Prioritization of corridors for adaptive signal control ......July 21, 2015 . Basis for project...

12
Prioritization of corridors for adaptive signal control technology ITE Western District Annual Meeting Las Vegas, NV July 21, 2015

Transcript of Prioritization of corridors for adaptive signal control ......July 21, 2015 . Basis for project...

Page 1: Prioritization of corridors for adaptive signal control ......July 21, 2015 . Basis for project MAP-21 . Identify need . Planning Time Index (PTI) PTI Thresholds . ... November 2013

Prioritization of corridors for adaptive

signal control technology

ITE Western District Annual Meeting

Las Vegas, NV

July 21, 2015

Page 2: Prioritization of corridors for adaptive signal control ......July 21, 2015 . Basis for project MAP-21 . Identify need . Planning Time Index (PTI) PTI Thresholds . ... November 2013

Basis for project

MAP-21

Page 3: Prioritization of corridors for adaptive signal control ......July 21, 2015 . Basis for project MAP-21 . Identify need . Planning Time Index (PTI) PTI Thresholds . ... November 2013

Identify need

Page 4: Prioritization of corridors for adaptive signal control ......July 21, 2015 . Basis for project MAP-21 . Identify need . Planning Time Index (PTI) PTI Thresholds . ... November 2013

Planning Time Index (PTI)

Page 5: Prioritization of corridors for adaptive signal control ......July 21, 2015 . Basis for project MAP-21 . Identify need . Planning Time Index (PTI) PTI Thresholds . ... November 2013

PTI Thresholds

Page 6: Prioritization of corridors for adaptive signal control ......July 21, 2015 . Basis for project MAP-21 . Identify need . Planning Time Index (PTI) PTI Thresholds . ... November 2013

ID corridors appropriate for adaptive

control

• Traffic conditions fluctuate often

• Incidents change demand

– Crashes

– Special events

– Preemption

– Weather

• Demanding situations

with few constraints

– Low ped volumes

• System reliability

– PTI differs significantly

from TTI

Page 7: Prioritization of corridors for adaptive signal control ......July 21, 2015 . Basis for project MAP-21 . Identify need . Planning Time Index (PTI) PTI Thresholds . ... November 2013

Travel time benefit

Page 8: Prioritization of corridors for adaptive signal control ......July 21, 2015 . Basis for project MAP-21 . Identify need . Planning Time Index (PTI) PTI Thresholds . ... November 2013

Travel time benefit

Page 9: Prioritization of corridors for adaptive signal control ......July 21, 2015 . Basis for project MAP-21 . Identify need . Planning Time Index (PTI) PTI Thresholds . ... November 2013

Benefit/cost

Page 10: Prioritization of corridors for adaptive signal control ......July 21, 2015 . Basis for project MAP-21 . Identify need . Planning Time Index (PTI) PTI Thresholds . ... November 2013

Benefit/cost

Page 11: Prioritization of corridors for adaptive signal control ......July 21, 2015 . Basis for project MAP-21 . Identify need . Planning Time Index (PTI) PTI Thresholds . ... November 2013

Next steps

Page 12: Prioritization of corridors for adaptive signal control ......July 21, 2015 . Basis for project MAP-21 . Identify need . Planning Time Index (PTI) PTI Thresholds . ... November 2013