Probable 1% Main Flood Dinh BinhProbable 1% Main Flood Dinh Binh Peak Discharge: 4821 m3/s, Volume:...
Transcript of Probable 1% Main Flood Dinh BinhProbable 1% Main Flood Dinh Binh Peak Discharge: 4821 m3/s, Volume:...
Figure S3.6 Probable 1% Hydrograph Main Flood at Dinh Binh, Cay Muong and Binh Thanh
Probable 1% Main Flood Dinh BinhPeak Discharge: 4821 m3/s, Volume: 590 Mm3
0500
10001500200025003000350040004500500055006000650070007500
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00
time (hours)
disc
harg
e (m
3/s)
Probable 1% Main Flood Cay MuongPeak Discharge: 6270 m3/s, Volume:840 Mm3
0500
10001500200025003000350040004500500055006000650070007500
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00
time (hours)
disc
harg
e (m
3/s)
1987 Historical Flood
Probable 1%Main Flood Binh ThanhPeak Discharge: 7370 m3/s, Volume: 1050 Mm3
0500
10001500200025003000350040004500500055006000650070007500
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00
time (hours)
disc
harg
e (m
3/s)
F-17
Figure S3.7 Probable 1% Hydrograph Early Flood at Dinh Binh, Cay Muong and Binh Thanh
Probable 1% Early Flood Dinh BinhPeak Discharge: 823 m3/s, Volume: 83 Mm3
0
200
400
600
800
1000
1200
1400
0 10 20 30 40 50 60 70 80
time (hours)
disc
harg
e (m
3/s)
Probable 1% Early Flood Cay MuongPeak Discharge: 1070 m3/s, Volume: 134 Mm3
0
200
400
600
800
1000
1200
1400
0 10 20 30 40 50 60 70 80
time (hours)
disc
harg
e (m
3/s)
Probable 1% Early Flood Binh ThanhPeak Discharge: 1258 m3/s, Volume: 180 Mm3
0
200
400
600
800
1000
1200
1400
0 10 20 30 40 50 60 70 80
time (hours)
disc
harg
e (m
3/s)
F-18
Figure S3.8 Probable 10% Hydrograph Late Flood at Dinh Binh, Cay Muong and Binh Thanh
Probable 10% Late Flood Binh ThanhPeak Discharge: 1,800 m3/s, Volume: 324 Mm3
0200400600800100012001400160018002000
0 10 20 30 40 50 60 70 80
time (hours)
disc
harg
e (m
3/s)
Probable 10% Late Flood Dinh BinhPeak Discharge: 1180 m3/s, Volume: 148 Mm3
0
500
1000
1500
2000
0 10 20 30 40 50 60 70 80
time (hours)
disc
harg
e (m
3/s)
Probable 10% Late Flood Cay MuongPeak Discharge: 1530 m3/s, Volume: 241 Mm3
0200400600800100012001400160018002000
0 10 20 30 40 50 60 70 80
time (hours)
disc
harg
e (m
3/s)
F-19
F-20
109゜00' 109゜20'108゜40'
13゜40'
14゜00'
14゜20'
14゜40'
13゜40'
14゜00'
14゜20'
14゜40'
109゜00' 109゜20'108゜40'
AN LAO
HOAI NHON
HOAI AN
VINH TANH
PHU MY
PHU CAT
TAY SON
AN NHON
TUY PHUOC
QUY NHON
VAN CHAN
KRONG PAThe Study on Nationwide Water Resources
Development and Managementin the Socialist Republic of Vietnam
JAPAN INTERNATIONAL COOPERATION AGENCY
Urban Domestic Water Demand in EachUrban Center in 2020
Figure S3.10
K BANG
AN KHE
KONG CHRO
A YUN PA
DUC PHO
BA TO
DONG XUAN
SONG CAU
0 25km155 10
N
Vinh Son Dam
Thuan Ninh Dam
Nui Mot Dam
Dinh Binh Dam
Hoi An Dam
Van Phong Weir
< Legend >
RiverRoadDam (Existing)Dam (Plan)Catchments AreaDistrict BoundaryProvince BoundaryUrban CenterUrban Domestic
Water Demand in 2020
Ngo May
Dap Da
Binh Dinh
Tuy Phuoc
Dieu Tri
Quy Nhon
Phu Phuong
[ m3/d]
[5,067m3/d]
[5,067m3/d]
[4,874m3/d]
[83,809m3/d]
[2,089m3/d]
[3,773m3/d]
[3,144m3/d]
Phu My[3,179m3/d]
F-21
The Study on Nationwide Water ResourcesDevelopment and Management
in the Socialist Republic of Vietnam
Figure S3.11
JAPAN INTERNATIONAL COOPERATION AGENCY
Schematic Presentation of Rural Domestic and IndustrialWater Demand in 2020
LEGEND: Rural DomesticWater Demand:Rural Industrial WaterDemand: Industrial Zone WaterDemand
Sea
Dinh Binh Dam
1,276m3/d [Vinh Thanh District]
49,620m3/d
Van Phong Weir
8,624m3/d [Phu Cat District]
5,794m3/d [Tay Son District]
45,217m3/d
7,794m3/d
[Tuy Phuoc District]
7,190m3/d
[An Nhon District]
1,062m3/d
[Van Canh District]
976m3/d
[Quy Nhon]
21,000m3/d
70,000m3/d
