaration

Contact Ericsson: Marc Devos Contact Mobistar : Mohamed Amraoui

Page 3: Procedure Management PTN V1_3

2 CONFIGURATION CSG

2.1 Connection CSG

Step 1: Connect SHDSL links on the SHDSL Board of the CSG. Same for ADSL.

Step 2: Connect your PC on the ETH/OAM port of the CXPA Board with RJ45 cable

The following indicators are present on the front panel of the CXPA: STAT indicator, red or green, which indicates the board working status PROG indicator, red or green, which indicates the running status of the program SYNC indicator, red or green, which indicates the clock synchronization status SRV indicator, red, yellow or green, which indicates the service status CRIT indicator, red, which indicates critical alarms MAJ indicator, orange, which indicates major alarms MIN indicator, yellow, which indicates minor alarms LINK indicator, green, which indicates the port connection status ACT indicator, yellow, which indicates the data transceiving status of the port

Step 3: Start U 2000 server and after all the processes are started, start U2000 Web LCT

The default IP of NE PTN910 is 129.9.X.X/255.255.0.0Your laptop must have an IP on this range.In case that the PTN910 was already configured, be sure that you have an IP Address in its range.For U2000 Web LCT starts use the following:

User: adminPassword: admin123

Page 4: Procedure Management PTN V1_3

Step 4: Click Auto Discovery NextThe system will start to search the NE

Step 5: When the NE is found Click stopCreate

Page 5: Procedure Management PTN V1_3

The NE will be created on U2000LCT

Use the following:

User: lctPassword: password

Step 6: Click right on the NEConfigurationupload

Page 6: Procedure Management PTN V1_3

The configuration of the NE will be uploaded on U2000LCT

Step 7: Click right NEOpen Slot Diagram

Page 7: Procedure Management PTN V1_3

Click right on the SHDSL board and ADSL boardAdd physical board

Step 8: Click right NE NE explorer

Page 8: Procedure Management PTN V1_3

Step 9: ConfigurationNE Attribute Modify NE IDEnter the values given by engineer

Page 9: Procedure Management PTN V1_3

Step 10: Communication Communication ParametersConfigure the Management IP address

IP Address: Management IP of the CSGSubnet Mask: 255.255.224.0Gateway IP address: Management IP of the MASG (Primary GNE IP Address: 10.35.63.254)

You will loose the connectivity after configuring the management IP.You need to configure your laptop with an IP on the same range of the management IP.Then you can start to configure interface and management tunnel.

Step 11: Change the LSR ID

Function Tree -> Configuration -> MPLS Management -> Basic Configuration

Note: If the LSR ID is not blank, after you modify the LSRID the softwar of PTN910 will reboot. Wait until the PTN910 software startup completely, and then do the other configuration.

2.2 Configuration Interface

2.1.1 G.SHDSL Link

Step 1:Set G.shdsl bound mode is EFM

Interface Management—》DSL Interface—》G.shdsl Interfaces—Bound Mode

Page 10: Procedure Management PTN V1_3

Step 2:Check G.shdsl link statusPort state = Data OKPort state = IDLE NOK

Interface Management—》DSL Interface—》G.shdsl InterfacesGenernal AttributesClick on “Query” button

Page 11: Procedure Management PTN V1_3

Step 3:Set G.shdsl link port mode is Layer Mix

Interface Management—》Ethernet Virtual Interface—》Genernal Attributes

Step 4:Create sub-Interface on G.shdsl link

Interface Management—》Ethernet Virtual Interface—》Genernal Attributes—》NEW

Port : 50Name : Sub-1050Port Type : VLAN Sub interface

Page 12: Procedure Management PTN V1_3

Board : Virtual PortPort : choose the port where the 4-SDH4 board is connected VLAN : 1050Specify IP Address: ManuallyIP address: set IP primary addressIP Mask : 255.255.254.0Enable tunnel : Enabled

Step 5:Check subInterface

Interface Management—》Ethernet Virtual Interface—》Layer 3 Attributes

Page 13: Procedure Management PTN V1_3

2.2.2 ADSL Link

Step 1:Set ADSL link VPC list that include DSLAM VPC configuration

Interface Management—》DSL Interface—》ADSL Interfaces—》VPI/VPC Configuration—》Configure VPI/VCI

8/35 should be there

Step 2:Set ADSL link port mode is Layer MixInterface Management—》Ethernet Virtual Interface—》Genernal Attributes

Page 14: Procedure Management PTN V1_3

Step 3:Creat subInterface on ADSL linkInterface Management—》Ethernet Virtual Interface—》Genernal Attributes—》NEW

Port : 51Name : Sub-1051Port Type : VLAN Sub interfaceBoard : Virtual PortPort : choose the port where the 3-ADS2A-1 is connected VLAN : 1051Specify IP Address: ManuallyIP address: set IP offload addressIP Mask : 255.255.254.0Enable tunnel : Enabled

Page 15: Procedure Management PTN V1_3

Step 4:Check subInterface Interface Management—》Ethernet Virtual Interface—》Layer 3 Attributes

2.2 Configuration Management

Step 1:Create Static Route for IP TunnelConfiguration—》Control Plan Configuration—》Static Route Management —》Create

Page 16: Procedure Management PTN V1_3

Two routes are needed:

