proc_0103B68A

3
PAGE 1 OF 3 document.doc SUEZ OIL COMPANY ZEIT BAY FIELD PRIORITY TYPE ( T ) 1 - EMERGENCY 1- REPAIR 4- FABRICATION 2 - URGENT 2- FAILURE 5- REMOD . 3 - ROUTINE 3- P.M. 6- MOB. EQUIP . JOB NUMBER ZB – 68A – B - 010 WEEK ENDING DAY EQUIPMENT / SYSTEM DESCRIPTION : OIL PLANT AIR CONDITIONED AUTH. BY DATE ORIGINATOR : EQUIPMENT TAG NUMBER (S) AIR CONDITIONED FOR: 1. POWER GENERATION TURBINES GT-1001A/B/C/D (NO. = 4) 2. SUB-STATION 10 (NO. = 4) 3. SUB-STATION 20 (NO. = 4) (NO. JOB ESTIMATES _____________________________________ PERSONNEL :-------------------------- ----------------------- MAT. / EQUIP.:--------------------------------- --------------- OTHERS :--------------------- --------------------------- TRANSPORT :-------------------------- ---------------------- SPECIAL PERMIT REQUIRED ? CO-ORDINATE WITH MATERIAL / PARTS REQUIRED UOI STOCK SERIES NUMBER PART NUMBER REMARKS :- SPECIAL TOOLS REQUIRED :- NUMBER OF MEN HOURS TAKES WORK COMPLETED BY : DATE / : / CHECKED BY : MONTH YEAR DATE : / / QTY

description

proc

Transcript of proc_0103B68A

SUEZ OIL COMPANY

ZEIT BAY FIELDS

SUCOJOB NUMBER : ZB-68A-B-010

PREVENTIVE MAINTENANCE JOB SHEETWORK ORDER NUMBER

TASKSTATUSTASK DESCRIPTIONSHEET NO. 1 OF 1

1

2

3

4

5

6

1

2

3

4

SPLIT AIR CONDITIONED

Check Ferion Gas Pressure (about 60 PSI)

Check Inlet Ampere

Clean Air Filter

Check Drain System for Blockage

Check Fan Belt TensionBlow Condense Unit

WINDOW AIR CONDITIONEDCheck Inlet Ampere

Clean Air Filter

Check Drain System for Blockage

Blow Condense Unit

QTY

DATE : / /

YEAR

MONTH

CHECKED BY :

DATE : / /

WORK COMPLETED BY :

HOURS TAKES

NUMBER OF MEN

SPECIAL TOOLS REQUIRED :-

REMARKS :-

2

2

2

PART NUMBER

STOCK SERIES NUMBER

UOI

MATERIAL / PARTS REQUIRED

CO-ORDINATE WITH

SPECIAL

PERMIT

REQUIRED ?

JOB ESTIMATES

_____________________________________

PERSONNEL :-------------------------------------------------

MAT. / EQUIP.:------------------------------------------------

OTHERS :------------------------------------------------

TRANSPORT :------------------------------------------------

MISC. :-------------------------------------------------

TOTAL : -------------------------------------

JOB ESTIMATED BY : DATE :

EQUIPMENT TAG NUMBER (S)

AIR CONDITIONED FOR:

1. POWER GENERATION TURBINES GT-1001A/B/C/D (NO. = 4)

2. SUB-STATION 10 (NO. = 4)

3. SUB-STATION 20 (NO. = 4)

4. KTI CONTROL ROOM F-1003/F-3003(NO. = 2)

5. OIL PLANT CONTROL ROOM(NO. = 2)

ORIGINATOR :

AUTH. BY DATE

EQUIPMENT / SYSTEM DESCRIPTION :

OIL PLANT AIR CONDITIONED

DAY

WEEK ENDING

ZB 68A B - 010

JOB NUMBER

PRIORITYTYPE ( T )

1- EMERGENCY 1- REPAIR 4- FABRICATION

2- URGENT 2- FAILURE 5- REMOD.

3- ROUTINE 3- P.M. 6- MOB. EQUIP.

4-

SUEZ OIL COMPANY

ZEIT BAY FIELD

PAGE 2 OF 1proc_0103B68A