17,500m3/d
Nhon Hoi I.Z
Long My I.Z
Phu Tai I.Z
100,530m3/d
(Apex of Delta)
Binh Thanh
F-22
The Study on Nationwide Water Resources
Development and Management in the Socialist Republic of Vietnam
JAPAN INTERNATIONAL COOPERATION AGENCY
Figure S3.12 Schematic Model of Water Balance Analysis
Vinh Thanh
SEA
SEA
Domestic and Industry Dams
Existing
Proposed
Irrigation Area
Proposed
Existing Existing
LEGEND
Proposed
Suoi Chiep
Suoi
Chi
nh
Qua
ng H
ien
Suoi
But
Ha Thanh River
Da
Mai
Long
My
Long
My1
Phu Tai
Ha Thanh
Ha Thanh
Ha Thanh
Cay Da
To b
e ca
ncel
ed
in th
e Fi
nal M
/P
La Tinh
Vinh Son
Dinh Binh
Kone River
Nui Mot
Thuan Ninh
Go Cham River
Dap Da River
Tan An River
Van Phong Van Phong
Dong Sim
Phu Phong
Dap Da
Go Cham
Tan An
Tan An
Nha Phu
Thuan Weir
Thuan Hat
Ha Bac
Dap Da Lao Tam
Thu
Thie
n
Nui
Tha
p
Binh Thanh
Vinh Thanh
Hon Lap H
on G
a
Suoi
Cha
y
My
Thua
n
Truo
ng S
on
Bo Ngo
Ha Nhe
Paper Mill
F-23
Figure S3.13 Design Flood Hydrograph of 5% Probable Late Flood
0
500
1,000
1,500
2,000
2,500
3,000
3,500
0 12 24 36 48 60 72
Time (hour)
Dis
char
ge (m
3 /s)
Dinh BinhBinh ThanhF-24
The Study on Nationwide Water ResourcesDevelopment and Management
in the Socialist Republic of Vietnam
Figure S3.14
JAPAN INTERNATIONAL COOPERATION AGENCYDistribution of Flood Control Facilities ofKone River
Quy NhonCity
Thi Nai Swamp
Thuan Ninh Reservoir
Binh DinhTown
Dinh Binh Reservoir
Tay SonTown
Nui Mot Reservoir
River ChannelImprovement
River ChannelImprovement
Beo River
Cay Muong
Binh Thanh
F-25
The Study on Nationwide Water ResourcesDevelopment and Management
in the Socialist Republic of Vietnam
Figure S3.15
JAPAN INTERNATIONAL COOPERATION AGENCYDesign Discharge Distribution of KoneRiver Delta
Quy NhonCity
Thi Nai Swamp
Thuan Ninh Reservoir
Binh DinhTown
Tay SonTown
Nui Mot ReservoirBeo River
Cay Muong
Binh Thanh
Q=614m3/s
Q=627m3/s
Q=1,077m3/sQ=868m3/s
Legned:Q=10m3/s : Design Discharge
(1,960m3/s: Basic Discharge
Q=647m3/sQ=856m3/sQ=1,693m3/sQ=1,743m3/s
F-26
221
293
376
221
293
376
221
293
376
2,000
2,500
3,000
3,500
4,000
4,500
5,000
5,500
200 250 300 350 400Dinh Binh Dam Flood Control Volume (MCM)
Floo
d Pe
ak a
t Bin
h Th
anh
(m3/
s)
Figure S3.16 Relationship Between Dinh Binh Dam Flood Control Volume and Probable Major Flood Peak Discharge at Binh Thanh
10Year
20Year
50Year
221
293
376
10
11
12
13
14
15
200 250 300 350 400Dinh Binh Dam Flood Control Volume (MCM)
Floo
d C
ontro
l Ben
efit
(milli
on U
S$)
Figure S3.17 Relationship Between Dinh Binh Dam Flood Control Volume and Expected Flood Damage to be Mitigated
F-27
Phu My
Dieu Tri
Ngo May
Tuy Phuoc
Phu Phuong
Dap Da
Binh Dinh
Suoi Chiep Dam
Phu Tai Dam
109゜00' 109゜20'108゜40'
13゜40'
14゜00'
14゜20'
14゜40'
109゜00' 109゜20'108゜40'
0 25km155 10
Vinh Son Dam
Thuan Ninh Dam
Nui Mot Dam
Hoi Son Dam
N
Van Phong Weir
Dinh Binh Dam
108゜40' 109゜00'
13゜40'
14゜00'
14゜20'
13゜40'
14゜00'
14゜20'
< Legend >
RiverRoadBasin BoundaryUrban CenterDam (Existing)Dam (Planning)WeirReforestaion AreaHeightening of Sea DikeRiver ImprovemnetIndustrial Zone
PipelineExistingUnder ConstructionProposed
IrrigationExisting AreaNew Development Project Area related to Dinh Binh DamNew Independent Development Project Area
Canal
Quy Nhon
Nui HoiIndustrial Zone
Long MyIndustrial Zone
Phu TaiIndustrial Zone
Kone R
iver
Ha Th
anh Rive
r
La T
inh R
iver
Figure S3.18Location Map of Integrated River BasinManagement PlanJAPAN INTERNATIONAL COOPERATION
AGENCY
The Study on Nationwide Water ResourcesDevelopment and Management
in the Socialist Republic of Vietnam
Thuan Phong Dam
National Road No.19
National R
oad No.1
To H
o Chi M
in
To H
anoi
To An Khe Prei Ku
East Sea
Gia Lai Province
Binh Dinh Province
Kon Tum Province
Phu Yen Province
F-28