Pro moss trial at corning 12 15
21
ProMoss™ Trial at Corning Inc
-
Upload
angel-rehan -
Category
Engineering
-
view
168 -
download
3
Transcript of Pro moss trial at corning 12 15
ProMoss Trial at Corning Inc
ProMoss Trial at Corning Inc
Reggie Kornegay(left), Site Energy Manager and Chris Witte(right) Division Energy Manager Discussing ProMoss Use at Corning Diesel Facility
Scope and ObjectivesCorning Cooling Tower TrialDetermine and compare effectiveness and benefits of ProMoss on a kiln cooling towerScaleCorrosionBiological (bacterial counts and organic contamination)pH, conductivity, calcium hardnessOperating costs/savingsCompare results with a tower on traditional chemical water treatment and another with an electro- precipitator on non-chemical water treatment
Corning Criteria for SuccessSystem PerformanceDesired OutcomeCorrosionMild Steel