Route List ID: 1 Board: Virtual EthernetPort: 50Next Hop IP Address: IP Primary of MASGDestination Node IP Address : IP Primary of MASGDestination Node Subnet Mask: 255.255.255.255

Route List ID: 2Board: Virtual EthernetPort: 50Next Hop IP Address: IP Primary of MASGDestination Node IP Address: LSR IP of MASGDestination Node Subnet Mask: 255.255.255.255

Step 2:Create LDP PeerConfiguration—》Control Plan Configuration—》MPLS-LDP Configuration —》Create

Page 17: Procedure Management PTN V1_3

Opposite IP Address: LSR IP of MASG

Step 3:Create IP TunnelIP/GRE Tunnel Management—》IP Tunnel Management —》New

Tunnel ID : automaticSource Board: Virtual EthernetSource Port: 50Destination IP Address: IP Primary of MASG

Step 4:Enable IP Tunnel for DCN

Page 18: Procedure Management PTN V1_3

Communication --》DCN Management —》Tunnel Settings—》IP Tunnel—》Enabled

3 CONFIGURATION MASG

3.1 Basic configuration

This part should be done during the commissioning

3.1.1 MASG NNI Side

Step 1:Set GE port mode is Layer MixInterface Management—》Ethernet Interface—》Port Mode

Page 19: Procedure Management PTN V1_3

Step 2:Creat VLAN subinterface with IP MASG primary and offloadInterface Management—》Ethernet Virtual Interface—》General AttributesNew

Step 3:Check VLAN subinterfaceInterface Management—》Ethernet Virtual Interface—》Layer3 Attributes

Page 20: Procedure Management PTN V1_3

3.1.2 UNI Side

Step 1:Change MASG GE port Attribute:Encapsulation Type :QinQ;MAX Frame Length:9000Function Tree—》Configuration—》Interface ManagementEthernet Interface—》General Attributes

Step 2:Change MASG GE port Layer 2 Attribute:Tag:81 00

Page 21: Procedure Management PTN V1_3

Function Tree—》Configuration—》Interface ManagementEthernet Interface—》Layer 2 Attributes

Step 3:Create QinQ Link that means create S_VLAN we need:Function Tree—》Configuration—》Ethernet Service ManagementQinQ Link—》New

Step 4:Create E_Lan service that means add S_VLAN to service:Function TreeConfigurationEthernet Service ManagementE_Lan serviceNew

Page 22: Procedure Management PTN V1_3

3.2 Configuration Management

Step 1:Create Static Route for IP TunnelConfiguration—》Control Plan Configuration—》Static Route Management —》Create

Page 23: Procedure Management PTN V1_3

Two routes are needed:

Route List ID: follow the orderBoard: Virtual EthernetPort: 50Next Hop IP Address: IP Primary of CSGDestination Node IP Address : IP Primary of CSGDestination Node Subnet Mask: 255.255.255.255

Route List ID: follow the orderBoard: Virtual EthernetPort: 50Next Hop IP Address: IP Primary of CSGDestination Node IP Address: LSR IP of CSGDestination Node Subnet Mask: 255.255.255.255

Step 2:Create LDP Peer

Configuration—》Control Plane Configuration—》MPLS-LDP Configuration —》Create

Opposite IP Address: LSR IP of CSG

Step 3:Create IP TunnelIP/GRE Tunnel Management—》IP Tunnel Management —》New

Page 24: Procedure Management PTN V1_3

Tunnel ID : AutomaticSource Board: Virtual EthernetSource Port: 50Destination IP Address: IP Primary of CSG

Step 4:Enable IP Tunnel for DCN (search by tunnel ID)Communication --》DCN Management —》Tunnel Settings—》IP Tunnel—》Enabled

4 CHECKING

4.1 ADD NE ON U2000

When the CSG and MASG is configured, you can ADD the CSG on NMS

Page 25: Procedure Management PTN V1_3

Step 1: FileDiscoveryNE

Step 2: FileTransport NE search Add Select IP Address of GNEEnter IP Mngt of MASGClick OKStart search

Step 3: Click Stop when he found the NE ID of the CSGSelect the GNE ID (ID of MASG) and then create

Page 26: Procedure Management PTN V1_3

When the NE is created: double-click on NEuploadThe configuration of CSG will be uploaded on the NMS. Then change the name of the CSG: ConfigurationAttribute

Page 27: Procedure Management PTN V1_3

4.2 CHECK THE MANAGEMENT

Step 1 : Click right on the CSG and then login to check the management

Page 28: Procedure Management PTN V1_3

Step 2 : Click right on the CSG on then do a ping to test the connectivity between the CSG and MASG

Page 29: Procedure Management PTN V1_3

5 Backup/Recover Configuration

5.1 Backup Configuration

Step 1: Administration NE Software Management NE Data Backup/Restoration

Step 2: choose the NE to backup and click “backup”

You have all the backup history on “backup information”

Page 30: Procedure Management PTN V1_3

5.2 Recover configuration

Step 1: Administration NE Software Management NE Data Backup/Restoration

Step2: choose NE to recover and click “Recover”

Step 3: Click Start and click Yes in the displayed Operation Confirmation dialog box. The processing information is displayed in the Device View area.NOTEWhen the restoration is complete, the following information will be displayed in the Device View area.

Step 4: Right-click the device icon and click Activation Database to activate the database file whichis just restored.